National Emission Standards for Hazardous Air Pollutants: Primary Copper Smelting Residual Risk and Technology Review and Primary Copper Smelting Area Source Technology Review, 41648-41724 [2024-09883]
Download as PDF
41648
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 63
[EPA–HQ–OAR–2020–0430; FRL–7522–02–
OAR]
RIN 2060–AU63
National Emission Standards for
Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and
Technology Review and Primary
Copper Smelting Area Source
Technology Review
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
This action finalizes the
residual risk and technology review
(RTR) conducted for the Primary Copper
Smelting major source category
regulated under national emission
standards for hazardous air pollutants
(NESHAP). This action also finalizes the
technology review for the Primary
Copper Smelting area source NESHAP.
The final amendments for the major
source NESHAP include particulate
matter (PM) emission standards as a
surrogate for metal hazardous air
pollutants (HAP) other than mercury
(primarily lead and arsenic) for anode
refining point sources, process fugitive
emissions from roofline vents, Hoboken
converter process fugitive capture
systems where they combine with anode
refining point sources, and new
converters. We are also finalizing
emission standards for previously
unregulated HAP including mercury,
benzene, toluene, hydrogen chloride
(HCl), chlorine, polycyclic aromatic
hydrocarbons (PAH), and dioxins and
furans (D/F). In addition, we are taking
final action in the major source
NESHAP to establish work practice
standards for bypass stacks, and add a
new emissions limit for lead and
emissions control design standards to
minimize process fugitive emissions at
facilities with flash furnaces and PeirceSmith converters. Final amendments for
both the major source NESHAP and the
area source NESHAP include removing
exemptions and associated provisions
for periods of startup, shutdown, and
malfunction (SSM), specifying that the
emission standards apply at all times,
and requiring electronic reporting of
performance test results and notification
of compliance reports.
DATES: This final rule is effective May
13, 2024, except for amendatory
instruction 3, which is effective July 15,
2024. The incorporation by reference
(IBR) of certain publications listed in
lotter on DSK11XQN23PROD with RULES3
SUMMARY:
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
the rule is approved by the Director of
the Federal Register as of May 13, 2024.
ADDRESSES: The U.S. Environmental
Protection Agency (EPA) has established
a docket for this action under Docket ID
No. EPA–HQ–OAR–2020–0430. All
documents in the docket are listed on
the https://www.regulations.gov/
website. Although listed, some
information is not publicly available,
e.g., Confidential Business Information
or other information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either
electronically through https://
www.regulations.gov/, or in hard copy at
the EPA Docket Center, WJC West
Building, Room Number 3334, 1301
Constitution Ave. NW, Washington, DC.
The Public Reading Room hours of
operation are 8:30 a.m. to 4:30 p.m.
Eastern Standard Time (EST), Monday
through Friday. The telephone number
for the Public Reading Room is (202)
566–1744, and the telephone number for
the EPA Docket Center is (202) 566–
1742.
FOR FURTHER INFORMATION CONTACT: For
questions about this final action, contact
U.S. EPA, Attn: Amanda Hansen, Mail
Drop: D243–04, 109 T.W. Alexander
Drive, P.O. Box 12055, RTP, North
Carolina 27711; telephone number:
(919) 541–3165; email address:
hansen.amanda@epa.gov. For specific
information regarding the risk modeling
methodology, contact U.S. EPA, Attn:
James Hirtz, Mail Drop: C539–02, 109
T.W. Alexander Drive, P.O. Box 12055,
RTP, North Carolina 27711; telephone
number: (919) 541–0881; email address:
hirtz.james@epa.gov.
SUPPLEMENTARY INFORMATION: Preamble
acronyms and abbreviations. We use
multiple acronyms and terms in this
preamble. While this list may not be
exhaustive, to ease the reading of this
preamble and for reference purposes,
the EPA defines the following terms and
acronyms here:
ACI activated carbon injection
ADEQ Arizona Department of
Environmental Quality
ANSI American National Standards
Institute
BTF beyond-the-floor
CAA Clean Air Act
CEDRI Compliance and Emissions Data
Reporting Interface
CEMS continuous emissions monitoring
system
CFR Code of Federal Regulations
CRA Congressional Review Act
CMS continuous monitoring systems
DCOT digital camera opacity technique
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
D/F dioxins and furans
DSI dry sorbent injection
EAF electric arc furnaces
EJ Environmental Justice
EPA Environmental Protection Agency
ERT Electronic Reporting Tool
FEM Federal equivalent method
FR Federal Register
FRM Federal reference method
GACT generally available control
technology
gr/dscf grains per dry standard cubic feet
HAP hazardous air pollutants
HCl hydrogen chloride
HEM–4 Human Exposure Model, Version
1.5.5
HI hazard index
HQ hazard quotient
ICR information collection request
lbs pounds
lb/hr pounds per hour
LEAN Louisiana Environmental Action
Network
MACT maximum achievable control
technology
mg/dscm milligrams per dry standard cubic
meter
MIR maximum individual risk
MTG Measurement Technology Group
NAAQS National Ambient Air Quality
Standards
NAICS North American Industry
Classification System
NESHAP National Emission Standards for
Hazardous Air Pollutants
NTTAA National Technology Transfer and
Advancement Act
OAR Office of Air and Radiation
OMB Office of Management and Budget
PAH polycyclic aromatic hydrocarbons
Pb lead
PDF portable document format
PM particulate matter
PRA Paperwork Reduction Act
RATA Relative Accuracy Test Audit
REL reference exposure level
RFA Regulatory Flexibility Act
RIN Regulatory Information Number
RTR risk and technology review
SIP state implementation plan
SO2 sulfur dioxide
SSM startup, shutdown, and malfunction
TEQ toxic equivalency quotient
TOSHI target organ-specific hazard index
tpy ton per year
ug/m3 micrograms per cubic meter
UMRA Unfunded Mandates Reform Act
UPL upper prediction limit
VCS voluntary consensus standards
WESP wet electrostatic precipitator
Background information. On January
11, 2022 (87 FR 1616), and July 24, 2023
(88 FR 47415), the EPA proposed
revisions to the Primary Copper
Smelting major source NESHAP based
on our RTR. In this action, we are
finalizing decisions and revisions for
the major source rule. On January 11,
2022 (87 FR 1616), the EPA also
proposed revisions to the Primary
Copper Smelting area source NESHAP
based on our technology review. In this
action, we are also finalizing decisions
and revisions for the area source rule.
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
We summarize some of the more
significant comments we timely
received regarding the proposed rules
and provide our responses in this
preamble. A summary of all other public
comments on the proposals and the
EPA’s responses to those comments is
available in National Emission
Standards for Hazardous Air Pollutant
Emissions: Primary Copper Smelting
Residual Risk and Technology Review
and Primary Copper Smelting Area
Source Technology Review: Summary of
Public Comments and Responses,
Docket ID No. EPA–HQ–OAR–2020–
0430. ‘‘Track changes’’ versions of the
regulatory language that incorporate the
changes to the two rules in this action
are available in the docket.
Organization of this document. The
information in this preamble is
organized as follows:
I. General Information
A. Executive Summary
B. Does this action apply to me?
C. Where can I get a copy of this document
and other related information?
D. Judicial Review and Administrative
Reconsideration
II. Background
A. What is the statutory authority for this
action?
B. What is the Primary Copper Smelting
source category and how does the
NESHAP regulate HAP emissions from
the source category?
C. What changes did we propose for the
Primary Copper Smelting source
category in our January 11, 2022,
proposal and in our July 24, 2023,
supplemental proposal?
III. What is included in this final rule?
A. What are the final rule amendments
based on the risk review for the Primary
Copper Smelting source category?
B. What are the final rule amendments
based on the technology review for the
Primary Copper Smelting source
category?
C. What are the final rule amendments
pursuant to CAA sections 112(d)(2) and
(3) for the Primary Copper Smelting
source category?
D. What are the final rule amendments
addressing emissions during periods of
startup, shutdown, and malfunction?
E. What other changes have been made to
the NESHAP?
F. What are the effective and compliance
dates of the standards?
IV. What is the rationale for our final
decisions and amendments for the
Primary Copper Smelting source
category?
A. Residual Risk Review for the Primary
Copper Smelting Source Category
B. Technology Review for the Primary
Copper Smelting Source Category
C. CAA Sections 112(d)(2) and (3)
Revisions for the Primary Copper
Smelting Source Category
D. Final Rule Amendments Addressing
Bypass Stack Emissions
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
E. Final Rule Amendments Addressing
Compliance Dates
F. Other Major Comments
V. Summary of Cost, Environmental, and
Economic Impacts and Additional
Analyses Conducted
A. What are the affected facilities?
B. What are the air quality impacts?
C. What are the cost impacts?
D. What are the economic impacts?
E. What are the benefits?
F. What analysis of environmental justice
did we conduct?
VI. Statutory and Executive Order Reviews
A. Executive Orders 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
B. Paperwork Reduction Act (PRA)
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act
(UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use
I. National Technology Transfer and
Advancement Act (NTTAA) and 1 CFR
Part 51
J. Executive Order 12898: Federal Actions
To Address Environmental Justice in
Minority Populations and Low-Income
Populations and Executive Order 14096:
Revitalizing Our Nation’s Commitment
to Environmental Justice for All
K. Congressional Review Act (CRA)
I. General Information
A. Executive Summary
This action presents the results of the
U.S. Environmental Protection Agency
(EPA or the Agency) residual risk and
technology review (RTR) for the
National Emission Standards for
Hazardous Air Pollutants (NESHAP) for
major source Primary Copper Smelters
as required under the Clean Air Act
(CAA). Pursuant to the CAA, this action
also presents the results of the
technology review for the Primary
Copper Smelting area source NESHAP.
Based on the results of the risk
review, the EPA is finalizing a
determination that risks from emissions
of air toxics from this major source
category are currently unacceptable.
This unacceptable risk determination
considers all health information,
including the EPA’s analysis of health
risks associated with emissions of lead
and arsenic from these facilities. The
modeled exceedance of the lead
National Ambient Air Quality Standard
(NAAQS) of 0.15 ug/m3 at Freeport
represents an important health metric in
EPA’s unacceptability determination for
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
41649
the Primary Copper source category.
The EPA estimated that the highest
modeled rolling 3-month concentration
of lead at a residential location is 0.17
ug/m3 based on 2019 actual emissions
and 0.24 ug/m3 based on allowable
emissions, at the Freeport facility, refer
to appendix 1; section 9 of the Residual
Risk Assessment for the Primary Copper
Smelting Source Category in Support of
the 2021 Risk and Technology Review
Proposed Rule for additional details of
the monitor to model comparison for
this rule. The NAAQS off-site lead (Pb)
monitor (at Miami Golf Course)
recorded Pb levels for 2019 were below
the NAAQS with a maximum 3-month
Pb concentration at the monitor of 0.038
ug/m3, while the modeled Pb
concentration based upon actual
emissions for this site was 0.045 ug/m3.
This close alignment of the monitor
with model results for the Miami Golf
Course site provides us with additional
confidence in our maximum off-site
model concentration of 0.17 ug/m3 at a
residential location. The EPA also found
that the maximum individual risk (MIR)
of cancer was estimated to be 70-in-1
million based on actual emissions and
90-in-1 million based on allowable
emissions (driven by arsenic emissions),
which is approaching the presumptive
level of unacceptability of 100-in-1
million. In addition, the EPA found that
the maximum acute hazard quotient
(HQ) was 7 (also driven by arsenic
emissions). Considering all of the health
risk information and factors discussed
above, along with the risk information
and uncertainties discussed in the 2022
proposed rule preamble (87 FR 1616),
the EPA has determined that the current
risks for this source category are
unacceptable.
To reduce risks to an acceptable level,
the EPA is finalizing a new emission
limit for particulate matter (PM) as a
surrogate for particulate hazardous air
pollutant (HAP) metals (such as lead
and arsenic) in the major source
NESHAP for a combination of process
fugitive roofline emissions from the
anode refining department, copper
converter departments, slag cleaning
vessels and smelting vessels (also
known as smelting furnaces). This
standard will achieve significant
reductions of lead and arsenic emissions
and their associated health risks (as
described in section IV.A. of this
preamble).
Pursuant to the LEAN decision (which
is described further in section II.A. of
this preamble), the EPA is also
finalizing new emissions standards
based on maximum achievable control
technology (MACT) for the major source
NESHAP to address currently
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41650
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
unregulated emissions of HAP, as
follows: PM, as a surrogate for
particulate HAP metals, for (1) anode
refining furnace point source emissions;
(2) new converters; and (3) the
combination of process fugitive roofline
emissions from the anode refining
department, copper converter
departments, slag cleaning vessels and
smelting vessels (also known as
smelting furnaces). The EPA is also
finalizing new pollutant-specific
emissions limits based on MACT for the
following HAP: mercury, lead, benzene,
toluene, hydrogen chloride (HCl),
chlorine, polycyclic aromatic
hydrocarbons (PAH), naphthalene and
dioxins and furans (D/F). Furthermore,
in this final action, after reviewing and
considering public comments, the EPA
is finalizing work practice standards
according to CAA 112(h) for bypass
stacks which were previously an
unregulated emissions source.
Pursuant to the CAA mandated
technology review, we are finalizing a
PM limit (as a surrogate for nonmercury
metal HAP) for the combined emissions
from the Hoboken converter process
fugitive capture systems where they
combine with anode refining point
source emissions. This standard will
achieve significant reductions of lead
and arsenic emissions (as described in
sections III.B. and IV.B. of this
preamble). Furthermore, we are
finalizing emissions control design
standards to minimize process fugitive
HAP metals emissions from roof vents at
facilities with flash furnaces and PeirceSmith converters. In addition, under the
technology review the EPA is finalizing
work practice standards to minimize
fugitive dust emissions which will
achieve further emissions reductions
beyond the reductions that will be
achieved from the rooflines under the
risk review for major sources (described
above).
With regard to primary copper
smelting area sources, the Agency did
not identify any developments in
practices, processes, or control
technologies. Therefore, the EPA is not
finalizing any new or revised standards
pursuant to the CAA technology review
for the area source NESHAP.
In addition to the new and revised
standards described in the previous
paragraphs, consistent with Sierra Club
v. EPA (which is described further in
section III.D. of this preamble), the EPA
is also finalizing rule changes to remove
exemptions and associated provisions
for periods of startup, shutdown, and
malfunction (SSM) and to specify that
the emission standards apply at all
times. The EPA is also finalizing rule
changes to require electronic reporting
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
of performance test results and
notification of compliance reports for
both area and major sources.
Implementation of the rules is expected
to reduce HAP metal emissions from
primary copper smelters, improve
human health, and reduce
environmental impacts associated with
those emissions. This final action will
also result in improved monitoring,
compliance, and implementation of the
existing standards.
During development of these
proposed and final rules, the EPA also
completed a demographic analysis
which indicates that cancer risks
associated with emissions from the
major source category
disproportionately affect communities
with environmental justice concerns,
including low-income residents,
American Indians, and Hispanics living
near these facilities. Once the new and
revised standards (described in this
preamble) are implemented, risks in
nearby communities due to HAP
emissions will be reduced to acceptable
levels and the NESHAP will provide an
ample margin of safety to protect public
health.
B. Does this action apply to me?
The source categories that are the
subject of this action are Primary
Copper Smelting Major Sources
regulated under 40 CFR part 63, subpart
QQQ, and Primary Copper Smelting
Area Sources, regulated under 40 CFR
part 63, subpart EEEEEE. The North
American Industry Classification
System (NAICS) code for the primary
copper smelting industry is 331410.
This list of categories and NAICS codes
is not intended to be exhaustive, but
rather provides a guide for readers
regarding the entities that this final
action is likely to affect. The final
standards will be directly applicable to
the affected sources. State, local, and
Tribal governments would not be
directly affected by this final action. As
defined in the Initial List of Categories
of Sources Under Section 112(c)(1) of
the Clean Air Act Amendments of 1990
(see 57 FR 31576, July 16, 1992) and
Documentation for Developing the
Initial Source Category List, Final
Report (see EPA–450/3–91–030, July
1992), the Primary Copper Smelting
major source category addresses any
major source facility engaged in the
pyrometallurgical process used for the
extraction of copper from sulfur oxides,
native ore concentrates, or other copper
bearing minerals. As originally defined,
the category includes, but is not limited
to, the following smelting process units:
roasters, smelting furnaces, and
converters. Affected sources under the
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
current major source NESHAP are
concentrate dryers, smelting furnaces,
slag cleaning vessels, converters, and
fugitive emission sources. The area
source category was added to the source
category list in 2002 (67 FR 70427,
70428). Affected sources under the area
source NESHAP are concentrate dryers,
smelting vessels (e.g., furnaces),
converting vessels, matte drying and
grinding plants, secondary gas systems,
and anode refining operations.
C. Where can I get a copy of this
document and other related
information?
In addition to being available in the
docket, an electronic copy of this final
action will also be available on the
internet. Following signature by the
EPA Administrator, the EPA will post a
copy of this final action at https://
www.epa.gov/stationary-sources-airpollution/primary-copper-smeltingnational-emissions-standardshazardous-air and at https://
www.epa.gov/stationary-sources-airpollution/primary-copper-smeltingarea-sources-national-emissionsstandards. Following publication in the
Federal Register, the EPA will post the
Federal Register version and key
technical documents at this same
website.
Additional information is available on
the RTR website at https://
www.epa.gov/stationary-sources-airpollution/risk-and-technology-reviewnational-emissions-standardshazardous. This information includes
an overview of the RTR program and
links to project websites for the RTR
source categories.
D. Judicial Review and Administrative
Reconsideration
Under Clean Air Act (CAA) section
307(b)(1), judicial review of this final
action is available only by filing a
petition for review in the United States
Court of Appeals for the District of
Columbia Circuit (the Court) by July 12,
2024. Under CAA section 307(b)(2), the
requirements established by this final
rule may not be challenged separately in
any civil or criminal proceedings
brought by the EPA to enforce the
requirements.
Section 307(d)(7)(B) of the CAA
further provides that only an objection
to a rule or procedure which was raised
with reasonable specificity during the
period for public comment (including
any public hearing) may be raised
during judicial review. This section also
provides a mechanism for the EPA to
reconsider the rule if the person raising
an objection can demonstrate to the
Administrator that it was impracticable
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
to raise such objection within the period
for public comment or if the grounds for
such objection arose after the period for
public comment (but within the time
specified for judicial review) and if such
objection is of central relevance to the
outcome of the rule. Any person seeking
to make such a demonstration should
submit a Petition for Reconsideration to
the Office of the Administrator, U.S.
EPA, Room 3000, WJC South Building,
1200 Pennsylvania Ave. NW,
Washington, DC 20460, with a copy to
both the person(s) listed in the
preceding FOR FURTHER INFORMATION
CONTACT section, and the Associate
General Counsel for the Air and
Radiation Law Office, Office of General
Counsel (Mail Code 2344A), U.S. EPA,
1200 Pennsylvania Ave. NW,
Washington, DC 20460.
lotter on DSK11XQN23PROD with RULES3
II. Background
A. What is the statutory authority for
this action?
Section 112 of the CAA establishes a
two-stage regulatory process to address
emissions of HAP from stationary
sources. In the first stage, we must
identify categories of sources emitting
one or more of the HAP listed in CAA
section 112(b) and then promulgate
technology-based NESHAP for those
sources. ‘‘Major sources’’ are those that
emit, or have the potential to emit, any
single HAP at a rate of 10 tons per year
(tpy) or more, or 25 tpy or more of any
combination of HAP. For major sources,
these standards are commonly referred
to as MACT standards and must reflect
the maximum degree of emission
reductions of HAP achievable (after
considering cost, energy requirements,
and non-air quality health and
environmental impacts). In developing
MACT standards, CAA section 112(d)(2)
directs the EPA to consider the
application of measures, processes,
methods, systems, or techniques,
including, but not limited to, those that
reduce the volume of or eliminate HAP
emissions through process changes,
substitution of materials, or other
modifications; enclose systems or
processes to eliminate emissions;
collect, capture, or treat HAP when
released from a process, stack, storage,
or fugitive emissions point; are design,
equipment, work practice, or
operational standards; or any
combination of the above.
For these MACT standards, the statute
specifies certain minimum stringency
requirements, which are referred to as
MACT floor requirements, and which
may not be based on cost
considerations. See CAA section
112(d)(3). For new sources, the MACT
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
floor cannot be less stringent than the
emission control achieved in practice by
the best-controlled similar source. The
MACT standards for existing sources
can be less stringent than floors for new
sources, but they cannot be less
stringent than the average emission
limitation achieved by the bestperforming 12 percent of existing
sources in the category or subcategory
(or the best-performing five sources for
categories or subcategories with fewer
than 30 sources). In developing MACT
standards, we must also consider
control options that are more stringent
than the floor under CAA section
112(d)(2). We may establish standards
more stringent than the floor, based on
the consideration of the cost of
achieving the emissions reductions, any
non-air quality health and
environmental impacts, and energy
requirements. Standards more stringent
than the floor are commonly referred to
as beyond-the-floor (BTF) standards. In
certain instances, as provided in CAA
section 112(h), the EPA may set work
practice standards in lieu of numerical
emission standards. For area sources,
CAA section 112(d)(5) gives the EPA
discretion to set standards based on
generally available control technologies
or management practices (Generally
Available Control Technology (GACT)
standards) in lieu of MACT standards.
In the second stage of the regulatory
process, the CAA requires the EPA to
undertake two different analyses, which
we refer to as the technology review and
the residual risk review. Under the
technology review, we must review the
technology-based standards and revise
them ‘‘as necessary (taking into account
developments in practices, processes,
and control technologies)’’ no less
frequently than every 8 years, pursuant
to CAA section 112(d)(6). In conducting
this review, the EPA is not required to
recalculate the MACT floors that were
established in earlier rulemakings.
Natural Resources Defense Council
(NRDC) v. EPA, 529 F.3d 1077, 1084
(D.C. Cir. 2008). Association of Battery
Recyclers, Inc. v. EPA, 716 F.3d 667
(D.C. Cir. 2013). The EPA may consider
cost in deciding whether to revise the
standards pursuant to CAA section
112(d)(6). The EPA is required to
address regulatory gaps, such as missing
standards for listed air toxics known to
be emitted from the source category, and
any new MACT standards must be
established under CAA sections
112(d)(2) and (3), or, in specific
circumstances, CAA sections 112(d)(4)
or (h). Louisiana Environmental Action
Network (LEAN) v. EPA, 955 F.3d 1088
(D.C. Cir. 2020). Under the residual risk
PO 00000
Frm 00005
Fmt 4701
Sfmt 4700
41651
review, we must evaluate the risk to
public health remaining after
application of the technology-based
standards and revise the standards, if
necessary, to provide an ample margin
of safety to protect public health or to
prevent, taking into consideration costs,
energy, safety, and other relevant
factors, an adverse environmental effect.
The residual risk review is required
within 8 years after promulgation of the
technology-based standards, pursuant to
CAA section 112(f). In conducting the
residual risk review, if the EPA
determines that the current standards
provide an ample margin of safety to
protect public health, it is not necessary
to revise the MACT standards pursuant
to CAA section 112(f).1 Section
112(d)(5) of the CAA provides that this
residual risk review is not required for
categories of area sources subject to
GACT standards. For more information
on the statutory authority for this rule,
see 87 FR 1616 and 88 FR 47415.
B. What is the Primary Copper Smelting
source category and how does the
NESHAP regulate HAP emissions from
the source category?
The primary copper smelting source
category includes any facility that uses
a pyrometallurgical process to produce
anode copper from copper ore
concentrates. Primary copper smelting
begins with copper mines supplying the
ore concentrate (typically 30 percent
copper). In most cases, the moisture is
reduced from the ore concentrate in
dryers, and then the ore concentrate is
fed through a smelting furnace where it
is melted and reacts to produce copper
matte. One existing smelter is able to
feed its copper concentrate directly to
the smelting furnace without prior
drying. Copper matte is a molten
solution of copper sulfide mixed with
iron sulfide and is about 60 percent
copper. The solution is further refined
using converters to make blister copper,
which is approximately 98 percent
copper. Converters use oxidation to
remove sulfide as sulfur dioxide (SO2)
gas and the iron as a ferrous oxide slag.
The majority of the SO2 gases are sent
to a sulfuric acid plant. The slag is
removed, cooled, and often processed
again to remove any residual copper.
The blister copper is reduced in the
anode furnace to remove impurities and
oxygen, typically by injecting natural
gas and steam, to produce a high purity
1 The Court has affirmed this approach of
implementing CAA section 112(f)(2)(A): NRDC v.
EPA, 529 F.3d 1077, 1083 (D.C. Cir. 2008) (‘‘If EPA
determines that the existing technology-based
standards provide an ‘ample margin of safety,’ then
the Agency is free to readopt those standards during
the residual risk rulemaking.’’).
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41652
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
copper. The molten copper from the
anode refining furnace is poured into
molds and cooled to produce solid
copper ingots called anodes. This
process is known as casting. The anodes
are sent to a copper refinery, either onsite or at an off-site location, for further
purification using an electrolytic
process to obtain high purity copper
that is sold as a product.
The processing units of interest at
primary copper smelters, because of
their potential to generate HAP
emissions, are the following: dryers,
smelting furnaces, copper converters,
anode refining furnaces, and, if present,
copper holding vessels, slag cleaning
vessels, and matte drying and grinding
plants. In addition, fugitive emissions
are sources of HAP at primary copper
smelters. The transfer of matte,
converter slag, and blister copper is the
primary source of fugitive emissions.
There are three primary copper
smelting facilities in the U.S. that are
subject to the NESHAPs in this review.
Two of the facilities, Asarco and
Freeport (also referred to as FMMI), are
both located in Arizona and are major
sources of HAP emissions that are
subject to subpart QQQ, the major
source NESHAP. The third facility,
Kennecott, is located in Utah and is an
area source subject to subpart EEEEEE,
the area source NESHAP.
Two of the facilities (Asarco and
Kennecott) use flash smelting furnaces
(the INCO smelting furnace and the
Outotec®, respectively). Flash smelting
furnaces consist of blowing fine, dried
copper sulfide concentrate and silica
flux with air, oxygen-enriched air or
oxygen into a hot hearth-type furnace.
The sulfide minerals in the concentrate
react with oxygen resulting in oxidation
of the iron and sulfur, which produces
heat and therefore melting of the solids.
The molten matte and slag are removed
separately from the furnace as they
accumulate, and at the facility using the
INCO furnace, the matte is transferred
via ladles to the copper converters. The
Freeport facility uses an ISASMELT
furnace. The ISASMELT process
involves dropping wet feed through a
feed port, such that dryers are not
needed. A mixture of air, oxygen, and
natural gas is blown through a vertical
lance in the center of the furnace,
generating heat and melting the feed.
The molten metal is then tapped from
the bottom and sent to an electric
furnace to separate the matte from slag.
The slag is removed from the electric
furnace through tapholes and is
transferred to slag pots via ladles. The
matte is also removed from the electric
furnace through tapholes and
transferred to the converter via ladles.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
At the area source primary copper
smelter, molten copper matte tapped
from the Outotec® smelting furnace is
not transferred as molten material
directly to the converting vessel as is
performed at the two major source
smelters. Instead, the matte is first
quenched with water to form solid
granules of copper matte. These matte
granules are then ground to a finer
texture and fed to the flash converting
furnace for the continuous converting of
copper. The continuous copper
converter differs significantly in design
and operation from the cylindrical batch
converters operated at the other U.S.
smelters. Because there are no transfers
of molten material between the smelting
furnace and the continuous copper
converter, this technology has
inherently lower potential HAP
emissions than a smelter using batch
copper converting technology.
In either a facility using batch copper
converting or a facility using continuous
copper converting, and as discussed
above in this section, molten blister
copper is next transferred from the
converting vessel to an anode furnace
for refining to further remove residual
impurities and oxygen, and then poured
into molds to produce solid copper
ingots called anodes. The anode copper
is sent to a copper refinery, either onsite or at another location, where it is
further purified using an electrolytic
process to obtain the high purity copper
that is sold as a product. The copper
refinery is not part of the primary
copper smelting source category.
The current NESHAP for major
sources (40 CFR part 63, subpart QQQ)
was proposed on April 20, 1998 (63 FR
19582), with a supplement to the
proposed rule published on June 26,
2000 (65 FR 39326). The final rule,
promulgated on June 12, 2002 (67 FR
40478), established PM standards as a
surrogate for HAP metals for copper
concentrate dryers, smelting furnaces,
slag cleaning vessels, and existing
converters. The major source NESHAP
applies to major sources that use batch
copper converters. Regarding new
sources, the NESHAP prohibits batch
converters for new sources, which
indirectly means that any new source
would need to have continuous
converters, similar to the area source
(Kennecott), or another technology. The
converter building is subject to an
opacity limit that only applies during
performance testing. A fugitive dust
plan is required to minimize fugitive
dust emissions. Subpart QQQ also
establishes requirements to demonstrate
initial and continuous compliance with
all applicable emission limitations,
work practice standards, and operation
PO 00000
Frm 00006
Fmt 4701
Sfmt 4700
and maintenance requirements. Annual
performance testing is required to
demonstrate compliance.
The NESHAP for area sources (40 CFR
part 63, subpart EEEEEE) establishes
GACT standards for primary copper
smelting area sources and was proposed
on October 6, 2006 (71 FR 59302) and
finalized on January 23, 2007 (72 FR
2930). Technical corrections were then
published on July 3, 2007, via direct
final rule (72 FR 36363). The affected
sources (i.e., copper concentrate dryers,
smelting vessels, converting vessels,
matte drying and grinding plants,
secondary gas systems and anode
refining departments) are subject to PM
limits as a surrogate for HAP metals.
Compliance is demonstrated by either
continuously measuring PM, conducting
a performance test every 2.5 years, or
operating a PM continuous emission
monitoring system (CEMS).
C. What changes did we propose for the
Primary Copper Smelting source
category in our January 11, 2022,
proposal and in our July 24, 2023,
supplemental proposal?
On January 11, 2022, the EPA
published a proposed rule in the
Federal Register (87 FR 1616) for the
NESHAP for Primary Copper Smelting,
40 CFR part 63, subpart QQQ, that took
into consideration the RTR analyses and
for the NESHAP for Primary Copper
Smelting Area Sources, 40 CF part 63,
subpart EEEEEE, that took into
consideration the technology review. In
the 2022 proposed rule, we proposed:
• PM limits based on the MACT floor
for anode refining point sources at new
and existing major sources;
• PM limits based on the MACT floor
for process fugitive emissions from
roofline vents of smelting furnaces at
new and existing major sources;
• PM limits based on the MACT floor
for process fugitive emissions from
roofline vents of converters at new and
existing major sources;
• PM limits based on beyond-thefloor (BTF) for process fugitive
emissions from roofline vents at anode
refining operations at new and existing
major sources;
• PM limits based on the MACT floor
for new converters at major sources;
• Facility-wide mercury limit based
on BTF for any combination of stacks or
other vents from the copper concentrate
dryers, copper converter department,
the anode refining department, and the
smelting vessels at existing major
sources;
• Facility-wide mercury limit based
on the MACT floor for new major
sources;
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
• Revisions to the existing fugitive
dust control work practice standards to
make them more robust than what is
currently required by the major source
NESHAP;
• Removal of SSM exemptions and
associated provisions and specify that
emissions standards apply at all times
for both area sources and major sources;
and
• Requirements for electronic
reporting of performance test reports
and notification of compliance reports
for both area sources and major sources.
During the comment period for the
2022 proposal, the EPA received public
comments from industry, Tribal nations,
environmental groups, Arizona
Department of Environmental Quality
(ADEQ), and private citizens. After
reviewing the comments, and after
consideration of additional data and
information received since the 2022
proposal, the EPA determined it was
appropriate to gather additional data,
revise some of the analyses associated
with that proposal, and to publish a
supplemental proposal for the major
source NESHAP.
In support of the supplemental
proposal, the EPA sent a section 114
information request to the Freeport
facility only, as the Asarco facility has
been idled since October 2019. The
section 114 information request was
delivered to the Freeport facility on
August 31, 2022. In response to this
section 114 information request, the
EPA received performance test results
for the Freeport facility containing
emission rates of benzene, 1,4dichlorobenzene, chlorine,
formaldehyde, hexane, hydrogen
fluoride, hydrogen chloride, toluene,
total hydrocarbons, PAH including
naphthalene, and dioxins and furans.
The section 114 information request
response from Freeport also provided
data regarding costs and feasibility of
installing additional controls for the
aisle scrubber including a wet
electrostatic precipitator (WESP) and a
baghouse to control emissions from the
Hoboken converter process fugitive
capture system. Finally, the section 114
information request response from
Freeport provided detailed information
for input materials, emission sources,
and process information.
In addition to the information
collected through the section 114
information request, the EPA also
received information during and after
the public comment period of the 2022
proposed RTR. This additional
information included cost estimates for
the control devices which we expect
would be needed to comply with the
emission limits proposed in the 2022
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
proposal (e.g., for mercury, lead and
arsenic). It also included additional
performance testing results for the
roofline vents, vent fume stack, aisle
scrubber, and acid plant stack. Finally,
Freeport also voluntarily performed an
additional performance test for mercury
in 2022 and submitted those results to
the EPA.
Based on evaluation of all the data,
we proposed several revised and new
MACT standards in a supplemental
proposal published in the Federal
Register (88 FR 47415) on July 24, 2023,
pursuant to CAA sections 112(d)(2),
(d)(3), (d)(6), and (f). For the
supplemental proposal, which
addressed only the major source
NESHAP, we proposed:
• Benzene, toluene, HCl, chlorine,
PAH, naphthalene and D/F limits based
on the MACT floor for any new and
existing combination of stacks or other
vents from the copper concentrate
dryers, copper converter department,
the anode refining department, and the
smelting vessels at major sources based
on test data submitted by the only
operating major source;
• Revisions to the proposed PM limits
for process fugitive emissions from
roofline vents of smelting vessels,
converters, and anode refining
operations at new and existing sources
to provide a combined emission limit
for all roofline vents based on additional
test data and comments submitted by
affected facilities;
• Revisions to the proposed mercury
limits for any new and existing
combination of stacks or other vents
from the copper concentrate dryers,
converting department, the anode
refining department, and the smelting
vessels to provide a limit based on the
MACT floor after considering additional
test data and comments submitted by
affected facilities; and
• Prohibition of the use of bypass
stacks for major sources.
We also co-proposed two options for
further controlling HAP metals at the
aisle scrubber source at Freeport as
follows:
• Option 1—PM limits based on the
addition of a WESP downstream of the
aisle scrubber to provide additional
control of the combined emissions
stream from the secondary capture
system for the converter department 2
and the anode refining department (i.e.,
the same option evaluated by the EPA
2 Based on comments on the supplemental
proposal, this system should be referred to as a
process fugitive capture system for the Hoboken
converters; we are clarifying this terminology in the
final rule.
PO 00000
Frm 00007
Fmt 4701
Sfmt 4700
41653
in the ample margin of safety analysis
included in the January 2022 proposal);
• Option 2—PM limits based on the
addition of a baghouse upstream of the
aisle scrubber to provide additional
control of the secondary capture system
for the converter department.
III. What is included in this final rule?
This action finalizes the EPA’s
determinations pursuant to the RTR
provisions of CAA section 112 for the
Primary Copper Smelting major source
category and amends the Primary
Copper Smelting major source NESHAP,
40 CFR part 63, subpart QQQ, based on
those determinations. The changes
being finalized for the major sources in
this action include promulgation of
MACT floor-based PM limits for the
anode refining department point source
emissions; BTF PM limits to address
process fugitive emissions from the
smelting vessels, copper converter
department, and anode refining roofline
vents combined; MACT floor-based PM
limits for new copper converter
departments; MACT floor-based
emission standards for previously
unregulated HAP (e.g., mercury,
benzene, toluene, HCl, chlorine, PAH,
naphthalene and D/F); and PM limits for
the combined anode refining
department and Hoboken converter
process fugitive capture systems. This
action also finalizes design standards to
limit HAP metals and a BTF lead
emissions limit to minimize process
fugitive emissions from roofline vents
for certain processes. In addition, this
action finalizes work practice standards
for the use of bypass stacks and
revisions to the fugitive dust control
plan requirements. This action also
finalizes other changes to the major
source NESHAP including electronic
reporting requirements and the removal
of SSM exemptions. This final action
includes several changes to the
proposed requirements in the 2022
proposal and 2023 supplemental
proposal based on consideration of
comments and information received
during the public comment periods as
described in section IV. of this
preamble.
