Public Hearing, 56470-56471 [2024-15004]
Download as PDF
56470
Federal Register / Vol. 89, No. 131 / Tuesday, July 9, 2024 / Notices
pursuant to a determination by the
Secretary of State pursuant to E.O.
13224.
Consistent with the determination in
section 10 of E.O. 13224 that prior
notice to persons determined to be
subject to the Order who might have a
constitutional presence in the United
States would render ineffectual the
blocking and other measures authorized
in the Order because of the ability to
transfer funds instantaneously, the
Secretary of State determines that no
prior notice needs to be provided to any
person subject to this determination
who might have a constitutional
presence in the United States, because
to do so would render ineffectual the
measures authorized in the Order.
This determination shall be published
in the Federal Register.
Dated: June 14, 2024.
Elizabeth H. Richard,
Coordinator for Counterterrorism.
[FR Doc. 2024–14942 Filed 7–8–24; 8:45 am]
BILLING CODE 4710–AD–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Scheduled for Action
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on August 1, 2024. The Commission
will hold this hearing in person and
telephonically. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice and
any additional testimony on the
proposed rulemaking placed on the
table at the June Commission meeting.
Such projects and actions are intended
to be scheduled for Commission action
at its next business meeting, tentatively
scheduled for September 12, 2024,
which will be noticed separately. The
public should note that this public
hearing will be the only opportunity to
offer oral comments to the Commission
for the listed projects and actions. The
deadline for the submission of written
comments is August 12, 2024.
DATES: The public hearing will convene
on August 1, 2024, at 6:30 p.m. The
public hearing will end at 9:00 p.m. or
at the conclusion of public testimony,
whichever is earlier. The deadline for
submitting written comments is
Monday, August 12, 2024.
ADDRESSES: This public hearing will be
conducted in person and virtually. You
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
18:00 Jul 08, 2024
may attend in person at Susquehanna
River Basin Commission, 4423 N Front
St., Harrisburg, Pennsylvania, or join by
telephone at Toll-Free Number 1–877–
304–9269 and then enter the guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423 or joyler@srbc.gov. The
proposed rulemaking that was placed on
the table at the June Commission
meeting can be viewed on the Federal
Register website with the following
citation: 89 FR 20148. Information
concerning the project applications is
available at the Commission’s Water
Application and Approval Viewer at
https://www.srbc.gov/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.gov/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf.
SUPPLEMENTARY INFORMATION: In
addition to hearing any additional
testimony on the proposed rulemaking,
the public hearing will cover the
following projects:
Jkt 262001
1. Project Sponsor and Facility:
Amazon Data Services, Inc. Project
Facility: PHL100 Data Center Campus,
Salem Township, Luzerne County, Pa.
Application for consumptive use of up
to 0.060 mgd (30-day average).
2. Project Sponsor and Facility:
Ashland Area Municipal Water
Authority, Butler Township, Schuylkill
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.115
mgd (30-day average) from Well 5
(Docket No. 19931101). Service area is
located in an Environmental Justice
area.
3. Project Sponsor: Borough of
Middletown. Project Facility:
Middletown Water System, Borough of
Middletown, Dauphin County, Pa.
Application for renewal of groundwater
withdrawal of up to 1.070 mgd (30-day
average) from Well 6 (Docket No.
19970702). Service area is located in an
Environmental Justice area.
4. Project Sponsor and Facility:
Caernarvon Township Authority,
Caernarvon Township, Berks County,
Pa. Application for renewal of
groundwater withdrawal of up to 0.317
mgd (30-day average) from Well 8
(Docket No. 19940902). Service area is
located in an Environmental Justice
area.
5. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C.
(Loyalsock Creek), Forksville Borough,
PO 00000
Frm 00195
Fmt 4703
Sfmt 4703
Sullivan County, Pa. Application for
renewal and modification of surface
water withdrawal of up to 1.500 mgd
(peak day) (Docket No. 20190903).
6. Project Sponsor and Facility: Clear
Water Technology, LLC (Middle Branch
Wyalusing Creek), Forest Lake
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 1.440 mgd (peak
day).
7. Project Sponsor and Facility:
Dillsburg Area Authority, Franklin
Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.199 mgd (30-day
average) from Well 3 (Docket No.
20081207).
8. Project Sponsor: Greater Hazleton
Community-Area New Development
Organization, Inc. Project Facility: CAN
DO, Inc.—Corporate Center, Butler
Township, Luzerne County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.547 mgd (30-day
average) from Well 1 (Docket No.
