Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 64438-64440 [2024-17396]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
64438
Federal Register / Vol. 89, No. 152 / Wednesday, August 7, 2024 / Notices
Applicants: West Texas Gas Utility,
LLC.
Description: Annual Purchased Gas
Cost Reconciliation Report of West
Texas Gas Utility, LLC.
Filed Date: 7/31/24.
Accession Number: 20240731–5036.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–926–000.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: 4(d) Rate Filing: EGTS—
Revision Clarifying Incremental Electric
Power Costs to be effective 9/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5038.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–927–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: Compliance filing: MRT
RP20–131 and RP20–212, et seq. Cost
and Revenue Study Compliance Filing
to be effective N/A.
Filed Date: 7/31/24.
Accession Number: 20240731–5041.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–928–000.
Applicants: MountainWest Overthrust
Pipeline, LLC.
Description: Annual Fuel Gas
Reimbursement Report of
MountainWest Overthrust Pipeline,
LLC.
Filed Date: 7/31/24.
Accession Number: 20240731–5043.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–929–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreements Update
(Hartree 614700 615843 610670 Aug
2024) to be effective 8/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5044.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–930–000.
Applicants: Kern River Gas
Transmission Company.
Description: 4(d) Rate Filing: 2024 BP,
Concord, Constellation TSA Term
Amendments to be effective 8/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5048.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–931–000.
Applicants: Honeoye Storage
Corporation.
Description: Compliance filing: HSC
2024 Rate Case Compliance Filing to be
effective 9/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5054.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–932–000.
Applicants: Kern River Gas
Transmission Company.
VerDate Sep<11>2014
17:07 Aug 06, 2024
Jkt 262001
Description: 4(d) Rate Filing: 2024
KRF–1 Form of Service Exhibit A Filing
to be effective 9/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5057.
Comment Date: 5 p.m. ET 8/12/24.
Docket Numbers: RP24–933–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: 4(d) Rate Filing:
Negotiated Rate—Citadel Energy
Marketing to be effective 9/1/2024.
Filed Date: 7/31/24.
Accession Number: 20240731–5070.
Comment Date: 5 p.m. ET 8/12/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: July 31, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–17398 Filed 8–6–24; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–500–000]
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on July 19, 2024,
Florida Gas Transmission Company,
LLC (FGT), 1300 Main St., Houston,
Texas 77002, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205, 157.208,
157.210, and 157.211 of the
Commission’s regulations under the
Natural Gas Act (NGA), and FTG’s
blanket certificate issued in Docket No.
CP82–553–000, for authorization to
increase certificated mainline capacity,
and to construct, modify, own, maintain
and operate interstate natural gas
delivery point and appurtenant
facilities, consisting of an additional
alternate feed connection and a meter
station upgrade; appurtenant facility
maintenance replacement on a
compressor unit at FGT’s existing
Compressor Station 10 (CS 10) and other
appurtenant facilities as needed. All of
the above facilities are located in St.
Helena Parish, Louisiana and Perry
County, Mississippi (Livingston Parish
Project). The project will allow FGT to
transport incremental certificated firm
transportation capacity up to 4.0 million
cubic feet per day (MMcf/d) to the
existing City of Walker Meter Station
delivery point to be upgraded by FGT,
and to be utilized by the City of Walker,
La (City of Walker, Customer, or
Shipper) primarily for residential use
through the City of Walker gas system.
The estimated cost for the project is
$985,000, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
E:\FR\FM\07AUN1.SGM
07AUN1
Federal Register / Vol. 89, No. 152 / Wednesday, August 7, 2024 / Notices
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Florida Gas Transmission
Company, LLC, 1300 Main St., Houston,
Texas, 77002, at (713) 989–2605, or
blair.lichtenwalter@energytransfer.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 30, 2024.
