Application for Renewal of Authorization To Export Electric Energy; Constellation Generation Company LLC, 59909-59910 [2024-16269]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 142 / Wednesday, July 24, 2024 / Notices
ENMAX filed an application
(Application or App.) for renewal of its
export authority for a five-year term.
App. at 1.
According to the Application,
ENMAX is an Alberta, Canada
corporation having its principal place of
business at Calgary, Alberta, Canada and
a wholly owned subsidiary of ENMAX
Energy Corporation, which is a wholly
owned subsidiary of ENMAX
Corporation, which is wholly owned by
The City of Calgary. Id. at 1–2. ENMAX
represents that it is a power marketer
and engages in the purchase and sale of
energy and capacity in wholesale
electric markets. Id. at 3. ENMAX also
represents that it has received authority
from the Federal Energy Regulatory
Commission (FERC) to sell power in the
U.S. at market-based rates. Id. at 1.
The Applicant states that although it
does not own transmission border
facilities, it purchases transmission
service from locations in the United
States to the border with Canada. Id. at
5. Furthermore, ENMAX represents that
its parent company ENMAX
Corporation, through ENMAX Power
Corporation, owns electrical
transmission and distribution assets in
the Calgary, Alberta, Canada region and
indirectly owns Versant Power, a public
utility that owns electrical transmission
and distribution lines in Maine. Id. at 2.
ENMAX represents that its export of
electricity will not impair the
sufficiency of the United States electric
supply because the power exported will
only be on transmission lines with
available capacity. App. at 5.
Additionally, the Applicant states that it
will comply with all applicable
reliability and technical standards set
forth in the relevant licenses and that its
proposed exports would not adversely
affect transmission facilities or impede
the coordinated use of transmission
facilities. Id.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
VerDate Sep<11>2014
17:57 Jul 23, 2024
Jkt 262001
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning ENMAX’s Application
should be clearly marked with GDO
Docket No. EA–264–E. Additional
copies are to be provided directly to
Wesley Manfro, ENMAX Corporation,
141—50 Avenue SE Calgary, AB T2G
4S7, wmanfro@enmax.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
July 18, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on July 19,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–16270 Filed 7–23–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–249–E]
Application for Renewal of
Authorization To Export Electric
Energy; Constellation Generation
Company LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
AGENCY:
Constellation Generation
Company LLC (the Applicant) has
SUMMARY:
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
59909
applied for renewed authorization to
transmit electric energy from the United
States to Canada pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before August 23, 2024.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to .
FOR FURTHER INFORMATION CONTACT:
Janessa Zucchetto, (240) 474–8226,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) under Delegation Order
No. S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On February 10, 2022, DOE issued
order No. EA–249–D to Constellation
Generation Company LLC to transmit
electric energy from the United States to
Canada. On June 6, 2024, Constellation
Generation Company LLC filed a
renewal Application (Application or
App.) for an additional five-year term.
App. at 1.
According to the Application,
Constellation Generation Company LLC
is a ‘‘Pennsylvania limited liability
company with its principal executive
offices in Baltimore, Maryland.’’ Id. at 2.
Constellation Generation Company LLC
states it is a competitive power
generator ‘‘with approximately 32,000
megawatts of owned capacity located in
a number of organized markets.’’ Id. The
Applicant further states that it ‘‘does not
own or operate any transmission or
distribution facilities and does not have
a franchised service area.’’ Id.
Constellation Generation Company LLC
is ‘‘authorized by the Federal Energy
Regulatory Commission (‘‘FERC’’) to sell
energy, capacity, an ancillary service at
market-based rates in the United
States.’’ Id.
E:\FR\FM\24JYN1.SGM
24JYN1
ddrumheller on DSK120RN23PROD with NOTICES1
59910
Federal Register / Vol. 89, No. 142 / Wednesday, July 24, 2024 / Notices
The Applicant states that it has and
will continue to export on either firm or
interruptible basis and ‘‘will not impair
the sufficiency of the electric power
supply within the United States . . .
[or] will not impede or tend to impede
the regional coordination of electric
utility planning or operations.’’ Id. at 3.
Constellation Generation Company LLC
states it ‘‘has and will continue to make
all necessary commercial arrangements
and will obtain any and all other
regulatory approvals required in order
to affect any power exports.’’ Id. The
Applicant further states it ‘‘has and will
continue to comply with the terms and
conditions contained in the
authorizations issued for these crossborder facilities as well as any other
export limitations that DOE may deem
appropriate, consistent with DOE’s
orders authorizing exports of electric
energy by power marketers.’’ Id. at 4.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
previously provided email address in
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning Constellation Generation
Company LLC’s Application should be
clearly marked with GDO Docket No.
EA–249–E. Additional copies are to be
provided directly to Todd Brecher,
Constellation Generation Company,
LLC, 1310 Point Street, 8th Floor,
Baltimore, MD 21231, 410–470–2593,
todd.brecher@constellation.com; and
Buffy Pyle-Liberto, Constellation Energy
Generation, LLC, 1310 Point Street, 8th
Floor, Baltimore, MD 21231, 443–910–
0414, b.pyle-liberto@constellation.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
VerDate Sep<11>2014
17:57 Jul 23, 2024
Jkt 262001
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
July 18, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on July 19,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–16269 Filed 7–23–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–515]
Application for Authorization To
Export Electric Energy; AMA QSE, LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
AGENCY:
AMA QSE, LLC (the
Applicant or ‘‘AMA’’) has applied for
authorization to transmit electric energy
from the United States to Mexico
pursuant to the Federal Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before August 23, 2024.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Janessa Zucchetto, (240) 474–8226,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
SUMMARY:
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) under Delegation Order
No. S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On June 4, 2024, AMA QSE, LLC filed
an application (Application or App.)
with DOE to transmit electric energy
from the United States to Mexico for a
five-year term. App. at 1–2.