20090309).
9. Project Sponsor and Facility: Jersey
Shore Area Joint Water Authority, Pine
Creek Township, Clinton County, Pa.
Application for groundwater
withdrawal of up to 0.452 mgd (30-day
average) from Pine Creek Well 1, which
is an increase of the quantity established
in Certificate of Registration No. GF–
202012137.
10. Project Sponsor and Facility:
JKLM Energy, LLC (Mill Creek), Rutland
Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 0.600 mgd (peak
day).
11. Project Sponsor and Facility:
JKLM Energy, LLC (Tioga River),
Lawrenceville Borough, Tioga County,
Pa. Application for renewal with an
increase of surface water withdrawal of
up to 1.800 mgd (peak day) (Docket No.
20230610).
12. Project Sponsor and Facility:
Municipal Authority of the Borough of
Mansfield, Richmond Township, Tioga
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.173
mgd (30-day average) from Well 1
(Docket No. 19940707).
13. Project Sponsor: New Enterprise
Stone & Lime Co., Inc. Project Facility:
Roaring Spring Quarry (Halter Creek 2),
Taylor Township, Blair County, Pa.
Applications for renewal of
consumptive use of up to 0.380 mgd
(peak day) and surface water
withdrawal of up to 0.288 mgd (peak
day) (Docket No. 19940705 and
Certificate of Registration No. GF–
202204215).
14. Project Sponsor and Facility:
Pennsylvania General Energy Company,
E:\FR\FM\09JYN1.SGM
09JYN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 89, No. 131 / Tuesday, July 9, 2024 / Notices
L.L.C. (Loyalsock Creek), Plunketts
Creek Township, Lycoming County, Pa.
Application for renewal of surface water
withdrawal of up to 2.000 mgd (peak
day) (Docket No. 20231213).
15. Project Sponsor: The Procter &
Gamble Paper Products Company.
Project Facility: Mehoopany Plant,
Washington Township, Wyoming
County, Pa. Application for renewal of
consumptive use of up to 2.750 mgd
(peak day) (Docket No. 19940704).
16. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Lycoming
Creek), McIntyre Township, Lycoming
County, Pa. Application for renewal of
surface water withdrawal of up to 2.000
mgd (peak day) (Docket No. 20190910).
17. Project Sponsor and Facility:
Seneca Resources Company, LLC
(Marsh Creek), Delmar Township, Tioga
County, Pa. Application for renewal of
surface water withdrawal of up to 0.499
mgd (peak day) (Docket No. 20190911).
18. Project Sponsor and Facility:
Shrewsbury Borough, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.120 mgd (30-day
average) from the Woodlyn Well (Docket
No. 19920501).
19. Project Sponsor and Facility: State
College Borough Water Authority,
Benner Township, Centre County, Pa.
Applications for renewal of
groundwater withdrawal (30-day
averages) of up to 1.584 mgd from Well
17, 0.576 mgd from Well 18, and 1.512
mgd from Well 19 (Docket No.
19930501).
20. Project Sponsor and Facility:
Strasburg Lancaster County Borough
Authority, Strasburg Township,
Lancaster County, Pa. Application for
renewal of groundwater withdrawal of
up to 0.275 mgd (30-day average) from
the Fisher Well (Docket No. 19890107).
Service area is located in an
Environmental Justice area.
21. Project Sponsor: TableTrust
Brands LLC. Project Facility: Freebird
East, Bethel Township, Lebanon
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.199
mgd (30-day average) from Well 8
(Docket No. 19990701).
22. Project Sponsor: UGI Development
Company. Project Facility: Hunlock
Creek Energy Center (Susquehanna
River), Hunlock Township, Luzerne
County, Pa. Applications for renewal of
surface water withdrawal of up to
55.050 mgd (peak day) and consumptive
use of up to 2.396 mgd (peak day)
(Docket No. 20090916).
23. Project Sponsor and Facility:
Williamsburg Municipal Authority,
Catharine Township, Blair County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.180 mgd (30-day
VerDate Sep<11>2014
18:00 Jul 08, 2024
Jkt 262001
average) from Well 3 (Docket No.
19940702).
24. Project Sponsor and Facility: XTO
Energy Inc. (West Branch Susquehanna
River), Chapman Township, Clinton
County, Pa. Application for renewal of
surface water withdrawal of up to 2.000
mgd (peak day) (Docket No. 20190912).
Located in an Environmental Justice
area.
