Combined Notice of Filings #1, 47143-47144 [2024-11889]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 89, No. 106 / Friday, May 31, 2024 / Notices
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item p
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Deadline for filing comments,
motions to intervene, and protests: June
24, 2024.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include the docket number P–2183–086.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: As a result
of a required six-year review process,
the Grand River Dam Authority (GRDA)
filed an updated Shoreline Management
Plan (SMP) under Article 406 for the
Markham-Ferry Project. The revised
plan, developed in consultation with
stakeholders, discusses proposed
modifications and updates to certain
VerDate Sep<11>2014
17:22 May 30, 2024
Jkt 262001
elements of the previously approved
plan. The revised plan also discusses
additional resource provisions
pertaining to vegetation management,
wetlands, and wildlife habitat.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
47143
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–11887 Filed 5–30–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–187–000.
Applicants: Bayou Galion Solar
Project, LLC.
Description: Bayou Galion Solar
Project, LLC submits Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 5/23/24.
Accession Number: 20240523–5087.
Comment Date: 5 p.m. ET 6/13/24.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL24–110–000.
Applicants: Southwest Power Pool,
Inc.
Description: Petition for Declaratory
Order of Southwest Power Pool, Inc.
Filed Date: 5/21/24.
Accession Number: 20240521–5247.
Comment Date: 5 p.m. ET 6/20/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–1697–000.
Applicants: AES Westwing II ES, LLC.
Description: Supplement to April 4,
2024 AES Westwing II ES, LLC tariff
filing.
Filed Date: 5/17/24.
Accession Number: 20240517–5155.
Comment Date: 5 p.m. ET 5/28/24.
Docket Numbers: ER24–1718–000.
Applicants: Switched On, LLC.
Description: Supplement to 04/08/
024, Switched On, LLC tariff filing.
Filed Date: 5/21/24.
Accession Number: 20240521–5242.
Comment Date: 5 p.m. ET 5/31/24.
Docket Numbers: ER24–1769–001.
E:\FR\FM\31MYN1.SGM
31MYN1
khammond on DSKJM1Z7X2PROD with NOTICES
47144
Federal Register / Vol. 89, No. 106 / Friday, May 31, 2024 / Notices
Applicants: Midcontinent
Independent System Operator, Inc..
Description: Tariff amendment: 2024–
05–23_SA 4275 NSP–NSP Substitute
Original GIA (R1036) to be effective 4/
8/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5113.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–1780–001.
Applicants: Lake Erie Connector
Transmission, LLC.
Description: Lake Erie Connector
Transmission, LLC submits an
amendment to its 04/12/2024 Request
for Order Confirming Negotiated Rate
Authority and Waiver of Previously
Granted Reporting Requirements.
Filed Date: 5/23/24.
Accession Number: 20240523–5205.
Comment Date: 5 p.m. ET 6/3/24.
Docket Numbers: ER24–2082–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: 205(d) Rate Filing:
amendment to Rate Schedule FERC No.
2 to be effective 7/22/2024.
Filed Date: 5/22/24.
Accession Number: 20240522–5226.
Comment Date: 5 p.m. ET 6/12/24.
Docket Numbers: ER24–2083–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing: 4261
1000 Mile Solar & SPS Facilities Service
Agreement to be effective 7/23/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5054.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2084–000.
Applicants: American Electric Power
Service Corporation, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits amended
and Restated CIAC, SA No. 6679 to be
effective 4/29/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5067.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2086–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 205(d) Rate Filing: 2024–
05–23_SA 4296 NSP–NSP GIA (R1032)
to be effective 5/13/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5090.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2087–000.
Applicants: Public Service Company
of New Hampshire.
Description: Tariff amendment:
Cancel First amend Engineering Design
Procurement Agreement NECEC
Transmission to be effective 5/23/2024.
VerDate Sep<11>2014
17:22 May 30, 2024
Jkt 262001
Filed Date: 5/23/24.
Accession Number: 20240523–5100.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2088–000.
Applicants: RB Inyokern Solar WDAT
1203 LLC.
Description: 205(d) Rate Filing: RB
Inyokern Solar WDAT 1203 LLC CoTenancy and Shared Facilities
Agreement to be effective 8/1/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5107.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2089–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Cooperative
Energy NITSA amendment Filing
(adding South Diamondhead DP) to be
effective 4/22/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5132.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2090–000.
Applicants: RB Inyokern Solar WDAT
1281 LLC.
Description: 205(d) Rate Filing: RB
Inyokern Solar WDAT 1281 LLC CoTenancy and Shared Facilities
Agreement to be effective 8/1/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5143.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24–2091–000.
Applicants: Paxton BESS 1 LLC.
Description: Baseline eTariff Filing:
Paxton BESS 1 LLC MBR Tariff to be
effective 7/23/2024.
Filed Date: 5/23/24.
Accession Number: 20240523–5156.
