Texas Gas Transmission, LLC, Gulf Pipeline Company, LLC; Notice of Application and Establishing Intervention Deadline, 46390-46392 [2024-11673]

Download as PDF 46390 Federal Register / Vol. 89, No. 104 / Wednesday, May 29, 2024 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM96–1–043] Standards for Business Practices of Interstate Natural Gas Pipelines; Notice of Minor Correction On March 21, 2024, the Commission issued a Notice of Proposed Rulemaking (NOPR) proposing to amend its regulations to incorporate by reference, with certain enumerated exceptions, the latest version (Version 4.0) of Standards for Business Practices of Interstate Natural Gas Pipelines adopted by the Wholesale Gas Quadrant of the North American Energy Standards Board (NAESB) with comments due on June 4, 2024.1 On May 21, 2024, NAESB filed a report regarding a minor correction to its Invoicing Related Standards (Version 4.0) to modify standard 3.4.1 related to the technical implementation of the Transportation/Sales Invoice. Comments on the minor correction may be filed on or before June 4, 2024, along with comments on the NOPR. Dated: May 21, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–11671 Filed 5–28–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–468–000] lotter on DSK11XQN23PROD with NOTICES1 Texas Gas Transmission, LLC, Gulf Pipeline Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on May 8, 2024, Texas Gas Transmission, LLC (Texas Gas) and Gulf Pipeline Company, LLC (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, jointly filed an application under sections 7(b) and 7(c) of the Natural Gas Act (NGA) and part 157 of the Commission’s regulations requesting authorization for their Eunice Reliability and Lake Charles Supply Projects (Project). Specifically, Texas Gas proposes to: (1) replace four 1,100 horsepower (HP) and one 2,250 HP reciprocating units with one 8,968 HP Solar T70 gas-fired, turbine-driven unit and one 6,391 HP Solar T60 gas-fired, turbine-driven unit, 1 Standards for Business Practices of Interstate Natural Gas Pipelines, Notice of Proposed Rulemaking, 186 FERC ¶ 61,196 (2024). VerDate Sep<11>2014 18:05 May 28, 2024 Jkt 262001 and appurtenances at its Eunice Compressor Station in Acadia Parish, Louisiana; (2) install overpressure protection at its existing Woodlawn Junction in Jefferson Davis Parish, Louisiana; and (3) abandon by lease the Project capacity of 120,000 dekatherms per day (Dth/d). Additionally, Gulf South seeks authorization to acquire the Project capacity by lease from Texas Gas. The Project will allow Texas Gas to provide 120,000 Dth/d of new transportation service leased to Gulf South to meet the needs of an electric utility and two natural gas marketers serving end-use customers in the Lake Charles area. Texas Gas estimates the total cost of the Project to be $72,856,800, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov). From the Commission’s Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from FERC Online Support at 202–502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502– 8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Any questions regarding the proposed project should be directed to J. Kyle Stephens, Vice President, Regulatory Affairs at Texas Gas Transmission, LLC and Gulf South Pipeline Company, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, by phone at (713) 479– 8033, or by email at Kyle.Stephens@ bwpipelines.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00033 Fmt 4703 Sfmt 4703 Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file comments on the project, you can protest the filing, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on June 11, 2024. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections, to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. Protests Pursuant to sections 157.10(a)(4) 2 and 385.211 3 of the Commission’s regulations under the NGA, any person 4 may file a protest to the application. Protests must comply with the requirements specified in section 2 18 CFR 157.10(a)(4). CFR 385.211. 4 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 E:\FR\FM\29MYN1.SGM 29MYN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 89, No. 104 / Wednesday, May 29, 2024 / Notices 385.2001 5 of the Commission’s regulations. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. To ensure that your comments or protests are timely and properly recorded, please submit your comments on or before June 11, 2024. There are three methods you can use to submit your comments or protests to the Commission. In all instances, please reference the Project docket number CP24–468–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments or protests electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments or protests by mailing them to the following address below. Your written comments must reference the Project docket number CP24–468–000. To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: DebbieAnne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 2225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,6 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 7 and the regulations under the NGA 8 by the intervention deadline for the project, which is June 11, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP24–468–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to 6 18 CFR 385.102(d). CFR 385.214. 8 18 CFR 157.10. 