This action also finalizes the EPA’s
determination pursuant to the
technology review provisions of CAA
section 112 for the Primary Copper
Smelting area source category. We
determined that there are no
developments in practices, processes,
and control technologies that warrant
revisions to the NESHAP for Primary
Copper Smelting Area Sources, 40 CFR
part 63, subpart EEEEEE, pursuant to
CAA section 112(d)(6). However, this
action finalizes amendments to the area
E:\FR\FM\13MYR3.SGM
13MYR3
41654
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
source NESHAP to remove SSM
exemptions and associated provisions
and provide electronic reporting
requirements.
A. What are the final rule amendments
based on the risk review for the Primary
Copper Smelting source category?
This section introduces the final
amendments to the Primary Copper
Smelting NESHAP, 40 CFR part 63,
subpart QQQ, being promulgated
pursuant to CAA section 112(f). The
EPA is promulgating a PM emission
limit (as a surrogate for HAP metals
other than mercury) of 6.3 pounds per
hour (lb/hour) for process fugitive
emissions from roofline vents of the
smelting vessels, copper converter
departments, slag cleaning vessels and
anode refining departments combined,
at new and existing sources. This
emission limit is the same as proposed
in the 2023 supplemental proposal. This
combined PM emission limit for process
fugitive emissions from roofline vents is
also being promulgated under CAA
section 112(d)(2) and (d)(3) as described
in section III.C. of this preamble.
lotter on DSK11XQN23PROD with RULES3
B. What are the final rule amendments
based on the technology review for the
Primary Copper Smelting source
category?
We determined that there are
developments in practices, processes,
and control technologies that warrant
revisions to the MACT standards for this
source category. Therefore, to satisfy the
requirements of CAA section 112(d)(6),
we are revising the MACT standards to
include a combined emission standard
for the anode refining department point
source emissions and Hoboken
converter process fugitive capture
system of 4.1 milligrams per dry
standard cubic meter (mg/dscm). The
promulgated standard was co-proposed
in the 2023 supplemental proposal as
one of the two options expected to
require additional controls of the
combined emission streams. The
promulgated standard is expected to
require the installation of PM controls
(such as a baghouse) to control the
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
emissions from the Hoboken converter
process fugitive capture system before
this emission stream combines with the
anode refining department point source
exhaust in the aisle scrubber.
We are also promulgating, as
proposed in the 2022 proposal,
amendments to the existing
requirements for facilities to develop
and implement a fugitive dust control
plan pursuant to CAA section 112(d)(6)
as part of technology review.
In addition, the EPA is promulgating
a lead emission limit of 0.326 lb/hour
under CAA section 112(d)(2) and (3)
and design standards under CAA
section 112(d)(6) for minimizing process
fugitive emissions from any
combination of roofline vents associated
with the Peirce-Smith copper converter
department, Inco flash furnace and the
anode refining department, at new and
existing sources. The design standards
are being promulgated for the flash
furnace area capture system, fuming
ladle capture system, and the anode
furnace secondary hood capture and
control system to further reduce process
fugitive HAP metals at facilities with a
combination of the Peirce-Smith copper
converter department, Inco flash furnace
and the anode refining department. We
note that the combined lead emission
limit for reducing process fugitive
emissions from roofline vents is being
promulgated under CAA section
112(d)(2) and (d)(3) as described in
section III.C. of this preamble. However,
the design standards are being
promulgated under CAA section
112(d)(6).
As part of the technology review for
the major source NESHAP, we also
identified regulatory gaps (previously
unregulated processes or pollutants) and
are establishing new standards to fill
those gaps as described in section III.C.
of this preamble.
C. What are the final rule amendments
pursuant to CAA sections 112(d)(2) and
(3) for the Primary Copper Smelting
source category?
Pursuant to CAA sections 112(d)(2)
and (3), we are promulgating MACT
PO 00000
Frm 00008
Fmt 4701
Sfmt 4700
floor limits for emissions of PM (as a
surrogate for HAP metals other than
mercury) from new and existing anode
refining departments and new copper
converter departments, which were
previously unregulated sources of HAP
metals. We are also promulgating,
pursuant to CAA sections 112(d)(2) and
(3), a BTF limit for emissions of PM (as
a surrogate for HAP metals other than
mercury) from new and existing sources
of process fugitive emissions from the
roofline vents from the smelting vessels,
slag cleaning vessels, the copper
converter department, and the anode
refining department combined, which
were previously unregulated sources of
HAP metals. As described in section
III.A. of this preamble, the emissions
standard for new and existing sources of
process fugitive gases from the roofline
vents from the smelting vessels, slag
cleaning vessels, the converter
department, and the anode refining
department is also being finalized
pursuant to CAA section 112(f)(2) to
address the source category
unacceptable risk determination. In
addition, we are also promulgating,
pursuant to CAA sections 112(d)(2) and
(3), a BTF lead emission limit to
minimize process fugitive emissions
from any combination of roofline vents
associated with the Peirce-Smith copper
converter department, Inco flash furnace
and the anode refining department.
Lastly, we are promulgating, pursuant to
CAA sections 112(d)(2) and (3), MACT
emission limits for mercury, benzene,
toluene, HCl, chlorine, PAH excluding
naphthalene, naphthalene, and D/F, all
of which were previously unregulated
HAP. A summary of the MACT
standards promulgated pursuant to CAA
sections 112(d)(2) and (3) is provided in
table 1 below. For more information on
these standards, including their
rationale, see section IV.C. of this
preamble.
BILLING CODE 6560–50–P
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
41655
PM
New and existing Anode Refining Department
5.8 mg/dscm
PM
New Copper Converter Department
0.031 lb/ton copper
concentrate feed
charged to the
smelting vessel
PM
New and existing process fugitive gases from the roofline
vents from the smelting vessels, slag cleaning vessels, the
copper converter department, and the anode refining
department
6.3 lb/hr 2
Lead
Existing process fugitive emissions from any combination
of roofline vents associated with the Peirce-Smith copper
converter department, Inca flash furnace and the anode
refining department
0.326 lb/hr 2
Mercury
New combination of stacks or other vents from the copper
concentrate dryers, copper converter department, the anode
refining department, slag cleaning vessels and the smelting
vessels
0.00097 lb/hr
Mercury
Existing combination of stacks or other vents from the
copper concentrate dryers, copper converter department, the
anode refining department, slag cleaning vessels and
the smelting vessels
0.033 lb/hr
Benzene
New and existing combination of stacks or other vents from
the copper concentrate dryers, copper converter department,
the anode refining department, slag cleaning
vessels and the smelting vessels
1. 7E-03 lb/ton copper
concentrate feed
charged to the
smelting vessel
Toluene
New and existing combination of stacks or other vents from
the copper concentrate dryers, copper converter department,
the anode refining department, slag cleaning
vessels and the smelting vessels
8.4E-04 lb/ton copper
concentrate feed
charged to the
smelting vessel
HCl
New and existing combination of stacks or other vents
from the copper concentrate dryers, copper converter
department, the anode refining department, slag cleaning
vessels and the smelting vessels
1.5E-03 lb/ton copper
concentrate feed
charged to the
smelting vessel
Chlorine
New and existing combination of stacks or other vents
from the copper concentrate dryers, copper converter
department, the anode refining department, slag cleaning
vessels and the smelting vessels
5.4E-03 lb/ton copper
concentrate feed
charged to the
smelting vessel
PAH
(excluding
Naphthalene)
New and existing combination of stacks or other vents
from the copper concentrate dryers, copper converter
department, the anode refining department, slag cleaning
vessels and the smelting vessels
1.0E-04 lb/ton copper
concentrate feed
charged to the
smelting vessel
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00009
Fmt 4701
Sfmt 4725
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.101
lotter on DSK11XQN23PROD with RULES3
Table 1. Summary of Final MACT Standards Pursuant to CAA Sections 112(d)(2) and (3)
41656
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Naphthalene
New and existing combination of stacks or other vents
from the copper concentrate dryers, copper converter
department, the anode refining department, slag cleaning
vessels and the smelting vessels
D/F
New and existing combination of stacks or other vents
from the copper concentrate dryers, converter department,
the anode refining department, slag cleaning vessels and
the smelting vessels
2.8E-04 lb/ton copper
concentrate feed
charged to the
smelting vessel
60 ng TEQ/Mg copper
concentrate feed
charged to the
smelting vessel
1 We are also finalizing an additional PM emission limit pursuant to CAA section 112(d)( 6)
technology review; see section III.B. for details.
2 Denotes BTF emission standard.
D. What are the final rule amendments
addressing emissions during periods of
startup, shutdown, and malfunction?
We are finalizing the elimination of
SSM exemptions and associated
provisions in the Primary Copper
Smelting NESHAPs (40 CFR part 63,
subparts QQQ and EEEEEE) as proposed
in the 2022 proposal, other than
clarifications and other non-substantive
updates in SSM exemption removal
explanation and provisions. In its 2008
decision in Sierra Club v. EPA, 551 F.3d
1019 (D.C. Cir. 2008), the court vacated
portions of two provisions in the EPA’s
CAA section 112 regulations governing
the emissions of HAP during periods of
SSM. Specifically, the court vacated the
SSM exemption contained in 40 CFR
63.6(f)(1) and (h)(1), holding that under
section 302(k) of the CAA, emissions
standards or limitations must be
continuous in nature and that the SSM
exemption violates the CAA’s
requirement that some section 112
standards apply continuously.
Consistent with Sierra Club v. EPA, the
EPA is establishing standards in these
rules that apply at all times. We have
revised table 1 (the General Provisions
Applicability Table) in both rules in
several respects related to SSM. For
example, we have eliminated the
incorporation of the General Provisions
requirement that the sources develop an
SSM plan, changed several references
related to requirements that apply
during periods of SSM, and eliminated
or revised certain recordkeeping and
reporting requirements related to the
eliminated SSM exemption. The EPA
also made changes to the rules to
remove or modify inappropriate,
unnecessary, or redundant language in
the absence of the SSM exemption. See
the 2022 proposed rule for additional
information on removal of SSM
exemptions. In addition, for 40 CFR part
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
63, subpart QQQ, we are finalizing a
work practice standard allowing the
venting of process gases through a
bypass stack during planned
maintenance events under limited
conditions as described in section IV.D.
E. What other changes have been made
to the NESHAP?
1. Electronic Reporting
To increase the ease and efficiency of
data submittal and data accessibility,
the EPA is finalizing, as proposed in the
2022 proposal, a requirement that
owners and operators of sources subject
to the Primary Copper Smelting
NESHAP for major sources (subpart
QQQ) submit electronic copies of
required performance test reports and
performance evaluations of continuous
monitoring systems (CMS) measuring
relative accuracy test audit (RATA)
pollutants (being finalized at 40 CFR
63.1455) through the EPA’s Central Data
Exchange (CDX) using the Compliance
and Emissions Data Reporting Interface
(CEDRI). A description of the electronic
data submission process is provided in
the memorandum Electronic Reporting
Requirements for New Source
Performance Standards (NSPS) and
National Emission Standards for
Hazardous Air Pollutants (NESHAP)
Rules, available in the docket for this
action (Docket ID No. EPA–HQ–OAR–
2020–0430–0031). The final rule
requires that performance test results or
performance evaluation of CMS
measuring RATA pollutants collected
using test methods that are supported by
the EPA’s Electronic Reporting Tool
(ERT) as listed on the ERT website 3 at
the time of the test be submitted in the
format generated through the use of the
ERT; or alternatively, owners or
operators may submit an electronic file
3 https://www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert.
PO 00000
Frm 00010
Fmt 4701
Sfmt 4700
consistent with the extensible markup
language (XML) schema listed on the
EPA’s ERT website. Other performance
tests or performance evaluations of CMS
measuring RATA pollutants collected
using test methods that are not
supported by the EPA’s ERT as listed on
the EPA’s ERT website at the time of the
test must be included as an attachment
in the ERT or an alternate electronic file
consistent with the XML schema listed
on the EPA’s ERT website. The final
rule also requires that notification of
compliance reports be submitted as a
portable document format (PDF) upload
in CEDRI.
We are finalizing the electronic
reporting requirements for the Primary
Copper Smelting NESHAP for area
sources (40 CFR part 63, subpart
EEEEEE) as proposed in the 2022
proposal. The electronic reporting
requirements are in 40 CFR 63.11147,
63.11148, and 63.11149 of the rule, and
include electronic reporting
requirements for monthly emissions
reports, emergency notifications,
notifications of a deviation, semi-annual
monitoring reports; and performance
tests, where applicable.
2. Other Changes
The EPA is finalizing, as proposed in
the 2022 proposal, the revision to the
applicability description under
§ 63.1441 to clarify that the NESHAP
applies to major source smelting
facilities that use any type of converter,
not just batch converters because the
current definition limits applicability to
only major sources that use batch
converters. The major source NESHAP
should apply to any Primary Copper
major source regardless of what type of
converter they use. Therefore, we are
finalizing this change.
Regarding revisions to testing
requirements, the Agency is finalizing,
as proposed in the 2022 proposal,
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.102
lotter on DSK11XQN23PROD with RULES3
BILLING CODE 6560–50–C
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
revisions to the wording in § 63.1450
clarifying that facilities must test for
filterable particulate, not total
particulate. The test methods in
§ 63.1450(a) have not changed for PM
from the existing regulation. The
methods in the existing regulation
(Methods 5, 5D, and 17) are methods for
filterable PM. Total PM includes
filterable PM and condensable PM. The
condensable PM test method (Method
202) is not included in the existing
regulation for the emission standards set
in 2002. In conjunction with clarifying
that facilities must test for filterable
particulate, not total particulate, we are
changing all instances of the wording
‘‘total particulate matter’’ in the current
rule to ‘‘filterable particulate matter.’’
The Agency is finalizing, as proposed
in the 2022 proposal and 2023
supplemental proposal, the addition of
appropriate test methods for PM10,
fugitive PM, mercury, benzene, toluene,
chlorine, hydrogen chloride, PAH
excluding naphthalene, naphthalene,
and dioxins/furans, as well as updating
test methods that are incorporated by
reference because the affected facilities
will need to know what test methods
they need to use to demonstrate
compliance with the new standards.
Finally, the EPA is finalizing, as
proposed in the 2022 proposal, to revise
the definitions under § 63.1459 by
changing the term ‘‘smelting furnace’’ to
‘‘smelting vessel’’ to be consistent with
the definition in the area source rule, 40
CFR part 63, subpart EEEEEE, because
we find it is appropriate that both rules
include the broader definition of
smelting vessel, which is already in the
area source rule. The specific definition
is as follows: Smelting vessel means a
furnace, reactor, or other type of vessel
in which copper ore concentrate and
fluxes are smelted to form a molten
mass of material containing copper
matte and slag. Other copper-bearing
materials may also be charged to the
smelting vessel.
F. What are the effective and
compliance dates of the standards?
For the additional MACT floor
emission limits (mercury, HCl, chlorine,
D/F, benzene, toluene, PAHs excluding
naphthalene, and naphthalene) in 40
CFR part 63, subpart QQQ, the EPA is
finalizing, as proposed in the 2023
supplemental proposal, the requirement
that existing facilities must comply with
these limits within 1 year after
promulgation because we estimated
both facilities can meet these MACT
floor limits without having to install
new controls. Similarly, for the new PM
emission standard for anode refining
point sources where the anode
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
emissions are not combined with
Hoboken converter process fugitive
capture system emissions in an aisle
scrubber, the Agency is finalizing, as
proposed in the 2022 proposal, the
proposed requirement that existing
facilities must comply within 1 year
after promulgation of the final rule as
major source facilities that do not
combine their anode point source
emissions are expected to meet the limit
without additional controls. For anode
refining point sources that combine
their anode emissions with Hoboken
converter process fugitive capture
system emissions in an aisle scrubber,
compliance with the anode refining
point source limit will be demonstrated
through compliance with the combined
PM limit at the aisle scrubber outlet and
its associated compliance date.
For the combined PM limit at the aisle
scrubber outlet, which treats combined
emissions from the Hoboken converter
process fugitive capture system and
anode refining point source, the EPA is
finalizing that facilities must comply
with this limit within 3 years after
promulgation of the final rule. We are
allowing up to 3 years to meet this limit
as we expect facilities will need up to
3 years to design, construct and operate
the necessary capture and control
equipment to meet the limit.
For the combined process fugitive PM
roofline emissions limit for copper
converter departments, anode refining
departments, slag cleaning vessels and
smelting vessel roofline vents, the EPA
is finalizing, as proposed in the 2023
supplemental proposal, the requirement
that existing facilities comply with this
limit within 2 years after promulgation
of the final rule. We are allowing up to
two years to meet this limit as we expect
facilities will need up to 2 years to
design, construct and operate the
necessary capture and control
equipment to meet the limit.
For the combined process fugitive
lead roofline emissions limit for PeirceSmith copper converter department,
Inco flash furnace and the anode
refining department roofline vents, the
EPA is finalizing that facilities must
comply with this limit within 3 years
after promulgation of the final rule. We
are allowing up to 3 years to meet this
limit as we expect facilities will need up
to 3 years to design, construct and
operate the necessary capture and
control equipment to meet the limit.
For all other changes in this action we
are finalizing, as proposed, that existing
facilities must comply within 180 days
after promulgation of the final rule.
New sources must comply with all of
the standards immediately upon the
effective date of the standard, May 13,
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
41657
2024, or upon startup, whichever is
later.
We are also finalizing amendments to
§§ 63.1442 and 63.1443 and adding a
new table (table 4 to 40 CFR part 63,
subpart QQQ) which provides the
applicability dates for previously
unregulated affected sources (e.g., anode
refining department, bypass stack), as
well as the effective dates and
compliance dates for the emission
standards proposed in the 2022
proposal and 2023 supplemental
proposal which are being promulgated
in this final action.
IV. What is the rationale for our final
decisions and amendments for the
Primary Copper Smelting source
category?
For each issue, this section provides
a description of what we proposed and
what we are finalizing for the issue, the
EPA’s rationale for the final decisions
and amendments, and a summary of key
comments and responses. For all
comments not discussed in this
preamble, comment summaries and the
EPA’s responses can be found in the
National Emission Standards for
Hazardous Air Pollutant Emissions:
Primary Copper Smelting Residual Risk
and Technology Review and Primary
Copper Smelting Area Source
Technology Review: Summary of Public
Comments and Responses document,
available in the docket for this action
(Docket ID No. EPA–HQ–OAR–2020–
0430).
A. Residual Risk Review for the Primary
Copper Smelting Source Category
1. What did we propose pursuant to
CAA section 112(f) for the Primary
Copper Smelting source category?
Pursuant to CAA section 112(f), the
EPA conducted a residual risk review
and presented the results of this review,
along with the proposed decisions
regarding risk acceptability and ample
margin of safety, in the January 11,
2022, proposed rule (87 FR 1616). In the
2022 proposed rule, the EPA
determined that risks from the primary
copper smelting source category were
unacceptable due to HAP metal
(primarily lead and arsenic) emissions.
Based on new information and data
received after the 2022 proposal through
the comment period and issuance of a
2022 CAA section 114 information
request from the Freeport facility, the
EPA updated the baseline risk
assessment, updated control Option 1,
and added a new control Option 2 that
affected the Freeport facility only. The
Asarco facility has been idle since
October 2019, and therefore, a section
E:\FR\FM\13MYR3.SGM
13MYR3
41658
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
114 information request was not issued
to them. The risk results for the Asarco
facility did not change in the 2023
supplemental proposal because we did
not receive any new data or information
after the 2022 proposal was published
and before the supplemental proposal
was published.
The results of the risk assessment for
the 2022 proposal are described in more
detail in the Residual Risk Assessment
for the Primary Copper Smelting Major
Source Category in Support of the 2021
Risk and Technology Review Proposed
Rule document, which is available in
the docket (Docket ID No. EPA–HQ–
OAR–2020–0430–0051). The results of
the baseline risk assessment for the 2023
supplemental proposal are presented in
table 2 and in more detail in the
residual risk document, Revised
Residual Risk Assessment for the
Freeport Smelter (Miami, AZ) in
Support of the 2023 Supplemental
Proposal for the Primary Copper
Smelting Source Category, which is
available in the Docket for this action
(Docket ID No. EPA–HQ–OAR–2020–
0430–0187).
Table 2. Primary Copper Smelting Major Source Category Inhalation Risk Assessment
Results Supporting the Supplemental Proposal
Maximum Individual Estimated Population Estimated Annual Maximum Noncancer HI
Maximum
at Increased Risk of
Cancer Risk (in 1
Cancer
Incidence
and
3-month
Lead
Screening
Acute
2
Cancer;::: 1-in-1
Number of
3) 3 Noncancer HQ i
Concentration
(ug/m
(
cases
per
year)
million)
Million
Facilities 1
Actual Allowable Actual Allowable Actual Allowable
Actual
Allowable
Actual
Emissions Emissions Emissions Emissions Emissions Emissions Emissions Emissions
Emissions
HI=l
HI=l
(arsenic)
(arsenic)
HQ (REL)=7
developmental developmental
(Arsenic)
1
70
90
22,900
29,001
0.002
0.003
Pb Cone:
0.17
1 The Freeport facility was the only facility evaluated in this updated risk analysis.
Pb Cone:
0.24
Maximum individual excess lifetime cancer and noncancer risk due to arsenic emissions from the source
category, 71 percent from the anode refining roofline at Freeport and 23 percent from anode furnaces and
converters point source emissions from the Aisle Scrubber at Freeport.
3 The modeled max 3-month off-site lead concentration is compared to the lead (Pb) National Ambient Air
Quality Standards (NAAQS) standard of 0.15 ug/m3 based upon actual and allowable emissions from the
source category. The Pb NAAQS standard was developed to address all exposure pathways (inhalation
and ingestion).
4 The maximum estimated off-site acute exposure concentration was divided by available short-term doseresponse values to develop an array of hazard quotient (HQ) values. The HQ value shown here is based
on the lowest available acute dose-response value, which is the reference exposure level (REL). There
are no other acute health benchmarks for arsenic other than the I -hour REL.
A refined modeling analysis for the
2022 proposal was conducted at the
facility with the highest annual
concentration of lead, Freeport, to
characterize ambient concentrations of
lead for 3-month intervals. The
maximum 3-month concentration was
predicted for each off-site receptor. The
concentrations were then compared to
the Pb NAAQS of 0.15 micrograms per
cubic meter (ug/m3). The maximum 3month off-site modeled concentration
was 0.17 ug/m3 for actual emissions and
0.24 ug/m3 for allowable emissions, and
these results occurred near the Freeport
facility. These results did not change in
the 2023 supplemental proposal.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
The inhalation risk assessment in the
2023 supplemental proposal estimated
that the baseline cancer maximum
individual risk (MIR) was 70-in-1
million for the source category based on
actual emissions. The total estimated
cancer incidence from the source
category was 0.002 excess cancer cases
per year, or one excess case every 500
years, with arsenic compounds
contributing 97 percent of the cancer
incidence for the source category in the
2023 supplemental proposal.
Approximately 22,900 people of the
46,460 people within 50 km of the
facility were estimated to have cancer
risks above 1-in-1 million from HAP
emitted from the source category. The
PO 00000
Frm 00012
Fmt 4701
Sfmt 4700
HEM–4 model predicted the maximum
chronic noncancer hazard index (HI)
value for the source category was 1
(developmental), with an acute noncancer HQ value equal to 7 driven by
emissions of arsenic from the anode
refining roofline at Freeport and, to a
lesser degree, the anode furnace point
source and Hoboken converter process
fugitive capture system emissions
emitted through the aisle scrubber at
Freeport.
The inhalation risk assessment based
on MACT-allowable emissions did not
change from the 2022 proposal and
indicated that the cancer MIR was 90in-1 million. The total estimated cancer
incidence from the source category was
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.103
lotter on DSK11XQN23PROD with RULES3
2
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
0.003 excess cancer cases per year, or
one excess case every 333 years, with
arsenic contributing 90 percent and
cadmium contributing 8 percent of the
cancer incidence for the source
category. Approximately 29,001 people
were estimated to have cancer risks
above 1-in-1 million from exposure to
HAP emissions if HAP were emitted at
the levels allowed under the NESHAP
as it existed prior to finalization of this
regulatory action. The chronic noncancer risks remained the same as
actuals, with acute non-cancer hazards
not being modeled due to the
uncertainty of estimating acute impacts
based upon hourly allowable emission
estimates.
Regarding multipathway risk, we
concluded in the 2022 proposal that
there was no significant potential for
multipathway health effects based upon
EPA’s Tier 3 screening analysis. Due to
the conservative nature of the screens
and the level of additional refinements
that would go into a site-specific
multipathway assessment, were one to
be conducted, we are confident that the
HQ for ingestion exposure,
specifically cadmium and mercury
through fish ingestion, is less than 1.
For arsenic, maximum cancer risk posed
by fish ingestion would also be reduced
to levels below 1-in-1 million, and
maximum cancer risk under the rural
gardener scenario would decrease to 20in-1 million or less. The estimated risks
for the garden scenario seem unlikely
due to the arid climate of the area and
the hypothetical nature of the scenario.
Further details on the Tier 3 screening
assessment can be found in Appendix
10–11 of Residual Risk Assessment for
the Primary Copper Smelting Major
Source Category in Support of the Risk
and Technology Review 2021 Proposed
Rule.
In the 2023 supplemental proposal,
we estimated that the multipathway and
inhalation risk results would be reduced
further due to baseline arsenic
emissions at proposal (2022) being
lowered based upon additional data
being received. We also estimated in the
2023 supplemental proposal that,
although the mercury emissions
increased from the 2022 proposal
baseline, the mercury HQ would still be
less than 1 (0.2) for the fisher scenario.
For the 2023 supplemental proposal,
the Agency weighed all the health risk
factors in the risk acceptability
determination and proposed that the
risks from the Primary Copper Smelting
source category are unacceptable at
baseline. To address the unacceptable
risks, in the supplemental proposal, we
proposed a combined PM emission limit
for process fugitive emissions from
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
roofline vents of smelting furnaces,
converters, and anode refining
operations, which would significantly
reduce risks. We estimated in the
supplemental proposal that this
combined PM limit would reduce
emissions of HAP metal (primarily lead
and arsenic) by 4.59 tpy. To be able to
comply with the limit, we estimated
that the Freeport facility would need to
install controls (e.g., improved capture
system, including hoods, ductwork, and
fans, and one additional baghouse) to
reduce process fugitive roofline
emissions from the anode refining
source, the main risk driver. As
described in the supplemental proposal,
we estimated that these controls would
reduce the MIR at Freeport from 70-in1 million to an estimated 20-in-1
million and that the acute noncancer
HQ (for arsenic) would be reduced from
7 to 2 (based on actual emissions). In
addition, the modeled lead
concentrations would be reduced below
the NAAQS. We estimated that the MIR
for Asarco would remain at 60-in-1
million and would be the source
category MIR after the proposed controls
are applied at Freeport. In the
supplemental proposal, we concluded
that these risks, after implementation of
proposed controls, were acceptable. We
also proposed that existing facilities
would need to comply within two years
after promulgation of the final rule and
new facilities must comply with all
requirements in the final rule upon start
up. We proposed that compliance
would be demonstrated through an
initial performance test followed by a
compliance test once per year.
We then considered whether the
Primary Copper Smelting NESHAP
provides an ample margin of safety to
protect public health and whether more
stringent standards are necessary to
prevent an adverse environmental
effect, taking into consideration costs,
energy, safety, and other relevant
factors. In considering whether the
standards should be tightened to
provide an ample margin of safety to
protect public health, we considered the
same risk factors that we considered for
our acceptability determination and also
considered the costs, technological
feasibility, and other relevant factors
related to emissions control options that
might reduce risks associated with
emissions from the source category.
As discussed in the 2023
supplemental proposal, pursuant to
CAA section 112(d)(6) and to provide an
ample margin of safety to protect public
health pursuant to CAA section
112(f)(2), the EPA co-proposed two
regulatory options for additional control
of either the secondary capture system
PO 00000
Frm 00013
Fmt 4701
Sfmt 4700
41659
for the converter department4 or
additional control of the combined
emissions stream of the secondary
capture system for the converter
department and the point source
emissions from the anode refining
department. For Option 1, a WESP
would be located downstream of the
aisle scrubber and therefore further
control the combined emissions stream
of the secondary capture system for the
converter department and the point
source emissions from the anode
refining department. Under Option 2, a
baghouse would be installed upstream
of the aisle scrubber to provide
additional control of the secondary
capture system for the converter
department. The EPA proposed that
these control options would result in
more stringent emission standards for
these emission sources than were
currently required in 40 CFR part 63,
subpart QQQ.
In the 2022 proposal, the EPA
evaluated additional work practices to
reduce fugitive dust emissions, and the
Agency found that the implementation
of a more robust fugitive dust plan
would result in an unquantified
reduction of HAP, and we therefore
proposed this requirement in the 2022
proposal. In the 2022 proposal, the EPA
proposed that the combination of the
standards for anode refining roof vents,
fugitive dust plan and all other current
standards in the NESHAP would ensure
the NESHAP provides an ample margin
of safety to protect public health.
2. How did the risk review change for
the Primary Copper Smelting source
category?
While reviewing the information
provided during the 2023 supplemental
proposal public comment period and
reviewing the data provided during the
section 114 process, a correction was
made to the spreadsheet used to
calculate the average emissions from the
aisle scrubber based on stack tests
provided by Freeport. The correction
resulted in a slightly lower average
arsenic emission rate for this source
(from 0.626 tpy in the supplemental
proposal to 0.563 tpy in the final rule),
and therefore we re-modeled the
baseline and roofline vent control
scenarios as well as the two control
options for the aisle scrubber. In
addition to the corrected emission rate
for the aisle scrubber, the EPA reevaluated the estimated control
efficiencies of the control options co4 Based on cmments on the supplement proposal,
this system should be referred to as a roofline
capture sysem for the Hoboken converters; we are
claarifying this termionlogy in the final rule.
E:\FR\FM\13MYR3.SGM
13MYR3
41660
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
proposed for the aisle scrubber source at
Freeport based on the comments and
information received on the
supplemental proposal. These
comments and our responses are
discussed further in section IV.A.3. of
this preamble.
As discussed in the memorandum
Cost Estimates for Additional Controls
of Freeport’s Aisle Scrubber—REVISED,
which is available in the docket for this
action, and as further discussed in
section IV.B. of this preamble, we
updated the control efficiency estimates
for the aisle scrubber control options. In
the 2023 supplemental proposal, we
estimated that under Option 1,
installing a WESP downstream of the
aisle scrubber would achieve 95 percent
control efficiency, and we estimated 6.3
tpy metal HAP reductions. Based on the
comments received from Freeport
regarding the technical feasibility of
controlling the high-volume aisle
scrubber exhaust stream using a WESP
and our evaluation of those comments,
we updated the estimated control
efficiency for the WESP option to 73
percent, and we now estimate 4.9 tpy
metal HAP reduced. In the 2023
supplemental proposal, we estimated
that under Option 2 (Baghouse option),
installing a baghouse upstream of the
aisle scrubber to control the Hoboken
converter process fugitive capture
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
system gas stream for the copper
converter department would reduce
metal HAP emissions by 4.5 tpy. Note
that in the supplemental proposal, we
referred to the process fugitive capture
system as a ‘‘secondary’’ capture system.
However, Freeport commented that the
capture system is better characterized as
a tertiary capture system. Therefore, for
the remainder of this preamble, we refer
to this capture system as the Hoboken
converter process fugitive capture
system. Furthermore, based on
comments received from Freeport in
response to the 2023 supplemental
proposal regarding the technical
feasibility of controlling the highvolume Hoboken converter process
fugitive capture system using a
baghouse and our evaluation of those
comments, we now estimate the
baghouse will achieve 61 percent
control efficiency of the Hoboken
converter process fugitive capture
system gas stream, and using the same
assumption that this gas stream
contributes 75 percent to the aisle
scrubber, we estimate that HAP metals
will be reduced under this option by 3.0
tpy (which represents an overall control
efficiency of 46 percent for the aisle
scrubber). Therefore, the modeling
conducted in support of the final rule
was updated to reflect these new control
efficiencies. The results of the updated
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
modeling for the aisle scrubber control
options, in addition to our consideration
of public comment on this issue,
resulted in a change to what we
proposed for ample margin of safety.
The details of what we are finalizing for
the ample margin of safety analysis are
in section IV.A.3. of this preamble. The
details of what we are promulgating for
the aisle scrubber source are in section
IV.B.3.
With the exception of the revised
emissions described above, the risk
assessment supporting the final rule was
conducted in the same manner, using
the same models and methods, as that
conducted for the supplemental
proposal. The documentation for the
final rule risk assessment can be found
in the memorandum titled Freeport
Baseline and Control Options Re-model
Risk Analysis Memo, which is available
in the docket for this rulemaking.
Inhalation Risk Assessment Results.
Table 3 presents the updated
summary of the inhalation risk
assessment results based on the updated
modeling supporting the final rule. The
results are very similar to those of the
2023 supplemental proposal. The only
changes are to the number of people at
increased risk of cancer greater than or
equal to 1-in-1 million.
BILLING CODE 6560–50–P
E:\FR\FM\13MYR3.SGM
13MYR3
41661
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Table 3. Comparison of the Primary Copper Smelting Baseline Inhalation Risk Assessment
Results for Freeport with Post-Control Risk Estimates for the Final Rule Control Options
Estimated Risks Based on Actual Emissions
Maximum
Residential
Annual Pb Cone.
(ug/m3)3
Max
Predicted
3month
Modeled Pb
Cone.
(ug/m3)4
Acute
HQ
(REL) 5
1 (As)
0.12
0.17(Pb)
7 (As)
0.001
0.3 (As)
0.041
0.06 (Pb)
2 (As)
15,648
0.0007
0.3 (As)
0.0295
0.04 (Pb)
I (As)
16,035
0.0008
0.3 (As)
0.0329
0.05 (Pb)
I (As)
Population at
Increased Risk of
Cancer 2: 1-in-1
million
Annual
Cancer
Incidence
(cases per
year)
Maximum
Chronic
Noncancer
TOSHI2
70 (As)
21,875
0.002
Final Rule
Post-Control
for Anode
Roofline
20 (As)
16,962
Final Rule
Post-Control
Option 1 for
Aisle
Scrubber'
20 (As)
Final Rule
Post-Control
Option 2 for
Aisle
Scrubber7
20 (As)
Maximum
Individual
Cancer
Risk (in-I
million)
Final Rule
(revised
baseline)
Risk
Assessment
Scenario'
values provided in this table are based upon only arsenic and lead emissions from Freeport (Miami, AZ). 2
Target organ-specific hazard index (TOSHI) value for developmental effects does not include contribution from
lead. A TOSHI could not be calculated due to differences in exposure duration for the arsenic and lead
benchmarks.
The maximum annual concentration for lead is based upon the MIR location which is also the maximum
off-site exposure location for Freeport.
4
The maximum predicted 3-month Pb (lead) cone based on actual emissions at the time of proposal was
based on AERMOD modeling with LEAD_pOST, while the maximum predicted 3-month Pb cone for the
supplemental proposal are based upon extrapolations of the HEM-4 annual Pb concentrations using the annual and
3-month modeled results from proposal. These values are compared to the lead NAAQS (0.15 ug/m3) to determine
whether there are risk concerns for lead.
