No. S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On May 21, 1946, Presidential Permit
No. PP–48 (formally, FPC Docket IT–
5762) was granted to EPE authorizing
construction, operation, maintenance,
and connection, of a 69-kilovolt (kV)
transmission line at the international
border between the U.S. and Mexico.
Presidential Permit No. PP–48 was
amended on March 15, 1949 (Docket
No. PP–48–1), November 26, 1958
(Docket No. PP–48–2), and December
13, 1990 (Docket No. PP–48–3). On May
1, 2024, EPE filed an application with
DOE (Application or App.) requesting to
amend Presidential Permit No. PP–48 to
reflect a change in counterparty from
Comisión Federal de Electricidad (CFE)
to the Centro Nacional de Control de
Energı́a (CENACE). App. at 2.
According to the Application, EPE
and CFE entered into an Interchange
Agreement (Enabling Contract) to
‘‘govern the exchange of power between
the two countries.’’ Id. EPE states that
‘‘reforms in Mexico have resulted in
CFE no longer being responsible for
energy transactions with EPE pursuant
to the Enabling Contract. Rather,
[CENACE] now operates [Mexico’s] the
wholesale electricity market, has
operational control of the national
electric system, and establishes energy
imports and exports for reliability and
emergency situations.’’ Id. EPE states
that the Enabling Contract was assigned
from CFE to CENACE effective April 16,
2024. Id. EPE requests that DOE amend
Presidential Permit No. PP–48 to reflect
CENACE as the counterparty rather than
CFE and confirm that the permit will
remain applicable to the Enabling
Contract now that it has been assigned
to CENACE. Id.
Additionally, Article 3 of Presidential
Permit No. PP–48–3 also provides that
‘‘[t]he facilities . . . will be designed
and operated in accordance with the
applicable criteria established by the
Inland Power Pool, and consistent with
the Western Systems Coordinating
Council.’’ PP–48–3 at 6. Issuance of the
permit preceded the enactment of the
Energy Policy Act of 2005, which added
section 215 to the Federal Power Act
and allowed the Federal Energy
Regulatory Commission to certify an
Electric Reliability Organization to
develop enforceable reliability
standards for the Nation’s bulk-power
system. The certified organization, the
North American Electric Reliability
Corporation (NERC), oversees several
Regional Entities, one of which is the
Western Electricity Coordinating
Council (WECC). Therefore, concurrent
with reviewing EPE’s request to modify
Presidential Permit No. PP–48 to reflect
VerDate Sep<11>2014
20:36 Jun 28, 2024
Jkt 262001
the substitution of CENACE for CFE, the
Department intends to revise Article 3
to substitute the full names of NERC and
WECC, as applicable.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of Federal
Energy Regulatory Commission’s
(FERC’s) Rules of Practice and
Procedure (18 CFR 385.211). Any
person desiring to become a party to this
proceeding should file a motion to
intervene at Electricity.Exports@
hq.doe.gov in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning El Paso Electric Company’s
Application should be clearly marked
with GDO Docket No. PP–48–4.
Additional copies are to be provided
directly to Abe Gonzalez, El Paso
Electric, P.O. Box 982, El Paso, Texas
79960, abe.gonzalez@epelectric.com.
Before a Presidential permit may be
issued, DOE must determine whether
the proposed action is in the public
interest. In making that determination,
DOE will consider the environmental
impacts of the proposed action (i.e.,
granting the Presidential permit, with
any conditions and limitations, or
denying the permit) pursuant to DOE’s
National Environmental Policy Act
Implementing Procedures (10 CFR part
1021); determine the Applicant’s
proposed project’s impact on electric
reliability by ascertaining whether the
proposed project would adversely affect
the operation of the U.S. electric power
supply system under normal and
contingency conditions; and weigh any
other factors that DOE may also
consider relevant to the public interest.
DOE also must obtain the favorable
recommendation of the Secretary of
State and the Secretary of Defense
before taking final action on a
Presidential permit application.
EPE’s Application may be reviewed or
downloaded electronically at
www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov. Copies
of this Application will be made
available, upon request, by accessing the
program website at https://
www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
June 24, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on June 26,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–14419 Filed 6–28–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC24–91–000.
Applicants: Tenaska Virginia
Partners, L.P.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Tenaska Virginia
Partners, L.P.
Filed Date: 6/21/24.
Accession Number: 20240621–5215.
Comment Date: 5 p.m. ET 7/12/24.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–210–000.
Applicants: Millers Branch Solar,
LLC.
Description: Millers Branch Solar,
LLC submits notice of self-certification
of exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624–5093.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24–211–000.