7 18 5 18 CFR 385.2001. VerDate Sep<11>2014 18:05 May 28, 2024 Jkt 262001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 46391 intervene must reference the Project docket number CP24–468–000. To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: DebbieAnne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email at: Kyle Stephens, Vice President, Regulatory Affairs, Texas Gas Transmission, LLC and Gulf South Pipeline Company, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, or by email at Kyle.Stephens@ bwpipelines.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). 11 18 CFR 385.214(b)(3) and (d). E:\FR\FM\29MYN1.SGM 29MYN1 46392 Federal Register / Vol. 89, No. 104 / Wednesday, May 29, 2024 / Notices Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on June 11, 2024. Dated: May 21, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–11673 Filed 5–28–24; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OARM–2016–0762; FRL–12004– 01–OMS] Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Comment Request; General Administrative Requirements for Assistance Programs (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), General Administrative Requirements for Assistance Programs (EPA ICR Number 0938.23, OMB Control Number 2030–0020) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2024. Public comments were previously requested via the Federal Register on September 28, 2023 during a 60-day comment period. This notice allows for an additional 30 days for public comments. SUMMARY: Comments may be submitted on or before June 28, 2024. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OARM–2016–0762 to EPA online using www.regulations.gov (our preferred method), by email to docket_ oms@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 lotter on DSK11XQN23PROD with NOTICES1 DATES: VerDate Sep<11>2014 18:05 May 28, 2024 Jkt 262001 Pennsylvania Ave. NW, Washington, DC 20460. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Submit written comments and recommendations to OMB for the proposed information collection within 30 days of publication of this notice to www.reginfo.gov/public/do/PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. FOR FURTHER INFORMATION CONTACT: Amanda Kemp, Office of Grants and Debarment, National Policy, Training and Compliance Division, 3903R, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: 202–564– 0209; fax number: 202–565–2470; email address: kemp.amanda@epa.gov. SUPPLEMENTARY INFORMATION: This is a proposed extension of the ICR, which is currently approved through June 30, 2024. An agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. Public comments were previously requested via the Federal Register on September 28, 2023 during a 60-day comment period (88 FR 66840). This notice allows for an additional 30 days for public comments. Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https://www.epa.gov/dockets. Abstract: The information is collected from applicants and recipients of EPA assistance to monitor adherence to the programmatic and administrative requirements of the Agency’s financial assistance program. The information collected is used to make awards, pay recipients, and collect information on how Federal funds are being spent. EPA needs this information to meet its Federal stewardship responsibilities. This ICR renewal requests authorization for the collection of information under PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 EPA’s General Regulation for Assistance Programs, which establishes minimum management requirements for all recipients of EPA grants or cooperative agreements (assistance agreements). These regulations include only those provisions mandated by statue or added by EPA to ensure sound and effective financial assistance management with respect to Disadvantaged Business Enterprise (DBE) utilization. The information required by these regulations will be used by EPA award officials to make assistance awards and assistance payments and to verify that the recipient is using Federal funds appropriately. Form numbers: listed in supporting statement. Respondents/affected entities: The primary recipients of EPA assistance agreements are state and local governments, Indian Tribes, educational institutions, and not-for-profit institutions. Respondent’s obligation to respond: Required to obtain an assistance agreement (40 CFR part 30, 40 CFR part 31, and 40 CFR part 33 for awards made prior to December 26, 2014, and 2 CFR 200, 2 CFR 1500, and 40 CFR part 33 for awards made after December 26, 2014). Estimated number of respondents: 9,821(total). Frequency of response: On occasion, quarterly, and annually. Total estimated burden: 302,030 hours (per year). Burden is defined at 5 CFR 1320.03(b). Total estimated cost: $19,719,538 (per year), which includes $0 annualized capital or operation & maintenance costs. Changes in the estimates: There is an increase of 207,424 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This increase occurred for several reasons. First, EPA received unprecedented levels of funding to award grants under the American Rescue Plan (ARP), the Bipartisan Infrastructure Bill (BIL), and the Inflation Reduction Act (IRA). This led to a significant increase in number of grant applications received and awards made under various EPA grant programs. EPA also revised its approach to more accurately estimate the number of ongoing grant recipients who are subject to the requirements for record keeping and submittal of quarterly progress reports. In addition, EPA reviewed the burden assumptions in the ICR to ensure that they reflect the Agency’s current experiences under its grant programs. EPA made adjustments to increase the burden hour estimates E:\FR\FM\29MYN1.SGM 29MYN1

