Columbia Gulf Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 48156-48157 [2024-12327]

Download as PDF 48156 Federal Register / Vol. 89, No. 109 / Wednesday, June 5, 2024 / Notices the activity and information about the American Climate Corps program. If a member of the public would like to apply, they can follow a link posted on the service opportunity page, which will take them to the program’s application. ACC.gov will not include an application to serve. ACC.gov will streamline the American Climate Corps’ ability to reach a wide audience of applicants, aiming to increase participation in American Climate Corps programs and make it substantially easier for the public to find opportunities to serve. Yasmeen Shaheen-McConnell, Senior Advisor for Strategic Partnerships. [FR Doc. 2024–12272 Filed 6–4–24; 8:45 am] BILLING CODE 6050–28–P DEPARTMENT OF ENERGY Notice of Availability of Preliminary List of Potential National Interest Electric Transmission Corridors; Request for Comments Correction In notice document, 2024–10251, appearing on pages 40477 through 40479 in the issue of Friday, May 10, 2024, make the following correction: On page 40478, in the third column, on the twenty third line from the bottom, change the URL from ‘‘https:// www.energy.gov/sites/default/files/ 2023-12/2023-12-15 %20GDO%20NIETC%20Final%20 Guidance%20Document.Vpdf’’ to ‘‘https://www.energy.gov/sites/default/ files/2023-12/2023-12-15%20GDO% 20NIETC%20Final %20Guidance%20Document.pdf.’’ [FR Doc. C1–2024–10251 Filed 6–4–24; 8:45 am] BILLING CODE 0099–10–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–471–000] khammond on DSKJM1Z7X2PROD with NOTICES Columbia Gulf Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Public Participation Take notice that on May 23, 2024, Columbia Gulf Transmission, LLC (Columbia Gulf), 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA), and Columbia Gulf’s blanket certificate issued in VerDate Sep<11>2014 16:50 Jun 04, 2024 Jkt 262001 Docket No. CP83–496–000, for authorization to install 134 feet and 177 feet of new 30-inch-diameter natural gas pipeline on the east and west sides, respectively, of the Wax Lake Outlet to connect Columbia Gulf’s existing East Lateral Line 300 (EL–300) pipeline and an existing 30-inch-diameter aerial crossing above the Wax Lake, located in St. Mary Parish, Louisiana (Wax Lake Tie-ins Installation). The project is designed to provide redundancy across Wax Lake due to a potential integrity threat to Columbia Gulf’s EL–300 that crosses under Wax Lake. The estimated cost for the project is $16.6 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at (202) 502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– 8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Any questions concerning this request should be directed to David A. Alonzo, Manager, Project Authorizations, Columbia Gulf Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, by phone at (832) 320–5477, or by email at david_alonzo@ tcenergy.com. There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on July 29, 2024. How to PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is July 29, 2024. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is July 29, 2024. As described further in Rule 214, your 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. 2 Persons E:\FR\FM\05JNN1.SGM 05JNN1 Federal Register / Vol. 89, No. 109 / Wednesday, June 5, 2024 / Notices motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before July 29, 2024. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. khammond on DSKJM1Z7X2PROD with NOTICES How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP24–471–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at VerDate Sep<11>2014 16:50 Jun 04, 2024 Jkt 262001 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP24–471– 000. To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: DebbieAnne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: David A. Alonzo, Manager, Project Authorizations, Columbia Gulf Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, or by email at david_alonzo@tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 48157 Dated: May 30, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–12327 Filed 6–4–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN79–6–000] FERC Form 580 Interrogatory on Fuel and Energy Purchase Practices; Notice of Request for Partial Waiver Take notice that on May 21, 2024, pursuant to Rule 207(a)(5) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure,1 Pacific Gas and Electric Company submitted a request for a partial waiver of the requirement to respond to the 2024 FERC Form 580 Interrogatory on Fuel and Energy Purchase Practices, as more fully explained in the request. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at 202–502–6652 1 18 E:\FR\FM\05JNN1.SGM CFR 385.207(2020). 05JNN1

Agencies

[Federal Register Volume 89, Number 109 (Wednesday, June 5, 2024)]
[Notices]
[Pages 48156-48157]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-12327]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP24-471-000]


Columbia Gulf Transmission, LLC; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on May 23, 2024, Columbia Gulf Transmission, LLC 
(Columbia Gulf), 700 Louisiana Street, Suite 1300, Houston, Texas 
77002-2700, filed in the above referenced docket, a prior notice 
request pursuant to sections 157.205 and 157.208 of the Commission's 
regulations under the Natural Gas Act (NGA), and Columbia Gulf's 
blanket certificate issued in Docket No. CP83-496-000, for 
authorization to install 134 feet and 177 feet of new 30-inch-diameter 
natural gas pipeline on the east and west sides, respectively, of the 
Wax Lake Outlet to connect Columbia Gulf's existing East Lateral Line 
300 (EL-300) pipeline and an existing 30-inch-diameter aerial crossing 
above the Wax Lake, located in St. Mary Parish, Louisiana (Wax Lake 
Tie-ins Installation). The project is designed to provide redundancy 
across Wax Lake due to a potential integrity threat to Columbia Gulf's 
EL-300 that crosses under Wax Lake. The estimated cost for the project 
is $16.6 million, all as more fully set forth in the request which is 
on file with the Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov). From 
the Commission's Home Page on the internet, this information is 
available on eLibrary. The full text of this document is available on 
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or 
downloading. To access this document in eLibrary, type the docket 
number excluding the last three digits of this document in the docket 
number field.
    User assistance is available for eLibrary and the Commission's 
website during normal business hours from FERC Online Support at (202) 
502-6652 (toll free at 1-866-208-3676) or email at 
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at 
[email protected].
    Any questions concerning this request should be directed to David 
A. Alonzo, Manager, Project Authorizations, Columbia Gulf Transmission, 
LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, by 
phone at (832) 320-5477, or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on July 29, 2024. How 
to file protests, motions to intervene, and comments is explained 
below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is July 29, 2024. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is July 29, 2024. As 
described further in Rule 214, your

[[Page 48157]]

motion to intervene must state, to the extent known, your position 
regarding the proceeding, as well as your interest in the proceeding. 
For an individual, this could include your status as a landowner, 
ratepayer, resident of an impacted community, or recreationist. You do 
not need to have property directly impacted by the project in order to 
intervene. For more information about motions to intervene, refer to 
the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before July 29, 2024. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP24-471-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP24-471-000.
    To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    To file via any other method: Debbie-Anne A. Reese, Acting 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.
    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: David A. 
Alonzo, Manager, Project Authorizations, Columbia Gulf Transmission, 
LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, or by 
email at [email protected]. Any subsequent submissions by an 
intervenor must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: May 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-12327 Filed 6-4-24; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.