Applicants: FRP Tupelo Solar, LLC.
Description: FRP Tupelo Solar, LLC
submits notice of self-certification of
exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624–5160.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24–212–000.
Applicants: Harmony Florida Solar II,
LLC.
Description: Harmony Florida Solar II,
LLC submits notice of self-certification
of exempt wholesale generator status.
Filed Date: 6/24/24.
E:\FR\FM\01JYN1.SGM
01JYN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices
Accession Number: 20240624–5161.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24–213–000.
Applicants: Storey Bend Solar, LLC.
Description: Storey Bend Solar, LLC
submits notice of self-certification of
exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624–5166.
Comment Date: 5 p.m. ET 7/15/24.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL24–119–000.
Applicants: PJM Interconnection,
L.L.C.
Description: ISO/RTO 206 Filing:
Revisions to Operating Agreement
Facilitating PJM Independent 205 Filing
Rights to be effective 12/31/9998.
Filed Date: 6/21/24.
Accession Number: 20240621–5078.
Comment Date: 5 p.m. ET 7/12/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1905–017.
Applicants: AZ721 LLC.
Description: Notice of Change in
Status of Amazon Energy LLC.
Filed Date: 6/21/24.
Accession Number: 20240621–5214.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER23–2625–001;
ER11–1846–013; ER11–1847–013;
ER11–1850–013; ER11–2062–030;
ER11–2175–008; ER11–2176–007;
ER11–2598–016; ER11–3188–008;
ER11–3418–010; ER11–4307–031;
ER11–4308–031; ER12–224–009; ER12–
225–009; ER12–261–030; ER12–2301–
008; ER17–764–008; ER17–765–008;
ER17–767–008; ER18–1160–004; ER21–
2826–003.
Applicants: NRG Curtailment
Solutions, Inc., NRG Cottonwood
Tenant LLC, Stream Energy Delaware,
LLC, Stream Energy Illinois, LLC,
Stream Ohio Gas & Electric, LLC, Stream
Energy New York, LLC, Independence
Energy Group LLC, Stream Energy New
Jersey, LLC, Stream Energy Columbia,
LLC, Reliant Energy Northeast LLC,
Green Mountain Energy Company,
XOOM Energy, LLC, Stream Energy
Maryland, LLC, Gateway Energy
Services Corporation, Stream Energy
Pennsylvania, LLC, SGE Energy
Sourcing, LLC, Energy Plus Holdings
LLC, Direct Energy Business, LLC,
Direct Energy Marketing Inc., Direct
Energy Services, LLC, NRG Business
Marketing LLC.
Description: Triennial market power
analysis for Northeast Region of NRG
Business Marketing LLC.
Filed Date: 6/20/24.
VerDate Sep<11>2014
20:36 Jun 28, 2024
Jkt 262001
Accession Number: 20240620–5360.
Comment Date: 5 p.m. ET 8/19/24.
Docket Numbers: ER24–729–001.
Applicants: Holyoke BESS LLC.
Description: Refund Report: Refund
Report in Docket ER24–729 to be
effective N/A.
Filed Date: 6/24/24.
Accession Number: 20240624–5181.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–738–001.
Applicants: PNY BESS LLC.
Description: Refund Report: Refund
Report in Docket ER24–738 to be
effective N/A.
Filed Date: 6/24/24.
Accession Number: 20240624–5175.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–1610–001.
Applicants: Basin Electric Power
Cooperative.
Description: Tariff Amendment:
Response to May 24, 2024 Deficiency
Letter to be effective 8/20/2024.
Filed Date: 6/21/24.
Accession Number: 20240621–5200.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER24–1982–001.
Applicants: Wellesley BESS LLC.
Description: Tariff Amendment:
Amended Application for Market Based
Rate Authorization to be effective 7/1/
2024.
Filed Date: 6/21/24.
Accession Number: 20240621–5172.
Comment Date: 5 p.m. ET 7/1/24.
Docket Numbers: ER24–2344–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Amendment to ISA, SA No. 5682;
Queue Nos. AF1–190/AF1–191 (amend)
to be effective 8/21/2024.
Filed Date: 6/21/24.
Accession Number: 20240621–5173.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER24–2345–000.
Applicants: SEPV Cuyama, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization and Request for Waivers
to be effective 6/25/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5052.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2346–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1892R13 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5071.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2347–000.
Applicants: Southwest Power Pool,
Inc.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
54451
Description: 205(d) Rate Filing:
1977R20 Nemaha-Marshall Electric
Cooperative NITSA and NOA to be
effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5079.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2348–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1978R13 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5086.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2349–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1893R14 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5092.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2350–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1894R13 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5099.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2351–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1895R14 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5112.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2352–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
1897R14 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5118.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2353–000.