Opportunity To Appear and Comment
Interested parties may appear or call
into the hearing to offer comments to
the Commission on any business listed
above required to be the subject of a
public hearing. Given the nature of the
meeting, the Commission strongly
encourages those members of the public
wishing to provide oral comments to
pre-register with the Commission by
emailing Jason Oyler at joyler@srbc.gov
before the hearing date. The presiding
officer reserves the right to limit oral
statements in the interest of time and to
control the course of the hearing
otherwise. Access to the hearing via
telephone will begin at 6:15 p.m.
Guidelines for the public hearing are
posted on the Commission’s website,
www.srbc.gov, before the hearing for
review. The presiding officer reserves
the right to modify or supplement such
guidelines at the hearing. Written
comments on any business listed above
required to be the subject of a public
hearing may also be mailed to Mr. Jason
Oyler, Secretary to the Commission,
Susquehanna River Basin Commission,
4423 North Front Street, Harrisburg, Pa.
17110–1788, or submitted electronically
through https://www.srbc.gov/meetingcomment/default.aspx?type=2&cat=7.
Comments mailed or electronically
submitted must be received by the
Commission on or before Monday,
August 12, 2024, to be considered.
Authority: Pub. L. 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806, 807, and
808.
Dated: July 3, 2024.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2024–15004 Filed 7–8–24; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Rescission of Record of Decision and
Final Environmental Impact Statement:
La Crosse County, Wisconsin
Federal Highway
Administration (FHWA), Department of
Transportation (DOT).
AGENCY:
PO 00000
Frm 00196
Fmt 4703
Sfmt 9990
56471
Notice to rescind the Record of
Decision (ROD) and the Final
Environmental Impact Statement (FEIS).
ACTION:
The FHWA, in cooperation
with the Wisconsin Department of
Transportation (WisDOT), is issuing this
notice to advise the public that we are
rescinding the 1998 Record of Decision
(ROD) and the Final Environmental
Impact Statement (FEIS) that proposed
various improvements along northsouth corridors in La Crosse County, WI.
FOR FURTHER INFORMATION CONTACT:
Lisa Hemesath, Environmental
Protection Specialist, Federal Highway
Administration, 525 Junction Road,
Suite 8000, Madison, Wisconsin,
53717–2157, Telephone: (608) 829–
7503.
Barry Paye, Director, Bureau of
Technical Services, Wisconsin
Department of Transportation, 4822
Madison Yards Way, 5th Floor,
Madison, WI 53705, Telephone: (608)
246–7945.
SUPPLEMENTARY INFORMATION: The
FHWA, as the lead Federal agency, in
cooperation with the WisDOT, is
rescinding the ROD and the FEIS that
proposed various improvements along
north-south corridors in La Crosse
County, WI. The purpose and need of
the FEIS were to develop transportation
corridors that supported all
transportation users, supported
economic growth, and met forecasted
transportation demand. The Notice of
Intent (NOI) to prepare the EIS was
published in the Federal Register on
July 27, 1995. The FEIS was approved
on January 7, 1998. The ROD was issued
on May 22, 1998. The FHWA has
determined, in conjunction with
WisDOT, that the ROD and the FEIS for
the project shall be rescinded for the
following reasons: a lack of support
from the public and stakeholders,
anticipated development in the corridor
has not occurred and forecasted travel
demand hasn’t been realized.
Any future Federal-aided action
within this corridor will comply with
environmental review requirements of
the National Environmental Policy Act
(NEPA) (42 U.S.C. 4321), FHWA
environmental regulations (23 CFR part
771) and related authorities, as
appropriate. Comments and questions
concerning this action should be
directed to FHWA or WisDOT at the
addresses provided above.
SUMMARY:
Glenn Fulkerson,
Division Administrator, FHWA Wisconsin
Division, Madison, WI.
[FR Doc. 2024–14993 Filed 7–8–24; 8:45 am]
BILLING CODE 4910–RY–P
E:\FR\FM\09JYN1.SGM
09JYN1
Agencies
[Federal Register Volume 89, Number 131 (Tuesday, July 9, 2024)]
[Notices]
[Pages 56470-56471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-15004]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on August 1, 2024. The Commission will hold this hearing in
person and telephonically. At this public hearing, the Commission will
hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION
section of this notice and any additional testimony on the proposed
rulemaking placed on the table at the June Commission meeting. Such
projects and actions are intended to be scheduled for Commission action
at its next business meeting, tentatively scheduled for September 12,
2024, which will be noticed separately. The public should note that
this public hearing will be the only opportunity to offer oral comments
to the Commission for the listed projects and actions. The deadline for
the submission of written comments is August 12, 2024.
