Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG25–7–000.
Applicants: NRG THW GT LLC.
Description: NRG THW GT LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 10/9/24.
Accession Number: 20241009–5091.
Comment Date: 5 p.m. ET 10/30/24.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL24–151–000.
Applicants: Kentucky Municipal
Energy Agency.
Description: Petition for Exemption
from Filing Fee of Kentucky Municipal
Energy Agency.
Filed Date: 10/4/24.
Accession Number: 20241004–5107.
Comment Date: 5 p.m. ET 10/25/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–2336–001.
Applicants: Duquesne Light
Company, PJM Interconnection, L.L.C.
Description: Tariff Amendment:
Duquesne Light Company submits tariff
filing per 35.17(b): PJM TOs’ Response
to the Sept. 9, 2024 Deficiency Notice in
ER24–2336 to be effective 9/20/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5073.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER24–2338–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Response to the Sept. 9, 2024 Deficiency
Notice in ER24–2338 to be effective 12/
31/9998.
Filed Date: 10/9/24.
Accession Number: 20241009–5075.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER24–2767–001.
Applicants: Pontotoc Wind, LLC.
Description: Tariff Amendment:
Amendment Response to Request
Additional Information to be effective
10/13/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5083.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER24–2787–000.
Applicants: Agway Energy Services,
LLC.
Description: Supplement to 08/15/
2024, Agway Energy Services, LLC tariff
filing.
VerDate Sep<11>2014
16:43 Oct 15, 2024
Jkt 265001
Filed Date: 10/9/24.
Accession Number: 20241009–5144.
Comment Date: 5 p.m. ET 10/21/24.
Docket Numbers: ER24–2833–001.
Applicants: Silver Peak Solar, LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective 8/23/
2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5132.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–63–000.
Applicants: Keystone Appalachian
Transmission Company, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing:
Keystone Appalachian Transmission
Company submits tariff filing per
35.13(a)(2)(iii: KATCo submits
Interconnection Agreement, SA No.
2532 with Duquesne to be effective 12/
9/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5015.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–64–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Generator Interconnection Agreement,
SA No. 7378; Project Identifier AF1–206
to be effective 9/9/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5079.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–65–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
16 to be effective 12/9/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5092.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–66–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 205(d) Rate Filing: 2024–
10–09_SA 4349 NSP-Sherco Solar 2 GIA
(J1605) to be effective 10/7/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5125.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–67–000.
Applicants: Grace Orchard Solar II,
LLC.
Description: Baseline eTariff Filing:
Grace Orchard Solar II, LLC Application
for Market-Based Rate Authorization to
be effective 12/9/2024.
Filed Date: 10/9/24.
Accession Number: 20241009–5128.
Comment Date: 5 p.m. ET 10/30/24.
Docket Numbers: ER25–68–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Original GIA Service Agreement No.
7376; AF1–208 to be effective 9/9/2024.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Filed Date: 10/9/24.
Accession Number: 20241009–5169.
Comment Date: 5 p.m. ET 10/30/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 9, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–23850 Filed 10–15–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE: October 17, 2024, 10:00
a.m.
PLACE: Room 2C, 888 First Street NE,
Washington, DC 20426.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: Agenda.
E:\FR\FM\16OCN1.SGM
16OCN1
Federal Register / Vol. 89, No. 200 / Wednesday, October 16, 2024 / Notices
Note —Items listed on the agenda may be
deleted without further notice.
CONTACT PERSON FOR MOR INFORMATION:
Debbie-Anne A. Reese, Secretary,
Telephone (202) 502–8400.
For a recorded message listing items
stricken from or added to the meeting,
call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
83473
relevant to the items on the agenda. All
public documents, however, may be
viewed online at the Commission’s
website at https://elibrary.ferc.gov/
eLibrary/search using the eLibrary link.
1118TH—MEETING
[Open meeting; October 17, 2024; 10:00 a.m.]
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 ........
A–2 ........
AD25–1–000 ................................................
AD25–2–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
ELECTRIC
E–1
E–2
E–3
E–4
........
........
........
........
RM22–7–001 ...............................................
RM22–2–000 ...............................................
ER20–2186–003, EL20–62–001 .................
EL14–12–016, EL15–45–015 ......................
E–5 ........
E–6 ........
E–7 ........
E–8 ........
E–9 ........
E–10 ......
E–11 ......
ER24–2033–000 ..........................................
ER24–1906–000 ..........................................
ER24–2039–000 ..........................................
