Safety Zone; Fall River Fireworks Display, Fall River, MA, 54355-54356 [2024-14376]
Download as PDF
Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Rules and Regulations
54355
19. Red, White, and Tahoe Blue Fireworks, Incline Village, NV
Sponsor ................................
Event Description .................
Date ......................................
Time .....................................
Location ................................
Regulated Area ....................
Various Sponsors.
Fireworks Display.
Week of July 4th.
From 9 a.m. on June 30, 2024, till 8:30 p.m. on July 4, 2024, the barges will load, transit, and stage at the display location. From 8:30 p.m. until approximately 9:55 p.m. on July 4, 2024, the safety zone will encompass all
navigable waters within a 1,000-foot radius of the fireworks barges.
500 to 1,000 feet off Incline Village, NV in Crystal Bay.
100-foot radius around the fireworks launch barge during the loading of pyrotechnics aboard the fireworks barge
and during the transit of the fireworks barge from the loading location to the display location. Increases to a
1,000-foot radius upon commencement of the fireworks display.
31. Benicia Fourth of July Fireworks
Sponsor ................................
Event Description .................
Date ......................................
Time .....................................
Location ................................
Regulated Area ....................
City of Benicia, CA.
Fireworks Display.
July 4th.
From 9:30 p.m. until approximately 9:50 p.m. on July 4, 2024.
Carquinez Strait, Benicia, CA.
1,000-foot radius around the fireworks launch site located on the Benicia First Street Pier.
Under the provisions of 33 CFR
165.1191, unauthorized persons or
vessels are prohibited from anchoring,
blocking, loitering, or impeding the
through transit of participants or official
patrol vessels in the safety zone during
all applicable effective dates and times,
unless authorized to do so by the
PATCOM or other Official Patrol,
defined as a Federal, State, or local law
enforcement agency on scene to assist
the Coast Guard in enforcing the safety
zone. During the enforcement periods, if
you are the operator of a vessel in one
of the safety zones, you must comply
directions from the Patrol Commander
or other Official Patrol. The PATCOM or
Official Patrol may, upon request, allow
the transit of commercial vessels
through regulated areas when it is safe
to do so.
In addition to this notice of
enforcement in the Federal Register, the
Coast Guard plans to provide
notification of this enforcement period
via the Local Notice to Mariners.
If the Captain of the Port determines
that the regulated area need not be
enforced for the full duration stated in
this notice, a Broadcast Notice to
Mariners may be used to grant general
permission to enter the regulated area.
ddrumheller on DSK120RN23PROD with RULES1
Dated: June 25, 2024.
Jordan M. Baldueza,
Captain, U.S. Coast Guard, Captain of the
Port San Francisco.
[FR Doc. 2024–14358 Filed 6–28–24; 8:45 am]
BILLING CODE 9110–04–P
VerDate Sep<11>2014
16:19 Jun 28, 2024
Jkt 262001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2024–0522]
Safety Zone; LaPointe Fireworks,
LaPointe, WI
Coast Guard, DHS.
Notification of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
the safety zone for the LaPointe
Fireworks in LaPointe, WI from 9:30
p.m. through 10:30 p.m. on July 4, 2024.
This action is necessary to protect
participants and spectators during the
LaPointe Fireworks taking place at
46°46′40″ N, 090°47′22″ W in the North
Channel off LaPointe. During the
enforcement period, entry into,
transiting, or anchoring within the
safety zone is prohibited unless
authorized by the Captain of the Port
Duluth or designated on-scene
representative.
SUMMARY:
The regulations in 33 CFR
165.943(b) will be enforced from 9:30
p.m. through 10:30 p.m. on July 04,
2024, for the LaPointe Fireworks safety
zone, § 165.943(a).
FOR FURTHER INFORMATION CONTACT: If
you have questions on this document,
call or email MST1 Corbin Spies,
telephone (218) 725–3818, email
DuluthWWM@uscg.mil.
SUPPLEMENTARY INFORMATION: The Coast
Guard will enforce the safety zone for
the annual LaPointe Fireworks in 33
CFR 165.943(a) from 9:30 p.m. through
10:30 p.m. on July 4, 2024, on all waters
of Lake Superior bounded by the arc of
a circle with a 1,120-foot radius from
DATES:
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
the fireworks launch site with its center
in position 46°46′40″ N, 090°47′22″ W.
Entry into, transiting, or anchoring
within the safety zone is prohibited
unless authorized by the Captain of the
Port Duluth or their designated on-scene
representative. The Captain of the Port’s
designated on-scene representative may
be contacted via VHF Channel 16.
This document is issued under
authority of 33 CFR 165.943 and 5
U.S.C. 552(a). In addition to this
publication in the Federal Register, the
Coast Guard will provide the maritime
community with advance notification of
the enforcement of this safety zone via
Broadcast Notice to Mariners.
Dated: June 25, 2024.
