Green Mountain Power Corporation; Notice of Intent To Prepare an Environmental Assessment, 83006 [2024-23664]
Download as PDF
83006
Federal Register / Vol. 89, No. 199 / Tuesday, October 15, 2024 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2288–057]
[Project No. 2490–031]
Central Rivers Power, NH LLC; Notice
of Availability of Final Environmental
Assessment
Green Mountain Power Corporation;
Notice of Intent To Prepare an
Environmental Assessment
[FR Doc. 2024–23664 Filed 10–11–24; 8:45 am]
On August 30, 2022, the Green
Mountain Power Corporation filed a
minor relicense application for the 0.5megawatt Taftsville Hydroelectric
Project No. 2490 (project). The project is
located on the Ottauquechee River in
the Village of Taftsville, in Windsor
County, Vermont. No Federal or Tribal
lands occur within or adjacent to the
project boundary.
In accordance with the Commission’s
regulations, on June 12, 2024,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, staff does not
anticipate that licensing the project
would constitute a major Federal action
significantly affecting the quality of the
human environment. Therefore, staff
intends to prepare an Environmental
Assessment (EA) on the application to
relicense the project.1
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
DEPARTMENT OF ENERGY
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Gorham
Hydroelectric Project, located on the
Androscoggin River in Coos County,
New Hampshire and has prepared a
Final Environmental Assessment (FEA)
for the project. No federal land is
occupied by project works or located
within the project boundary.
The FEA contains staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the FEA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any questions regarding this notice
may be directed to Ryan Hansen at (202)
502–8074 or ryan.hansen@ferc.gov.
khammond on DSKJM1Z7X2PROD with NOTICES
Any questions regarding this notice
may be directed to David Gandy at (202)
502–8560 or david.gandy@ferc.gov.
DEPARTMENT OF ENERGY
Dated: October 7, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Milestone
Commission issues
EA.
Dated: October 7, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Target date
August 25, 2025.
[FR Doc. 2024–23670 Filed 10–11–24; 8:45 am]
1 In accordance with the Council on
Environmental Quality’s regulations, the unique
identification number for documents relating to this
environmental review is EAXX–019–20–000–
1728292340. 40 CFR 1501.5(c)(4) (2024).
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:35 Oct 11, 2024
Jkt 265001
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. CP24–524–000]
BBT AlaTenn, LLC; Notice of Request
Under Blanket Authorization and
Establishing Intervention and Protest
Deadline
Take notice that on September 24,
2024, BBT AlaTenn, LLC (AlaTenn)
filed in the above referenced docket, a
prior notice request pursuant to sections
157.205(b), 157.208(b), and 157.210, of
the Commission’s regulations under the
Natural Gas Act (NGA) and AlaTenn’s
blanket certificate issued in Docket No.
CP85–359–000, for authorization to (1)
construct approximately 3,800 feet of
16-inch-diameter pipeline; (2) acquire a
37-mile-long pipeline (Trigas Line); and
(3) construct new piping and valves to
connect the acquired Trigas Line to
AlaTenn’s system, all located in Colbert
County, Alabama (AlaTenn Pride Loop
Project). The Project will enable
AlaTenn to provide its customers with
enhanced gas supply access and
increased operational flexibility. The
estimated cost of the project is
$4,241,541, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
E:\FR\FM\15OCN1.SGM
15OCN1
Agencies
[Federal Register Volume 89, Number 199 (Tuesday, October 15, 2024)]
[Notices]
[Page 83006]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-23664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2490-031]
Green Mountain Power Corporation; Notice of Intent To Prepare an
Environmental Assessment
On August 30, 2022, the Green Mountain Power Corporation filed a
minor relicense application for the 0.5-megawatt Taftsville
Hydroelectric Project No. 2490 (project). The project is located on the
Ottauquechee River in the Village of Taftsville, in Windsor County,
Vermont. No Federal or Tribal lands occur within or adjacent to the
project boundary.
In accordance with the Commission's regulations, on June 12, 2024,
Commission staff issued a notice that the project was ready for
environmental analysis (REA Notice). Based on the information in the
record, staff does not anticipate that licensing the project would
constitute a major Federal action significantly affecting the quality
of the human environment. Therefore, staff intends to prepare an
Environmental Assessment (EA) on the application to relicense the
project.\1\
---------------------------------------------------------------------------
\1\ In accordance with the Council on Environmental Quality's
regulations, the unique identification number for documents relating
to this environmental review is EAXX-019-20-000-1728292340. 40 CFR
1501.5(c)(4) (2024).
---------------------------------------------------------------------------
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members, and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA...................... August 25, 2025.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to David Gandy
at (202) 502-8560 or [email protected].
Dated: October 7, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-23664 Filed 10-11-24; 8:45 am]