Idaho Power Company; Notice of Application For Non-Project Use of Project Land and Waters-Water Withdrawal Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 42868-42869 [2024-10675]
Download as PDF
42868
Federal Register / Vol. 89, No. 96 / Thursday, May 16, 2024 / Notices
a subsequent license for the project or
other disposition under the FPA,
whichever comes first.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10615–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Tower Kleber Limited Partnership;
Notice of Authorization for Continued
Project Operation
The license for the Tower and Kleber
Hydroelectric Project No. 10615 was
issued for a period ending April 30,
2024.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 10615
is issued to Tower Kleber Limited
Partnership for a period effective May 1,
2024, through April 30, 2025, or until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first.
If issuance of a new license (or other
disposition) does not take place on or
before April 30, 2025, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Tower Kleber Limited Partnership
is authorized to continue operation of
the Tower and Kleber Hydroelectric
Project under the terms and conditions
of the prior license until the issuance of
VerDate Sep<11>2014
17:50 May 15, 2024
Jkt 262001
Dated: May 9, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–10673 Filed 5–15–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2055–109]
Idaho Power Company; Notice of
Application For Non-Project Use of
Project Land and Waters—Water
Withdrawal Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters—Water
Withdrawal.
b. Project No: P–2055–109.
c. Date Filed: March 18, 2024, April
23, 2024, and May 8, 2024
d. Applicant: Idaho Power Company.
e. Name of Project: C.J. Strike
Hydroelectric Project.
f. Location: The project is located on
the Snake and Bruneau Rivers in
Owyhee and Elmore Counties, Idaho.
Part of the project occupies federal
lands managed by the U.S. Bureau of
Land Management (BLM).
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Nathan
Gardiner, (208) 388–2975, ngardiner@
idahopower.com.
i. FERC Contact: Michael Calloway,
(202) 502–8041, michael.calloway@
ferc.gov.
j. Cooperating agencies: With this
notice, the Commission is inviting
federal, state, local, and Tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item k
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Deadline for filing comments,
motions to intervene, and protests: June
10, 2024.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include the docket number P–2055–109.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: The licensee
submitted a request on behalf of Idaho
Water Resources Board to allow the use
and to occupy lands and waters inside
the project boundary for the purposes of
constructing a pumping station and an
intake pipe. The lands inside the project
boundary are administered by BLM. The
facility would withdraw up to 2 cubic
feet per second (cfs) (1.29 million
gallons per day (MGD)) in the winter
season (November to mid-March) and 6
cfs (3.88 MGD) in the summer season
(mid-March through October). The
anticipated average annual water
withdrawal volume is approximately
1,800 acre-feet/year which would
provide raw water to the Mountain
Home Airforce Base water treatment
plant. Discharged treated wastewater
from the Airforce Base would be stored
in a lagoon and used to irrigate a golf
course under an Idaho Department of
Environmental Quality Re-use Permit.
E:\FR\FM\16MYN1.SGM
16MYN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 96 / Thursday, May 16, 2024 / Notices
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
VerDate Sep<11>2014
17:50 May 15, 2024
Jkt 262001
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: May 9, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–10675 Filed 5–15–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4349–033]
EONY Generation Limited; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 4349–033.
c. Date Filed: April 26, 2024.
d. Applicant: EONY Generation
Limited.
e. Name of Project: Moose River
Hydroelectric Project.
f. Location: On the Moose River in
Lewis County, New York.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Gregory Clarke,
Chief Electricity Generation Officer,
EONY Generation Limited, 7659
Lyonsdale Road, Lyonsdale, NY 13368;
email at GregoryClarke@
portagepower.com.
i. FERC Contact: Kelly Wolcott,
Project Coordinator, Great Lakes Branch,
Division of Hydropower Licensing;
telephone at (202) 502–6480; email at
kelly.wolcott@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
42869
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: June 25, 2024.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. All
filings must clearly identify the project
name and docket number on the first
page: Moose River Hydroelectric Project
(P–4349–033).
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The Moose
River Project includes a dam that is
comprised of: (1) a southern section that
includes: (a) an earthen dike; (b) a
concrete retaining wall; (c) a 39-footlong concrete intake structure with: (i)
a 3-foot-wide debris sluice gate; and (ii)
a 15-foot-wide sluice gate equipped
with an approximately 27-foot-wide
trashrack with 2-inch clear bar spacing;
and (d) a concrete section with a 10foot-wide stoplog gate; and (2) a
northern section that includes: (a) a
south abutment; (b) a 240-foot-long
spillway that has a crest elevation of
1,024.6 feet National Geodetic Vertical
Datum of 1929 (NGVD 29) with a 58foot-long, 0.5-foot-high notch; and (c) a
north abutment.
The dam creates an impoundment
that has a surface area of 21 acres at the
spillway crest elevation of 1,024.6 feet
NGVD, which is the normal maximum
surface elevation of the impoundment.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 89, Number 96 (Thursday, May 16, 2024)]
[Notices]
[Pages 42868-42869]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-10675]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2055-109]
Idaho Power Company; Notice of Application For Non-Project Use of
Project Land and Waters--Water Withdrawal Accepted for Filing,
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters--
Water Withdrawal.
b. Project No: P-2055-109.
c. Date Filed: March 18, 2024, April 23, 2024, and May 8, 2024
d. Applicant: Idaho Power Company.
e. Name of Project: C.J. Strike Hydroelectric Project.
f. Location: The project is located on the Snake and Bruneau Rivers
in Owyhee and Elmore Counties, Idaho. Part of the project occupies
federal lands managed by the U.S. Bureau of Land Management (BLM).
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Nathan Gardiner, (208) 388-2975,
[email protected].
i. FERC Contact: Michael Calloway, (202) 502-8041,
[email protected].
j. Cooperating agencies: With this notice, the Commission is
inviting federal, state, local, and Tribal agencies with jurisdiction
and/or special expertise with respect to environmental issues affected
by the proposal, that wish to cooperate in the preparation of any
environmental document, if applicable, to follow the instructions for
filing such requests described in item k below. Cooperating agencies
should note the Commission's policy that agencies that cooperate in the
preparation of any environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. Deadline for filing comments, motions to intervene, and
protests: June 10, 2024.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include the docket number P-2055-109.
Comments emailed to Commission staff are not considered part of the
Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
l. Description of Request: The licensee submitted a request on
behalf of Idaho Water Resources Board to allow the use and to occupy
lands and waters inside the project boundary for the purposes of
constructing a pumping station and an intake pipe. The lands inside the
project boundary are administered by BLM. The facility would withdraw
up to 2 cubic feet per second (cfs) (1.29 million gallons per day
(MGD)) in the winter season (November to mid-March) and 6 cfs (3.88
MGD) in the summer season (mid-March through October). The anticipated
average annual water withdrawal volume is approximately 1,800 acre-
feet/year which would provide raw water to the Mountain Home Airforce
Base water treatment plant. Discharged treated wastewater from the
Airforce Base would be stored in a lagoon and used to irrigate a golf
course under an Idaho Department of Environmental Quality Re-use
Permit.
[[Page 42869]]
m. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
q. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: May 9, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-10675 Filed 5-15-24; 8:45 am]