DATES: The public hearing will convene on August 1, 2024, at 6:30 p.m.
The public hearing will end at 9:00 p.m. or at the conclusion of public
testimony, whichever is earlier. The deadline for submitting written
comments is Monday, August 12, 2024.
ADDRESSES: This public hearing will be conducted in person and
virtually. You may attend in person at Susquehanna River Basin
Commission, 4423 N Front St., Harrisburg, Pennsylvania, or join by
telephone at Toll-Free Number 1-877-304-9269 and then enter the guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423 or
[email protected]. The proposed rulemaking that was placed on the table
at the June Commission meeting can be viewed on the Federal Register
website with the following citation: 89 FR 20148. Information
concerning the project applications is available at the Commission's
Water Application and Approval Viewer at https://www.srbc.gov/waav.
Additional supporting documents are available to inspect and copy in
accordance with the Commission's Access to Records Policy at
www.srbc.gov/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.
SUPPLEMENTARY INFORMATION: In addition to hearing any additional
testimony on the proposed rulemaking, the public hearing will cover the
following projects:
Projects Scheduled for Action
1. Project Sponsor and Facility: Amazon Data Services, Inc. Project
Facility: PHL100 Data Center Campus, Salem Township, Luzerne County,
Pa. Application for consumptive use of up to 0.060 mgd (30-day
average).
2. Project Sponsor and Facility: Ashland Area Municipal Water
Authority, Butler Township, Schuylkill County, Pa. Application for
renewal of groundwater withdrawal of up to 0.115 mgd (30-day average)
from Well 5 (Docket No. 19931101). Service area is located in an
Environmental Justice area.
3. Project Sponsor: Borough of Middletown. Project Facility:
Middletown Water System, Borough of Middletown, Dauphin County, Pa.
Application for renewal of groundwater withdrawal of up to 1.070 mgd
(30-day average) from Well 6 (Docket No. 19970702). Service area is
located in an Environmental Justice area.
4. Project Sponsor and Facility: Caernarvon Township Authority,
Caernarvon Township, Berks County, Pa. Application for renewal of
groundwater withdrawal of up to 0.317 mgd (30-day average) from Well 8
(Docket No. 19940902). Service area is located in an Environmental
Justice area.
5. Project Sponsor and Facility: Chesapeake Appalachia, L.L.C.
(Loyalsock Creek), Forksville Borough, Sullivan County, Pa. Application
for renewal and modification of surface water withdrawal of up to 1.500
mgd (peak day) (Docket No. 20190903).
6. Project Sponsor and Facility: Clear Water Technology, LLC
(Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna
County, Pa. Application for surface water withdrawal of up to 1.440 mgd
(peak day).
7. Project Sponsor and Facility: Dillsburg Area Authority, Franklin
Township, York County, Pa. Application for renewal of groundwater
withdrawal of up to 0.199 mgd (30-day average) from Well 3 (Docket No.
20081207).
8. Project Sponsor: Greater Hazleton Community-Area New Development
Organization, Inc. Project Facility: CAN DO, Inc.--Corporate Center,
Butler Township, Luzerne County, Pa. Application for renewal of
groundwater withdrawal of up to 0.547 mgd (30-day average) from Well 1
(Docket No. 20090309).
9. Project Sponsor and Facility: Jersey Shore Area Joint Water
Authority, Pine Creek Township, Clinton County, Pa. Application for
groundwater withdrawal of up to 0.452 mgd (30-day average) from Pine
Creek Well 1, which is an increase of the quantity established in
Certificate of Registration No. GF-202012137.
10. Project Sponsor and Facility: JKLM Energy, LLC (Mill Creek),
Rutland Township, Tioga County, Pa. Application for surface water
withdrawal of up to 0.600 mgd (peak day).
11. Project Sponsor and Facility: JKLM Energy, LLC (Tioga River),
Lawrenceville Borough, Tioga County, Pa. Application for renewal with
an increase of surface water withdrawal of up to 1.800 mgd (peak day)
(Docket No. 20230610).
12. Project Sponsor and Facility: Municipal Authority of the
Borough of Mansfield, Richmond Township, Tioga County, Pa. Application
for renewal of groundwater withdrawal of up to 0.173 mgd (30-day
average) from Well 1 (Docket No. 19940707).