5
The HQ values are based upon the lowest I-hour acute health benchmark, the REL for arsenic. Arsenic
also has anAEGL-2 value (irreversible or escape-impairing effects) which resulted in a maximum HQ value of
0.0006 based upon actual emissions estimated in this supplemental proposal.
6
Option 1 represents controls on anode roofline (described in section IV.A. of this preamble) +WESP on
aisle scrubber (described in section IV.A. of this preamble).
7
Option 2 represents controls on anode roofline (described in section IV.A of this preamble) + baghouse
upstream of aisle scrubber (described in section IV.A. of this preamble).
lotter on DSK11XQN23PROD with RULES3
3. What key comments did we receive
on the risk review, and what are our
responses?
We received comments regarding the
risk assessment for the Primary Copper
Smelting source category. The following
is a summary of some of the more
significant comments and our responses
to those comments. Other comments
received and our responses to those
comments can be found in the
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
document titled National Emission
Standards for Hazardous Air Pollutant
Emissions: Primary Copper Smelting
Residual Risk and Technology Review
and Primary Copper Smelting Area
Source Technology Review: Summary of
Public Comments and Responses,
available in the docket for this action
(Docket ID No. EPA–HQ–OAR–2020–
0430).
Comment: In response to the EPA’s
request for comment on our ample
PO 00000
Frm 00015
Fmt 4701
Sfmt 4700
margin of safety analysis in the 2022
proposal, in which we discussed and
sought comment on but decided not to
propose additional controls for the aisle
scrubber, specifically a WESP, one
commenter stated that they agreed with
our decision. The commenter suggested
that the aisle scrubber should be subject
to a concentration-based filterable
particulate matter (fPM) limit of 23 mg/
dscm similar to other vents processing
emissions from the vessels managing
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.104
1 All
lotter on DSK11XQN23PROD with RULES3
41662
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
molten material, and that the existing
MACT floor emissions from the aisle
scrubber do not significantly contribute
to the estimated risks from metal HAP.
Other commenters supported our
consideration of additional controls for
the aisle scrubber. In the 2023
supplemental proposal, we discussed
another ample margin of safety analysis
in which we co-proposed two possible
control options for the aisle scrubber, a
WESP downstream of the aisle scrubber
or a baghouse upstream of the aisle
scrubber. One commenter expressed
support for the additional controls on
the aisle scrubber and for the associated
reduction to risk. Several commenters
stated the proposed options do not meet
the requirements for ample margin of
safety, which according to the
commenters must be cost effective,
feasible, and provide meaningful
improvement in risk to public health.
One of the commenters explained that
the two metrics for evaluating risk
reduction are based on the MIR cancer
risk and the noncancer HQ. Concerning
these control options, the commenters
asserted the MIR is unchanged when
reducing to significant digits and that it
remains at 20-in-1 million after
accounting for the associated
reductions. One commenter noted that
these MIR values consider expected
reductions from other risk-based
standards in the 2022 proposal and 2023
supplemental proposal (e.g., the process
fugitive roofline vent standard). One of
the commenters took issue with the
standard being applied only to the
Freeport facility. The commenter
contended that the roofline controls to
achieve acceptable risk leave the MIR
for the other major source copper
smelter (Asarco) ‘‘untouched’’ at 60-in1 million, asserting that this is ‘‘unfair,
arbitrary and capricious, and
unsupported by the record.’’ While the
EPA estimated the HQ would drop from
2 to 1 for both options in the 2023
proposed rule, the commenter argued
that the acute arsenic HQ value is based
on a poorly documented and outdated
study, and that more recent studies have
failed to demonstrate the developmental
impact which is at the foundation of the
EPA’s HQ assessment. The commenters
added that the EPA has accepted much
higher HQ values for arsenic in other
rules (e.g., Integrated Iron and Steel
Manufacturing NESHAP 85 FR 42074,
42083; Primary Aluminum Reduction
Plants NESHAP 80 FR 62390, 62398).
The commenters also noted that
emission reductions were overestimated
by the EPA and resulted in overstated
reductions to risk.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Response: The finding of
unacceptable risks is not based on any
one risk metric (e.g., acute hazard
quotients), but rather considering all
health information available and the
degree of uncertainty associated with
that information. In the 2015 final rule
for Primary Aluminum (Docket ID No.
EPA–HQ–OAR–2011–0797), EPA
weighed all health risk factors and
uncertainties in the risk acceptability
determination for the Prebake ovens
subcategory. The current acute
methodology, while similar between the
two rules, is still considered a screening
assessment. While the chronic cancer
risks for both source categories were
comparable, the acute screening
methodologies differ and must be
weighted in regard to the accuracy and
uncertainty of each piece of information
in a weight-of-evidence approach for
each decision. This relevant body of
information is growing fast (and will
likely continue to grow even faster),
necessitating a flexible weight-ofevidence approach that acknowledges
both complexity and uncertainty in the
simplest and most transparent way
possible. The acute screening risks
posed by arsenic are based upon the
most up to date review of the REL by
EPA and considered the best available
benchmark for assessing current risks
posed by this pollutant. The application
of the acute benchmarks when paired
with our acute methodology to assess
‘‘reasonable worst-case one-hour
concentrations (i.e., 99th percentile)’’
for off-site locations where people
maybe present provides a realistic
estimate or screen for short-term
exposures while we consider EPA’s
chronic assessment for this source
category to be a refined site-specific
assessment.
Based on comments and information
provided during the comment period,
we have updated the estimated control
efficiency for both options co-proposed
in the 2023 supplemental proposal, and
therefore the final rule expected
emission reductions are less than those
proposed in the 2023 supplemental
proposal. We have taken this and all
comments into consideration and
determined that it is necessary to
promulgate a PM emission limit for the
combined emissions from the anode
refining point source and the Hoboken
converter process fugitive capture
system pursuant to CAA section
112(d)(6) but not pursuant to CAA
section 112(f)(2) because after further
consideration and comparison to other
source categories, in this specific case,
we agree with the commenter that the
risk reductions are minimal and that
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
these controls are not necessary to
ensure the NESHAP provides an ample
margin of safety pursuant to CAA
section 112(f). Given the space and
infrastructure issues and challenges and
effort needed to construct and operate
such a new control system at Freeport,
we conclude that the facility will likely
need up to 3 years to demonstrate
compliance with the new standards,
which are described in more detail in
section IV.B. of this preamble. Given the
factors described above, we are
finalizing Option 2, with a revised PM
emission standard of 4.1 mg/dscm,
under the CAA section 112(d)(6)
technology review because we conclude
that this option represents a
development in technologies, processes
or practices pursuant to section
112(d)(6). As described in more detail in
section IV.B. of this preamble, the
baghouse technology to reduce metal
HAP emissions at the aisle scrubber
identified in the 2023 supplemental
proposal is feasible, readily available
and already in use at primary copper
smelting facilities (including Freeport)
as well as in use at facilities in other
source categories. We are allowing up to
3 years to comply with this standard
because we conclude the facility will
need up to 3 years to plan, design,
install and operate new controls to
reduce emissions from the aisle
scrubber. The rationale for our decision
to promulgate a standard under CAA
112(d)(6) is described further in section
IV.B. of this preamble.
4. What is the rationale for our final
approach and final decisions for the risk
review?
The EPA sets standards under CAA
section 112(f)(2) using ‘‘a two-step
standard-setting approach, with an
analytical first step to determine an
‘acceptable risk’ that considers all
health information, including risk
estimation uncertainty and includes a
presumptive limit on MIR of
approximately 1-in-10 thousand.5 If
risks are unacceptable, the EPA must
determine the emissions standards
necessary to reduce risk to an acceptable
level without considering costs. A
second step follows in which the actual
standard is set at a level that provides
‘an ample margin of safety’ in
consideration of all health information,
including the number of persons at risk
levels higher than approximately 1-in-1
million, as well as other relevant factors
including costs and economic impacts,
technological feasibility, and other
5 1-in-10 thousand is equivalent to 100-in-1
million. The EPA currently describes cancer risks
as ‘n-in-1 million.’
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
factors relevant to each particular
decision.’’ As discussed in more detail
in the 2022 proposal and in the Benzene
NESHAP, there is flexibility regarding
factors the EPA may consider in making
determinations and how the EPA may
weigh those factors for each source
category. The EPA conducts a risk
assessment that provides estimates of
the MIR posed by emissions of HAP that
are carcinogens from each source in the
source category, the HI for chronic
exposures to HAP with the potential to
cause noncancer health effects, the HQ
for acute exposures to HAP with the
potential to cause noncancer health
effects,6 and to assess risks for lead, the
EPA compares ambient air
concentrations with the lead NAAQS,
which is 0.15 ug/m3 based on 3-month
rolling averages. The assessment also
provides estimates of the distribution of
cancer risk within the exposed
populations, cancer incidence, and an
evaluation of the potential for an
adverse environmental effect. (54 FR
38045, September 14, 1989) As
discussed in the 2022 proposed rule, the
scope of the EPA’s risk analysis is
consistent with the explanation in
EPA’s response to comments on our
policy under the Benzene NESHAP (54
FR 38057) summarized hereafter: In
summary, the EPA’s policy permits
consideration of multiple measures of
health risk including, but not limited to,
the MIR, the presence of non-cancer
health effects, and the uncertainties of
the risk estimates such that these factors
can then be weighed in each individual
case. The EPA’s policy, as discussed in
the Benzene NESHAP response to
comments, also complies with the
Congressional intent behind the CAA.
Thus, the level of the MIR is only one
factor to be weighed in determining
acceptability of risk. The Benzene
NESHAP explained that ‘‘an MIR of
approximately one in 10 thousand
should ordinarily be the upper end of
the range of acceptability. As risks
increase above this benchmark, they
become presumptively less acceptable
under CAA section 112, and would be
weighed with the other health risk
measures and information in making an
overall judgment on acceptability. Or,
the Agency may find, in a particular
case, that a risk that includes an MIR
less than the presumptively acceptable
level is unacceptable in the light of
other health risk factors.’’ Id. at 38045.
6 The MIR is defined as the cancer risk associated
with a lifetime of exposure at the highest
concentration of HAP where people are likely to
live. The HQ is the ratio of the potential HAP
exposure concentration to the noncancer doseresponse value; the HI is the sum of HQs for HAP
that affect the same target organ or organ system.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
In other words, risks that include an
MIR above 100-in-1 million may be
determined to be acceptable, and risks
with an MIR below that level may be
determined to be unacceptable,
depending on all of the available health
information.
a. Acceptability Determination
In this final rule, as in the 2023
supplemental proposal and in the 2022
proposal, the EPA concludes that the
baseline risks are unacceptable. This
determination, as described in the 2022
proposal and the 2023 supplemental
proposal, is largely based on the
estimated exceedance of the lead
NAAQS, along with the maximum acute
HQ of 7 for arsenic, which indicate
there are significant risks of acute
noncancer health effects—especially for
children, infants, and developing
fetuses, all of whom are particularly
vulnerable to chemical exposures as
they undergo key developmental
processes. Also contributing to this
determination, although to a lesser
extent, are the inhalation cancer MIRs
due to arsenic, with an estimated MIR
of 70-in-1 million for actual emissions
and 90-in-1 million for allowable
emissions, which are approaching the
presumptive level of unacceptability of
100-in-1 million.
b. What is EPA requiring in the final
rule to address the unacceptable risk?
To address the unacceptable risk, the
Agency is promulgating a combined PM
emission limit (as a surrogate for HAP
metals other than mercury) for process
fugitive emissions from roofline vents of
a combination of smelting vessels,
copper converter departments, slag
cleaning vessels and anode refining
departments at new and existing sources
as proposed in the 2023 supplemental
proposal. We are also finalizing the PM
emission standard pursuant to CAA
section 112(d)(2) and (d)(3) as discussed
further in section IV.C. of this preamble.
We are also finalizing, as proposed, that
compliance would be demonstrated
through an initial performance test
followed by a compliance test once per
year.
c. Remaining Risks After
Implementation of the Requirements To
Address Unacceptable Risk
To determine the remaining risks after
implementation of the new combined
PM emission limit to control process
fugitive emissions from the roofline
vents, we conducted a post-control risk
assessment. As described in section
IV.A.2., the baseline emissions for the
aisle scrubber source at Freeport were
corrected and the baseline modeling
PO 00000
Frm 00017
Fmt 4701
Sfmt 4700
41663
was conducted again for the final rule
along with the roofline vents control
option. The revised baseline modeling
results, as discussed in section IV.A.2.,
did not result in any change to the
acceptability determination or to the
main risk driver under section 112(f) of
the CAA. More details on the modeling
for the final rule are in the
memorandum Freeport Baseline and
Control Options Re-model Risk Analysis
Memo, found in the docket for this
action. More details on the modeling
analysis for the 2023 supplemental
proposal are described in the document
Revised Residual Risk Assessment for
the Freeport Smelter (Miami, AZ) in
Support of the 2023 Supplemental
Proposal for the Primary Copper
Smelting Source Category, available in
the docket for this action (Docket ID No.
EPA–HQ–OAR–2020–0430–0187).
The post-control modeled risks were
updated as described in the
memorandum Freeport Baseline and
Control Options Re-model Risk Analysis
Memo, available in the docket for this
rule (Docket ID No. EPA–HQ–OAR–
2020–0430). The risk assessment after
implementing the PM limit for process
fugitive emission from roof vents as
discussed in this section of this
preamble indicates that the modeled
lead concentrations would be reduced
to 0.06 mg/m3, which is below the
NAAQS of 0.15 mg/m3. The MIR at
Freeport is reduced from 70-in-1 million
to 20-in-1 million and the population
with cancer risks greater than or equal
to 1-in-1 million is reduced from 21,875
to 16,035. We estimate that at Freeport
the maximum chronic noncancer
inhalation TOSHI will be reduced from
1 to less than 1 (0.3), and the acute HQ
will be reduced from a value of 7 to 2.
We estimate that the source category
MIR after implementation of the PM
limit for process fugitive emissions from
roofline vents will be 60-in-1 million,
which is the maximum baseline cancer
risk near the Asarco facility. We expect
that Asarco can comply with the PM
standard for process fugitive emissions
from roofline vents without additional
controls, and therefore it will not
achieve emission reductions at Asarco
as a result of this PM limit. However, as
described in sections III.B. and III.C.,
and IV.B. and IV.C. of this preamble, we
are finalizing a lead limit under CAA
sections 112(d)(2) and (3) and design
standards under our CAA section
112(d)(6) technology review,
respectively, that will achieve
reductions of HAP metal emissions at
Asarco. We note that the facility already
has plans to implement improvements
(consistent with the design standards in
E:\FR\FM\13MYR3.SGM
13MYR3
41664
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
this final rule) that will reduce their
process fugitive emissions of metal HAP
as well as SO2 emissions. In fact, these
improvements have been adopted into
their most recent state operating permit
(finalized in October 2023). As
mentioned elsewhere in this preamble,
Asarco is currently not operating.
However, we expect that these
improvement projects will likely reduce
the MIR when Asarco returns to
operating status.
Based on the post-control risk
assessment, we conclude that, after the
requirements described in this preamble
to address unacceptable risk are
implemented, the risks to public health
will be reduced to an acceptable level.
d. Ample Margin of Safety Analysis
Under the ample margin of safety
analysis, we again considered all of the
health factors evaluated in the
acceptability determination and
evaluated the cost and feasibility of
available control technologies and other
measures (including the controls,
measures, and costs reviewed under the
technology review) that could be
applied to further reduce the risks due
to emission of HAP identified in our
risk assessment.
While the additional controls for the
combined gas stream from the anode
refining department and the Hoboken
converter process fugitive capture
system identified under the technology
review will provide some additional
risk reduction, in this case the
additional risk reduction is minimal (for
example, no change in the cancer MIR
of 20-in-1 million), and therefore we are
not finalizing this emission standard to
provide an ample margin of safety. We
conclude that the standards we are
finalizing to achieve acceptable risk will
also provide an ample margin of safety
to protect public health and that, as
proposed, a more stringent standard is
not necessary to prevent an adverse
environmental effect in accordance with
CAA section 112(f)(2).
B. Technology Review for the Primary
Copper Smelting Source Category
lotter on DSK11XQN23PROD with RULES3
1. What did we propose pursuant to
CAA section 112(d)(6) for the Primary
Copper Smelting source category?
In the 2022 proposal, as part of our
ample margin of safety analysis and
technology review, we considered
additional controls for the Freeport aisle
scrubber which was the second highest
contributor to the baseline risks,
estimated to represent 23 percent of the
MIR. We estimated emission reductions
and costs for controlling the combined
emissions stream of the anode refining
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
department and Hoboken converter
process fugitive capture system (i.e., the
aisle scrubber) with a WESP. We also
estimated the impacts on risk reductions
of these additional controls. The Agency
sought comment on this control option
but did not propose it in the 2022
proposal. We received comments on the
control option for the aisle scrubber as
well as additional information from the
Freeport facility in response to the
EPA’s 2022 section 114 information
request.
Subsequently, in the 2023
supplemental proposal, based on the
comments on the 2022 proposal and the
new information from the section 114
information request, the EPA coproposed regulatory options for
additional control of either the Hoboken
converter process fugitive capture
system or additional control of the
combined emissions stream of the
Hoboken converter process fugitive
capture system and the anode refining
department (i.e., aisle scrubber). These
standards were proposed as technology
developments pursuant to CAA section
112(d)(6) and to provide an ample
margin of safety to protect public health
pursuant to CAA section 112(f)(2). As
described in the 2023 supplemental
proposal, the first option (hereafter
referred to as Option 1) was the addition
of a WESP downstream of the aisle
scrubber providing additional control of
the combined emissions stream from the
Hoboken converter process fugitive
capture system and the anode refining
department point source (i.e., the same
option evaluated by the EPA in our
ample margin of safety analysis
included in the 2022 proposal). The
second option (hereafter referred to as
Option 2) was the addition of a
baghouse upstream of the aisle scrubber
providing additional control of the
Hoboken converter process fugitive
capture system. As noted in the 2023
supplemental proposal, using
performance test data from Freeport we
estimated the baseline emissions for the
aisle scrubber to be 6.63 tpy metal HAP.
We also used these test data as the basis
to establish an emissions limit along
with an estimate of the expected
reductions that would be achieved with
the additional controls (i.e., a new
baghouse up-stream of current Aisle
scrubber or a WESP after the Aisle
scrubber). To do this, we first used the
data to develop the 99 percent upper
prediction limit (UPL). The 99 percent
UPL for the combined emissions stream
from the anode refining department and
the Hoboken converter process fugitive
capture system is 7.48 mg/dscm. This
UPL served as the baseline for the
PO 00000
Frm 00018
Fmt 4701
Sfmt 4700
development of the potential emission
standards for each option. Secondly, the
UPL value was adjusted (decreased)
based on the expected percent reduction
that would be achieved by each option.
Finally, we estimated costs and risk
reductions for each control option. A
summary of the options as presented in
the 2023 supplemental proposal is
included here for reference. Because we
proposed these standards under both
the technology review authority of CAA
section 112(d)(6) and the risk review
authority of CAA section 112(f)(2), we
estimated risk reductions associated
with each of the options consistent with
a CAA section 112(f)(2) ample margin of
safety analysis and our summary that
follows includes those results even
though the risk results would not
typically be part of the analysis to
support a CAA section 112(d)(6)
technology review. The summary of the
risk reductions presented are the
incremental changes attributed to the
control option after considering the
effects of the implementation of the
other risk-based standards in this
rulemaking (i.e., the process fugitive
roofline vent standards).
For Option 1, we estimated that the
control technology could achieve 95
percent emissions reduction which was
estimated to be 6.3 tpy metal HAP. The
emission limit for this option was 0.374
mg/dscm. The estimated costs were
$98.5 million capital costs, $25.2
million total annualized costs, and a
cost effectiveness of $4.0 million/ton
metal HAP. Risks would be reduced
below 1-in-1 million for an additional
1,900 people (the number of people
with risk greater than 1-in-1 million
would be reduced from 17,400 to
15,500). The maximum acute HQ due to
arsenic emissions would be reduced
from 2 to 1. The MIR at Freeport (20-in1 million) and for the source category
(60-in-1 million) would be unchanged
by this control option.
For Option 2, we estimated that the
control technology could achieve 90
percent reduction of the Hoboken
converter process fugitive capture
system emissions (or 68 percent
reduction of the aisle scrubber
emissions overall) which was estimated
to be 4.5 tpy metal HAP. The emission
limit for this option was 2.43 mg/dscm.
The estimated costs were $37 million
capital costs, $6.2 million total
annualized costs, and a cost
effectiveness of $1.38 million/ton metal
HAP. Risks would be reduced below 1in-1 million for an additional 700
people (the number of people with risk
greater than 1-in-1 million would be
reduced from 17,400 to 16,700). The
maximum acute HQ due to arsenic
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
emissions would be reduced from 2 to
1. The MIR at Freeport (20-in-1 million)
and for the source category (60-in-1
million) would be unchanged by this
control option.
The Agency also proposed, in the
2022 proposal, additional work
practices to reduce fugitive dust
emissions and development of a fugitive
dust control plan that must be reviewed,
updated (if necessary), and approved by
the Administrator or delegated
permitting authority. We proposed these
requirements in order to provide an
ample margin of safety under CAA
section 112(f)(2) and as a development
in practices pursuant to CAA section
112(d)(6).
With regard to the emission sources at
the area source primary copper smelting
facility, including sources of fugitive
dust emissions, the Agency did not
identify any developments in practices,
processes, or control technologies. For
more details, refer to the document
Technology Review for the Primary
Copper Smelting Source Category,
which is available in Docket ID No.
EPA–HQ–OAR–2020–0430.
2. How did the technology review
change for the Primary Copper Smelting
major source category?
Based on comments received during
the comment period for the 2023
supplemental proposal, as discussed in
more detail in section IV.B.3. of this
preamble, we revised our expected
emission reductions and control costs
for the aisle scrubber control options. A
detailed description of the emission
reduction estimates and cost estimates
associated with these options is
provided in the memorandum Cost
Estimates for Additional Controls of
Freeport’s Aisle Scrubber—REVISED,
which is available in the docket for this
rulemaking.
Specifically, for Option 1, we now
estimate the control efficiency as 73
percent and estimate emissions
reductions of 4.9 tpy metal HAP. We did
not amend our cost estimates for this
option from those presented in the 2023
supplemental proposal. So, combining
our revision to the estimated emission
reductions with the costs presented in
the 2023 supplemental proposal yields
a revised cost effectiveness value of $5.2
million/ton HAP metal. We received
additional information from Freeport
regarding the costs for site preparation
well after the close of the public
comment period in a letter dated
January 29, 2024, which is available in
the docket. In this letter, Freeport
estimated costs to demolish and relocate
part of the aisle scrubber motor control
center (MCC) room, a parking and
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
storage area, and part of the converter
maintenance building in order to install
a WESP. They estimated these site
preparation costs to be $9.2M in capital.
As noted above, we received this
information about four months after the
close of the comment period.
Furthermore, the letter did not provide
sufficient details to determine the
validity of the estimate. Therefore we
have not included it in our cost
estimates. However, we note that if we
did include these costs, the total capital
costs would be $108M, the annualized
costs would be $26M, and the cost
effectiveness would be slightly higher at
$5.4M/ton of HAP metal reduced.
For Option 2, we now estimate the
baghouse will achieve 61 percent
control efficiency of the Hoboken
converter process fugitive capture
system gas stream and estimate
emissions reductions of 3.0 tpy metal
HAP (which represents an overall
control efficiency of 46 percent for the
aisle scrubber). We also revised our cost
estimates for Option 2. The revised cost
estimates provide a total capital
investment of $59.5 million, total
annualized costs of $10.8 million and a
cost effectiveness of $3.6 million/ton
HAP metal. As noted above under
Option 1, we received additional
information from Freeport, well after the
close of the comment period, regarding
costs for site preparation in the area
where a baghouse would be installed.
They estimated it would cost $5.2M to
demolish and relocate the anode
baghouse MCC room, storage bunkers,
and demolition and rerouting of the
aisle scrubber piping that is currently
located in the area where they estimate
the baghouse would be installed. As
stated under Option 1, we have not
included this cost in our estimates
because we received this information
well after the close of the comment
period and we have insufficient details
to evaluate its validity. However, we
note that if we did include their
estimate for site preparation, the total
capital investment would increase to
$64.8M, with total annualized costs of
$11.5M and a slightly higher cost
effectiveness of $3.8M/ton HAP metal
reduced.
In addition, we received new
information regarding the Asarco
facility since publication of the 2023
supplemental proposal. Asarco is
located in the Hayden area of Gila and
Pinal Counties in Arizona and is the
primary source of lead emissions in this
area. As discussed in the 2022 proposed
rule, the Hayden area is currently
designated as nonattainment for the
2010, 1-hour primary SO2 NAAQS and
2008 lead NAAQS. There have been
PO 00000
Frm 00019
Fmt 4701
Sfmt 4700
41665
various regulatory actions to reduce
emissions in this area and at the Asarco
facility including, but not limited to, a
consent decree between EPA and Asarco
to bring the facility into compliance
with the NESHAP by December 2018
and revisions to the state
implementation plan (SIP) to help
achieve attainment of the lead NAAQS
by October 2019. However, effective
March 2, 2022, the EPA determined that
the Hayden lead nonattainment area
failed to attain the 2008 lead primary
and secondary lead NAAQS and the
2010 1-hour primary SO2 NAAQS (87
FR 4805, January 31, 2022) by the
applicable date of October 3, 2019. As
a result, the State of Arizona is required
to submit revisions of the SIP to EPA.
As part of this process, EPA Region 9
staff informed the EPA Office of Air
Quality Planning and Standards staff in
October 2023 of several projects that
Asarco has planned as part of the most
recent SIP revisions and that ADEQ has
adopted into Appendix A of Asarco’s
operating permit (October 3, 2023),
which is available in the docket for this
action. The projects include engineering
controls and work practices which
Asarco estimates will reduce fugitive
metal HAP emissions at the facility. The
projects that are in Asarco’s operating
permit include the following:
• Flash Furnace Control System: This
project involves installing and
ventilating a partial enclosure around
the Inco flash furnace uptake shaft to
improve the capture of process fugitives.
• Fuming Ladle Capture System: This
project involves the construction of a
hood and retaining walls to improve
capture of process fugitives from fuming
ladles.
• Anode Furnace Secondary Hood
Capture and Control System: This
project involves the construction of
secondary hoods to improve capture
and then ducts the emissions to a
planned new anode secondary hood
baghouse.
These projects will help ensure that
process fugitive metal HAP roofline
emissions would be reduced and will
ensure that the roofline emissions at
Asarco can meet a lead limit of 0.326 lb/
hour, which is based on modeling
demonstration submitted by the facility
to the state in support of a revision to
the lead SIP. We expect no additional
costs to comply with the lead limit other
than compliance testing costs. The lead
limit is further discussed in section
IV.C.2.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41666
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
3. What key comments did we receive
on the technology review, and what are
our responses?
Comment: Commenters objected to
the EPA’s change in position in the
supplemental proposal about using a
WESP to control aisle scrubber
emissions. The commenters stated that
the EPA rejected the technology in the
2022 proposal yet co-proposed it as an
option in the 2023 supplemental
proposal. Commenters stated that in the
2022 proposal, the EPA concluded with
regards to using a WESP to control aisle
scrubber emissions that ‘‘[g]iven the
relatively high estimated capital costs,
uncertainties, and moderate risk
reductions . . . the Agency is not
proposing these additional controls’’
under the ample margin of safety
analysis. Yet in the supplemental
proposal the EPA stated the ‘‘cost
impacts’’ of $4.0 million/ton metal HAP
for a WESP are ‘‘reasonable.’’ The
commenters point out the new cost
effectiveness in the supplemental is
more than 2 times the cost effectiveness
that the EPA considered excessive for a
WESP in the 2022 proposal, and that it
far exceeds the precedent set in the
recent Coke Oven proposed NESHAP
revisions, where the agency found that
$1.3 million/ton is the reasonable upper
threshold of cost effectiveness for
nonmercury metal HAP.
In addition to objecting to the EPA’s
change of position on using a WESP,
another commenter stated that the EPA
overestimated the achievable removal
efficiency for a WESP in the dilute, high
volume gas stream at the aisle scrubber.
The commenter asserted that the actual
removal efficiency would be 60 percent,
rather than the 95 percent estimated by
the EPA. The commenter performed
their own estimate of emission
reductions and cost and estimated a cost
effectiveness of $6.3 million/ton HAP
metal. Other commenters expressed
support for using a WESP to control
aisle scrubber emissions as it would
reduce metal emissions from the
converter department and the anode
refining department. The commenter
stated that while the EPA does not
express a preference for either the WESP
or baghouse option, the WESP-based
limit is consistent with the Clean Air
Act, while the baghouse-based limit is
not. Clean Air Act section 112(d)(2)
expressly provides that the EPA’s air
toxics standards must require the
‘‘maximum’’ reduction that is
‘‘achievable’’ considering cost and other
statutory factors. As such, both
proposed limits are achievable
considering cost and other statutory
factors, however, the ‘‘maximum’’
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
degree of reduction that is achievable is
the one provided by the WESP-based
limit. The commenter also noted the
WESP-based limit would yield
substantially greater reductions in metal
HAP emissions (6.3 tpy as opposed to
4.5 tpy from the baghouse-based limit)
and would reduce cancer risk below 1in-1 million for 1,900 people, whereas
the baghouse-based limit would reduce
cancer risk below 1-in-1 million for only
700 people. Another commenter added
that emissions from smelters are
virtually certain to increase in the future
as the demand for copper increases,
which means that the difference in
reductions in using a WESP versus a
baghouse will also increase. The
commenter stated that the cost
effectiveness ‘‘of the WESP option will
increase relative to the baghouse option,
therefore, the EPA should issue a strong
limit based on the reductions that are
achievable with a WESP.’’ Several
commenters stated that the San Carlos
Apache Tribe is directly impacted by
both major source smelters, and
emissions of lead and arsenic are of
particular concern due to their
persistent and bioaccumulative nature.
The same commenters stated their
support for the WESP option to achieve
maximum emission reductions. These
commenters also claimed that EPA
underestimated the emissions of lead
and other pollutants from the copper
smelters based on a comparison to
Toxics Release Inventory (TRI) data.
One commenter provided TRI estimates
for lead from the Freeport smelter,
stating ‘‘In 2020, for example, the
Freeport smelter alone reported emitting
more than 14 tons of lead. In 2019, it
reported emitting 21 tons of lead and, in
2018, it reported emitting more than 29
tons of lead . . .’’.
Response: In the 2022 proposal, we
stated that we were not proposing the
WESP control option at that time,
however we solicited comments
regarding our analysis and whether we
should establish more stringent
standards to reduce HAP metal
emissions from the aisle scrubber. We
also subsequently requested in a 2022
section 114 information request that the
Freeport facility perform feasibility
analyses for additional control of the
aisle scrubber. In response to the 2022
proposal, we received comment that we
should establish more stringent
standards to reduce HAP metal from the
aisle scrubber. Therefore, we used the
new information collected during the
comment period and from Freeport’s
response to the CAA section 114
information request to develop the
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
WESP and baghouse options presented
in the 2023 supplemental proposal.
Based on comments we received on
the 2023 supplemental proposal, we
also revised our emission reductions
estimates for the WESP. As described in
the 2023 supplemental proposal, the
expected control efficiency for the
WESP was 95 percent, however, we
acknowledge that a number of factors
can affect control efficiency, including
the particulate concentration of the inlet
stream to the control device. The aisle
scrubber handles a high volume of gas
(flowrate of approximately 1 million
actual cubic feet per minute) and low
particulate loading relative to the
flowrate. We agree with commenters
that the low concentration of particulate
in the exhaust stream of the aisle
scrubber, which would be the inlet to
the WESP, may present technical
feasibility issues in achieving a 95
percent reduction. Therefore, we
updated our estimates of emission
reductions. As detailed in the technical
memorandum Cost Estimates for
Additional Controls of Freeport’s Aisle
Scrubber—REVISED, which is available
in the docket for this rulemaking, we
back-calculated the control efficiency of
the WESP by assuming the aisle
scrubber exhaust particulate would be
reduced to 1 milligram per cubic meter
(mg/m3) by the WESP, which is an
assumed minimum outlet concentration
for this control technology. Based on
this back-calculation, the resulting
control efficiency of the WESP is 73
percent. Applying this revised control
efficiency to the baseline emissions for
the aisle scrubber (6.63 tpy metal HAP)
yields an estimated reduction of 4.9 tpy
metal HAP. We did not receive
information during the 2023
supplemental proposal comment period
on our total annualized costs for the
WESP option. Therefore, when we
combine the revised emission
reductions (4.9 tpy metal HAP) with the
total annualized costs ($25.2 million)
presented in the 2023 supplemental
proposal for the WESP option, the cost
effectiveness is $5.2 million/ton HAP
metal.
As described in this final rule
preamble, we have concluded that, after
taking public comment into
consideration and making the
appropriate revisions to our estimates,
the costs for Option 1 are not
reasonable. For this reason and others
discussed in this preamble, we are not
promulgating the WESP option.
In regard to comments on Tribal
impacts and their concerns about lead
and arsenic, the EPA recognizes the
concerns of Tribal commenters and their
representatives and we have taken their
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
comments into consideration in this
action. With regard to impacts, although
the EPA determined that risks due to
HAP emissions are unacceptable at
baseline for populations living close to
the Freeport facility, the EPA’s risk
assessment completed for this source
category indicates that health risks due
to HAP emissions from primary copper
smelting sources on Tribal lands, which
are further away (about 10 miles from
the facility) are well within
acceptability at baseline. After the
amendments in this final rule are
implemented, the NESHAP will provide
an ample margin of safety for all
populations, including the San Carlos
Apache Tribe. More information
regarding the estimated health risks due
to lead and arsenic emissions to humans
at baseline (due to current emissions)
and post-control (due to emissions after
the amendments in this action are
implemented) are described in sections
III.A. and IV.A. of this preamble, and
the estimated impacts to various
demographic groups are described in
section V.F. of this preamble. More
details of the risk assessment are
available in the document titled
Residual Risk Assessment for the
Primary Copper Smelting Major Source
Category in Support of the 2021 Risk
and Technology Review Proposed Rule,
which is available in the docket.
Regarding the comments supporting
the addition of WESP to control HAP
metal emissions, for the reasons
described elsewhere in this preamble,
we are not promulgating the WESP
option and are promulgating the
baghouse option for the aisle scrubber.
We estimate that the amendments in the
final rule will reduce total metal HAP
emissions (primarily lead and arsenic)
by 8 tpy for the major source category.
Regarding the TRI emissions estimates
provided by the commenter compared
to our estimates, we estimate that the
two major source facilities currently
emit a total of 16.7 tpy of metal HAP
(the majority of these emissions are from
Freeport). We estimated these emissions
primarily using test data provided by
the facility for the sources subject to the
Primary Copper Smelting major source
NESHAP. The TRI is a ‘‘whole facility’’
inventory, which means that it includes
estimates of stack and fugitive air
emissions for all HAPs that are emitted
at the facility which also include
emissions from non-source category
processes. Our emission estimates
include those applicable to the primary
copper smelting source category only.
However, as noted in previous
paragraph, this final rule will achieve an
estimated reduction of 8 tpy of HAP
metals, therefore after these
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
amendments to the NESHAP are
implemented, total estimated emissions
will be about 8.7 tpy for the major
source category.
Comment: Commenters stated that the
EPA erroneously describes their
facility’s converters as having ‘‘primary
and secondary capture systems and
controls, but no tertiary controls.’’
According to the commenter, Hoboken
converters use a side-flue intake capture
system, and the roofline canopy system
(installed in 2017 as part of facility-wide
improvements to ensure the Miami
area’s compliance with revised
standards for SO2) is properly described
as a tertiary capture system. Therefore,
the commenter noted that the proposed
standards would not appropriately
apply to the converters at their facility
as they do not have ‘‘secondary capture
systems.’’