S.V. Murphy,
Lieutenant Commander, U.S. Coast Guard,
Acting, Captain of the Port Duluth.
[FR Doc. 2024–14433 Filed 6–28–24; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2024–0545]
Safety Zone; Fall River Fireworks
Display, Fall River, MA
Coast Guard, DHS.
Notification of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
the safety zone for the Fall River
Fireworks Display on July 4, 2024, to
provide for the safety of life on
navigable waterways during this
firework display. Our regulation for
marine events within the First Coast
Guard District identifies the regulated
SUMMARY:
E:\FR\FM\01JYR1.SGM
01JYR1
54356
Federal Register / Vol. 89, No. 126 / Monday, July 1, 2024 / Rules and Regulations
area for this event in Fall River, MA.
During the enforcement periods, the
operator of any vessel in the regulated
area must comply with directions from
the Patrol Commander or any Official
Patrol displaying a Coast Guard ensign.
DATES: The regulation for the event 1.3
Fall River Fireworks listed in Table to
33 CFR 165.173 will be enforced from
9 p.m. until 11 p.m. on July 4, 2024.
FOR FURTHER INFORMATION CONTACT: If
you have questions about this
notification of enforcement, call or
email MST3 Nicholas Easley,
Waterways Management Division,
Sector Southeastern New England, U.S.
Coast Guard; telephone 206–827–4160,
email SENEWWM@uscg.mil.
SUPPLEMENTARY INFORMATION: The Coast
Guard will enforce the safety zone for
the Fall River Fireworks Display
regulated area in 33 CFR 165.173 from
9 p.m. to 11 p.m. on July 4, 2024. This
action is being taken to provide for the
safety of life on navigable waterways
during this 1-day event. Our regulation
for marine events within the First Coast
Guard District, § 165.173, specifies the
location of the regulated area for the Fall
River Fireworks Display, which is in the
vicinity of Battleship Cove, Fall River,
MA. During the enforcement periods, as
reflected in § 165.173, if you are the
operator of a vessel in the regulated area
you must comply with directions from
the Patrol Commander or any Official
Patrol displaying a Coast Guard ensign.
In addition to this notification of
enforcement in the Federal Register, the
Coast Guard plans to provide
notification of this enforcement period
via the Local Notice to Mariners and
marine information broadcasts.
C. Prindle,
Captain, U.S. Coast Guard, Captain of the
Port Sector Southeastern New England.
[FR Doc. 2024–14376 Filed 6–28–24; 8:45 am]
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket Number USCG–2024–0546]
ddrumheller on DSK120RN23PROD with RULES1
RIN 1625–AA00
Safety Zone; Laguna Madre, South
Padre Island, TX
Coast Guard, DHS.
Temporary final rule.
AGENCY:
The Coast Guard is
establishing a temporary safety zone for
SUMMARY:
VerDate Sep<11>2014
16:19 Jun 28, 2024
Jkt 262001
This rule is effective without
notice from July 1, 2024, through
August 30, 2024. It will be subject to
enforcement from the hours of 9:30 p.m.
through 11:59 p.m. each of the following
dates: June 25, 28; July 2, 5, 9, 12, 16,
19, 23, 26, 30; and August 2, 6, 9, 16,
23, 30, but that enforcement schedule is
subject to change. For the purposes of
enforcement, actual notice will be used
from June 25, 2024, until July 1, 2024.
ADDRESSES: To view documents
mentioned in this preamble as being
available in the docket, go to https://
www.regulations.gov, type USCG–2024–
0546 in the ‘‘SEARCH’’ box and click
‘‘SEARCH.’’ Click on Open Docket
Folder on the line associated with this
rule.
FOR FURTHER INFORMATION CONTACT: If
you have questions about this rule, call
or email Lieutenant Commander
Anthony Garofalo, Sector Corpus Christi
Waterways Management Division, U.S.
Coast Guard; telephone 361–939–5130,
email CCWaterways@uscg.mil.
SUPPLEMENTARY INFORMATION:
DATES:
I. Table of Abbreviations
CFR Code of Federal Regulations
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of proposed rulemaking
§ Section
U.S.C. United States Code
II. Background Information and
Regulatory History
BILLING CODE 9110–04–P
ACTION:
certain navigable waters in the Laguna
Madre. The safety zone is needed to
protect personnel, vessels, and the
marine environment from potential
hazards created by a firework display
launched from a barge in the Laguna
Madre, South Padre Island, Texas. Entry
of vessels or persons into this zone is
prohibited unless specifically
authorized by the Captain of the Port,
Sector Corpus Christi or a designated
representative.
The Coast Guard is issuing this
temporary rule without prior notice and
opportunity to comment pursuant to
authority under section 4(a) of the
Administrative Procedure Act (APA) (5
U.S.C. 553(b)). This provision
authorizes an agency to issue a rule
without prior notice and opportunity to
comment when the agency for good
cause finds that those procedures are
‘‘impracticable, unnecessary, or contrary
to the public interest.’’ Under 5 U.S.C.
