Atlantic Wind Lease Sale 10 for Commercial Leasing for Wind Power Development on the U.S. Central Atlantic Outer Continental Shelf-Final Sale Notice, 54506-54519 [2024-14462]

Download as PDF 54506 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices National Park Service is not responsible for the determinations in this notice. ddrumheller on DSK120RN23PROD with NOTICES1 Abstract of Information Available A total of 1,277 cultural items have been requested for repatriation. Under the auspices of the Robert S. Peabody Institute of Archaeology (then the Department of Archaeology at Phillips Academy), Warren K. Moorehead conducted an archeological survey of Maine from 1912–1920. During this survey, Moorehead removed thousands of items from multiple cemetery and burial sites in the state and sent much of it to what is now the Robert S. Peabody Institute of Archaeology. Moorehead detailed his expedition in A Report on the Archaeology of Maine published in 1922. While much of the material removed from these sites is housed at the Peabody Institute, Moorehead also traded items from Maine cemeteries with other institutions. Some cultural items from these cemeteries are present in other institutional collections. The 828 unassociated funerary objects were removed from seven known cemeteries in Hancock County, ME. The 828 cultural items include flaked and ground stones, modified faunal remains, ceramic fragments, and samples of soil, ochre, and charcoal. Of those items listed above, 74 are recorded in the Peabody Institute’s database but could not be located. Peabody Institute staff members continue to look for these 74 missing items. The nine unassociated funerary objects were removed from one known cemetery in Kennebec County, ME. The nine cultural items are chipped and ground stones. The 297 unassociated funerary objects were removed from three known cemeteries in Knox County, ME. The 297 cultural items include flaked and ground stones, modified flora and faunal remains, and ceramic fragments. Of those items listed above, 11 are recorded in the Peabody Institute’s database but could not be located. Peabody Institute staff members continue to look for these 11 missing items. The 142 unassociated funerary objects were removed from three known cemeteries in Penobscot County, ME. The 142 cultural items include flaked and ground stones as well as samples of soil, pyrite, and ochre. The one unassociated funerary object was removed from a known cemetery in Somerset County, ME. The one unassociated funerary item is a pipe. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Determinations The Robert S. Peabody Institute of Archaeology has determined that: • The 1,277 unassociated funerary objects described in this notice are reasonably believed to have been placed intentionally with or near human remains, and are connected, either at the time of death or later as part of the death rite or ceremony of a Native American culture according to the Native American traditional knowledge of a lineal descendant, Indian Tribe, or Native Hawaiian organization. The unassociated funerary objects have been identified by a preponderance of the evidence as related to human remains, specific individuals, or families, or removed from a specific burial site or burial area of an individual or individuals with cultural affiliation to an Indian Tribe or Native Hawaiian organization. • There is a reasonable connection between the cultural items described in this notice and the Houlton Band of Maliseet Indians; Mi’kmaq Nation (previously listed as Aroostook Band of Micmacs); Passamaquoddy Tribe; and the Penobscot Nation. Requests for Repatriation Additional, written requests for repatriation of the cultural items in this notice must be sent to the authorized representative identified in this notice under ADDRESSES. Requests for repatriation may be submitted by any lineal descendant, Indian Tribe, or Native Hawaiian organization not identified in this notice who shows, by a preponderance of the evidence, that the requestor is a lineal descendant or a culturally affiliated Indian Tribe or Native Hawaiian organization. Repatriation of the cultural items in this notice to a requestor may occur on or after July 31, 2024. If competing requests for repatriation are received, the Robert S. Peabody Institute of Archaeology must determine the most appropriate requestor prior to repatriation. Requests for joint repatriation of the cultural items are considered a single request and not competing requests. The Robert S. Peabody Institute of Archaeology is responsible for sending a copy of this notice to the Indian Tribes and Native Hawaiian organizations identified in this notice and to any other consulting parties. Authority: Native American Graves Protection and Repatriation Act, 25 U.S.C. 3004 and the implementing regulations, 43 CFR 10.9. PO 00000 Frm 00103 Fmt 4703 Sfmt 4703 Dated: June 24, 2024. Melanie O’Brien, Manager, National NAGPRA Program. [FR Doc. 2024–14465 Filed 6–28–24; 8:45 am] BILLING CODE 4312–52–P DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management [Docket No. BOEM–2022–0023] Atlantic Wind Lease Sale 10 for Commercial Leasing for Wind Power Development on the U.S. Central Atlantic Outer Continental Shelf—Final Sale Notice Bureau of Ocean Energy Management, Interior. ACTION: Final sale notice. AGENCY: This Final Sale Notice (FSN) contains information pertaining to the areas available for commercial wind power leasing during Atlantic Wind Lease Sale 10 (ATLW–10) on the U.S. Central Atlantic Outer Continental Shelf (OCS). Specifically, this FSN details certain provisions and conditions of the leases, auction details, the lease form, criteria for evaluating competing bids, and procedures for award, appeal, and lease execution. The Bureau of Ocean Energy Management (BOEM) will offer two leases for sale using an ascending clock auction with multiple-factor bidding: Lease OCS–A 0557 and Lease OCS–A 0558 (Lease Areas). Bidders will be subject to a ‘one-per-customer’ rule, as explained below. BOEM will use new auction software for the lease sale, resulting in minor changes to the auction rules. The Lease Areas are in the previously identified wind energy areas (WEAs) A–2 and C–1, offshore the States of Delaware and Maryland and the Commonwealth of Virginia. The issuance of any lease resulting from this sale will not constitute approval of project-specific plans to develop offshore wind energy. Such plans, if submitted by the Lessee, will be subject to environmental, technical, and public reviews prior to a BOEM decision on whether the proposed activity should be authorized. DATES: BOEM will hold an online mock auction for potential bidders starting at 9:00 a.m. Eastern Daylight Time (EDT) on August 12, 2024. The monetary auction will be held online and will begin at 9:00 a.m. EDT on August 14, 2024. Additional details are provided in the section entitled, ‘‘Deadlines and Milestones for Bidders.’’ FOR FURTHER INFORMATION CONTACT: Bridgette Duplantis, Bureau of Ocean SUMMARY: E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices ddrumheller on DSK120RN23PROD with NOTICES1 Energy Management, Office of Leasing and Plans, 1201 Elmwood Park Boulevard, New Orleans, Louisiana 70123, (504) 736–7502 or bridgette.duplantis@boem.gov. SUPPLEMENTARY INFORMATION: I. Background a. Call for Information and Nominations (Call): On April 29, 2022, BOEM published the Call for Information and NominationsCommercial Leasing for Wind Power Development on the Central Atlantic Outer Continental Shelf (see 87 FR 25539). The Call consisted of six areas labeled A–F. BOEM received 66 comments from the general public; Federal, State, and local agencies; the fishing industry; industry groups; developers; non-governmental organizations (NGOs); universities; and other stakeholders. Comments can be viewed at https://www.regulations.gov/ document/BOEM-2022-0023-0001/ comment. Three developers nominated areas for a commercial wind energy lease within the Call Area. b. Area Identification (Area ID): After modifying the Area ID process in a Notice to Stakeholders, which is available at https://www.boem.gov/ newsroom/notes-stakeholders/boemenhances-its-processes-identify-futureoffshore-wind-energy-areas, BOEM used this process to support identification of draft WEAs in the Central Atlantic. After the close of the Call comment period on June 28, 2022, BOEM initiated the Area ID process by reviewing the input received on the Call. BOEM and the National Oceanic and Atmospheric Administration’s (NOAA’s) National Centers for Coastal Ocean Science (NCCOS) Team used an ocean planning tool to identify the eight draft WEAs on the U.S. Central Atlantic OCS using the methodology outlined in the BOEM and NCCOS Draft Report: Development of the Central Atlantic Wind Energy Areas, which can be found at https:// www.boem.gov/sites/default/files/ documents/renewable-energy/stateactivities/BOEM_NCCOS_JointReport_ DraftWEAs.pdf. On November 16, 2022, BOEM opened a 30-day public comment period on eight draft WEAs on the OCS offshore the U.S. Central Atlantic coast, covering approximately 1.7 million acres. BOEM considered the following non-exclusive information sources when identifying the draft WEAs: comments and nominations received on the Call; information from the Central Atlantic Intergovernmental Renewable Energy Task Force; input from Delaware, Maryland, Virginia, and North Carolina state agencies; input VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 from Federal agencies; input from federally recognized Tribes; comments from stakeholders and ocean users, including the maritime community, offshore wind developers, and the commercial and recreational fishing industry; state and local renewable energy goals; and information on domestic and global offshore wind market and technological trends. BOEM’s draft WEA recommendations did not reflect a final assessment from the Department of Defense (DoD) regarding compatibility of the draft WEAs with DoD needs. After the close of the draft WEA comment period on December 16, 2022, BOEM finalized the Area ID process after reviewing the input received from all stakeholders mentioned above and the DoD assessment. BOEM announced the final WEAs on July 31, 2023, by designating three WEAs within the Call Area. The first WEA (A–2) is 101,767 acres and located approximately 26 nautical miles (nm) from the mouth of the Delaware Bay. The second WEA (B– 1) is 78,285 acres and located 23.5 nm offshore Ocean City, Maryland. The third WEA (C–1) is 176,506 acres and located approximately 35 nm from the mouth of the Chesapeake Bay. The final WEAs comprise 356,558 acres and would support approximately 4.3–8.1 GW of energy production if fully developed. BOEM, DoD (the Departments of the Air Force and Navy), and the National Aeronautics and Space Administration (NASA) agreed to undertake an in-depth review of WEA B–1 to determine if the impacts to military and NASA operations could be acceptable and/or mitigated. The Central Atlantic Area ID process and documentation can be found at https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. c. Environmental Reviews: On August 1, 2023, BOEM published a notice of intent to prepare an environmental assessment (EA) to consider potential environmental consequences of site characterization activities (e.g., biological, archaeological, geological, and geophysical surveys and core samples) and site assessment activities (e.g., installation of meteorological buoys) that are expected to take place after issuance of wind energy leases in the Call Area. When scoping the EA, BOEM sought comments on the issues and alternatives that should inform the EA. BOEM received 104 comment submissions, which can be found at https://www.regulations.gov under Docket No. BOEM–2023–0034. In addition to the preparation of the Draft EA, including compliance with threatened and endangered species PO 00000 Frm 00104 Fmt 4703 Sfmt 4703 54507 requirements for certain data collection activities associated with OCS leasing (https://www.boem.gov/sites/default/ files/documents/renewable-energy/ OSW-surveys-NLAA-programmatic.pdf), BOEM initiated other required consultations under the Endangered Species Act, the Magnuson-Stevens Fishery Conservation and Management Act, and the Coastal Zone Management Act. The EA and associated consultations informed BOEM’s decision on whether to proceed with this FSN. BOEM will conduct additional environmental reviews upon receipt of a Lessee’s Construction and Operations Plan (COP) if the proposed leases reach that stage of development. II. List of Eligible Bidders BOEM has determined that the following 17 entities are legally, technically, and financially qualified to bid in the ATLW–10 auction, pursuant to 30 CFR 585.107 and 585.108: Company name Atlantic Shores Offshore Wind, LLC ....... Avangrid Renewables, LLC ..................... BP Central Atlantic Offshore Wind LLC .. Corio USA Projectco LLC ....................... energyRE Offshore Wind Holdings, LLC Equinor Wind US LLC ............................. Invenergy Central Atlantic Offshore LLC OW North America Ventures LLC ........... Reventus Power Central Atlantic, LLC ... RWE Offshore US CATL, LLC ................ Seaglass Offshore Wind II, LLC ............. Shell New Energies US LLC ................... TotalEnergies Renewables USA, LLC .... US Mainstream Renewable Power Inc ... US Wind Inc ............................................ Vineyard Central Atlantic LLC ................. Virginia Electric and Power Company .... Company No. 15092 15019 15195 15182 15171 15058 15193 15133 15194 15190 15155 15140 15136 15089 15023 15192 15042 a. Affiliated Entities: On the Bidder’s Financial Form (BFF), discussed in sections III(a)(i) and X below, eligible bidders must list any other eligible bidders with whom they are affiliated. For the purpose of identifying affiliated entities, a bidding entity is any individual, firm, corporation, association, partnership, consortium, or joint venture (when established as a separate entity) that is participating in the same auction. BOEM considers bidding entities to be affiliated when: i. They own or have common ownership of more than 50 percent of the voting securities, or instruments of ownership or other forms of ownership, of another bidding entity. Ownership of less than 10 percent of another bidding entity constitutes a presumption of noncontrol that BOEM may rebut. ii. They own or have common ownership of between 10 and 50 percent of the voting securities or instruments of ownership, or other forms of ownership, of another bidding entity, and BOEM E:\FR\FM\01JYN1.SGM 01JYN1 54508 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices ddrumheller on DSK120RN23PROD with NOTICES1 determines that there is control upon consideration of factors including the following: a. The extent to which there are common officers or directors. b. With respect to the voting securities, or instruments of ownership or other forms of ownership: The percentage of ownership or common ownership, the relative percentage of ownership or common ownership compared to the percentage(s) of ownership by other bidding entities, if a bidding entity is the greatest single owner, or if there is an opposing voting bloc of greater ownership. c. Shared ownership, operation, or day-to-day management of a lease, grant, or facility, as those terms are defined in BOEM’s regulations at 30 CFR 585.113. iii. They are both direct, or indirect, subsidiaries of the same parent company. iv. With respect to any lease(s) offered in this auction, they have entered into an agreement prior to the auction regarding the shared ownership, operation, or day-to-day management of such lease. v. Other evidence indicates the existence of power to exercise control, such as evidence that one bidding entity has power to exercise control over the other, or that multiple bidders collectively have the power to exercise control over another bidding entity or entities. Affiliated entities are not permitted to compete against each other in the auction. Where two or more affiliated entities have qualified to bid in the auction, the affiliated entities must decide prior to the auction which one (if any) will participate in the auction. If two or more affiliated entities attempt to participate in the auction, BOEM will disqualify those bidders from the auction. III. Deadlines and Milestones for Bidders This section describes the major deadlines and milestones in the auction process from publication of this FSN to execution of a lease issued pursuant to this sale. a. FSN Waiting Period: During the period between FSN publication and the lease auction, qualified bidders must take several steps to remain eligible to participate in the auction. i. Bidder’s Financial Form: Each bidder must submit a BFF to BOEM to participate in the auction. The BFF must include each bidder’s Conceptual Strategy for each bidding credit for which that bidder wishes to be considered. BOEM must receive each bidder’s BFF on or before July 12, 2024, VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 and it is each bidder’s responsibility to ensure BOEM’s timely receipt. If a bidder does not submit a BFF by this deadline, BOEM, in its sole discretion, may grant an extension to that bidder only if BOEM determines the bidder’s failure to timely submit a BFF was caused by events beyond the bidder’s control. The BFF can be downloaded at: https://www.boem.gov/renewableenergy/state-activities/central-atlantic. Once BOEM has processed a bidder’s BFF, the bidder is allowed to log into pay.gov and submit a bid deposit. For purposes of this auction, BOEM will not consider BFFs submitted for previous lease sales. An original signed BFF may be mailed to BOEM’s Office of Renewable Energy Programs. A signed copy of the form may be submitted in PDF format to renewableenergy@ boem.gov. A faxed copy will not be accepted. BFF submissions should be accompanied with a transmittal letter on company letterhead. The BFF must be executed on paper with a wet signature or with a digital signature affixed by an authorized representative listed on the bidder’s current legal qualification card on file with BOEM, subject to 18 U.S.C. 1001 (Fraud and False Statements). Further information about the BFF can be found in the ‘‘Bidder’s Financial Form’’ section X of this notice. ii. Bid Deposit: Once BOEM has processed a BFF and provided the appropriate information to the Office of Natural Resources Revenue (ONRR), ONRR will populate the Bid Deposit Forms and notify the bidders of access to pay.gov for the bid deposits. The bidder must log into https:// www.pay.gov to submit a bid deposit. To participate in the mock auction and the monetary auction, each qualified bidder must provide a bid deposit of $5,000,000 no later than July 29, 2024. BOEM will grant extensions to this deadline only if BOEM, in its sole discretion, determines that the failure to timely submit the bid deposit was caused by events beyond the bidder’s control. Further information about bid deposits can be found in the ‘‘Bid Deposit’’ section XI of this notice. In accordance with 30 CFR 585.222(e), BOEM will send a written notice of its decision to accept or reject bids to all bidders whose deposits we hold. b. Conducting the Auction: i. Affirmative Action: Prior to bidding in the monetary auction, each bidder must file the Equal Opportunity Affirmative Action Representation Form BOEM–2032 (February 2020, available on BOEM’s website at https:// www.boem.gov/BOEM-2032/) and the Equal Opportunity Compliance Report Certification Form BOEM–2033 PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 (February 2020, available on BOEM’s website at https://www.boem.gov/BOEM2033/) with the BOEM Office of Renewable Energy Programs. The forms can be submitted digitally to renewableenergy@boem.gov or mailed to the BOEM Office of Renewable Energy Programs. This certification is required by 41 CFR part 60 and Executive Order (E.O.) 11246, issued September 24, 1965, as amended by E.O. 11375, issued October 13, 1967, and by E.O. 13672, issued July 21, 2014. Both forms must be on file with BOEM for the bidder(s) prior to the execution of any lease contract. ii. Notification of Eligibility for Bidding Credits: BOEM will notify each bidder of its eligibility for bidding credits prior to the Mock Auction. iii. Mock Auction: BOEM will hold a Mock Auction on August 12, 2024, beginning at 9:00 a.m. EDT, which is open only to qualified bidders who have met the requirements and deadlines for auction participation, including submission of the bid deposit. The Mock Auction is intended to give bidders an opportunity to clarify auction rules, test the functionality of the auction software, and identify any potential issues that may arise during the auction. iv. The Auction: On August 14, 2024, BOEM, through its contractor, will commence the multiple-factor auction. The first round of the auction will start at 9:00 a.m. EDT. The auction will proceed electronically according to a schedule to be distributed by the BOEM Auction Manager at the beginning of the auction, subject to any revisions (which will be communicated to bidders during the auction). BOEM anticipates that the auction will last one or two business days, but the auction may continue for additional business days, as necessary, until the auction ends in accordance with the procedures described in the ‘‘Auction Procedures’’ section of this notice. v. Announce Provisional Winners: BOEM will announce the provisional winners of the lease sale after the auction ends. c. From the Auction to Lease Execution: i. Refund Non-Winners: Once the provisional winners have been announced, BOEM will provide the non-winners with a written explanation of why they did not win and will return their bid deposits. ii. Department of Justice (DOJ) Review: DOJ will have 30 days in which to conduct an antitrust review of the auction, pursuant to 43 U.S.C. 1337(c). iii. Delivery of the Lease: BOEM will send three lease copies to each E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices provisional winner, with instructions on how to execute the lease. Once the lease has been fully executed, a provisional winner becomes an auction winner. The first year’s rent is due 45 calendar days after the auction winners receive the lease copies for execution. iv. Return the Lease: Within ten business days of receiving the lease copies, the auction winners must post financial assurance, pay any outstanding balance of their winning bids (i.e., winning cash bid less applicable bid deposits), and sign and return the three executed lease copies. The winners may request extensions and BOEM may grant such extensions if BOEM determines the delay was caused by events beyond the requesting winner’s control, pursuant to 30 CFR 585.224(e). v. Execution of Lease: Once BOEM has received the signed lease copies and verified that all other required materials have been received, BOEM will make a final determination regarding its issuance of the leases and will execute the leases, if appropriate. IV. Areas Offered for Leasing The two Lease Areas included in this FSN are the same size and orientation as described in the Proposed Sale Notice (PSN). BOEM’s designation of the two Lease Areas offered in the FSN is informed by extensive coordination with BOEM’s intergovernmental task force members, consultation and engagement with Tribes, stakeholder engagement, a partnership with NOAA’s NCCOS to utilize spatial modeling to inform the identification of WEAs, and 54509 consideration of the 42 comments that BOEM received in response to the PSN. The two areas BOEM is offering for lease are: Lease Area A–2, OCS–A 0557, which consists of 101,443 acres and is approximately 26.4 nm from the mouth of the Delaware Bay; and Lease Area C– 1, OCS–A 0558, which consists of 176,505 acres and is approximately 35 nm from the mouth of the Chesapeake Bay. Descriptions of the proposed Lease Areas can be found in Addendum A of the proposed leases, which can be found on BOEM’s website at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. The areas available for lease, as listed in Table 1, will be auctioned in a single auction. TABLE 1—ATLW–10 FINAL LEASE AREAS Lease area name Acres A–2 ..................................................................................................................................................................... C–1 .................................................................................................................................................................... OCS–A 0557 OCS–A 0558 101,443 176,505 Total ............................................................................................................................................................ .............................. 