Combined Notice of Filings #1, 72387-72388 [2024-19968]

Download as PDF Federal Register / Vol. 89, No. 172 / Thursday, September 5, 2024 / Notices the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. Dated: August 29, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–19973 Filed 9–4–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG24–265–000. Applicants: Clearview Solar I, LLC. Description: Clearview Solar I, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/29/24. Accession Number: 20240829–5050. Comment Date: 5 p.m. ET 9/19/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER23–2979–004. Applicants: CPV Maple Hill Solar, LLC. Description: Compliance filing: Informational Filing Regarding Planned Transfer to be effective N/A. Filed Date: 8/29/24. Accession Number: 20240829–5213. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2906–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: Revisions to Incorporate a Mark-toAuction Collateral Requirement for TCR Market to be effective 5/1/2025. Filed Date: 8/28/24. Accession Number: 20240828–5162. Comment Date: 5 p.m. ET 9/18/24. Docket Numbers: ER24–2907–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT submits Amended IA, SA No. 4578 to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5028. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2908–000. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C. VerDate Sep<11>2014 22:19 Sep 04, 2024 Jkt 262001 Description: 205(d) Rate Filing: American Electric Power Service Corporation submits tariff filing per 35.13(a)(2)(iii: AEPSC submits I&M and NIPSCO CIAC SA No. 7262 to be effective 8/21/2024. Filed Date: 8/29/24. Accession Number: 20240829–5039. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2909–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation of WMPA, SA No. 6020; Queue No. AG1–141 to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5051. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2910–000. Applicants: PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 3349; U2–073/Z2–013/AB2–038 to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5056. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2911–000. Applicants: Entergy Louisiana, LLC. Description: 205(d) Rate Filing: ELL Amite LBA Agreement to be effective 8/ 31/2024. Filed Date: 8/29/24. Accession Number: 20240829–5058. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2912–000. Applicants: Bluegrass Solar, LLC. Description: Compliance filing: Informational Filing Pursuant to Schedule 2 of the PJM Interconnection to be effective N/A. Filed Date: 8/29/24. Accession Number: 20240829–5061. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2913–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 205(d) Rate Filing: 2024– 08–29_SA 4344 NSP-Northern Prairie Solar II GIA (J1657) to be effective 8/19/ 2024. Filed Date: 8/29/24. Accession Number: 20240829–5064. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2914–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 205(d) Rate Filing: 2024– 08–29_SA 4345 DPC-ibV Energy GIA (J1808) to be effective 8/20/2024. Filed Date: 8/29/24. Accession Number: 20240829–5065. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2915–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 72387 Description: 205(d) Rate Filing: American Transmission Systems, Incorporated submits tariff filing per 35.13(a)(2)(iii: ATSI submits One Construction Services Agreement, SA No. 6940 to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5091. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2916–000. Applicants: PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: Original GIA Service Agreement No. 7338, AG1–223 to be effective 7/30/ 2024. Filed Date: 8/29/24. Accession Number: 20240829–5104. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2917–000. Applicants: California Independent System Operator Corporation. Description: 205(d) Rate Filing: 2024– 08–29 WEIM Implementation Agreement—Black Hills to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5145. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2918–000. Applicants: Midcontinent Independent System Operator, Inc., Montana-Dakota Utilities Co. Description: 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2024–08–29_SA 4329 4330 MDU-Bowman Wind MPFP FCA & FSA to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5150. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2919–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT submits One Construction Agreement, SA No. 7219 to be effective 10/29/2024. Filed Date: 8/29/24. Accession Number: 20240829–5157. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2920–000. Applicants: Clearview Solar I, LLC. Description: Baseline eTariff Filing: Application for MBR Authorization to be effective 10/1/2024. Filed Date: 8/29/24. Accession Number: 20240829–5171. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2921–000. Applicants: Boswell Wind, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 8/30/2024. E:\FR\FM\05SEN1.SGM 05SEN1 72388 Federal Register / Vol. 89, No. 172 / Thursday, September 5, 2024 / Notices Filed Date: 8/29/24. Accession Number: 20240829–5173. Comment Date: 5 p.m. ET 9/19/24. Docket Numbers: ER24–2922–000. Applicants: Last Mile Transmission, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 8/30/2024. Filed Date: 8/29/24. Accession Number: 20240829–5212. Comment Date: 5 p.m. ET 9/19/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 29, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–19968 Filed 9–4–24; 8:45 am] BILLING CODE 6717–01–P Dated: August 29, 2024. Debbie-Anne A. Reese, Acting Secretary. DEPARTMENT OF ENERGY khammond on DSKJM1Z7X2PROD with NOTICES submitted a tariff filing per 301.1: DSW_ BCP_FY2025BaseCharge-20240825 to be effective 10/1/2024. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Comment Date: 5:00 p.m. Eastern Time on September 25, 2024. [FR Doc. 2024–19970 Filed 9–4–24; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. EF24–9–000] Western Area Power Administration; Notice of Filing Take notice that on August 26, 2024, Western Area Power Administration VerDate Sep<11>2014 22:19 Sep 04, 2024 Jkt 262001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–494–000] Black Bayou Gas Storage, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Black Bayou Gas Storage Project, and Notice of Public Scoping Session The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts of the Black Bayou Gas Storage Project involving construction and operation of facilities by Black Bayou Gas Storage, LLC (Black Bayou) in Cameron and Calcasieu Parishes, Louisiana. The Commission will use this environmental document in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00pm Eastern Time on September 27, 2024. Comments may be submitted in written or oral form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. E:\FR\FM\05SEN1.SGM 05SEN1