553(b)(B), the Coast Guard finds that
good cause exists for not publishing a
notice of proposed rulemaking (NPRM)
with respect to this rule because it is
impracticable. We must establish this
safety zone as soon as possible to
PO 00000
Frm 00026
Fmt 4700
Sfmt 4700
protect personnel, vessels, and the
marine environment from potential
hazards created by the fireworks
displays occurring daily now.
Under 5 U.S.C. 553(d)(3), the Coast
Guard finds that good cause exists for
making this rule effective less than 30
days after publication in the Federal
Register. Delaying the effective date of
this rule would be contrary to the public
interest because immediate action is
needed to respond to the potential
safety hazards associated with fireworks
launched from a barge in the waters of
the Laguna Madre.
III. Legal Authority and Need for Rule
The Coast Guard is issuing this rule
under authority in 46 U.S.C. 70034. The
Captain of the Port Sector Corpus
Christi (COTP) has determined that
potential hazards associated with a
fireworks display will be a safety
concern for anyone within a 700-yard
radius from a stationary barge from
which the fireworks will be launched.
The purpose of this rule is to ensure
safety of vessels and persons on these
navigable waters in the safety zone
while the display of the fireworks takes
place in the Laguna Madre.
IV. Discussion of the Rule
This rule establishes a temporary
safety zone from June 25, 2024, until
August 30, 2024. The safety zone will be
subject to enforcement from the hours of
9:30 p.m. through 11:59 p.m. each day
it is in effect. It is anticipated that
fireworks will only take place each of
the following nights: June 25, 28; July 2,
5, 9, 12, 16, 19, 23, 26, 30; and August
2, 6, 9, 16, 23, 30, but that schedule is
subject to change. The COTP or a
designated representative will inform
the public of the enforcement times and
date for this safety zone through
Broadcast Notices to Mariners, Local
Notices to Mariners, and/or Safety
Marine Information Broadcasts, as
appropriate. The safety zone will
encompass certain navigable waters of
the Laguna Madre and is defined by a
700-yard radius around the launching
platform. The regulated area
encompasses a 700-yard radius from the
following point; 26°6′02.1″ N,
97°10′17.7″ W. No vessel or person is
permitted to enter the temporary safety
zone during the effective period without
obtaining permission from the COTP or
a designated representative, who may be
contacted on Channel 16 VHF–FM
(156.8 MHz) or by telephone at 361–
939–0450.
V. Regulatory Analyses
We developed this rule after
considering numerous statutes and
E:\FR\FM\01JYR1.SGM
01JYR1
Agencies
[Federal Register Volume 89, Number 126 (Monday, July 1, 2024)]
[Rules and Regulations]
[Pages 54355-54356]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-14376]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG-2024-0545]
Safety Zone; Fall River Fireworks Display, Fall River, MA
AGENCY: Coast Guard, DHS.
ACTION: Notification of enforcement of regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard will enforce the safety zone for the Fall
River Fireworks Display on July 4, 2024, to provide for the safety of
life on navigable waterways during this firework display. Our
regulation for marine events within the First Coast Guard District
identifies the regulated
[[Page 54356]]
area for this event in Fall River, MA. During the enforcement periods,
the operator of any vessel in the regulated area must comply with
directions from the Patrol Commander or any Official Patrol displaying
a Coast Guard ensign.
DATES: The regulation for the event 1.3 Fall River Fireworks listed in
Table to 33 CFR 165.173 will be enforced from 9 p.m. until 11 p.m. on
July 4, 2024.
FOR FURTHER INFORMATION CONTACT: If you have questions about this
notification of enforcement, call or email MST3 Nicholas Easley,
Waterways Management Division, Sector Southeastern New England, U.S.
Coast Guard; telephone 206-827-4160, email [email protected].
SUPPLEMENTARY INFORMATION: The Coast Guard will enforce the safety zone
for the Fall River Fireworks Display regulated area in 33 CFR 165.173
from 9 p.m. to 11 p.m. on July 4, 2024. This action is being taken to
provide for the safety of life on navigable waterways during this 1-day
event. Our regulation for marine events within the First Coast Guard
District, Sec. 165.173, specifies the location of the regulated area
for the Fall River Fireworks Display, which is in the vicinity of
Battleship Cove, Fall River, MA. During the enforcement periods, as
reflected in Sec. 165.173, if you are the operator of a vessel in the
regulated area you must comply with directions from the Patrol
Commander or any Official Patrol displaying a Coast Guard ensign.
In addition to this notification of enforcement in the Federal
Register, the Coast Guard plans to provide notification of this
enforcement period via the Local Notice to Mariners and marine
information broadcasts.
C. Prindle,
Captain, U.S. Coast Guard, Captain of the Port Sector Southeastern New
England.
[FR Doc. 2024-14376 Filed 6-28-24; 8:45 am]
BILLING CODE 9110-04-P