ER24–2037–000 ..........................................
ER24–2034–000 ..........................................
EC24–79–000 ..............................................
ER13–75–013, ER15–416–003 ..................
ER13–77–012, ER15–433–003 ..................
ER13–78–013, ER15–434–003 ..................
ER13–79–011, ER15–413–003 ..................
ER13–82–011, ER15–411–008 ..................
–91–010, ER15–426–003 ...........................
ER13–96–011, ER15–431–003 ..................
ER13–97–011, ER15–430–003 ..................
ER13–105–007 ............................................
ER15–423–003, ER15–428–005 ................
ER15–424–003 ............................................
ER13–120–011, ER15–432–003 ................
EL25–4–000 ................................................
EL25–2–000 ................................................
EL25–3–000 ................................................
EL24–64–001 ..............................................
ER24–99–003 ..............................................
ER24–1221–001 ..........................................
RR24–5–000 ...............................................
E–12
E–13
E–14
E–15
......
......
......
......
Applications for Permits to Site Interstate Electric Transmission Facilities.
Compensation for Reactive Power Within the Standard Power Factor Range.
Fern Solar LLC.
Association of Businesses Advocating Tariff Equity, et al. v. Midcontinent Independent
System Operator, Inc. et al. Arkansas Electric Cooperative Corporation, et al. v.
ALLETE, Inc., et al.
GridLiance High Plains LLC.
Cheyenne Light, Fuel and Power Company.
Deseret Generation & Transmission Co-operative, Inc.
Tucson Electric Power Company.
GridLiance Heartland LLC.
Chalk Point Power, LLC, Dickerson Power, LLC, and Lanyard Power Marketing, LLC.
Public Service Company of Colorado.
Tucson Electric Power Company.
UNS Electric Inc.
Public Service Company of New Mexico.
Arizona Public Service Company.
El Paso Electric Company.
Black Hills Power, Inc.
Black Hills Colorado Electric Utility Company, LP.
NV Energy, Inc.
Nevada Power Company.
Sierra Pacific Power Company.
Cheyenne Light, Fuel & Power Company.
Basin Electric Power Cooperative, Inc.
Tri-State Generation and Transmission Association, Inc.
Deseret Generation & Transmission Co-operative, Inc.
Lackawanna Energy Center LLC v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
Southwest Power Pool, Inc.
North American Electric Reliability Corporation.
GAS
G–1 ........
RM25–2–000 ...............................................
Supplemental Review of the Oil Pipeline Index Level.
HYDRO
H–1 ........
H–2 ........
P–14513–003 ..............................................
P–606–027 ..................................................
Idaho Irrigation District and New Sweden Irrigation District.
Pacific Gas and Electric Company.
CERTIFICATES
C–1 ........
C–2 ........
lotter on DSK11XQN23PROD with NOTICES1
C–3 ........
CP24–13–000 ..............................................
CP23–543–000 ............................................
CP23–544–000 ............................................
CP23–545–000 ............................................
CP24–1–000, CP13–27–000 ......................
A free webcast of this event is
available through the Commission’s
website. Anyone with Internet access
who desires to view this event can do
so by navigating to www.ferc.gov’s
VerDate Sep<11>2014
16:43 Oct 15, 2024
Jkt 265001
MountainWest Overthrust Pipeline, LLC.
Bison Pipeline LLC.
Northern Border Pipeline Company.
Wyoming Interstate Company, L.L.C. and Fort Union Gas Gathering, L.L.C.
Cameron Interstate Pipeline, LLC.
Calendar of Events and locating this
event in the Calendar. The Federal
Energy Regulatory Commission provides
technical support for the free webcasts.
Please call (202) 502–8680 or email
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
customer@ferc.gov if you have any
questions.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
E:\FR\FM\16OCN1.SGM
16OCN1
83474
Federal Register / Vol. 89, No. 200 / Wednesday, October 16, 2024 / Notices
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters but will
not be telecast.
Issued: October 10, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024–23947 Filed 10–11–24; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2736–046]
lotter on DSK11XQN23PROD with NOTICES1
Idaho Power Company; Notice of Intent
To Prepare an Environmental
Assessment and Revising the
Processing Schedule
On February 14, 2023, Idaho Power
Company filed an application for a new
major license for the 67.5-megawatt
American Falls Hydroelectric Project
(American Falls Project; FERC No.
2736). The American Falls project is
located on the Snake River in Power
County, Idaho, near the city of
American Falls, about 25 miles
southwest of Pocatello. The project is
located at the American Falls Dam,
owned and operated by the United
States Bureau of Reclamation. The
project occupies 7.37 acres of United
States land administered by the U.S.
