Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES 47146 Federal Register / Vol. 89, No. 106 / Friday, May 31, 2024 / Notices Date and time Location Thursday, June 13, 2024: 6:00 to 8:00 p.m. CDT ................................... Trousdale Community Center, 301 E Main Street, Hartsville, TN 37074, (615) 374–9574. The primary goal of these comment sessions is to have you identify the specific environmental issues and concerns with the draft EIS. Individual verbal comments will be taken on a oneon-one basis with a court reporter. This format is designed to receive the maximum amount of verbal comments, in a convenient way during the timeframe allotted. Each comment session is scheduled from 6:00 p.m. to 8:00 p.m. You may arrive at any time after 6:00 p.m. There will not be a formal presentation by Commission staff when the session opens. If you wish to speak, the Commission staff will hand out numbers in the order of your arrival. Comments will be taken until the end times listed above. However, if no additional numbers have been handed out and all individuals who wish to provide comments have had an opportunity to do so, staff may conclude the session at 7:30 p.m. Please see appendix 2 for additional information on the session format and conduct. Your oral comments will be recorded by the court reporter (with FERC staff or representative present) and become part of the public record for this proceeding. Transcripts will be publicly available on FERC’s eLibrary system (see page 2 and 3 for instructions on using eLibrary). If a significant number of people are interested in providing oral comments in the one-on-one settings, a time limit may be implemented for each commentor. Although there will not be a formal presentation, Commission staff will be available throughout the comment session to answer your questions about the environmental review process. It is important to note that the Commission provides equal consideration to all comments received, whether filed in written form or provided orally at a comment session. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR part 385.214). Motions to intervene are more fully described at https://www.ferc.gov/howintervene. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good VerDate Sep<11>2014 17:22 May 30, 2024 Jkt 262001 cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Questions? Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: May 24, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–11999 Filed 5–30–24; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2422–058] Great Lakes Hydro America, LLC; Notice of Availability of Draft Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for license for the Sawmill Hydroelectric Project, located on the Androscoggin River in Coos County, New Hampshire and has prepared a Draft Environmental Assessment (DEA) for the project. No federal land is occupied by project works or located within the project boundary. The DEA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the DEA via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://ferconline.ferc.gov/ eSubscription.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/FERC Online.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferc online.ferc.gov/QuickComment.aspx. E:\FR\FM\31MYN1.SGM 31MYN1 Federal Register / Vol. 89, No. 106 / Friday, May 31, 2024 / Notices For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: DebbieAnne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2422–058. Any questions regarding this notice may be directed to Ryan Hansen at (202) 502–8074 or ryan.hansen@ferc.gov. Dated: May 23, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–11885 Filed 5–30–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD24–3–000] Commission Information Collection Activities (FERC–725B); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 725B, Mandatory Reliability Standards, Critical Infrastructure Protection (CIP) (Update for CIP–012–1 to version CIP– 012–02) Cyber Security— Communications between Control Centers. DATES: Comments on the collection of information are due July 30, 2024. ADDRESSES: You may submit copies of your comments (identified by Docket No. RD24–3–000) by one of the following methods: Electronic filing through https:// www.ferc.gov, is preferred. • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, not in scanned or picture format. • For those unable to file electronically, comments may be filed khammond on DSKJM1Z7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:22 May 30, 2024 Jkt 262001 by USPS mail or by other delivery methods: Æ Mail via U.S. Postal Service Only: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ All other delivery services: Federal Energy Regulatory Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville, MD 20852. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov. FOR FURTHER INFORMATION CONTACT: Jean Sonneman may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–6362. SUPPLEMENTARY INFORMATION: Title: FERC–725B, Mandatory Reliability Standards, Critical Infrastructure Protection (CIP) (Update to CIP–012–2). OMB Control No.: 1902–0248. Type of Request: Revision of a currently approved FERC–725B information collection requirements with changes to the reporting requirements. Abstract: On August 8, 2005, Congress enacted the Energy Policy Act of 2005.1 The Energy Policy Act of 2005 added a new section 215 to the Federal Power Act (FPA),2 which requires a Commission-certified Electric Reliability Organization to develop mandatory and enforceable Reliability Standards,3 including requirements for cybersecurity protection, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the Electric Reliability Organization subject to Commission oversight, or the Commission can independently enforce Reliability Standards. 1 Energy Policy Act of 2005, Public Law 109–58, sec. 1261 et seq., 119 Stat. 594 (2005). 2 16 U.S.C. 824o. 3 Section 215 of the FPA defines Reliability Standard as a requirement, approved by the Commission, to provide for reliable operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the Bulk-Power System. However, the term does not include any requirement to enlarge such facilities or to construct new transmission capacity or generation capacity. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 47147 On February 3, 2006, the Commission issued Order No. 672,4 implementing FPA section 215. The Commission subsequently certified the North American Electric Reliability Corporation (NERC) as the Electric Reliability Organization. The Reliability Standards developed by NERC become mandatory and enforceable after Commission approval and apply to users, owners, and operators of the Bulk-Power System, as set forth in each Reliability Standard.5 The CIP Reliability Standards require entities to comply with specific requirements to safeguard bulk electric system (BES) Cyber Systems 6 and their associated BES Cyber Assets. These standards are results-based and do not specify a technology or method to achieve compliance, instead leaving it up to the entity to decide how best to comply. The Commission has approved multiple versions of the CIP Reliability Standards submitted by NERC, partly to address the evolving nature of cyberrelated threats to the Bulk-Power System. High impact systems include large control centers. Medium impact systems include smaller control centers, ultra-high voltage transmission, and large substations and generating facilities. The remainder of the BES Cyber Systems are categorized as low impact systems. Most requirements in 4 Rules Concerning Certification of the Elec. Reliability Org.; and Procedures for the Establishment, Approval, and Enf’t of Elec. Reliability Standards, Order No. 672, 71 FR 8661 (Feb. 17, 2006), 114 FERC ¶ 61,104, order on reh’g, Order No. 672–A, 71 FR 19814 (Apr. 28, 2006), 114 FERC ¶ 61,328 (2006). 5 NERC uses the term ‘‘registered entity’’ to identify users, owners, and operators of the BulkPower System responsible for performing specified reliability functions with respect to NERC Reliability Standards. See, e.g., Version 4 Critical Infrastructure Protection Reliability Standards, Order No. 761, 77 FR 24594 (Apr. 25, 2012), 139 FERC ¶ 61,058, at P 46, order denying clarification and reh’g, 140 FERC ¶ 61,109 (2012). Within the NERC Reliability Standards are various subsets of entities responsible for performing various specified reliability functions. We collectively refer to these as ‘‘entities.’’ 6 NERC defines BES Cyber System as ‘‘[o]ne or more BES Cyber Assets logically grouped by a responsible entity to perform one or more reliability tasks for a functional entity.’’ NERC, Glossary of Terms Used in NERC Reliability Standards, at 5 (2020), Glossary_of_Terms.pdf (nerc.com) . NERC defines BES Cyber Asset as A Cyber Asset that if rendered unavailable, degraded, or misused would, within 15 minutes of its required operation, mis-operation, or nonoperation, adversely impact one or more Facilities, systems, or equipment, which, if destroyed, degraded, or otherwise rendered unavailable when needed, would affect the reliable operation of the Bulk Electric System. Redundancy of affected Facilities, systems, and equipment shall not be considered when determining adverse impact. Each BES Cyber Asset is included in one or more BES Cyber Systems. Id. at 4. E:\FR\FM\31MYN1.SGM 31MYN1