Agencies

[Federal Register Volume 89, Number 172 (Thursday, September 5, 2024)]
[Notices]
[Pages 72387-72388]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-19968]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG24-265-000.
    Applicants: Clearview Solar I, LLC.
    Description: Clearview Solar I, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5050.
    Comment Date: 5 p.m. ET 9/19/24.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER23-2979-004.
    Applicants: CPV Maple Hill Solar, LLC.
    Description: Compliance filing: Informational Filing Regarding 
Planned Transfer to be effective N/A.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5213.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2906-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: Revisions to Incorporate a Mark-
to-Auction Collateral Requirement for TCR Market to be effective 5/1/
2025.
    Filed Date: 8/28/24.
    Accession Number: 20240828-5162.
    Comment Date: 5 p.m. ET 9/18/24.

    Docket Numbers: ER24-2907-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT 
submits Amended IA, SA No. 4578 to be effective 10/29/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5028.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2908-000.
    Applicants: American Electric Power Service Corporation, PJM 
Interconnection, L.L.C.
    Description: 205(d) Rate Filing: American Electric Power Service 
Corporation submits tariff filing per 35.13(a)(2)(iii: AEPSC submits 
I&M and NIPSCO CIAC SA No. 7262 to be effective 8/21/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5039.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2909-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Notice of Cancellation of WMPA, SA 
No. 6020; Queue No. AG1-141 to be effective 10/29/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5051.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2910-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Amendment to ISA, Service 
Agreement No. 3349; U2-073/Z2-013/AB2-038 to be effective 10/29/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5056.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2911-000.
    Applicants: Entergy Louisiana, LLC.
    Description: 205(d) Rate Filing: ELL Amite LBA Agreement to be 
effective 8/31/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5058.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2912-000.
    Applicants: Bluegrass Solar, LLC.
    Description: Compliance filing: Informational Filing Pursuant to 
Schedule 2 of the PJM Interconnection to be effective N/A.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5061.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2913-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 205(d) Rate Filing: 2024-08-29_SA 4344 NSP-Northern 
Prairie Solar II GIA (J1657) to be effective 8/19/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5064.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2914-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 205(d) Rate Filing: 2024-08-29_SA 4345 DPC-ibV Energy 
GIA (J1808) to be effective 8/20/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5065.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2915-000.
    Applicants: American Transmission Systems, Incorporated, PJM 
Interconnection, L.L.C.
    Description: 205(d) Rate Filing: American Transmission Systems, 
Incorporated submits tariff filing per 35.13(a)(2)(iii: ATSI submits 
One Construction Services Agreement, SA No. 6940 to be effective 10/29/
2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5091.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2916-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Original GIA Service Agreement No. 
7338, AG1-223 to be effective 7/30/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5104.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2917-000.
    Applicants: California Independent System Operator Corporation.
    Description: 205(d) Rate Filing: 2024-08-29 WEIM Implementation 
Agreement--Black Hills to be effective 10/29/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5145.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2918-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Montana-Dakota Utilities Co.
    Description: 205(d) Rate Filing: Midcontinent Independent System 
Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2024-08-29_SA 
4329 4330 MDU-Bowman Wind MPFP FCA & FSA to be effective 10/29/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5150.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2919-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT 
submits One Construction Agreement, SA No. 7219 to be effective 10/29/
2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5157.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2920-000.
    Applicants: Clearview Solar I, LLC.
    Description: Baseline eTariff Filing: Application for MBR 
Authorization to be effective 10/1/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5171.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2921-000.
    Applicants: Boswell Wind, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
8/30/2024.

[[Page 72388]]

    Filed Date: 8/29/24.
    Accession Number: 20240829-5173.
    Comment Date: 5 p.m. ET 9/19/24.

    Docket Numbers: ER24-2922-000.
    Applicants: Last Mile Transmission, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
8/30/2024.
    Filed Date: 8/29/24.
    Accession Number: 20240829-5212.
    Comment Date: 5 p.m. ET 9/19/24.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: August 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-19968 Filed 9-4-24; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.