Bureau of Reclamation in Power
County, Idaho.
In accordance with the Commission’s
regulations, on February 7, 2024,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice and
the water quality certification issued by
Idaho DEQ, staff does not anticipate that
licensing the project would constitute a
major federal action significantly
affecting the quality of the human
environment. On April 22, 2024, the
Commission issued a notice indicating
that staff intended to prepare a draft and
final Environmental Assessment (EA).
However, upon further review, staff
intends to prepare a single EA on the
application to relicense the American
Falls Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
VerDate Sep<11>2014
16:43 Oct 15, 2024
Jkt 265001
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
By this notice, Commission staff is
updating the procedural schedule for
completing the EA. The revised
schedule is shown below. Further
revisions to the schedule may be made
as appropriate.
Milestone
Target date
Commission issues EA ......
Comments on EA ..............
January 2025.1
February 2025.
Any questions regarding this notice
may be directed to Golbahar
Mirhosseini at golbahar.mirhosseini@
ferc.gov.
Dated: October 9, 2024.
Debbie-Anne Reese,
Secretary.
[FR Doc. 2024–23848 Filed 10–15–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–12330–01–OA]
Announcement of Meeting of the
National Environmental Education
Advisory Council
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
Under the Federal Advisory
Committee Act (FACA), the
Environmental Protection Agency (EPA)
gives notice of a virtual meeting of the
National Environmental Education
Advisory Council (NEE–AC). The NEE–
AC was created by Congress to advise,
consult with, and make
recommendations to the Administrator
of the Environmental Protection Agency
(EPA) on matters related to activities,
SUMMARY:
1 The
Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) (2023)
require that EAs be completed within 1 year of the
Federal action agency’s decision to prepare an EA.
See National Environmental Policy Act, 42 U.S.C.
4321 et seq., as amended by section 107(g)(1)(B)(iii)
of the Fiscal Responsibility Act of 2023, Public Law
118–5, 4336a, 137 Stat. 42.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
functions, and policies of EPA under the
National Environmental Education Act
(the Act).
The purpose of this meeting is to
discuss specific topics of relevance by
the council to provide advice and
insights to the Agency on environmental
education.
DATES: The National Environmental
Education Advisory Council will hold a
public meeting on Thursday, October
24, 2024, from 10 a.m. until 2 p.m.
Eastern Standard Time. The meeting
will be virtual. A link for participation
will be provided upon request.
FOR FURTHER INFORMATION CONTACT:
Javier Araujo, Designated Federal
Officer, araujo.javier@epa.gov, 202–
441–8981, U.S. EPA, Office of
Environmental Education, William
Jefferson Clinton North, Room 1426,
1200 Pennsylvania Avenue NW,
Washington, DC 20460.
SUPPLEMENTARY INFORMATION: Members
of the public wishing to participate
virtually must contact the DFO by
October 14, 2024, to receive access to
the meeting. Members of the public who
wish to make brief oral comments or
provide a written statement to the NEE–
AC must contact Javier Araujo,
Designated Federal Officer, at
araujo.javier@epa.gov or 202–441–8981
by 10 business days prior to each
regularly scheduled meeting. Oral
comments at this meeting will be
limited to three minutes and will be
accommodated as time permits.
Meeting Access: For information on
access or services for individuals with
disabilities or to request
accommodations, please contact Javier
Araujo at araujo.javier@epa.gov or 202–
441–8981, preferably at least 10 days
prior to the meeting, to give EPA as
much time as possible to process your
request.
Kathryn Avivah Jakob,
Director, Office of Public Engagement and
Environmental Education.
[FR Doc. 2024–23782 Filed 10–15–24; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2024–0094; FRL–12275–01–
OCSPP]
Pesticide Registration Maintenance
Fee: Product Cancellation Order for
Certain Pesticide Registrations
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
E:\FR\FM\16OCN1.SGM
16OCN1
Agencies
[Federal Register Volume 89, Number 200 (Wednesday, October 16, 2024)]
[Notices]
[Pages 83472-83474]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-23947]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
TIME AND DATE: October 17, 2024, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: Agenda.
[[Page 83473]]
Note --Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MOR INFORMATION: Debbie-Anne A. Reese, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items stricken from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed online at the
Commission's website at https://elibrary.ferc.gov/eLibrary/search using
the eLibrary link.
