Combined Notice of Filings, 80553-80554 [2024-22752]
Download as PDF
Federal Register / Vol. 89, No. 192 / Thursday, October 3, 2024 / Notices
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: September 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–22754 Filed 10–2–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2322–069; 2322–071; 2325–
100; Project No. 2574–092; Project No.
2611–091]
ddrumheller on DSK120RN23PROD with NOTICES1
Brookfield White Pine Hydro, LLC,
Merimil Limited Partnership, HydroKennebec, LLC; Notice of Revised
Procedural Schedule for
Environmental Impact Statement for
the Proposed Project Relicense,
Interim Species Protection Plan, and
Final Species Protection Plan
Milestone
Issue Final EIS ..........
On January 31, 2020, Brookfield
White Pine Hydro, LLC filed an
application for a new license to
continue to operate and maintain the
8.65-megawatt (MW) Shawmut
Hydroelectric Project No. 2322
(Shawmut Project). On June 1, 2021, in
a separate compliance proceeding for
the Shawmut Project, Brookfield White
Pine Hydro, LLC filed an Interim
Species Protection Plan (Interim Plan)
for Atlantic salmon and requested
Commission approval to amend the
current Shawmut license to incorporate
the Interim Plan. The Interim Plan
includes measures to protect
endangered Atlantic salmon until the
Commission issues a decision on the
relicense application for the Shawmut
Project.
Also on June 1, 2021, Brookfield
Power US Asset Management, LLC
(Brookfield), on behalf of the affiliated
licensees for the 6.915–MW Lockwood
Hydroelectric Project No. 2574, 15.433–
MW Hydro-Kennebec Hydroelectric
Project No. 2611, and 15.98–MW
Weston Hydroelectric Project No. 2325,
filed a Final Species Protection Plan
(Final Plan) for Atlantic salmon,
Atlantic sturgeon, and shortnose
sturgeon and requested Commission
approval to amend the three project
licenses to incorporate the Final Plan.
All four projects are located on the
VerDate Sep<11>2014
17:59 Oct 02, 2024
Jkt 265001
Kennebec River, in Kennebec and
Somerset Counties, Maine.
On November 23, 2021, Commission
staff issued a notice of intent to prepare
a draft and final Environmental Impact
Statement (EIS) to evaluate the effects of
relicensing the Shawmut Project and
amending the licenses of all four
projects to incorporate the measures in
the Interim and Final Plans. The notice
of intent included a schedule for
preparing a draft and final EIS. The
schedule was updated on September 18,
2023.1
The draft EIS was issued on March 28,
2024. Extensive verbal and written
comments on the draft EIS were filed by
state and federal resource agencies, nongovernmental organizations, Indian
Tribes, and the public. The comments
need to be considered in the final EIS.
Therefore, by this notice, Commission
staff is updating the procedural
schedule for completing the final EIS.
The revised schedule is shown below.
Further revisions to the schedule may
be made as appropriate.
Target date
February 28, 2025
Any questions regarding this notice
may be directed to Marybeth Gay at
Marybeth.gay@ferc.gov or Matt Cutlip at
Matt.Cutlip@ferc.gov.
Dated: September 24, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–22851 Filed 10–2–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24–1073–000.
Applicants: Carolina Gas
Transmission, LLC.
Description: 4(d) Rate Filing: CGT—
2024 FRQ and TDA Report to be
effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5017.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1074–000.
Applicants: ANR Pipeline Company.
1 The final EIS was scheduled to be issued by
September 2024.
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
80553
Description: 4(d) Rate Filing: Devon
Gas Services 140141—Non-Conforming
to be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5021.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1075–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: 4(d) Rate Filing:
Negotiated Rates—Yankee Gas to Emera
eff 9–26–24 to be effective 9/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5024.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1076–000.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: 4(d) Rate Filing: EGTS—
September 26, 2024 Negotiated Rate and
Nonconforming Service Agreements to
be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5028.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1077–000.
Applicants: ETC Tiger Pipeline, LLC.
Description: 4(d) Rate Filing: Update
to GT&C Section 33 to be effective 10/
26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5032.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1078–000.
Applicants: ANR Pipeline Company.
Description: 4(d) Rate Filing: GT&C—
Early Termination Filing to be effective
10/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5030.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1080–000.
Applicants: Viking Gas Transmission
Company.
Description: 4(d) Rate Filing: Fuel and
Loss Retention Adjustment—Fall 2024
to be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5046.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1081–000.
Applicants: Enable Gas Transmission,
LLC.
Description: 4(d) Rate Filing: ThirdParty Capacity Tariff Provisions to be
effective 10/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5047.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1082–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Shell Oct 2024) to be effective 10/1/
2024.
Filed Date: 9/26/24.