13. Project Sponsor: New Enterprise Stone & Lime Co., Inc. Project
Facility: Roaring Spring Quarry (Halter Creek 2), Taylor Township,
Blair County, Pa. Applications for renewal of consumptive use of up to
0.380 mgd (peak day) and surface water withdrawal of up to 0.288 mgd
(peak day) (Docket No. 19940705 and Certificate of Registration No. GF-
202204215).
14. Project Sponsor and Facility: Pennsylvania General Energy
Company,
[[Page 56471]]
L.L.C. (Loyalsock Creek), Plunketts Creek Township, Lycoming County,
Pa. Application for renewal of surface water withdrawal of up to 2.000
mgd (peak day) (Docket No. 20231213).
15. Project Sponsor: The Procter & Gamble Paper Products Company.
Project Facility: Mehoopany Plant, Washington Township, Wyoming County,
Pa. Application for renewal of consumptive use of up to 2.750 mgd (peak
day) (Docket No. 19940704).
16. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Lycoming Creek), McIntyre Township, Lycoming County, Pa. Application
for renewal of surface water withdrawal of up to 2.000 mgd (peak day)
(Docket No. 20190910).
17. Project Sponsor and Facility: Seneca Resources Company, LLC
(Marsh Creek), Delmar Township, Tioga County, Pa. Application for
renewal of surface water withdrawal of up to 0.499 mgd (peak day)
(Docket No. 20190911).
18. Project Sponsor and Facility: Shrewsbury Borough, York County,
Pa. Application for renewal of groundwater withdrawal of up to 0.120
mgd (30-day average) from the Woodlyn Well (Docket No. 19920501).
19. Project Sponsor and Facility: State College Borough Water
Authority, Benner Township, Centre County, Pa. Applications for renewal
of groundwater withdrawal (30-day averages) of up to 1.584 mgd from
Well 17, 0.576 mgd from Well 18, and 1.512 mgd from Well 19 (Docket No.
19930501).
20. Project Sponsor and Facility: Strasburg Lancaster County
Borough Authority, Strasburg Township, Lancaster County, Pa.
Application for renewal of groundwater withdrawal of up to 0.275 mgd
(30-day average) from the Fisher Well (Docket No. 19890107). Service
area is located in an Environmental Justice area.
21. Project Sponsor: TableTrust Brands LLC. Project Facility:
Freebird East, Bethel Township, Lebanon County, Pa. Application for
renewal of groundwater withdrawal of up to 0.199 mgd (30-day average)
from Well 8 (Docket No. 19990701).
22. Project Sponsor: UGI Development Company. Project Facility:
Hunlock Creek Energy Center (Susquehanna River), Hunlock Township,
Luzerne County, Pa. Applications for renewal of surface water
withdrawal of up to 55.050 mgd (peak day) and consumptive use of up to
2.396 mgd (peak day) (Docket No. 20090916).
23. Project Sponsor and Facility: Williamsburg Municipal Authority,
Catharine Township, Blair County, Pa. Application for renewal of
groundwater withdrawal of up to 0.180 mgd (30-day average) from Well 3
(Docket No. 19940702).
24. Project Sponsor and Facility: XTO Energy Inc. (West Branch
Susquehanna River), Chapman Township, Clinton County, Pa. Application
for renewal of surface water withdrawal of up to 2.000 mgd (peak day)
(Docket No. 20190912). Located in an Environmental Justice area.
Opportunity To Appear and Comment
Interested parties may appear or call into the hearing to offer
comments to the Commission on any business listed above required to be
the subject of a public hearing. Given the nature of the meeting, the
Commission strongly encourages those members of the public wishing to
provide oral comments to pre-register with the Commission by emailing
Jason Oyler at [email protected] before the hearing date. The presiding
officer reserves the right to limit oral statements in the interest of
time and to control the course of the hearing otherwise. Access to the
hearing via telephone will begin at 6:15 p.m. Guidelines for the public
hearing are posted on the Commission's website, www.srbc.gov, before
the hearing for review. The presiding officer reserves the right to
modify or supplement such guidelines at the hearing. Written comments
on any business listed above required to be the subject of a public
hearing may also be mailed to Mr. Jason Oyler, Secretary to the
Commission, Susquehanna River Basin Commission, 4423 North Front
Street, Harrisburg, Pa. 17110-1788, or submitted electronically through
https://www.srbc.gov/meeting-comment/default.aspx?type=2&cat=7.
Comments mailed or electronically submitted must be received by the
Commission on or before Monday, August 12, 2024, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806,
807, and 808.
Dated: July 3, 2024.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2024-15004 Filed 7-8-24; 8:45 am]
BILLING CODE 7040-01-P