Response: We have corrected the
characterization of the capture and
control systems for converters at the
Freeport facility in the preamble and
regulatory text associated with the final
rule.
Comment: Several commenters
asserted that the aisle scrubber
standards are not justified pursuant to
section 112(d)(6). The commenters
argued that the EPA has not identified
any ‘‘developments in practice,
processes or control technologies’’ since
the original publication of the Primary
Copper Smelting NESHAP that would
justify additional controls on the aisle
scrubber. Commenters noted that the
EPA cites section 112(d)(6) to claim that
‘‘developments’’ warrant the imposition
of new controls, but the EPA fails to
recognize that section 112(d)(6) only
authorizes revisions that are
‘‘necessary.’’ The commenter asserted
the word ‘‘necessary’’ cannot be
ignored, and that it clearly requires
some showing of necessity beyond the
identification of ‘‘developments’’
because the mere existence of a
development does not make it
‘‘necessary.’’ According to commenters,
the fact that the term ‘‘developments’’ is
found only in a parenthetical confirms
it is merely one component of the
analysis that ultimately must conclude
a revision to a standard is ‘‘necessary,’’
a showing that the EPA has not made
here.
Response: We disagree that, in this
case, additional controls to reduce
emissions at the aisle scrubber are not
necessary. The aisle scrubber stack was
identified in the 2022 proposal as one
of the largest sources of metal HAP
emissions at Freeport. We currently
estimate it emits 6.63 tpy of HAP metals
(primarily lead and arsenic). The aisle
scrubber is a control device that is
PO 00000
Frm 00021
Fmt 4701
Sfmt 4700
41667
mainly used to control SO2 emissions.
This device controls emissions from the
anode refining point source and
emissions from the Hoboken converter
process fugitive capture system. The
anode refining point source gas stream
passes through a PM control device (i.e.,
a baghouse) before entering the aisle
scrubber for SO2 control, but the
converter process fugitive capture
system is ducted directly to the aisle
scrubber without PM control prior to the
aisle scrubber. We identified and
proposed in the 2023 supplemental
proposal 2 options to reduce metal HAP
emissions from the aisle scrubber stack
at Freeport. Our analysis shows that the
technologies to reduce metal HAP
emissions at the aisle scrubber
identified in the 2023 supplemental
proposal are readily available and
already in use at primary copper
smelting facilities (including Freeport)
as well as in use at facilities in other
source categories. This is especially true
for baghouses. Regarding the WESP,
although this technology has been
applied at some emissions points at
these facilities and other metals sectors
(e.g., Secondary Lead Smelters), we are
not aware of the WESP being
successfully applied to emissions
sources similar to the aisle scrubber.
Specifically, the aisle scrubber has a
very high flow rate and low
concentration of PM compared to other
point source emissions sources where
the WESP has been applied.
Another factor we considered in our
decision is that the Asarco facility has
a secondary hood capture system to
collect secondary emissions from their
Peirce-Smith converters and that
secondary hood capture system is
vented to a baghouse for PM control
(which also controls metal HAP
emissions). We find these PM controls
are especially important for lead and
arsenic because these two pollutants are
persistent, bioaccumulative and highly
toxic HAPs.
Given all of this information, we
conclude that additional PM controls
are necessary to further reduce metal
HAP at the aisle scrubber source, and
that the baghouse technology that we
proposed in the 2023 supplemental
proposal (i.e., Option 2 in the
supplemental proposed rule) represents
a development that will further reduce
metal HAP emissions at Freeport. The
baghouse is a common, well
demonstrated technology used to
control PM emissions from various
industrial emissions sources.
Comment: One commenter was
supportive of the baghouse option
despite expressing a preference for the
WESP option.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41668
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Other commenters were opposed to
the baghouse option. These commenters
noted that the cost effectiveness of this
option exceeds the threshold for cost
effectiveness for nonmercury metal HAP
despite being underestimated.
Commenters stated that the EPA
overstated emission reductions and
underestimated costs by about a factor
of 2.
Commenters asserted that the EPA
overstated the emission reductions from
this option. One commenter explained
that due to the high volume of the
exhaust stream and the low particulate
concentration in the exhaust stream
(estimated to be on the order of 0.001 gr/
ft3), control efficiency is expected to be
closer to 50 percent, rather than the 90
percent used by the EPA. The
commenter explained this is because
they are not aware of any vendor
guarantee of a minimum exhaust
concentration of 0.0001 gr/ft3 which
would be required to achieve 90 percent
control.
Commenters provided their own
estimate of the baghouse costs of $70–
88 million and noted that the
discrepancy between their estimate and
the EPA’s estimate in the supplemental
proposal (which differed by about a
factor of 2) can be attributed to: under
sizing and, thus, underestimating costs
for ductwork; using a shaker instead of
more modern pulse jet style baghouse;
using too small of a scaling factor to size
the baghouse; underestimating the cost
of the lime injection system; omitting
indirect costs (e.g., freight, spare parts,
engineering procurement and
construction management services,
equipment rental); and omitting
contingency which the commenter
included at a value of 25 percent. Using
their own emission reduction estimates
of 2.5 tpy HAP metal and total
annualized cost estimates ranging from
$12.7M to $14.5M (with 25 percent
contingency included), commenters
estimated the cost effectiveness value
for this option as being between $4.8 to
$5.8 million/ton HAP.
Response: As described in the
previous comment response, we
conclude that additional PM controls
are necessary to further reduce metal
HAP at the aisle scrubber source, and
that the baghouse technology represents
a development that will further reduce
metal HAP emissions at Freeport. To
inform our decision under the
technology review, we evaluated the
types of technology used in the industry
and other source categories. We found
that baghouse technology is readily
available, feasible, well demonstrated
and is being used to control a similar
source at the other major source primary
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
copper smelter in this source category.
However, we have revised our emission
reductions estimates and our cost
estimates for this option after
considering the comments.
As described in the 2023
supplemental proposal, for a baghouse
we generally expect achievable control
efficiencies to be at least 90 percent. We
acknowledge that a number of factors
can affect the control efficiency,
including the particulate concentration
of the inlet stream to the control device.
Based on the engineering evaluation
provided by Freeport in their 2022
section 114 information collection
request response, the Hoboken converter
process fugitive capture system has a
high flowrate and low particulate
loading relative to the flowrate. We
agree with commenters that the
expected concentration of particulate in
the inlet stream may present technical
feasibility issues achieving a 90 percent
reduction. Therefore, we updated our
estimates of emission reductions.
First, we note that through CAA
section 114 information requests for
other EPA rules (e.g., electric arc
furnaces (EAF), foundries), we have
collected data demonstrating that
baghouses achieve average particulate
outlet concentrations below 0.001 grains
per dry standard cubic feet (gr/dscf). We
found that baghouses with similar
flowrates to those expected for the
Hoboken process fugitive capture
system in the EAF source category
achieve, on average, outlet
concentrations of filterable particulate
of 0.0006 gr/dscf with a range of 0.0001
to 0.0017 gr/dscf. For foundries, there
were 2 facilities that were used to set
the new source standard which had
average PM emissions of 0.0002 gr/dscf
and a high value of 0.0004 gr/dscf. The
other had an average of 0.0008 gr/dscf
and a high value of 0.00086 gr/dscf.
Considering this information and the
information provided in Freeport’s
engineering evaluation for the Hoboken
converter process fugitive capture
system, we back-calculated the control
efficiency of the baghouse assuming that
the Hoboken converter process fugitive
capture system particulate would be
reduced to 0.0005 gr/dscf which is an
assumed achievable outlet
concentration for this control option
when estimating the control efficiency.
The expected baghouse flowrate was
taken from the Freeport engineering
analysis, and the particulate loading
was assumed to be 75 percent of the
aisle scrubber outlet. The resulting
control efficiency is 61 percent.
Applying this revised control efficiency
to the baseline emissions for the
Hoboken converter process fugitive
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
capture system (assumed to be 75
percent of the aisle scrubber or 4.97 tpy
metal HAP) yields an estimated
reduction of 3.0 tpy metal HAP. The
expected reduction is 46 percent of the
aisle scrubber emissions overall, after
the Hoboken converter process fugitive
capture system baghouse stream
combines with the controlled anode
refining department stream in the aisle
scrubber.
Next, concerning costs, we have
updated our cost estimates after
considering the comments. We revised
the estimated costs for total capital
investment to include those costs
provided by the commenter for
equipment supply. We utilized the EPA
cost control manual to estimate all
indirect costs including contingency in
accordance with section 6, Chapter 1—
Baghouses and Filters. The revised cost
estimates provide a total capital
investment of $59.5 million and total
annualized costs of $10.8 million. Using
our emission reduction estimate and the
total annualized cost estimate, the cost
effectiveness is $3.6 million/ton metal
HAP reduced.
While this cost effectiveness is higher
than we have accepted in the past for
reducing metal HAP in some standards,
there are other relevant factors that EPA
can consider, and has considered. The
highest cost effectiveness accepted in
the past was $1.5M/ton of metal HAP in
2009 dollars (which is about $2M/ton of
metal HAP in 2022 dollars) in the
Secondary Lead Smelting NESHAP (77
FR 556, January 5, 2012). However, it is
important to note that EPA considers
other factors besides cost-effectiveness
when considering requirements under
the technology reviews, such as
feasibility of controls, how well certain
controls have been demonstrated, and
overall economic impacts. In this case,
as described previously in this section,
we determined that baghouse
technology is readily available, feasible,
well demonstrated and is being used to
control a similar source at the other
major source primary copper smelter in
this source category. Furthermore, in
this specific case, we have collectively
considered the significant emission
reductions of persistent,
bioaccumulative, and toxic (PBT) HAPs
(primarily lead and arsenic, which are
both PBT HAPs), non-air environmental
impacts, feasibility concerns, and the
costs of each of the options. We note
that lead and arsenic are known
developmental toxicants that can cause
particular harm to infants, children, and
the developing fetus. Furthermore,
arsenic is classified as a human
carcinogen by the EPA and the World
Health Organization. In addition, we do
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
not expect that the overall economic
impacts of this rule will lead to
significant changes in domestic copper
production; the market price for
commercial grade copper or any
products comprised of copper inputs; or
employment, as described in section
V.D. of this preamble. This rationale and
these considerations are discussed in
more detail in section IV.B.4. of this
preamble.
The details of our emission reduction
estimates and cost estimates have been
provided in the technical memorandum
Cost Estimates for Additional Controls
of Freeport’s Aisle Scrubber—REVISED,
which is available in the docket for this
rulemaking.
4. What is the rationale for our final
approach for the technology review?
As noted in section IV.A. of this
preamble, we updated our risk modeling
based on the revisions to the expected
emission reductions for each of the
options proposed in the 2023
supplemental proposal. We conclude
that, in this case, the risk reductions
achieved are not sufficient to
promulgate this standard (i.e., the PM
limit for the Aisle scrubber described
previously in this section) pursuant to
CAA section 112(f); however, we
continue to maintain that baghouses are
proven technologies for achieving high
degrees of particulate control. We also
find that additional controls on similar
exhaust streams are used in the source
category. As discussed in section IV.B.3.
of this preamble, the aisle scrubber stack
is one of the largest sources of metal
HAP emissions at Freeport. We estimate
it emits 6.63 tpy of HAP metals
(primarily lead and arsenic). The aisle
scrubber is a control device that is
mainly used to control SO2 emissions
from the anode refining point source
and from the Hoboken converter process
fugitive capture system. While the
anode refining point source gases are
vented to a PM control device before
entering the aisle scrubber, the gas
stream from the Hoboken converter
process fugitive capture system vents
directly to the aisle scrubber without
prior PM control. We conclude that
further reduction of metal HAP
emissions from the aisle scrubber are
necessary and that there are
developments in practices, processes, or
control technologies that will achieve
further reductions of metal HAP
emissions at Freeport. The PM controls
on this source are especially important
for reducing lead and arsenic because
these two pollutants are PBT HAPs.
To inform our decision under the
technology review, we evaluated the
types of technology used in the industry
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
and in other source categories to control
PM emissions. As discussed in this
preamble, we proposed two options in
the 2023 supplemental proposal: Option
1 evaluated a tighter PM limit based on
the application of a WESP downstream
of the aisle scrubber and Option 2
evaluated a tighter PM limit based on
using baghouse technology upstream of
the aisle scrubber. We next analyzed the
technical feasibility, estimated costs,
and non-air environmental impacts for
each option. As described in section
IV.B.3. of this preamble, we are not
aware of a WESP (Option 1) being
successfully applied to emissions
sources similar to the aisle scrubber,
which has a very high flow rate and low
concentration of PM compared to other
point source emissions sources where
the WESP has been applied. As
described previously in this preamble,
we determined that baghouse
technology (Option 2) is readily
available, feasible, and is being used to
control a similar source at the other
major source copper smelter in this
source category.
With regard to feasibility, the Freeport
facility property does not extend far
beyond its core manufacturing
operations and is bordered on one side
by a railroad track; therefore, space to
install large equipment such as that
required in either option is limited. In
their feasibility analysis for these
control options, Freeport explained that
Option 1 requires a larger footprint than
Option 2. We also considered the
secondary impacts of the two control
options and found that Option 1 would
require the use of significant amounts of
water, which is of particular concern
because the facility is located in an arid
climate where water resources are
limited.
As is permitted under CAA section
112(d)(6), we also considered the costs
of each option. The cost estimates for
the WESP option include a total capital
investment of $98.5M and total
annualized costs of $25.2M. With an
estimated reduction of 4.9 tpy of total
metal HAP emissions, we estimate the
cost effectiveness of installing a WESP
is $5.2M/ton of HAP metal reduced. We
have updated our cost and emission
reduction estimates for the baghouse
option after considering the comments
as described in section IV.B.3. The
revised cost estimates include a total
capital investment of $59.5 million and
total annualized costs of $10.8 million.
Using our emission reduction estimate
of 3.0 tpy and the total annualized cost
estimate, the cost effectiveness is $3.6
million/ton metal HAP reduced for the
baghouse option (Option 2).
PO 00000
Frm 00023
Fmt 4701
Sfmt 4700
41669
In collectively considering the
emission reductions, secondary impacts,
feasibility concerns, and the costs of
each of the options, we find that Option
2 provides sizeable reductions of HAP
metals, including two highly toxic
persistent bioaccumulative HAPs (i.e.,
lead and arsenic) at reasonable costs
while minimizing secondary impacts
and feasibility concerns. Therefore,
taking into consideration the comments
and other information and data as well
as the other factors discussed in this
preamble, we are promulgating a PM
standard of 4.1 mg/dscm for the
combined emissions stream from the
Hoboken converter process fugitive
capture system and the anode refining
department (i.e., the aisle scrubber)
pursuant to CAA section 112(d)(6). We
estimate this will reduce HAP metal
emissions by 3.0 tpy.
A detailed description on the
development of this emission standard
is provided in the memorandum Final
Emission Standard Development for the
Aisle Scrubber, which is available in the
docket for this rulemaking.
In the 2022 proposal, additional work
practice standards to minimize fugitive
dust and development of a fugitive dust
control plan that must be reviewed,
updated (if necessary), and approved by
the Administrator or delegated
permitting authority were proposed.
These standards were proposed in order
to provide an ample margin of safety to
protect public health and pursuant to
CAA section 112(d)(6). In this specific
case, for the Primary Copper Smelting
source category, we have decided to
promulgate the additional work
practices to minimize fugitive dust and
the development of a fugitive dust
control plan under only the technology
review. The work practices and dust
plan requirements are the same as
proposed in the 2022 proposal. The
fugitive dust plan and work practices
are appropriate under CAA section
112(d)(6) because they are practices that
will ensure emissions will be
minimized. It is our understanding that
the facilities are already doing these
types of practices so, although these
measures are anticipated to further
address fugitive emissions and advance
the goal of minimizing HAP metal
emissions, we are unable to quantify
and assure significant enough
reductions in actual emissions that
would significantly reduce health risk;
therefore, we are not promulgating
under CAA 112(f) in this particular case.
We expect that since facilities are
already implementing most of the
additional work practices as part of
requirements in the facility’s operating
permit or to comply with consent
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41670
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
decree, there will be minimal additional
costs to comply with the final rule work
practices and fugitive dust plan
requirements. The only additional costs
would be a slight increase related to
recordkeeping and reporting
requirements. For details on the work
practices see the 2022 proposal
preamble (87 FR 1616).
As noted in section IV.A.3., one of the
commenters took issue with the aisle
scrubber standard being applied only to
the Freeport facility when their postroofline control MIR is 20-in-1 million.
They stated that roofline controls to
achieve acceptable risk leave the MIR
for the other major source copper
smelter (Asarco) ‘‘untouched’’ at 60-in1 million, asserting this is ‘‘unfair,
arbitrary and capricious, and
unsupported by the record.’’ After
considering this comment, our prior
proposals, and the information in the
record, we evaluated options under
CAA section 112(d)(6) and 112(d)(2) and
(3) to reduce process fugitive emissions
from Asarco. In the 2022 proposal, we
solicited comment on a BTF limit to
control process fugitives from the flash
furnace roofline vent to reduce risk at
Asarco. We estimated that to comply
with a BTF limit, the facility would
need to install improved capture and
control of the flash furnaces as well as
the large ladle containing hot liquid
matte from the flash furnace taping/
pouring operations, called the fuming
ladle. In our cost estimates, we assumed
a new baghouse would be needed as
well as a roofline ventilation capture
system. We did not receive comments
on this specific BTF standard or our cost
estimation. However, as noted above in
this paragraph, we did receive the
general comment that said our proposal
would do nothing to reduce the MIR of
60-in-1 million at Asarco.
Nevertheless, as described in section
IV.B.2., we received new information
regarding developments in technology
(3 projects to reduce process fugitive
emissions from roof vents) currently
planned for the Asarco facility (and
have been incorporated into their state
permit and draft SIP), which are
estimated to achieve a 30 percent
reduction in process fugitive metal HAP
emissions from the roofline vents. We
have reviewed this information and
agree that these developments will
reduce fugitive metal HAP emissions.
We estimate, based on the roofline vent
metal HAP emissions estimates we had
for the 2022 proposal and applying a 30
percent reduction, that the total process
fugitive metal HAP emissions (including
lead and arsenic, which are persistent,
bioaccumulative HAPs) from the
roofline will be reduced by 0.39 tpy.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
These estimates are available in the
docket for this action (see memorandum
Cost Estimates for Enhanced Capture
and Control of Process Fugitive
Emissions at Asarco). We expect that
the reductions in process fugitive metal
HAP emissions will also reduce risk;
however, we have not yet quantified
this risk reduction because the facility is
not currently operating and their future
operational emission profile may be
different than what we have modeled in
support of the 2022 proposed rule.
Furthermore, we received this
information regarding the three projects
well after the end of the comment
period and therefore we did not have
sufficient time to remodel and calculate
the risk reductions that will be
achieved.
With regard to cost impacts, we
estimate that for the facility to comply
with these design standards (and
comply with the lead limit, promulgated
under CAA section 112(d)(2) and (3),
which is discussed in section IV.C.2. of
this preamble), the facility will need to
install improved capture and control
consistent with what is expected under
the state permit and SIP. As mentioned
in section IV.B. of this preamble, the
improvements needed to comply with
the design standards and emissions
limit are already adopted into the
facility’s operating permit and therefore
costs impacts are already expected
regardless of the requirements we are
including in this final rule. However,
since the facility has not yet begun
construction for these improvements,
we estimated costs for these projects as
part of this action. We estimate that the
total costs for complying with the
design standards and lead emission
limit are $15.4M in capital costs and
$3.9M in annualized costs. Asarco
provided estimated costs for these
projects in a letter provided on February
26, 2024, which is available in the
docket for this action. They estimate
total capital costs of $22.4M and $5.8M
in annualized costs for all three projects.
Given the late submittal and the courtordered promulgation deadline of May
2, 2024, we did not have sufficient time
to review these estimates and determine
their validity. However, we note again
that the projects are already
requirements in their operating permit
and the facility is already expecting to
incur these costs unrelated to the
NESHAP. More details on the estimated
costs are found in the memorandum
Cost Estimates for Enhanced Capture
and Control of Process Fugitive
Emissions at Asarco, which is available
in the docket for this action. To achieve
reduction of HAP metals at Asarco, we
PO 00000
Frm 00024
Fmt 4701
Sfmt 4700
are finalizing design standards
consistent with their 2023 operating
permit which include improved capture
and control of the Peirce-Smith flash
furnaces, fuming ladles, and anode
furnaces.
C. CAA Sections 112(d)(2) and (3)
Revisions for the Primary Copper
Smelting Source Category
1. Anode Refining Point Source
Emissions
a. What did we propose for the anode
refining point source pursuant to CAA
section 112(d)(2) and (d)(3)?
We proposed a MACT floor PM limit
as a surrogate for metal HAP in 40 CFR
63.1444(i) (finalized at 40 CFR
63.1444(f)) for new and existing anode
refining departments in the 2022
proposal. The MACT floor emissions
standard for new and existing sources,
5.78 mg/dscm, was developed based on
the 99 percent UPL for PM emissions
from the available emissions data
(which was from Asarco) and represents
the MACT floor level of control. We
considered beyond-the-floor options for
the standard, but we did not identify
any feasible, cost-effective beyond-thefloor options. It should be noted that at
the Freeport facility, the anode refining
department gas stream and the Hoboken
converter process fugitive capture
system exhaust stream are both routed
to and combined in the aisle scrubber
from which they are emitted to the
atmosphere. The facility conducts
performance tests after the anode
refining department stream is combined
with the Hoboken converter process
fugitive capture system exhaust stream
(i.e., at the aisle scrubber outlet).
Therefore, the EPA also proposed
amendments to the existing alternative
emission limit in 40 CFR 63.1446 to
include the anode refining department
stream, as we expected Freeport would
be able to use this option to demonstrate
compliance with the anode refining
department emission limit at the aisle
scrubber outlet. Lastly, we proposed in
40 CFR 63.1451(a) and 63.1453(a),
respectively, that compliance with the
PM emissions limit for the anode
refining department will be
demonstrated through an initial
performance test followed by a
compliance test at least once per year.
b. How did the anode refining point
source revisions made pursuant to CAA
section 112(d)(2) and (3) change since
proposal?
There are no changes to the emission
standard for the anode refining point
source since the proposals, except that
we rounded the 5.78 mg/dscm to 2
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
significant figures (i.e., 5.8 mg/dscm).
We are promulgating the MACT floorbased PM emission standard of 5.8 mg/
dscm for the anode refining department
point source emissions (i.e., emissions
exiting the anode baghouse) and related
compliance requirements, as proposed
in the 2022 proposal. However, because
Freeport combines their anode refining
point source emissions with the fugitive
capture system from the Hoboken
converters, we are also finalizing, as
proposed, to include the anode refining
department point source emissions as
an emission source to be included in the
alternative emission limit calculation
for the combined stream.
Additionally, in the final rule based
on comments, we are also providing that
facilities that combine the anode
refining department and Hoboken
converter process fugitive capture
system streams must comply with the
combined stream PM limit of 4.1 mg/
dscm and related compliance
requirements to demonstrate
compliance with the anode refining
department emission standard and
related compliance requirements. As
discussed in section IV.B. of this
preamble and pursuant to CAA section
112 (d)(6), we are finalizing a PM
emission standard of 4.1 mg/dscm for
the combined stream of the anode
refining department and Hoboken
converter process fugitive capture
system and an annual compliance
testing requirement.
c. What key comments did we receive
on the proposed anode refining point
source revisions made pursuant to CAA
section 112(d)(2) and (3) and what are
our responses?
Comment: One commenter stated that
the EPA should set the PM MACT floor
based on a concentration limit of 23 mg/
dscm, which is an existing technologybased limit for similar emission points
in the current NESHAP rather than the
99 percent UPL emission standard
developed using only data from Asarco.
The commenter explained that this limit
should be applied at their aisle scrubber
stack, which is the emission point for
emissions from their Hoboken converter
process fugitive capture system and
their anode refining department, thus
each affected source would be subject to
the same 23 mg/dscm limit. The
commenter added that the EPA does not
have sufficient data to set a mass rate for
the anode refining department MACT
floor since the only data used to set the
limit are from Asarco, which does not
reflect the operating performance of
their anode refining department and
does not reflect the best 5 sources as is
required by the EPA’s procedure for
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
source categories with less than 30
sources. The commenter explained that
they cannot provide performance tests
of their anode refining department
emissions using EPA methods because
of the duct configuration of the
baghouse controlling these emissions.
However, in their comment letter they
submitted an engineering evaluation
which characterized the flowrate and
particulate emissions for the anode
refining department’s baghouse. The
engineering evaluation was not
conducted following EPA methods. The
commenter used the data from the
engineering evaluation with the data the
EPA used in the development of the 99
percent UPL (i.e., Asarco’s data) to
estimate a revised MACT standard, 7.3
mg/dscm. The commenter stated that
the purpose of the recalculation of the
MACT standard was to demonstrate
their argument that more data collection
is necessary to support the development
of a representative MACT standard for
the anode refining department.
Response: First, as described in the
preamble of the 2022 proposal, the
emission standard for the anode refining
point source was proposed pursuant to
CAA section 112(d)(2) and (3). This
standard is not being proposed pursuant
to CAA section 112(d)(6). The 1998
proposal for primary copper smelting
identified the anode refining
department in the definition of primary
copper smelters; however, the EPA did
not have sufficient data at the time to set
a standard for this emission source. In
contrast, in the 2007 area source
NESHAP for primary copper smelting,
data were available to set an emissions
standard for the anode refining
department. With the recently acquired
Asarco data, we now have sufficient
data to develop a MACT floor emission
standard for the anode refining point
source at major sources. The Asarco
data includes 9 data points, which
exceeds the minimum sample size of 3
data points necessary to develop a
MACT floor. Therefore, we disagree that
we have insufficient data to develop the
emission standard. We also do not find
the data included in Freeport’s
engineering evaluation appropriate to
include in the MACT floor dataset since
these data were not collected following
EPA methods. In regard to the comment
that the MACT floor limit does not
reflect the best 5 sources, there are only
two major sources in this category, and
as stated, only one of these major
sources had valid data from an anode
refining department. We used all
available valid data from the best
performing sources for which the EPA
could reasonably obtain emissions
PO 00000
Frm 00025
Fmt 4701
Sfmt 4700
41671
information in the category, which is in
accordance with CAA section 112
(d)(3)(B).
Comment: One commenter explained
that the configuration of their anode
refining department baghouse makes the
proposed test methods infeasible. The
commenter stated that the anode
refining department exhaust at their
facility is controlled by a baghouse,
which is ducted to the aisle scrubber
where it combines with exhaust from
the facility’s Hoboken converter process
fugitive capture system. The point of
emission for their anode refining
department exhaust is the outlet of the
aisle scrubber. The commenter stated
implementing the alternative emission
limit option to comply with the anode
refining limit (as proposed by the EPA)
is not feasible due to the inability to
measure flowrate using EPA Method 1
in the duct between the baghouse outlet
and aisle scrubber inlet. The commenter
explained the ductwork does not have
enough straight passes to measure
flowrate according to EPA Method 1.
Response: Based on reviewing
information submitted by the
commenter and observations made by
the EPA during a November 7, 2023, site
visit to the facility, the EPA agrees that
there is currently no viable testing
location for flowrates using EPA Method
1 from the anode refining department
baghouse to the aisle scrubber. In light
of this new information, we agree that
the use of the alternative emission limit
is not an option for demonstrating
compliance with the anode refining
department for this facility. However,
this alternative emission limit
procedure may be appropriate at a new
facility; thus, we are finalizing the
proposed amendment to add the anode
refining department to the list of
emission sources which could be
included in the emission alternative
limit calculation option. However, as
discussed elsewhere, we are
promulgating a limit for the combined
stream of the anode refining department
and Hoboken converter process fugitive
capture system (i.e., the Freeport aisle
scrubber). Based on the data provided
by the Freeport facility in their section
114 information request response, an
estimated 75 percent of the particulate
emissions emitted from the aisle
scrubber are from the Hoboken
converter process fugitive capture
system while the remaining 25 percent
are from the anode refining baghouse.
The emission standard for the combined
stream of the anode refining department
and Hoboken converter process fugitive
capture system based on 61 percent
control of the emissions by a baghouse
controlling the emissions from the
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41672
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Hoboken converter process fugitive
capture system is 4.1 mg/dscm. The
emission standard for the combined
stream of the anode refining department
and Hoboken converter process fugitive
capture system is more stringent than
the anode refining department emission
standard alone (5.8 mg/dscm).
Therefore, we are finalizing that
compliance with the emission standard
for the combined stream of the anode
refining department and Hoboken
converter process fugitive capture
system demonstrates compliance with
the anode refining department emission
standard.
Comment: One commenter stated that
in the 2022 proposal the EPA proposed
a new MACT floor limit for the anode
refining department. The commenter
requested clarification if the PM limits
for the aisle scrubber in the 2023
supplemental proposal replace the
anode refining department limit in the
2022 proposal (because their anode
refining department baghouse vents to
the aisle scrubber), or if the EPA intends
to retain the separate anode baghouse
requirement.
Response: As described in section
IV.B. of this preamble, we are
promulgating a particulate emission
limit for the combined stream of the
anode refining department and the
Hoboken converter process fugitive
capture system (i.e., aisle scrubber) as
proposed in the 2023 supplemental
proposal, as well as an independent
anode refining department emission
limit as proposed in the 2022 proposal.
Compliance with the anode refining
department emission limit will be
demonstrated by complying with the
appropriate limit, i.e., if there is a
combined emission stream then the
affected source will comply with the
combined emission standard, or if the
anode refining department is
independent (i.e., not combined with
other emission streams), then the
affected source will comply with the
independent limit for anode refining
department.
in the major source NESHAP. The 2007
area source NESHAP includes emission
standards for anode refining operations
at area sources. Therefore, in the 2022
proposal, we concluded that anode
refining is part of the source category
and emits HAP emissions. In the 2022
proposal, we considered a BTF option,
but did not consider going BTF in this
case due to cost effectiveness. Pursuant
to section 112(d)(2) and (3), we are
finalizing, as proposed in the 2022
proposal, a MACT floor PM limit of 5.8
mg/dscm as a surrogate for metal HAP
for new and existing anode refining
departments. We are finalizing, as
proposed, that compliance with the PM
emissions limit for the anode refining
department will be demonstrated
through an initial performance test
followed by a compliance test at least
once per year. We are also finalizing to
include the anode refining department
as an emission source to be included in
the alternative emission limit
calculation for new facilities.
Based on the comments received on
the 2022 proposal and the 2023
supplemental proposal and on
information collected during a
November 7, 2023, site visit to the
Freeport facility, we are promulgating
that compliance with the combined
emission standard of 4.1 mg/dscm, for
the combination of anode refining
department emissions and Hoboken
converter process fugitive capture
system emissions (being promulgated
under CAA section 112(d)(6) as
described in section IV.B. of this
preamble) will demonstrate compliance
with the anode refining MACT floor PM
limit. Under section 112(d)(6), we are
finalizing initial and continuous
compliance requirements for the
combined emission standard including
initial and subsequent annual
performance testing. The combined
standard and associated compliance
requirements will ensure that affected
sources can demonstrate compliance
with the rule requirements.
d. What is the rationale for our final
approach and final decisions for the
anode refining point source revisions
made pursuant to CAA section 112(d)(2)
and (3)?
As discussed in the 2022 proposal
preamble, the 1998 proposal for primary
copper smelting major sources
identified anode refining in the
definition of primary copper smelters.
However, at that time, the EPA did not
have sufficient data to set an emission
limit for anode refining, and therefore
did not propose specific emission
standards for anode refining operations
2. Process Fugitive Emissions From
Roofline Vents
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
a. What did we propose for process
fugitive emissions from roofline vents
pursuant to CAA section 112(d)(2) and
(d)(3)?
As noted previously in the preamble
for this final rule, the standards and
associated compliance requirements for
the process fugitive emissions from
roofline vents source are being finalized
pursuant CAA section 112(f)(2) to
address unacceptable risk for the source
category as well as pursuant to CAA
section 112(d)(2) and (3). As proposed
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
in the 2022 proposal and the 2023
supplemental proposal, we are
promulgating the same emission
standard to reduce risk to a level that
would be considered acceptable and to
satisfy the requirements of CAA section
112(d)(2) and (3). As discussed in the
context of risk in section IV.A. of the
preamble for this final rule, we
proposed emission standards for the
process fugitive emissions from roofline
vents. In the 2022 proposal, we
proposed separate standards for each
roofline vent (i.e., smelting vessels,
copper converter department, and anode
refining department) based on emissions
data received from the Freeport facility.
We performed a BTF analysis for
additional controls of each roofline vent
and concluded in the 2022 proposal that
a BTF standard was appropriate for the
anode refining process fugitive roofline
vent while MACT floor standards were
appropriate for the smelting and copper
converter roofline vents.
During the comment period for the
2022 proposal, we received additional
test data of the roofline vents from the
Freeport facility. We received comments
from both facilities in the major source
category requesting that the roofline
vent be a combined limit because there
is comingling of emissions in the
building where the processes are
located. We received significant
comment regarding the proposed test
methods for demonstrating compliance
with the roofline vent emission
standards. We also received comments
on our cost estimates for the BTF
control option of the anode refining
roofline vent.
In the 2023 supplemental proposal,
we proposed a combined limit. The
combined limit was calculated using the
99 percent UPL methodology.
Specifically, for calculating the
combined emission limit, we first
determined the 99 percent UPL of the
combined emission rates based on all
test data now available for filterable PM.
We then determined the average fraction
of emissions which are attributable to
the anode refining roof vent (72
percent). Then we adjusted the anode
refining roof vent’s portion of the 99
percent UPL by reducing that portion of
the value by 90 percent. We also
adjusted our costs in response to public
comments on the proposed option to
reflect the design requirements at the
Freeport facility primarily by increasing
the baghouse flowrate, lowering the air
to cloth ratio and adding a lime
injection system. The revised capital
costs were $10.2 million and annualized
costs were $2.14 million. The baghouse
is expected to achieve 4.59 tpy
reduction of lead and arsenic with a cost
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
effectiveness of $467,000/ton metal
HAP.
In addition, in the 2022 proposal we
solicited comment on a lead limit for
the roofline vents in addition to, or
instead of, the PM limit for the anode
refining roof vents. The agency
considered a possible lead limit of 0.26
lb/hr as a potential BTF MACT limit for
anode refining process fugitive
emissions.
b. How did the requirements for process
fugitive emissions from roofline vents
proposed pursuant to CAA section
112(d)(2) and (3) change since proposal?
As discussed in this preamble, we are
promulgating the combined BTF PM
limit of 6.3 lb/hour for the roofline vents
as proposed in the 2023 supplemental
proposal. The BTF control cost
estimates were updated to incorporate
the most current bank prime interest
rate resulting in a small increase in total
annualized costs which are now
estimated as $2.30 million with a
resulting cost effectiveness of $500,000/
ton metal HAP with 4.6 tpy (rounded
from 4.59 tpy) reduction of lead and
arsenic. The revised cost estimates are
documented in the memorandum Cost
Estimates for Enhanced Capture and
Control of Process Fugitive Emissions
from the Anode Refining Operations at
Freeport—REVISED, which is available
in the docket for this rulemaking. The
cost estimates were otherwise
unchanged and the adjustments do not
change our conclusions about the
necessity of promulgating the BTF
standard. However, we received
significant comment on the proposed
compliance test methods. To address
some of the concerns raised by the
commenters, we are promulgating
revised methods and allowing the use of
Federal reference method (FRM) and
Federal equivalent method (FEM)
monitors as discussed in section
IV.C.2.c.
