New Hampshire Water Resource Board and Steels Pond Hydro, Inc., New Hampshire Water Resource Board and Steels Pond Hydro LLC; Notice of Partial Transfer of Exemption, 60411 [2024-16297]
Download as PDF
Federal Register / Vol. 89, No. 143 / Thursday, July 25, 2024 / Notices
GOP; Recordkeeping Req ...
Total ..............................
Number and type of
respondents 3
Annual
number of
responses per
respondent
Total number
of responses
Avg. burden &
cost per response 4
Total annual burden hours &
total annual cost
($)
Cost per
respondent ($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
5 1028
...................................
1
1028
10 hrs.; $455.90 .....
10,280 hrs.; $468,665.20 ....
..............................................
........................
........................
................................
29,812 hrs.; $1,978,293.48
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 19, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
LLC informed the Commission that the
exemption from licensing for the Steels
Pond Project No. 3265, originally issued
October 18, 1983,1 has been partially
transferred to Steels Pond Hydro LLC.
The project is located on the North
Branch of the Contoocook River in
Hillsborough County, New Hampshire.
The transfer of an exemption does not
require Commission approval.
2. Steels Pond Hydro LLC, located at
230 Park Avenue, Suite 447, New York,
New York 10169 is now the coexemptee of the Steels Pond Project No.
3265 with the New Hampshire Water
Resource Board.
Dated: July 18, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–16297 Filed 7–24–24; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2024–16386 Filed 7–24–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP24–490–000]
[Project No. 3265–004]
New Hampshire Water Resource Board
and Steels Pond Hydro, Inc., New
Hampshire Water Resource Board and
Steels Pond Hydro LLC; Notice of
Partial Transfer of Exemption
ddrumheller on DSK120RN23PROD with NOTICES1
1. By letter filed July 8, 2024, Steels
Pond Hydro, Inc. and Steels Pond Hydro
3 For PER–003–2, PER–005–2 and PER–006–1: RC
= Reliability Coordinator; BA = Balancing
Authority; TOP = Transmission Operator; TO =
Transmission Owner; GOP = Generator Operator.
The NERC compliance registry table April 16, 2024,
was used to perform analysis.
4 The estimated hourly cost (salary plus benefits)
is a combination based on the Bureau of Labor
Statistics (BLS), as of 2023. The estimates for cost
per response are loaded hourly wage figure
(includes benefits) based on two occupational
categories for 2023 found on the Bureau of Labor
Statistics website (https://www.bls.gov/oes/current/
naics2_22.htm):
• Electrical Engineer (Occupation Code: 17–
2071): $77.29 (to calculate the reporting
requirements).
• Office and Administrative Support (Occupation
Code: 43–0000): $45.59 (to calculate the
recordkeeping requirements).
5 The number of US unique GOPs is 1028 taken
from the NERC compliance registry information of
April 16, 2024.
VerDate Sep<11>2014
19:41 Jul 24, 2024
60411
Jkt 262001
EcoEléctrica, L.P.; Notice of
Application and Establishing
Intervention Deadline
Take notice that on July 5, 2024,
EcoEléctrica, L.P. (EcoEléctrica), 641
Road 337, Km. 3.7, Bo. Tallaboa
Poniente, Peñuelas, Puerto Rico 00624,
filed an application under section 3(a)
of the Natural Gas Act (NGA), and part
153 of the Commission’s regulations to
amend its authorization granted by the
Commission on June 19, 2014, for its
LNG Supply Pipeline Project.
Specifically, EcoEléctrica seeks
authorization to increase the sendout
capacity on its LNG Supply Pipeline to
the existing off-site liquefied natural gas
(LNG) Truck Loading Facility from 250
gallons per minute (gpm) to 500 gpm
during periods of simultaneous trailer
loading. The Project is designed to meet
the increasing demand for LNG from the
Truck Loading Facility and its
downstream users. EcoEléctrica states
1 New Hampshire Water Resource Board and
Steels Pond Hydro, Inc., 25 FERC ¶ 62,055 (1983)
(Order Granting Exemption from Licensing of a
Small Hydroelectric Project of 5 Megawatts or Less).
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
455.90
........................
that the requested capacity increase will
only require minor modifications to the
existing LNG facility at its LNG
terminal, all as more fully set forth in
the application which is on file with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions regarding the proposed
project should be directed to Carlos A.
Reyes, President & General Manager,
EcoEléctrica, L.P., 641 Road 337, Km.
3.7, Bo. Tallaboa Poniente, Peñuelas,
Puerto Rico 00624, by phone at (787)
759–0202 or by email at carlos.reyes@
ecoelectrica.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
1 18
E:\FR\FM\25JYN1.SGM
CFR 157.9.
25JYN1
Agencies
[Federal Register Volume 89, Number 143 (Thursday, July 25, 2024)]
[Notices]
[Page 60411]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-16297]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3265-004]
New Hampshire Water Resource Board and Steels Pond Hydro, Inc.,
New Hampshire Water Resource Board and Steels Pond Hydro LLC; Notice of
Partial Transfer of Exemption
1. By letter filed July 8, 2024, Steels Pond Hydro, Inc. and Steels
Pond Hydro LLC informed the Commission that the exemption from
licensing for the Steels Pond Project No. 3265, originally issued
October 18, 1983,\1\ has been partially transferred to Steels Pond
Hydro LLC. The project is located on the North Branch of the Contoocook
River in Hillsborough County, New Hampshire. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ New Hampshire Water Resource Board and Steels Pond Hydro,
Inc., 25 FERC ] 62,055 (1983) (Order Granting Exemption from
Licensing of a Small Hydroelectric Project of 5 Megawatts or Less).
---------------------------------------------------------------------------
2. Steels Pond Hydro LLC, located at 230 Park Avenue, Suite 447,
New York, New York 10169 is now the co-exemptee of the Steels Pond
Project No. 3265 with the New Hampshire Water Resource Board.
Dated: July 18, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-16297 Filed 7-24-24; 8:45 am]
BILLING CODE 6717-01-P