Applicants: American Electric Power
Service Corporation, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits amended
ILDSA, SA No. 1252 to be effective 9/
1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5151.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2354–000.
Applicants: PJM Interconnection,
L.L.C.
E:\FR\FM\01JYN1.SGM
01JYN1
ddrumheller on DSK120RN23PROD with NOTICES1
54452
Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices
Description: 205(d) Rate Filing:
Ministerial Clean-Up OATT, Att. KAppendix and OA, Schedule 1, Sections
3.2 to be effective 4/1/2015.
Filed Date: 6/24/24.
Accession Number: 20240624–5172.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24–2355–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Amended ISA, Service Agreement No.
6578; AD1–088 to be effective 8/26/
2024.
Filed Date: 6/24/24.
Accession Number: 20240624–5180.
Comment Date: 5 p.m. ET 7/15/24.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC24–3–000.
Applicants: Enbridge Inc.
Description: Enbridge Inc. submits
Notice of Self-Certification of Foreign
Utility Company Status.
Filed Date: 6/20/24.
Accession Number: 20240620–5021.
Comment Date: 5 p.m. ET 7/11/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
VerDate Sep<11>2014
20:36 Jun 28, 2024
Jkt 262001
Dated: June 24, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–14395 Filed 6–28–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9885–220]
Marysville Hydro Partners; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 9885–220.
c. Date Filed: April 30, 2024.
d. Submitted By: Marysville Hydro
Partners.
e. Name of Project: Falls River
Hydroelectric Project.
f. Location: On the Fall River, in
Fremont County, Idaho. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Doug
Dockter, 205 N 10th St., Ste. 510, Boise,
Idaho 83702; (208) 388–2987; email—
DDockter@ida-west.com.
i. FERC Contact: Maryam Zavareh at
(202) 502–8474; or email at
maryam.zavareh@ferc.gov.
j. Marysville Hydro Partners filed its
request to use the Traditional Licensing
Process on April, 30 2024. Marysville
Hydro Partners provided public notice
of its request on July 6, 2000. In a letter
dated June 24, 2024, the Acting Director
of the Division of Hydropower
Licensing approved Marysville Hydro
Partners’ request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
PO 00000
Frm 00049
Fmt 4703
Sfmt 9990
l. With this notice, we are designating
the Marysville Hydro Partners as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Marysville Hydro Partners filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll free, (886) 208–3676 or TTY (202)
502–8659.
You may register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 9885–220.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 30, 2027.
p. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: June 24, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–14397 Filed 6–28–24; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\01JYN1.SGM
01JYN1
Agencies
[Federal Register Volume 89, Number 126 (Monday, July 1, 2024)]
[Notices]
[Pages 54450-54452]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-14395]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC24-91-000.
Applicants: Tenaska Virginia Partners, L.P.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Tenaska Virginia Partners, L.P.
Filed Date: 6/21/24.
Accession Number: 20240621-5215.
Comment Date: 5 p.m. ET 7/12/24.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG24-210-000.
Applicants: Millers Branch Solar, LLC.
Description: Millers Branch Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624-5093.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24-211-000.
Applicants: FRP Tupelo Solar, LLC.
Description: FRP Tupelo Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624-5160.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24-212-000.
Applicants: Harmony Florida Solar II, LLC.
Description: Harmony Florida Solar II, LLC submits notice of self-
certification of exempt wholesale generator status.
Filed Date: 6/24/24.
[[Page 54451]]
Accession Number: 20240624-5161.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: EG24-213-000.
Applicants: Storey Bend Solar, LLC.
Description: Storey Bend Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
Filed Date: 6/24/24.
Accession Number: 20240624-5166.
Comment Date: 5 p.m. ET 7/15/24.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL24-119-000.
Applicants: PJM Interconnection, L.L.C.
Description: ISO/RTO 206 Filing: Revisions to Operating Agreement
Facilitating PJM Independent 205 Filing Rights to be effective 12/31/
9998.
Filed Date: 6/21/24.
Accession Number: 20240621-5078.
Comment Date: 5 p.m. ET 7/12/24.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1905-017.
Applicants: AZ721 LLC.
Description: Notice of Change in Status of Amazon Energy LLC.
Filed Date: 6/21/24.
Accession Number: 20240621-5214.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER23-2625-001; ER11-1846-013; ER11-1847-013; ER11-
1850-013; ER11-2062-030; ER11-2175-008; ER11-2176-007; ER11-2598-016;
ER11-3188-008; ER11-3418-010; ER11-4307-031; ER11-4308-031; ER12-224-
009; ER12-225-009; ER12-261-030; ER12-2301-008; ER17-764-008; ER17-765-
008; ER17-767-008; ER18-1160-004; ER21-2826-003.
