BIF III Holtwood LLC; Notice of Application for Non-Project Use of Project Land and Waters Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 83676-83677 [2024-23943]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
83676
Federal Register / Vol. 89, No. 201 / Thursday, October 17, 2024 / Notices
Accession Number: 20241010–5020.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–74–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 205(d) Rate Filing: 2024–
10–10_SA 4360 ATC-Wisconsin Power
and Light GIA (J1793) to be effective 9/
30/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5033.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–75–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 205(d) Rate Filing: 2024–
10–10_SA 4361 ATC-Ursa Solar GIA
(J1629) to be effective 10/1/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5089.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–76–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii): Forsyth Solar
LGIA Filing to be effective 10/2/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5095.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–77–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Amendment to ISA Service Agreement
No. 4425; Z2–076 to be effective 12/10/
2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5129.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–78–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: 205(d) Rate Filing: CEPC
Facility Construction Agreement to be
effective 12/10/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5151.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–79–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing:
American Transmission Systems,
Incorporated submits tariff filing per
35.13(a)(2)(iii): ATSI submits
Construction Agreement, SA No. 7267
to be effective 12/10/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5166.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–80–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
VerDate Sep<11>2014
18:31 Oct 16, 2024
Jkt 265001
Description: 205(d) Rate Filing:
American Transmission Systems,
Incorporated submits tariff filing per
35.13(a)(2)(iii): ATSI submits
Construction Agreement, SA No. 7263
to be effective 12/10/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5193.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–81–000.
Applicants: Metropolitan Edison
Company.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff to
be effective 10/11/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5213.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–82–000.
Applicants: Pennsylvania Electric
Company.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff to
be effective 10/11/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5214.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–83–000.
Applicants: Pennsylvania Power
Company.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff to
be effective 10/11/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5218.
Comment Date: 5 p.m. ET 10/31/24.
Docket Numbers: ER25–84–000.
Applicants: West Penn Power
Company.
Description: Tariff Amendment:
Notice of Cancellation of MBR Tariff to
be effective 10/11/2024.
Filed Date: 10/10/24.
Accession Number: 20241010–5220.
Comment Date: 5 p.m. ET 10/31/24.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES25–2–000; ES25–
3–000; ES25–4–000 ES25–5–000; ES25–
6–000; ES25–7–000.
Applicants: System Energy Resources,
Inc., Entergy Texas, Inc., Entergy New
Orleans, LLC, Entergy Mississippi, LLC,
Entergy Louisiana, LLC, Entergy
Arkansas, LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Entergy Arkansas, LLC, et al.
Filed Date: 10/4/24.
Accession Number: 20241004–5224.
Comment Date: 5 p.m. ET 10/25/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 10, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–23946 Filed 10–16–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 487–139]
BIF III Holtwood LLC; Notice of
Application for Non-Project Use of
Project Land and Waters Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 487–139.
c. Date Filed: June 21, 2024.
d. Applicant: BIF III Holtwood LLC.
e. Name of Project: Wallenpaupack
Hydroelectric Project.
f. Location: The Wallenpaupack
Hydroelectric Project is located in Pike
and Wayne counties, Pennsylvania; the
proposed docks would be located in
Pike County.
E:\FR\FM\17OCN1.SGM
17OCN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 201 / Thursday, October 17, 2024 / Notices
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Katie Lester,
Brookfield Renewable, (570) 226–1371,
kathleen.lester@
brookfieldrenewable.com.
i. FERC Contact: Mary Karwoski,
(678) 245–3027, mary.karwoski@
ferc.gov.
j. Cooperating Agencies: With this
notice, the Commission is inviting
federal, state, local, and Tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item k
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Deadline for filing comments,
motions to intervene, and protests:
November 12, 2024.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include the docket number P–487–139.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
VerDate Sep<11>2014
18:31 Oct 16, 2024
Jkt 265001
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: The
licensee’s application requests
Commission authorization to permit
Hunters Haven Farm, LLC (d/b/a White
Sand Springs) to construct a residential
marina. Within the project boundary,
White Sand Springs’s marina would
consist of three floating docks that could
accommodate 124 watercrafts in total.
The proposed docks conform to the
project’s approved Shoreline
Management Plan.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
83677
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 10, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–23943 Filed 10–16–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–4–000]
Panel Member List for Hydropower;
Licensing Study Dispute Resolution;
Notice Requesting Applications for
Panel Members for Hydropower
Licensing Study Dispute Resolution
This notice requests applications from
those interested in being listed as
potential panel members to assist in the
Federal Energy Regulatory
Commission’s (Commission) study
dispute resolution process for the
integrated licensing process (ILP) of
hydropower projects.
Background
The Commission’s ILP regulations
pertaining to hydroelectric licensing
under the Federal Power Act encourages
informal resolution of study
disagreements. In cases where this is not
successful, a formal study dispute
resolution process is available for state
and federal agencies or Indian tribes
with mandatory conditioning
authority.1
The ILP provides that the disputed
study must be submitted to a dispute
resolution panel consisting of a person
from Commission staff, a person from
the agency or Indian tribe referring the
1 See 5.14 of the Commission’s regulations at
https://www.ecfr.gov/current/title-18/chapter-I/
subchapter-B/part-5.
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 89, Number 201 (Thursday, October 17, 2024)]
[Notices]
[Pages 83676-83677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-23943]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 487-139]
BIF III Holtwood LLC; Notice of Application for Non-Project Use
of Project Land and Waters Accepted for Filing, Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 487-139.
c. Date Filed: June 21, 2024.
d. Applicant: BIF III Holtwood LLC.
e. Name of Project: Wallenpaupack Hydroelectric Project.
f. Location: The Wallenpaupack Hydroelectric Project is located in
Pike and Wayne counties, Pennsylvania; the proposed docks would be
located in Pike County.
[[Page 83677]]
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Katie Lester, Brookfield Renewable, (570)
226-1371, [email protected].
i. FERC Contact: Mary Karwoski, (678) 245-3027,
[email protected].
j. Cooperating Agencies: With this notice, the Commission is
inviting federal, state, local, and Tribal agencies with jurisdiction
and/or special expertise with respect to environmental issues affected
by the proposal, that wish to cooperate in the preparation of any
environmental document, if applicable, to follow the instructions for
filing such requests described in item k below. Cooperating agencies
should note the Commission's policy that agencies that cooperate in the
preparation of any environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. Deadline for filing comments, motions to intervene, and
protests: November 12, 2024.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include the docket number P-487-139. Comments
emailed to Commission staff are not considered part of the Commission
record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
l. Description of Request: The licensee's application requests
Commission authorization to permit Hunters Haven Farm, LLC (d/b/a White
Sand Springs) to construct a residential marina. Within the project
boundary, White Sand Springs's marina would consist of three floating
docks that could accommodate 124 watercrafts in total. The proposed
docks conform to the project's approved Shoreline Management Plan.
m. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
q. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: October 10, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-23943 Filed 10-16-24; 8:45 am]
BILLING CODE 6717-01-P