277,948 a. Map of the Area for Leasing: A map of the lease areas, and GIS spatial files X, Y (eastings, northings) UTM Zone 18, NAD83 Datum, and geographic X, Y (longitude, latitude), NAD83 Datum can be found on BOEM’s website at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. V. Lease Stipulations ddrumheller on DSK120RN23PROD with NOTICES1 Lease area ID BOEM is including several lease stipulations in Addendum C of each lease related to reporting requirements, avoiding and minimizing potential future user conflicts and environmental impacts, project labor agreements, national security, and project design. a. Reporting requirements: BOEM is including stipulations similar to those found in previous leases requiring a semi-annual progress report from lessees and regular engagement with Tribes and parties that may be affected by lessees’ activities on the OCS. The lease stipulations require working with BOEM to identify: Tribes that have cultural and/or historical ties to the Lease Areas, and potentially affected parties; coastal communities; commercial and recreational fishing industries and stakeholders; educational and research institutions; environmental and public interest NGOs; federal, state, and local agencies; mariners and the maritime industry; ocean users; submarine cable operators; and underserved communities, as defined in VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 section 2 of E.O. 13985. The report must identify Tribes and parties that may be affected by lessees’ activities on the OCS and with whom the lessees have engaged; provide updates on engagement activities; document potential adverse effects to the interests of Tribes and parties; document how, if at all, a project has been informed or altered to address those potential effects; include feedback from engagement regarding transmission planning prior to proposing any export cable route; provide information that can be made available to the public; and include strategies to reach potentially affected individuals with Limited English Proficiency. The stipulations include requirements for lessees to engage in ways that minimize linguistic, technological, cultural, capacity, or other obstacles. The stipulations encourage lessees to work collaboratively with governments, community leadership and organizations, and Tribes and to develop specific frameworks for capacity building. In acknowledgment of the existing and growing consultation burden placed on many of the Tribes and parties, the stipulation also requires, to the maximum extent practicable, that lessees coordinate with one another on engagement activities. It is BOEM’s intention that this requirement for lessees to coordinate their engagement PO 00000 Frm 00106 Fmt 4703 Sfmt 4703 apply not only to meetings proposed by lessees, but also to reasonable requests to coordinate engagement made by Tribes and parties. Coordinated engagement among Tribes and lessees is strongly encouraged and is in addition to BOEM’s responsibilities to federally recognized Tribes under E.O. 13175. In addition, the reporting stipulation requires that the progress report incorporate separate lease requirements for the development of communication plans for Tribal governments (Native American Tribes Communications Plan), agencies (Agency Communications Plan), and fisheries (Fisheries Communications Plan). Lastly, the progress report must include an update on activities executed under any survey plan. b. Commercial Fisheries: BOEM is including a stipulation that contains components of stipulations included in prior commercial leases issued by BOEM, including a requirement for a Fisheries Communications Plan. c. Protected Species: Unless otherwise authorized by BOEM, Lessee’s OCS activities must comply with the standards in the Project Design Criteria and Best Management Practices found in BOEM’s notice (https:// www.boem.gov/sites/default/files/ documents//PDCs%20and%20BMPs %20for%20Atlantic%20 Data%20Collection%2011222021.pdf) last revised on November 22, 2021. The E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 54510 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices 2021 Biological Assessment and letter of concurrence from which these measures were derived may be found here: https://www.boem.gov/renewableenergy/state-activities/nmfs-esaconsultations. At the Lessee’s option, the Lessee, its operators, personnel, and contractors may satisfy this requirement by complying with the National Marine Fisheries Service approved measures to safeguard protected species that are most current at the time. d. Marine Mammal Protection Act Authorization(s): If the Lessee is required to obtain an authorization pursuant to section 101(a)(5) of the Marine Mammal Protection Act prior to conducting survey activities in support of plan submittal, the Lessee must provide to BOEM a copy of the authorization prior to commencing these activities. e. Project Labor Agreements (PLAs) and Supply Chain: BOEM is committed to workforce safety and the establishment of a durable domestic supply chain that can sustain the U.S. offshore wind energy industry, including for the leases offered in this sale. To advance these goals, BOEM is including two lease stipulations, one that encourages construction efficiency for projects and one that contributes towards establishing a domestic supply chain: i. The first stipulation requires lessees to make every reasonable effort to enter into a PLA covering the construction stage of any project for the Lease Areas. ii. The second stipulation requires lessees to establish a Statement of Goals in which the Lessee describes its plans for contributing to the creation of a robust and resilient U.S.-based offshore wind industry supply chain that would facilitate this or other renewable energy projects permitted by BOEM. The Lessee is required to provide regular progress updates on the achievement of those goals to BOEM, and BOEM will make those updates publicly available. f. Research Site Access: This stipulation makes explicit that BOEM, its designated representative, or any entity to which BOEM provides access retains the right to access the Lease Area for purposes of future research. This provision does not limit the Lessor’s authority to access the lease for other purposes, including, but not limited to, inspections conducted pursuant to 30 CFR 285.822. g. Archaeological Survey Requirements: This stipulation requires that the Lessee provide to BOEM, in the associated plan submissions, a description of the methods it will use to conduct archaeological surveys in support of plans (i.e., Site Assessment VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Plan (SAP) and/or COP), in addition to the survey results. The Lessee is required to coordinate a Tribal presurvey meeting with Tribes that have cultural and/or historical ties to the Lease Area, and the Lessee must work with BOEM to identify such Tribes. In the post-review discovery clauses, the stipulation requires that, in the event of an unanticipated discovery of a potential archaeological resource, the Lessee will immediately halt bottomdisturbing activities occurring within 305 meters (1,000 feet) or less of the discovery and that the avoidance distance must be calculated from the maximum discernible extent of the archaeological resource. h. Foreign Interest: To protect national defense capabilities and military operations, BOEM is requiring the Lessee to provide to DoD specific information about the personnel allowed to access the wind turbine structures and associated data systems. That information includes the names of entities or persons having a direct ownership interest in an offshore wind facility, as well as any changes in ownership interests; and the names of the material vendors, entities, and persons with which the Lessee will potentially execute contracts to perform construction, supply turbines or other components, or conduct construction and operational activities at the facility. In addition, the Lessee must resolve DoD’s security concerns before it allows access to the site by foreign persons or representatives of foreign entities for which DoD has raised concerns and before the Lessee uses wind turbines or other permanent on-site equipment manufactured by such an entity. i. Notice of Assignment to the Committee on Foreign Investment in the United States (CFIUS): Under BOEM’s regulations, a Lessee must be one of the following: (1) a citizen or national of the United States; (2) an alien lawfully admitted for permanent residence in the United States, as defined in 8 U.S.C. 1101(a)(20); (3) a private, public, or municipal corporation organized under the laws of any State of the United States, the District of Columbia, or any territory or insular possession subject to U.S. jurisdiction; (4) an association of such citizens, nationals, resident aliens, or corporations; (5) an Executive Agency of the United States, as defined in 5 U.S.C. 105; (6) a State of the United States; or (7) a political subdivision of States of the United States. BOEM is including a stipulation that requires any proposed assignee of the lease that is a foreign-controlled business entity under the regulations at 31 CFR part 800 to provide joint notice, with the Lessee/ PO 00000 Frm 00107 Fmt 4703 Sfmt 4703 assignor, to CFIUS of the proposed leasing transaction, in accordance with applicable regulations at 31 CFR part 800, subpart D, and provide a copy of the notice to the DoD. In addition, approval of any assignment of lease interest to a foreign-controlled business entity under 31 CFR part 800 is subject to this CFIUS notice stipulation. Such assignments would take place only after CFIUS provides notice that it has concluded all necessary reviews under section 721 of the Defense Production Act of 1950, as amended, with respect to the leasing decision or assignment. j. Transmission Planning: The Lessee must—to the extent that it is technically and economically practical or feasible— consider the use of shared cable corridors, regional transmission systems, meshed systems, or other mechanisms for transmission facilities proposed in a COP. Such consideration must be done in accordance with stipulation 3.1.1, which requires the Lessee to engage with Tribes and parties regarding transmission planning prior to proposing any export cable route. The foregoing does not prevent the Lessee from proposing the use of transmission systems traditionally constructed in a Project easement in any COP that the Lessee submits; nor does it prevent BOEM from requiring in a COP approval the use of cable corridors, regional transmission systems, meshed systems, or other mechanisms for transmission facilities, if deemed technically and economically practical or feasible by BOEM. k. NASA Operations (Lease OCS–A 0558): NASA and the Missile Defense Agency identified potential impacts to operations originating from the Wallops Island Flight Facility. BOEM has included stipulations in Lease OCS–A 0558 to avoid and minimize this potential conflict with wind energy development. In response to public comment, BOEM worked with NASA to provide additional clarification on the type and frequency of NASA activities expected to impact the lease area, the affected portions of the lease area, and the circumstances necessitating suspension of operations and/or evacuation. The additional information is found on BOEM’s website at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. l. Siting Conditions (Lease OCS–A 0558): BOEM has included lease stipulations addressing surface structure layout and orientation based on input from the U.S. Coast Guard to avoid and minimize potential vessel navigation issues as a result of Lease OCS–A 0558 being adjacent to existing lease OCS–A 0483. An additional stipulation has E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices been added to avoid and minimize impacts to the existing Dunant cable within Lease Area OCS–A 0558. ddrumheller on DSK120RN23PROD with NOTICES1 VI. Potential Future Restrictions a. Potential Future Restrictions to Mitigate Potential Conflicts with Department of Defense Activities: Those interested in bidding should be aware of potential conflicts with DoD’s existing uses of the OCS. BOEM coordinates with DoD throughout the leasing process and the Military Aviation and Installation Assurance Siting Clearinghouse (Clearinghouse) conducted a DoD assessment of the Call Area. The assessment identified the following potential issues that may require mitigation. Lessees will be expected to coordinate with the Clearinghouse to assess and mitigate the impact on DoD activities as they design their proposed facilities. i. Air Surveillance and Radar: The North American Aerospace Defense Command (NORAD) mission may be affected by the development of the Lease Area(s). Considering both the expected height of offshore turbines and future cumulative wind turbine effects, adverse impacts can be mitigated through the use of Radar Adverseimpact Management (RAM) 1 and overlapping radar coverage. For projects where RAM mitigation is acceptable, BOEM anticipates including the following project approval conditions: (1) Lessee will notify NORAD when the project is within 30–60 days of completion of commissioning of the last wind turbine generator (WTG) (meaning every WTG in the Project is installed with potential for blade rotation), and again when the project is complete and operational, for RAM scheduling; (2) Lessee will contribute funds to DoD in the amount of no less than $80,000 toward the cost of DoD’s execution of the RAM procedures for each radar system affected; and (3) Lessee will curtail wind turbine operations for national security or defense purposes as described in the lease. ii. Advanced Dynamic Aircraft Measurement System (ADAMS) operations: The operation of wind turbines within Lease Area OCS–A 0558 (C–1) may interfere with the operations of the Advanced Dynamic Aircraft Measurement System (ADAMS), located at Naval Air Station Patuxent River, Maryland. Should interference and negative impacts on ADAMS be identified as a 1 RAM is the technical process designed to minimize the adverse impact of obstruction interference on a radar system. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 result of a Lessee’s operations on Lease OCS–A 0558, BOEM may require the Lessee as a future condition of approval to work with the Department of Defense (DoD) to mitigate impacts to ADAMS. The extent of impact, if any, is not currently known and DoD is undertaking modeling and data collection to assess impacts using the turbines constructed on the existing, neighboring Lease OCS–A 0483. Expected mitigation for interference with ADAMS caused by wind turbine operation is currently limited to curtailment of turbine operations during test events. Depending on the degree of impact and availability of additional mitigations, BOEM may require the Lessee to curtail operation of the wind facility to support ADAMS operation, if DoD determines curtailment is required. DoD projects curtailment requirements to be up to 1750 scheduled hours per year. This estimate is based on assumptions that can be refined as more information becomes available. Assumptions include: • DoD projections for research, development, test, and evaluation demands on ADAMS; • interference from a wind facility would occur every time a test is scheduled (as opposed to only during periods when atmospheric ducting coincides with ADAMS operations and interference is possible); • the Lessee has limited flexibility to continue or resume power generation once the curtailment is scheduled with the power grid operator in the event ADAMS operations are canceled or suspended; • Power grid scheduling assumptions include: (1) curtailment must be scheduled at least 72 hours prior to the ADAMS event; (2) curtailment cannot be canceled within the 24-hour window prior to the scheduled event; and (3) curtailment hours cannot be adjusted within the 72-hour window prior to the scheduled event. The actual number of ADAMS operating hours executed will be less than scheduled but may not be known until less than 24 hours in advance of the ADAMS event. If the future Lessee is not constrained by the grid operator (as in the power grid assumptions above), the number of hours of curtailment could be substantially less. Actual curtailment requirements will be subject to validation by DoD of the project’s effects on ADAMS and may increase or decrease based upon national defense mission requirements. Alternative mitigation measures may also be developed prior to construction and operation of the project. PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 54511 iii. U.S. Air Force and U.S. Air Force Air National Guard operations: The U.S. Air Force noted that the airspace above both proposed Lease Areas has a floor of 1,000 feet above sea level. The U.S. Air Force requested BOEM limit structure heights to no higher than 1,000 feet above sea level. BOEM will further coordinate with DoD and the Lessee to deconflict potential impacts throughout the project design and COP review stage, which may result in adding mitigation measures or terms and conditions as part of any COP approval. BOEM may require the Lessee to enter into an agreement with DoD to implement any conditions and mitigate any identified impacts. b. Potential Future Restrictions within Significant Sediment Resource Areas: Potential bidders are advised that BOEM has developed sand resource areas in aliquots offshore the Mid Atlantic (MMIS Application (https:// mmis.doi.gov/BOEMMMIS/)). OCS sand resource areas are composed of sand deposits found on or below the surface of the OCS seabed. If it is determined that significant OCS sand resources may be impacted by a proposed activity, BOEM may require the Lessee to undertake measures deemed economically, environmentally, and technically feasible to protect the resources to the maximum extent practicable, including minimizing, avoiding, and mitigating impact to these resources. Measures may include modification of proposed transmission corridor locations. There is also potential for sand resources to exist in aliquots not currently identified. BOEM and/or the Bureau of Safety and Environmental Enforcement (BSEE) will not approve future requests for in-place decommissioning of cables in sand resource areas unless BOEM’s Marine Minerals Program has determined that the cable corridor does not unduly interfere with other uses of the OCS, specifically sand resource use. c. Potential Future Restriction to Mitigate Potential Conflicts with Environmental Resources: All potential bidders should be aware that site specific surveys may reveal features requiring mitigation at the COP stage. This includes sensitive benthic resources and cultural resources. d. Potential Future Restriction to Mitigate Potential Conflicts with Lease Area OCS–A 0557 and USCG Proposed Traffic Separation Schemes (TSS) Precautionary Areas: Those interested in bidding should be aware that Lease Area OCS–A 0557 is spaced less than 1nm from the northern portion of the proposed Off Delaware Bay Southern E:\FR\FM\01JYN1.SGM 01JYN1 54512 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices Approach Precautionary Area, which includes the Delaware Bay Eastern Approach TSS extension lane. These areas are identified in the Final Consolidated Port Approaches Port Access Route Studies and have been included in the United States Coast Guard’s Notice of Proposed Rulemaking (NPRM) for Shipping Safety Fairways Along the Atlantic Coast, published on January 19, 2024. The USCG NPRM begins the formal process for codifying the TSS and Precautionary Areas for vessel use with the intended purpose of facilitating navigational safety. Per the United States Coast Guard’s Marine Planning Guidelines outlined in the October 5, 2023, USCG Navigation and Vessel Inspection Circular NO. 02–23 Enclosure 4, the preferred recommended setback distance for any offshore structure to parallel any International Maritime Organization routing measure is 2 nm. There is less than 2 nm spacing between the northern boundary of Lease Area OCS–A 0557 and the proposed Delaware Bay Eastern Approach TSS extension lane. Table 2 lists the sub-blocks that are within the 2 nm of the proposed Delaware Bay Eastern Approach TSS extension lane and which may be subject to mitigation measures (i.e., no surface occupancy). TABLE 2—OCS–A 0557: BLOCKS OF CONCERN Protraction No. Protraction name Salisbury Salisbury Salisbury Salisbury ....................................................................... ....................................................................... ....................................................................... ....................................................................... Maps identifying these OCS blocks and sub-blocks are available on BOEM’s website at: https://www.boem.gov/ renewable-energy/state-activities/ central-atlantic. VII. Lease Terms and Conditions ddrumheller on DSK120RN23PROD with NOTICES1 BOEM has made available the terms, conditions, and stipulations for the commercial leases that will be offered through this sale.2 BOEM reserves the right to require compliance with additional terms and conditions associated with the approval of a SAP and a COP. The lease forms 3 are on BOEM’s website at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. Each lease will include the following attachments: 1. Addendum A (‘‘Description of Leased Area and Lease Activities’’); 2. Addendum B (‘‘Lease Term and Financial Schedule’’); 3. Addendum C (‘‘Lease-Specific Terms, Conditions, and Stipulations’’); 4. Addendum D (‘‘Project Easement’’). Addenda A, B, and C provide detailed lease terms and conditions. Addendum D will be completed at the time of COP approval or approval with 2 On May 15, 2024, BOEM published in the Federal Register the Renewable Energy Modernization Rule (Rule), which once effective on July 15, 2024, will require updates to the lease published with this FSN. Those updates are likely to reflect changes to the timing of lease terms and the formula for calculating operating fees. After July 15, 2024, BOEM will revise the lease to conform to the Rule and will inform qualified bidders of the changes. BOEM expects no other updates or changes to the lease published with this FSN. 3 Note to potential bidders: The title and content of Section 21, Waiver, of Lease OCS–A 0558 has been removed and replaced with Variance, which is an updated provision that was included in Lease OCS–A 0557, but inadvertently omitted from Lease OCS–A 0558, in the PSN published in the Federal Register on December 12, 2023. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Block No. NJ18–05 NJ18–05 NJ18–05 NJ18–05 Sub-block 6330 6331 6332 6333 D, H. A, B, C, D, E, F, G, H. A, B, C, D, E, F, G, H. E. modifications, should a COP be approved. a. Required Plans for Potential Development of Executed Leases: To the extent required under BOEM’s regulations at 30 CFR part 585, the Lessee may submit a SAP, if the Lessee intends to conduct site assessment activities under that SAP, and must submit a COP to avoid lease termination under 30 CFR 585.432(a). VIII. Lease Financial Terms and Conditions This section provides an overview of the required annual payments and financial assurances under the lease. Potential bidders should review the lease for more detailed information, including any changes from past practices. a. Rent: Pursuant to 30 CFR 585.224(b) and 585.503, the first year’s rent payment of $3 per acre is due within 45-calendar days after the Lessee receives the unexecuted lease copies from BOEM. Thereafter, annual rent payments are due on the anniversary of the Effective Date of the lease (the ‘‘Lease Anniversary’’). Once commercial operations under the lease begin, BOEM will charge rent only for the portions of the Lease Area remaining undeveloped (i.e., non-generating acreage). For example, for the 101,443 acres of OCS– A 0557 (A–2), the rent payment would be $304,329 per year until commercial operations begin. If the Lessee submits an application for relinquishment of a portion of its leased area within the first 45-calendar days after receiving the lease copies from BOEM and BOEM approves that application, no rent payment will be due on the relinquished portion of the Lease Area. Later relinquishments of PO 00000 Frm 00109 Fmt 4703 Sfmt 4703 any portion of the Lease Area will reduce the Lessee’s rent payments starting in the year following BOEM’s approval of the relinquishment. A lease issued under this part confers on the Lessee the right to one or more project easements, without further competition, for the purpose of installing gathering, transmission, and distribution cables, pipelines, and appurtenances on the OCS as necessary for the full enjoyment of the lease. A Lessee must apply for the project easement as part of the COP or SAP, as provided under subpart F of 30 CFR part 585. The Lessee also must pay rent for any project easement associated with the lease. Rent commences on the date that BOEM approves the COP that describes the project easement (or any modification of such COP that affects the easement acreage), as outlined in 30 CFR 585.507. Annual rent for a project easement is the greater of $5 per acre per year, or $450 per year. If a COP revision results in increased easement acreage, BOEM will require the appropriate amount of additional rent when it approves the COP. b. Operating Fee: For purposes of calculating the initial annual operating fee payment under 30 CFR 585.506, BOEM applies an operating fee rate to a proxy for the wholesale market value of the electricity expected to be generated from the project during its first 12 months of operations. This initial payment will be prorated to reflect the period between the commencement of commercial operations and the Lease Anniversary. The initial annual operating fee payment will be due within 90-calendar days of the commencement of commercial operations. Thereafter, E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices subsequent annual operating fee payments will be due on or before the Lease Anniversary. The subsequent annual operating fee payments will be calculated by multiplying the operating fee rate by the imputed wholesale market value of the projected annual electric power A–2, OCS–A 0557 .... C–1, OCS–A 0558 .... VerDate Sep<11>2014 Wholesale power price PJM DPL. PJM DOM. 20:36 Jun 28, 2024 8,760 hrs X year 0.4 x Power Price x 0.02 = $2,735,923.20 i. Operating Fee Rate: The operating fee rate is the share of the imputed wholesale market value of the projected annual electric power production due to ONRR as an annual operating fee. For the Lease Areas, BOEM will set the fee rate at 0.02 (2 percent) for the entire life of commercial operations. ii. Nameplate Capacity: Nameplate capacity is the maximum rated electric output, expressed in MW, which the turbines of the wind facility under commercial operations can produce at their rated wind speed as designated by the turbine’s manufacturer. iii. Capacity Factor: The capacity factor relates to the amount of energy delivered to the grid during a period of time compared to the amount of energy the wind facility would have produced at full capacity during that same period of time. BOEM will set the capacity factor at 0.4 (i.e., 40 percent) for the year in which the commercial operations begin and for the first 6 full years of commercial operations on the lease. At the end of the sixth year, BOEM may adjust the capacity factor to reflect the performance over the previous 5 years based upon the actual metered electricity generation at the delivery point to the electrical grid. BOEM may make similar adjustments to the capacity factor once every 5 years thereafter. iv. Wholesale Power Price Index: Under 30 CFR 585.506(c)(2)(i), the wholesale power price, expressed in dollars per MWh, is determined at the time each annual operating fee payment is due. For the leases offered in this sale the following table provides the price data. A similar price dataset may also be used and may be posted by BOEM at https://www.boem.gov for reference. Lease area name X Jkt 262001 c. Financial Assurance: Within 10 business days after receiving the unexecuted lease copies for execution and pursuant to 30 CFR 585.515– 585.516, the provisional winners must provide an initial lease-specific bond or other BOEM-approved financial assurance instrument in the amount of $100,000. The provisional winners may meet financial assurance requirements by posting a surety bond or other financial assurance instrument as detailed in 30 CFR 585.526–585.529. BOEM encourages the provisional winners to discuss the financial assurance instrument requirements with BOEM as soon as possible after the auction has concluded. BOEM will base the amount of all SAP, COP, and decommissioning financial assurance on cost estimates for meeting all accrued lease obligations at the respective stages of development. The required amount of supplemental and decommissioning financial assurance will be determined on a caseby-case basis. The financial terms described above can be found in Addendum ‘‘B’’ of the lease, which is available at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. IX. Bidder’s Financial Form Each bidder must submit to BOEM the information required in the BFF referenced in this FSN. A copy of the form is available at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. BOEM recommends that each bidder designate an email address in its BFF that the bidder must use to create an account in pay.gov (if it has not already done so). BOEM must receive BFFs, including Conceptual Strategies, no later than July 12, 2024. If a bidder does not submit a BFF for this sale by the deadline, BOEM, in its sole discretion, may grant an extension to that bidder only if BOEM determines the bidder’s failure to PO 00000 Frm 00110 Fmt 4703 Sfmt 4703 timely submit a BFF was caused by events beyond the bidder’s control. The BFF is required to be executed by an authorized representative listed in the bidder’s qualification package on file with BOEM. BFFs submitted by bidders for previous lease sales will not satisfy the requirements of this auction. For the ATLW–10, BOEM will accept bidders’ BFFs and Conceptual Strategies electronically or by mail. Instructions for submission can be found in the BFF. The BFF must be executed on paper with a wet signature or with the application of a digital signature by an authorized representative listed on the legal qualification card currently on file with BOEM as authorized to bind the company. Winning bidders who have committed to bidding credit(s) must meet the bidding credit requirements no later than submission of their first Facility Design Report (FDR) or the applicable Lease Anniversary, whichever is sooner. X. Bid Deposit A bid deposit is an advance cash payment submitted to BOEM to participate in the auction. ONRR will notify the bidders that they have access to the Bid Deposit Form in pay.gov, and bidders must use the Bid Deposit Form on the https://www.pay.gov website to submit a deposit. Bidders may need to create an account in pay.gov to access the Bid Deposit Form and submit a deposit. Each bidder must submit a bid deposit of $5,000,000 no later than July 29, 2024, to be eligible to bid for one lease area. Any bidder who fails to submit the bid deposit by this deadline may be disqualified from participating in the auction. BOEM will consider extensions to this deadline only if BOEM, in its sole discretion, determines that the failure to timely submit the bid deposit was caused by events beyond the bidder’s control. Following the auction, provisional winners’ bid deposits will be applied E:\FR\FM\01JYN1.SGM 01JYN1 ER01JY24.016</GPH> ddrumheller on DSK120RN23PROD with NOTICES1 ~:h For example, the annual operating fee for a 976 megawatt (MW) wind facility operating at a 40 percent capacity (i.e., capacity factor of 0.4) with a regional wholesale power price of $40 per megawatt hour (MWh) and an operating fee rate of 0.02 will be calculated as follows: production. For the purposes of this calculation, the imputed market value will be the product of the project’s annual nameplate capacity, the total number of hours in a year (8,760), the capacity factor, and the annual average price of electricity derived from a regional wholesale power price index. Annual Operating Fee= 976 MW 54513 54514 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices against their winning cash bids. Once BOEM has announced the provisional winners, BOEM will refund bid deposits to the other bidders. If BOEM offers a lease to a provisionally winning bidder and that bidder fails to timely return the signed lease form, establish financial assurance, or pay the balance of its bid, BOEM may retain the bidder’s $5,000,000 bid deposit. In such a circumstance, BOEM may determine which bid would have won in the absence of the bid previously determined to be the winning bid and may offer a lease to this next highest bidder if this next highest bidder is not a provisionally winning bidder of the other lease area in the auction. This process will be repeated if needed. XI. Minimum Bid The minimum bid is the lowest dollar amount per acre that BOEM will accept as a winning bid and is the amount at which BOEM will start the bidding in the auction. BOEM has established a minimum bid of $100.00 per acre for this lease sale. XII. Auction Procedures a. Multiple-Factor Bidding Auction: As authorized under 30 CFR 585.220(a)(4) and 585.221(a)(6), BOEM will use a multiple-factor auction format for this lease sale. The bidding system for this lease sale will be a multiplefactor combination of monetary and non-monetary factors. The bid made by a particular bidder in each round will represent the sum of the monetary factor (cash bid) and the value of any nonmonetary factors in the form of bidding credits. Bidders will be subject to a ‘oneper-customer’ rule, meaning that each bidder can acquire at most one lease area. BOEM will start the auction using the minimum bid price for each lease area and will increase prices incrementally until no more than one bidder remains bidding on each lease area in the auction. In response to public comments, BOEM is revising the bidding credit percentages from those proposed in the PSN. The total bidding credits remain at 25 percent. BOEM is increasing the credit for contributing to a fisheries compensatory mitigation fund from 8 percent to 12.5 percent, and is reducing the credit for supporting offshore wind workforce training programs or supply chain development from 17 percent to 12.5 percent. These changes reflect the potential conflicts of offshore wind with commercial fisheries and the many existing efforts of state and other federal initiatives for offshore wind workforce training and supply chain development. For this sale, BOEM is calculating bidding credits as a percentage of the whole bid, which is a change from the method used in prior sales, where bidding credits were calculated as a percentage of the cash portion of the bid. The intended purpose of this change is to simplify the bidding credit calculation. BOEM will grant bidding credits to bidders that commit to one or both of the following, subject to review of the bidder’s BFF and Conceptual Strategy. i. Supporting workforce training programs for the offshore wind industry or supporting the development of a domestic supply chain for the offshore wind industry, or a combination of both; or ii. Establishing and contributing to a fisheries compensatory mitigation fund or contributing to an existing fund to mitigate potential negative impacts to commercial and for-hire recreational fisheries caused by OCS offshore wind development in the Atlantic. These bidding credits are intended to: i. Enhance, through training, the offshore wind workforce and/or enhance the establishment of a domestic supply chain for offshore wind manufacturing, assembly, or services, both of which will contribute to the expeditious and orderly development of offshore wind resources on the OCS; and ii. Minimize potential economic effects on commercial fisheries impacted by potential offshore wind development, as cooperation with commercial fisheries impacted by OCS operations will enable development of the lease areas to advance. Changes to Auction Rules: BOEM will be employing new auction software for ddrumheller on DSK120RN23PROD with NOTICES1 Lease area name Lease area ID A–2 ................................................................................................................................... C–1 .................................................................................................................................. The auction will be conducted in a series of rounds. Before each round, the auction system will announce the prices for each lease area offered in the VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Frm 00111 Fmt 4703 Sfmt 4703 Acres OCS–A 0557 OCS–A 0558 auction. In Round 1, there is a single price for each lease area equal to the minimum bid price (also known as the ‘opening price’ or ‘clock price of Round PO 00000 lease sales held in 2024. The auction format remains an ascending clock auction with multiple-factor bidding. There are five main changes to the ascending clock auction rules in the new software, as follows: i. If a bidder decides to bid on a different lease area in a given round of the auction, it may submit a bid to reduce demand for the lease area it bid on in the previous round and, simultaneously, submit a bid to increase demand for another lease area. This allows a bidder the option to switch to another lease area if the price of the first lease area exceeds the bidder’s specified bid price. ii. Provisional winners will no longer be determined using a two-step process. The auction rules are implemented in a way such that, when the auction concludes, the bidder who remains on a lease area after the final round becomes its provisional winner. There will be no additional processing step. iii. The auction will use a ‘second price’ rule. A given lease area will be won by the bidder that submitted the highest bid amount for the lease area, but the winning bidder will pay the highest bid amount at which there was competition (i.e., the ‘second price’). iv. Each bidder’s bidding credit will be expressed directly as a percentage of the final price of the lease. v. For sales in which bidders are allowed to bid for and potentially acquire two or more lease areas, any bid for two or more lease areas will be treated as independent bids for those lease areas, rather than as a package bid. Changes i. through iv. listed above are applicable to the ATLW–10 sale. However, change v. to the ascending clock auction rules is inapplicable, due to the ‘one-per-customer’ rule. All potential bidders should review the complete Auction Procedures for Offshore Wind Lease Sales (Version 1) located at: https://www.boem.gov/ renewable-energy/lease-and-grantinformation. The Auction: Using an online bidding system to host the auction, BOEM will start the bidding for Leases OCS–A 0557 and OCS–A 0558 as described below. 101,443 176,505 Minimum bid $10,144,300 17,650,500 1’). Each bidder can bid, at the opening price, for one lease area. After Round 1, the bidder’s ‘‘processed demand’’ is one for the lease area (if any) for which the E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices bidder bid in Round 1.4 The bidder’s eligibility for Round 2 equals the number of lease area for which the bidder bid in Round 1. Starting in Round 2, each lease area is assigned a range of prices for the round. The start-of-round price is the lowest price in the range, and the clock price is the highest price in the range. A bidder still eligible to bid after the previous round can either continue bidding at the new round’s clock price for the same lease area for which the bidder’s processed demand is one or submit a bid at any price in the range for that round to reduce demand for that lease area. A bid to reduce demand at some price indicates that the bidder is not willing to acquire that lease area at a price exceeding the specified bid price. A bidder that bids to reduce demand for a lease area can optionally bid to increase demand for the other lease area in the same round. If an eligible bidder does not place a bid during the round for the lease area for which the bidder’s processed demand is one, the auction system will consider this a request to reduce demand for that lease area at the round’s start-of-round price. That bidder can nonetheless win that lease area if it is the last remaining bidder for that lease area. After each round, the auction system processes the bids and determines each bidder’s processed demand for each lease area and the posted prices for the lease areas. The bidder’s eligibility for the next round equals the number of lease areas for which the bidder had a processed demand of one. If, after any round, a bidder’s processed demand is zero for both lease area s, the bidder’s eligibility drops to zero and the bidder can no longer bid in the auction. The posted price is the price determined for each lease area after processing of all bids for a round. If only one bidder remains on a lease area, the posted price reflects the ‘‘second price’’ (i.e., the highest price at which there was competition for the lease area).5 If, after the bids for the round have been processed, there is no lease area with excess demand, the auction will end. When this occurs, each bidder with a processed demand of one for a Lease Area will become the provisional winner for that lease area. Otherwise, 4 Bidders specify their demand for a lease area with either a 0 or 1 in the auction system. A demand of 1 indicates the lease area that they are bidding on. Processed demand is the demand, either 0 or 1 of a bidder for a lease area following the processing of the bids for the round. 5 The Auction Procedures for Offshore Wind Lease Sales provides details on how bids are prioritized and processed. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 the auction will continue with a new round in which the start-of-round price for each lease area equals the posted price of the previous round. The increment by which the clock price exceeds the start-of-round price will be determined based on several factors including, but not limited to, the expected time needed to conduct the auction and the number of rounds that have already occurred. BOEM reserves the right to increase or decrease the increment as it deems appropriate. The provisional winner of each lease area will pay the final posted price (less any applicable bidding credit) or risk forfeiting its bid deposit. A provisional winner will be disqualified if it is subsequently found to have violated auction rules or BOEM regulations, or otherwise engaged in conduct detrimental to the integrity of the competitive auction. If a bidder submits a bid that BOEM determines to be a provisionally winning bid, the bidder must sign the applicable lease documents, post financial assurance, and submit the outstanding balance (if any) of its winning bid (i.e., winning bid minus the applicable bid deposit and any applicable bidding credits) within 10 business days of receiving the lease copies, pursuant to 30 CFR 585.224. BOEM reserves the right to not issue the lease to the provisionally winning bidder if that bidder fails to: timely execute three copies of the lease and return them to BOEM, timely post adequate financial assurance, timely pay the balance of its winning bid, or otherwise comply with applicable regulations or the terms of this FSN. In any of these cases, the bidder will forfeit its bid deposit and BOEM reserves the right to offer a lease to the next highest eligible bidder as determined by BOEM. BOEM will publish the names of the provisional winners of the lease areas and the associated prices shortly after the conclusion of the sale. Full bid results, including round-by-round results of the entire sale, will be published on BOEM’s website after a review of the results and announcement of the provisional winners. Additional Information Regarding the Auction Format: i. Authorized Individuals and Bidder Authentication: An entity that is eligible to participate in the auction will identify on its BFF up to three individuals who will be authorized to bid on behalf of the company, including their names, business telephone numbers, and email addresses. All individuals will log into the auction system using Login.gov. Prior to the auction, each individual listed on the BFF form must obtain a Fast Identify PO 00000 Frm 00112 Fmt 4703 Sfmt 4703 54515 Online (FIDO) compliant security key,6 and must register this security key on Login.gov using the same email address that was listed in the BFF. The Login.gov registration, together with the FIDO-compliant security key, will enable the individual to log into the auction system. BOEM will provide information on this process on its website. After BOEM has processed the bid deposits, the auction contractor will send an email to the authorized individuals, inviting them to practice logging into the auction system on a specific day in advance of the mock auction. The Login.gov login process, along with the authentication process for the auction helpdesk, will also be tested during the mock auction. If an eligible bidder fails to submit a bid deposit or does not participate in the first round of the auction, BOEM will deactivate that bidder’s login information. ii. Timing of Auction: The auction will begin at 9:00 a.m. EDT on August 14, 2024. Bidders will be able to log into the auction system beginning 30 minutes before the start of the auction. BOEM recommends that bidders log in earlier than 9:00 a.m. EDT on that day to ensure that any login issues are resolved prior to the start of the auction. iii. Messaging Service: BOEM and its auction contractors will use the auction system’s messaging service to keep bidders informed on issues of interest during the auction. For example, BOEM could change the schedule at any time, including during the auction. If BOEM changes the schedule during the auction, it will use the messaging service to notify bidders that a revision has been made and will direct bidders to the relevant page. BOEM will also use the messaging service for other updates during the auction. iv. Bidding Rounds: Bidders are allowed to place bids or to change their bids at any time during the bidding round. At the top of the bidding page, a countdown clock shows how much time remains in each round. Bidders will have until the end of the round to place bids. Bidders should do so according to the procedures described in this FSN and the Auction Procedures 6 FIDO keys are produced by many manufacturers, such as Yubico and Google. They are widely available and can easily be purchased from Amazon, Best Buy, Walmart, or any other seller of electronics. The latest generation of the FIDO standard is FIDO2, and each authorized individual should obtain a key compliant with the FIDO2 authentication standard. FIDO keys are typically inserted into a computer’s USB port, so the authorized individual should obtain a FIDO key compatible with their computer (USB–A or USB– C) or a USB adapter, as necessary. E:\FR\FM\01JYN1.SGM 01JYN1 54516 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices ddrumheller on DSK120RN23PROD with NOTICES1 for Offshore Wind Lease Sales. Information about the round results will be made available only after the round has closed, so there is no strategic advantage to placing bids early or late in the round. The Auction Procedures for Offshore Wind Lease Sales elaborate on the auction procedures described in this FSN. In the event of any inconsistency between the Auction Procedures for Offshore Wind Lease Sales, the Bidder Manual, and the FSN, the FSN is controlling.7 v. Alternate Bidding Procedures: Redundancy is the most effective way to mitigate technical and human issues during an auction. BOEM strongly recommends that bidders consider authorizing more than one individual to bid in the auction—and confirming during the mock auction that each individual is able to access the auction system. A mobile hotspot or other form of wireless access is helpful if a company’s main internet connection should fail. As a last resort, an authorized individual facing technical issues may request to submit its bid by telephone. To be authorized to place a telephone bid, an authorized individual must call the help desk number listed in the auction manual before the end of the round. BOEM will authenticate the caller’s identity, including requiring the caller to provide a code from the software token. The caller must also explain the reasons why a telephone bid needs to be submitted. BOEM may, in its sole discretion, permit or refuse to accept a request for the placement of a bid using this alternate telephonic bidding procedure. The auction help desk requires codes from the Google Authenticator application (app) as part of its procedure for identifying individuals who call for assistance. Prior to the auction, all individuals listed on the BFF should download the Google AuthenticatorTM mobile app 8 onto their smartphone or tablet.9 The first time the individual logs into the auction system, the system will provide a QR token to be read into the Google Authenticator app. This token is unique to the individual and enables the Google Authenticator app to generate timesensitive codes that will be recognized by the auction system. When an individual calls the auction help desk, 7 The Bidder Manual describes use of the auction platform and is provided to the auction participants in advance of the auction. 8 Google Authenticator must be installed from either the Apple App Store or the Google Play Store. 9 Installing the Google Authenticator app is only required if the app has not already been installed on the smartphone or tablet. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 the current code from the app must be provided to the help desk representative as part of the user authentication process. BOEM will provide information on this process on its website. b. 12.5 Percent Bidding Credit for Workforce Training or Supply Chain Development or a Combination of Both: This bidding credit allows a bidder to receive a credit of 12.5 percent of its bid in exchange for a commitment to make a qualifying monetary contribution (‘‘Contribution’’), in the same amount as the bidding credit received, to programs or initiatives that support workforce training programs for the U.S. offshore wind industry or development of a U.S. domestic supply chain for the offshore wind industry, or both, as described in the BFF Addendum and the lease. To qualify for this credit, the bidder must commit to the bidding credit requirements on the BFF and submit a Conceptual Strategy as described in the BFF Addendum. i. The Contribution to workforce training must result in a better trained and/or larger domestic offshore wind workforce that provides for more efficient operations via increasing the supply of fully trained personnel. Training of existing Lessee employees, Lessee contractors, or employees of affiliated entities will not qualify. ii. The Contribution to domestic supply chain development must result in overall benefits to the U.S. offshore wind supply chain available to all potential purchasers of offshore wind services, components, or subassemblies, not solely the Lessee’s project; and either: (i) the demonstrable development of new domestic capacity (including vessels) or the demonstrable buildout of existing capacity; or (ii) an improved offshore wind domestic supply chain by reducing the upfront capital or certification cost for manufacturing offshore wind components, including the building of facilities, the purchasing of capital equipment, and the certifying of existing manufacturing facilities. iii. Contributions cannot be used to satisfy private cost shares for any federal tax or other incentive programs where cost sharing is a requirement. No portion of the Contribution may be used to meet the requirements of any other bidding credits for which the Lessee qualifies. iv. Bidders interested in obtaining a bidding credit could choose to contribute to workforce training programs, domestic supply chain initiatives, or a combination of both. The Conceptual Strategy must describe verifiable actions that the Lessee will take that would allow BOEM to confirm PO 00000 Frm 00113 Fmt 4703 Sfmt 4703 compliance when the documentation for satisfying the bidding credit is submitted. The Contribution must be tendered in full, and the Lessee must provide documentation evidencing it has made the Contribution and complied with applicable requirements, no later than the date the Lessee submits its first FDR. v. Contributions to workforce training must promote and support one or more of the following purposes: (i) Union apprenticeships, labor management training partnerships, stipends for workforce training, or other technical training programs or institutions focused on providing skills necessary for the planning, design, construction, operation, maintenance, or decommissioning of offshore wind energy projects in the United States; (ii) Maritime training necessary for the crewing of vessels to be used for the construction, servicing, and/or decommissioning of wind energy projects in the United States; (iii) Training workers in skills or techniques necessary to manufacture or assemble offshore wind components, subcomponents, or subassemblies. Examples of areas involving these skills and techniques include welding; wind energy technology; hydraulic maintenance; braking systems; mechanical systems, including blade inspection and maintenance; or computers and programmable logic control systems; (iv) Tribal offshore wind workforce development programs or training for employees of an Indian Economic Enterprise 10 in skills necessary in the offshore wind industry; or (v) Training in any other job skills that the Lessee can demonstrate are necessary for the planning, design, construction, operation, maintenance, or decommissioning of offshore wind energy projects in the United States. vi. Contributions to domestic supply chain development must promote and support one or more of the following: (i) Development of a domestic supply chain for the offshore wind industry, including manufacturing of components and subassemblies and the expansion of related services; (ii) Domestic Tier 2 and Tier 3 offshore wind component suppliers and domestic Tier-1 supply chain efforts, including quay-side fabrication; 11 (iii) Technical assistance 10 https://www.bia.gov/sites/default/files/dup/ assets/as-ia/ieed/Primer%20on%20Buy%20Indian %20Act%20508%20Compliant %202.6.18(Reload).pdf. 11 Tier-1 denotes the primary offshore wind components such as the blades, nacelles, towers, foundations, and cables. Tier 2 subassemblies are the systems that have a specific function for a Tier 1 component. Tier 3 subcomponents are commonly E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices grants to help U.S. manufacturers re-tool or certify (e.g., ISO–9001) for offshore wind manufacturing; (iv) Development of Jones Act-compliant vessels for the construction, servicing, and/or decommissioning of wind energy projects in the United States; (v) Purchase and installation of lift cranes or other equipment capable of lifting or moving foundations, towers, and nacelles quayside, or lift cranes on vessels with these capabilities; (vi) Port infrastructure directly related to offshore wind component manufacturing or assembly of major offshore wind facility components; (vii) Establishing a new or existing bonding support reserve or revolving fund available to all businesses providing goods and services to offshore wind energy companies, including disadvantaged businesses and/or Indian Economic Enterprises; or (viii) Other supply chain development efforts that the Lessee can demonstrate advance the manufacturing of offshore wind components or subassemblies or the provision of offshore wind services in the United States. vii. Documentation: If a lease is issued pursuant to a winning bid that includes a bidding credit for workforce training or supply chain development, the Lessee is required to provide documentation showing that the Lessee has met the financial commitment before the Lessee submits the first FDR for the lease. The documentation must allow BOEM to objectively verify the amount of the Contribution and the beneficiary(ies) of the Contribution. At a minimum, the documentation must include: all written agreements between the Lessee and beneficiary(ies) of the Contribution, which must detail the amount of the Contribution(s) and how it will be used by the beneficiaries of the Contribution(s) to satisfy the goals of the bidding credit for which the Contribution was made; all receipts documenting the amount, date, financial institution, and the account and owner of the account to which the Contribution was made; and sworn statements by the entity that made the Contribution and the beneficiary(ies) of the Contribution attesting that all information provided in the above documentation is true and accurate. The documentation will need to describe how the funded initiative or program has advanced, or is expected to advance, U.S. offshore wind workforce training or supply chain development. The documentation must also provide qualitative and/or quantitative available items that are combined into Tier 2 subassemblies, such as motors, bolts, and gears. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 information that includes the estimated number of trainees or jobs supported, or the estimated leveraged supply chain investment resulting or expected to result from the Contribution. The documentation will need to contain any information called for in the Conceptual Strategy that the Lessee submitted with its BFF and to allow BOEM to objectively verify (i) the amount of the Contribution and the beneficiary(ies) of the Contribution, and (ii) compliance with the bidding credit criteria provided in Addendum ‘‘C’’ of the lease. If the Lessee’s implementation of its Conceptual Strategy changes due to market needs or other factors, the Lessee must explain the changed approach. BOEM reserves all rights to determine that the bidding credit has not been satisfied if changes from the Lessee’s Conceptual Strategy result in the Lessee not meeting the criteria for the bidding credit described in Addendum ‘‘C’’ of the lease. viii. Enforcement: The commitment for the bidding credit will be made in the BFF and will be included in a lease addendum that will bind the Lessee and all future assignees of the lease. If BOEM were to determine that a Lessee or assignee had failed to satisfy the requirements of the bidding credit, or if a Lessee were to relinquish or otherwise fail to develop the lease by the tenth anniversary date of lease issuance, the amount corresponding to the bidding credit awarded will be immediately due and payable to ONRR with interest from the lease Effective Date. The interest rate will be the underpayment interest rate identified by ONRR. The Lessee will not be required to pay said amount if the Lessee satisfied its bidding credit requirements but failed to develop the lease by the tenth Lease Anniversary. BOEM could, at its sole discretion, extend the documentation deadline beyond the first FDR submission or extend the lease development deadline beyond the 10-year timeframe. c. 12.5 Percent Bidding Credit for Fisheries Compensatory Mitigation Fund: The second bidding credit will allow a bidder to receive a credit of 12.5 percent of its bid in exchange for a commitment to establish and contribute to a fisheries compensatory mitigation fund, or to contribute to a similar existing fund, to compensate for potential negative impacts to commercial and for-hire recreational fisheries. The term ‘‘commercial fisheries’’ refers to commercial and processing businesses engaged in the act of catching and marketing fish and shellfish for sale from the Atlantic. The term ‘‘for-hire recreational fisheries’’ refers to charter and headboat fishing PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 54517 operations involving vessels-for-hire engaged in recreational fishing in the Atlantic that are hired for a charter fee by an individual or group of individuals for the exclusive use of that individual or group of individuals. The Fund must compensate commercial and for-hire recreational fishers for gear loss or damage, as well as income loss claims incurred as a result of any stage of offshore wind project development (pre-construction, construction, operations, and decommissioning) resulting from this lease. Loss claims may also result from impacts from the development of easements associated with this lease and/or the conduct of surveys on this lease before the establishment of the Fund. Funds determined to be in excess of those needed to compensate for gear loss or damage and income loss as a result of lease development, based on actuarial accounting, may be used to: • Support regional fisheries compensatory mitigation efforts for other Atlantic OCS offshore wind projects, • Offset the cost of gear and navigational aid upgrades and other transitions for operating within a wind farm; or • Promote participation of fishers and fishing communities in the offshore wind project development process or other programs that better enable the fishing and offshore wind industries to co-exist. Lessees are encouraged to coordinate with other lessees to establish or contribute to a regional fund. The regional fund should ensure leasespecific claims are accounted for. To qualify for this credit, the bidder must commit to the bidding credit requirements on the BFF and submit a Conceptual Strategy as described in the BFF Addendum. The Conceptual Strategy must describe the actions that the lessee intends to take that will allow BOEM to verify compliance when the lessee seeks to demonstrate satisfaction of the requirements for the bidding credit. The lessee is required to provide documentation showing that the lessee has met the commitment and complied with the applicable bidding credit requirements before the lessee submits the lease’s first FDR or before the fifth Lease Anniversary, whichever is sooner. Any fund established or selected by the lessee to meet this bidding credit requirement must include a process for evaluating the actuarial status of funds at least every 5 years and publicly report information on fund disbursement and administrative costs at least annually. E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 54518 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices The fisheries compensatory mitigation fund must be independently managed by a third party and must include trustees or board members from fishing stakeholder groups. The fund must be designed with fiduciary governance and strong internal controls while minimizing administrative expenses. The Contribution may be used for fund startup costs, but the Fund should minimize costs by leveraging existing processes, procedures, and information from BOEM’s draft Fisheries Mitigation Guidance, the Eleven Atlantic States’ Fisheries Mitigation Project, or other sources. Documentation: If a lease is awarded pursuant to a winning bid that includes a fisheries compensatory mitigation fund bidding credit, the lessee must provide written documentation to BOEM that demonstrates that it completed the fund Contribution before it submits the lease’s first FDR or before the fifth Lease Anniversary, whichever is sooner. The documentation must enable BOEM to objectively verify the Contribution has met all applicable requirements as outlined in Addendum ‘‘C’’ of the lease. At a minimum, this documentation must include: a. The procedures established to compensate for gear loss or damage and lost fishing income resulting from any stage of offshore wind development (pre-construction, construction, operation, and decommissioning) adherent to the requirements above; b. The fisheries compensatory mitigation fund charter, including the governance structure, audit and public reporting procedures, and standards for paying compensatory mitigation for impacts to fishers from all phases of offshore development adherent to the requirements above; c. All receipts documenting the amount, date, financial institution, and the account and owner of the account to which the Contribution was made; and d. Sworn statements by the entity that made the Contribution, attesting to: i. The amount and date(s) of the Contribution; ii. That the Contribution is being (or will be) used in accordance with the bidding credit requirements in the lease; and iii. That all information provided is true and accurate. The documentation must contain any information specified in the Conceptual Strategy that was submitted with the BFF. If the lessee’s implementation of its Conceptual Strategy changes due to market needs or other factors, the lessee must explain this change. BOEM reserves the right to determine that the bidding credit has not been satisfied if VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 changes from the lessee’s Conceptual Strategy result in the lessee not meeting the criteria for the bidding credit described in Addendum ‘‘C’’ of the lease. Enforcement: The commitment to the fisheries compensatory mitigation fund bidding credit will be made in the BFF. It will be included in Addendum ‘‘C’’ of the lease and will bind the lessee and all future assignees of the lease. If BOEM were to determine that a lessee or assignee had failed to satisfy the commitment at the time the first FDR is submitted, or by the fifth Lease Anniversary, whichever is sooner, the amount corresponding to the bidding credit awarded will be immediately due and payable to ONRR with interest from the lease Effective Date. The interest rate will be the underpayment interest rate identified by ONRR. The lessee will not be required to pay said amount if the lessee satisfied its bidding credit requirements by the time the first FDR is submitted, or the fifth Lease Anniversary, whichever is sooner. BOEM may, at its sole discretion, extend the documentation deadline beyond the first FDR or beyond the 5-year timeframe. XIII. Rejection or Non-Acceptance of Bids BOEM reserves the right to reject any and all bids that do not satisfy the requirements and rules of the auction, this FSN, or applicable regulations and statutes. XIV. Anti-Competitive Review Bidding behavior in this lease sale is subject to federal antitrust laws. Following the auction, but before the acceptance of bids and the issuance of the lease, BOEM will ‘‘allow the Attorney General, in consultation with the Federal Trade Commission, thirty days to review the results of [the] lease sale.’’ 43 U.S.C. 1337(c)(1). If a provisionally winning bidder is found to have engaged in anti-competitive behavior in connection with this lease sale, BOEM will reject its provisionally winning bid. Compliance with BOEM’s auction procedures and regulations is not an absolute defense to violations of antitrust laws. Anti-competitive behavior determinations are fact-specific. Such behavior may manifest itself in several different ways, including, but not limited to: 1. An express or tacit agreement among bidders not to bid in an auction, or to bid a particular price; 2. An agreement among bidders not to bid; PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 3. An agreement among bidders not to bid against each other; or 4. Other agreements among bidders that have the potential to affect the final auction price. Pursuant to 43 U.S.C. 1337(c)(3), BOEM will decline to award a lease if the Attorney General, in consultation with the Federal Trade Commission, determines that awarding the lease would be inconsistent with antitrust laws. For more information on whether specific communications or agreements could constitute a violation of federal antitrust law, please see https:// www.justice.gov/atr/business-resources or consult legal counsel. a. Process for Issuing the Lease Once all post-auction reviews have been completed to BOEM’s satisfaction, BOEM will provide three unsigned copies of the lease to each provisionally winning bidder. Within 10 business days after receiving the lease copies, the provisionally winning bidders must: 1. Sign and return the lease copies on the bidder’s behalf; 2. File financial assurance, as required under 30 CFR 585.515–537; and 3. Pay by electronic funds transfer (EFT) the balance owed (the winning cash bid less the applicable bid deposit), if any. BOEM requires bidders to use EFT procedures (not pay.gov, the website bidders used to submit bid deposits) for payment of the balance, following the detailed instructions available on ONRR’s website at: https:// onrr.gov/paying/paymentoptions?tabs=renewable-energy,biddeposit-options. BOEM will not execute the lease until the three requirements above have been satisfied, BOEM has accepted the provisionally winning bidder’s financial assurance pursuant to 30 CFR 585.515, and BOEM has processed the provisionally winning bidder’s payment. BOEM may extend the 10business-day deadline for signing a lease, filing the required financial assurance, and paying the balance owed if BOEM determines, in its sole discretion, that the provisionally winning bidder’s inability to comply with the deadline was caused by events beyond the provisionally winning bidder’s control pursuant to 30 CFR 585.224(e). If the provisionally winning bidder does not meet these requirements or otherwise fails to comply with applicable regulations or the terms of the FSN, BOEM reserves the right not to issue the lease to that bidder. In such a case, the provisional winner will forfeit its bid deposit. Also, in such a case, E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices BOEM reserves the right to offer the lease to the next highest eligible bidder as determined by BOEM. Within 45 calendar days of the date that a provisional winner receives lease copies, each provisional winner is required to pay the first year’s rent using the ‘‘ONRR Renewable Energy Initial Rental Payments’’ form available at: https://www.pay.gov/public/form/start/ 27797604/. Subsequent annual rent payments must be made following the detailed instructions available on ONRR’s website at: https://onrr.gov/paying/ payment-options?tabs=rent-payments. b. Non-Procurement Debarment and Suspension Regulations Pursuant to 43 CFR part 42, subpart C, an OCS renewable energy Lessee will be required to comply with the Department of the Interior’s nonprocurement debarment and suspension regulations at 2 CFR parts 180 and 1400. The Lessee must also communicate this requirement to persons with whom the Lessee does business relating to this lease by including this requirement as a condition in their contracts and in other transactions. ddrumheller on DSK120RN23PROD with NOTICES1 c. Changes to Auction Details The Program Manager of BOEM’s Office of Renewable Energy Programs has the discretion to change any auction detail specified in the FSN, including the date and time, if s/he deems that events outside BOEM’s control may interfere with a fair and proper lease sale. Such events may include, but are not limited to, natural disasters (e.g., earthquakes, hurricanes, floods, and blizzards), wars, riots, acts of terrorism, fire, strikes, civil disorder, Federal Government shutdowns, cyberattacks against relevant information systems, or other events of a similar nature. In case of such events, BOEM will notify all qualified bidders via email, phone, and BOEM’s website at: https:// www.boem.gov/renewable-energy/stateactivities/central-atlantic. Bidders should call BOEM’s Auction Manager at (703) 787–1121 if they have concerns. d. Withdrawal of Blocks BOEM reserves the right to withdraw all or portions of each lease area prior to executing the leases with the winning bidders. If BOEM exercises this right, it will refund bid deposits to winning bidders, without interest, as provided in 30 CFR 585.224(f). e. Appeals Procedures to request reconsideration of rejected bids are provided in BOEM’s regulations at 30 CFR 585.225 and VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 585.118(c). BOEM’s decision on a bid is the final action of the Department of the Interior, and is not subject to appeal to the Office of Hearings and Appeals, but an unsuccessful bidder may apply for reconsideration by the Director under 30 CFR 585.225 as follows: (a) If BOEM rejects your bid, BOEM will provide a written statement of the reasons and will refund any money deposited with your bid, without interest. (b) You may ask the BOEM Director for reconsideration, in writing, within 15 business days of bid rejection, under 30 CFR 585.118(c)(1). The Director will send you a written response either affirming or reversing the rejection. f. Protection of Privileged or Confidential Information BOEM will protect privileged or confidential information that the Lessee submits, as authorized by the Freedom of Information Act (FOIA), 30 CFR 585.114, or other applicable statutes. If the Lessee wishes to protect the confidentiality of information, the Lessee should clearly mark it ‘‘Contains Privileged or Confidential Information’’ and consider submitting such information as a separate attachment. BOEM will not disclose such information, except as required by FOIA. If your submission is requested under the FOIA, your information will only be withheld if a determination is made that one of the FOIA’s exemptions to disclosure applies. Such a determination will be made in accordance with the Department’s FOIA regulations and applicable law. Labeling information as privileged or confidential will alert BOEM to more closely scrutinize whether it warrants withholding. Further, BOEM will not treat as confidential aggregate summaries of otherwise nonconfidential information. XV. Compliance With the Inflation Reduction Act (Pub. L. 117–169 (Aug. 16, 2022)) (Hereinafter, the ‘‘IRA’’) Section 50265(b)(2) of the IRA provides that ‘‘[d]uring the 10-year period beginning on the date of enactment of this Act . . . the Secretary may not issue a lease for offshore wind development under section 8(p)(1)(C) of the OCS Lands Act (43 U.S.C. 1337(p)(1)(C)) unless—(A) an offshore [oil and gas] lease sale has been held during the 1-year period ending on the date of the issuance of the lease for offshore wind development; and (B) the sum total of acres offered for lease in offshore [oil and gas] lease sales during the 1-year period ending on the date of the issuance of the lease for offshore PO 00000 Frm 00116 Fmt 4703 Sfmt 4703 54519 wind development is not less than 60,000,000 acres.’’ Section 50264(d) of the IRA provides that ‘‘. . . not later than March 31, 2023, the Secretary shall conduct Lease Sale 259[.]’’ Oil and Gas Lease Sale 261 was held on December 20, 2023, satisfying the requirements in section 50265(b)(2) of the IRA for any offshore wind lease issued by December 20, 2024. BOEM expects to issue any leases resulting from ATLW–10 no later than the one-year anniversary of Lease Sale 261. Authority: 43 U.S.C. 1337(p); 30 CFR 585.211 and 585.216. Elizabeth Klein, Director, Bureau of Ocean Energy Management. [FR Doc. 2024–14462 Filed 6–28–24; 8:45 am] BILLING CODE 4340–98–P INTERNATIONAL TRADE COMMISSION [Investigation No. 731–TA–1123 (Third Review)] Steel Wire Garment Hangers from China; Institution of a Five-Year Review United States International Trade Commission. ACTION: Notice. AGENCY: The Commission hereby gives notice that it has instituted a review pursuant to the Tariff Act of 1930 (‘‘the Act’’), as amended, to determine whether revocation of the antidumping duty order on steel wire garment hangers from China would be likely to lead to continuation or recurrence of material injury. Pursuant to the Act, interested parties are requested to respond to this notice by submitting the information specified below to the Commission. SUMMARY: Instituted July 1, 2024. To be assured of consideration, the deadline for responses is July 31, 2024. Comments on the adequacy of responses may be filed with the Commission by September 6, 2024. FOR FURTHER INFORMATION CONTACT: Calvin Chang (202–205–3062), Office of Investigations, U.S. International Trade Commission, 500 E Street SW, Washington, DC 20436. Hearingimpaired persons can obtain information on this matter by contacting the Commission’s TDD terminal on 202– 205–1810. Persons with mobility impairments who will need special assistance in gaining access to the Commission should contact the Office of the Secretary at 202–205–2000. DATES: E:\FR\FM\01JYN1.SGM 01JYN1

