Low Head Hydro M 11, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 80549 [2024-22848]
Download as PDF
Federal Register / Vol. 89, No. 192 / Thursday, October 3, 2024 / Notices
period notice will be the only public
comment notice published for this
information collection.
Dated: September 30, 2024.
Kun Mullan,
PRA Coordinator, Strategic Collections and
Clearance, Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2024–22792 Filed 10–2–24; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15360–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Low Head Hydro M 11, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 4, 2024, Low Head Hydro M
11, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
proposed Mississippi Locks and Dam 11
Hydroelectric Project, a hydropower
project proposed to be located at the
U.S. Army Corps of Engineers’ (Corps)
Mississippi Lock and Dam located on
the Mississippi River, near Dubuque,
Iowa. The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Mississippi Locks and
Dam 11 Hydroelectric Project would
consist of the following: (1) an
impoundment approximately 19,613
acres with a storage capacity of 170,000
acre-feet; (2) a 200-foot-long and 300foot-wide intake area located upstream
of the powerhouse; (3) a 120-foot long
and 276-foot-wide powerhouse located
adjacent to the left bank of the existing
Corps’ dam; (4) nine vertical Kaplan
turbine-generators rated at 1.57
megawatt (MW) each installed in the
new powerhouse, for a total installed
capacity of 14.13 MW; (5) a 13megavolt-ampere, 4.16/69-kilovolt (kV)
three-phase step-up transformer located
adjacent to the powerhouse in a new,
50-foot-wide by 60-foot-long substation;
(6) a 1.52-mile-long, single overhead
three-phase 69-kV line extending from
the substation to the interconnection
VerDate Sep<11>2014
17:59 Oct 02, 2024
Jkt 265001
point; (7) new concrete guide walls
constructed upstream and downstream
of the powerhouse; (8) a 276-foot-wide
and 400-foot-long unlined earthen
excavation tailrace area having stone
riprap placed in the areas of higher
velocity; and (9) appurtenant facilities.
The proposed project would have an
estimated annual generation of 91
gigawatt-hours.
Applicant Contact: Allen W. Skelly,
Low Head Hydro M 11, LLC, 127
Longwood Blvd., Mount Orab, Ohio
45154; phone: (937) 802–8866.
FERC Contact: Shivani Khetani;
phone: (212) 273–5917, or by email at
shivani.khetani@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
80549
The first page of any filing should
include docket number P–15360–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15360) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 27, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–22848 Filed 10–2–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RM19–15–002; AD16–16–002]
Qualifying Facility Rates and
Requirements Implementation Issues
Under the Public Utility Regulatory
Policies Act of 1978; Notice of
Schedule for the Preparation of an
Environmental Assessment for
Qualifying Facility Rates and
Requirements Implementation Issues
Under the Public Utility Regulatory
Policies Act of 1978
On July 16, 2020, the Federal Energy
Regulatory Commission (Commission)
issued Order No. 872,1 approving
certain revisions to its regulations
implementing sections 201 and 210 of
the Public Utility Regulatory Policies
Act of 1978 (PURPA).2 On September 5,
2023, the U.S. Court of Appeals for the
Ninth Circuit (Ninth Circuit) remanded
Order No. 872, without vacatur, based
on its finding that, pursuant to the
National Environmental Policy Act
(NEPA),3 the Commission must prepare
an environmental assessment (EA)
analyzing the potential impacts of the
rule on climate change and air quality.4
This notice identifies Commission
staff’s intention to prepare an EA for
Order No. 872 and sets forth the
1 Qualifying Facility Rates & Requirements;
Implementation Issues Under the Pub. Util. Regul.
Policies Act of 1978, Order No. 872, 172 FERC
¶ 61,041, order on reh’g, Order No. 872–A, 173
FERC ¶ 61,158 (2020), aff’d in part and remanded
in part sub nom. Solar Energy Indus. Ass’n v. FERC,
80 F.4th 956 (9th Cir. 2023) (Solar Energy).
2 16 U.S.C. 796(17)–(18), 824a–3.
3 42 U.S.C. 4321 et seq.; see also 18 CFR pt. 380
(2023) (Commission’s regulations implementing
NEPA).
4 Solar Energy, 80 F.4th at 996–97.
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 89, Number 192 (Thursday, October 3, 2024)]
[Notices]
[Page 80549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-22848]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15360-000]
Low Head Hydro M 11, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On June 4, 2024, Low Head Hydro M 11, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the proposed Mississippi
Locks and Dam 11 Hydroelectric Project, a hydropower project proposed
to be located at the U.S. Army Corps of Engineers' (Corps) Mississippi
Lock and Dam located on the Mississippi River, near Dubuque, Iowa. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed Mississippi Locks and Dam 11 Hydroelectric Project
would consist of the following: (1) an impoundment approximately 19,613
acres with a storage capacity of 170,000 acre-feet; (2) a 200-foot-long
and 300-foot-wide intake area located upstream of the powerhouse; (3) a
120-foot long and 276-foot-wide powerhouse located adjacent to the left
bank of the existing Corps' dam; (4) nine vertical Kaplan turbine-
generators rated at 1.57 megawatt (MW) each installed in the new
powerhouse, for a total installed capacity of 14.13 MW; (5) a 13-
megavolt-ampere, 4.16/69-kilovolt (kV) three-phase step-up transformer
located adjacent to the powerhouse in a new, 50-foot-wide by 60-foot-
long substation; (6) a 1.52-mile-long, single overhead three-phase 69-
kV line extending from the substation to the interconnection point; (7)
new concrete guide walls constructed upstream and downstream of the
powerhouse; (8) a 276-foot-wide and 400-foot-long unlined earthen
excavation tailrace area having stone riprap placed in the areas of
higher velocity; and (9) appurtenant facilities. The proposed project
would have an estimated annual generation of 91 gigawatt-hours.
Applicant Contact: Allen W. Skelly, Low Head Hydro M 11, LLC, 127
Longwood Blvd., Mount Orab, Ohio 45154; phone: (937) 802-8866.
FERC Contact: Shivani Khetani; phone: (212) 273-5917, or by email
at [email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Debbie-
Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any
filing should include docket number P-15360-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15360) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 27, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-22848 Filed 10-2-24; 8:45 am]
BILLING CODE 6717-01-P