We are promulgating a lead emission
limit of 0.326 lb/hour for minimizing
process fugitive emissions from any
combination of roofline vents associated
with the Peirce-Smith copper converter
department, Inco flash furnace and the
anode refining department, at existing
sources. This emissions limit reflects
the estimated reductions that will be
achieved by the design standards
described in section IV.B. We are also
finalizing that facilities must
demonstrate compliance with this
emission limit once per year. We note
that Peirce-Smith converters are batch
converters and the NESHAP prohibits
the use of batch converters for new
sources. Therefore, this lead limit is not
relevant for new sources.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
c. What key comments did we receive
on the proposed requirements for
process fugitive emissions from roofline
vents pursuant to CAA section 112(d)(2)
and (3) and what are our responses?
Comment: Numerous comments were
received on the proposed test methods
for measuring PM at roof vents, which
include EPA Test Methods 1, 2/2F/2G,
3/3A/3B, 4, 5D and Oregon Method 8.
Most comments were that the proposed
test methods are not suited for testing
PM from roof vents; that MiniVol
portable samplers should be used for
sampling PM at the roof vents instead of
the proposed test methods; and that the
proposed test methods are unsafe to
conduct at rooflines.
Commenters discussed the lack of
isokinetic conditions at the roofline,
which they stated inhibits the use of
Method 1. For example, a commenter
explained that Method 1 provides two
alternative procedures: a ‘‘simplified
procedure,’’ and an ‘‘alternative
procedure.’’ Citing section 1.2 of the
method, the commenter stated the
simplified procedure ‘‘cannot be used
when the measurement site is less than
2 stack or duct diameters or less than a
half diameter upstream from a flow
disturbance.’’ The commenter stated
that neither stack diameters nor duct
diameters can be defined for the smelter
facilities’ roofline vents, within the
meaning and purposes of section 1.2.
With regards to the alternative
procedure, the commenter stated this
procedure depends on the ability to
develop representative pitch and yaw
angles of the gas flow to be sampled,
based on directional flow-sensing probe
measurements of pitch and yaw angles
at forty or more traverse points within
the flow. The commenter stated this
procedure is not possible to perform at
the smelter facilities’ roofline vents
because fugitive emissions at the vents
occur at a variety of angles that are
constantly changing due to ambient
winds.
Another commenter discussed the
lack of isokinetic conditions at the
roofline and referenced a feasibility
study (EPA–HQ–OAR–2020–0430–
0062) that concluded that the roofline
vents at the Miami smelter cannot meet
the minimum methods of Method 1,
including either the simplified
procedure or alternative procedure. The
commenter stated that if Method 1
cannot be utilized effectively at the 2
facilities subject to the major source
rule, the rule is not practical to
implement or enforce.
A commenter discussed in depth the
limitations of Method 5D, stating that,
unlike a positive pressure baghouse for
PO 00000
Frm 00027
Fmt 4701
Sfmt 4700
41673
which Method 5D was designed, the
roofline vent air flow is induced by
natural buoyance of the warmer gas
inside the smelter building and by
outside air wind pressures—not by use
of a forced air blower like those used in
a baghouse. The commenter referenced
an illustration in a technical analysis of
the proposed vent test methods, which
shows that the flow rate varies
significantly over short periods of time
and occasionally is negative (i.e., air
flows into the vent). Another
commenter stated, ‘‘FMMI identified the
incompatibility of Method 5D to the
roofline vent configurations as part of its
original comments on April 26, 2022
. . . Nevertheless, the EPA left the issue
unaddressed in the supplemental rule
proposal, and the agency has not
provided any guidance or technical
analysis explaining how Method 5D
could be adapted to the distinctly
different conditions presented by the
roofline vents.’’ A commenter stated
because EPA Method 5D is not
compatible with the low, variable air
velocities and physical configuration of
the roofline vents, FMMI has utilized a
sampling methodology and test protocol
negotiated with the ADEQ (the ‘‘ADEQ
test method’’).
Commenters advocated using MiniVol
portable air samplers as an alternative to
the proposed test methods for
measuring PM from roof vents. They
stated that using MiniVol portable air
samplers is the most representative
sampling method for the roofline
emissions application, and while not a
FRM sampler, they provide results that
closely approximate data from FRM
samplers to obtain representative
concentrations of PM without the need
for isokinetic sampling. The commenter
noted that the portable air samplers can
be run concurrently at several locations
along the roofline, which the
commenter notes offers several benefits:
(1) fluctuations in flows and emissions
along the roofline are better managed,
(2) sampling is not dependent on linear
air flow, so constant adjustments are not
required, and (3) sampling can occur for
longer periods of time, which provides
a more representative sample of the
process operations occurring in the
smelter buildings. The commenter noted
use of this sampling protocol will
require the collection of velocity and
temperature measurements using the
existing roofline monitoring system
equipment. As an added benefit, the
portable air samplers also are capable of
speciating samples of PM, PM10, and
PM2.5.
A commenter noted that Asarco’s
2015 consent decree with ADEQ, which
governs the operation of their Hayden
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41674
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
smelter, requires process fugitive
emissions studies (FES) pursuant to a
protocol (‘‘FES Protocol’’ or ‘‘Protocol’’)
approved by the EPA on May 24, 2017.
Within the FES Protocol is a
determination that process fugitive PM
emissions at the roofline shall be
quantified via a sampling methodology
that centers on the use of MiniVol
portable air samplers at the roofline
vents. The commenter stated that the
EPA’s approval of the Protocol
constitutes a determination by the EPA
that this sampling method is
appropriate for determining the rate of
fugitive PM emissions at the roofline.
The MiniVol sampler, in particular, is a
low-flow sampler, which is well-suited
to low, variable air flows at the
roofline—unlike the iso-kinetic
sampling methods specified in
paragraph (e)(1) of proposed 40 CFR
63.1450. The commenter attached
copies of the Protocol and the EPA’s
approval of the Protocol to their
comment letters submitted on the 2022
proposed RTR and on the 2023
supplemental proposal (Docket ID Nos.
EPA–HQ–OAR–2020–0430–0135 and
EPA–HQ–OAR–2020–0430–0204,
respectively).
A commenter stated the final
rulemaking should include a provision
that explicitly authorizes the use of
MiniVol portable air samplers, together
with appropriate temperature and flow
sensors to determine PM emissions at
the roofline. The commenter advocated
the use of a fugitive emissions
monitoring protocol specific to the
relevant smelter and approved by the
EPA’s Office of Air Quality Planning
and Standards, Measurement
Technology Group (MTG) or other
reviewing body such as ADEQ and
believes (a) 6 months after the date of
the final rulemaking’s publication in the
Federal Register would be an
appropriate deadline for submittal of the
protocol for agency approval; and (b) 2
years after agency approval of the
protocol would be an appropriate
deadline for commencing measurements
of the rate of fugitive PM emissions at
the roofline to determine whether they
exceed the fugitive PM emissions-rate
limit. Correspondingly, the commenter
noted the final rulemaking should
provide that, during the pendency of the
protocol’s implementation, only the
work practice standards and operation
and maintenance requirements of the
revised subpart QQQ rules shall apply
to the process fugitive PM emissions.
This would be consistent with 42 U.S.C.
7412(h)(1)–(2)(B) and the approach the
EPA took in the Mercury and Air Toxics
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Standards (MATS) and Industrial
Boilers rulemakings.
The commenter stated that the ADEQ
test method was utilized to collect all of
the emission data that the EPA relied on
for the UPL calculation that is the sole
basis for the combined roofline PM
emission limit in the supplemental
proposed rule. According to the
commenter, it is not appropriate for the
EPA to set emission limits based upon
the ADEQ test method and then prohibit
the use of that very same method to
demonstrate compliance. If the ADEQ
test method was good enough to set
enforceable emission limits, it should
also be good enough to demonstrate
compliance. The commenter stated that
if the ADEQ test method (or some
reasonable modification of that method)
does not meet the EPA’s requirements,
then no limit should be established at
this time because that approach
necessarily means that a valid data basis
for a limit does not yet exist. If that is
indeed the EPA’s position FMMI and
the EPA can work together to develop
an acceptable test method, FMMI can
collect the necessary data to support the
calculation of a UPL based on that
agreed method, and the agency can set
emission limits based on that data set.
In a related point, a commenter stated
that they are concerned that the
proposed roofline lead limit is based on
data collected using samplers that are
not designated as an FRM. Use of nonFRM sampler data could create a
standard that is not achievable if tested
using an FRM. It is unclear from the
EPA’s proposed rule how to address a
potential discrepancy between a
standard based on non-FRM and testing
using an FRM. The commenter goes on
to say that the EPA’s proposed PM limit
was established using data that were
collected using a method other than
EPA Method 5. Another commenter has
similar concerns with the EPA’s rule in
regard to the proposed limit being based
on data collected using samplers that
are not designated as an FRM: First,
they state it is not clear from the EPA’s
rule that a Method 5 test conducted at
the same time would have produced the
same result as the alternative method
used to obtain the data the rule is based
on. Second, they state it is unknown
whether this standard is achievable, as
determined by the proposed test
methodology.
Lastly, commenters had concerns
about the safety of the personnel
conducting testing at the roofline. The
commenter stated it would be unsafe,
due to the elevated temperature
environment and other conditions at the
roofline, for humans to perform roofline
activities required by paragraph (e) of
PO 00000
Frm 00028
Fmt 4701
Sfmt 4700
proposed 40 CFR 63.1450. Many areas
of the roofline are currently only
accessible by narrow catwalks that do
not currently have approved tie-off
points or sufficient space to
accommodate the personnel and the
required sampling equipment. Some
roofline areas require respirators or
other personal protective equipment,
and the EPA’s proposed testing methods
would require continuous presence of
multiple personnel working directly in
the pathway of exiting fumes for 3, 12hour test runs. The commenter stated
the Method 5 sampling protocol
requires adequate sample locations to
account for variations in the flows along
the roofline, which then necessitates a
large number of sampling staff to be
located in a dangerous, high
temperature environment for extended
periods of 12 hours or more. The
commenter noted the temperatures at
the roofline can reach 140 degrees
Fahrenheit and pose a significant safety
concern for the testing personnel.
Response: In reviewing the comments
and as a result of a site visit, the EPA
is revising the methods for the roof-vent
testing. For sample location
determination, if EPA method 1 is
inappropriate, the facilities need to use
method 5D, section 8.1.3, Roof Monitor
or Monovent, and also use section 8.2 to
determine how many traverse points
should be sampled or have proposed
sampling locations approved by EPA
Office of Air and Radiation (OAR),
Office of Air Quality Planning and
Standards, MTG or the delegated
authority. Due to the variability in the
flow rates, an anemometer may be used
to determine the flow. For the PM
concentration measurements, a constant
sample flow rate and mass volume is
required due to the highly variable
process flow rate. EPA method 17 may
be used for this constant flow rate
sampling. EPA Method 17 particulate
matter samples will be collected at the
roofline vent temperatures to maintain
the same temperature basis as the
samples used in setting the standard.
EPA Methods 5 and 5D have been
removed since these methods require
heating the filter to 248 ± 25 Fahrenheit,
which would not be representative of
the roofline temperatures. It is
understood that isokinetics may not be
met with this sampling and this
calculation is waived for this sampling.
The MiniVol samplers are not EPAapproved samplers. There is a concern
because these are battery operated and
may not provide a constant rate of
sampling. As an alternative, an
approved FRM or FEM ambient PM
monitor may be used, which will also
address the commenter’s safety
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
concerns. A list of designated reference
and equivalent methods is provided
here: https://www.epa.gov/amtic/airmonitoring-methods-criteria-pollutants.
However, tapered oscillating
microbalances are not appropriate for
this sampling. The FRM or FEM
ambient PM monitor must be able to
tolerate temperatures up to 150 degrees
Fahrenheit.
The commenter has raised concerns
on the use of the MiniVol sampler to set
the standard while different methods
are used for determining compliance.
The EPA has mitigated these issues
through the adaptations to the
methodology finalized, the use of
calibrated anemometer for low and
variable process flow rates, fixed rate
sampling and the allowance for in stack
filter methodology (EPA Method 17).
The primary sampling difference
between the methods now is the more
stable operation of the EPA Method 17
sampling system or an FRM/FEM,
ensuring that the sampled flow rate is
consistent.
The EPA alternative methods
approval is conducted by the
Measurement Technology Group (MTG).
The MiniVol roof-vent sampling
protocols/sampling methods have not
been submitted or approved by MTG.
The Asarco protocol included FRM
sampling side-by-side with the MiniVol
sampling. This side-by-side sampling
could use Method 301 to validate the
MiniVol samplers, but the proposed
sampling has not yet occurred. This
Method 301 validation could still occur,
and the data could be used to support
an alternative method approval from
MTG. If these revised methods are not
appropriate or the tester/facility wants
to use alternative methods, the tester/
facility can apply for an alternative test
method approval through MTG. A
Method 301 study should be conducted
to verify that the selected monitors used
provide equivalent data to the EPA
methods.
Comment: A commenter agreed with
the EPA’s reasoning and determination
not to propose a BTF lead emissions
limit in addition to, or instead of, the
fugitive PM emissions limit in proposed
40 CFR 63.1444(i)(3). Similarly, another
commenter stated that, in response to
EPA’s request for comments, an
additional lead limit on the roofline
vents is not necessary. They explained
that they agreed with the EPA’s
conclusion that PM is the most
appropriate surrogate for metal HAPs.
Response: While we agree that PM is
an appropriate surrogate for metal HAP,
we are also finalizing a process fugitive
lead limit for facilities using flash
furnaces and associated with the Peirce-
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Smith converters of 0.326 lb/hr for a
combination of roof vents associated
with Peirce-Smith copper converter
department, Inco flash furnace and the
anode refining department. We estimate
that this final standard will reduce lead
emissions by 0.39 tpy.
Comment: Commenters requested that
the EPA establish direct lead limits,
either in addition to or instead of the
PM limit because it is one of the risk
drivers for this source category and
would be appropriate to control for it
directly.
Response: We have determined that
filterable particulate is an adequate
surrogate for lead and other HAP metals
for this source category. The use of PM
as a surrogate for particulate metal HAP
is consistent with the approach used to
limit particulate metal HAP emissions
from other copper smelting processes in
the current NESHAP and for many other
source categories (i.e., Ferroalloys
Production, Integrated Iron and Steel
Manufacturing, and Integrated Iron and
Steel Foundries). Therefore, providing
PM emission standards which require
reductions as a surrogate for metal HAPs
is expected to result in commensurate
reductions of metal HAP. We are also
finalizing a process fugitive lead limit
for facilities using Inco flash furnaces
and Peirce-Smith converters of 0.326 lb/
hr for a combination of roof vents
associated with the Peirce-Smith copper
converter department, Inco flash furnace
and the anode refining department
which we estimate will reduce lead
emissions by 0.39 tpy.
d. What is the rationale for our final
approach and final decisions for the
process fugitive emissions from roofline
vents revisions made pursuant to CAA
section 112(d)(2) and (3)?
As described in the 2022 proposal and
in the 2023 supplemental proposal, the
2002 major source NESHAP does not
include standards for process fugitive
emissions from the rooflines of smelting
vessels, converters, or anode refining
operations, except for an opacity limit
for converter roof vents that applies
during testing. Therefore, we are
finalizing, as proposed in the 2023
supplemental proposal, a BTF combined
PM limit of 6.3 lb/hr as a surrogate for
metal HAP for new and existing process
fugitive emissions from roofline vents
pursuant to CAA section 112(d)(2) and
(3). As described in section IV.A., we
are also finalizing this combined
roofline PM limit under CAA section
112(f) to reduce emissions of HAP
metals (especially lead and arsenic,
which are two persistent,
bioaccumulative and highly toxic
HAPs), and their associated risks, to
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
41675
achieve acceptable risks levels. We are
finalizing, as proposed, that compliance
with the PM emissions limit for the
process fugitive emissions from roofline
vents will be demonstrated through an
initial performance test followed by a
compliance test at least once per year.
Based on comments we received on the
2022 proposal and the 2023
supplemental proposal, we are
finalizing adaptations to the test
methods by which compliance with this
limit can be demonstrated including the
use of fixed rate sampling and the
allowance for in stack filter
methodology (EPA Method 17). The
costs for Freeport to comply with this
combined PM limit are described in
section IV.C.2.b., and we estimate that
Asarco can already comply with this
limit and therefore will not incur costs
to comply with the combine PM roofline
limit except testing costs. We estimate
that both facilities will incur testing
costs of $107,000 per year to comply
with the performance test requirements.
In addition, we are finalizing a lead
emission limit of 0.326 lb/hour to
minimize process fugitive lead
emissions from any combination of
roofline vents associated with PeirceSmith copper converter departments,
Inco flash furnaces and the anode
refining departments, at existing
sources. This limit will only apply to
the Asarco facility (since they are the
only existing major source with PeirceSmith copper converter departments
and Inco flash furnaces), and we
estimate this will reduce metal HAP by
0.39 tpy and ensure that future
violations of the lead NAAQS will not
occur. As mentioned in section IV.B.2.
of this preamble, Asarco has been a
major contributer to the Hayden Arizona
lead NAAQS non-attainment status.
This limit is consistent with the
modeling demonstration submitted by
the facility to the state in support of a
revision to the lead SIP. This document
is available in the docket for this action
(Docket ID No. EPA–HQ–OAQ–2020–
0430). As discussed in section IV.B., we
are also promulgating design standards
under CAA section 112 (d)(6) that will
ensure this limit is met. As discussed in
section IV.B., the costs to comply with
the design standards are already
expected to be incurred by the facility.
We are finalizing, that compliance with
the lead emissions limit for the process
fugitive emissions from roofline vents
will be demonstrated through an initial
performance test followed by a
compliance test at least once per year.
The facility can test for lead at the same
time as the performance test for PM;
however, they will have some
E:\FR\FM\13MYR3.SGM
13MYR3
41676
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
additional costs for the laboratory
analysis that we estimate to be $18,000
per year.
3. Mercury
lotter on DSK11XQN23PROD with RULES3
a. What did we propose for mercury
emissions pursuant to CAA section
112(d)(2) and (3)?
In the 2022 proposal, the EPA
proposed a BTF mercury limit of 0.0043
lb/hr for existing sources, based on
emissions data from Freeport and
Asarco, and a MACT floor mercury limit
of 0.00097 lb/hr for new sources, based
on emissions data from Asarco. As
noted in the preamble of the 2022
proposal, in order to comply with the
proposed emission limit for existing
sources, the EPA expected that the
Freeport facility would have to install
and operate an activated carbon
injection (ACI) system and a polishing
baghouse on the stack emissions release
point, the acid plant. The EPA expected
the installation of these additional
controls would result in a 90 percent
reduction of mercury emissions from
the acid plant source and that the costeffectiveness of mercury control would
be $27,500 per pound (in 2019 dollars).
During and after public comment
period of the 2022 proposal, the EPA
received a number of comments and
additional data concerning the BTF
limit for existing sources including:
• Mercury testing results obtained in
2018–2021 by the Freeport facility
which did not fully follow EPA Method
29;
• Additional mercury testing results
collected at the Freeport facility in 2022
which fully followed EPA Method 29;
and
• Comments regarding the technical
infeasibility of adding mercury controls
(e.g., polishing baghouse with ACI) at
the acid plant, including explanations
that the conditions of the acid plant
exhaust streams are unsuited for the
control option since the stream has a
high moisture content, low mercury
concentrations, and high concentrations
of SO2/SO3 which inhibit mercury
removal.
As discussed in the 2023
supplemental proposal, the EPA
evaluated the emissions data from all of
Freeport’s performance tests (i.e., 2018–
2022) and concluded that only the test
conducted in 2022 which fully followed
Method 29 should be used in the MACT
floor emission limit development. The
EPA also agreed that characteristics of
the exhaust stream from the acid plant
stack and equipment configuration at
the acid plant may inhibit mercury
control (e.g., moisture content, acid gas
content, mercury concentration) which
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
could result in diminished emission
reductions. Therefore, we evaluated
controlling mercury from the aisle
scrubber stack and the vent fume stack
and determined the latter was best
suited for mercury control (see
discussion in the 2023 supplemental
proposal). Based on a new stack location
and a new emissions data set, which
includes the original Asarco data and
data from Freeport’s 2022 test, the
revised mercury limit for existing
sources in the 2023 supplemental
proposal, as determined using the 99
percent UPL approach, is a MACT floor
limit of 0.033 lb/hr for combined facility
wide emissions. We also evaluated BTF
control options in the 2023
supplemental proposal and concluded
that the costs were unreasonable, and
we proposed the MACT floor emission
standard. We proposed that compliance
with the mercury emissions limit for
new and existing sources would be
demonstrated through an initial
compliance test for each of the affected
sources (e.g., furnaces, converters,
anode refining) followed by a
compliance test at least once every year.
b. How did the mercury emissions
standard made pursuant to CAA section
112(d)(2) and (3) change since proposal?
The mercury emission standard for
new sources, 0.00097 lb/hr, is being
promulgated as proposed in 2022. In the
2023 supplemental proposal, we
proposed a revised mercury emission
standard of 0.033 lb/hr for existing
sources and are finalizing that standard
as proposed. Both emission standards
are based on the MACT floor.
c. What key comments did we receive
on the mercury revisions made pursuant
to CAA section 112(d)(2) and (3) and
what are our responses?
Comment: Commenters contend that
the EPA does not have sufficient data to
develop a MACT floor for mercury.
They stated that they do not believe the
single 3-run test results are sufficient to
establish the proposed MACT floor
emission standard for existing sources.
The commenter noted there was
significant run-to-run variability which
the commenter stated can be attributed
to the profile of the process feed and the
nature of a batch process. Commenters
noted that additional performance
testing of mercury will be conducted at
the Freeport facility in the fourth
quarter of 2023, and first quarter of 2024
using EPA Method 29, and they asked
that the EPA allow for submittal and
consideration of these data (which they
say they will be able to provide at least
several weeks prior to the May 2, 2024,
deadline for final rule publication)
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
when establishing limits in the final
rule. In the absence of additional data,
commenters believe that a
representative MACT floor cannot be
established, and any regulatory action
should be postponed or limited to
workplace standards. They rationalized
this comment by citing the NESHAP for
Secondary Lead Smelting (77 FR 570)
where the EPA did not promulgate
standards because of incomplete testing
and lack of testing data for furnaces that
burn varying types of fuel.
Response: As described in the 2023
supplemental proposal, the EPA revised
its calculations by only using the stack
test data that followed EPA Method 29.
The proposed mercury standard was
developed based on the 99 percent UPL
of the available emissions data for this
source category, which included data
collected from Freeport through the
2022 section 114 information request
from Freeport as well as test data from
Asarco, yielding a sample size of 5 data
points. The test report associated with
Freeport’s section 114 information
request response was conducted using
EPA test Method 29 and was reviewed
by EPA measurement experts upon
submission. A dataset of more than 3
data points meets the sample size
necessary to use the 99 percent UPL
approach to develop a MACT standard.
We acknowledge that a sample size of
5 is considered a limited dataset;
however, we have followed our
documented approach for MACT floor
development for limited datasets
included in Appendix B of the
aforementioned memorandum (Docket
ID No. EPA–HQ–OAR–2020–0430–
0153). Therefore, we disagree that we
have insufficient data to develop a
numerical emission standard based on
the MACT floor.
We note that we received two
additional test reports from Freeport;
one on January 29, 2024 (non-metal
HAPs) and one on February 16, 2024
(mercury), well after close of the public
comment period (i.e., September 22,
2023) and have been notified that
Freeport plans to send a third test report
in mid-April 2024. Based on a
preliminary review of the new test data,
we determined that some tests were not
valid due to deviation from the EPA
method and that incorporation of the
valid tests would not result in
significant changes to the proposed
emission limits. We did not incorporate
these late-submitted data for two timing
related reasons. First, other stakeholders
would not have an opportunity to
review and comment on these new data;
and second, given the court-ordered
promulgation deadline of May 2, 2024,
we had insufficient time to complete the
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
necessary quality control and assurance
of the data, and to perform new
calculations and analyses to establish
revised limits before the May 2, 2024,
deadline. Thus, we are promulgating the
existing source MACT floor emission
standards for mercury, as well as for the
other non-metal HAP, as proposed in
the 2023 supplemental proposal and as
discussed in sections IV.C.3. and IV.C.4.
of this preamble.
Comment: Some commenters
expressed support for the decision in
the 2023 supplemental proposal not to
move forward with a BTF standard for
mercury, while other commenters
suggested that the EPA adopt the BTF
standard for mercury. Commenters
stated that indirect costs including
engineering, procurement, and
construction management, as well as
startup costs had not been included in
our estimates. Specifically concerning
costs for baghouses, commenters stated
that most modern baghouses are of the
pulse jet, rather than shaker style,
configuration.
Response: As described in the 2023
supplemental proposal, the EPA reproposed a MACT floor standard for
mercury after considering the technical
feasibility and costs of BTF control
options. In consideration of the
comments regarding costs, we
performed a holistic review of the cost
estimates for controls included in this
rulemaking. As described in the 2023
supplemental proposal, we estimated
costs for controlling mercury at the vent
fume stack using a polishing baghouse
with ACI. We found that our BTF cost
estimates for mercury controls omitted
indirect costs and assumed costs for a
shaker style baghouse. In response to
the comments received on the 2023
supplemental proposal, we have revised
our BTF cost estimates for mercury
control of the vent fume stack at the
Freeport facility to include indirect
costs and to more appropriately assume
a pulse jet configuration baghouse. The
details of these revisions can be found
in the memorandum Estimated Cost for
Beyond-the-floor Controls for Mercury
Emissions from Primary Copper
Smelting Facilities—REVISED, available
in the docket for this rulemaking. Our
revised estimates of the cost of BTF
mercury are capital costs of $10.7
million and total annualized costs of
$3.0 million. We did not receive
additional test data or other information
that would result in revisions to the
expected emission reductions we
presented in the 2023 supplemental
proposal. Using the expected
reductions, 40.5 lb/yr, the resulting cost
effectiveness is $73,300/lb mercury. We
continue to maintain, as proposed in the
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
2023 supplemental proposal, that the
cost effectiveness for the BTF control of
mercury is unreasonable and are
promulgating the MACT floor emission
standard for existing sources.
d. What is the rationale for our final
approach and final decisions for the
mercury revisions made pursuant to
CAA section 112(d)(2) and (3)?
As described in the 2022 proposal and
the 2023 supplemental proposal, the
2002 major source NESHAP does not
include standards for mercury. We are
finalizing, as proposed in the 2022
proposal, the new source MACT floor
mercury limit of 0.00097 lb/hr mercury.
As stated in the 2022 proposal, the new
source MACT floor mercury limit was
calculated based on emissions data from
the best performing facility, which is
Asarco in this case. We are finalizing, as
proposed in the 2023 supplemental
proposal, the existing source MACT
floor mercury limit of 0.033 lb/hr
mercury. As discussed in section
IV.C.3.c. of this preamble, we made
some revisions to the cost of mercury
controls that were included in the 2023
supplemental proposal. These revisions
improved the completeness of our
estimates but did not change our
conclusion that the costs of the BTF
option for controlling mercury with a
polishing baghouse and ACI at the vent
fume stack are unreasonable ($73,000/lb
mercury reduced). We also considered
other BTF options, but all other options
were less cost-effective than additional
controls of the vent fume stack using the
baghouse/ACI option. We note the BTF
options we considered are higher than
historic acceptable cost effectiveness
values for mercury. The highest historic
acceptable cost-effective values in the
2011 final MATS rule were up to
$22,400 per pound of mercury reduced
in 2007 dollars (which equates to about
$32,000 per pound in current dollars).
We are finalizing, as proposed, that
compliance with the mercury emissions
limit for new and existing sources will
be demonstrated through an initial
compliance test for each of the affected
sources (e.g., furnaces, converters,
anode refining) followed by a
compliance test at least once every year.
4. Other Unregulated HAP
a. What did we propose for the
unregulated HAP pursuant to CAA
section 112(d)(2) and (d)(3)?
During the public comment period of
the 2022 proposal, the EPA received
comments claiming there were
additional unregulated HAP from the
source category beyond those we
addressed in the 2022 proposal. In
PO 00000
Frm 00031
Fmt 4701
Sfmt 4700
41677
response to these public comments, the
EPA issued a CAA section 114
information request to collect further
information. The information request
was sent to the Freeport facility only, as
the Asarco facility has been idled since
October 2019. The collected data
indicated the following additional
unregulated pollutants are emitted from
the source category: benzene, D/F, HCl,
chlorine, PAH (including naphthalene),
and toluene. These pollutants are
mainly emitted due to the combustion
of natural gas and coke. Based on this
new information, the EPA proposed the
following MACT floor emission limits
for these pollutants in the 2023
supplemental proposal:
• 1.7E–03 lbs benzene/ton
concentrated ore fed for new and
existing sources;
• 8.4E–04 lbs toluene/ton
concentrated ore fed for new and
existing sources;
• 1.5E–03 lb/ton concentrated ore fed
for HCl for new and existing sources;
• 5.4E–03 lbs chlorine/ton
concentrated ore fed for new and
existing sources;
• 1.0E–04 lbs PAH excluding
naphthalene/ton concentrated ore fed
for new and existing sources;
• 2.8E–04 lbs naphthalene/ton
concentrated ore fed for new and
existing sources; and
• 60 ng D/F TEQ/Mg concentrated ore
fed for new and existing sources.
We also proposed that compliance
with the unregulated HAP emissions
limits for each affected source will be
demonstrated through an initial
performance test followed by a
compliance test at least once every 5
years.
b. How did the unregulated HAP
revisions made pursuant to CAA section
112(d)(2) and (3) change since proposal?
As described in section IV.C.4.a., we
proposed MACT floor emission limits
for benzene, D/F, HCl, chlorine, PAH
(including naphthalene), and toluene.
The decision not to propose BTF
emission limits was based on the results
of our BTF analysis. The BTF analysis
assumed ACI or DSI would be installed
with an existing scrubber to achieve the
expected emission reductions. However,
based on comments received on this
analysis as discussed in section IV.C.4.c.
of this preamble and the promulgation
of additional controls for the Hoboken
converter process fugitive capture
system, we made revisions to our BTF
analysis. Specifically, we revised the
BTF control options to be the addition
of ACI or DSI to the baghouse control
device we expect will be installed
upstream of the aisle scrubber to control
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41678
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
the Hoboken converter process fugitive
capture system, rather than a scrubber.
We revised the expected emission
reductions for each unregulated HAP
(i.e., benzene, D/F, HCl, chlorine, PAH
(including naphthalene), and toluene) to
reflect the assumption that the baghouse
will receive about 75 percent of the
loading to the aisle scrubber. The
performance test results that were used
to quantify emission reductions of the
unregulated HAP were conducted at the
outlet of the aisle scrubber. Therefore,
we are revising the emission reduction
estimates provided in the 2023
supplemental proposal to be based on
the expected loading to the baghouse.
We did not identify any BTF options for
HCl because the MACT floor emission
standard was set at 3 times the
representative detection limit (3xRDL)
and it is infeasible to measure lower
levels of this pollutant. For Cl, we
adjusted our expected emission
reductions from the addition of DSI
based on an expected control efficiency
of 98 percent to 20 percent. This control
efficiency adjustment was in response to
a comment we received from Freeport.
Freeport commented that the stack test
data was taken from the aisle scrubber
outlet; because the aisle scrubber is a
caustic scrubber additional reduction of
acid gases would be expected to be far
lower than our proposed 98 percent.
They estimated it should be 0 to 20
percent. We agree and thus updated the
expected control efficiency to 20
percent. Finally, as noted previously in
this preamble, during the comment
period for the 2023 supplemental
proposal, we received comments on
control costs and performed a holistic
review of all control cost estimates for
this rulemaking. These comments stated
that installation costs and indirect costs
including engineering, procurement,
and construction management, as well
as startup costs and contingency had not
been included in our estimates. We also
received comments regarding the sizing
of a DSI system for the baghouse for the
Hoboken converter process fugitive
capture system as discussed in section
IV.B. The costs for ACI and DSI were
updated to include installation and
indirect costs including contingency for
completeness and were updated in
response to comments regarding the
sizing of such systems for the baghouse
expected to be required for controlling
the Hoboken converter process fugitive
capture system. Based on these
revisions, the quantity of expected
emission reductions from the addition
of DSI or ACI was reduced, and the
overall cost effectiveness increased for
unregulated HAP. This did not change
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
our proposal to base numerical emission
standards for these pollutants on the
MACT floor. The detailed emission
reductions and cost estimates for the
revised BTF options for this final rule
are provided in a memorandum entitled
Estimated Cost for Beyond-the-floor
Controls for Unregulated HAP
Emissions from Primary Copper
Smelting Facilities—REVISED, which is
available in the docket for this action.
Units of unregulated HAP were also
revised from pounds (or nanograms) per
ton (or Mg) concentrated ore fed, as
applicable, to pounds (or nanograms)
per ton (or Mg) of copper concentrate
feed charged to the smelting vessel.
c. What key comments did we receive
on the unregulated HAP revisions made
pursuant to CAA section 112(d)(2) and
(3) and what are our responses?
Comment: Commenters appreciated
that the EPA proposed MACT standards
for the unregulated pollutants, but they
also encouraged the EPA to reconsider
the BTF options for control of these
pollutants and require the additional
control requirements. Commenters
questioned the approach used to
evaluate the BTF cost of controls for the
nonregulated pollutants. By taking a
pollutant-by-pollutant approach to
assessing the cost per ton of pollution,
the EPA’s approach makes the cost
assessment very high. For example, the
BTF control options for benzene, PAH,
naphthalene, and D/F were all estimated
with the addition of ACI to the existing
control device. So, the capital outlay
and operational cost should include the
tons per year (tpy) reduction of all
pollutants instead of looking at the cost
per ton for each one individually.
Similarly, the BTF control for HCl and
Cl is DSI, so one control will address
both pollutants.
Response: We conclude that even by
evaluating the combination of pollutants
noted by the commenter, we would still
consider the costs of complying with the
BTF standards for these HAP not
reasonable in this case. Generally, we
find that the annualized emissions of
these unregulated HAP are quite low,
and our BTF analysis which informed
the 2023 supplemental proposal
concluded that the costs and costeffectiveness associated with the BTF
options were not reasonable. For more
details on the BTF analysis, see the
memorandum entitled Estimated Cost
for Beyond-the-floor Controls for HAP
Emissions from Primary Copper
Smelting Facilities—REVISED, which is
available in the docket for this action.
Comment: Commenters stated the
proposed MACT standards for the
unregulated HAP are inappropriate
PO 00000
Frm 00032
Fmt 4701
Sfmt 4700
because they would apply to both the
Freeport facility and the Asarco facility
when they are based on emissions data
and information collected exclusively
from the Freeport facility, and unique to
Freeport’s use of fuels and other raw
materials which are precursors to such
HAP emissions from the Freeport
facility. Commenters stated that
promulgation of the MACT standards
would, therefore, violate 42 U.S.C.
7412(d)(3)(B) for failing to be based
empirically or predictively on HAP
emissions data and information
pertaining also to the Asarco facility.
Commenters stated the EPA should
engage with Asarco to determine
whether the facility has relevant HAP
emissions data for consideration in the
rulemaking, or not set standards for HCl,
Cl or D/F because: (1) the overall
emissions profiles of these HAP would
be particularly sensitive to variations in
feed to the smelter, including changes in
quantities and qualities of fuel and
additives, such as coke, flux and scrap;
and (2) the individual stack emissions
profiles of these HAP—including
distributions and emissions rates—
would vary greatly between the point
sources at the Freeport facility and the
point sources at the Asarco facility, due
to the substantial differences between
the process flows and gas flows
(including capture) at the Freeport
facility and the process flows and gas
flows (including capture) at the Asarco
facility. Commenters also contended
that the MACT standards for
unregulated HAP are based on a single
testing campaign; therefore, a
representative MACT floor cannot be
established. Commenters noted that
additional performance testing of the
unregulated HAP will be conducted at
the Freeport facility in the fourth
quarter of 2023 and first quarter of 2024,
and they asked that the EPA allow for
submittal and consideration of these
data (which they said they will be able
to provide at least several weeks prior
to the May 4, 2024, deadline for final
rule publication) when establishing
limits in the final rule. In the absence
of additional data, commenters believe
that a representative MACT floor cannot
be established, and any regulatory
action should be postponed or limited
to workplace standards.