Agencies

[Federal Register Volume 89, Number 126 (Monday, July 1, 2024)]
[Notices]
[Pages 54506-54519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-14462]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[Docket No. BOEM-2022-0023]


Atlantic Wind Lease Sale 10 for Commercial Leasing for Wind Power 
Development on the U.S. Central Atlantic Outer Continental Shelf--Final 
Sale Notice

AGENCY: Bureau of Ocean Energy Management, Interior.

ACTION: Final sale notice.

-----------------------------------------------------------------------

SUMMARY: This Final Sale Notice (FSN) contains information pertaining 
to the areas available for commercial wind power leasing during 
Atlantic Wind Lease Sale 10 (ATLW-10) on the U.S. Central Atlantic 
Outer Continental Shelf (OCS). Specifically, this FSN details certain 
provisions and conditions of the leases, auction details, the lease 
form, criteria for evaluating competing bids, and procedures for award, 
appeal, and lease execution. The Bureau of Ocean Energy Management 
(BOEM) will offer two leases for sale using an ascending clock auction 
with multiple-factor bidding: Lease OCS-A 0557 and Lease OCS-A 0558 
(Lease Areas). Bidders will be subject to a `one-per-customer' rule, as 
explained below. BOEM will use new auction software for the lease sale, 
resulting in minor changes to the auction rules. The Lease Areas are in 
the previously identified wind energy areas (WEAs) A-2 and C-1, 
offshore the States of Delaware and Maryland and the Commonwealth of 
Virginia. The issuance of any lease resulting from this sale will not 
constitute approval of project-specific plans to develop offshore wind 
energy. Such plans, if submitted by the Lessee, will be subject to 
environmental, technical, and public reviews prior to a BOEM decision 
on whether the proposed activity should be authorized.

DATES: BOEM will hold an online mock auction for potential bidders 
starting at 9:00 a.m. Eastern Daylight Time (EDT) on August 12, 2024. 
The monetary auction will be held online and will begin at 9:00 a.m. 
EDT on August 14, 2024. Additional details are provided in the section 
entitled, ``Deadlines and Milestones for Bidders.''

FOR FURTHER INFORMATION CONTACT: Bridgette Duplantis, Bureau of Ocean

[[Page 54507]]

Energy Management, Office of Leasing and Plans, 1201 Elmwood Park 
Boulevard, New Orleans, Louisiana 70123, (504) 736-7502 or 
[email protected].

SUPPLEMENTARY INFORMATION: 

I. Background

    a. Call for Information and Nominations (Call): On April 29, 2022, 
BOEM published the Call for Information and Nominations-Commercial 
Leasing for Wind Power Development on the Central Atlantic Outer 
Continental Shelf (see 87 FR 25539). The Call consisted of six areas 
labeled A-F. BOEM received 66 comments from the general public; 
Federal, State, and local agencies; the fishing industry; industry 
groups; developers; non-governmental organizations (NGOs); 
universities; and other stakeholders. Comments can be viewed at https://www.regulations.gov/document/BOEM-2022-0023-0001/comment. Three 
developers nominated areas for a commercial wind energy lease within 
the Call Area.
    b. Area Identification (Area ID): After modifying the Area ID 
process in a Notice to Stakeholders, which is available at https://www.boem.gov/newsroom/notes-stakeholders/boem-enhances-its-processes-identify-future-offshore-wind-energy-areas, BOEM used this process to 
support identification of draft WEAs in the Central Atlantic. After the 
close of the Call comment period on June 28, 2022, BOEM initiated the 
Area ID process by reviewing the input received on the Call. BOEM and 
the National Oceanic and Atmospheric Administration's (NOAA's) National 
Centers for Coastal Ocean Science (NCCOS) Team used an ocean planning 
tool to identify the eight draft WEAs on the U.S. Central Atlantic OCS 
using the methodology outlined in the BOEM and NCCOS Draft Report: 
Development of the Central Atlantic Wind Energy Areas, which can be 
found at https://www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/BOEM_NCCOS_JointReport_DraftWEAs.pdf.
    On November 16, 2022, BOEM opened a 30-day public comment period on 
eight draft WEAs on the OCS offshore the U.S. Central Atlantic coast, 
covering approximately 1.7 million acres. BOEM considered the following 
non-exclusive information sources when identifying the draft WEAs: 
comments and nominations received on the Call; information from the 
Central Atlantic Intergovernmental Renewable Energy Task Force; input 
from Delaware, Maryland, Virginia, and North Carolina state agencies; 
input from Federal agencies; input from federally recognized Tribes; 
comments from stakeholders and ocean users, including the maritime 
community, offshore wind developers, and the commercial and 
recreational fishing industry; state and local renewable energy goals; 
and information on domestic and global offshore wind market and 
technological trends. BOEM's draft WEA recommendations did not reflect 
a final assessment from the Department of Defense (DoD) regarding 
compatibility of the draft WEAs with DoD needs.
    After the close of the draft WEA comment period on December 16, 
2022, BOEM finalized the Area ID process after reviewing the input 
received from all stakeholders mentioned above and the DoD assessment. 
BOEM announced the final WEAs on July 31, 2023, by designating three 
WEAs within the Call Area. The first WEA (A-2) is 101,767 acres and 
located approximately 26 nautical miles (nm) from the mouth of the 
Delaware Bay. The second WEA (B-1) is 78,285 acres and located 23.5 nm 
offshore Ocean City, Maryland. The third WEA (C-1) is 176,506 acres and 
located approximately 35 nm from the mouth of the Chesapeake Bay. The 
final WEAs comprise 356,558 acres and would support approximately 4.3-
8.1 GW of energy production if fully developed. BOEM, DoD (the 
Departments of the Air Force and Navy), and the National Aeronautics 
and Space Administration (NASA) agreed to undertake an in-depth review 
of WEA B-1 to determine if the impacts to military and NASA operations 
could be acceptable and/or mitigated. The Central Atlantic Area ID 
process and documentation can be found at https://www.boem.gov/renewable-energy/state-activities/central-atlantic.
    c. Environmental Reviews: On August 1, 2023, BOEM published a 
notice of intent to prepare an environmental assessment (EA) to 
consider potential environmental consequences of site characterization 
activities (e.g., biological, archaeological, geological, and 
geophysical surveys and core samples) and site assessment activities 
(e.g., installation of meteorological buoys) that are expected to take 
place after issuance of wind energy leases in the Call Area. When 
scoping the EA, BOEM sought comments on the issues and alternatives 
that should inform the EA. BOEM received 104 comment submissions, which 
can be found at https://www.regulations.gov under Docket No. BOEM-2023-
0034. In addition to the preparation of the Draft EA, including 
compliance with threatened and endangered species requirements for 
certain data collection activities associated with OCS leasing (https://www.boem.gov/sites/default/files/documents/renewable-energy/OSW-surveys-NLAA-programmatic.pdf), BOEM initiated other required 
consultations under the Endangered Species Act, the Magnuson-Stevens 
Fishery Conservation and Management Act, and the Coastal Zone 
Management Act. The EA and associated consultations informed BOEM's 
decision on whether to proceed with this FSN. BOEM will conduct 
additional environmental reviews upon receipt of a Lessee's 
Construction and Operations Plan (COP) if the proposed leases reach 
that stage of development.

II. List of Eligible Bidders

    BOEM has determined that the following 17 entities are legally, 
technically, and financially qualified to bid in the ATLW-10 auction, 
pursuant to 30 CFR 585.107 and 585.108:

------------------------------------------------------------------------
                                                                Company
                         Company name                             No.
------------------------------------------------------------------------
Atlantic Shores Offshore Wind, LLC...........................      15092
Avangrid Renewables, LLC.....................................      15019
BP Central Atlantic Offshore Wind LLC........................      15195
Corio USA Projectco LLC......................................      15182
energyRE Offshore Wind Holdings, LLC.........................      15171
Equinor Wind US LLC..........................................      15058
Invenergy Central Atlantic Offshore LLC......................      15193
OW North America Ventures LLC................................      15133
Reventus Power Central Atlantic, LLC.........................      15194
RWE Offshore US CATL, LLC....................................      15190
Seaglass Offshore Wind II, LLC...............................      15155
Shell New Energies US LLC....................................      15140
TotalEnergies Renewables USA, LLC............................      15136
US Mainstream Renewable Power Inc............................      15089
US Wind Inc..................................................      15023
Vineyard Central Atlantic LLC................................      15192
Virginia Electric and Power Company..........................      15042
------------------------------------------------------------------------

    a. Affiliated Entities: On the Bidder's Financial Form (BFF), 
discussed in sections III(a)(i) and X below, eligible bidders must list 
any other eligible bidders with whom they are affiliated. For the 
purpose of identifying affiliated entities, a bidding entity is any 
individual, firm, corporation, association, partnership, consortium, or 
joint venture (when established as a separate entity) that is 
participating in the same auction. BOEM considers bidding entities to 
be affiliated when:
    i. They own or have common ownership of more than 50 percent of the 
voting securities, or instruments of ownership or other forms of 
ownership, of another bidding entity. Ownership of less than 10 percent 
of another bidding entity constitutes a presumption of non-control that 
BOEM may rebut.
    ii. They own or have common ownership of between 10 and 50 percent 
of the voting securities or instruments of ownership, or other forms of 
ownership, of another bidding entity, and BOEM

[[Page 54508]]

determines that there is control upon consideration of factors 
including the following:
    a. The extent to which there are common officers or directors.
    b. With respect to the voting securities, or instruments of 
ownership or other forms of ownership: The percentage of ownership or 
common ownership, the relative percentage of ownership or common 
ownership compared to the percentage(s) of ownership by other bidding 
entities, if a bidding entity is the greatest single owner, or if there 
is an opposing voting bloc of greater ownership.
    c. Shared ownership, operation, or day-to-day management of a 
lease, grant, or facility, as those terms are defined in BOEM's 
regulations at 30 CFR 585.113.
    iii. They are both direct, or indirect, subsidiaries of the same 
parent company.
    iv. With respect to any lease(s) offered in this auction, they have 
entered into an agreement prior to the auction regarding the shared 
ownership, operation, or day-to-day management of such lease.
    v. Other evidence indicates the existence of power to exercise 
control, such as evidence that one bidding entity has power to exercise 
control over the other, or that multiple bidders collectively have the 
power to exercise control over another bidding entity or entities.
    Affiliated entities are not permitted to compete against each other 
in the auction. Where two or more affiliated entities have qualified to 
bid in the auction, the affiliated entities must decide prior to the 
auction which one (if any) will participate in the auction. If two or 
more affiliated entities attempt to participate in the auction, BOEM 
will disqualify those bidders from the auction.

III. Deadlines and Milestones for Bidders

    This section describes the major deadlines and milestones in the 
auction process from publication of this FSN to execution of a lease 
issued pursuant to this sale.
    a. FSN Waiting Period: During the period between FSN publication 
and the lease auction, qualified bidders must take several steps to 
remain eligible to participate in the auction.
    i. Bidder's Financial Form: Each bidder must submit a BFF to BOEM 
to participate in the auction. The BFF must include each bidder's 
Conceptual Strategy for each bidding credit for which that bidder 
wishes to be considered. BOEM must receive each bidder's BFF on or 
before July 12, 2024, and it is each bidder's responsibility to ensure 
BOEM's timely receipt. If a bidder does not submit a BFF by this 
deadline, BOEM, in its sole discretion, may grant an extension to that 
bidder only if BOEM determines the bidder's failure to timely submit a 
BFF was caused by events beyond the bidder's control. The BFF can be 
downloaded at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic. Once BOEM has processed a bidder's BFF, the bidder is 
allowed to log into pay.gov and submit a bid deposit. For purposes of 
this auction, BOEM will not consider BFFs submitted for previous lease 
sales. An original signed BFF may be mailed to BOEM's Office of 
Renewable Energy Programs. A signed copy of the form may be submitted 
in PDF format to [email protected]. A faxed copy will not be 
accepted. BFF submissions should be accompanied with a transmittal 
letter on company letterhead. The BFF must be executed on paper with a 
wet signature or with a digital signature affixed by an authorized 
representative listed on the bidder's current legal qualification card 
on file with BOEM, subject to 18 U.S.C. 1001 (Fraud and False 
Statements). Further information about the BFF can be found in the 
``Bidder's Financial Form'' section X of this notice.
    ii. Bid Deposit: Once BOEM has processed a BFF and provided the 
appropriate information to the Office of Natural Resources Revenue 
(ONRR), ONRR will populate the Bid Deposit Forms and notify the bidders 
of access to pay.gov for the bid deposits. The bidder must log into 
https://www.pay.gov to submit a bid deposit. To participate in the mock 
auction and the monetary auction, each qualified bidder must provide a 
bid deposit of $5,000,000 no later than July 29, 2024. BOEM will grant 
extensions to this deadline only if BOEM, in its sole discretion, 
determines that the failure to timely submit the bid deposit was caused 
by events beyond the bidder's control. Further information about bid 
deposits can be found in the ``Bid Deposit'' section XI of this notice. 
In accordance with 30 CFR 585.222(e), BOEM will send a written notice 
of its decision to accept or reject bids to all bidders whose deposits 
we hold.
    b. Conducting the Auction:
    i. Affirmative Action: Prior to bidding in the monetary auction, 
each bidder must file the Equal Opportunity Affirmative Action 
Representation Form BOEM-2032 (February 2020, available on BOEM's 
website at https://www.boem.gov/BOEM-2032/) and the Equal Opportunity 
Compliance Report Certification Form BOEM-2033 (February 2020, 
available on BOEM's website at https://www.boem.gov/BOEM-2033/) with the 
BOEM Office of Renewable Energy Programs. The forms can be submitted 
digitally to [email protected] or mailed to the BOEM Office of 
Renewable Energy Programs. This certification is required by 41 CFR 
part 60 and Executive Order (E.O.) 11246, issued September 24, 1965, as 
amended by E.O. 11375, issued October 13, 1967, and by E.O. 13672, 
issued July 21, 2014. Both forms must be on file with BOEM for the 
bidder(s) prior to the execution of any lease contract.
    ii. Notification of Eligibility for Bidding Credits: BOEM will 
notify each bidder of its eligibility for bidding credits prior to the 
Mock Auction.
    iii. Mock Auction: BOEM will hold a Mock Auction on August 12, 
2024, beginning at 9:00 a.m. EDT, which is open only to qualified 
bidders who have met the requirements and deadlines for auction 
participation, including submission of the bid deposit. The Mock 
Auction is intended to give bidders an opportunity to clarify auction 
rules, test the functionality of the auction software, and identify any 
potential issues that may arise during the auction.
    iv. The Auction: On August 14, 2024, BOEM, through its contractor, 
will commence the multiple-factor auction. The first round of the 
auction will start at 9:00 a.m. EDT. The auction will proceed 
electronically according to a schedule to be distributed by the BOEM 
Auction Manager at the beginning of the auction, subject to any 
revisions (which will be communicated to bidders during the auction). 
BOEM anticipates that the auction will last one or two business days, 
but the auction may continue for additional business days, as 
necessary, until the auction ends in accordance with the procedures 
described in the ``Auction Procedures'' section of this notice.
    v. Announce Provisional Winners: BOEM will announce the provisional 
winners of the lease sale after the auction ends.
    c. From the Auction to Lease Execution:
    i. Refund Non-Winners: Once the provisional winners have been 
announced, BOEM will provide the non-winners with a written explanation 
of why they did not win and will return their bid deposits.
    ii. Department of Justice (DOJ) Review: DOJ will have 30 days in 
which to conduct an antitrust review of the auction, pursuant to 43 
U.S.C. 1337(c).
    iii. Delivery of the Lease: BOEM will send three lease copies to 
each

[[Page 54509]]

provisional winner, with instructions on how to execute the lease. Once 
the lease has been fully executed, a provisional winner becomes an 
auction winner. The first year's rent is due 45 calendar days after the 
auction winners receive the lease copies for execution.
    iv. Return the Lease: Within ten business days of receiving the 
lease copies, the auction winners must post financial assurance, pay 
any outstanding balance of their winning bids (i.e., winning cash bid 
less applicable bid deposits), and sign and return the three executed 
lease copies. The winners may request extensions and BOEM may grant 
such extensions if BOEM determines the delay was caused by events 
beyond the requesting winner's control, pursuant to 30 CFR 585.224(e).
    v. Execution of Lease: Once BOEM has received the signed lease 
copies and verified that all other required materials have been 
received, BOEM will make a final determination regarding its issuance 
of the leases and will execute the leases, if appropriate.

IV. Areas Offered for Leasing

    The two Lease Areas included in this FSN are the same size and 
orientation as described in the Proposed Sale Notice (PSN). BOEM's 
designation of the two Lease Areas offered in the FSN is informed by 
extensive coordination with BOEM's intergovernmental task force 
members, consultation and engagement with Tribes, stakeholder 
engagement, a partnership with NOAA's NCCOS to utilize spatial modeling 
to inform the identification of WEAs, and consideration of the 42 
comments that BOEM received in response to the PSN. The two areas BOEM 
is offering for lease are: Lease Area A-2, OCS-A 0557, which consists 
of 101,443 acres and is approximately 26.4 nm from the mouth of the 
Delaware Bay; and Lease Area C-1, OCS-A 0558, which consists of 176,505 
acres and is approximately 35 nm from the mouth of the Chesapeake Bay.
    Descriptions of the proposed Lease Areas can be found in Addendum A 
of the proposed leases, which can be found on BOEM's website at: 
https://www.boem.gov/renewable-energy/state-activities/central-atlantic. The areas available for lease, as listed in Table 1, will be 
auctioned in a single auction.

                   Table 1--ATLW-10 Final Lease Areas
------------------------------------------------------------------------
           Lease area name               Lease area ID         Acres
------------------------------------------------------------------------
A-2..................................         OCS-A 0557         101,443
C-1..................................         OCS-A 0558         176,505
                                      ----------------------------------
    Total............................  .................         277,948
------------------------------------------------------------------------

    a. Map of the Area for Leasing: A map of the lease areas, and GIS 
spatial files X, Y (eastings, northings) UTM Zone 18, NAD83 Datum, and 
geographic X, Y (longitude, latitude), NAD83 Datum can be found on 
BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic.