Agencies

[Federal Register Volume 89, Number 104 (Wednesday, May 29, 2024)]
[Notices]
[Pages 46390-46392]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-11673]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP24-468-000]


Texas Gas Transmission, LLC, Gulf Pipeline Company, LLC; Notice 
of Application and Establishing Intervention Deadline

    Take notice that on May 8, 2024, Texas Gas Transmission, LLC (Texas 
Gas) and Gulf Pipeline Company, LLC (Gulf South), 9 Greenway Plaza, 
Suite 2800, Houston, Texas 77046, jointly filed an application under 
sections 7(b) and 7(c) of the Natural Gas Act (NGA) and part 157 of the 
Commission's regulations requesting authorization for their Eunice 
Reliability and Lake Charles Supply Projects (Project). Specifically, 
Texas Gas proposes to: (1) replace four 1,100 horsepower (HP) and one 
2,250 HP reciprocating units with one 8,968 HP Solar T70 gas-fired, 
turbine-driven unit and one 6,391 HP Solar T60 gas-fired, turbine-
driven unit, and appurtenances at its Eunice Compressor Station in 
Acadia Parish, Louisiana; (2) install overpressure protection at its 
existing Woodlawn Junction in Jefferson Davis Parish, Louisiana; and 
(3) abandon by lease the Project capacity of 120,000 dekatherms per day 
(Dth/d). Additionally, Gulf South seeks authorization to acquire the 
Project capacity by lease from Texas Gas. The Project will allow Texas 
Gas to provide 120,000 Dth/d of new transportation service leased to 
Gulf South to meet the needs of an electric utility and two natural gas 
marketers serving end-use customers in the Lake Charles area. Texas Gas 
estimates the total cost of the Project to be $72,856,800, all as more 
fully set forth in the application which is on file with the Commission 
and open for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov). From 
the Commission's Home Page on the internet, this information is 
available on eLibrary. The full text of this document is available on 
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or 
downloading. To access this document in eLibrary, type the docket 
number excluding the last three digits of this document in the docket 
number field.
    User assistance is available for eLibrary and the Commission's 
website during normal business hours from FERC Online Support at 202-
502-6652 (toll free at 1-866-208-3676) or email at 
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at 
[email protected].
    Any questions regarding the proposed project should be directed to 
J. Kyle Stephens, Vice President, Regulatory Affairs at Texas Gas 
Transmission, LLC and Gulf South Pipeline Company, LLC, 9 Greenway 
Plaza, Suite 2800, Houston, Texas 77046, by phone at (713) 479-8033, or 
by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file comments on the project, you can protest 
the filing, and you can file a motion to intervene in the proceeding. 
There is no fee or cost for filing comments or intervening. The 
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on 
June 11, 2024. How to file protests, motions to intervene, and comments 
is explained below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections, to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be.

Protests

    Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the 
Commission's regulations under the NGA, any person \4\ may file a 
protest to the application. Protests must comply with the requirements 
specified in section

[[Page 46391]]

385.2001 \5\ of the Commission's regulations. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.10(a)(4).
    \3\ 18 CFR 385.211.
    \4\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
    \5\ 18 CFR 385.2001.
---------------------------------------------------------------------------

    To ensure that your comments or protests are timely and properly 
recorded, please submit your comments on or before June 11, 2024.
    There are three methods you can use to submit your comments or 
protests to the Commission. In all instances, please reference the 
Project docket number CP24-468-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments or protests electronically by using 
the eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. With eFiling, 
you can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making; first select ``General'' and then select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments or protests by 
mailing them to the following address below. Your written comments must 
reference the Project docket number CP24-468-000.

To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Debbie-Anne A. Reese, Acting Secretary, 
Federal Energy Regulatory Commission, 2225 Wilkins Avenue, Rockville, 
Maryland 20852

    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\6\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \7\ and the regulations under the NGA \8\ by the 
intervention deadline for the project, which is June 11, 2024. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \7\ 18 CFR 385.214.
    \8\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP24-468-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below. Your 
motion to intervene must reference the Project docket number CP24-468-
000.

To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Debbie-Anne A. Reese, Acting Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852

    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email at: Kyle Stephens, Vice President, Regulatory 
Affairs, Texas Gas Transmission, LLC and Gulf South Pipeline Company, 
LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, or by email at 
[email protected]. Any subsequent submissions by an 
intervenor must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online. Service can be via 
email with a link to the document.
    All timely, unopposed \9\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\11\ A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \9\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \10\ 18 CFR 385.214(c)(1).
    \11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the

[[Page 46392]]

Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on June 11, 2024.

    Dated: May 21, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-11673 Filed 5-28-24; 8:45 am]
BILLING CODE 6717-01-P