Agencies

[Federal Register Volume 89, Number 106 (Friday, May 31, 2024)]
[Notices]
[Pages 47146-47147]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-11885]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2422-058]


Great Lakes Hydro America, LLC; Notice of Availability of Draft 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for license for the Sawmill Hydroelectric 
Project, located on the Androscoggin River in Coos County, New 
Hampshire and has prepared a Draft Environmental Assessment (DEA) for 
the project. No federal land is occupied by project works or located 
within the project boundary.
    The DEA contains staff's analysis of the potential environmental 
impacts of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    The Commission provides all interested persons with an opportunity 
to view and/or print the DEA via the internet through the Commission's 
Home Page (https://www.ferc.gov/), using the ``eLibrary'' link. Enter 
the docket number, excluding the last three digits in the docket number 
field, to access the document. For assistance, contact FERC Online 
Support at [email protected], or toll-free at (866) 208-3676, 
or for TTY, (202) 502-8659.
    You may also register online at https://ferconline.ferc.gov/eSubscription.aspx to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Any comments should be filed within 30 days from the date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://ferconline.ferc.gov/QuickComment.aspx.

[[Page 47147]]

For assistance, please contact FERC Online Support. In lieu of 
electronic filing, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, 
Acting Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Room 1A, Washington, DC 20426. Submissions sent via any 
other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include docket 
number P-2422-058.
    Any questions regarding this notice may be directed to Ryan Hansen 
at (202) 502-8074 or [email protected].

    Dated: May 23, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-11885 Filed 5-30-24; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.