How to file protests, motions to
intervene, and comments is explained
below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
khammond on DSKJM1Z7X2PROD with NOTICES
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is
September 30, 2024. A protest may also
serve as a motion to intervene so long
as the protestor states it also seeks to be
an intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 30,
2024. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
1 18
2 Persons
VerDate Sep<11>2014
17:07 Aug 06, 2024
Jkt 262001
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
64439
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
30, 2024. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP24–000–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP24–500–
000.
To file via USPS: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First
Street NE, Washington, DC 20426
To file via any other method: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Blair Lichtenwalter,
Senior Director of Certificates, Florida
Gas Transmission Company, LLC, 1300
Main St., Houston, Texas, 77002, or by
blair.lichtenwalter@energytransfer.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\07AUN1.SGM
07AUN1
64440
Federal Register / Vol. 89, No. 152 / Wednesday, August 7, 2024 / Notices
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: July 31, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–17396 Filed 8–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–2625–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Mordor ES2 LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Mordor
ES2 LLC’s application for market-based
rate authority, with an accompanying
rate tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
VerDate Sep<11>2014
17:07 Aug 06, 2024
Jkt 262001
future issuances of securities and
assumptions of liability, is August 20,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at 202–502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Dated: July 31, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–17394 Filed 8–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–2624–000]
Mordor ES1 LLC ; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Mordor
ES1 LLC’s application for market-based
rate authority, with an accompanying
rate tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 89, Number 152 (Wednesday, August 7, 2024)]
[Notices]
[Pages 64438-64440]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-17396]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-500-000]
Florida Gas Transmission Company, LLC; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on July 19, 2024, Florida Gas Transmission
Company, LLC (FGT), 1300 Main St., Houston, Texas 77002, filed in the
above referenced docket, a prior notice request pursuant to sections
157.205, 157.208, 157.210, and 157.211 of the Commission's regulations
under the Natural Gas Act (NGA), and FTG's blanket certificate issued
in Docket No. CP82-553-000, for authorization to increase certificated
mainline capacity, and to construct, modify, own, maintain and operate
interstate natural gas delivery point and appurtenant facilities,
consisting of an additional alternate feed connection and a meter
station upgrade; appurtenant facility maintenance replacement on a
compressor unit at FGT's existing Compressor Station 10 (CS 10) and
other appurtenant facilities as needed. All of the above facilities are
located in St. Helena Parish, Louisiana and Perry County, Mississippi
(Livingston Parish Project). The project will allow FGT to transport
incremental certificated firm transportation capacity up to 4.0 million
cubic feet per day (MMcf/d) to the existing City of Walker Meter
Station delivery point to be upgraded by FGT, and to be utilized by the
City of Walker, La (City of Walker, Customer, or Shipper) primarily for
residential use through the City of Walker gas system. The estimated
cost for the project is $985,000, all as more fully set forth in the
request which is on file with the Commission and open to public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov). From
the Commission's Home Page on the internet, this information is
available on eLibrary. The full text of this document is available on
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or
downloading. To access this document in eLibrary, type the docket
number excluding the last three digits of this document in the docket
number field.
[[Page 64439]]
User assistance is available for eLibrary and the Commission's
website during normal business hours from FERC Online Support at (202)
502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
[email protected].
Any questions concerning this request should be directed to Blair
Lichtenwalter, Senior Director of Certificates, Florida Gas
Transmission Company, LLC, 1300 Main St., Houston, Texas, 77002, at
(713) 989-2605, or [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on September 30,
2024. How to file protests, motions to intervene, and comments is
explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or [email protected].
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is September 30, 2024. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is September 30, 2024. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before September 30, 2024. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP24-000-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP24-500-000.
To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other method: Debbie-Anne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Blair
Lichtenwalter, Senior Director of Certificates, Florida Gas
Transmission Company, LLC, 1300 Main St., Houston, Texas, 77002, or by
[email protected]. Any subsequent submissions by
an intervenor must be served on the applicant and all other parties to
the proceeding. Contact information for parties can be downloaded from
the
[[Page 64440]]
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: July 31, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-17396 Filed 8-6-24; 8:45 am]
BILLING CODE 6717-01-P