Energy Stream, LLC; Notice of Authorization for Continued Project Operation, 70619-70620 [2024-19504]

Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 89, No. 169 / Friday, August 30, 2024 / Notices Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.15: Paper Shell Solar 1 LGIA Termination Filing to be effective 8/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5095. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2848–000. Applicants: Troutdale Grid, LLC. Description: Baseline eTariff Filing: Troutdale Grid, LLC Application for Market-Based Rate Authorization to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5102. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2849–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2024–08–23_SA 4328 NSP-Three Waters Wind Farm GIA (S1013) to be effective 8/9/2024. Filed Date: 8/23/24. Accession Number: 20240823–5109. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2850–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 5596; Queue No. AD1–020 to be effective 10/ 23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5115. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2851–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Rate Schedule FERC No. 14 to be effective 10/22/2024. Filed Date: 8/23/24. Accession Number: 20240823–5120. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2852–000. Applicants: New England Power Company. Description: Tariff Amendment: 2024–08–23 Notice of Cancellation of CRA with Holden Municipal Light Dept. to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5121. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2853–000. Applicants: Duke Energy Florida, LLC. Description: Tariff Amendment: DEFCity of Mount Dora, FMPP, OUC RS No. 366 Cancellation to be effective 10/31/ 2024. Filed Date: 8/23/24. VerDate Sep<11>2014 20:35 Aug 29, 2024 Jkt 262001 Accession Number: 20240823–5123. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2854–000. Applicants: Aron Energy Prepay 44 LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5127. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2855–000. Applicants: Aron Energy Prepay 45 LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5132. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2856–000. Applicants: Aron Energy Prepay 46 LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5133. Comment Date: 5 p.m. ET 9/13/24. Docket Numbers: ER24–2857–000. Applicants: Aron Energy Prepay 47 LLC. Description: Baseline eTariff Filing: Baseline new to be effective 10/23/2024. Filed Date: 8/23/24. Accession Number: 20240823–5138. Comment Date: 5 p.m. ET 9/13/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 70619 assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 23, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–19489 Filed 8–29–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5679–000] Energy Stream, LLC; Notice of Authorization for Continued Project Operation The license for the M.S.C. Hydroelectric Project No. 5679 was issued for a period ending July 31, 2024. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 5679 is issued to Energy Stream, LLC for a period effective August 1, 2024, through July 31, 2025, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before July 31, 2025, notice is hereby given that, pursuant to 18 CFR 16.18(c), E:\FR\FM\30AUN1.SGM 30AUN1 70620 Federal Register / Vol. 89, No. 169 / Friday, August 30, 2024 / Notices an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Energy Stream, LLC is authorized to continue operation of the M.S.C. Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. Dated: August 23, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–19504 Filed 8–29–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: ddrumheller on DSK120RN23PROD with NOTICES1 Filings Instituting Proceedings Docket Numbers: RP24–991–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing: 2024 Operational Entitlements Filing to be effective N/A. Filed Date: 8/26/24. Accession Number: 20240826–5044. Comment Date: 5 p.m. ET 9/9/24. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP20–1060–010. Applicants: Columbia Gas Transmission, LLC. Description: Report Filing: Annual LPS Informational Filing to be effective N/A. Filed Date: 8/23/24. Accession Number: 20240823–5073. Comment Date: 5 p.m. ET 9/4/24. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 20:35 Aug 29, 2024 Jkt 262001 The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 26, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–19573 Filed 8–29–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2326 is issued to Great Lakes Hydro America, LLC for a period effective August 1, 2024, through July 31, 2025, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before July 31, 2025, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Great Lakes Hydro America, LLC is authorized to continue operation of the Cross Power Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. Dated: August 23, 2024. Debbie-Anne A. Reese, Acting Secretary. [Project No. 2326–000] Great Lakes Hydro America, LLC; Notice of Authorization for Continued Project Operation [FR Doc. 2024–19497 Filed 8–29–24; 8:45 am] The license for the Cross Power Hydroelectric Project No. 2326 was issued for a period ending July 31, 2024. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the DEPARTMENT OF ENERGY PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL24–135–000. Applicants: Freeman Solar LLC v. PJM Interconnection, L.L.C. Description: Complaint of Freeman Solar LLC v. PJM Interconnection, L.L.C. Filed Date: 8/23/24. Accession Number: 20240823–5162. Comment Date: 5 p.m. ET 9/12/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2386–005. Applicants: Great Bay Solar I, LLC. E:\FR\FM\30AUN1.SGM 30AUN1

Agencies

[Federal Register Volume 89, Number 169 (Friday, August 30, 2024)]
[Notices]
[Pages 70619-70620]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-19504]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 5679-000]


Energy Stream, LLC; Notice of Authorization for Continued Project 
Operation

    The license for the M.S.C. Hydroelectric Project No. 5679 was 
issued for a period ending July 31, 2024.
    Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the 
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and 
conditions of the prior license until a new license is issued, or the 
project is otherwise disposed of as provided in section 15 or any other 
applicable section of the FPA. If the project's prior license waived 
the applicability of section 15 of the FPA, then, based on section 9(b) 
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth 
at 18 CFR 16.21(a), if the licensee of such project has filed an 
application for a subsequent license, the licensee may continue to 
operate the project in accordance with the terms and conditions of the 
license after the minor or minor part license expires, until the 
Commission acts on its application. If the licensee of such a project 
has not filed an application for a subsequent license, then it may be 
required, pursuant to 18 CFR 16.21(b), to continue project operations 
until the Commission issues someone else a license for the project or 
otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 5679 is issued to 
Energy Stream, LLC for a period effective August 1, 2024, through July 
31, 2025, or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first.
    If issuance of a new license (or other disposition) does not take 
place on or before July 31, 2025, notice is hereby given that, pursuant 
to 18 CFR 16.18(c),

[[Page 70620]]

an annual license under section 15(a)(1) of the FPA is renewed 
automatically without further order or notice by the Commission, unless 
the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Energy Stream, LLC is authorized to continue 
operation of the M.S.C. Hydroelectric Project under the terms and 
conditions of the prior license until the issuance of a subsequent 
license for the project or other disposition under the FPA, whichever 
comes first.

    Dated: August 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-19504 Filed 8-29-24; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.