Combined Notice of Filings #1, 61417-61418 [2024-16859]
Download as PDF
Federal Register / Vol. 89, No. 147 / Wednesday, July 31, 2024 / Notices
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is
September 23, 2024. A protest may also
serve as a motion to intervene so long
as the protestor states it also seeks to be
an intervenor.
lotter on DSK11XQN23PROD with NOTICES1
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 23,
2024. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
VerDate Sep<11>2014
17:29 Jul 30, 2024
Jkt 262001
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
20, 2024. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP24–498–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP24–498–
000.
To file via USPS: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other method: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission,
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
61417
12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at George W. Flugrad, Senior
Counsel, Eastern Gas Transmission and
Storage, Inc., 10700 Energy Way, Glen
Allen, VA 23060, or via email at
George.Flugrad@bhegts.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–16862 Filed 7–30–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–391–010;
ER21–2557–005; ER22–2662–005;
ER22–2663–005; ER22–2664–005;
ER23–1275–003; ER23–1276–003;
ER23–1277–003; ER24–1276–001.
E:\FR\FM\31JYN1.SGM
31JYN1
lotter on DSK11XQN23PROD with NOTICES1
61418
Federal Register / Vol. 89, No. 147 / Wednesday, July 31, 2024 / Notices
Applicants: Aron Energy Prepay 35
LLC, Aron Energy Prepay 23 LLC, Aron
Energy Prepay 22 LLC, Aron Energy
Prepay 21 LLC, Aron Energy Prepay 16
LLC, Aron Energy Prepay 15 LLC, Aron
Energy Prepay 14 LLC, Aron Energy
Prepay 5 LLC, J. Aron & Company LLC.
Description: Notice of Change in
Status of J. Aron & Company LLC, et al.
Filed Date: 7/25/24.
Accession Number: 20240725–5112.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–1929–001.
Applicants: Willowbrook Solar I, LLC.
Description: Tariff Amendment:
Response to Deficiency Letter in Docket
ER24–1929–000 to be effective 5/24/
2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5093.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2079–000.
Applicants: Basin Electric Power
Cooperative.
Description: Refund Report: Refund
Report to be effective N/A.
Filed Date: 7/25/24.
Accession Number: 20240725–5027.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2587–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 7305; Project
Identifier No. AF2–380 to be effective 6/
24/2024.
Filed Date: 7/24/24.
Accession Number: 20240724–5123.
Comment Date: 5 p.m. ET 8/14/24.
Docket Numbers: ER24–2588–000.
Applicants: NextEra Energy Seabrook,
LLC.
Description: § 205(d) Rate Filing:
NextEra Energy Seabrook, LLC 3rd
Amendment to A&R EP Agreement with
NECEC to be effective 7/3/2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5070.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2589–000.
Applicants: Castleton Commodities
Energy Services LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 7/26/2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5096.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2590–000.
Applicants: Castleton Commodities
Energy Trading LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 7/26/2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5097.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2591–000.
Applicants: PacifiCorp.
VerDate Sep<11>2014
17:29 Jul 30, 2024
Jkt 262001
Description: Tariff Amendment:
Termination of Powerex LTF PTP
Conditional Firm Agreement (SA 1016
and SA 1017) to be effective 9/24/2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5102.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24–2592–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2024–07–25_SA 4313 NSP-Summit Lake
Solar GIA (J1581) to be effective 7/18/
2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5113.
Comment Date: 5 p.m. ET 8/15/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–16859 Filed 7–30–24; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–497–000]
MountainWest Pipeline, LLC; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on July 18, 2024,
MountainWest Pipeline, LLC (MWP)
filed a prior notice request for
authorization, in accordance with
sections 157.205 and 157.214, of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act and MWP’s
blanket certificate issued in Docket No.
CP82–491–000,1 to increase: (1) the
maximum certificated shut-in pressure,
(2) the maximum certificated volume of
natural gas to be stored, and (3) the
working gas inventory at its Clay Basin
underground gas storage reservoir (Clay
Basin Storage Reservoir) in Daggett
County, Utah. MWP proposes to
increase the maximum certificated shutin pressure from 2,536 pounds per
square inch absolute (psia) to 2,700 psia,
the maximum certificated storage
capacity from 120.2 billion standard
cubic feet (Bscf) to 128.0 Bscf and the
working gas inventory from 54.0 Bscf to
61.8 Bscf at its existing Clay Basin
Storage Reservoir, all as more fully set
forth in the request which is on file with
the Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
1 Mountain Fuel Resources, Inc., 20 FERC
¶ 62,580 (1982).
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 89, Number 147 (Wednesday, July 31, 2024)]
[Notices]
[Pages 61417-61418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-16859]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-391-010; ER21-2557-005; ER22-2662-005; ER22-
2663-005; ER22-2664-005; ER23-1275-003; ER23-1276-003; ER23-1277-003;
ER24-1276-001.
[[Page 61418]]
Applicants: Aron Energy Prepay 35 LLC, Aron Energy Prepay 23 LLC,
Aron Energy Prepay 22 LLC, Aron Energy Prepay 21 LLC, Aron Energy
Prepay 16 LLC, Aron Energy Prepay 15 LLC, Aron Energy Prepay 14 LLC,
Aron Energy Prepay 5 LLC, J. Aron & Company LLC.
Description: Notice of Change in Status of J. Aron & Company LLC,
et al.
Filed Date: 7/25/24.
Accession Number: 20240725-5112.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-1929-001.
Applicants: Willowbrook Solar I, LLC.
Description: Tariff Amendment: Response to Deficiency Letter in
Docket ER24-1929-000 to be effective 5/24/2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5093.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2079-000.
Applicants: Basin Electric Power Cooperative.
Description: Refund Report: Refund Report to be effective N/A.
Filed Date: 7/25/24.
Accession Number: 20240725-5027.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2587-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 7305;
Project Identifier No. AF2-380 to be effective 6/24/2024.
Filed Date: 7/24/24.
Accession Number: 20240724-5123.
Comment Date: 5 p.m. ET 8/14/24.
Docket Numbers: ER24-2588-000.
Applicants: NextEra Energy Seabrook, LLC.
Description: Sec. 205(d) Rate Filing: NextEra Energy Seabrook, LLC
3rd Amendment to A&R EP Agreement with NECEC to be effective 7/3/2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5070.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2589-000.
Applicants: Castleton Commodities Energy Services LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
7/26/2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5096.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2590-000.
Applicants: Castleton Commodities Energy Trading LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
7/26/2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5097.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2591-000.
Applicants: PacifiCorp.
Description: Tariff Amendment: Termination of Powerex LTF PTP
Conditional Firm Agreement (SA 1016 and SA 1017) to be effective 9/24/
2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5102.
Comment Date: 5 p.m. ET 8/15/24.
Docket Numbers: ER24-2592-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2024-07-25_SA 4313 NSP-
Summit Lake Solar GIA (J1581) to be effective 7/18/2024.
Filed Date: 7/25/24.
Accession Number: 20240725-5113.
Comment Date: 5 p.m. ET 8/15/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-16859 Filed 7-30-24; 8:45 am]
BILLING CODE 6717-01-P