Midcontinent Independent System Operator, Inc., PJM Interconnection, L.L.C., Southwest Power Pool, Inc., ISO New England, Inc.; Notice of Extension of Time, 83008 [2024-23745]
Download as PDF
83008
Federal Register / Vol. 89, No. 199 / Tuesday, October 15, 2024 / Notices
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Docket Nos. EL24–80–000; EL24–81–000;
EL24–82–000; EL24–83–000]
Federal Energy Regulatory
Commission
Midcontinent Independent System
Operator, Inc., PJM Interconnection,
L.L.C., Southwest Power Pool, Inc., ISO
New England, Inc.; Notice of Extension
of Time
[Project No. 2300–052]
Great Lakes Hydro America, LLC;
Notice of Availability of Final
Environmental Assessment
khammond on DSKJM1Z7X2PROD with NOTICES
[FR Doc. 2024–23743 Filed 10–11–24; 8:45 am]
DEPARTMENT OF ENERGY
[FR Doc. 2024–23674 Filed 10–11–24; 8:45 am]
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Shelburne
Hydroelectric Project, located on the
Androscoggin River in Coos County,
New Hampshire and has prepared a
Final Environmental Assessment (FEA)
for the project. No Federal land is
occupied by project works or located
within the project boundary.
The FEA contains staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the FEA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
16:35 Oct 11, 2024
Dated: October 8, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
BILLING CODE 6717–01–P
Dated: October 7, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
VerDate Sep<11>2014
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any questions regarding this notice
may be directed to Ryan Hansen at (202)
502–8074 or ryan.hansen@ferc.gov.
Jkt 265001
On September 30, 2024, Advanced
Energy Economy, the American Clean
Power Association, and the Solar Energy
Industries Association (collectively, the
Clean Energy Associations) filed a
motion for a 14-day extension of time—
from October 11, 2024 to October 25,
2024—for interested entities to submit
responses in the above-referenced
proceedings.1 No answers were filed.
Upon consideration, notice is hereby
given that an extension of time for
interested entities to file responses in
the above-referenced proceedings is
granted to and including October 25,
2024.
Dated: October 8, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–23745 Filed 10–11–24; 8:45 am]
BILLING CODE 6717–01–P
1 Midcontinent Indep. Sys. Operator, Inc., 187
FERC ¶ 61,170, at P 72 & ordering para. (E) (2024).
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Western Area Power Administration
Provo River Project—Rate Order No.
WAPA–221
Western Area Power
Administration, DOE.
ACTION: Notice of proposed formula rate
for power service.
AGENCY:
The Colorado River Storage
Project Management Center (CRSP MC)
of the Western Area Power
Administration (WAPA) proposes a new
formula rate for the Provo River Project
(PRP) power service. The existing rate
for this service expires on March 31,
2025. This rate action proposes no
change to the existing formula rate
under Rate Schedule PR–2 other than
extending the effective date for a 5-year
period through March 31, 2030.
DATES: A consultation and comment
period will begin October 15, 2024 and
end November 14, 2024. CRSP MC will
accept written comments any time
during the consultation and comment
period.
ADDRESSES: Written comments and
requests to be informed of Federal
Energy Regulatory Commission (FERC)
actions concerning the proposed
formula rate submitted by WAPA to
FERC for approval should be sent to:
Rodney Bailey, CRSP Manager, CRSP
MC, Western Area Power
Administration, 1800 South Rio Grande
Drive, Montrose, CO 81401, or email:
CRSPMC-rateadj@wapa.gov. The CRSP
MC will post information about the
proposed formula rate and written
comments received to its website at:
www.wapa.gov/about-wapa/regions/
crsp/rates/.
FOR FURTHER INFORMATION CONTACT:
Tamala Gheller, Rates Manager, CRSP
MC, Western Area Power
Administration, (970) 240–6545 or
email: gheller@wapa.gov.
SUPPLEMENTARY INFORMATION: On June
10, 2020, FERC approved and confirmed
Rate Schedule PR–2 under Rate Order
No. WAPA–189 on a final basis through
March 31, 2025.1 This schedule applies
to PRP power service.
The existing formula rate provides
sufficient revenue to recover annual
costs within the cost recovery criteria
set forth in Department of Energy (DOE)
Order RA 6120.2. The proposed rate
continues the formula-based
methodology that includes an annual
update to the financial data in the rate
formula. CRSP MC intends the proposed
SUMMARY:
1 Order Confirming and Approving Rate Schedule
on a Final Basis, FERC Docket No. EF20–1–000.
E:\FR\FM\15OCN1.SGM
15OCN1
Agencies
[Federal Register Volume 89, Number 199 (Tuesday, October 15, 2024)]
[Notices]
[Page 83008]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-23745]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL24-80-000; EL24-81-000; EL24-82-000; EL24-83-000]
Midcontinent Independent System Operator, Inc., PJM
Interconnection, L.L.C., Southwest Power Pool, Inc., ISO New England,
Inc.; Notice of Extension of Time
On September 30, 2024, Advanced Energy Economy, the American Clean
Power Association, and the Solar Energy Industries Association
(collectively, the Clean Energy Associations) filed a motion for a 14-
day extension of time--from October 11, 2024 to October 25, 2024--for
interested entities to submit responses in the above-referenced
proceedings.\1\ No answers were filed.
---------------------------------------------------------------------------
\1\ Midcontinent Indep. Sys. Operator, Inc., 187 FERC ] 61,170,
at P 72 & ordering para. (E) (2024).
---------------------------------------------------------------------------
Upon consideration, notice is hereby given that an extension of
time for interested entities to file responses in the above-referenced
proceedings is granted to and including October 25, 2024.
Dated: October 8, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-23745 Filed 10-11-24; 8:45 am]
BILLING CODE 6717-01-P