V. Lease Stipulations

    BOEM is including several lease stipulations in Addendum C of each 
lease related to reporting requirements, avoiding and minimizing 
potential future user conflicts and environmental impacts, project 
labor agreements, national security, and project design.
    a. Reporting requirements: BOEM is including stipulations similar 
to those found in previous leases requiring a semi-annual progress 
report from lessees and regular engagement with Tribes and parties that 
may be affected by lessees' activities on the OCS. The lease 
stipulations require working with BOEM to identify: Tribes that have 
cultural and/or historical ties to the Lease Areas, and potentially 
affected parties; coastal communities; commercial and recreational 
fishing industries and stakeholders; educational and research 
institutions; environmental and public interest NGOs; federal, state, 
and local agencies; mariners and the maritime industry; ocean users; 
submarine cable operators; and underserved communities, as defined in 
section 2 of E.O. 13985. The report must identify Tribes and parties 
that may be affected by lessees' activities on the OCS and with whom 
the lessees have engaged; provide updates on engagement activities; 
document potential adverse effects to the interests of Tribes and 
parties; document how, if at all, a project has been informed or 
altered to address those potential effects; include feedback from 
engagement regarding transmission planning prior to proposing any 
export cable route; provide information that can be made available to 
the public; and include strategies to reach potentially affected 
individuals with Limited English Proficiency.
    The stipulations include requirements for lessees to engage in ways 
that minimize linguistic, technological, cultural, capacity, or other 
obstacles. The stipulations encourage lessees to work collaboratively 
with governments, community leadership and organizations, and Tribes 
and to develop specific frameworks for capacity building.
    In acknowledgment of the existing and growing consultation burden 
placed on many of the Tribes and parties, the stipulation also 
requires, to the maximum extent practicable, that lessees coordinate 
with one another on engagement activities. It is BOEM's intention that 
this requirement for lessees to coordinate their engagement apply not 
only to meetings proposed by lessees, but also to reasonable requests 
to coordinate engagement made by Tribes and parties. Coordinated 
engagement among Tribes and lessees is strongly encouraged and is in 
addition to BOEM's responsibilities to federally recognized Tribes 
under E.O. 13175.
    In addition, the reporting stipulation requires that the progress 
report incorporate separate lease requirements for the development of 
communication plans for Tribal governments (Native American Tribes 
Communications Plan), agencies (Agency Communications Plan), and 
fisheries (Fisheries Communications Plan). Lastly, the progress report 
must include an update on activities executed under any survey plan.
    b. Commercial Fisheries: BOEM is including a stipulation that 
contains components of stipulations included in prior commercial leases 
issued by BOEM, including a requirement for a Fisheries Communications 
Plan.
    c. Protected Species: Unless otherwise authorized by BOEM, Lessee's 
OCS activities must comply with the standards in the Project Design 
Criteria and Best Management Practices found in BOEM's notice (https://www.boem.gov/sites/default/files/documents//PDCs%20and%20BMPs%20for%20Atlantic%20Data%20Collection%2011222021.pdf) 
last revised on November 22, 2021. The

[[Page 54510]]

2021 Biological Assessment and letter of concurrence from which these 
measures were derived may be found here: https://www.boem.gov/renewable-energy/state-activities/nmfs-esa-consultations. At the 
Lessee's option, the Lessee, its operators, personnel, and contractors 
may satisfy this requirement by complying with the National Marine 
Fisheries Service approved measures to safeguard protected species that 
are most current at the time.
    d. Marine Mammal Protection Act Authorization(s): If the Lessee is 
required to obtain an authorization pursuant to section 101(a)(5) of 
the Marine Mammal Protection Act prior to conducting survey activities 
in support of plan submittal, the Lessee must provide to BOEM a copy of 
the authorization prior to commencing these activities.
    e. Project Labor Agreements (PLAs) and Supply Chain: BOEM is 
committed to workforce safety and the establishment of a durable 
domestic supply chain that can sustain the U.S. offshore wind energy 
industry, including for the leases offered in this sale. To advance 
these goals, BOEM is including two lease stipulations, one that 
encourages construction efficiency for projects and one that 
contributes towards establishing a domestic supply chain:
    i. The first stipulation requires lessees to make every reasonable 
effort to enter into a PLA covering the construction stage of any 
project for the Lease Areas.
    ii. The second stipulation requires lessees to establish a 
Statement of Goals in which the Lessee describes its plans for 
contributing to the creation of a robust and resilient U.S.-based 
offshore wind industry supply chain that would facilitate this or other 
renewable energy projects permitted by BOEM. The Lessee is required to 
provide regular progress updates on the achievement of those goals to 
BOEM, and BOEM will make those updates publicly available.
    f. Research Site Access: This stipulation makes explicit that BOEM, 
its designated representative, or any entity to which BOEM provides 
access retains the right to access the Lease Area for purposes of 
future research. This provision does not limit the Lessor's authority 
to access the lease for other purposes, including, but not limited to, 
inspections conducted pursuant to 30 CFR 285.822.
    g. Archaeological Survey Requirements: This stipulation requires 
that the Lessee provide to BOEM, in the associated plan submissions, a 
description of the methods it will use to conduct archaeological 
surveys in support of plans (i.e., Site Assessment Plan (SAP) and/or 
COP), in addition to the survey results. The Lessee is required to 
coordinate a Tribal pre-survey meeting with Tribes that have cultural 
and/or historical ties to the Lease Area, and the Lessee must work with 
BOEM to identify such Tribes. In the post-review discovery clauses, the 
stipulation requires that, in the event of an unanticipated discovery 
of a potential archaeological resource, the Lessee will immediately 
halt bottom-disturbing activities occurring within 305 meters (1,000 
feet) or less of the discovery and that the avoidance distance must be 
calculated from the maximum discernible extent of the archaeological 
resource.
    h. Foreign Interest: To protect national defense capabilities and 
military operations, BOEM is requiring the Lessee to provide to DoD 
specific information about the personnel allowed to access the wind 
turbine structures and associated data systems. That information 
includes the names of entities or persons having a direct ownership 
interest in an offshore wind facility, as well as any changes in 
ownership interests; and the names of the material vendors, entities, 
and persons with which the Lessee will potentially execute contracts to 
perform construction, supply turbines or other components, or conduct 
construction and operational activities at the facility. In addition, 
the Lessee must resolve DoD's security concerns before it allows access 
to the site by foreign persons or representatives of foreign entities 
for which DoD has raised concerns and before the Lessee uses wind 
turbines or other permanent on-site equipment manufactured by such an 
entity.
    i. Notice of Assignment to the Committee on Foreign Investment in 
the United States (CFIUS): Under BOEM's regulations, a Lessee must be 
one of the following: (1) a citizen or national of the United States; 
(2) an alien lawfully admitted for permanent residence in the United 
States, as defined in 8 U.S.C. 1101(a)(20); (3) a private, public, or 
municipal corporation organized under the laws of any State of the 
United States, the District of Columbia, or any territory or insular 
possession subject to U.S. jurisdiction; (4) an association of such 
citizens, nationals, resident aliens, or corporations; (5) an Executive 
Agency of the United States, as defined in 5 U.S.C. 105; (6) a State of 
the United States; or (7) a political subdivision of States of the 
United States. BOEM is including a stipulation that requires any 
proposed assignee of the lease that is a foreign-controlled business 
entity under the regulations at 31 CFR part 800 to provide joint 
notice, with the Lessee/assignor, to CFIUS of the proposed leasing 
transaction, in accordance with applicable regulations at 31 CFR part 
800, subpart D, and provide a copy of the notice to the DoD. In 
addition, approval of any assignment of lease interest to a foreign-
controlled business entity under 31 CFR part 800 is subject to this 
CFIUS notice stipulation. Such assignments would take place only after 
CFIUS provides notice that it has concluded all necessary reviews under 
section 721 of the Defense Production Act of 1950, as amended, with 
respect to the leasing decision or assignment.
    j. Transmission Planning: The Lessee must--to the extent that it is 
technically and economically practical or feasible--consider the use of 
shared cable corridors, regional transmission systems, meshed systems, 
or other mechanisms for transmission facilities proposed in a COP. Such 
consideration must be done in accordance with stipulation 3.1.1, which 
requires the Lessee to engage with Tribes and parties regarding 
transmission planning prior to proposing any export cable route. The 
foregoing does not prevent the Lessee from proposing the use of 
transmission systems traditionally constructed in a Project easement in 
any COP that the Lessee submits; nor does it prevent BOEM from 
requiring in a COP approval the use of cable corridors, regional 
transmission systems, meshed systems, or other mechanisms for 
transmission facilities, if deemed technically and economically 
practical or feasible by BOEM.
    k. NASA Operations (Lease OCS-A 0558): NASA and the Missile Defense 
Agency identified potential impacts to operations originating from the 
Wallops Island Flight Facility. BOEM has included stipulations in Lease 
OCS-A 0558 to avoid and minimize this potential conflict with wind 
energy development. In response to public comment, BOEM worked with 
NASA to provide additional clarification on the type and frequency of 
NASA activities expected to impact the lease area, the affected 
portions of the lease area, and the circumstances necessitating 
suspension of operations and/or evacuation. The additional information 
is found on BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic.
    l. Siting Conditions (Lease OCS-A 0558): BOEM has included lease 
stipulations addressing surface structure layout and orientation based 
on input from the U.S. Coast Guard to avoid and minimize potential 
vessel navigation issues as a result of Lease OCS-A 0558 being adjacent 
to existing lease OCS-A 0483. An additional stipulation has

[[Page 54511]]

been added to avoid and minimize impacts to the existing Dunant cable 
within Lease Area OCS-A 0558.

VI. Potential Future Restrictions

    a. Potential Future Restrictions to Mitigate Potential Conflicts 
with Department of Defense Activities: Those interested in bidding 
should be aware of potential conflicts with DoD's existing uses of the 
OCS. BOEM coordinates with DoD throughout the leasing process and the 
Military Aviation and Installation Assurance Siting Clearinghouse 
(Clearinghouse) conducted a DoD assessment of the Call Area. The 
assessment identified the following potential issues that may require 
mitigation. Lessees will be expected to coordinate with the 
Clearinghouse to assess and mitigate the impact on DoD activities as 
they design their proposed facilities.
    i. Air Surveillance and Radar: The North American Aerospace Defense 
Command (NORAD) mission may be affected by the development of the Lease 
Area(s). Considering both the expected height of offshore turbines and 
future cumulative wind turbine effects, adverse impacts can be 
mitigated through the use of Radar Adverse-impact Management (RAM) \1\ 
and overlapping radar coverage. For projects where RAM mitigation is 
acceptable, BOEM anticipates including the following project approval 
conditions:
---------------------------------------------------------------------------

    \1\ RAM is the technical process designed to minimize the 
adverse impact of obstruction interference on a radar system.
---------------------------------------------------------------------------

    (1) Lessee will notify NORAD when the project is within 30-60 days 
of completion of commissioning of the last wind turbine generator (WTG) 
(meaning every WTG in the Project is installed with potential for blade 
rotation), and again when the project is complete and operational, for 
RAM scheduling;
    (2) Lessee will contribute funds to DoD in the amount of no less 
than $80,000 toward the cost of DoD's execution of the RAM procedures 
for each radar system affected; and
    (3) Lessee will curtail wind turbine operations for national 
security or defense purposes as described in the lease.
    ii. Advanced Dynamic Aircraft Measurement System (ADAMS) 
operations: The operation of wind turbines within Lease Area OCS-A 0558 
(C-1) may interfere with the operations of the Advanced Dynamic 
Aircraft Measurement System (ADAMS), located at Naval Air Station 
Patuxent River, Maryland.
    Should interference and negative impacts on ADAMS be identified as 
a result of a Lessee's operations on Lease OCS-A 0558, BOEM may require 
the Lessee as a future condition of approval to work with the 
Department of Defense (DoD) to mitigate impacts to ADAMS. The extent of 
impact, if any, is not currently known and DoD is undertaking modeling 
and data collection to assess impacts using the turbines constructed on 
the existing, neighboring Lease OCS-A 0483.
    Expected mitigation for interference with ADAMS caused by wind 
turbine operation is currently limited to curtailment of turbine 
operations during test events. Depending on the degree of impact and 
availability of additional mitigations, BOEM may require the Lessee to 
curtail operation of the wind facility to support ADAMS operation, if 
DoD determines curtailment is required.
    DoD projects curtailment requirements to be up to 1750 scheduled 
hours per year. This estimate is based on assumptions that can be 
refined as more information becomes available. Assumptions include:
     DoD projections for research, development, test, and 
evaluation demands on ADAMS;
     interference from a wind facility would occur every time a 
test is scheduled (as opposed to only during periods when atmospheric 
ducting coincides with ADAMS operations and interference is possible);
     the Lessee has limited flexibility to continue or resume 
power generation once the curtailment is scheduled with the power grid 
operator in the event ADAMS operations are canceled or suspended;
     Power grid scheduling assumptions include: (1) curtailment 
must be scheduled at least 72 hours prior to the ADAMS event; (2) 
curtailment cannot be canceled within the 24-hour window prior to the 
scheduled event; and (3) curtailment hours cannot be adjusted within 
the 72-hour window prior to the scheduled event.
    The actual number of ADAMS operating hours executed will be less 
than scheduled but may not be known until less than 24 hours in advance 
of the ADAMS event. If the future Lessee is not constrained by the grid 
operator (as in the power grid assumptions above), the number of hours 
of curtailment could be substantially less.
    Actual curtailment requirements will be subject to validation by 
DoD of the project's effects on ADAMS and may increase or decrease 
based upon national defense mission requirements. Alternative 
mitigation measures may also be developed prior to construction and 
operation of the project.
    iii. U.S. Air Force and U.S. Air Force Air National Guard 
operations: The U.S. Air Force noted that the airspace above both 
proposed Lease Areas has a floor of 1,000 feet above sea level. The 
U.S. Air Force requested BOEM limit structure heights to no higher than 
1,000 feet above sea level.
    BOEM will further coordinate with DoD and the Lessee to deconflict 
potential impacts throughout the project design and COP review stage, 
which may result in adding mitigation measures or terms and conditions 
as part of any COP approval. BOEM may require the Lessee to enter into 
an agreement with DoD to implement any conditions and mitigate any 
identified impacts.
    b. Potential Future Restrictions within Significant Sediment 
Resource Areas: Potential bidders are advised that BOEM has developed 
sand resource areas in aliquots offshore the Mid Atlantic (MMIS 
Application (https://mmis.doi.gov/BOEMMMIS/)). OCS sand resource areas 
are composed of sand deposits found on or below the surface of the OCS 
seabed. If it is determined that significant OCS sand resources may be 
impacted by a proposed activity, BOEM may require the Lessee to 
undertake measures deemed economically, environmentally, and 
technically feasible to protect the resources to the maximum extent 
practicable, including minimizing, avoiding, and mitigating impact to 
these resources. Measures may include modification of proposed 
transmission corridor locations. There is also potential for sand 
resources to exist in aliquots not currently identified. BOEM and/or 
the Bureau of Safety and Environmental Enforcement (BSEE) will not 
approve future requests for in-place decommissioning of cables in sand 
resource areas unless BOEM's Marine Minerals Program has determined 
that the cable corridor does not unduly interfere with other uses of 
the OCS, specifically sand resource use.
    c. Potential Future Restriction to Mitigate Potential Conflicts 
with Environmental Resources: All potential bidders should be aware 
that site specific surveys may reveal features requiring mitigation at 
the COP stage. This includes sensitive benthic resources and cultural 
resources.
    d. Potential Future Restriction to Mitigate Potential Conflicts 
with Lease Area OCS-A 0557 and USCG Proposed Traffic Separation Schemes 
(TSS) Precautionary Areas: Those interested in bidding should be aware 
that Lease Area OCS-A 0557 is spaced less than 1nm from the northern 
portion of the proposed Off Delaware Bay Southern

[[Page 54512]]

Approach Precautionary Area, which includes the Delaware Bay Eastern 
Approach TSS extension lane. These areas are identified in the Final 
Consolidated Port Approaches Port Access Route Studies and have been 
included in the United States Coast Guard's Notice of Proposed 
Rulemaking (NPRM) for Shipping Safety Fairways Along the Atlantic 
Coast, published on January 19, 2024. The USCG NPRM begins the formal 
process for codifying the TSS and Precautionary Areas for vessel use 
with the intended purpose of facilitating navigational safety. Per the 
United States Coast Guard's Marine Planning Guidelines outlined in the 
October 5, 2023, USCG Navigation and Vessel Inspection Circular NO. 02-
23 Enclosure 4, the preferred recommended setback distance for any 
offshore structure to parallel any International Maritime Organization 
routing measure is 2 nm. There is less than 2 nm spacing between the 
northern boundary of Lease Area OCS-A 0557 and the proposed Delaware 
Bay Eastern Approach TSS extension lane. Table 2 lists the sub-blocks 
that are within the 2 nm of the proposed Delaware Bay Eastern Approach 
TSS extension lane and which may be subject to mitigation measures 
(i.e., no surface occupancy).

                                     Table 2--OCS-A 0557: Blocks of Concern
----------------------------------------------------------------------------------------------------------------
                                                  Protraction
               Protraction name                       No.          Block No.                Sub-block
----------------------------------------------------------------------------------------------------------------
Salisbury.....................................         NJ18-05            6330  D, H.
Salisbury.....................................         NJ18-05            6331  A, B, C, D, E, F, G, H.
Salisbury.....................................         NJ18-05            6332  A, B, C, D, E, F, G, H.
Salisbury.....................................         NJ18-05            6333  E.
----------------------------------------------------------------------------------------------------------------

    Maps identifying these OCS blocks and sub-blocks are available on 
BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic.

VII. Lease Terms and Conditions

    BOEM has made available the terms, conditions, and stipulations for 
the commercial leases that will be offered through this sale.\2\ BOEM 
reserves the right to require compliance with additional terms and 
conditions associated with the approval of a SAP and a COP. The lease 
forms \3\ are on BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic. Each lease will include the 
following attachments:
---------------------------------------------------------------------------

    \2\ On May 15, 2024, BOEM published in the Federal Register the 
Renewable Energy Modernization Rule (Rule), which once effective on 
July 15, 2024, will require updates to the lease published with this 
FSN. Those updates are likely to reflect changes to the timing of 
lease terms and the formula for calculating operating fees. After 
July 15, 2024, BOEM will revise the lease to conform to the Rule and 
will inform qualified bidders of the changes. BOEM expects no other 
updates or changes to the lease published with this FSN.
    \3\ Note to potential bidders: The title and content of Section 
21, Waiver, of Lease OCS-A 0558 has been removed and replaced with 
Variance, which is an updated provision that was included in Lease 
OCS-A 0557, but inadvertently omitted from Lease OCS-A 0558, in the 
PSN published in the Federal Register on December 12, 2023.
---------------------------------------------------------------------------

    1. Addendum A (``Description of Leased Area and Lease 
Activities'');
    2. Addendum B (``Lease Term and Financial Schedule'');
    3. Addendum C (``Lease-Specific Terms, Conditions, and 
Stipulations'');
    4. Addendum D (``Project Easement'').
    Addenda A, B, and C provide detailed lease terms and conditions. 
Addendum D will be completed at the time of COP approval or approval 
with modifications, should a COP be approved.
    a. Required Plans for Potential Development of Executed Leases: To 
the extent required under BOEM's regulations at 30 CFR part 585, the 
Lessee may submit a SAP, if the Lessee intends to conduct site 
assessment activities under that SAP, and must submit a COP to avoid 
lease termination under 30 CFR 585.432(a).

VIII. Lease Financial Terms and Conditions

    This section provides an overview of the required annual payments 
and financial assurances under the lease. Potential bidders should 
review the lease for more detailed information, including any changes 
from past practices.
    a. Rent: Pursuant to 30 CFR 585.224(b) and 585.503, the first 
year's rent payment of $3 per acre is due within 45-calendar days after 
the Lessee receives the unexecuted lease copies from BOEM. Thereafter, 
annual rent payments are due on the anniversary of the Effective Date 
of the lease (the ``Lease Anniversary''). Once commercial operations 
under the lease begin, BOEM will charge rent only for the portions of 
the Lease Area remaining undeveloped (i.e., non-generating acreage). 
For example, for the 101,443 acres of OCS-A 0557 (A-2), the rent 
payment would be $304,329 per year until commercial operations begin.
    If the Lessee submits an application for relinquishment of a 
portion of its leased area within the first 45-calendar days after 
receiving the lease copies from BOEM and BOEM approves that 
application, no rent payment will be due on the relinquished portion of 
the Lease Area. Later relinquishments of any portion of the Lease Area 
will reduce the Lessee's rent payments starting in the year following 
BOEM's approval of the relinquishment.
    A lease issued under this part confers on the Lessee the right to 
one or more project easements, without further competition, for the 
purpose of installing gathering, transmission, and distribution cables, 
pipelines, and appurtenances on the OCS as necessary for the full 
enjoyment of the lease. A Lessee must apply for the project easement as 
part of the COP or SAP, as provided under subpart F of 30 CFR part 585.
    The Lessee also must pay rent for any project easement associated 
with the lease. Rent commences on the date that BOEM approves the COP 
that describes the project easement (or any modification of such COP 
that affects the easement acreage), as outlined in 30 CFR 585.507. 
Annual rent for a project easement is the greater of $5 per acre per 
year, or $450 per year. If a COP revision results in increased easement 
acreage, BOEM will require the appropriate amount of additional rent 
when it approves the COP.
    b. Operating Fee: For purposes of calculating the initial annual 
operating fee payment under 30 CFR 585.506, BOEM applies an operating 
fee rate to a proxy for the wholesale market value of the electricity 
expected to be generated from the project during its first 12 months of 
operations. This initial payment will be prorated to reflect the period 
between the commencement of commercial operations and the Lease 
Anniversary. The initial annual operating fee payment will be due 
within 90-calendar days of the commencement of commercial operations. 
Thereafter,

[[Page 54513]]

subsequent annual operating fee payments will be due on or before the 
Lease Anniversary.
    The subsequent annual operating fee payments will be calculated by 
multiplying the operating fee rate by the imputed wholesale market 
value of the projected annual electric power production. For the 
purposes of this calculation, the imputed market value will be the 
product of the project's annual nameplate capacity, the total number of 
hours in a year (8,760), the capacity factor, and the annual average 
price of electricity derived from a regional wholesale power price 
index. For example, the annual operating fee for a 976 megawatt (MW) 
wind facility operating at a 40 percent capacity (i.e., capacity factor 
of 0.4) with a regional wholesale power price of $40 per megawatt hour 
(MWh) and an operating fee rate of 0.02 will be calculated as follows:
[GRAPHIC] [TIFF OMITTED] TR01JY24.016

    i. Operating Fee Rate: The operating fee rate is the share of the 
imputed wholesale market value of the projected annual electric power 
production due to ONRR as an annual operating fee. For the Lease Areas, 
BOEM will set the fee rate at 0.02 (2 percent) for the entire life of 
commercial operations.
    ii. Nameplate Capacity: Nameplate capacity is the maximum rated 
electric output, expressed in MW, which the turbines of the wind 
facility under commercial operations can produce at their rated wind 
speed as designated by the turbine's manufacturer.
    iii. Capacity Factor: The capacity factor relates to the amount of 
energy delivered to the grid during a period of time compared to the 
amount of energy the wind facility would have produced at full capacity 
during that same period of time. BOEM will set the capacity factor at 
0.4 (i.e., 40 percent) for the year in which the commercial operations 
begin and for the first 6 full years of commercial operations on the 
lease. At the end of the sixth year, BOEM may adjust the capacity 
factor to reflect the performance over the previous 5 years based upon 
the actual metered electricity generation at the delivery point to the 
electrical grid. BOEM may make similar adjustments to the capacity 
factor once every 5 years thereafter.
    iv. Wholesale Power Price Index: Under 30 CFR 585.506(c)(2)(i), the 
wholesale power price, expressed in dollars per MWh, is determined at 
the time each annual operating fee payment is due. For the leases 
offered in this sale the following table provides the price data. A 
similar price dataset may also be used and may be posted by BOEM at 
https://www.boem.gov for reference.

