Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 54450 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices No. S1–DEL–S3–2023 and Redelegation Order No. S3–DEL–GD1–2023. On May 21, 1946, Presidential Permit No. PP–48 (formally, FPC Docket IT– 5762) was granted to EPE authorizing construction, operation, maintenance, and connection, of a 69-kilovolt (kV) transmission line at the international border between the U.S. and Mexico. Presidential Permit No. PP–48 was amended on March 15, 1949 (Docket No. PP–48–1), November 26, 1958 (Docket No. PP–48–2), and December 13, 1990 (Docket No. PP–48–3). On May 1, 2024, EPE filed an application with DOE (Application or App.) requesting to amend Presidential Permit No. PP–48 to reflect a change in counterparty from Comisión Federal de Electricidad (CFE) to the Centro Nacional de Control de Energı́a (CENACE). App. at 2. According to the Application, EPE and CFE entered into an Interchange Agreement (Enabling Contract) to ‘‘govern the exchange of power between the two countries.’’ Id. EPE states that ‘‘reforms in Mexico have resulted in CFE no longer being responsible for energy transactions with EPE pursuant to the Enabling Contract. Rather, [CENACE] now operates [Mexico’s] the wholesale electricity market, has operational control of the national electric system, and establishes energy imports and exports for reliability and emergency situations.’’ Id. EPE states that the Enabling Contract was assigned from CFE to CENACE effective April 16, 2024. Id. EPE requests that DOE amend Presidential Permit No. PP–48 to reflect CENACE as the counterparty rather than CFE and confirm that the permit will remain applicable to the Enabling Contract now that it has been assigned to CENACE. Id. Additionally, Article 3 of Presidential Permit No. PP–48–3 also provides that ‘‘[t]he facilities . . . will be designed and operated in accordance with the applicable criteria established by the Inland Power Pool, and consistent with the Western Systems Coordinating Council.’’ PP–48–3 at 6. Issuance of the permit preceded the enactment of the Energy Policy Act of 2005, which added section 215 to the Federal Power Act and allowed the Federal Energy Regulatory Commission to certify an Electric Reliability Organization to develop enforceable reliability standards for the Nation’s bulk-power system. The certified organization, the North American Electric Reliability Corporation (NERC), oversees several Regional Entities, one of which is the Western Electricity Coordinating Council (WECC). Therefore, concurrent with reviewing EPE’s request to modify Presidential Permit No. PP–48 to reflect VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 the substitution of CENACE for CFE, the Department intends to revise Article 3 to substitute the full names of NERC and WECC, as applicable. Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the Application at Electricity.Exports@ hq.doe.gov. Protests should be filed in accordance with Rule 211 of Federal Energy Regulatory Commission’s (FERC’s) Rules of Practice and Procedure (18 CFR 385.211). Any person desiring to become a party to this proceeding should file a motion to intervene at Electricity.Exports@ hq.doe.gov in accordance with FERC Rule 214 (18 CFR 385.214). Comments and other filings concerning El Paso Electric Company’s Application should be clearly marked with GDO Docket No. PP–48–4. Additional copies are to be provided directly to Abe Gonzalez, El Paso Electric, P.O. Box 982, El Paso, Texas 79960, abe.gonzalez@epelectric.com. Before a Presidential permit may be issued, DOE must determine whether the proposed action is in the public interest. In making that determination, DOE will consider the environmental impacts of the proposed action (i.e., granting the Presidential permit, with any conditions and limitations, or denying the permit) pursuant to DOE’s National Environmental Policy Act Implementing Procedures (10 CFR part 1021); determine the Applicant’s proposed project’s impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system under normal and contingency conditions; and weigh any other factors that DOE may also consider relevant to the public interest. DOE also must obtain the favorable recommendation of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. EPE’s Application may be reviewed or downloaded electronically at www.energy.gov/gdo/pendingapplications-0 or by emailing Electricity.Exports@hq.doe.gov. Copies of this Application will be made available, upon request, by accessing the program website at https:// www.energy.gov/gdo/pendingapplications-0 or by emailing Electricity.Exports@hq.doe.gov. Signing Authority: This document of the Department of Energy was signed on June 24, 2024, by Maria Robinson, Director, Grid Deployment Office, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on June 26, 2024. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2024–14419 Filed 6–28–24; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC24–91–000. Applicants: Tenaska Virginia Partners, L.P. Description: Application for Authorization Under Section 203 of the Federal Power Act of Tenaska Virginia Partners, L.P. Filed Date: 6/21/24. Accession Number: 20240621–5215. Comment Date: 5 p.m. ET 7/12/24. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG24–210–000. Applicants: Millers Branch Solar, LLC. Description: Millers Branch Solar, LLC submits notice of self-certification of exempt wholesale generator status. Filed Date: 6/24/24. Accession Number: 20240624–5093. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: EG24–211–000. Applicants: FRP Tupelo Solar, LLC. Description: FRP Tupelo Solar, LLC submits notice of self-certification of exempt wholesale generator status. Filed Date: 6/24/24. Accession Number: 20240624–5160. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: EG24–212–000. Applicants: Harmony Florida Solar II, LLC. Description: Harmony Florida Solar II, LLC submits notice of self-certification of exempt wholesale generator status. Filed Date: 6/24/24. E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices Accession Number: 20240624–5161. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: EG24–213–000. Applicants: Storey Bend Solar, LLC. Description: Storey Bend Solar, LLC submits notice of self-certification of exempt wholesale generator status. Filed Date: 6/24/24. Accession Number: 20240624–5166. Comment Date: 5 p.m. ET 7/15/24. Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL24–119–000. Applicants: PJM Interconnection, L.L.C. Description: ISO/RTO 206 Filing: Revisions to Operating Agreement Facilitating PJM Independent 205 Filing Rights to be effective 12/31/9998. Filed Date: 6/21/24. Accession Number: 20240621–5078. Comment Date: 5 p.m. ET 7/12/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–1905–017. Applicants: AZ721 LLC. Description: Notice of Change in Status of Amazon Energy LLC. Filed Date: 6/21/24. Accession Number: 20240621–5214. Comment Date: 5 p.m. ET 7/12/24. Docket Numbers: ER23–2625–001; ER11–1846–013; ER11–1847–013; ER11–1850–013; ER11–2062–030; ER11–2175–008; ER11–2176–007; ER11–2598–016; ER11–3188–008; ER11–3418–010; ER11–4307–031; ER11–4308–031; ER12–224–009; ER12– 225–009; ER12–261–030; ER12–2301– 008; ER17–764–008; ER17–765–008; ER17–767–008; ER18–1160–004; ER21– 2826–003. Applicants: NRG Curtailment Solutions, Inc., NRG Cottonwood Tenant LLC, Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream Ohio Gas & Electric, LLC, Stream Energy New York, LLC, Independence Energy Group LLC, Stream Energy New Jersey, LLC, Stream Energy Columbia, LLC, Reliant Energy Northeast LLC, Green Mountain Energy Company, XOOM Energy, LLC, Stream Energy Maryland, LLC, Gateway Energy Services Corporation, Stream Energy Pennsylvania, LLC, SGE Energy Sourcing, LLC, Energy Plus Holdings LLC, Direct Energy Business, LLC, Direct Energy Marketing Inc., Direct Energy Services, LLC, NRG Business Marketing LLC. Description: Triennial market power analysis for Northeast Region of NRG Business Marketing LLC. Filed Date: 6/20/24. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Accession Number: 20240620–5360. Comment Date: 5 p.m. ET 8/19/24. Docket Numbers: ER24–729–001. Applicants: Holyoke BESS LLC. Description: Refund Report: Refund Report in Docket ER24–729 to be effective N/A. Filed Date: 6/24/24. Accession Number: 20240624–5181. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–738–001. Applicants: PNY BESS LLC. Description: Refund Report: Refund Report in Docket ER24–738 to be effective N/A. Filed Date: 6/24/24. Accession Number: 20240624–5175. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–1610–001. Applicants: Basin Electric Power Cooperative. Description: Tariff Amendment: Response to May 24, 2024 Deficiency Letter to be effective 8/20/2024. Filed Date: 6/21/24. Accession Number: 20240621–5200. Comment Date: 5 p.m. ET 7/12/24. Docket Numbers: ER24–1982–001. Applicants: Wellesley BESS LLC. Description: Tariff Amendment: Amended Application for Market Based Rate Authorization to be effective 7/1/ 2024. Filed Date: 6/21/24. Accession Number: 20240621–5172. Comment Date: 5 p.m. ET 7/1/24. Docket Numbers: ER24–2344–000. Applicants: PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: Amendment to ISA, SA No. 5682; Queue Nos. AF1–190/AF1–191 (amend) to be effective 8/21/2024. Filed Date: 6/21/24. Accession Number: 20240621–5173. Comment Date: 5 p.m. ET 7/12/24. Docket Numbers: ER24–2345–000. Applicants: SEPV Cuyama, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization and Request for Waivers to be effective 6/25/2024. Filed Date: 6/24/24. Accession Number: 20240624–5052. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2346–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1892R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5071. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2347–000. Applicants: Southwest Power Pool, Inc. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 54451 Description: 205(d) Rate Filing: 1977R20 Nemaha-Marshall Electric Cooperative NITSA and NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5079. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2348–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1978R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5086. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2349–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1893R14 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5092. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2350–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1894R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5099. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2351–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1895R14 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5112. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2352–000. Applicants: Southwest Power Pool, Inc. Description: 205(d) Rate Filing: 1897R14 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5118. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2353–000. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: American Electric Power Service Corporation submits tariff filing per 35.13(a)(2)(iii: AEP submits amended ILDSA, SA No. 1252 to be effective 9/ 1/2024. Filed Date: 6/24/24. Accession Number: 20240624–5151. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2354–000. Applicants: PJM Interconnection, L.L.C. E:\FR\FM\01JYN1.SGM 01JYN1 ddrumheller on DSK120RN23PROD with NOTICES1 54452 Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Notices Description: 205(d) Rate Filing: Ministerial Clean-Up OATT, Att. KAppendix and OA, Schedule 1, Sections 3.2 to be effective 4/1/2015. Filed Date: 6/24/24. Accession Number: 20240624–5172. Comment Date: 5 p.m. ET 7/15/24. Docket Numbers: ER24–2355–000. Applicants: PJM Interconnection, L.L.C. Description: 205(d) Rate Filing: Amended ISA, Service Agreement No. 6578; AD1–088 to be effective 8/26/ 2024. Filed Date: 6/24/24. Accession Number: 20240624–5180. Comment Date: 5 p.m. ET 7/15/24. Take notice that the Commission received the following foreign utility company status filings: Docket Numbers: FC24–3–000. Applicants: Enbridge Inc. Description: Enbridge Inc. submits Notice of Self-Certification of Foreign Utility Company Status. Filed Date: 6/20/24. Accession Number: 20240620–5021. Comment Date: 5 p.m. ET 7/11/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. VerDate Sep<11>2014 20:36 Jun 28, 2024 Jkt 262001 Dated: June 24, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–14395 Filed 6–28–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9885–220] Marysville Hydro Partners; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 9885–220. c. Date Filed: April 30, 2024. d. Submitted By: Marysville Hydro Partners. e. Name of Project: Falls River Hydroelectric Project. f. Location: On the Fall River, in Fremont County, Idaho. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Doug Dockter, 205 N 10th St., Ste. 510, Boise, Idaho 83702; (208) 388–2987; email— DDockter@ida-west.com. i. FERC Contact: Maryam Zavareh at (202) 502–8474; or email at maryam.zavareh@ferc.gov. j. Marysville Hydro Partners filed its request to use the Traditional Licensing Process on April, 30 2024. Marysville Hydro Partners provided public notice of its request on July 6, 2000. In a letter dated June 24, 2024, the Acting Director of the Division of Hydropower Licensing approved Marysville Hydro Partners’ request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Idaho State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. PO 00000 Frm 00049 Fmt 4703 Sfmt 9990 l. With this notice, we are designating the Marysville Hydro Partners as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Marysville Hydro Partners filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed and/or printed on the Commission’s website https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. You may register online at https:// ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 9885–220. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by April 30, 2027. p. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: June 24, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–14397 Filed 6–28–24; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\01JYN1.SGM 01JYN1

