City of Tualatin, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 61415-61416 [2024-16858]
Download as PDF
Federal Register / Vol. 89, No. 147 / Wednesday, July 31, 2024 / Notices
timely objection is received that
sufficiently shows the grant of the
license would be inconsistent with the
Bayh-Dole Act or implementing
regulations. A competing application for
a patent license agreement, completed
in compliance with 37 CFR 404.8 and
received by the Air Force within the
period for timely objections, will be
treated as an objection and may be
considered as an alternative to the
proposed license.
Authority: 35 U.S.C. 209; 37 CFR part
404.
Tommy W. Lee,
Acting Air Force Federal Register Liaison
Officer.
[FR Doc. 2024–16810 Filed 7–30–24; 8:45 am]
BILLING CODE 3911–44–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24–917–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Yankee Gas to Emera
Energy eff 7–25–24 to be effective 7/25/
2024.
Filed Date: 7/25/24.
Accession Number: 20240725–5030.
Comment Date: 5 p.m. ET 8/6/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Filings in Existing Proceedings
BILLING CODE 6717–01–P
Docket Numbers: RP24–834–001.
Applicants: Gulf South Pipeline
Company, LLC.
Description: Compliance filing:
Compliance Filing in Docket No. RP24–
834–000 to be effective 7/22/2024.
Filed Date: 7/24/24.
Accession Number: 20240724–5110.
Comment Date: 5 p.m. ET 8/5/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
61415
[FR Doc. 2024–16860 Filed 7–30–24; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD24–3–000]
City of Tualatin, Oregon; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On July 23, 2024, the City of Tualatin,
Oregon, filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Tualatin Service Center
Hydroelectric Energy Recovery Project
would have an installed capacity of 56
kilowatts (kW), and would be located
along the applicant’s existing water
supply system in the City of Tualatin,
Washington County, Oregon.
Applicant Contact: Gregg Semler,
InPipe Energy, 830 NE Holladay St.,
Portland, OR 97232, 503–341–0004,
gregg@inpipeenergy.com.
FERC Contact: Christopher Chaney,
202–502–6778, christopher.chaney@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The project would
consist of: (1) one 56-kW centrifugal
pump as turbine generating unit and (2)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 278
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory
provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) ..........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ..............................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
lotter on DSK11XQN23PROD with NOTICES1
FPA 30(a)(3)(C)(i) .......................
FPA 30(a)(3)(C)(ii) ......................
FPA 30(a)(3)(C)(iii) .....................
Preliminary Determination: The
proposed Tualatin Service Center
Hydroelectric Energy Recovery Project
VerDate Sep<11>2014
17:29 Jul 30, 2024
Jkt 262001
will not alter the primary purpose of the
conduit, which is for municipal water
supply. Therefore, based upon the above
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Y
Y
Y
criteria, Commission staff preliminarily
determines that the operation of the
project described above satisfies the
E:\FR\FM\31JYN1.SGM
31JYN1
lotter on DSK11XQN23PROD with NOTICES1
61416
Federal Register / Vol. 89, No. 147 / Wednesday, July 31, 2024 / Notices
requirements for a qualifying conduit
hydropower facility, which is not
required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice. Deadline for filing
motions to intervene is 30 days from the
issuance date of this notice. Anyone
may submit comments or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210 and 385.214.
Any motions to intervene must be
received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy
of all other filings in reference to this
application must be accompanied by
1 18
CFR 385.2001–2005 (2023).
VerDate Sep<11>2014
17:29 Jul 30, 2024
Jkt 262001
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD24–3) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–16858 Filed 7–30–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–498–000]
Eastern Gas Transmission and
Storage, Inc.; Notice of Request Under
Blanket Authorization and Establishing
Intervention and Protest Deadline
Take notice that on July 18, 2024,
Eastern Gas Transmission and Storage,
Inc. (EGTS), 10700 Energy Way, Glen
Allen, VA 23060, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205(b) and
157.216(b) of the Commission’s
regulations under the Natural Gas Act
(NGA), and EGTS’s blanket certificate
issued in Docket No. CP82–537–000, for
authorization to abandon three storage
wells, all associated facilities, and fourinch-diameter pipelines at each well.
All of the facilities proposed to be
abandoned are located in Harrison and
Lewis Counties, West Virginia (FinkKennedy/Lost Creek Well Abandonment
Project). The project will allow EGTS to
abandon these storage wells that do not
provide significant value through either
flow performance or maintenance of
current integrity standards. EGTS
estimates the cost for the project to be
$16 million, all as more fully set forth
in the request which is on file with the
Commission and open to public
inspection.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to George W.
Flugrad, Senior Counsel, Eastern Gas
Transmission and Storage, Inc., 10700
Energy Way, Glen Allen, VA 23060, or
via email at George.Flugrad@
bhegts.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 23, 2024.
How to file protests, motions to
intervene, and comments is explained
below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 89, Number 147 (Wednesday, July 31, 2024)]
[Notices]
[Pages 61415-61416]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-16858]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD24-3-000]
City of Tualatin, Oregon; Notice of Preliminary Determination of
a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On July 23, 2024, the City of Tualatin, Oregon, filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA). The proposed Tualatin
Service Center Hydroelectric Energy Recovery Project would have an
installed capacity of 56 kilowatts (kW), and would be located along the
applicant's existing water supply system in the City of Tualatin,
Washington County, Oregon.
Applicant Contact: Gregg Semler, InPipe Energy, 830 NE Holladay
St., Portland, OR 97232, 503-341-0004, [email protected].
FERC Contact: Christopher Chaney, 202-502-6778,
[email protected].
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) one 56-kW centrifugal pump as turbine generating
unit and (2) appurtenant facilities. The proposed project would have an
estimated annual generation of approximately 278 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A).......................... The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the
distribution of water for agricultural, municipal,
or industrial consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i)....................... The facility is constructed, operated, or maintained Y
for the generation of electric power and uses for
such generation only the hydroelectric potential of
a non-federally owned conduit.
FPA 30(a)(3)(C)(ii)...................... The facility has an installed capacity that does not Y
exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)..................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Tualatin Service Center
Hydroelectric Energy Recovery Project will not alter the primary
purpose of the conduit, which is for municipal water supply. Therefore,
based upon the above criteria, Commission staff preliminarily
determines that the operation of the project described above satisfies
the
[[Page 61416]]
requirements for a qualifying conduit hydropower facility, which is not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice. Anyone
may submit comments or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must be received on or before the
specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2023).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, MD 20852. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
(i.e., CD24-3) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email [email protected]. For
TTY, call (202) 502-8659.
Dated: July 25, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-16858 Filed 7-30-24; 8:45 am]
BILLING CODE 6717-01-P