Comment Date: 5 p.m. ET 6/13/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: May 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–11889 Filed 5–30–24; 8:45 a.m.]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP23–516–000; CP23–516–
001]
East Tennessee Natural Gas, LLC;
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Ridgeline Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Ridgeline Expansion Project
(Project), proposed by East Tennessee
Natural Gas, LLC (East Tennessee) in the
above-referenced docket. East Tennessee
requests authorization to construct and
operate 122.2 miles of 30-inch-diameter
natural gas pipeline and associated
facilities in Trousdale, Smith, Jackson,
Putnam, Overton, Fentress, Morgan, and
Roane Counties, Tennessee. The
purpose of the Project is to provide
about 300,000 dekatherms per day of
new firm natural gas transportation
capacity and up to 95,000 dekatherms of
customized delivery service (i.e.,
parking capability) from multiple
providers to the site of Tennessee Valley
Authority’s Kingston Fossil Plant.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed Project would have some
limited adverse environmental effects;
however, with implementation of the
mitigation measures recommended in
E:\FR\FM\31MYN1.SGM
31MYN1
Agencies
[Federal Register Volume 89, Number 106 (Friday, May 31, 2024)]
[Notices]
[Pages 47143-47144]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-11889]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG24-187-000.
Applicants: Bayou Galion Solar Project, LLC.
Description: Bayou Galion Solar Project, LLC submits Notice of
Self-Certification of Exempt Wholesale Generator Status.
Filed Date: 5/23/24.
Accession Number: 20240523-5087.
Comment Date: 5 p.m. ET 6/13/24.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL24-110-000.
Applicants: Southwest Power Pool, Inc.
Description: Petition for Declaratory Order of Southwest Power
Pool, Inc.
Filed Date: 5/21/24.
Accession Number: 20240521-5247.
Comment Date: 5 p.m. ET 6/20/24.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER24-1697-000.
Applicants: AES Westwing II ES, LLC.
Description: Supplement to April 4, 2024 AES Westwing II ES, LLC
tariff filing.
Filed Date: 5/17/24.
Accession Number: 20240517-5155.
Comment Date: 5 p.m. ET 5/28/24.
Docket Numbers: ER24-1718-000.
Applicants: Switched On, LLC.
Description: Supplement to 04/08/024, Switched On, LLC tariff
filing.
Filed Date: 5/21/24.
Accession Number: 20240521-5242.
Comment Date: 5 p.m. ET 5/31/24.
Docket Numbers: ER24-1769-001.
[[Page 47144]]
Applicants: Midcontinent Independent System Operator, Inc..
Description: Tariff amendment: 2024-05-23_SA 4275 NSP-NSP
Substitute Original GIA (R1036) to be effective 4/8/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5113.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-1780-001.
Applicants: Lake Erie Connector Transmission, LLC.
Description: Lake Erie Connector Transmission, LLC submits an
amendment to its 04/12/2024 Request for Order Confirming Negotiated
Rate Authority and Waiver of Previously Granted Reporting Requirements.
Filed Date: 5/23/24.
Accession Number: 20240523-5205.
Comment Date: 5 p.m. ET 6/3/24.
Docket Numbers: ER24-2082-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: 205(d) Rate Filing: amendment to Rate Schedule FERC
No. 2 to be effective 7/22/2024.
Filed Date: 5/22/24.
Accession Number: 20240522-5226.
Comment Date: 5 p.m. ET 6/12/24.
Docket Numbers: ER24-2083-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 4261 1000 Mile Solar & SPS
Facilities Service Agreement to be effective 7/23/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5054.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2084-000.
Applicants: American Electric Power Service Corporation, PJM
Interconnection, L.L.C.
Description: 205(d) Rate Filing: American Electric Power Service
Corporation submits tariff filing per 35.13(a)(2)(iii: AEP submits
amended and Restated CIAC, SA No. 6679 to be effective 4/29/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5067.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2086-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 205(d) Rate Filing: 2024-05-23_SA 4296 NSP-NSP GIA
(R1032) to be effective 5/13/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5090.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2087-000.
Applicants: Public Service Company of New Hampshire.
Description: Tariff amendment: Cancel First amend Engineering
Design Procurement Agreement NECEC Transmission to be effective 5/23/
2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5100.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2088-000.
Applicants: RB Inyokern Solar WDAT 1203 LLC.
Description: 205(d) Rate Filing: RB Inyokern Solar WDAT 1203 LLC
Co-Tenancy and Shared Facilities Agreement to be effective 8/1/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5107.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2089-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing: Alabama Power Company submits
tariff filing per 35.13(a)(2)(iii: Cooperative Energy NITSA amendment
Filing (adding South Diamondhead DP) to be effective 4/22/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5132.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2090-000.
Applicants: RB Inyokern Solar WDAT 1281 LLC.
Description: 205(d) Rate Filing: RB Inyokern Solar WDAT 1281 LLC
Co-Tenancy and Shared Facilities Agreement to be effective 8/1/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5143.
Comment Date: 5 p.m. ET 6/13/24.
Docket Numbers: ER24-2091-000.
Applicants: Paxton BESS 1 LLC.
Description: Baseline eTariff Filing: Paxton BESS 1 LLC MBR Tariff
to be effective 7/23/2024.
Filed Date: 5/23/24.
Accession Number: 20240523-5156.
Comment Date: 5 p.m. ET 6/13/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: May 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-11889 Filed 5-30-24; 8:45 a.m.]
BILLING CODE 6717-01-P