Response: The proposed unregulated
HAP standards were developed based
on the 99 percent UPL of the available
emissions data for this source category,
which included data collected through
the 2022 section 114 information
request to Freeport. The testing
associated with Freeport’s section 114
information request response was
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
conducted using the EPA prescribed test
methods, and the results were reviewed
by EPA measurement experts upon
submission. We did not find equivalent
data from Asarco in the administrative
record. Nevertheless, the EPA is allowed
to and required to establish MACT
standards for a source category based on
sources for which we have emissions
data; thus, the data for Freeport must be
used for the source category in the
absence of data from Asarco. The 3 data
points we used to set the floor are the
minimum sample size necessary to use
the 99 percent UPL approach to develop
a MACT standard. While we
acknowledge this is a limited dataset,
we followed the EPA protocol for
developing MACT from limited datasets
which was described in Appendix B of
the Proposed Maximum Achievable
Control Technology (MACT) Floor
Analysis for Unregulated HAP for the
Primary Copper Smelting Major Source
Category memorandum (Docket ID No.
EPA–HQ–OAR–2020–0430–0153);
therefore, we disagree that we have
insufficient data to develop numerical
emission standards based on the MACT
floor.
As described in section IV.C.3.c. of
this preamble, we note that we received
an additional test report for these nonmetal HAPs on January 29, 2024, well
after close of the public comment period
(i.e., September 22, 2023). However, for
the reasons described in section
IV.C.3.c., we did not incorporate these
new data in our analyses to establish
revised standards for the final rule.
Therefore, we are promulgating the
MACT floor emission standards for
these unregulated HAP, as proposed.
Comment: Commenters agreed with
the EPA’s conclusion that the BTF
options for controlling unregulated HAP
are not cost effective. They also noted
these control options, which include the
use of ACI and DSI in combination with
the aisle scrubber, are not technically
feasible. Commenters noted that the
aisle scrubber is a wet scrubber
designed for acid gas control, and the
use of either ACI or DSI would require
a high-efficiency particulate control
device such as a baghouse to collect the
injected material. The commenter stated
that the addition of a baghouse would
significantly increase control costs for
the pollutants, making the cost
effectiveness of their control poorer.
With regards to HCl and Cl, commenters
stated the EPA’s estimated emissions
reductions of 98 percent for these
pollutants using DSI injection is not
practical given their already efficient
removal by the aisle scrubber and thus
already very low stack concentrations.
DSI could not be expected to reduce
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
emissions of these pollutants by more
than 20 percent and could potentially
result in 0 percent emission reduction.
Response: As described elsewhere in
this preamble, we are promulgating a
combined emission standard for the
combination of exhaust streams from
the anode refining department and the
Hoboken converter process fugitive
capture system. At the Freeport facility,
the anode refining department and the
Hoboken converter process fugitive
capture system exhaust streams
combine in the aisle scrubber from
which they are emitted to the
atmosphere. The Freeport facility
controls the anode refining department
emissions with a baghouse prior to
routing the exhaust to the aisle scrubber.
We expect that the combined standard
we are promulgating in this action will
require the installation of a baghouse to
control the emissions stream from the
Hoboken converter process fugitive
capture system. Therefore, the costs for
a primary particulate control device of
the emission streams which combine in
the aisle scrubber will be incurred to
comply with the combined emission
standard. As discussed in section
IV.C.4.b., in response to comments for
this rulemaking we are amending our
cost estimates included in the 2023
supplemental proposal for controlling
these unregulated HAP to include
installation and indirect costs including
contingency as well as to address
comments regarding the sizing of these
injection systems. We continue to
expect that DSI/ACI systems would be
required to provide control for these
pollutants, and, thus, our revised
estimates continue to represent the
incremental costs of adding these
systems to an existing control device,
which will now be the baghouse
required for compliance with other
requirements in this final rulemaking.
As noted in our previous discussion of
the baghouse for the Hoboken converter
process fugitive capture system, the
baghouse receives about 75 percent of
the loading to the aisle scrubber. The
performance test results which were
used to inform the emission standards
and to quantify emission reductions of
the unregulated HAP (i.e., benzene, D/
F, HCl, chlorine, PAH (including
naphthalene), and toluene) were
conducted at the outlet of the aisle
scrubber. Therefore, we are revising our
emission reduction estimates provided
in the 2023 supplemental proposal to be
based on the expected loading to the
baghouse (i.e., 75 percent of the
emission rates from the aisle scrubber
outlet). Concerning the control
efficiency applied to HCl and Cl
PO 00000
Frm 00033
Fmt 4701
Sfmt 4700
41679
emissions, we note that the
measurements of emission rates were
taken at the outlet of the aisle scrubber.
The aisle scrubber is designed to reduce
acid gases including HCl and Cl;
therefore, we agree with commenters
that assuming an additional 98 percent
reduction of the emission rates at the
aisle scrubber in our BTF evaluation is
likely technically infeasible. In
reviewing the data for HCl, we note that
the 99 percent UPL was less than 3
times the representative detection limit
(3xRDL), thus the emission standard
was set at 3xRDL consistent with EPA
emission standard development
procedures. Therefore, it is infeasible to
measure lower levels of HCl and we are
no longer considering BTF options for
this pollutant. However, we have
revised our estimated emission
reductions for Cl to assume a 20 percent
reduction. The revisions to the expected
quantity of emission reductions and our
cost estimates result in increased cost
effectiveness for these unregulated HAP.
For chlorine, benzene, toluene, and
PAH, the cost effectiveness ranges from
$8.1 million/ton HAP reduced to $120
million/ton of HAP reduced. For D/F,
the cost effectiveness is $107 million/
gram of HAP reduced. These revisions
do not change our conclusion that the
BTF costs for controlling these
pollutants are unreasonable, and we are
therefore promulgating the MACT floor
standards. The details of our BTF
analysis can be found in Estimated Cost
for Beyond-the-floor Controls for HAP
Emissions from Primary Copper
Smelting Facilities—REVISED, which is
available in the docket for this
rulemaking.
Comment: Commenters noted that the
proposed standards for unregulated
HAP are a function of concentrated ore
fed, i.e., the emission limits are pounds
per ton concentrated ore fed.
Commenters stated that some of these
compounds are not correlated with ore
composition, but instead with natural
gas consumption or impurities from
third party copper scrap recycling. The
commenters noted that additional
performance testing should be
conducted to inform whether other
operating parameters influence
emissions.
Response: We used production-based
thresholds to provide equitable
emission standards for other facilities in
the source category. No data was
provided by FMMI indicating whether
copper scrap was part of the feed during
the performance tests which informed
the emission standards. However, in
light of the possibility that copper scrap
was part of the feed during the tests
conducted in response to the 2022
E:\FR\FM\13MYR3.SGM
13MYR3
41680
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
section 114 information request, we are
changing the denominator from a
concentrated ore fed basis to a copper
concentrate feed charged to the smelting
vessel basis, where ‘‘copper concentrate
feed’’ is defined in 40 CFR 63.1459.
d. What is the rationale for our final
approach and final decisions for the
unregulated HAP revisions made
pursuant to CAA section 112(d)(2) and
(3)?
As discussed in the 2023
supplemental proposal, the EPA
identified benzene, toluene, HCl, Cl,
PAHs, and D/F in the major source
category for which the 2002 major
source NESHAP did not include
standards. Except for HCl, the standards
we are promulgating for unregulated
HAP are MACT floor limits based on the
99 percent UPL. For HCl, the 99 percent
UPL was less than 3xRDL for HCl,
therefore, consistent with EPA
guidelines, the latter was used to set the
MACT floor limit. As discussed in the
2023 supplemental proposal, the EPA
evaluated BTF limits for each pollutant
but did not propose them due to
unreasonable costs. Therefore,
consistent with the 2023 supplemental
proposal, we are promulgating
numerical emission standards for each
unregulated HAP (i.e., benzene, D/F,
HCl, chlorine, PAH excluding
naphthalene, naphthalene, and toluene).
We are also promulgating, as proposed,
that compliance with these standards
will be demonstrated by an initial
performance test and subsequent
performance testing at least once every
5 years.
5. New Copper Converter Departments
a. What did we propose for the new
copper converter departments pursuant
to CAA section 112(d)(2) and (d)(3)?
lotter on DSK11XQN23PROD with RULES3
The EPA proposed in the 2022
proposal a MACT floor limit for new
copper converters of 0.031 lbs of PM10
per ton of copper concentrate feed
charged to the smelting vessel. We also
proposed that compliance with the PM10
emissions limit for new copper
converter departments will be
demonstrated through an initial
performance test followed by
compliance test at least once per year.
b. How did the new copper converter
departments revisions made pursuant to
CAA section 112(d)(2) and (3) change
since proposal?
The proposed limit and compliance
requirements were not changed.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
c. What key comments did we receive
on the proposed new copper converter
departments revisions made pursuant to
CAA section 112(d)(2) and (3) and what
are our responses?
The EPA did not receive notable
comments on the proposed limit or
proposed compliance requirements.
d. What is the rationale for our final
approach and final decisions for the
new copper converter departments
revisions made pursuant to CAA section
112(d)(2) and (3)?
As discussed in the 2022 proposal,
the 2002 major source NESHAP current
requirement for new converters is that
the use of new batch copper converters
is prohibited. Any new copper
converters covered by the major source
NESHAP would need to be continuous
converters or some other currently
unknown non-batch converter
technology. However, the 2002 major
NESHAP did not include an emissions
standard for new converters. Therefore,
pursuant to CAA section 112(d)(2) and
(3), the EPA is finalizing, as proposed in
the 2022 proposal, the MACT floor limit
for new copper converters of 0.031 lbs
of PM10 per ton of copper concentrate
feed charged to the smelting vessel and
related compliance requirements. As
discussed in the 2022 proposal, there
are currently no existing continuous
converters in the major source category,
and therefore, we did not propose and
are not finalizing an emission standard
for existing continuous copper
converters. Also as discussed in the
2022 proposal, since there are no
existing continuous copper converters
in the major source category, the PM10
limit is based on the performance of the
best similar source, which is the
Kennecott primary copper smelting
facility. We did not identify any costeffective BTF options.
D. Final Rule Amendments Addressing
Bypass Stack Emissions
1. What revisions did we propose for
bypass stack emissions?
We proposed in the 2023
supplemental proposal prohibiting the
use of a bypass stack. We also proposed
in the 2023 supplemental proposal a
definition of ‘‘bypass stack’’ in 40 CFR
63.1459 and proposed that use of a
bypass stack will result in a violation of
the numerical emission standards
contained in the Primary Copper
Smelting NESHAP in 40 CFR 63.1444.
We proposed that the use of a bypass
stack during a performance test will
invalidate the test.
PO 00000
Frm 00034
Fmt 4701
Sfmt 4700
2. How did the bypass stack revisions
change since proposal?
Based on consideration of comments,
the EPA is not prohibiting the use of a
by-pass stack. Instead, EPA is
promulgating a work practice standard
pursuant to CAA section 112(h) to
minimize HAP emissions vented
through a bypass stack during planned
maintenance events. We are
promulgating work practices instead of
an emissions limit because we
determined it is not economically or
technically feasible to complete valid
PM compliance tests during these
events. When it is infeasible to reliable
conduct valid compliance tests, such as
in this case, the CAA section 112(h)
allows EPA to establish work practice
standards instead of a numerical
emissions limit.
When the bypass stack is used, the
process concentrate feed will be ceased,
but pollution controls will remain
operating until no copper is being
processed by the converters. During
these periods, a charge remains in the
electric furnace to ensure the material
remains molten, any additional
emissions from the smelting process are
nominal because the smelting furnace
and converters are not operating, and a
crust will form on the slag surface of the
electric furnace minimizing flow rate
and emissions. Only once the crust is
formed, the bypass is then opened to
vent residual gases prior to conducting
maintenance. A CEMS for flow and SO2
or a PM detector at the duct for the
bypass stack may be used, and data from
the CEMS confirms the emissions
during these planned maintenance
activities are minimal. We are revising
the definition of a bypass stack to reflect
this approved purpose.
3. What key comments did we receive
on the proposed bypass stack revisions
and what are our responses?
Comment: Several commenters
supported the EPA’s proposal to
prohibit the use of bypass stacks, noting
that a bypass stack is a negligent
mechanism that promotes a reactive
rather than a proactive approach to a
facility’s pollution. One user of bypass
stacks disagreed with the proposal to
eliminate their use, noting it is overly
broad and ignores essential work
practices designed to ensure the safe
maintenance of process and pollution
control equipment. The commenter
noted that the bypass is used during
maintenance and in particular prior to
entering process vessels or confined
spaces. In these instances, the
commenter explained that the
concentrate feed is ceased, but pollution
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
controls remain operating until no more
copper is being processed by the
converters. During these periods, a
charge remains in the electric furnace to
ensure the material remains molten, any
additional emissions from the smelting
process are nominal because the
smelting furnace and converters are not
operating, and a crust will form on the
slag surface of the electric furnace
minimizing emissions. The commenter
further explained that the bypass is then
opened to vent residual gases prior to
conducting maintenance. The
commenter noted that they operate a
CEMS for flow and SO2 at the duct for
the bypass stack, and data from this
CEMS confirms the SO2 emissions
during these maintenance activities are
minimal. The commenter does not
believe it is appropriate for the use of
the bypass to be considered a violation
of the numerical emission standards of
the NESHAP or a bypass of the
associated air pollution control devices
(APCDs). In the maintenance periods
when the bypass is used, emissions are
expected to be small and below
applicable limits, and air pollution
control equipment is either not possible
or unnecessary. The commenter
recommended that the EPA promulgate
work practice standards to regulate the
use of the bypass. An additional
comment was submitted after the
comment period ended which also
explained in more detail the challenges
of testing the bypass stack siting zero or
near zero velocities and volumetric flow
rates at the stack.
Response: The EPA has reviewed the
information provided and we are
establishing a work practice standard for
use of the bypass stack to allow planned
maintenance of the control devices and
processes to be conducted safely. When
the bypass stack is used, the work
practice must be followed, and the
smelting furnaces and converters must
not be operating. The control devices
will remain operational until a crust is
formed on the slag and emissions are
minimal. The HAP emission limits are
on a concentrate feed basis and during
the work practice standards the feed
concentrate ceases so the HAP limit is
not applicable. Since the bypass stack is
only used in planned maintenance, flow
rate and SO2 will be minimal but need
to be monitored and emissions are
expected to be minimal due to the low
or lack of flow rate and when the work
practice standards are implemented. We
are finalizing the definition ‘‘bypass
stack’’ in 40 CFR 63.1459. We are also
finalizing that the use of a bypass stack
during a performance test will
invalidate the test. These conditions are
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
consistent with the EPA’s interpretation
of the application of the court’s decision
in Sierra Club v. EPA, 551 F. 3d 1019
(D.C. Cir. 2008).
4. What is the rationale for our final
approach and final decisions for bypass
stack emissions?
The EPA’s rationale for allowing the
use of a bypass stack is to ensure safety
during essential planned maintenance
events, and the approach being finalized
ensures that applicable emission limits
continue to be met. For this reason, we
are promulgating the following work
practice standard for the use of bypass
stacks at Primary Copper Smelters:
In the case of planned maintenance,
feed to the IsaSmelt® Furnace must
cease; power to the electric furnace
must be lowered and a crust must be
allowed to form on the surface of the
slag; the operation of the converters
must cease and the converters rolled
out; and the operation of the anode
vessels must cease. Once the main
process units are shut down, residual
process gases may be re-directed from
the acid plant. If the fan to the anode
refining point source baghouse is
functioning, then the residual process
gases must be redirected to the control
device. If there is a shutdown or
emergency shutdown event, the control
devices should continue to run until
process emissions cease. If the control
devices are shut down before the
process emissions cease and the bypass
stack is used to vent to the process gas
to the atmosphere, there will be a
violation of the work practice standards.
In addition to this work practice
standard, we finalize, as proposed, that
the use of a bypass stack is not
permitted during compliance
performance tests of the processes. We
estimate that Freeport will not incur
costs to comply with the final work
practices because they are already
implementing them at their facility.
E. Final Rule Amendments Addressing
Compliance Dates
1. What compliance dates did we
propose?
In the 2022 proposal, the EPA
proposed that existing facilities must
comply with the anode refining point
source limit within one year. In the
supplemental proposal, we proposed a
combined roofline PM emission limit
with a compliance timeframe of 2 years
following promulgation, and a 1-year
compliance timeframe following
promulgation for emission limits for
mercury, HCl, chlorine, D/F, benzene,
toluene, PAHs excluding naphthalene,
and naphthalene. We also proposed in
PO 00000
Frm 00035
Fmt 4701
Sfmt 4700
41681
the supplemental proposal a compliance
timeframe of 2 years following
promulgation for the co-proposed
options for the aisle scrubber at
Freeport.
2. How did the compliance dates change
since proposal?
We are promulgating option 2 for the
aisle scrubber at Freeport, which we
expect will require the installation of
PM controls (such as a baghouse) to
control emissions from the Hoboken
converter process fugitive capture
system in order to comply with the
emission standard (a combined PM limit
at the aisle scrubber outlet). Option 2 is
being promulgated pursuant to section
112(d)(6); therefore, we are revising its
compliance date to 3 years following
promulgation. We are also revising the
compliance time for anode refining
point sources. As discussed in section
III.F., for anode refining point sources
where the anode emissions are not
combined with Hoboken converter
process fugitive capture system
emissions in an aisle scrubber, we are
finalizing the proposed requirement that
existing facilities must comply within 1
year after promulgation. For anode
refining point sources that combine
their anode emissions with Hoboken
converter process fugitive capture
system emissions in an aisle scrubber,
compliance with the anode refining
point source limit will be demonstrated
through compliance with the combined
PM limit at the aisle scrubber outlet and
its associated compliance date.
3. What key comments did we receive
on the proposed compliance dates and
what are our responses?
Comment: Commenters stated that the
EPA should allow 3 years for
compliance with the combined roofline
PM emission limit. The commenters
stated there are also significant practical
reasons for a 3-year compliance period
including the complex design and
engineering of the most cost efficient
and reliable combination of control
options to achieve the targeted emission
reductions. According to the
commenters, the design and engineering
involves multiple time-consuming steps
to (i) assess the emission sources, (ii)
evaluate the potential control options
for effectiveness, reliability and cost,
(iii) design engineering of the final
scope, (iv) procurement in a current
environment where supply issues are
common, (v) construction, and finally
(vi) startup, which will be challenging
to accomplish in 3 years, much less 2.
Response: We acknowledge the
complex nature of the engineering
involved to evaluate the best controls to
E:\FR\FM\13MYR3.SGM
13MYR3
41682
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
use to comply with the final combine
roofline PM standard, as well as the
potential supply issues; however, the
combined roofline PM emission limit is
being promulgated pursuant to CAA
section 112(f)(2), to address
unacceptable risk. Section 112(f)(2) of
the CAA allows up to two years after the
effective date of a standard to comply if
the Administrator finds it is necessary
for the installation of controls.
lotter on DSK11XQN23PROD with RULES3
4. What is the rationale for our final
approach and final decisions for
compliance dates?
We are promulgating compliance
times for the standards in the rule based
on time frames allowed in CAA, which
includes up to 2 years for section
112(f)(2), and up to 3 years for sections
112(d)(2) and (3), and 112(d)(6), along
with our judgement of when the
standards can be met. The final
compliance dates are as follows:
• Three years within promulgation
for meeting the combined PM limit for
the anode point source emissions that
are combined with Hoboken converter
process fugitive capture system
emissions;
• Three years within promulgation
for meeting the anode refining point
source standard for anode point source
emissions that are combined with
Hoboken converter process fugitive
capture system emissions;
• One year within promulgation for
meeting the anode refining point source
standard for anode point source
emissions that are not combined with
Hoboken converter process fugitive
capture system emissions; and
• Two years within promulgation for
meeting the combined roofline PM
emission limit;
• Three years within promulgation
for meeting the combined roofline lead
emission limit and design standards;
• One year within promulgation or
meeting standards for mercury, HCl,
chlorine, D/F, benzene, toluene, PAHs
excluding naphthalene, and
naphthalene; and
• 180 days within promulgation for
all other revisions including compliance
with SSM revisions and bypass stack
revisions.
For new sources, all standards in the
rule are effective immediately upon the
effective date of the standard, or upon
startup, whichever is later. We are
finalizing a new table, table 4, in the 40
CFR part 63, subpart QQQ, to provide
the applicability and compliance dates
for the new standards to assist facilities
with determining these timeframes.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
F. Other Major Comments
Comment: A commenter stated that
they understood the EPA’s assertion that
fenceline monitoring is not appropriate
for this source category given roof top
emissions would not be measured at the
fenceline. The Commenter stated that
HAP metals tend to deposit within a few
miles of the facility and therefore
suggested that EPA consider community
monitoring similar to those proposed in
the Ethylene Oxide Sterilizer Rule.
Another commenter noted that the
EPA’s assertion that fenceline
monitoring is not appropriate for this
source category is refuted by EPA’s air
toxics standards for integrated iron and
steel mills (‘‘Steel Mills’’), in which the
agency finds that fugitive emissions
come from heights of 100 feet or more
and proposed fenceline monitoring.
Alternatively to fenceline monitoring,
the EPA could provide for monitors
placed higher up, either on existing
structures or structures built for the
purpose but does not even discuss this
possibility.
Response: As stated in the 2023
supplemental proposal, we considered
the possibility of a fenceline monitoring
requirement and determined that it is
not appropriate for this source category.
When considering whether fenceline
monitoring was appropriate for this
source category, we examined the
potential for fugitive HAP emissions to
be significant, particularly at or near
ground level, and whether there are
measurement capabilities for the
expected pollutants to be monitored, in
this case lead and/or arsenic. For this
source category, we did not identify any
significant sources of ground level
emissions. Other considerations
included whether there are similar
sources located at facilities in other
source categories where fenceline
monitoring is already being conducted.
For example, we recognize that one
similarity between integrated iron and
steel facilities and primary copper
facilities is that both source categories
have fugitive metal HAP emissions from
roof vents, and as mentioned by the
commenter, EPA is requiring fenceline
monitoring of chromium at the II&S
facilities. However, there are also
important differences. First, we are
promulgating process fugitive numeric
emission limits for the roofline vents at
major source primary copper smelters
and requirements for annual compliance
testing of the roofline vents at these
sources. In contrast, the integrated iron
and steel final rule (89 FR 23294, April
3, 2024) did not include numeric
emission limits for the roofline vents
and does not require any emissions
PO 00000
Frm 00036
Fmt 4701
Sfmt 4700
testing from the roof vents (other than
opacity readings). Instead, in the
Integrated Iron and Steel NESHAP, the
EPA finalized the following: (1) work
practice standards for the basic oxygen
process furnaces (BOPFs), Bell Leaks
(charging operation) and beaching; and
(2) opacity limits for slag processing and
planned bleeder valve openings.
Secondly, we note that some of the
sources of fugitive emissions at
integrated iron and steel are at ground
level such as slag processing and
beaching. We have not identified any
significant sources of ground level
fugitive emissions at the primary copper
smelters. Furthermore, regarding
fugitive emissions from the roof vents,
unlike Primary Copper facilities (for
which we have test data and will obtain
future test data through emissions
testing requirements), we have no
emissions test data from roof vents at
integrated iron and steel (II&S) facilities.
Therefore, in the integrated iron and
steel rulemaking, fenceline monitoring
for chromium was proposed and
finalized to ensure that the work
practices and opacity limits for these
unmeasured fugitive and particulate
emissions sources at integrated iron and
steel facilities are achieving the
anticipated reductions.
In addition, we disagree with the
commenter’s suggestion to place
monitors at an elevated height.
Fenceline ambient air monitors are
typically used to monitor the potential
exposure of nearby communities to
ground level pollutant emissions;
therefore, placing monitors at a height
higher than the standard 1.5 meters (the
breathing zone) would not be
appropriate.
Furthermore, there are lead monitors
and arsenic monitors already in the
surrounding community nearby the
major source facilities, and, as stated in
the 2022 proposal, Utah Division of Air
Quality (UDAQ), conducted lead
ambient monitoring near the area source
facility (Kennecott) from January 2010
through June 2017. With EPA’s
concurrence, this lead monitor was
shutdown after UDAQ was able to
demonstrate that the likelihood of
violating the NAAQS for lead was so
low that it was no longer necessary to
monitor.
We maintain in the final rule, as
stated in the 2023 supplemental
proposal, that these characteristics
suggest that fenceline monitoring—
which is typically used to detect
emissions that can be difficult to control
or measure at the points where they are
emitted, and to identify the need for
follow-up investigation and corrective
action—would have relatively limited
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
value in the context of this primary
copper smelting source category.
We also note that while the EPA’s EtO
Sterilizers proposal requested comment
on the appropriateness of community
monitoring, EPA did not propose or
finalize fenceline or ambient air
monitoring requirements in the EtO
Sterilizers rule (88 FR 22790, April 13,
2023; 89 FR 24090, April 5, 2024).
Comment: A commenter stated that
process fugitive emissions captured and
ducted to a baghouse, emissions from
the secondary capture system for the
converter department and the anode
refining department or the alternative
proposed baghouse-based emissions
from the converter department should
be monitored by PM CEMS to ensure
compliance.
Response: The EPA has included PM
CEMS as an option for continued
compliance in the final rule. Either an
operating parameter established during
the performance test or PM CEMS will
be utilized to demonstrate continued
compliance.
V. Summary of Cost, Environmental,
and Economic Impacts and Additional
Analyses Conducted
A. What are the affected facilities?
The Primary Copper Smelting source
category includes any facility that uses
a pyrometallurgical process to extract
copper from copper sulfur ore
concentrates, native ore concentrates, or
other copper bearing minerals. There are
currently 3 copper smelting facilities: 2
are major sources and 1 is an area
source. No new copper smelting
facilities are currently being constructed
or are planned in the near future.
1. 40 CFR Part 63, Subpart QQQ
The affected sources subject to 40 CFR
part 63, subpart QQQ, the major source
NESHAP, are copper concentrate dryers,
smelting furnaces, slag cleaning vessels,
copper converter departments, and
fugitive emission sources.
lotter on DSK11XQN23PROD with RULES3
2. 40 CFR Part 63, Subpart EEEEEE
Under 40 CFR part 63, subpart
EEEEEE, the area source NESHAP, the
affected sources are copper concentrate
dryers, smelting vessels, converting
vessels, matte drying and grinding
plant, secondary gas systems, anode
refining furnaces, and anode shaft
furnaces.
B. What are the air quality impacts?
The final amendments in this action
would achieve about 8.0 tpy (7.99 tpy
rounded) reduction of HAP metals
emissions (primarily lead, arsenic,
cadmium) from process fugitives
associated with roofline vents and
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
emissions from the aisle scrubber
(combined primary emissions from
anode refining department and
emissions from the Hoboken converter
process fugitive capture system). In this
action, we are also finalizing additional
work practices that we estimate will
achieve some additional unquantified
HAP emissions reductions. These final
amendments will also reduce risks to
public health and the environment, as
described above in this preamble.
Furthermore, we are finalizing new
standards for mercury, benzene,
toluene, HCl, chlorine, PAH, and
dioxins/furans. We do not expect to
achieve reductions in emissions with
these new standards. However, these
standards will ensure that the emissions
remain controlled and minimized
moving forward. The final amendments
also include removal of the SSM
exemptions.
C. What are the cost impacts?
As described above, the PM standard
for the combined emissions from
roofline vents would require additional
controls to be installed at the Freeport
facility. We estimate capital costs of
$10.2 million and total annual costs of
$2.3 million (includes annual testing
costs) for Freeport (2022 dollars). Total
annual costs include annualized capital
costs, annual operating and
maintenance costs, and annual testing
costs. Additionally, we estimate that the
Freeport facility will need to install
additional controls to comply with the
emission limit for the combined gas
stream including the anode refining
point source and the Hoboken converter
process fugitive capture system. We
estimate capital costs of $59.5 million
and total annual costs of $10.8 million
will be incurred by Freeport. The
Asarco facility will need to install
additional controls to comply with the
design standards and lead emission
limit in this final rule. We estimate
capital costs of $15.4 million and total
annual costs (including testing) of $3.9
million will be incurred by Asarco.
We expect that both Asarco and
Freeport will incur additional costs for
compliance testing. The estimated
annual costs for performance testing of
the previously unregulated HAP are
$87,980 for the Freeport facility and
$113,340 for the Asarco facility. The
estimated annual costs for compliance
testing for the anode refining point
source and roofline PM emissions
standards for the Asarco facility is
$138,157.
The total annual costs of all the final
requirements (i.e., annualized capital,
annual operating and maintenance, and
annual emissions testing costs) are
PO 00000
Frm 00037
Fmt 4701
Sfmt 4700
41683
estimated to be about $17.3 million. The
total capital costs of the final rule are
estimated to be about $85.1 million.
D. What are the economic impacts?
The economic impacts associated
with this final rule were estimated over
an 8-year time frame from 2024 to 2031
using 3 percent and 7 percent discount
rates. The present value (PV) of the
estimated costs of this final rule,
discounted at a 7 percent rate over the
2024 to 2031 period, is $139 million in
2022 dollars. The equivalent annual
value (EAV) of the estimated costs is
$23 million at a 7 percent discount rate.
At a 3 percent discount rate, the PV and
EAV of the cost impacts are estimated
to be $146 million and $21 million,
respectively. This final rule does not
impact any small entities.
This final rule is not expected to have
significant impacts on domestic copper
production; the market price for
commercial grade copper or any
products comprised of copper inputs; or
employment, for several reasons. First,
the estimated annual costs of this final
rule are expected to be small compared
to the potential annual revenues of the
U.S. primary copper smelting industry.
For example, the U.S. Geological Survey
(USGS) estimates 2020 primary copper
smelter production was 315,000 mt.7
Applying an export price for
unmanufactured anodes and blister of
$5,400 per mt that year, industry
revenues in 2020 would have been an
estimated $1.7 billion.8 The estimated
annual costs of the final rule ($18
million) represent about one percent of
this 2020 annual revenue estimate.
Additionally, the affected companies are
accustomed to spending large sums on
annual maintenance. The 2022 annual
report for Freeport-McMoran noted that
they spent $87 million on annual
maintenance in 2021 at the Miami
smelter.9 The estimated annual costs of
this final rule for this Freeport facility
are $13 million, which is much lower
than those maintenance expenditures.
In addition, Freeport benefits from
integrating its mining operations with
its smelter. By being vertically
integrated, Freeport is able to insulate
itself from volatility in the cost of
7 See U.S. Geological Survey. Copper Statistics
and Information. National Minerals Information
Center. Annual Publication for 2020. Available at:
https://www.usgs.gov/centers/national-mineralsinformation-center/copper-statistics-andinformation. Note that 2020, which was a year of
relatively low production compared to previous
years is the most recent year for which USGS has
this information available.
8 Ibid.
9 Freeport -McMoran. 2022 Annual Report.
Available at: https://s22.q4cdn.com/529358580/
files/doc_financials/annual/AR_2022.pdf.
E:\FR\FM\13MYR3.SGM
13MYR3
41684
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
smelting relative to a scenario where it
outsources the smelting process. For
this reason, the EPA expects that
Freeport’s incentive to maintain its
smelting operation may extend beyond
the margins earned solely on the
smelting process. The EPA expects that
Freeport can comply with this rule
while continuing to operate its smelter
at a similar capacity as it would under
baseline conditions. Finally, due to
trade exposure and the commodified
nature of copper products (i.e., the
interchangeability of copper products
manufactured by different producers),
the EPA expects that the affected
companies are price takers, and thus we
would not expect price impacts due to
this final rule. The complete economic
analysis can be found in the
memorandum Economic Impact
Analysis for the Final Residual Risk and
Technology Review of the National
Emission Standards for Hazardous Air
Pollutants for Primary Copper Smelting
Sources, available in the docket.
E. What are the benefits?
1. 40 CFR Part 63, Subpart QQQ
lotter on DSK11XQN23PROD with RULES3
As described above, the final
amendments would result in significant
reductions in emissions of HAP metals,
especially lead and arsenic. Both lead
and arsenic are persistent
bioaccumulative toxic (PBT) HAPs and
developmental toxicants, with
particular impacts on infants, children
and the developing fetus. The final
amendments will reduce risk from the
source category to acceptable levels and
ensure the NESHAP provides an ample
margin of safety to protect public health.
The benefits associated with the
emission reductions were not able to be
monetized but include reductions in
both cancer and noncancer (e.g.,
developmental) endpoints. Some
unquantified benefits of these
amendments will accrue to Tribal
nations living in proximity to these
VerDate Sep<11>2014
22:36 May 10, 2024
Jkt 262001
facilities; the reduction in cancer and
non-cancer risks due to emissions of
PBT HAP metals will benefit Tribal and
other communities overburdened by air
pollution. The final amendments also
revise the standards such that they
apply at all times, which includes SSM
periods. Furthermore, the final
requirements to submit reports and test
results electronically will improve
monitoring, compliance, and
implementation of the rule.
2. 40 CFR Part 63, Subpart EEEEEE
The final amendments under 40 CFR
part 63, subpart EEEEEE, revise the
standards such that they apply at all
times, which includes SSM periods.
Furthermore, the final requirements to
submit reports and test results
electronically will improve monitoring,
compliance, and implementation of the
rule.
F. What analysis of environmental
justice did we conduct?
For purposes of analyzing regulatory
impacts, the EPA relies upon its June
2016 Technical Guidance for Assessing
Environmental Justice in Regulatory
Analysis, which provides
recommendations that encourage
analysts to conduct the highest quality
analysis feasible, recognizing that data
limitations, time, resource constraints,
and analytical challenges will vary by
media and circumstance. The Technical
Guidance states that a regulatory action
may involve potential environmental
justice (EJ) concerns if it could: (1)
create new disproportionate impacts on
communities with EJ concerns; (2)
exacerbate existing disproportionate
impacts on communities with EJ
concerns; or (3) present opportunities to
address existing disproportionate
impacts on communities with EJ
concerns through this action under
development.
The EPA’s EJ technical guidance
states that ‘‘[t]he analysis of potential EJ
PO 00000
Frm 00038
Fmt 4701
Sfmt 4700
concerns for regulatory actions should
address three questions: (A) Are there
potential EJ concerns associated with
environmental stressors affected by the
regulatory action for population groups
of concern in the baseline? (B) Are there
potential EJ concerns associated with
environmental stressors affected by the
regulatory action for population groups
of concern for the regulatory option(s)
under consideration? (C) For the
regulatory option(s) under
consideration, are potential EJ concerns
created or mitigated compared to the
baseline?’’ 10
The environmental justice analysis is
presented for the purpose of providing
the public with as full as possible an
understanding of the potential impacts
of this final action. The EPA notes that
analysis of such impacts is distinct from
the determinations finalized in this
action under CAA section 112, which
are based solely on the statutory factors
the EPA is required to consider under
that section.
To examine the potential for
Environmental Justice concerns, the
EPA conducted a baseline proximity
analysis, baseline risk-based analysis
(i.e., before implementation of any
controls proposed by this action), and
post-control risk-based analysis (i.e.,
after implementation of the controls
proposed by this action) for the Freeport
facility (tables 4 and 5). The total
population, population percentages, and
population count for each demographic
group for the entire U.S. population are
shown in the column titled
‘‘Nationwide Average’’ in tables 4 and 5
of this preamble. These national data are
provided as a frame of reference.
BILLING CODE 6560–50–P
10 Technical Guidance for Assessing
Environmental Justice in Regulatory Analysis, U.S.
EPA, June 2016. Quote is from section 3—Key
Analytic Considerations, page 11.