E:\FR\FM\03OCN1.SGM
03OCN1
ddrumheller on DSK120RN23PROD with NOTICES1
80554
Federal Register / Vol. 89, No. 192 / Thursday, October 3, 2024 / Notices
Accession Number: 20240926–5052.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1083–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreements Update
(AEPCO Oct 2024) to be effective 10/1/
2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5089.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24–1084–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreements Update
(Sempra Oct 2024) to be effective 10/1/
2024.
Filed Date: 9/26/24.
Accession Number: 20240926–5094.
Comment Date: 5 p.m. ET 10/8/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–22752 Filed 10–2–24; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:59 Oct 02, 2024
Jkt 265001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15296–002]
Tivis Branch Hydro, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process
(TLP).
b. Project No.: 15296–002.
c. Date Filed: July 25, 2024.
d. Submitted By: Tivis Branch Hydro,
LLC (Tivis Branch Hydro).
e. Name of Project: Flannagan
Hydroelectric Project.
f. Location: The project would be
located at the U.S. Army Corps of
Engineers’ (Corps) John W. Flannagan
Dam and Reservoir, on the Pound River
near the Town of Clintwood, Dickenson
County, Virginia. The project would
occupy about 1 acre of Federal land
administered by the Corps.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
David Duquette, Chief Executive Officer,
Littoral Power Systems, 5 Dover Street,
Suite 102, New Bedford, MA 02740.
Phone: (508) 436–4102, email:
dduquette@littoralpower.com.
i. FERC Contact: Martha Becton,
Phone: (202) 502–8335, Email:
martha.becton@ferc.gov.
j. Tivis Branch Hydro filed its request
to use the Traditional Licensing Process
on July 25, 2024, and provided public
notice of its request on August 22, 2024.
In a letter dated September 27, 2024, the
Director of the Division of Hydropower
Licensing approved Tivis Branch Hydro,
LLC’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Virginia State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
PO 00000
Frm 00103
Fmt 4703
Sfmt 4703
l. Tivis Branch Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD may be viewed
on the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
You may register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. The applicant states its
unequivocal intent to submit an
application for an original license for
Project No. 15296.
o. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 27, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–22849 Filed 10–2–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–285–000.
Applicants: Kalamazoo Generating
Station, LLC.
Description: Kalamazoo Generating
Station, LLC submits Amendment to
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 9/27/24.
Accession Number: 20240927–5028.
Comment Date: 5 p.m. ET 10/18/24.
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 89, Number 192 (Thursday, October 3, 2024)]
[Notices]
[Pages 80553-80554]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-22752]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24-1073-000.
Applicants: Carolina Gas Transmission, LLC.
Description: 4(d) Rate Filing: CGT--2024 FRQ and TDA Report to be
effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5017.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1074-000.
Applicants: ANR Pipeline Company.
Description: 4(d) Rate Filing: Devon Gas Services 140141--Non-
Conforming to be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5021.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1075-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: 4(d) Rate Filing: Negotiated Rates--Yankee Gas to
Emera eff 9-26-24 to be effective 9/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5024.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1076-000.
Applicants: Eastern Gas Transmission and Storage, Inc.
Description: 4(d) Rate Filing: EGTS--September 26, 2024 Negotiated
Rate and Nonconforming Service Agreements to be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5028.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1077-000.
Applicants: ETC Tiger Pipeline, LLC.
Description: 4(d) Rate Filing: Update to GT&C Section 33 to be
effective 10/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5032.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1078-000.
Applicants: ANR Pipeline Company.
Description: 4(d) Rate Filing: GT&C--Early Termination Filing to be
effective 10/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5030.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1080-000.
Applicants: Viking Gas Transmission Company.
Description: 4(d) Rate Filing: Fuel and Loss Retention Adjustment--
Fall 2024 to be effective 11/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5046.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1081-000.
Applicants: Enable Gas Transmission, LLC.
Description: 4(d) Rate Filing: Third-Party Capacity Tariff
Provisions to be effective 10/26/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5047.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1082-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: 4(d) Rate Filing: Negotiated Rate Agreement Update
(Shell Oct 2024) to be effective 10/1/2024.
Filed Date: 9/26/24.
[[Page 80554]]
Accession Number: 20240926-5052.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1083-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: 4(d) Rate Filing: Negotiated Rate Agreements Update
(AEPCO Oct 2024) to be effective 10/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5089.
Comment Date: 5 p.m. ET 10/8/24.
Docket Numbers: RP24-1084-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: 4(d) Rate Filing: Negotiated Rate Agreements Update
(Sempra Oct 2024) to be effective 10/1/2024.
Filed Date: 9/26/24.
Accession Number: 20240926-5094.
Comment Date: 5 p.m. ET 10/8/24.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: September 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-22752 Filed 10-2-24; 8:45 am]
BILLING CODE 6717-01-P