Agencies

[Federal Register Volume 89, Number 126 (Monday, July 1, 2024)]
[Notices]
[Pages 54450-54452]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-14395]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC24-91-000.
    Applicants: Tenaska Virginia Partners, L.P.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Tenaska Virginia Partners, L.P.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5215.
    Comment Date: 5 p.m. ET 7/12/24.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG24-210-000.
    Applicants: Millers Branch Solar, LLC.
    Description: Millers Branch Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5093.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: EG24-211-000.
    Applicants: FRP Tupelo Solar, LLC.
    Description: FRP Tupelo Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5160.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: EG24-212-000.
    Applicants: Harmony Florida Solar II, LLC.
    Description: Harmony Florida Solar II, LLC submits notice of self-
certification of exempt wholesale generator status.
    Filed Date: 6/24/24.

[[Page 54451]]

    Accession Number: 20240624-5161.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: EG24-213-000.
    Applicants: Storey Bend Solar, LLC.
    Description: Storey Bend Solar, LLC submits notice of self-
certification of exempt wholesale generator status.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5166.
    Comment Date: 5 p.m. ET 7/15/24.

    Take notice that the Commission received the following Complaints 
and Compliance filings in EL Dockets:

    Docket Numbers: EL24-119-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: ISO/RTO 206 Filing: Revisions to Operating Agreement 
Facilitating PJM Independent 205 Filing Rights to be effective 12/31/
9998.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5078.
    Comment Date: 5 p.m. ET 7/12/24.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER15-1905-017.
    Applicants: AZ721 LLC.
    Description: Notice of Change in Status of Amazon Energy LLC.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5214.
    Comment Date: 5 p.m. ET 7/12/24.

