Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 74934-74935 [2024-20831]

Download as PDF 74934 Federal Register / Vol. 89, No. 178 / Friday, September 13, 2024 / Notices elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: September 9, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–20830 Filed 9–12–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PH24–12–000] Unison Energy, LLC; Tiger Infrastructure Partners Fund III AIV U LP; Notice Tolling 60-Day Period for Action To Allow for Further Consideration To afford additional time for further consideration of the matters at issue in the above-captioned proceeding, the 60day period for action is hereby tolled. See 18 CFR 366.4(b)(1) (2023). Dated: September 6, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–20770 Filed 9–12–24; 8:45 am] khammond on DSKJM1Z7X2PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 17:53 Sep 12, 2024 Jkt 262001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–516–000] Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on August 30, 2024, Florida Gas Transmission Company, LLC (FGT), 1300 Main St., Houston, Texas 77002, filed in the above referenced docket, a prior notice request pursuant to sections 157.205, 157.208, 157.210, and 157.211 of the Commission’s regulations under the Natural Gas Act (NGA), and FGT’s blanket certificate issued in Docket No. CP82–553–000, for authorization to: (1) complete minor auxiliary facility modifications at its existing Compressor Station 13 in Washington County, Florida; (2) construct 2.57 miles of 12inch-diameter lateral loop pipeline in Putnam County, Florida; (3) modify the existing Palatka—CertainTeed Gypsum Meter and Regulation Station in Putnam County, Florida; and (4) construct appurtenant facilities under section 2.55(a) of the Commission’s regulations (Palatka Project or Project). The Project will allow FGT to add up to 12,000 million British thermal units per day of additional firm capacity to serve the CertainTeed Gypsum Palatka, LLC’s gypsum plant in Palatka, Florida. The estimated cost for the Project is $19,300,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at (202) 502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Any questions concerning this request should be directed to Blair Lichtenwalter, Senior Director of Certificates, Florida Gas Transmission Company, LLC, 1300 Main St., Houston, Texas 77002, or phone (713) 989–2605, or fax (713) 989–1205, or by email blair.lichtenwalter@energytransfer.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on November 8, 2024. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 2 Persons E:\FR\FM\13SEN1.SGM 13SEN1 Federal Register / Vol. 89, No. 178 / Friday, September 13, 2024 / Notices the protest deadline, which is November 8, 2024. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. khammond on DSKJM1Z7X2PROD with NOTICES Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is November 8, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before November 8, 2024. The filing of a comment alone 4 18 5 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 17:53 Sep 12, 2024 Jkt 262001 will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP24–516–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP24–516– 000. To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: DebbieAnne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at Blair Lichtenwalter, Senior Director of Certificates, Florida Gas Transmission Company, LLC, 1300 Main St., Houston, Texas 77002, or by email (with a link to the document) at blair.lichtenwalter@energytransfer.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 74935 Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: September 9, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–20831 Filed 9–12–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC24–118–000. Applicants: Shady Hills Power Company, L.L.C. Description: Application for Authorization Under Section 203 of the Federal Power Act of Shady Hills Power Company, L.L.C. Filed Date: 9/6/24. Accession Number: 20240906–5223. Comment Date: 5 p.m. ET 9/27/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER23–1851–009. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Third Status Report—Amended ISA–CSA, SA Nos. 6917–6918; Queue No. AD1–031 to be effective 10/26/2023. Filed Date: 9/9/24. Accession Number: 20240909–5077. Comment Date: 5 p.m. ET 9/30/24. Docket Numbers: ER23–2764–003. Applicants: Northeastern Power & Gas, LLC. Description: Response to 07/02/2024 Deficiency Letter of Northeastern Power & Gas, LLC. Filed Date: 8/30/24. Accession Number: 20240830–5357. E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 89, Number 178 (Friday, September 13, 2024)]
[Notices]
[Pages 74934-74935]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-20831]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP24-516-000]


Florida Gas Transmission Company, LLC; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on August 30, 2024, Florida Gas Transmission 
Company, LLC (FGT), 1300 Main St., Houston, Texas 77002, filed in the 
above referenced docket, a prior notice request pursuant to sections 
157.205, 157.208, 157.210, and 157.211 of the Commission's regulations 
under the Natural Gas Act (NGA), and FGT's blanket certificate issued 
in Docket No. CP82-553-000, for authorization to: (1) complete minor 
auxiliary facility modifications at its existing Compressor Station 13 
in Washington County, Florida; (2) construct 2.57 miles of 12-inch-
diameter lateral loop pipeline in Putnam County, Florida; (3) modify 
the existing Palatka--CertainTeed Gypsum Meter and Regulation Station 
in Putnam County, Florida; and (4) construct appurtenant facilities 
under section 2.55(a) of the Commission's regulations (Palatka Project 
or Project). The Project will allow FGT to add up to 12,000 million 
British thermal units per day of additional firm capacity to serve the 
CertainTeed Gypsum Palatka, LLC's gypsum plant in Palatka, Florida. The 
estimated cost for the Project is $19,300,000, all as more fully set 
forth in the request which is on file with the Commission and open to 
public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov). From 
the Commission's Home Page on the internet, this information is 
available on eLibrary. The full text of this document is available on 
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or 
downloading. To access this document in eLibrary, type the docket 
number excluding the last three digits of this document in the docket 
number field.
    User assistance is available for eLibrary and the Commission's 
website during normal business hours from FERC Online Support at (202) 
502-6652 (toll free at 1-866-208-3676) or email at 
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at 
[email protected].
    Any questions concerning this request should be directed to Blair 
Lichtenwalter, Senior Director of Certificates, Florida Gas 
Transmission Company, LLC, 1300 Main St., Houston, Texas 77002, or 
phone (713) 989-2605, or fax (713) 989-1205, or by email 
[email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on November 8, 2024. 
How to file protests, motions to intervene, and comments is explained 
below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by

[[Page 74935]]

the protest deadline, which is November 8, 2024. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is November 8, 2024. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before November 8, 2024. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP24-516-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP24-516-000.
    To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    To file via any other method: Debbie-Anne A. Reese, Acting 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.
    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail at Blair Lichtenwalter, Senior Director of Certificates, 
Florida Gas Transmission Company, LLC, 1300 Main St., Houston, Texas 
77002, or by email (with a link to the document) at 
[email protected]. Any subsequent submissions by 
an intervenor must be served on the applicant and all other parties to 
the proceeding. Contact information for parties can be downloaded from 
the service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: September 9, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-20831 Filed 9-12-24; 8:45 am]
BILLING CODE 6717-01-P