According to the Application, AMA
QSE, LLC is ‘‘authorized to do business
in the State of Texas and such other
states as required by the current nature
of its business.’’ App. at 2. AMA states
it ‘‘does not currently own or control
electric generation or transmission
facilities and does not have a power
supply of its own in the United
States[.]’’ Id. at 4. The Applicant
represents that it is ‘‘authorized by the
Federal Energy Regulatory Commission
(‘‘FERC’’) to make sales of electric
power at wholesale in interstate
commerce at market-based rates.’’ Id. at
2. Further, AMA QSE, LLC states it
‘‘will purchase the energy to be
exported from wholesale generators,
electrical utilities, and federal power
marketing agencies.’’ Id. The Applicant
adds that it will purchase the electricity
‘‘through negotiated agreements that
have been voluntarily executed by the
selling parties after considering their
own need for any such electricity.’’ Id.
at 4–5. The Applicant also notes its
transactions will comply with all
applicable regulatory requirements,
including any export limits imposed by
DOE. See Id. at 5–6. The Applicant
asserts its ‘‘exports will not impair or
tend to impede the sufficiency of
electric power supplies in the United
States or the regional coordination of
electric utility planning or operations.’’
Id. at 3.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 89, Number 142 (Wednesday, July 24, 2024)]
[Notices]
[Pages 59909-59910]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-16269]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[GDO Docket No. EA-249-E]
Application for Renewal of Authorization To Export Electric
Energy; Constellation Generation Company LLC
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Constellation Generation Company LLC (the Applicant) has
applied for renewed authorization to transmit electric energy from the
United States to Canada pursuant to the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before August 23, 2024.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to .
FOR FURTHER INFORMATION CONTACT: Janessa Zucchetto, (240) 474-8226,
[email protected].
SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE)
regulates electricity exports from the United States to foreign
countries in accordance with section 202(e) of the Federal Power Act
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority,
previously exercised by the now-defunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides that an entity which seeks to
export electricity must obtain an order from DOE authorizing that
export (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue
such orders was delegated to the DOE's Grid Deployment Office (GDO)
under Delegation Order No. S1-DEL-S3-2023 and Redelegation Order No.
S3-DEL-GD1-2023.
On February 10, 2022, DOE issued order No. EA-249-D to
Constellation Generation Company LLC to transmit electric energy from
the United States to Canada. On June 6, 2024, Constellation Generation
Company LLC filed a renewal Application (Application or App.) for an
additional five-year term. App. at 1.
According to the Application, Constellation Generation Company LLC
is a ``Pennsylvania limited liability company with its principal
executive offices in Baltimore, Maryland.'' Id. at 2. Constellation
Generation Company LLC states it is a competitive power generator
``with approximately 32,000 megawatts of owned capacity located in a
number of organized markets.'' Id. The Applicant further states that it
``does not own or operate any transmission or distribution facilities
and does not have a franchised service area.'' Id. Constellation
Generation Company LLC is ``authorized by the Federal Energy Regulatory
Commission (``FERC'') to sell energy, capacity, an ancillary service at
market-based rates in the United States.'' Id.
[[Page 59910]]
The Applicant states that it has and will continue to export on
either firm or interruptible basis and ``will not impair the
sufficiency of the electric power supply within the United States . . .
[or] will not impede or tend to impede the regional coordination of
electric utility planning or operations.'' Id. at 3. Constellation
Generation Company LLC states it ``has and will continue to make all
necessary commercial arrangements and will obtain any and all other
regulatory approvals required in order to affect any power exports.''
Id. The Applicant further states it ``has and will continue to comply
with the terms and conditions contained in the authorizations issued
for these cross-border facilities as well as any other export
limitations that DOE may deem appropriate, consistent with DOE's orders
authorizing exports of electric energy by power marketers.'' Id. at 4.
The existing international transmission facilities to be utilized
by the Applicant have been previously authorized by Presidential
permits issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties. See App. at
Exhibit C.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at
[email protected]. Protests should be filed in accordance
with Rule 211 of FERC's Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to become a party to this proceeding
should file a motion to intervene at the previously provided email
address in accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning Constellation Generation
Company LLC's Application should be clearly marked with GDO Docket No.
EA-249-E. Additional copies are to be provided directly to Todd
Brecher, Constellation Generation Company, LLC, 1310 Point Street, 8th
Floor, Baltimore, MD 21231, 410-470-2593,
[email protected]; and Buffy Pyle-Liberto, Constellation
Energy Generation, LLC, 1310 Point Street, 8th Floor, Baltimore, MD
21231, 443-910-0414, [email protected].
A final decision will be made on the requested authorization after
the environmental impacts have been evaluated pursuant to DOE's
National Environmental Policy Act Implementing Procedures (10 CFR part
1021) and after DOE evaluates whether the proposed action will have an
adverse impact on the sufficiency of supply or reliability of the
United States electric power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at https://www.energy.gov/gdo/pending-applications-0 or by emailing [email protected].
Signing Authority: This document of the Department of Energy was
signed on July 18, 2024, by Maria Robinson, Director, Grid Deployment
Office, pursuant to delegated authority from the Secretary of Energy.
That document with the original signature and date is maintained by
DOE. For administrative purposes only, and in compliance with
requirements of the Office of the Federal Register, the undersigned DOE
Federal Register Liaison Officer has been authorized to sign and submit
the document in electronic format for publication, as an official
document of the Department of Energy. This administrative process in no
way alters the legal effect of this document upon publication in the
Federal Register.
Signed in Washington, DC, on July 19, 2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2024-16269 Filed 7-23-24; 8:45 am]
BILLING CODE 6450-01-P