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
41685
Table 4. Comparison of Baseline and Post-Control Demographics of the Population with
Cancer Risk Greater than or Equal to 1-in-1 Million and 10-in-1 million Living Within 5
km of the Freeport Primary Copper Smelting Facility
Demographic
Group
Total
Population
Total
Population
Nationwide
Living
Average
Within
5km
330M
Cancer Risk 2:1-in-1
million
6,600
Cancer Risk 2: 10-in-1
million
Baseline
PostControl
Baseline
PostControl
6,600
6,600
1,500
150
Race and Ethnicity by Percent [Number of people]
White
59 percent
[195M]
44 percent
[2,900]
44 percent
[2,900]
44 percent
[2,900]
42 percent
[700]
45 percent
[<100]
Black
12 percent
[40M]
2 percent
[200]
2 percent
[200]
2 percent
[200]
7 percent
[100]
8 percent
[<100]
American
Indian or
Alaska
Native
0.6 percent
[2M]
1.9 percent
[100]
1.9 percent
[100]
1.9
percent
[100]
0.6 percent
[<100]
0.0 percent
[0]
48 percent
[3,200]
48 percent
[3,200]
48 percent
[3,200]
42 percent
[600]
36 percent
[<100]
4 percent
[200]
4 percent
[200]
4 percent
[200]
9 percent
[100]
1lpercent
[<100]
23 percent
[400]
27 percent
[<100]
77 percent
[1,200]
73 percent
[100]
Hispanic or
Latino
(includes
white and
nonwhite)
19 percent
[63M]
Other and
Multiracial
9 percent
[30M]
Income by Percent [Number of People]
Below
Poverty
Level
Above
Poverty
Level
13 percent
[43M]
87 percent
[287M]
21 percent
[1,400]
21 percent
[1,400]
21 percent
[1,400]
79 percent
[5,200]
79 percent
[5,200]
79 percent
[5,200]
> 25 w/o a
HS Diploma
12 percent
[40M]
23 percent
[1,500]
23 percent
[1,500]
23 percent
[1,500]
22 percent
[300]
21 percent
[<100]
> 25 w/HS
Diploma
88 percent
[290M]
77 percent
[5,100]
77 percent
[5,100]
77 percent
[5,100]
78 percent
[1,200]
79 percent
[100]
Linguistically Isolated by Percent [Number of People]
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00039
Fmt 4701
Sfmt 4725
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.105
lotter on DSK11XQN23PROD with RULES3
Education by Percent [Number of People]
41686
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Linguistically
Isolated
5 percent
[17M]
4 percent
[300]
4 percent
[300]
4 percent
[300]
9 percent
[100]
1lpercent
[<100]
Notes:
•
The nationwide population and all demographic percentages are based on the Census' 2016-2020 American
Community Survey 5-year block group averages and include Puerto Rico. The total population count is based
on the 2020 Decennial Census block population.
•
To avoid double counting, the "Hispanic or Latino" category is treated as a distinct demographic category for
these analyses. A person who identifies as Hispanic or Latino is counted as Hispanic/Latino, regardless of what
race this person may have also identified as in the Census.
Table 5. Comparison of Baseline and Post-Control Demographics of the Population with
Cancer Risk Greater than or Equal to 1-in-1 Million and 10-in-1 million Living Within 50 km
of the Freeport Primary Copper Smelting Facility
Demographic
Group
Total Population
Nationwide
Average
330M
Total
Population
Living
Within 50km
32,300
Cancer Risk ~l-in-1 million
Cancer Risk ~ 10-in-1
million
Baseline
PostControl
Baseline
PostControl
21,900
16,000
4,600
150
Race and Ethnicity by Percent [number of people]
White
59 percent
[195M]
38 percent
[12,400]
36 percent
[7,900]
49 percent
[7,800]
45 percent
[2,100]
45 percent
[<100]
Black
12 percent
[40M]
0.7 percent
[200]
1 percent
[200]
1 percent
[200]
3 percent
[100]
8 percent
[<100]
American
Indian or
Alaska Native
0.6 percent
[2M]
24 percent
[7,800]
24 percent
[5,700]
4 percent
[640]
1 percent
[<100]
0 percent
[0]
Hispanic or
Latino (includes
white and
nonwhite)
19 percent
[63M]
33 percent
[10,700]
33 percent
[7,200]
42 percent
[6,700]
44 percent
[2,000]
36 percent
[<100]
Other and
Multiracial
9 percent
[30M]
4 percent
[1,300]
4 percent
[900]
4 percent
[600]
7 percent
[300]
11 percent
[<100]
13 percent
[43M]
23 percent
[7,400]
24 percent
[5,300]
16 percent
[2,600]
14 percent
[600]
27 percent
[<100]
Above Poverty
Level
87 percent
[287M]
77 percent
[24,900]
76 percent
[16,600]
84 percent
[13,400]
86percent
[4,000]
73 percent
[100]
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00040
Fmt 4701
Sfmt 4725
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.107
Below Poverty
Level
ER13MY24.106
lotter on DSK11XQN23PROD with RULES3
Income by Percent [Number of People]
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
41687
Education by Percent [Number of People]
> 25 w/o a HS
Diploma
12 percent
[40M]
17 percent
[5,500]
18 percent
[3,900]
16 percent
[2,600]
14 percent
[600]
21 percent
[<100]
> 25 w/HS
Diploma
88 percent
[290M]
83 percent
[26,800]
82 percent
[18,000]
84 percent
[13,400]
86 percent
[4,000]
79 percent
[100]
4 percent
[200]
11 percent
[<100]
Linguistically Isolated by Percent [Number of People]
Linguistically
Isolated
5 percent
[17M]
3 percent
[1,000]
3 percent
[700]
2 percent
[300]
lotter on DSK11XQN23PROD with RULES3
BILLING CODE 6560–50–C
The baseline proximity demographic
analysis is an assessment of individual
demographic groups in the total
population living within 5 km (∼3.1
miles) and 50 km (∼31 miles) of the
facility. Approximately 32,300 and
6,600 people live within 50km and 5
km, respectively of the Freeport facility.
The results of the proximity
demographic analysis indicate that the
percent of the population that is
Hispanic or Latino and that is American
Indian or Alaska Native is higher than
the corresponding national averages.
This is particularly true for the
population within 50km, which is 24
percent American Indian or Alaska
Native, which is significantly above the
0.6 percent national average. The
percent of people living below the
poverty level and percent of people over
the age of 25 without a high school
diploma are also higher than the
national averages.
The risk-based demographic analysis
focused on the populations living
within 5 km (∼3.1 miles) and 50 km of
the Freeport facility with estimated
cancer risks greater than or equal to 1in-1 million and greater than or equal to
10-in-1 million resulting from Primary
Copper Smelting source category
emissions. The baseline risk analysis
indicated that emissions from the source
category, prior to controls in this action,
expose 6,600 people living within 5 km
and 21,900 people living within 50 km
to a cancer risk greater than or equal to
1-in-1 million, and 1,500 people living
within 5 km and 4,600 people living
within 50 km to a cancer risk greater
than or equal to 10-in-1 million. The
post-control risk-based demographic
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
analysis, which is an assessment of risks
to individual demographic groups in the
population living within 5 km and 50
km of the facilities after implementation
of the controls in this action (‘‘postcontrol’’), indicated that post-control
emissions from the source category
expose 6,600 people living within 5 km
and 16,000 people living within 50 km
to a cancer risk greater than or equal to
1-in-1 million and 150 people living
within 5 km and 150 people living
within 50 km to a cancer risk greater
than or equal to 10-in-1 million.
The demographics of the population
living within 5 km with baseline cancer
risks greater than or equal to 1-in-1
million is the same as the total
population living within 5 km (i.e., all
individuals living within 5 km have a
baseline cancer risk greater than or
equal to 1-in-1 million). Also, since the
controls do not reduce the number of
individuals living within 5km with risks
greater than or equal to 1-in-1 million,
the post-control demographics are also
the same as the baseline. The
demographics of the population living
within 5 km with baseline and postcontrol cancer risks greater than or
equal to 10-in-1 million indicates that
the percentage of the population that is
Hispanic or Latino, living below the
poverty level, over 25 without a high
school diploma and in linguistic
isolation are significantly above the
corresponding national averages.
However, the number of individuals
exposed to post-control risks greater
than or equal to 10-in-1 million is
reduced by a factor of 10 for each
demographic.
PO 00000
Frm 00041
Fmt 4701
Sfmt 4700
The demographics of the population
living within 50 km with baseline
cancer risks greater than or equal to 1in-1 million indicates that the
percentage of the population that is
American Indian or Alaska Native,
Hispanic or Latino, living below the
poverty level, over 25 without a high
school diploma and in linguistic
isolation are significantly above the
corresponding national averages. The
demographics of the population living
within 50 km with post-control cancer
risks greater than or equal to 1-in-1
million indicates that the percentage of
the population that is Hispanic or
Latino, living below the poverty level,
over 25 without a high school diploma
and in linguistic isolation are
significantly above the corresponding
national averages. The percentage of the
population that is American Indian or
Alaska Native with post-control cancer
risks greater than or equal to 1-in-1
million dropped significantly from 24
percent to 4 percent, with the number
of American Indian or Alaska Native
individuals at this risk level dropping
from 5,700 in the baseline to 640 postcontrol.
The demographics of the population
living within 50 km with baseline
cancer risks greater than or equal to 10in-1 million indicates that the
percentage of the population that is
Hispanic or Latino is significantly above
the national average. The percentage of
the population that is living below the
poverty level or over 25 without a high
school diploma are closer to the
national averages. The number of
individuals living within 50 km
exposed to post-control risks greater
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.108
Notes:
The nationwide population and all demographic percentages are based on the Census' 2016-2020 American Community
Survey 5-year block group averages and include Puerto Rico. The total population count is based on the 2020 Decennial
Census block population.
To avoid double counting, the "Hispanic or Latino" category is treated as a distinct demographic category for these
analyses. A person who identifies as Hispanic or Latino is counted as Hispanic/Latino, regardless of what race this person
may have also identified as in the Census.
41688
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
than or equal to 10-in-1 million is
reduced by about a factor of 30 for each
demographic.
The EPA provided meaningful
participation opportunities for
communities with environmental justice
concerns. The EPA proposed the
Primary Copper Smelting NESHAP in
January 2022, and received comments,
and published a supplemental proposal
in July of 2023, and received additional
comments. Communities with
environmental justice concerns had the
opportunity to comment and request
public hearings in response to both
proposals. The EPA received a
combined comment from the San Carlos
Apache Tribe, Sierra Club, and
Earthjustice; comment from The
National Tribal Air Association; a
combined comment from several nongovernmental organizations including
but not limited to the Allergy and
Asthma Network and the Children’s
Environmental Health Network. Section
IV. of this preamble provides a summary
of key comments and responses. For all
comments not discussed in this
preamble, comment summaries and the
EPA’s responses can be found in the
National Emission Standards for
Hazardous Air Pollutant Emissions:
Primary Copper Smelting Residual Risk
and Technology Review and Primary
Copper Smelting Area Source
Technology Review: Summary of Public
Comments and Responses document,
available in the docket for this action
(Docket ID No. EPA–HQ–OAR–2020–
0430). In addition to the response to
comments, the EPA conducted outreach
with potentially affected communities
by participating in the National Tribal
Air Association calls and conducted
Tribal consultations during this rule
making process. We believe this final
action will reduce adverse human
health or environmental effects on
communities with environmental justice
concerns and that the EPA provided
meaningful participation opportunities
for these communities to participate in
the development of this action.
lotter on DSK11XQN23PROD with RULES3
VI. Statutory and Executive Order
Reviews
Additional information about these
statutes and Executive orders can be
found at https://www.epa.gov/lawsregulations/laws-and-executive-orders.
A. Executive Orders 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
This action is a ‘‘significant regulatory
action’’ as defined in Executive Order
12866, as amended by Executive Order
14094. Accordingly, the EPA submitted
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
this action to the Office of Management
and Budget (OMB) for Executive Order
12866 review. Documentation of any
changes made in response to the
Executive Order 12866 review is
available in the docket. The EPA
prepared an economic analysis of the
potential impacts associated with this
action. This analysis, Economic Impact
Analysis for the Final Residual Risk and
Technology Review of the National
Emission Standards for Hazardous Air
Pollutants for Primary Copper Smelting
Sources, is also available in the docket.
B. Paperwork Reduction Act (PRA)
1. 40 CFR Part 63, Subpart QQQ
The information collection activities
in this final rule have been submitted
for approval to OMB under the PRA.
The ICR document that the EPA
prepared has been assigned OMB
Control Number 2060–0476 and EPA
ICR number 1850.10. You can find a
copy of the ICR in the docket for this
action, and it is briefly summarized
here. The information collection
requirements are not enforceable until
OMB approves them.
In this action, we are finalizing
amendments that require electronic
reporting of results of performance tests
and CEMS performance evaluations,
fugitive dust plans and notification of
compliance reports, remove the
requirement to submit certain
information related to the malfunction
exemption, and impose other rule
revisions that affect reporting and
recordkeeping requirements for primary
copper smelting facilities, such as
requirements to submit new
performance test reports and to
maintain new operating parameter
records to demonstrate compliance with
new standards. This information will be
collected to assure compliance with 40
CFR part 63, subpart QQQ.
Respondents/affected entities:
Owners or operators of primary copper
smelting facilities. Respondent’s
obligation to respond: Mandatory (40
CFR part 63, subpart QQQ).
Estimated number of respondents:
Two (total). Frequency of response:
Initial, semiannual, and annual.
Total estimated burden: The annual
recordkeeping and reporting burden for
facilities to comply with all of the
requirements in the NESHAP is
estimated to be 6,500 hours (per year).
Burden is defined at 5 CFR 1320.3(b).
Total estimated cost: The annual
recordkeeping and reporting burden for
facilities to comply with all of the
requirements in the NESHAP is
estimated to be $860,000 (per year), of
which $150,000 is for this rule, and
PO 00000
Frm 00042
Fmt 4701
Sfmt 4700
$710,000 is for the other costs related to
continued compliance with the
NESHAP.
There are no annualized capital costs.
There are an estimated $302,000 in
operation & maintenance costs
associated with periodic performance
testing.
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for the EPA’s regulations in 40
CFR are listed in 40 CFR Part 9. When
OMB approves this ICR, the Agency will
announce that approval in the Federal
Register and publish a technical
amendment to 40 CFR part 9 to display
the OMB control number for the
approved information collection
activities contained in this final rule.
2. 40 CFR Part 63, Subpart EEEEEE
The information collection activities
in this final rule have been submitted
for approval to OMB under the PRA.
The ICR document that the EPA
prepared has been assigned EPA ICR
number 2240.09. You can find a copy of
the ICR in the docket for this action, and
it is briefly summarized here. The
information collection requirements are
not enforceable until OMB approves
them.
In this action, we are finalizing
amendments that require electronic
reporting of results of performance tests
and CEMS performance evaluations and
notification of compliance reports,
remove the malfunction exemption, and
impose other revisions that affect
reporting and recordkeeping for primary
copper smelting facilities. This
information will be collected to assure
compliance with 40 CFR part 63,
subpart EEEEEE.
Respondents/affected entities:
Owners or operators of primary copper
smelting facilities. Respondent’s
obligation to respond: Mandatory (40
CFR part 63, subpart EEEEEE).
Estimated number of respondents:
One (total).
Frequency of response: Initial,
semiannual, and quarterly.
Total estimated burden: The annual
recordkeeping and reporting burden for
facilities to comply with all of the
requirements in the NESHAP is
estimated to be 15 hours (per year).
Burden is defined at 5 CFR 1320.3(b).
Total estimated cost: The annual
recordkeeping and reporting burden for
facilities to comply with all of the
requirements in the NESHAP is
estimated to be $1,973 (per year).
There are no annualized capital or
operation and maintenance costs.
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for the EPA’s regulations in 40
CFR are listed in 40 CFR part 9. When
OMB approves this ICR, the Agency will
announce that approval in the Federal
Register and publish a technical
amendment to 40 CFR part 9 to display
the OMB control number for the
approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have
a significant economic impact on a
substantial number of small entities
under the RFA. This action will not
impose any requirements on small
entities. Based on the Small Business
Administration size category for this
source category, no small entities are
subject to this action.
D. Unfunded Mandates Reform Act
(UMRA)
This action does not contain any
unfunded mandate as described in
UMRA, 2 U.S.C. 1531–1538, and does
not significantly or uniquely affect small
governments. The action imposes no
enforceable duty on any State, local, or
Tribal governments or the private sector.
E. Executive Order 13132: Federalism
This action does not have federalism
implications. It will not have substantial
direct effects on the states, on the
relationship between the National
Government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
lotter on DSK11XQN23PROD with RULES3
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action does not have Tribal
implications as specified in Executive
Order 13175. The Executive order
defines Tribal implications as ‘‘actions
that have substantial direct effects on
one or more Indian tribes, on the
relationship between the Federal
Government and Indian tribes, or on the
distribution of power and
responsibilities between the Federal
Government and Indian tribes’’. Based
on all of our analyses, we conclude that
the amendments in this action will not
have a substantial direct effect on one or
more Tribes, change the relationship
between the Federal Government and
Tribes, or affect the distribution of
power and responsibilities between the
Federal Government and Indian Tribes.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Thus, Executive Order 13175 does not
apply to this action.
Although this action does not have
Tribal implications as defined by
Executive Order 13175, consistent with
the EPA policy on coordination and
consultation with Indian Tribes, the
EPA offered government-to-government
consultation with Tribes during the
rulemaking process. The EPA held a
consultation with the San Carlos
Apache Tribe on June 7, 2022, to
discuss the 2022 proposal (Docket ID
No. EPA–HQ–OAR–2020–0430–0185)
and ensure that the views of the San
Carlos Apache Tribe were taken into
consideration in the rulemaking process
in accordance with the EPA Policy on
Consultation with Indian Tribes
(December 2023). The EPA Policy on
Consultation with Indian Tribes is
available in the docket for this action.
The topics discussed during the
consultation are described in the
consultation request letter, dated April
4, 2022 (Docket ID No. EPA–HQ–OAR–
2020–0430–0139). In addition, the EPA
also received letters from
representatives of the San Carlos
Apache Tribe expressing their concerns
due to emissions of lead and arsenic
from the primary copper smelting
facilities, which are available in the
docket for this action. In the letter,
dated September 21, 2023 (which is
available in the docket for this action),
the Tribe requested consultation. We
reached out to the Tribe on several
occasions to schedule consultation but
did not receive a response.
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
This action is not subject to Executive
Order 13045 because it is not a
significant regulatory action under
section 3(f)(1) of Executive Order 12866,
and because the EPA does not believe
the environmental health or safety risks
addressed by this action present a
disproportionate risk to children. This
action’s health and risk assessments are
contained in sections III. and IV. of this
preamble and further documented in the
document titled Freeport Baseline and
Control Options Re-model Risk Analysis
Memo, which is available in the docket
for this rule (Docket ID No. EPA–HQ–
OAR–2020–0430).
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use
This action is not a ‘‘significant
energy action’’ because it is not likely to
have a significant adverse effect on the
supply, distribution, or use of energy.
PO 00000
Frm 00043
Fmt 4701
Sfmt 4700
41689
We have concluded that this action is
not likely to have any adverse energy
effects because it contains no regulatory
requirements that will have an adverse
impact on productivity, competition, or
prices in the energy sector.
I. National Technology Transfer and
Advancement Act (NTTAA) and 1 CFR
Part 51
This rulemaking involves technical
standards. Therefore, the EPA
conducted searches for the 2022
proposal and 2023 supplemental
proposal through the Enhanced NSSN
Database managed by the American
National Standards Institute (ANSI).
The Agency also contacted VCS
organizations and accessed and
searched their databases. Searches were
conducted for the EPA Methods 1, 1A,
2, 2A, 2C, 2D, 2F, 2G, 3, 3A, 3B, 4, 5,
5B, 5D, 9, 17, 18, 22, 23, 26A, 29, 30A,
and 30B of 40 CFR part 60, appendix A,
and EPA Method 201A of 40 CFR part
51, appendix M. No applicable VCS
were identified for EPA Method 1A, 2A,
2D, 2F, 2G, 5B, 5D, 22, 30A, 30B, or
201A. During the searches, if the title or
abstract (if provided) of the VCS
described technical sampling and
analytical procedures that are similar to
the EPA’s reference method, the EPA
considered it as a potential equivalent
method. All potential standards were
reviewed to determine the practicality
of the VCS for this rule. This review
requires significant method validation
data which meets the requirements of
the EPA Method 301 for accepting
alternative methods or scientific,
engineering and policy equivalence to
procedures in the EPA reference
methods. The EPA may reconsider
determinations of impracticality when
additional information is available for
particular VCS. Four VCS were
identified as an acceptable alternative to
the EPA test methods for the purposes
of this rule.
The VCS ANSI/ASME PTC 19.10–
1981 Part 10, Flue and Exhaust Gas
Analyses, is an acceptable alternative to
the EPA Method 3B manual portion
only and not the instrumental portion.
The ANSI/ASME PTC 19.10–1981 Part
10 method incorporates both manual
and instrumental methodologies for the
determination of O2 content. The
manual method segment of the O2
determination is performed through the
absorption of O2. This VCS may be
obtained from https://webstore.ansi.org/
or from the ANSI Headquarters at 1899
L Street NW, 11th Floor, Washington,
DC 20036.
The VCS ASTM D7520–16, Standard
Test Method for Determining the
Opacity of a Plume in the Outdoor
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41690
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Ambient Atmosphere, is an
instrumental method to determine
plume opacity in the outdoor ambient
environment as an alternative to visual
measurements made by certified smoke
readers in accordance with EPA Method
9. The concept of ASTM D7520–16, also
known as the Digital Camera Opacity
Technique or DCOT, is a test protocol to
determine the opacity of visible
emissions using a digital camera. It was
based on previous method development
using digital still cameras and field
testing of those methods. The purpose of
ASTM D7520–16 is to set a minimum
level of performance for products that
use DCOT to determine plume opacity
in ambient environments. The ASTM
D7520–16 is an acceptable alternative to
the EPA Method 9 with the following
conditions:
1. During the digital camera opacity
technique (DCOT) certification
procedure outlined in section 9.2 of
ASTM D7520–16, you or the DCOT
vendor must present the plumes in front
of various backgrounds of color and
contrast representing conditions
anticipated during field use such as blue
sky, trees, and mixed backgrounds
(clouds and/or a sparse tree stand).
2. You must also have standard
operating procedures in place including
daily or other frequency quality checks
to ensure the equipment is within
manufacturing specifications as
outlined in section 8.1 of ASTM D7520–
16.
3. You must follow the record keeping
procedures outlined in 40 CFR
63.10(b)(1) for the DCOT certification,
compliance report, data sheets, and all
raw unaltered Joint Photographic
Experts Group (JPEG) files used for
opacity and certification determination.
4. You or the DCOT vendor must have
a minimum of four (4) independent
technology users apply the software to
determine the visible opacity of the 300
certification plumes. For each set of 25
plumes, the user may not exceed 15
percent opacity of anyone reading and
the average error must not exceed 7.5
percent opacity.
5. This approval does not provide or
imply a certification or validation of any
vendor’s hardware or software. The
onus to maintain and verify the
certification and/or training of the
DCOT camera, software and operator in
accordance with ASTM D7520–16 and
this letter is on the facility, DCOT
operator, and DCOT vendor.
The voluntary consensus standard
ASTM D6420–99 (Reapproved 2010),
Test Method for Determination of
Gaseous Organic Compounds by Direct
Interface Gas Chromatography/Mass
Spectrometry, employs a direct interface
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
gas chromatograph/mass spectrometer
(GCMS) to identify and quantify the 36
volatile organic compounds (or sub-set
of these compounds). This ASTM
procedure has been approved by the
EPA as an alternative to EPA Method 18
only when the target compounds are all
known and the target compounds are all
listed in ASTM D6420 as measurable.
The VCS ASTM D6784–16, Standard
Test Method for Elemental, Oxidized,
Particle-Bound and Total Mercury Gas
Generated from Coal-Fired Stationary
Sources (Ontario Hydro Method), is an
acceptable alternative to the EPA
Methods 101A and 29 (portion for
mercury only) as a method for
measuring mercury. This method
applies to concentrations approximately
0.5–100 mg/Nm3. This test method
describes equipment and procedures for
obtaining samples from effluent ducts
and stacks, equipment and procedures
for laboratory analysis, and procedures
for calculating results.
The ASTM standards are available
from ASTM at https://www.astm.org or
1100 Barr Harbor Drive, West
Conshohocken, PA 19428–2959,
telephone number: (610) 832–9500, fax
number: (610) 832–9555 email address:
service@astm.org.
The searches conducted for the 2022
proposal and 2023 supplemental
proposal identified 26 VCS that were
potentially applicable for these rules in
lieu of the EPA reference methods. After
reviewing the available standards, the
EPA determined that 26 candidate VCS
(ASTM D3154–00 (2014), ASTM
D3464–96 (2014), ASTM 3796–09
(2016), ASTM D3796–90 (2004) ISO
10780:1994 (2016), ASME B133.9–1994
(2001), ISO 10396:(2007), ANSI/ASME
PTC 19–10–1981—Part 10 (2010) Flue
and Exhaust Gas Analyses—
Instrumental Procedure Only, ISO
12039:2001 (2012), ASTM D5835–95
(2013), ASTM D6522–11, CAN/CSA
Z223.2–M86 (R1999), ISO 9096:1992
(2003), ANSI/ASME PTC–38–1980
(1985), ASTM D3685/D3685M– 98–13,
CAN/CSA Z223.1–M1977, National
Institute of Occupational Safety and
Health (NIOSH) Method 2010 ‘‘Amines,
Aliphatic’’, ASTM D6060–96 (2009), EN
1948–3 (2006), EN 1911–1,2,3 (1998),
ASTM D6735–01 (2009), ISO
10397:1993, ASTM D6331 (2014),
EN13211:2001, CAN/CSA Z223.26–
M1987, ASTM E1979–21, ASTM
D4358–05) identified for measuring
emissions of pollutants or their
surrogates subject to emission standards
in the rule would not be practical due
to lack of equivalency, documentation,
validation data and other important
technical and policy considerations.
Additional information for the VCS
PO 00000
Frm 00044
Fmt 4701
Sfmt 4700
search and determinations can be found
in the memorandums Voluntary
Consensus Standard Results for
National Emission Standards for
Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and
Technology Review and Primary Copper
Smelting Area Source Technology
Review (Docket ID No. EPA–HQ–OAR–
2020–0430–0065) and Voluntary
Consensus Standard Results for
National Emission Standards for
Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and
Technology Review and Primary Copper
Smelting Area Source Technology
Review and Voluntary Consensus
Standard Results for National Emission
Standards of Hazardous Air Pollutants:
Primary Copper Smelting Supplemental
Proposal (Docket ID No. EPA–HQ–
OAR–2020–0430–0150), which are
available in the docket for this action.
Under 40 CFR 63.7(f) and 63.8(f), a
source may apply to the EPA to use
alternative test methods or alternative
monitoring requirements in place of any
required testing methods, performance
specifications or procedures in the final
rule or any amendments.
The EPA is also incorporating by
reference EPA/100/R–10/005,
Recommended Toxicity Equivalence
Factors (TEFs) for Human Health Risk
Assessments of 2, 3, 7, 8Tetrachlorodibenzo-p-dioxin and
Dioxin-Like Compounds, December
2010. This is the international method
of expressing toxicity equivalents for
dioxins/furans where a recommended
toxicity equivalent factor (TEF) is
multiplied by each individual
compound’s (congener) emission
concentration to calculate the toxic
equivalent quotient (TEQ). To estimate
risk associated with the mixture, the
dose-response function for the index
chemical is evaluated at this sum,
which is an estimate of the total index
chemical equivalent dose for the
mixture components being considered.
This method may be obtained from
https://www.epa.gov/sites/default/files/
2013-09/documents/tefs-for-dioxin-epa00-r-10–005-final.pdf. or U.S.
Environmental Protection Agency, 1200
Pennsylvania Avenue NW, Washington,
DC 20460, (202) 272–0167, https://
www.epa.gov.
J. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations and Executive
Order 14096: Revitalizing Our Nation’s
Commitment to Environmental Justice
for All
The EPA believes that the human
health or environmental conditions that
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
exist prior to this action result in or
have the potential to result in
disproportionate and adverse human
health or environmental effects on
communities with environmental justice
concerns. The EPA evaluated the
demographic characteristics of
communities located near the major
source facilities and determined that
elevated cancer risks associated with
emissions from these facilities
disproportionately affect Native
American, Hispanic, populations Below
Poverty Level and Over 25 without High
School Diploma individuals living
nearby. As part of its environmental
justice analysis, EPA evaluated whether
the final action for the Primary Copper
Smelting Major Source Category would
address the existing disproportionately
high and adverse human health effect
on these individuals and EPA further
evaluated the projected distribution of
reductions in risk resulting from this
action.
The EPA believes that this action is
likely to reduce existing
disproportionate and adverse effects on
communities with environmental justice
concerns. The agency estimated the MIR
at Freeport will be reduced from 70-in1 million to 20-in-1 million and the
population with cancer risks greater
than or equal to 1-in-1 million will be
reduced from 21,875 to 16,962 because
of this action. We estimate that the
maximum chronic noncancer inhalation
TOSHI will be reduced from 1 to less
than 1 (0.3), and the acute HQ will be
reduced from a value of 7 to 2 at
Freeport. Given the uncertainties in the
emissions data at Asarco and the short
timeframe to complete the final rule, we
did not evaluate the impact of the final
standards on the population living in
the vicinity of the Asarco facility. The
standards in this final rule are estimated
to reduce metal HAP emissions,
primarily lead and arsenic, from this
source category by 8.0 tpy.
The methodology and the results of
the demographic analysis are presented
in section V.F. of this preamble and in
the technical report Risk and
Technology Review—Analysis of
Demographic Factors for Populations
Living Near Primary Copper Smelting
Source Category Operations—Final Rule
(Docket ID No. EPA–HQ–OAR–2020–
0430). The information supporting this
Executive order review is contained in
section V.F. of this preamble.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
States. This action is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
List of Subjects in 40 CFR Part 63
Environmental protection,
Administrative practice and procedures,
Air pollution control, Hazardous
substances, Incorporation by reference,
Intergovernmental relations, Reporting
and recordkeeping requirements.
Michael S. Regan,
Administrator.
For the reasons stated in the
preamble, title 40, chapter I of the Code
of Federal Regulations is amended as
follows:
PART 63—NATIONAL EMISSION
STANDARDS FOR HAZARDOUS AIR
POLLUTANTS FOR SOURCE
CATEGORIES
1. The authority citation for part 63
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
Subpart A—General Provisions
2. Amend § 63.14 by revising
paragraphs (f)(1) and (i)(95), (105), and
(110) and adding paragraph (o)(30) to
read as follows:
■
§ 63.14
Incorporations by reference.
*
*
*
*
*
(f) * * *
(1) ANSI/ASME PTC 19.10–1981,
Flue and Exhaust Gas Analyses [Part 10,
Instruments and Apparatus], issued
August 31, 1981, IBR approved for
§§ 63.309(k); 63.365(b); 63.457(k);
63.772(e) and (h); 63.865(b); 63.997(e);
63.1282(d) and (g); 63.1450(a), (b), (d),
and (e) through (g); 63.1625(b); table 5
to subpart EEEE; §§ 63.3166(a);
63.3360(e); 63.3545(a); 63.3555(a);
63.4166(a); 63.4362(a); 63.4766(a);
63.4965(a);63.5160(d); table 4 to subpart
UUUU; table 3 to subpart YYYY;
§§ 63.7822(b); 63.7824(e); 63.7825(b);
63.8000(d); 63.9307(c); 63.9323(a);
63.9621(b) and (c); 63.11148(e);
63.11155(e); 63.11162(f); 63.11163(g);
63.11410(j); 63.11551(a); 63.11646(a);
63.11945; table 4 to subpart AAAAA;
table 5 to subpart DDDDD; table 4 to
subpart JJJJJ; table 4 to subpart KKKKK;
table 4 to subpart SSSSS; tables 4 and
5 to subpart UUUUU; table 1 to subpart
ZZZZZ; table 4 to subpart JJJJJJ.
*
*
*
*
*
(i) * * *
(95) ASTM D6420–99 (Reapproved
2010), Standard Test Method for
Determination of Gaseous Organic
Compounds by Direct Interface Gas
Chromatography-Mass Spectrometry,
Approved October 1, 2010, IBR
PO 00000
Frm 00045
Fmt 4701
Sfmt 4700
41691
approved for §§ 63.670(j); table 4 to
subpart UUUU; 63.1450(f); 63.7142(b);
appendix A to this part.
*
*
*
*
*
(105) ASTM D6784–16, Standard Test
Method for Elemental, Oxidized,
Particle-Bound and Total Mercury in
Flue Gas Generated from Coal-Fired
Stationary Sources (Ontario Hydro
Method), Approved March 1, 2016; IBR
approved for §§ 63.1450(d); 63.9621;
table 5 to subpart UUUUU; appendix A
to subpart UUUUU.
*
*
*
*
*
(110) ASTM D7520–16, Standard Test
Method for Determining the Opacity of
a Plume in the Outdoor Ambient
Atmosphere, approved April 1, 2016;
IBR approved for §§ 63.1450(c), (e), and
(g); 63.1453(h); 63.1625(b); table 3 to
subpart LLLLL; §§ 63.7823(c) through
(e); 63.7833(g); 63.11423(c).
*
*
*
*
*
(o) * * *
(30) EPA/100/R–10/005,
Recommended Toxicity Equivalence
Factors (TEFs) for Human Health Risk
Assessments of 2, 3, 7, 8Tetrachlorodibenzo-p-dioxin and
Dioxin-Like Compounds, December
2010; IBR approved for § 63.1459 and
table 2 to subpart QQQ. (Available at
https://www.epa.gov/sites/default/files/
2013-09/documents/tefs-for-dioxin-epa00-r-10-005-final.pdf.)
*
*
*
*
*
■ 3. Effective July 15, 2024, further
amend § 63.14 by:
■ a. Revising paragraphs (f)(1) and
(i)(110);
■ b. Redesignating paragraphs (o)(1)
through (30) as paragraphs (o)(2)
through (31); and
■ c. Adding new paragraph (o)(1).
The revisions and addition read as
follows:
§ 63.14
Incorporations by reference.
*
*
*
*
*
(f) * * *
(1) ANSI/ASME PTC 19.10–1981,
Flue and Exhaust Gas Analyses [Part 10,
Instruments and Apparatus], issued
August 31, 1981, IBR approved for
§§ 63.116(c); 63.116 and (h); 63.128(a);
63.145(i); 63.309(k); 63.365(b);
63.457(k); 63.490(g); 63.772(e) and (h);
63.865(b); 63.997(e); 63.1282(d) and (g);
63.1450(a), (b), and (e) through (g);
63.1625(b); table 5 to subpart EEEE;
§§ 63.3166(a); 63.3360(e); 63.3545(a);
63.3555(a); 63.4166(a); 63.4362(a);
63.4766(a); 63.4965(a); 63.5160(d); table
4 to subpart UUUU; table 3 to subpart
YYYY; §§ 63.7822(b); 63.7824(e);
63.7825(b); 63.8000(d); 63.9307(c);
63.9323(a); 63.9621(b) and (c);
63.11148(e); 63.11155(e); 63.11162(f);
E:\FR\FM\13MYR3.SGM
13MYR3
41692
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
63.11163(g); 63.11410(j); 63.11551(a);
63.11646(a); 63.11945; table 4 to subpart
AAAAA; table 5 to subpart DDDDD;
table 4 to subpart JJJJJ; table 4 to subpart
KKKKK; table 4 to subpart SSSSS; tables
4 and 5 to subpart UUUUU; table 1 to
subpart ZZZZZ; table 4 to subpart JJJJJJ.
