Mississippi Hub, LLC; Notice of Revised Schedule for Environmental Review of the MS Hub Capacity Expansion Project, 73645-73646 [2024-20588]
Download as PDF
73645
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 89, No. 176 / Wednesday, September 11, 2024 / Notices
foot-high, concrete, power intake tower
with openings on three sides protected
by steel trashracks; (9) a 25-foot-4-inchhigh, concrete, intake tower with
openings on three sides, each of which
is protected by steel trashracks that
receives water for the outlet works; (10)
a 760-foot-long, 8-foot-diameter concrete
tunnel through the left abutment of the
main dam that conveys water from the
power intake to the powerhouse; (11) a
steel-reinforced, concrete powerhouse
with a 6.8-megawatt, vertical-shaft,
Francis-type turbine, which discharges
to the Bear River at the base of the main
dam; (12) a 350-foot-long, 48-inchdiameter steel pipe that conveys water
from the intake structure to a valve
chamber for the outlet works; (13) a 400foot-long, 7.5-foot-diameter concretelined horseshoe tunnel that connects to
the valve chamber; (14) a 48-inchdiameter, outlet valve with a capacity of
500 cubic feet per second that
discharges directly into the Bear River;
(15) a fenced switchyard adjacent to the
powerhouse; (16) two recreation areas
with campgrounds, day-use areas, boat
ramps, restrooms, and sewage holding
ponds; and (17) a water system that
includes two pumps in the reservoir
delivering water to a treatment facility
that is piped to a 60,000-gallon storage
tank to supply water to recreation
facilities. The project has no
transmission facilities. The estimated
average annual generation (1976 to
2014) is 20,381 megawatt-hours.
South Sutter Water District proposes
to: (1) raise the normal maximum water
surface elevation (NMWSE) of the
project reservoir by approximately 5 feet
from an elevation of 300 feet to an
elevation of 304.8 feet; (2) raise the crest
of the existing spillway from an
elevation of 300 feet to an elevation of
304.8 feet to accommodate the proposed
pool raise; (3) construct an ogee-type
weir secondary spillway structure at an
elevation of 304.8 feet; (4) excavate a
new unlined spillway inlet channel to
divert water from the reservoir into the
new secondary spillway; (5) construct a
new 805-foot-long unlined outlet
channel to convey water back from the
secondary spillway to the existing
spillway; (6) construct a 300-foot-long
bridge to provide access to the
secondary spillway and allow vehicles
to pass over the dam and along
Blackford Road; (7) modify the existing
Blackford Road by raising the west end
15 feet to accommodate the approach to
the new bridge; (8) relocate, reroute, or
realign approximately 104 recreation
facilities and replacement or
rehabilitation of recreation facilities to
maintain their proper functioning
VerDate Sep<11>2014
17:42 Sep 10, 2024
Jkt 262001
condition; (9) add an existing 0.25-mile
road as a primary project road to access
the powerhouse and switchyard; and
(10) modify the project boundary to
account for: the removal of the 1.9-milelong transmission line from the license
in 1991; corrections based on current
project operation and maintenance; and
changes to the project boundary to
account for the new reservoir surface
level.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
For assistance, contact FERC Online
Support.
n. The applicant must file no later
than 60 days following the date of
issuance of this notice: (1) a copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Deadline for Filing Comments, Recommendations,
and Agency Terms and
Conditions/Prescriptions.
Licensee’s Reply to REA
Comments.
Date
November 4,
2024.
December 19,
2024.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: September 5, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–20592 Filed 9–10–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–80–000]
Mississippi Hub, LLC; Notice of
Revised Schedule for Environmental
Review of the MS Hub Capacity
Expansion Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
Mississippi Hub, LLC’s MS Hub
Capacity Expansion Project. The first
notice of schedule, issued on May 17,
2024, identified August 16, 2024, as the
EA issuance date. However, additional
time was required for Mississippi Hub,
LLC to file complete responses to staff’s
environmental information requests,
and for staff to review those responses.