    Docket Numbers: ER23-2625-001; ER11-1846-013; ER11-1847-013; ER11-
1850-013; ER11-2062-030; ER11-2175-008; ER11-2176-007; ER11-2598-016; 
ER11-3188-008; ER11-3418-010; ER11-4307-031; ER11-4308-031; ER12-224-
009; ER12-225-009; ER12-261-030; ER12-2301-008; ER17-764-008; ER17-765-
008; ER17-767-008; ER18-1160-004; ER21-2826-003.
    Applicants: NRG Curtailment Solutions, Inc., NRG Cottonwood Tenant 
LLC, Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream 
Ohio Gas & Electric, LLC, Stream Energy New York, LLC, Independence 
Energy Group LLC, Stream Energy New Jersey, LLC, Stream Energy 
Columbia, LLC, Reliant Energy Northeast LLC, Green Mountain Energy 
Company, XOOM Energy, LLC, Stream Energy Maryland, LLC, Gateway Energy 
Services Corporation, Stream Energy Pennsylvania, LLC, SGE Energy 
Sourcing, LLC, Energy Plus Holdings LLC, Direct Energy Business, LLC, 
Direct Energy Marketing Inc., Direct Energy Services, LLC, NRG Business 
Marketing LLC.
    Description: Triennial market power analysis for Northeast Region 
of NRG Business Marketing LLC.
    Filed Date: 6/20/24.
    Accession Number: 20240620-5360.
    Comment Date: 5 p.m. ET 8/19/24.

    Docket Numbers: ER24-729-001.
    Applicants: Holyoke BESS LLC.
    Description: Refund Report: Refund Report in Docket ER24-729 to be 
effective N/A.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5181.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-738-001.
    Applicants: PNY BESS LLC.
    Description: Refund Report: Refund Report in Docket ER24-738 to be 
effective N/A.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5175.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-1610-001.
    Applicants: Basin Electric Power Cooperative.
    Description: Tariff Amendment: Response to May 24, 2024 Deficiency 
Letter to be effective 8/20/2024.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5200.
    Comment Date: 5 p.m. ET 7/12/24.

    Docket Numbers: ER24-1982-001.
    Applicants: Wellesley BESS LLC.
    Description: Tariff Amendment: Amended Application for Market Based 
Rate Authorization to be effective 7/1/2024.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5172.
    Comment Date: 5 p.m. ET 7/1/24.

    Docket Numbers: ER24-2344-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Amendment to ISA, SA No. 5682; 
Queue Nos. AF1-190/AF1-191 (amend) to be effective 8/21/2024.
    Filed Date: 6/21/24.
    Accession Number: 20240621-5173.
    Comment Date: 5 p.m. ET 7/12/24.

    Docket Numbers: ER24-2345-000.
    Applicants: SEPV Cuyama, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authorization and Request for Waivers to be effective 6/25/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5052.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2346-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1892R13 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5071.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2347-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1977R20 Nemaha-Marshall Electric 
Cooperative NITSA and NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5079.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2348-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1978R13 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5086.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2349-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1893R14 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5092.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2350-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1894R13 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5099.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2351-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1895R14 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5112.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2352-000.
    Applicants: Southwest Power Pool, Inc.
    Description: 205(d) Rate Filing: 1897R14 Evergy Kansas Central, 
Inc. NITSA NOA to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5118.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2353-000.
    Applicants: American Electric Power Service Corporation, PJM 
Interconnection, L.L.C.
    Description: 205(d) Rate Filing: American Electric Power Service 
Corporation submits tariff filing per 35.13(a)(2)(iii: AEP submits 
amended ILDSA, SA No. 1252 to be effective 9/1/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5151.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2354-000.
    Applicants: PJM Interconnection, L.L.C.

[[Page 54452]]

    Description: 205(d) Rate Filing: Ministerial Clean-Up OATT, Att. K-
Appendix and OA, Schedule 1, Sections 3.2 to be effective 4/1/2015.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5172.
    Comment Date: 5 p.m. ET 7/15/24.

    Docket Numbers: ER24-2355-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: 205(d) Rate Filing: Amended ISA, Service Agreement No. 
6578; AD1-088 to be effective 8/26/2024.
    Filed Date: 6/24/24.
    Accession Number: 20240624-5180.
    Comment Date: 5 p.m. ET 7/15/24.

    Take notice that the Commission received the following foreign 
utility company status filings:

    Docket Numbers: FC24-3-000.
    Applicants: Enbridge Inc.
    Description: Enbridge Inc. submits Notice of Self-Certification of 
Foreign Utility Company Status.
    Filed Date: 6/20/24.
    Accession Number: 20240620-5021.
    Comment Date: 5 p.m. ET 7/11/24.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: June 24, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-14395 Filed 6-28-24; 8:45 am]
BILLING CODE 6717-01-P