1118th--MEETING
[Open meeting; October 17, 2024; 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1..................... AD25-1-000...................... Agency Administrative Matters.
A-2..................... AD25-2-000...................... Customer Matters, Reliability, Security and Market
Operations.
----------------------------------------------------------------------------------------------------------------
ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1..................... RM22-7-001...................... Applications for Permits to Site Interstate Electric
Transmission Facilities.
E-2..................... RM22-2-000...................... Compensation for Reactive Power Within the Standard
Power Factor Range.
E-3..................... ER20-2186-003, EL20-62-001...... Fern Solar LLC.
E-4..................... EL14-12-016, EL15-45-015........ Association of Businesses Advocating Tariff Equity,
et al. v. Midcontinent Independent System Operator,
Inc. et al. Arkansas Electric Cooperative
Corporation, et al. v. ALLETE, Inc., et al.
E-5..................... ER24-2033-000................... GridLiance High Plains LLC.
E-6..................... ER24-1906-000................... Cheyenne Light, Fuel and Power Company.
E-7..................... ER24-2039-000................... Deseret Generation & Transmission Co-operative, Inc.
E-8..................... ER24-2037-000................... Tucson Electric Power Company.
E-9..................... ER24-2034-000................... GridLiance Heartland LLC.
E-10.................... EC24-79-000..................... Chalk Point Power, LLC, Dickerson Power, LLC, and
Lanyard Power Marketing, LLC.
E-11.................... ER13-75-013, ER15-416-003....... Public Service Company of Colorado.
ER13-77-012, ER15-433-003....... Tucson Electric Power Company.
ER13-78-013, ER15-434-003....... UNS Electric Inc.
ER13-79-011, ER15-413-003....... Public Service Company of New Mexico.
ER13-82-011, ER15-411-008....... Arizona Public Service Company.
-91-010, ER15-426-003........... El Paso Electric Company.
ER13-96-011, ER15-431-003....... Black Hills Power, Inc.
ER13-97-011, ER15-430-003....... Black Hills Colorado Electric Utility Company, LP.
ER13-105-007.................... NV Energy, Inc.
ER15-423-003, ER15-428-005...... Nevada Power Company.
ER15-424-003.................... Sierra Pacific Power Company.
ER13-120-011, ER15-432-003...... Cheyenne Light, Fuel & Power Company.
EL25-4-000...................... Basin Electric Power Cooperative, Inc.
EL25-2-000...................... Tri-State Generation and Transmission Association,
Inc.
EL25-3-000...................... Deseret Generation & Transmission Co-operative, Inc.
E-12.................... EL24-64-001..................... Lackawanna Energy Center LLC v. PJM Interconnection,
L.L.C.
E-13.................... ER24-99-003..................... PJM Interconnection, L.L.C.
E-14.................... ER24-1221-001................... Southwest Power Pool, Inc.
E-15.................... RR24-5-000...................... North American Electric Reliability Corporation.
----------------------------------------------------------------------------------------------------------------
GAS
----------------------------------------------------------------------------------------------------------------
G-1..................... RM25-2-000...................... Supplemental Review of the Oil Pipeline Index Level.
----------------------------------------------------------------------------------------------------------------
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1..................... P-14513-003..................... Idaho Irrigation District and New Sweden Irrigation
District.
H-2..................... P-606-027....................... Pacific Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1..................... CP24-13-000..................... MountainWest Overthrust Pipeline, LLC.
C-2..................... CP23-543-000.................... Bison Pipeline LLC.
CP23-544-000.................... Northern Border Pipeline Company.
CP23-545-000.................... Wyoming Interstate Company, L.L.C. and Fort Union
Gas Gathering, L.L.C.
C-3..................... CP24-1-000, CP13-27-000......... Cameron Interstate Pipeline, LLC.
----------------------------------------------------------------------------------------------------------------
A free webcast of this event is available through the Commission's
website. Anyone with Internet access who desires to view this event can
do so by navigating to www.ferc.gov's Calendar of Events and locating
this event in the Calendar. The Federal Energy Regulatory Commission
provides technical support for the free webcasts. Please call (202)
502-8680 or email [email protected] if you have any questions.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission
[[Page 83474]]
Meeting Room. Members of the public may view this briefing in the
designated overflow room. This statement is intended to notify the
public that the press briefings that follow Commission meetings may now
be viewed remotely at Commission headquarters but will not be telecast.
Issued: October 10, 2024.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2024-23947 Filed 10-11-24; 4:15 pm]
BILLING CODE 6717-01-P