As a result, staff has revised the
schedule for issuance of the EA.
Schedule for Environmental Review
Issuance of the EA: October 30, 2024
E:\FR\FM\11SEN1.SGM
11SEN1
73646
Federal Register / Vol. 89, No. 176 / Wednesday, September 11, 2024 / Notices
90-day Federal Authorization Decision
Deadline: 1 January 28, 2025
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
lotter on DSK11XQN23PROD with NOTICES1
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP24–80), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
1 The Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
VerDate Sep<11>2014
17:42 Sep 10, 2024
Jkt 262001
Dated: September 5, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
(EcoEnergy_Sempra 2024) to be effective
9/5/2024.
Filed Date: 9/5/24.
Accession Number: 20240905–5099.
Comment Date: 5 p.m. ET 9/17/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings Instituting Proceedings
Filings in Existing Proceedings
Docket Numbers: PR24–93–000.
Applicants: KeySpan Gas East
Corporation.
Description: § 284.123 Rate Filing:
Revised Statement of Operating
Conditions to be effective 11/1/2024.
Filed Date: 9/4/24.
Accession Number: 20240904–5189.
Comment Date: 5 p.m. ET 9/25/24.
Docket Numbers: PR24–94–000.
Applicants: The Brooklyn Union Gas
Company.
Description: § 284.123 Rate Filing:
Revised Statement of Operating
Conditions to be effective 11/1/2024.
Filed Date: 9/5/24.
Accession Number: 20240905–5000.
Comment Date: 5 p.m. ET 9/26/24.
Docket Numbers: RP24–1050–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
9–1–24 to be effective 9/1/2024.
Filed Date: 9/4/24.
Accession Number: 20240904–5107.
Comment Date: 5 p.m. ET 9/16/24.
Docket Numbers: RP24–1051–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing:
Revisions to Sections 8.6 & 8.25 to be
effective 10/11/2024.
Filed Date: 9/5/24.
Accession Number: 20240905–5033.
Comment Date: 5 p.m. ET 9/17/24.
Docket Numbers: RP24–1052–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: DPEs—
Piedmont (Tidewater and Spray) to be
effective 10/6/2024.
Filed Date: 9/5/24.
Accession Number: 20240905–5072.
Comment Date: 5 p.m. ET 9/17/24.
Docket Numbers: RP24–1053–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreements Update
Docket Numbers: RP24–994–001.
Applicants: Midcontinent Express
Pipeline LLC.
Description: Tariff Amendment:
Amendment RP24–994 Negotiated Rate
Agreement to be effective 9/1/2024.
Filed Date: 8/29/24.
Accession Number: 20240829–5248.
Comment Date: 5 p.m. ET 9/9/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
[FR Doc. 2024–20588 Filed 9–10–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
PO 00000
Frm 00026
Fmt 4703
Sfmt 9990
Dated: September 5, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–20587 Filed 9–10–24; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 89, Number 176 (Wednesday, September 11, 2024)]
[Notices]
[Pages 73645-73646]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-20588]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-80-000]
Mississippi Hub, LLC; Notice of Revised Schedule for
Environmental Review of the MS Hub Capacity Expansion Project
This notice identifies the Federal Energy Regulatory Commission
staff's revised schedule for the completion of the environmental
assessment (EA) for Mississippi Hub, LLC's MS Hub Capacity Expansion
Project. The first notice of schedule, issued on May 17, 2024,
identified August 16, 2024, as the EA issuance date. However,
additional time was required for Mississippi Hub, LLC to file complete
responses to staff's environmental information requests, and for staff
to review those responses. As a result, staff has revised the schedule
for issuance of the EA.
Schedule for Environmental Review
Issuance of the EA: October 30, 2024
[[Page 73646]]
90-day Federal Authorization Decision Deadline: \1\ January 28, 2025
---------------------------------------------------------------------------
\1\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP24-80), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: September 5, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-20588 Filed 9-10-24; 8:45 am]