------------------------------------------------------------------------
              Lease area name                   Wholesale power price
------------------------------------------------------------------------
A-2, OCS-A 0557...........................  PJM DPL.
C-1, OCS-A 0558...........................  PJM DOM.
------------------------------------------------------------------------

    c. Financial Assurance: Within 10 business days after receiving the 
unexecuted lease copies for execution and pursuant to 30 CFR 585.515-
585.516, the provisional winners must provide an initial lease-specific 
bond or other BOEM-approved financial assurance instrument in the 
amount of $100,000. The provisional winners may meet financial 
assurance requirements by posting a surety bond or other financial 
assurance instrument as detailed in 30 CFR 585.526-585.529. BOEM 
encourages the provisional winners to discuss the financial assurance 
instrument requirements with BOEM as soon as possible after the auction 
has concluded.
    BOEM will base the amount of all SAP, COP, and decommissioning 
financial assurance on cost estimates for meeting all accrued lease 
obligations at the respective stages of development. The required 
amount of supplemental and decommissioning financial assurance will be 
determined on a case-by-case basis.
    The financial terms described above can be found in Addendum ``B'' 
of the lease, which is available at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic.

IX. Bidder's Financial Form

    Each bidder must submit to BOEM the information required in the BFF 
referenced in this FSN. A copy of the form is available at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic. BOEM 
recommends that each bidder designate an email address in its BFF that 
the bidder must use to create an account in pay.gov (if it has not 
already done so). BOEM must receive BFFs, including Conceptual 
Strategies, no later than July 12, 2024. If a bidder does not submit a 
BFF for this sale by the deadline, BOEM, in its sole discretion, may 
grant an extension to that bidder only if BOEM determines the bidder's 
failure to timely submit a BFF was caused by events beyond the bidder's 
control. The BFF is required to be executed by an authorized 
representative listed in the bidder's qualification package on file 
with BOEM. BFFs submitted by bidders for previous lease sales will not 
satisfy the requirements of this auction.
    For the ATLW-10, BOEM will accept bidders' BFFs and Conceptual 
Strategies electronically or by mail. Instructions for submission can 
be found in the BFF. The BFF must be executed on paper with a wet 
signature or with the application of a digital signature by an 
authorized representative listed on the legal qualification card 
currently on file with BOEM as authorized to bind the company. Winning 
bidders who have committed to bidding credit(s) must meet the bidding 
credit requirements no later than submission of their first Facility 
Design Report (FDR) or the applicable Lease Anniversary, whichever is 
sooner.

X. Bid Deposit

    A bid deposit is an advance cash payment submitted to BOEM to 
participate in the auction. ONRR will notify the bidders that they have 
access to the Bid Deposit Form in pay.gov, and bidders must use the Bid 
Deposit Form on the https://www.pay.gov website to submit a deposit. 
Bidders may need to create an account in pay.gov to access the Bid 
Deposit Form and submit a deposit. Each bidder must submit a bid 
deposit of $5,000,000 no later than July 29, 2024, to be eligible to 
bid for one lease area. Any bidder who fails to submit the bid deposit 
by this deadline may be disqualified from participating in the auction. 
BOEM will consider extensions to this deadline only if BOEM, in its 
sole discretion, determines that the failure to timely submit the bid 
deposit was caused by events beyond the bidder's control.
    Following the auction, provisional winners' bid deposits will be 
applied

[[Page 54514]]

against their winning cash bids. Once BOEM has announced the 
provisional winners, BOEM will refund bid deposits to the other 
bidders.
    If BOEM offers a lease to a provisionally winning bidder and that 
bidder fails to timely return the signed lease form, establish 
financial assurance, or pay the balance of its bid, BOEM may retain the 
bidder's $5,000,000 bid deposit. In such a circumstance, BOEM may 
determine which bid would have won in the absence of the bid previously 
determined to be the winning bid and may offer a lease to this next 
highest bidder if this next highest bidder is not a provisionally 
winning bidder of the other lease area in the auction. This process 
will be repeated if needed.

XI. Minimum Bid

    The minimum bid is the lowest dollar amount per acre that BOEM will 
accept as a winning bid and is the amount at which BOEM will start the 
bidding in the auction. BOEM has established a minimum bid of $100.00 
per acre for this lease sale.

XII. Auction Procedures

    a. Multiple-Factor Bidding Auction: As authorized under 30 CFR 
585.220(a)(4) and 585.221(a)(6), BOEM will use a multiple-factor 
auction format for this lease sale. The bidding system for this lease 
sale will be a multiple-factor combination of monetary and non-monetary 
factors. The bid made by a particular bidder in each round will 
represent the sum of the monetary factor (cash bid) and the value of 
any non-monetary factors in the form of bidding credits. Bidders will 
be subject to a `one-per-customer' rule, meaning that each bidder can 
acquire at most one lease area. BOEM will start the auction using the 
minimum bid price for each lease area and will increase prices 
incrementally until no more than one bidder remains bidding on each 
lease area in the auction.
    In response to public comments, BOEM is revising the bidding credit 
percentages from those proposed in the PSN. The total bidding credits 
remain at 25 percent. BOEM is increasing the credit for contributing to 
a fisheries compensatory mitigation fund from 8 percent to 12.5 
percent, and is reducing the credit for supporting offshore wind 
workforce training programs or supply chain development from 17 percent 
to 12.5 percent. These changes reflect the potential conflicts of 
offshore wind with commercial fisheries and the many existing efforts 
of state and other federal initiatives for offshore wind workforce 
training and supply chain development.
    For this sale, BOEM is calculating bidding credits as a percentage 
of the whole bid, which is a change from the method used in prior 
sales, where bidding credits were calculated as a percentage of the 
cash portion of the bid. The intended purpose of this change is to 
simplify the bidding credit calculation.
    BOEM will grant bidding credits to bidders that commit to one or 
both of the following, subject to review of the bidder's BFF and 
Conceptual Strategy.
    i. Supporting workforce training programs for the offshore wind 
industry or supporting the development of a domestic supply chain for 
the offshore wind industry, or a combination of both; or
    ii. Establishing and contributing to a fisheries compensatory 
mitigation fund or contributing to an existing fund to mitigate 
potential negative impacts to commercial and for-hire recreational 
fisheries caused by OCS offshore wind development in the Atlantic.
    These bidding credits are intended to:
    i. Enhance, through training, the offshore wind workforce and/or 
enhance the establishment of a domestic supply chain for offshore wind 
manufacturing, assembly, or services, both of which will contribute to 
the expeditious and orderly development of offshore wind resources on 
the OCS; and
    ii. Minimize potential economic effects on commercial fisheries 
impacted by potential offshore wind development, as cooperation with 
commercial fisheries impacted by OCS operations will enable development 
of the lease areas to advance.
    Changes to Auction Rules: BOEM will be employing new auction 
software for lease sales held in 2024. The auction format remains an 
ascending clock auction with multiple-factor bidding. There are five 
main changes to the ascending clock auction rules in the new software, 
as follows:
    i. If a bidder decides to bid on a different lease area in a given 
round of the auction, it may submit a bid to reduce demand for the 
lease area it bid on in the previous round and, simultaneously, submit 
a bid to increase demand for another lease area. This allows a bidder 
the option to switch to another lease area if the price of the first 
lease area exceeds the bidder's specified bid price.
    ii. Provisional winners will no longer be determined using a two-
step process. The auction rules are implemented in a way such that, 
when the auction concludes, the bidder who remains on a lease area 
after the final round becomes its provisional winner. There will be no 
additional processing step.
    iii. The auction will use a `second price' rule. A given lease area 
will be won by the bidder that submitted the highest bid amount for the 
lease area, but the winning bidder will pay the highest bid amount at 
which there was competition (i.e., the `second price').
    iv. Each bidder's bidding credit will be expressed directly as a 
percentage of the final price of the lease.
    v. For sales in which bidders are allowed to bid for and 
potentially acquire two or more lease areas, any bid for two or more 
lease areas will be treated as independent bids for those lease areas, 
rather than as a package bid.
    Changes i. through iv. listed above are applicable to the ATLW-10 
sale. However, change v. to the ascending clock auction rules is 
inapplicable, due to the `one-per-customer' rule.
    All potential bidders should review the complete Auction Procedures 
for Offshore Wind Lease Sales (Version 1) located at: https://www.boem.gov/renewable-energy/lease-and-grant-information.
    The Auction: Using an online bidding system to host the auction, 
BOEM will start the bidding for Leases OCS-A 0557 and OCS-A 0558 as 
described below.

----------------------------------------------------------------------------------------------------------------
                      Lease area name                         Lease area ID         Acres         Minimum bid
----------------------------------------------------------------------------------------------------------------
A-2.......................................................         OCS-A 0557         101,443        $10,144,300
C-1.......................................................         OCS-A 0558         176,505         17,650,500
----------------------------------------------------------------------------------------------------------------

    The auction will be conducted in a series of rounds. Before each 
round, the auction system will announce the prices for each lease area 
offered in the auction. In Round 1, there is a single price for each 
lease area equal to the minimum bid price (also known as the `opening 
price' or `clock price of Round 1'). Each bidder can bid, at the 
opening price, for one lease area. After Round 1, the bidder's 
``processed demand'' is one for the lease area (if any) for which the

[[Page 54515]]

bidder bid in Round 1.\4\ The bidder's eligibility for Round 2 equals 
the number of lease area for which the bidder bid in Round 1.
---------------------------------------------------------------------------

    \4\ Bidders specify their demand for a lease area with either a 
0 or 1 in the auction system. A demand of 1 indicates the lease area 
that they are bidding on. Processed demand is the demand, either 0 
or 1 of a bidder for a lease area following the processing of the 
bids for the round.
---------------------------------------------------------------------------

    Starting in Round 2, each lease area is assigned a range of prices 
for the round. The start-of-round price is the lowest price in the 
range, and the clock price is the highest price in the range. A bidder 
still eligible to bid after the previous round can either continue 
bidding at the new round's clock price for the same lease area for 
which the bidder's processed demand is one or submit a bid at any price 
in the range for that round to reduce demand for that lease area. A bid 
to reduce demand at some price indicates that the bidder is not willing 
to acquire that lease area at a price exceeding the specified bid 
price. A bidder that bids to reduce demand for a lease area can 
optionally bid to increase demand for the other lease area in the same 
round.
    If an eligible bidder does not place a bid during the round for the 
lease area for which the bidder's processed demand is one, the auction 
system will consider this a request to reduce demand for that lease 
area at the round's start-of-round price. That bidder can nonetheless 
win that lease area if it is the last remaining bidder for that lease 
area.
    After each round, the auction system processes the bids and 
determines each bidder's processed demand for each lease area and the 
posted prices for the lease areas. The bidder's eligibility for the 
next round equals the number of lease areas for which the bidder had a 
processed demand of one. If, after any round, a bidder's processed 
demand is zero for both lease area s, the bidder's eligibility drops to 
zero and the bidder can no longer bid in the auction. The posted price 
is the price determined for each lease area after processing of all 
bids for a round. If only one bidder remains on a lease area, the 
posted price reflects the ``second price'' (i.e., the highest price at 
which there was competition for the lease area).\5\ If, after the bids 
for the round have been processed, there is no lease area with excess 
demand, the auction will end. When this occurs, each bidder with a 
processed demand of one for a Lease Area will become the provisional 
winner for that lease area. Otherwise, the auction will continue with a 
new round in which the start-of-round price for each lease area equals 
the posted price of the previous round.
---------------------------------------------------------------------------

    \5\ The Auction Procedures for Offshore Wind Lease Sales 
provides details on how bids are prioritized and processed.
---------------------------------------------------------------------------

    The increment by which the clock price exceeds the start-of-round 
price will be determined based on several factors including, but not 
limited to, the expected time needed to conduct the auction and the 
number of rounds that have already occurred. BOEM reserves the right to 
increase or decrease the increment as it deems appropriate.
    The provisional winner of each lease area will pay the final posted 
price (less any applicable bidding credit) or risk forfeiting its bid 
deposit. A provisional winner will be disqualified if it is 
subsequently found to have violated auction rules or BOEM regulations, 
or otherwise engaged in conduct detrimental to the integrity of the 
competitive auction. If a bidder submits a bid that BOEM determines to 
be a provisionally winning bid, the bidder must sign the applicable 
lease documents, post financial assurance, and submit the outstanding 
balance (if any) of its winning bid (i.e., winning bid minus the 
applicable bid deposit and any applicable bidding credits) within 10 
business days of receiving the lease copies, pursuant to 30 CFR 
585.224. BOEM reserves the right to not issue the lease to the 
provisionally winning bidder if that bidder fails to: timely execute 
three copies of the lease and return them to BOEM, timely post adequate 
financial assurance, timely pay the balance of its winning bid, or 
otherwise comply with applicable regulations or the terms of this FSN. 
In any of these cases, the bidder will forfeit its bid deposit and BOEM 
reserves the right to offer a lease to the next highest eligible bidder 
as determined by BOEM.
    BOEM will publish the names of the provisional winners of the lease 
areas and the associated prices shortly after the conclusion of the 
sale. Full bid results, including round-by-round results of the entire 
sale, will be published on BOEM's website after a review of the results 
and announcement of the provisional winners.
    Additional Information Regarding the Auction Format:
    i. Authorized Individuals and Bidder Authentication: An entity that 
is eligible to participate in the auction will identify on its BFF up 
to three individuals who will be authorized to bid on behalf of the 
company, including their names, business telephone numbers, and email 
addresses. All individuals will log into the auction system using 
Login.gov. Prior to the auction, each individual listed on the BFF form 
must obtain a Fast Identify Online (FIDO) compliant security key,\6\ 
and must register this security key on Login.gov using the same email 
address that was listed in the BFF. The Login.gov registration, 
together with the FIDO-compliant security key, will enable the 
individual to log into the auction system. BOEM will provide 
information on this process on its website.
---------------------------------------------------------------------------

    \6\ FIDO keys are produced by many manufacturers, such as Yubico 
and Google. They are widely available and can easily be purchased 
from Amazon, Best Buy, Walmart, or any other seller of electronics. 
The latest generation of the FIDO standard is FIDO2, and each 
authorized individual should obtain a key compliant with the FIDO2 
authentication standard. FIDO keys are typically inserted into a 
computer's USB port, so the authorized individual should obtain a 
FIDO key compatible with their computer (USB-A or USB-C) or a USB 
adapter, as necessary.
---------------------------------------------------------------------------

    After BOEM has processed the bid deposits, the auction contractor 
will send an email to the authorized individuals, inviting them to 
practice logging into the auction system on a specific day in advance 
of the mock auction. The Login.gov login process, along with the 
authentication process for the auction helpdesk, will also be tested 
during the mock auction.
    If an eligible bidder fails to submit a bid deposit or does not 
participate in the first round of the auction, BOEM will deactivate 
that bidder's login information.
    ii. Timing of Auction: The auction will begin at 9:00 a.m. EDT on 
August 14, 2024. Bidders will be able to log into the auction system 
beginning 30 minutes before the start of the auction. BOEM recommends 
that bidders log in earlier than 9:00 a.m. EDT on that day to ensure 
that any login issues are resolved prior to the start of the auction.
    iii. Messaging Service: BOEM and its auction contractors will use 
the auction system's messaging service to keep bidders informed on 
issues of interest during the auction. For example, BOEM could change 
the schedule at any time, including during the auction. If BOEM changes 
the schedule during the auction, it will use the messaging service to 
notify bidders that a revision has been made and will direct bidders to 
the relevant page. BOEM will also use the messaging service for other 
updates during the auction.
    iv. Bidding Rounds: Bidders are allowed to place bids or to change 
their bids at any time during the bidding round. At the top of the 
bidding page, a countdown clock shows how much time remains in each 
round. Bidders will have until the end of the round to place bids. 
Bidders should do so according to the procedures described in this FSN 
and the Auction Procedures

[[Page 54516]]

for Offshore Wind Lease Sales. Information about the round results will 
be made available only after the round has closed, so there is no 
strategic advantage to placing bids early or late in the round.
    The Auction Procedures for Offshore Wind Lease Sales elaborate on 
the auction procedures described in this FSN. In the event of any 
inconsistency between the Auction Procedures for Offshore Wind Lease 
Sales, the Bidder Manual, and the FSN, the FSN is controlling.\7\
---------------------------------------------------------------------------

    \7\ The Bidder Manual describes use of the auction platform and 
is provided to the auction participants in advance of the auction.
---------------------------------------------------------------------------

    v. Alternate Bidding Procedures: Redundancy is the most effective 
way to mitigate technical and human issues during an auction. BOEM 
strongly recommends that bidders consider authorizing more than one 
individual to bid in the auction--and confirming during the mock 
auction that each individual is able to access the auction system. A 
mobile hotspot or other form of wireless access is helpful if a 
company's main internet connection should fail. As a last resort, an 
authorized individual facing technical issues may request to submit its 
bid by telephone. To be authorized to place a telephone bid, an 
authorized individual must call the help desk number listed in the 
auction manual before the end of the round. BOEM will authenticate the 
caller's identity, including requiring the caller to provide a code 
from the software token. The caller must also explain the reasons why a 
telephone bid needs to be submitted. BOEM may, in its sole discretion, 
permit or refuse to accept a request for the placement of a bid using 
this alternate telephonic bidding procedure. The auction help desk 
requires codes from the Google Authenticator application (app) as part 
of its procedure for identifying individuals who call for assistance. 
Prior to the auction, all individuals listed on the BFF should download 
the Google Authenticator\TM\ mobile app \8\ onto their smartphone or 
tablet.\9\ The first time the individual logs into the auction system, 
the system will provide a QR token to be read into the Google 
Authenticator app. This token is unique to the individual and enables 
the Google Authenticator app to generate time-sensitive codes that will 
be recognized by the auction system. When an individual calls the 
auction help desk, the current code from the app must be provided to 
the help desk representative as part of the user authentication 
process. BOEM will provide information on this process on its website.
---------------------------------------------------------------------------

