Central Rivers Power NH, LLC; Notice of Authorization for Continued Project Operation, 70624 [2024-19492]
Download as PDF
70624
Federal Register / Vol. 89, No. 169 / Friday, August 30, 2024 / Notices
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first.
If issuance of a new license (or other
disposition) does not take place on or
before July 31, 2025, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Central Rivers Power NH, LLC is
authorized to continue operation of the
Gorham Hydroelectric Project under the
terms and conditions of the prior license
until the issuance of a subsequent
license for the project or other
disposition under the FPA, whichever
comes first.
Dated: August 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–19493 Filed 8–29–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: August 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[Project No. 2287–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Central Rivers Power NH, LLC; Notice
of Authorization for Continued Project
Operation
The license for the J. Brodie Smith
Hydroelectric Project No. 2287 was
issued for a period ending July 31, 2024.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
VerDate Sep<11>2014
20:35 Aug 29, 2024
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2287
is issued to Central Rivers Power NH,
LLC for a period effective August 1,
2024, through July 31, 2025, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first.
If issuance of a new license (or other
disposition) does not take place on or
before July 31, 2025, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Central Rivers Power NH, LLC is
authorized to continue operation of the
J. Brodie Smith Hydroelectric Project
under the terms and conditions of the
prior license until the issuance of a
subsequent license for the project or
other disposition under the FPA,
whichever comes first.
Jkt 262001
[FR Doc. 2024–19492 Filed 8–29–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–513–000]
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 15, 2024,
WBI Energy Transmission, Inc. (WBI
Energy), 1250 West Century Avenue,
Bismarck, North Dakota 58503, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.208(b) of the
Commission’s regulations under the
Natural Gas Act (NGA), and WBI
Energy’s blanket certificate issued in
Docket No. CP82–487–000, et al., for
authorization to acquire from ONEOK
Rockies Midstream, L.L.C. and operate
an approximately 28-mile, 10.75-inchdiameter pipeline (Ft. Buford Pipeline
System) located in McKenzie County,
North Dakota. The purchase will
provide operational flexibility on WBI
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Energy’s Line Section 6. The purchase
price is $17 million, all as more fully set
forth in the request which is on file with
the Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to Lori Myerchin,
Vice President, Regulatory Affairs and
Transportation Services, WBI Energy
Transmission, Inc., 1250 West Century
Avenue, Bismarck, North Dakota 58503,
by phone at (701) 530–1563, or by email
at lori.myerchin@wbienergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 22, 2024. How
to file protests, motions to intervene,
and comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 89, Number 169 (Friday, August 30, 2024)]
[Notices]
[Page 70624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-19492]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2287-000]
Central Rivers Power NH, LLC; Notice of Authorization for
Continued Project Operation
The license for the J. Brodie Smith Hydroelectric Project No. 2287
was issued for a period ending July 31, 2024.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2287 is issued to
Central Rivers Power NH, LLC for a period effective August 1, 2024,
through July 31, 2025, or until the issuance of a new license for the
project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take
place on or before July 31, 2025, notice is hereby given that, pursuant
to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA
is renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Central Rivers Power NH, LLC is authorized to
continue operation of the J. Brodie Smith Hydroelectric Project under
the terms and conditions of the prior license until the issuance of a
subsequent license for the project or other disposition under the FPA,
whichever comes first.
Dated: August 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-19492 Filed 8-29-24; 8:45 am]