Applicants: NRG Curtailment Solutions, Inc., NRG Cottonwood Tenant
LLC, Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream
Ohio Gas & Electric, LLC, Stream Energy New York, LLC, Independence
Energy Group LLC, Stream Energy New Jersey, LLC, Stream Energy
Columbia, LLC, Reliant Energy Northeast LLC, Green Mountain Energy
Company, XOOM Energy, LLC, Stream Energy Maryland, LLC, Gateway Energy
Services Corporation, Stream Energy Pennsylvania, LLC, SGE Energy
Sourcing, LLC, Energy Plus Holdings LLC, Direct Energy Business, LLC,
Direct Energy Marketing Inc., Direct Energy Services, LLC, NRG Business
Marketing LLC.
Description: Triennial market power analysis for Northeast Region
of NRG Business Marketing LLC.
Filed Date: 6/20/24.
Accession Number: 20240620-5360.
Comment Date: 5 p.m. ET 8/19/24.
Docket Numbers: ER24-729-001.
Applicants: Holyoke BESS LLC.
Description: Refund Report: Refund Report in Docket ER24-729 to be
effective N/A.
Filed Date: 6/24/24.
Accession Number: 20240624-5181.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-738-001.
Applicants: PNY BESS LLC.
Description: Refund Report: Refund Report in Docket ER24-738 to be
effective N/A.
Filed Date: 6/24/24.
Accession Number: 20240624-5175.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-1610-001.
Applicants: Basin Electric Power Cooperative.
Description: Tariff Amendment: Response to May 24, 2024 Deficiency
Letter to be effective 8/20/2024.
Filed Date: 6/21/24.
Accession Number: 20240621-5200.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER24-1982-001.
Applicants: Wellesley BESS LLC.
Description: Tariff Amendment: Amended Application for Market Based
Rate Authorization to be effective 7/1/2024.
Filed Date: 6/21/24.
Accession Number: 20240621-5172.
Comment Date: 5 p.m. ET 7/1/24.
Docket Numbers: ER24-2344-000.
Applicants: PJM Interconnection, L.L.C.
Description: 205(d) Rate Filing: Amendment to ISA, SA No. 5682;
Queue Nos. AF1-190/AF1-191 (amend) to be effective 8/21/2024.
Filed Date: 6/21/24.
Accession Number: 20240621-5173.
Comment Date: 5 p.m. ET 7/12/24.
Docket Numbers: ER24-2345-000.
Applicants: SEPV Cuyama, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization and Request for Waivers to be effective 6/25/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5052.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2346-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1892R13 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5071.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2347-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1977R20 Nemaha-Marshall Electric
Cooperative NITSA and NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5079.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2348-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1978R13 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5086.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2349-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1893R14 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5092.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2350-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1894R13 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5099.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2351-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1895R14 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5112.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2352-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 1897R14 Evergy Kansas Central,
Inc. NITSA NOA to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5118.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2353-000.
Applicants: American Electric Power Service Corporation, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing: American Electric Power Service
Corporation submits tariff filing per 35.13(a)(2)(iii: AEP submits
amended ILDSA, SA No. 1252 to be effective 9/1/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5151.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2354-000.
Applicants: PJM Interconnection, L.L.C.
[[Page 54452]]
Description: 205(d) Rate Filing: Ministerial Clean-Up OATT, Att. K-
Appendix and OA, Schedule 1, Sections 3.2 to be effective 4/1/2015.
Filed Date: 6/24/24.
Accession Number: 20240624-5172.
Comment Date: 5 p.m. ET 7/15/24.
Docket Numbers: ER24-2355-000.
Applicants: PJM Interconnection, L.L.C.
Description: 205(d) Rate Filing: Amended ISA, Service Agreement No.
6578; AD1-088 to be effective 8/26/2024.
Filed Date: 6/24/24.
Accession Number: 20240624-5180.
Comment Date: 5 p.m. ET 7/15/24.
Take notice that the Commission received the following foreign
utility company status filings:
Docket Numbers: FC24-3-000.
Applicants: Enbridge Inc.
Description: Enbridge Inc. submits Notice of Self-Certification of
Foreign Utility Company Status.
Filed Date: 6/20/24.
Accession Number: 20240620-5021.
Comment Date: 5 p.m. ET 7/11/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: June 24, 2024.
Debbie-Anne A. Reese,
Acting Secretary.