    \8\ Google Authenticator must be installed from either the Apple 
App Store or the Google Play Store.
    \9\ Installing the Google Authenticator app is only required if 
the app has not already been installed on the smartphone or tablet.
---------------------------------------------------------------------------

    b. 12.5 Percent Bidding Credit for Workforce Training or Supply 
Chain Development or a Combination of Both: This bidding credit allows 
a bidder to receive a credit of 12.5 percent of its bid in exchange for 
a commitment to make a qualifying monetary contribution 
(``Contribution''), in the same amount as the bidding credit received, 
to programs or initiatives that support workforce training programs for 
the U.S. offshore wind industry or development of a U.S. domestic 
supply chain for the offshore wind industry, or both, as described in 
the BFF Addendum and the lease. To qualify for this credit, the bidder 
must commit to the bidding credit requirements on the BFF and submit a 
Conceptual Strategy as described in the BFF Addendum.
    i. The Contribution to workforce training must result in a better 
trained and/or larger domestic offshore wind workforce that provides 
for more efficient operations via increasing the supply of fully 
trained personnel. Training of existing Lessee employees, Lessee 
contractors, or employees of affiliated entities will not qualify.
    ii. The Contribution to domestic supply chain development must 
result in overall benefits to the U.S. offshore wind supply chain 
available to all potential purchasers of offshore wind services, 
components, or subassemblies, not solely the Lessee's project; and 
either: (i) the demonstrable development of new domestic capacity 
(including vessels) or the demonstrable buildout of existing capacity; 
or (ii) an improved offshore wind domestic supply chain by reducing the 
upfront capital or certification cost for manufacturing offshore wind 
components, including the building of facilities, the purchasing of 
capital equipment, and the certifying of existing manufacturing 
facilities.
    iii. Contributions cannot be used to satisfy private cost shares 
for any federal tax or other incentive programs where cost sharing is a 
requirement. No portion of the Contribution may be used to meet the 
requirements of any other bidding credits for which the Lessee 
qualifies.
    iv. Bidders interested in obtaining a bidding credit could choose 
to contribute to workforce training programs, domestic supply chain 
initiatives, or a combination of both. The Conceptual Strategy must 
describe verifiable actions that the Lessee will take that would allow 
BOEM to confirm compliance when the documentation for satisfying the 
bidding credit is submitted. The Contribution must be tendered in full, 
and the Lessee must provide documentation evidencing it has made the 
Contribution and complied with applicable requirements, no later than 
the date the Lessee submits its first FDR.
    v. Contributions to workforce training must promote and support one 
or more of the following purposes: (i) Union apprenticeships, labor 
management training partnerships, stipends for workforce training, or 
other technical training programs or institutions focused on providing 
skills necessary for the planning, design, construction, operation, 
maintenance, or decommissioning of offshore wind energy projects in the 
United States; (ii) Maritime training necessary for the crewing of 
vessels to be used for the construction, servicing, and/or 
decommissioning of wind energy projects in the United States; (iii) 
Training workers in skills or techniques necessary to manufacture or 
assemble offshore wind components, subcomponents, or subassemblies. 
Examples of areas involving these skills and techniques include 
welding; wind energy technology; hydraulic maintenance; braking 
systems; mechanical systems, including blade inspection and 
maintenance; or computers and programmable logic control systems; (iv) 
Tribal offshore wind workforce development programs or training for 
employees of an Indian Economic Enterprise \10\ in skills necessary in 
the offshore wind industry; or (v) Training in any other job skills 
that the Lessee can demonstrate are necessary for the planning, design, 
construction, operation, maintenance, or decommissioning of offshore 
wind energy projects in the United States.
---------------------------------------------------------------------------

    \10\ https://www.bia.gov/sites/default/files/dup/assets/as-ia/ieed/Primer%20on%20Buy%20Indian%20Act%20508%20Compliant%202.6.18(Reload).p
df.
---------------------------------------------------------------------------

    vi. Contributions to domestic supply chain development must promote 
and support one or more of the following: (i) Development of a domestic 
supply chain for the offshore wind industry, including manufacturing of 
components and subassemblies and the expansion of related services; 
(ii) Domestic Tier 2 and Tier 3 offshore wind component suppliers and 
domestic Tier-1 supply chain efforts, including quay-side fabrication; 
\11\ (iii) Technical assistance

[[Page 54517]]

grants to help U.S. manufacturers re-tool or certify (e.g., ISO-9001) 
for offshore wind manufacturing; (iv) Development of Jones Act-
compliant vessels for the construction, servicing, and/or 
decommissioning of wind energy projects in the United States; (v) 
Purchase and installation of lift cranes or other equipment capable of 
lifting or moving foundations, towers, and nacelles quayside, or lift 
cranes on vessels with these capabilities; (vi) Port infrastructure 
directly related to offshore wind component manufacturing or assembly 
of major offshore wind facility components; (vii) Establishing a new or 
existing bonding support reserve or revolving fund available to all 
businesses providing goods and services to offshore wind energy 
companies, including disadvantaged businesses and/or Indian Economic 
Enterprises; or (viii) Other supply chain development efforts that the 
Lessee can demonstrate advance the manufacturing of offshore wind 
components or subassemblies or the provision of offshore wind services 
in the United States.
---------------------------------------------------------------------------

    \11\ Tier-1 denotes the primary offshore wind components such as 
the blades, nacelles, towers, foundations, and cables. Tier 2 
subassemblies are the systems that have a specific function for a 
Tier 1 component. Tier 3 subcomponents are commonly available items 
that are combined into Tier 2 subassemblies, such as motors, bolts, 
and gears.
---------------------------------------------------------------------------

    vii. Documentation: If a lease is issued pursuant to a winning bid 
that includes a bidding credit for workforce training or supply chain 
development, the Lessee is required to provide documentation showing 
that the Lessee has met the financial commitment before the Lessee 
submits the first FDR for the lease. The documentation must allow BOEM 
to objectively verify the amount of the Contribution and the 
beneficiary(ies) of the Contribution.
    At a minimum, the documentation must include: all written 
agreements between the Lessee and beneficiary(ies) of the Contribution, 
which must detail the amount of the Contribution(s) and how it will be 
used by the beneficiaries of the Contribution(s) to satisfy the goals 
of the bidding credit for which the Contribution was made; all receipts 
documenting the amount, date, financial institution, and the account 
and owner of the account to which the Contribution was made; and sworn 
statements by the entity that made the Contribution and the 
beneficiary(ies) of the Contribution attesting that all information 
provided in the above documentation is true and accurate. The 
documentation will need to describe how the funded initiative or 
program has advanced, or is expected to advance, U.S. offshore wind 
workforce training or supply chain development. The documentation must 
also provide qualitative and/or quantitative information that includes 
the estimated number of trainees or jobs supported, or the estimated 
leveraged supply chain investment resulting or expected to result from 
the Contribution. The documentation will need to contain any 
information called for in the Conceptual Strategy that the Lessee 
submitted with its BFF and to allow BOEM to objectively verify (i) the 
amount of the Contribution and the beneficiary(ies) of the 
Contribution, and (ii) compliance with the bidding credit criteria 
provided in Addendum ``C'' of the lease. If the Lessee's implementation 
of its Conceptual Strategy changes due to market needs or other 
factors, the Lessee must explain the changed approach. BOEM reserves 
all rights to determine that the bidding credit has not been satisfied 
if changes from the Lessee's Conceptual Strategy result in the Lessee 
not meeting the criteria for the bidding credit described in Addendum 
``C'' of the lease.
    viii. Enforcement: The commitment for the bidding credit will be 
made in the BFF and will be included in a lease addendum that will bind 
the Lessee and all future assignees of the lease. If BOEM were to 
determine that a Lessee or assignee had failed to satisfy the 
requirements of the bidding credit, or if a Lessee were to relinquish 
or otherwise fail to develop the lease by the tenth anniversary date of 
lease issuance, the amount corresponding to the bidding credit awarded 
will be immediately due and payable to ONRR with interest from the 
lease Effective Date. The interest rate will be the underpayment 
interest rate identified by ONRR. The Lessee will not be required to 
pay said amount if the Lessee satisfied its bidding credit requirements 
but failed to develop the lease by the tenth Lease Anniversary. BOEM 
could, at its sole discretion, extend the documentation deadline beyond 
the first FDR submission or extend the lease development deadline 
beyond the 10-year timeframe.
    c. 12.5 Percent Bidding Credit for Fisheries Compensatory 
Mitigation Fund: The second bidding credit will allow a bidder to 
receive a credit of 12.5 percent of its bid in exchange for a 
commitment to establish and contribute to a fisheries compensatory 
mitigation fund, or to contribute to a similar existing fund, to 
compensate for potential negative impacts to commercial and for-hire 
recreational fisheries. The term ``commercial fisheries'' refers to 
commercial and processing businesses engaged in the act of catching and 
marketing fish and shellfish for sale from the Atlantic. The term 
``for-hire recreational fisheries'' refers to charter and headboat 
fishing operations involving vessels-for-hire engaged in recreational 
fishing in the Atlantic that are hired for a charter fee by an 
individual or group of individuals for the exclusive use of that 
individual or group of individuals.
    The Fund must compensate commercial and for-hire recreational 
fishers for gear loss or damage, as well as income loss claims incurred 
as a result of any stage of offshore wind project development (pre-
construction, construction, operations, and decommissioning) resulting 
from this lease. Loss claims may also result from impacts from the 
development of easements associated with this lease and/or the conduct 
of surveys on this lease before the establishment of the Fund. Funds 
determined to be in excess of those needed to compensate for gear loss 
or damage and income loss as a result of lease development, based on 
actuarial accounting, may be used to:
     Support regional fisheries compensatory mitigation efforts 
for other Atlantic OCS offshore wind projects,
     Offset the cost of gear and navigational aid upgrades and 
other transitions for operating within a wind farm; or
     Promote participation of fishers and fishing communities 
in the offshore wind project development process or other programs that 
better enable the fishing and offshore wind industries to co-exist.
    Lessees are encouraged to coordinate with other lessees to 
establish or contribute to a regional fund. The regional fund should 
ensure lease-specific claims are accounted for.
    To qualify for this credit, the bidder must commit to the bidding 
credit requirements on the BFF and submit a Conceptual Strategy as 
described in the BFF Addendum.
    The Conceptual Strategy must describe the actions that the lessee 
intends to take that will allow BOEM to verify compliance when the 
lessee seeks to demonstrate satisfaction of the requirements for the 
bidding credit. The lessee is required to provide documentation showing 
that the lessee has met the commitment and complied with the applicable 
bidding credit requirements before the lessee submits the lease's first 
FDR or before the fifth Lease Anniversary, whichever is sooner.
    Any fund established or selected by the lessee to meet this bidding 
credit requirement must include a process for evaluating the actuarial 
status of funds at least every 5 years and publicly report information 
on fund disbursement and administrative costs at least annually.

[[Page 54518]]

    The fisheries compensatory mitigation fund must be independently 
managed by a third party and must include trustees or board members 
from fishing stakeholder groups. The fund must be designed with 
fiduciary governance and strong internal controls while minimizing 
administrative expenses. The Contribution may be used for fund startup 
costs, but the Fund should minimize costs by leveraging existing 
processes, procedures, and information from BOEM's draft Fisheries 
Mitigation Guidance, the Eleven Atlantic States' Fisheries Mitigation 
Project, or other sources.
    Documentation: If a lease is awarded pursuant to a winning bid that 
includes a fisheries compensatory mitigation fund bidding credit, the 
lessee must provide written documentation to BOEM that demonstrates 
that it completed the fund Contribution before it submits the lease's 
first FDR or before the fifth Lease Anniversary, whichever is sooner. 
The documentation must enable BOEM to objectively verify the 
Contribution has met all applicable requirements as outlined in 
Addendum ``C'' of the lease. At a minimum, this documentation must 
include:
    a. The procedures established to compensate for gear loss or damage 
and lost fishing income resulting from any stage of offshore wind 
development (pre-construction, construction, operation, and 
decommissioning) adherent to the requirements above;
    b. The fisheries compensatory mitigation fund charter, including 
the governance structure, audit and public reporting procedures, and 
standards for paying compensatory mitigation for impacts to fishers 
from all phases of offshore development adherent to the requirements 
above;
    c. All receipts documenting the amount, date, financial 
institution, and the account and owner of the account to which the 
Contribution was made; and
    d. Sworn statements by the entity that made the Contribution, 
attesting to:
    i. The amount and date(s) of the Contribution;
    ii. That the Contribution is being (or will be) used in accordance 
with the bidding credit requirements in the lease; and
    iii. That all information provided is true and accurate.
    The documentation must contain any information specified in the 
Conceptual Strategy that was submitted with the BFF. If the lessee's 
implementation of its Conceptual Strategy changes due to market needs 
or other factors, the lessee must explain this change. BOEM reserves 
the right to determine that the bidding credit has not been satisfied 
if changes from the lessee's Conceptual Strategy result in the lessee 
not meeting the criteria for the bidding credit described in Addendum 
``C'' of the lease.
    Enforcement: The commitment to the fisheries compensatory 
mitigation fund bidding credit will be made in the BFF. It will be 
included in Addendum ``C'' of the lease and will bind the lessee and 
all future assignees of the lease. If BOEM were to determine that a 
lessee or assignee had failed to satisfy the commitment at the time the 
first FDR is submitted, or by the fifth Lease Anniversary, whichever is 
sooner, the amount corresponding to the bidding credit awarded will be 
immediately due and payable to ONRR with interest from the lease 
Effective Date. The interest rate will be the underpayment interest 
rate identified by ONRR. The lessee will not be required to pay said 
amount if the lessee satisfied its bidding credit requirements by the 
time the first FDR is submitted, or the fifth Lease Anniversary, 
whichever is sooner. BOEM may, at its sole discretion, extend the 
documentation deadline beyond the first FDR or beyond the 5-year 
timeframe.

XIII. Rejection or Non-Acceptance of Bids

    BOEM reserves the right to reject any and all bids that do not 
satisfy the requirements and rules of the auction, this FSN, or 
applicable regulations and statutes.

XIV. Anti-Competitive Review

    Bidding behavior in this lease sale is subject to federal antitrust 
laws. Following the auction, but before the acceptance of bids and the 
issuance of the lease, BOEM will ``allow the Attorney General, in 
consultation with the Federal Trade Commission, thirty days to review 
the results of [the] lease sale.'' 43 U.S.C. 1337(c)(1). If a 
provisionally winning bidder is found to have engaged in anti-
competitive behavior in connection with this lease sale, BOEM will 
reject its provisionally winning bid. Compliance with BOEM's auction 
procedures and regulations is not an absolute defense to violations of 
antitrust laws.
    Anti-competitive behavior determinations are fact-specific. Such 
behavior may manifest itself in several different ways, including, but 
not limited to:
    1. An express or tacit agreement among bidders not to bid in an 
auction, or to bid a particular price;
    2. An agreement among bidders not to bid;
    3. An agreement among bidders not to bid against each other; or
    4. Other agreements among bidders that have the potential to affect 
the final auction price.
    Pursuant to 43 U.S.C. 1337(c)(3), BOEM will decline to award a 
lease if the Attorney General, in consultation with the Federal Trade 
Commission, determines that awarding the lease would be inconsistent 
with antitrust laws.
    For more information on whether specific communications or 
agreements could constitute a violation of federal antitrust law, 
please see https://www.justice.gov/atr/business-resources or consult 
legal counsel.

a. Process for Issuing the Lease

    Once all post-auction reviews have been completed to BOEM's 
satisfaction, BOEM will provide three unsigned copies of the lease to 
each provisionally winning bidder. Within 10 business days after 
receiving the lease copies, the provisionally winning bidders must:
    1. Sign and return the lease copies on the bidder's behalf;
    2. File financial assurance, as required under 30 CFR 585.515-537; 
and
    3. Pay by electronic funds transfer (EFT) the balance owed (the 
winning cash bid less the applicable bid deposit), if any. BOEM 
requires bidders to use EFT procedures (not pay.gov, the website 
bidders used to submit bid deposits) for payment of the balance, 
following the detailed instructions available on ONRR's website at: 
https://onrr.gov/paying/payment-options?tabs=renewable-energy,bid-deposit-options.
    BOEM will not execute the lease until the three requirements above 
have been satisfied, BOEM has accepted the provisionally winning 
bidder's financial assurance pursuant to 30 CFR 585.515, and BOEM has 
processed the provisionally winning bidder's payment. BOEM may extend 
the 10-business-day deadline for signing a lease, filing the required 
financial assurance, and paying the balance owed if BOEM determines, in 
its sole discretion, that the provisionally winning bidder's inability 
to comply with the deadline was caused by events beyond the 
provisionally winning bidder's control pursuant to 30 CFR 585.224(e).
    If the provisionally winning bidder does not meet these 
requirements or otherwise fails to comply with applicable regulations 
or the terms of the FSN, BOEM reserves the right not to issue the lease 
to that bidder. In such a case, the provisional winner will forfeit its 
bid deposit. Also, in such a case,

[[Page 54519]]

BOEM reserves the right to offer the lease to the next highest eligible 
bidder as determined by BOEM.
    Within 45 calendar days of the date that a provisional winner 
receives lease copies, each provisional winner is required to pay the 
first year's rent using the ``ONRR Renewable Energy Initial Rental 
Payments'' form available at: https://www.pay.gov/public/form/start/27797604/.
    Subsequent annual rent payments must be made following the detailed 
instructions available on ONRR's website at: https://onrr.gov/paying/payment-options?tabs=rent-payments.

b. Non-Procurement Debarment and Suspension Regulations

    Pursuant to 43 CFR part 42, subpart C, an OCS renewable energy 
Lessee will be required to comply with the Department of the Interior's 
non-procurement debarment and suspension regulations at 2 CFR parts 180 
and 1400. The Lessee must also communicate this requirement to persons 
with whom the Lessee does business relating to this lease by including 
this requirement as a condition in their contracts and in other 
transactions.

c. Changes to Auction Details

    The Program Manager of BOEM's Office of Renewable Energy Programs 
has the discretion to change any auction detail specified in the FSN, 
including the date and time, if s/he deems that events outside BOEM's 
control may interfere with a fair and proper lease sale. Such events 
may include, but are not limited to, natural disasters (e.g., 
earthquakes, hurricanes, floods, and blizzards), wars, riots, acts of 
terrorism, fire, strikes, civil disorder, Federal Government shutdowns, 
cyberattacks against relevant information systems, or other events of a 
similar nature. In case of such events, BOEM will notify all qualified 
bidders via email, phone, and BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/central-atlantic. Bidders should call 
BOEM's Auction Manager at (703) 787-1121 if they have concerns.

d. Withdrawal of Blocks

    BOEM reserves the right to withdraw all or portions of each lease 
area prior to executing the leases with the winning bidders. If BOEM 
exercises this right, it will refund bid deposits to winning bidders, 
without interest, as provided in 30 CFR 585.224(f).

e. Appeals

    Procedures to request reconsideration of rejected bids are provided 
in BOEM's regulations at 30 CFR 585.225 and 585.118(c). BOEM's decision 
on a bid is the final action of the Department of the Interior, and is 
not subject to appeal to the Office of Hearings and Appeals, but an 
unsuccessful bidder may apply for reconsideration by the Director under 
30 CFR 585.225 as follows:
    (a) If BOEM rejects your bid, BOEM will provide a written statement 
of the reasons and will refund any money deposited with your bid, 
without interest.
    (b) You may ask the BOEM Director for reconsideration, in writing, 
within 15 business days of bid rejection, under 30 CFR 585.118(c)(1). 
The Director will send you a written response either affirming or 
reversing the rejection.

f. Protection of Privileged or Confidential Information

    BOEM will protect privileged or confidential information that the 
Lessee submits, as authorized by the Freedom of Information Act (FOIA), 
30 CFR 585.114, or other applicable statutes. If the Lessee wishes to 
protect the confidentiality of information, the Lessee should clearly 
mark it ``Contains Privileged or Confidential Information'' and 
consider submitting such information as a separate attachment. BOEM 
will not disclose such information, except as required by FOIA. If your 
submission is requested under the FOIA, your information will only be 
withheld if a determination is made that one of the FOIA's exemptions 
to disclosure applies. Such a determination will be made in accordance 
with the Department's FOIA regulations and applicable law. Labeling 
information as privileged or confidential will alert BOEM to more 
closely scrutinize whether it warrants withholding. Further, BOEM will 
not treat as confidential aggregate summaries of otherwise 
nonconfidential information.

XV. Compliance With the Inflation Reduction Act (Pub. L. 117-169 (Aug. 
16, 2022)) (Hereinafter, the ``IRA'')

    Section 50265(b)(2) of the IRA provides that ``[d]uring the 10-year 
period beginning on the date of enactment of this Act . . . the 
Secretary may not issue a lease for offshore wind development under 
section 8(p)(1)(C) of the OCS Lands Act (43 U.S.C. 1337(p)(1)(C)) 
unless--(A) an offshore [oil and gas] lease sale has been held during 
the 1-year period ending on the date of the issuance of the lease for 
offshore wind development; and (B) the sum total of acres offered for 
lease in offshore [oil and gas] lease sales during the 1-year period 
ending on the date of the issuance of the lease for offshore wind 
development is not less than 60,000,000 acres.'' Section 50264(d) of 
the IRA provides that ``. . . not later than March 31, 2023, the 
Secretary shall conduct Lease Sale 259[.]'' Oil and Gas Lease Sale 261 
was held on December 20, 2023, satisfying the requirements in section 
50265(b)(2) of the IRA for any offshore wind lease issued by December 
20, 2024. BOEM expects to issue any leases resulting from ATLW-10 no 
later than the one-year anniversary of Lease Sale 261.
    Authority: 43 U.S.C. 1337(p); 30 CFR 585.211 and 585.216.

Elizabeth Klein,
Director, Bureau of Ocean Energy Management.
[FR Doc. 2024-14462 Filed 6-28-24; 8:45 am]
BILLING CODE 4340-98-P