*
*
*
*
*
(i) * * *
(110) ASTM D7520–16, Standard Test
Method for Determining the Opacity of
a Plume in the Outdoor Ambient
Atmosphere, approved April 1, 2016;
IBR approved for §§ 63.1450(c), (e), and
(g); 63.1453(h); 63.1625(b); table 3 to
subpart LLLLL; §§ 63.7823(c) through
(f), 63.7833(g); 63.11423(c).
*
*
*
*
*
(o) * * *
(1) EPA/100/R–10/005,
Recommended Toxicity Equivalence
Factors (TEFs) for Human Health Risk
Assessments of 2, 3, 7, 8Tetrachlorodibenzo-p-dioxin and
Dioxin-Like Compounds, December
2010; IBR approved for § 63.1459 and
table 2 to subpart QQQ. (Available at
https://www.epa.gov/sites/default/files/
2013-09/documents/tefs-for-dioxin-epa00-r-10-005-final.pdf).
*
*
*
*
*
■ 4. Revise subpart QQQ, consisting of
§§ 63.1440 through 63.1459, to read as
follows:
Subpart QQQ—National Emission
Standards for Hazardous Air Pollutants for
Primary Copper Smelting
Sec.
63.1440 What is the purpose of this
subpart?
63.1441 Am I subject to this subpart?
63.1442 What parts of my plant does this
subpart cover?
63.1443 When do I have to comply with
this subpart?
63.1444 What emissions limitations, work
practice standards, and design standards
must I meet for my copper concentrate
dryers, smelting vessels, slag cleaning
vessels, copper converter departments,
anode refining departments, process
fugitive emissions from roofline vents,
and bypass stacks?
63.1445 What work practice standards must
I meet for my fugitive dust sources?
63.1446 What alternative emission
limitation may I meet for my combined
gas streams?
63.1447 What are my operation and
maintenance requirements?
63.1448 What are my general requirements
for complying with this subpart?
63.1449 By what dates must I conduct
performance tests or other initial
compliance demonstrations?
63.1450 What test methods and other
procedures must I use to demonstrate
initial compliance with the emission
limitations and design standards?
63.1451 How do I demonstrate initial
compliance with the emission
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
limitations, work practice standards,
design standards, and operation and
maintenance requirements that apply to
me?
63.1452 What are my monitoring
requirements?
63.1453 How do I demonstrate continuous
compliance with the emission
limitations, work practice standards,
design standards, and operation and
maintenance requirements that apply to
me?
63.1454 What notifications must I submit
and when?
63.1455 What reports must I submit and
when?
63.1456 What records must I keep and how
long must I keep my records?
63.1457 What part of the general provisions
apply to me?
63.1458 Who implements and enforces this
subpart?
63.1459 What definitions apply to this
subpart?
Table 1 to Subpart QQQ of Part 63—
Applicability of General Provisions to
This Subpart
Table 2 to Subpart QQQ of Part 63—NonMercury HAP Emission Limits
Table 3 to Subpart QQQ of Part 63—2010
Toxic Equivalency Factors (TEFs)
Table 4 to Subpart QQQ of Part 63—
Compliance Dates for Amendments
Being Promulgated on May 13, 2024
Figure 1 to Subpart QQQ of Part 63—Data
Summary Sheet for Determination of
Average Opacity
Subpart QQQ—National Emission
Standards for Hazardous Air Pollutants
for Primary Copper Smelting
§ 63.1440
subpart?
What is the purpose of this
This subpart establishes national
emission standards for hazardous air
pollutants (NESHAP) for primary
copper smelters. This subpart also
establishes requirements to demonstrate
initial and continuous compliance with
all applicable emission limitations,
work practice standards, design
standards, and operation and
maintenance requirements in this
subpart.
§ 63.1441
Am I subject to this subpart?
You are subject to this subpart if you
own or operate a primary copper
smelter that is (or is part of) a major
source of hazardous air pollutant (HAP)
emissions on the first compliance date
that applies to you (see § 63.1443). Your
primary copper smelter is a major
source of HAP if it emits or has the
potential to emit any single HAP at the
rate of 10 tons or more per year or any
combination of HAP at a rate of 25 tons
or more per year.
§ 63.1442 What parts of my plant does this
subpart cover?
(a) This subpart applies to each new
and existing affected source at your
PO 00000
Frm 00046
Fmt 4701
Sfmt 4700
primary copper smelter. The affected
sources are each copper concentrate
dryer, each smelting vessel, each slag
cleaning vessel, each copper converter
department, each anode refining
department, process fugitive emission
sources (i.e., roofline vents) from
smelting vessels, slag cleaning vessels,
copper converter department and anode
refining department, each bypass stack,
and the entire group of fugitive dust
sources, as defined in § 63.1459.
(b) The following affected sources:
each copper concentrate dryer, each
smelting vessel, each slag cleaning
vessel, each copper converter
department, and the entire group of
fugitive dust sources at your primary
copper smelter are existing if you
commenced construction or
reconstruction of the affected source
before April 20, 1998.
(c) The following affected sources:
each copper concentrate dryer, each
smelting vessel, each slag cleaning
vessel, each copper converter
department and the entire group of
fugitive dust sources at your primary
copper smelter are new if you
commenced construction or
reconstruction of the affected source on
or after April 20, 1998. An affected
source is reconstructed if it meets the
definition of ‘‘reconstruction’’ in § 63.2.
(d) The following affected sources:
each anode refining department and
process fugitive emission sources (i.e.,
roofline vents) from smelting vessels,
slag cleaning vessels, copper converter
department and anode refining
department are existing if you
commenced construction or
reconstruction of the affected source
before January 11, 2022.
(e) The following affected sources:
each anode refining department and
process fugitive emission sources (i.e.,
roofline vents) from smelting vessels,
slag cleaning vessels, copper converter
department and anode refining
department at your primary copper
smelter are new if you commenced
construction or reconstruction of the
affected source on or after January 11,
2022. An affected source is
reconstructed if it meets the definition
of ‘‘reconstruction’’ in § 63.2.
(f) The bypass stack is existing if you
commenced construction or
reconstruction of the affected source
before July 24, 2023.
(g) The bypass stack is new if you
commenced construction or
reconstruction of the affected source on
or after July 24, 2023. An affected source
is reconstructed if it meets the
definition of ‘‘reconstruction’’ in § 63.2.
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
§ 63.1443 When do I have to comply with
this subpart?
(a) If you have an existing affected
source, you must comply with each
emission limitation, work practice
standard, design standard, and
operation and maintenance requirement
in this subpart that applies to you no
later than June 13, 2005, except as
specified in table 4 to this subpart.
(b) If you have a new affected source
and its initial startup date is on or
before June 12, 2002, you must comply
with each emission limitation, work
practice standard, design standard, and
operation and maintenance requirement
in this subpart that applies to you by
June 12, 2002, except as specified in
table 4 to this subpart.
(c) If you have a new affected source
and its initial startup date is after June
12, 2002, you must comply with each
emission limitation, work practice
standard, design standard, and
operation and maintenance requirement
in this subpart that applies to you upon
initial startup, except as specified in in
table 4 to this subpart.
(d) If your primary copper smelter is
an area source that becomes a major
source of HAP (see § 63.1441), the
compliance dates listed in paragraphs
(d)(1) and (2) of this section apply to
you.
(1) Any portion of the existing
primary copper smelter that is a new
affected source or a new reconstructed
source must be in compliance with this
subpart upon startup.
(2) All other parts of the primary
copper smelter must be in compliance
with this subpart no later than 3 years
after it becomes a major source (see
§ 63.1441).
(e) You must meet the notification
and schedule requirements in § 63.1454.
Several of these notifications must be
submitted before the compliance date
for your affected source.
lotter on DSK11XQN23PROD with RULES3
§ 63.1444 What emissions limitations,
work practice standards, and design
standards must I meet for my copper
concentrate dryers, smelting vessels, slag
cleaning vessels, copper converter
departments, anode refining departments,
process fugitive emissions from roofline
vents, and bypass stacks?
(a) Copper concentrate dryers. For
each copper concentrate dryer, you
must comply with the emission
limitation in paragraph (a)(1) or (2) of
this section that applies to you.
(1) For each existing copper
concentrate dryer, you must not cause to
be discharged to the atmosphere from
the dryer vent any gases that contain
filterable particulate matter in excess of
50 milligrams per dry standard cubic
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
meter (mg/dscm) as measured using the
test methods specified in § 63.1450(a).
(2) For each new copper concentrate
dryer, you must not cause to be
discharged to the atmosphere from the
dryer vent any gases that contain
filterable particulate matter in excess of
23 mg/dscm as measured using the test
methods specified in § 63.1450(a).
(b) Smelting vessels. For each
smelting vessel, you must comply with
the emission limitations and work
practice standards in paragraphs (b)(1)
and (2) of this section.
(1) For each smelting vessel, you must
not cause to be discharged to the
atmosphere any process off-gas that
contains nonsulfuric acid particulate
matter in excess of 6.2 mg/dscm as
measured using the test methods
specified in § 63.1450(b). Process off-gas
from a smelting vessel is generated
when copper ore concentrates and
fluxes are being smelted to form molten
copper matte and slag layers.
(2) For each smelting vessel, you must
control the process fugitive emissions
released when tapping copper matte or
slag from the smelting vessel according
to paragraphs (b)(2)(i) and (ii) of this
section.
(i) At all times when copper matte or
slag is tapped from the smelting vessel,
you must operate a capture system that
collects the gases and fumes released
from the tapping port in use. The design
and placement of this capture system
must be such that the tapping port
opening, launder, and receiving vessel
(e.g., ladle, slag pot) are positioned
within the confines or influence of the
capture system’s ventilation draft during
those times when the copper matte or
slag is flowing from the tapping port
opening.
(ii) You must not cause to be
discharged to the atmosphere from the
capture system used to comply with
paragraph (b)(2)(i) of this section any
gases that contain filterable particulate
matter in excess of 23 mg/dscm as
measured using the test methods
specified in § 63.1450(a).
(c) Slag cleaning vessels. For each slag
cleaning vessel, you must comply with
the emission limitations and work
practice standards in paragraphs (c)(1)
through (3) of this section that apply to
you.
(1) For each slag cleaning vessel,
except as provided for in paragraph
(c)(2) of this section, you must not cause
to be discharged to the atmosphere any
process off-gas that contains nonsulfuric
acid particulate matter in excess of 6.2
mg/dscm as measured using the test
methods specified in § 63.1450(b).
(2) As an alternative to complying
with the emission limit for nonsulfuric
PO 00000
Frm 00047
Fmt 4701
Sfmt 4700
41693
acid particulate matter in paragraph
(c)(1) of this section, for each existing
slag cleaning vessel you may choose to
comply with the emission limit for
filterable particulate matter specified in
this paragraph (c)(2). You must not
cause to be discharged to the
atmosphere any process off-gas that
contains filterable particulate matter in
excess of 46 mg/dscm as measured
using the test methods specified in
§ 63.1450(a).
(3) For each slag cleaning vessel, you
must control process fugitive emissions
released when tapping copper matte or
slag from the slag cleaning vessel
according to paragraphs (c)(3)(i) and (ii)
of this section.
(i) At all times when copper matte or
slag is tapped from the slag cleaning
vessel, you must operate a capture
system that collects the gases and fumes
released from the tapping port in use.
The design and placement of this
capture system must be such that the
tapping port opening, launder, and
receiving vessel (e.g., ladle, slag pot) are
positioned within the confines or
influence of the capture system’s
ventilation draft during those times
when the copper matte or slag is flowing
from the tapping port opening.
(ii) You must not cause to be
discharged to the atmosphere from the
capture system used to comply with
paragraph (c)(3)(i) of this section any
gases that contain filterable particulate
matter in excess of 23 mg/dscm as
measured using the test methods
specified in § 63.1450(a).
(d) Existing copper converter
departments. For each existing copper
converter department, you must comply
with the emission limitations and work
practice standards in paragraphs (d)(1)
through (6) of this section that apply to
you.
(1) You must operate a capture system
that collects the process off gas vented
from each batch copper converter. At all
times when one or more batch copper
converters are blowing, you must
operate the capture system according to
the written operation and maintenance
plan that has been prepared according
to the requirements in § 63.1447(b).
(2) If your copper converter
department uses Peirce-Smith
converters, the capture system design
must include use of a primary hood that
covers the entire mouth of the converter
vessel when the copper converter is
positioned for blowing. Additional
hoods (e.g., secondary hoods) or other
capture devices must be included in the
capture system design as needed to
achieve the opacity limit in paragraph
(d)(4) of this section. The capture
system design may use multiple intake
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41694
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
and duct segments through which the
ventilation rates are controlled
independently of each other, and
individual duct segments may be
connected to separate control devices.
(3) If your copper converter
department uses Hoboken converters,
the capture system must collect all
process off-gas vented during blowing
through the side-flue intake on each
converter vessel.
(4) You must operate the capture
system such that any visible emissions
exiting the roof monitors or roof exhaust
fans on the building housing the copper
converter department meet the opacity
limit as specified in paragraphs (d)(4)(i)
and (ii) of this section.
(i) The opacity of any visible
emissions exiting the roof monitors or
roof exhaust fans on the building
housing the copper converter
department must not exceed 4 percent
as determined by a performance test
conducted according to § 63.1450(c).
(ii) The opacity limit in paragraph
(d)(4)(i) of this section applies only at
those times when a performance test is
conducted according to § 63.1450(c).
The requirements for compliance with
opacity and visible emission standards
specified in § 63.6(h) do not apply to
this opacity limit.
(5) You must not cause to be
discharged to the atmosphere from any
Peirce-Smith converter primary hood
capture system or Hoboken converter
side-flue intake capture system any
process off-gas that contains nonsulfuric
acid particulate matter in excess of 6.2
mg/dscm as measured using the test
methods specified in § 63.1450(b).
(6) You must not cause to be
discharged to the atmosphere from any
secondary capture system any gases that
contain filterable particulate matter in
excess of 23 mg/dscm as measured
using the test methods specified in
§ 63.1450(a).
(e) New copper converter
departments. For each new copper
converter department for which
construction commenced on or after
April 20, 1998, the use of batch copper
converters is prohibited. For each new
copper converter department which will
contain a copper converter other than a
batch converter (such as a continuous
converter), you must comply with the
emission limitation and work practice
standards in paragraphs (e)(1) and (2) of
this section.
(1) You must not cause to be
discharged to the atmosphere from any
combination of stacks or other vents any
captured process off-gas that contains
filterable particulate matter greater than
a daily (24-hour) average of 0.031
pounds of particulate matter per ton of
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
copper concentrate feed charged to the
smelting vessel as measured using the
test methods specified in § 63.1450(a).
(2) You must operate a capture system
that collects the gases and fumes
released from converting vessels and
conveys the collected gas stream to a
control device.
(f) New and existing anode refining
departments. Except as provided in
paragraph (f)(1) of this section, for each
new and existing anode refining
department, you must comply with the
emission limitation and work practice
standards in paragraphs (f)(2) and (3) of
this section.
(1) If the anode refining department
process exhaust gases are combined
with the Hoboken converter process
fugitive capture system, you must
demonstrate compliance with the
emission limitation and work practice
standards in paragraph (g) of this
section.
(2) For each new and existing anode
refining department, you must not
discharge to the atmosphere captured
process exhaust gases from the anode
refining furnaces containing filterable
particulate matter emissions in excess of
5.8 mg/dscm as measured using the test
methods specified in § 63.1450(a).
(3) You must operate a capture system
that collects the process off-gases and
fumes released from the anode refining
department and convey the collected
gas stream to a control device.
(g) Existing combined anode refining
department and Hoboken converter
process fugitive capture system. For
each new and existing anode refining
department and Hoboken converter
process fugitive capture system, you
must comply with the emission
limitation and work practice standards
in paragraphs (g)(1) through (3) of this
section.
(1) You must not discharge to the
atmosphere gases from the combination
of the anode refining department and
Hoboken converter process fugitive
capture system filterable particulate
matter emissions in excess of 4.1 mg/
dscm as measured using the test
methods specified in § 63.1450(a).
(2) You must operate a Hoboken
converter process fugitive capture
system that collects the process off-gases
and fumes released from the copper
converter department.
(3) You must operate a capture system
that collects the process off-gases and
fumes released from the anode refining
department and convey the collected
gas stream to a control device.
(h) New and existing sources of
process fugitive gases from the roofline
vents associated with the smelting
vessels, the slag cleaning vessels, copper
PO 00000
Frm 00048
Fmt 4701
Sfmt 4700
converter department, and the anode
refining department. You must not
discharge to the atmosphere process
fugitive gases from any combination of
new and existing roofline vents
associated with the smelting vessels,
slag cleaning vessels, copper converter
departments and the anode refining
departments containing filterable
particulate matter emissions in excess of
6.3 lb/hr as measured using the test
methods specified in § 63.1450(e).
(i) Baghouses. For each baghouse
applied to meet any filterable
particulate matter emission limit in
paragraphs (a) through (h) of this
section, you must operate the baghouse
such that the bag leak detection system
does not alarm for more than 5 percent
of the total operating time in any
semiannual reporting period.
(j) Venturi wet scrubbers. For each
venturi wet scrubber applied to meet
any filterable particulate matter
emission limit in paragraphs (a) through
(h) of this section, you must comply
with the site-specific operating limit(s)
of maintaining the hourly average
pressure drop and scrubber water flow
rate established during the initial or
subsequent performance test in
accordance with § 63.1450(a)(4).
(k) Other control devices. For each
control device other than a baghouse or
venturi wet scrubber applied to meet
any filterable particulate matter
emission limit in paragraphs (a) through
(h) of this section, you must operate the
control device as specified in
paragraphs (k)(1) and (2) of this section.
(1) You must select one or more
operating parameters, as appropriate for
the control device design, that can be
used as representative and reliable
indicators of the control device
operation.
(2) You must maintain the hourly
average value for each of the selected
parameters at or above the minimum
level or at or below the maximum level,
as appropriate for the selected
parameter, established during the initial
or subsequent performance test in
accordance with § 63.1450(a)(5).
(l) Existing source mercury emissions.
You must not discharge exhaust gases to
the atmosphere through any
combination of stacks or other vents
from copper concentrate dryers, copper
converter department, the anode
refining department, slag cleaning
vessel and smelting vessels containing
mercury emissions in excess of 0.033 lb/
hr for existing sources as measured by
the test methods in § 63.1450(d).
(m) New source mercury emissions.
You must not discharge exhaust gases to
the atmosphere through any
combination of stacks or other vents
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
from the copper concentrate dryers,
copper converter department, the anode
refining department, slag cleaning
vessel and smelting vessels containing
mercury emissions in excess of 0.00097
lb/hr for new sources as measured by
the test methods in § 63.1450(d).
(n) Control devices for mercury. For
each control device applied to meet the
mercury emission limit in paragraph (l)
or (m) of this section, you must operate
the control device as specified in
paragraphs (n)(1) and (2) of this section.
(1) You must select one or more
operating parameters, as appropriate for
the control device design, that can be
used as representative and reliable
indicators of the control device
operation.
(2) You must maintain the hourly
average value for each of the selected
parameters at or above the minimum
level or at or below the maximum level,
as appropriate for the selected
parameter, established during the initial
or subsequent performance test in
accordance with § 63.1450(d)(3).
(o) New and existing sources of
benzene, toluene, chlorine, hydrogen
chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene, and dioxins/furans
emissions. You must not discharge
exhaust gases to the atmosphere through
any combination of stacks or other vents
from the copper concentrate dryers,
copper converter department, the anode
refining department, slag cleaning
vessels and the smelting vessels in
excess the emission limits in table 2 to
this subpart as measured by the test
methods in § 63.1450(f).
(p) Existing sources of process fugitive
gases from the combination of roofline
vents associated with the Peirce-Smith
converter department, Inco flash
furnace, and anode refining department.
For any combination of new and
existing roofline vents associated with
the Peirce-Smith converter department,
Inco flash furnace, and anode refining
department, you must comply with the
emission limitation and design
standards in paragraph (p)(1) and (2) of
this section.
(1) Roofline emission limit for the
Peirce-Smith converter department, Inco
flash furnace, and anode refining
department. You must not discharge to
the atmosphere process fugitive gases
from any combination of existing
roofline vents associated with the
Peirce-Smith copper converter
department, Inco flash furnace, and the
anode refining department containing
lead emissions in excess of 0.326 lb/hr
as measured using the test methods
specified in § 63.1450(g).
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(2) Design standards for the PeirceSmith converter department, Inco flash
furnace, and anode refining department.
You must comply with design standards
in paragraphs (p)(2)(i) through (iii) of
this section at all times when the
primary copper smelter is operating,
except as provided herein.
(i) Flash furnace area capture system.
Operate hooding and interceptor walls
with a design evacuation rate of at least
50,000 cfm hourly average to capture
fugitive emissions from the flash
furnace area, matte tapping and slag
skimming areas, and route emissions to
a control device whenever the flash
furnace is in operation except for brief
periods when slag is being returned to
the flash furnace using the slag return
launder.
(ii) Fuming ladle capture system.
Operate hood and interceptor walls with
a design evacuation rate of at least
40,000 cfm to capture fugitive emissions
from fuming ladles in the converter aisle
and material transfer areas, and route
emissions to a control device whenever
a fuming ladle is detected.
(iii) Anode furnace secondary hood
capture and control system. Operate a
secondary hood around each in-use
anode furnace to capture process
fugitive emissions and route emissions
to a control device. The design
evacuation rate for the total system of all
anode furnace secondary hoods shall be
at least 150,000 cfm hourly average.
(q) Bypass stack work practice
standards. When using the bypass stack
for planned maintenance of control
devices and processes, the work practice
standard is applicable for the bypass
stack for the duration of the planned
maintenance. You must comply with
work practice standards in paragraphs
(q)(1) through (3) of this section.
(1) In the case of planned control
device or process maintenance, feed to
the smelting vessel must cease; power to
the electric furnace must be lowered,
and a crust allowed to form on the
surface of the slag; the operation of the
converters must cease and the
converters rolled out; and the operation
of the anode vessels must cease.
(2) If the fan to the anode refining
point source baghouse is functioning,
then the residual process gases must be
redirected to the control device. If the
process gas from a device being
maintenanced can be rerouted to a
different control device instead of the
bypass stack, it must be redirected to the
control device. Control devices must be
used until emissions are minimized.
(3) If there is a shutdown or
emergency shutdown event, the control
devices should continue to run until
process emissions cease. If the control
PO 00000
Frm 00049
Fmt 4701
Sfmt 4700
41695
devices are shut down before the
process emissions cease and the bypass
stack is used to vent the process gas to
the atmosphere, there will be a violation
of the emission and work practice
standards.
§ 63.1445 What work practice standards
must I meet for my fugitive dust sources?
(a) You must control particulate
matter emissions from fugitive dust
sources at your primary copper smelter
by operating according to a written
fugitive dust control plan that has been
approved by the Administrator or
approved authority under 40 CFR part
70 or 71. For the purpose of complying
with this paragraph (a) you must submit
a fugitive dust control plan which
addresses the fugitive dust sources
specified in paragraph (b) of this section
and includes the information specified
in paragraph (c) of this section on the
schedule provided in paragraphs (e) and
(f) of this section.
(b) Before November 12, 2024, your
fugitive dust control plan must address
each of the fugitive dust emission
sources listed in paragraphs (b)(1)
through (6), except paragraphs (b)(1)(i)
and (ii), of this section that are located
at your primary copper smelter. On or
after November 12, 2024, your fugitive
dust control plan must address each of
the fugitive dust emission sources listed
in paragraphs (b)(1) through (7) of this
section that are located at your primary
copper smelter.
(1) On-site roadways used by trucks or
other motor vehicles (e.g., front-end
loaders) when transporting bulk
quantities of fugitive dust materials.
Paved roads and parking areas that are
not used by these vehicles do not need
to be included in the plan (e.g.,
employee and visitor parking lots).
(i) You must conduct routine cleaning
of paved roads with a sweeper, vacuum
or wet broom (in accordance with
applicable recommendations by the
manufacturer of the street sweeper,
vacuum, or wet broom), with such
cleaning to occur no less frequently than
on a daily basis unless the roads have
sufficient surface moisture such that
fugitive dust is not generated.
(ii) Chemical dust suppressants will
be applied not less frequently than once
per month at slag haul roads and not
less frequently than every 6 weeks on all
other unpaved roads unless the roads
have sufficient surface moisture such
that fugitive dust is not generated.
(2) Unloading of fugitive dust
materials from trucks or railcars.
(3) Outdoor piles used for storage of
fugitive dust materials.
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(4) Bedding areas used for blending
copper concentrate and other feed
constituents.
(5) Each transfer point in conveying
systems used to transport fugitive dust
materials. These points include, but are
not limited to, transfer of material from
one conveyor belt to another and
transfer of material to a hopper or bin.
(6) Other site-specific sources of
fugitive dust emissions that the
Administrator or delegated authority
under 40 CFR part 70 or 71 designate to
be included in your fugitive dust control
plan.
(7) The cargo compartment of all
trucks or other motor vehicles (e.g.,
front-end loaders) when transporting
bulk quantities of fugitive dust materials
must be maintained to ensure:
(i) The floor, sides, and/or tailgate(s)
are free of holes or other openings.
(ii) All loads of trucks containing
copper concentrate arriving at the
facility are covered with a tarp to
prevent spills and fugitive emissions.
(iii) Trucks are loaded only to such a
level as to prevent spillage over the side.
(iv) A speed limit of 15 mph is
required.
(v) All dust producing material
internally transferred or moved by truck
at the facility is covered with a tarp to
prevent spills and fugitive emissions.
(c) Your fugitive dust control plan
must describe the control measures you
use to control fugitive dust emissions
from each source addressed in the plan,
as applicable and appropriate for your
site conditions. Examples of control
measures include, but are not limited to,
locating the source inside a building or
other enclosure, installing and operating
a local hood capture system over the
source and venting the captured gas
stream to a control device, placing
material stockpiles below grade,
installing wind screens or wind fences
around the source, spraying water on
the source as weather conditions
require, applying appropriate dust
suppression agents on the source, or
combinations of these control measures.
EAlt
(d) The requirement for you to operate
according to a written fugitive dust
control plan must be incorporated in
your operating permit that is issued by
the approved authority under 40 CFR
part 70 or 71. A copy of your fugitive
dust control plan must be sent to the
approved authority under 40 CFR part
70 or 71 on or before the compliance
date for your primary copper smelter, as
specified in § 63.1443 or paragraph (b)
of this section.
(e) For any element of the fugitive
dust control plan that requires new
construction at the facility, the owner or
operator shall complete such
construction, in accordance with the
specifications and schedule set forth in
the approved fugitive dust control plan.
(f) The fugitive dust control plan must
be reviewed, updated (if necessary), and
then submitted to the approved
permitting authority under 40 CFR part
70 or 71 with each application for the
title V operating permit renewal and
with each permit application for the
construction or modification of leadbearing fugitive dust generating sources.
On or after November 12, 2024, the
owner or operator must submit a copy
fugitive dust plan in PDF format to the
EPA via Compliance and Emissions
Data Reporting Interface (CEDRI), which
can be accessed through EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov) following the procedure
specified in §§ 63.1455(e) and 63.9(k).
§ 63.1446 What alternative emission
limitation may I meet for my combined gas
streams?
(a) For situations where you combine
gas streams from two or more affected
sources for discharge to the atmosphere
through a single vent, you may choose
to meet the requirements in paragraph
(b) of this section as an alternative to
complying with the individual filterable
particulate matter emission limits
specified in § 63.1444 that apply to you.
This alternative emission limit for a
combined gas stream may be used for
any combination of the affected source
lotter on DSK11XQN23PROD with RULES3
Equation 1 to Paragraph (b)(2)
EdQd + EsvQsv + EscvpQscvp + EscvfQscvf + EccQcc + EardQard
= -------------------------Qd
Where:
EAlt = Alternative filterable particulate matter
emission limit for the combined gas
stream discharged to atmosphere through
a single vent (mg/dscm);
Ed = Filterable particulate matter emission
limit applicable to copper concentrate
dryer as specified in § 63.1444(a)(1) or
(2) (mg/dscm);
VerDate Sep<11>2014
gas steams specified in paragraphs (a)(1)
through (6) of this section.
(1) Gas stream discharged from a
copper concentrate dryer vent that
would otherwise be subject to
§ 63.1444(a)(1) or (2);
(2) Gas stream discharged from a
smelting vessel capture system that
would otherwise be subject to
§ 63.1444(b)(2)(ii);
(3) Process off-gas stream discharged
from a slag cleaning vessel that would
otherwise be subject to § 63.1444(c)(2);
(4) Gas stream discharged from a slag
cleaning vessel capture system that
would otherwise be subject to
§ 63.1444(c)(3)(ii);
(5) Gas stream discharged from an
existing batch copper converter
secondary capture system that would
otherwise be subject to § 63.1444(d)(6);
and
(6) Gas stream discharged from anode
refining departments that would
otherwise be subject to § 63.1444(f)(2).
(b) You must meet the requirements
specified in paragraphs (b)(1) and (2) of
this section for the combined gas stream
discharged through a single vent.
(1) For each combined gas stream
discharged through a single vent, you
must not cause to be discharged to the
atmosphere any gases that contain
filterable particulate matter in excess of
the emission limit calculated using the
procedure in paragraph (b)(2) of this
section and measured using the test
methods specified in § 63.1450(a).
(2) You must calculate the alternative
filterable particulate matter emission
limit for your combined gas stream
using equation 1 to this paragraph (b)(2).
The volumetric flow rate value for each
of the individual affected source gas
streams that you use for equation 1 (i.e.,
the flow rate of the gas stream
discharged from the affected source but
before this gas stream is combined with
the other gas streams) is to be the
average of the volumetric flow rates
measured using the test method
specified in § 63.1450(a)(1)(ii):
22:07 May 10, 2024
Jkt 262001
+
Qsv
+
Qscvp
+ Qscvf + Qcc + Qard
Qd = Copper concentrate dryer exhaust gas
stream volumetric flow rate before being
combined with other gas streams (dscm/
hr);
Esv = Filterable particulate matter emission
limit for smelting vessel capture system
as specified in § 63.1444(b)(2)(ii) (mg/
dscm);
PO 00000
Frm 00050
Fmt 4701
Sfmt 4700
Qsv = Smelting vessel capture system
exhaust gas stream volumetric flow rate
before being combined with other gas
streams (dscm/hr);
Escvp = Filterable particulate matter
emission limit for slag cleaning vessel
process off-gas as specified in
§ 63.1444(c)(2) (mg/dscm);
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.109
41696
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
lotter on DSK11XQN23PROD with RULES3
Qscvp = Slag cleaning vessel process off-gas
volumetric flow rate before being
combined with other gas streams (dscm/
hr);
Escvf = Filterable particulate matter emission
limit for slag cleaning vessel capture
system as specified in § 63.1444(c)(3)(ii)
(mg/dscm);
Qscvf = Slag cleaning vessel capture system
exhaust gas stream volumetric flow rate
before being combined with other gas
streams (dscm/hr);
Ecc = Filterable particulate emission limit for
the existing batch copper converter
secondary capture system as specified in
§ 63.1444(d)(6) (mg/dscm);
Qcc = Batch copper converter capture system
exhaust gas stream volumetric flow rate
before being combined with other gas
streams (dscm/hr);
Eard = Filterable particulate matter emission
limit for the anode refining department
as specified in § 63.1444(f)(2); and
Qard = Anode refining department exhaust gas
stream volumetric flow rate before being
combined with other gas streams (dscm/
hr).
(c) For each baghouse applied to meet
any filterable particulate matter
emission limit in paragraph (b) of this
section, you must operate the baghouse
such that the bag leak detection system
does not alarm for more than 5 percent
of the total operating time in any
semiannual reporting period.
(d) For each venturi wet scrubber
applied to meet any filterable
particulate matter emission limit in
paragraph (b) of this section, you must
maintain the hourly average pressure
drop and scrubber water flow rate at or
above the minimum levels established
during the initial or subsequent
performance test in accordance with
§ 63.1450(a)(4).
(e) For each control device other than
a baghouse or venturi wet scrubber
applied to meet any filterable
particulate matter emission limit in
paragraph (b) of this section, you must
operate the control device as specified
in paragraphs (e)(1) and (2) of this
section.
(1) You must select one or more
operating parameters, as appropriate for
the control device design, that can be
used as representative and reliable
indicators of the control device
operation.
(2) You must maintain the hourly
average value for each of the selected
parameters at or above the minimum
level or at or below the maximum level,
as appropriate for the selected
parameter, established during the initial
or subsequent performance test in
accordance with § 63.1450(a)(5).
§ 63.1447 What are my operation and
maintenance requirements?
(a) Before November 12, 2024, as
required by § 63.6(e)(1)(i), you must
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
always operate and maintain your
affected source, including air pollution
control and monitoring equipment, in a
manner consistent with good air
pollution control practices for
minimizing emissions at least to the
levels required by this subpart. On or
after November 12, 2024, at all times,
you must maintain and operate any
affected source, including associated air
pollution control equipment and
monitoring equipment, in a manner
consistent with safety and good air
pollution control practices for
minimizing emissions. The general duty
to minimize emissions does not require
the owner or operator to make any
further efforts to reduce emissions if
levels required by the applicable
standard have been achieved.
Determination of whether a source is
operating in compliance with operation
and maintenance requirements will be
based on information available to the
Administrator which may include, but
is not limited to, monitoring results,
review of operation and maintenance
procedures, review of operation and
maintenance records, and inspection of
the source.
(b) You must prepare and operate at
all times according to a written
operation and maintenance plan for
each capture system and control device
subject to standards in § 63.1444 or
§ 63.1446. The plan must address the
requirements in paragraphs (b)(1)
through (4) of this section as applicable
to the capture system or control device.
(1) Preventative maintenance. You
must perform preventative maintenance
for each capture system and control
device according to written procedures
specified in your operation and
maintenance plan. The procedures must
include a preventative maintenance
schedule that is consistent with the
manufacturer’s instructions for routine
and long-term maintenance.
(2) Capture system inspections. You
must conduct monthly inspections of
the equipment components of the
capture system that can affect the
performance of the system to collect the
gases and fumes emitted from the
affected source (e.g., hoods, exposed
ductwork, dampers, fans) according to
written procedures specified in your
operation and maintenance plan. The
inspection procedure must include the
requirements in paragraphs (b)(2)(i)
through (iii) of this section as applicable
to the capture system or control device.
(i) Observations of the physical
appearance of the equipment to confirm
the physical integrity of the equipment
(e.g., verify by visual inspection no
holes in ductwork or hoods, no flow
PO 00000
Frm 00051
Fmt 4701
Sfmt 4700
41697
constrictions caused by dents, or
accumulated dust in ductwork).
(ii) Inspection, and if necessary
testing, of equipment components to
confirm that the component is operating
as intended (e.g., verify by appropriate
measures that flow or pressure sensors,
damper plates, automated damper
switches and motors are operating
according to manufacture or engineering
design specifications).
(iii) In the event that a defective or
damaged component is detected during
an inspection, you must initiate
corrective action according to written
procedures specified in your operation
and maintenance plan to correct the
defect or deficiency as soon as
practicable.
(3) Copper converter department
capture system operating limits. You
must establish, according to the
requirements in paragraph (b)(3)(i)
through (iii) of this section, operating
limits for the capture system that are
representative and reliable indicators of
the performance of capture system when
it is used to collect the process off-gas
vented from batch copper converters
during blowing.
(i) Select operating limit parameters
appropriate for the capture system
design that are representative and
reliable indicators of the performance of
the capture system when it is used to
collect the process off-gas vented from
batch copper converters during blowing.
At a minimum, you must use
appropriate operating limit parameters
that indicate the level of the ventilation
draft and the damper position settings
for the capture system when operating
to collect the process off-gas from the
batch copper converters during blowing.
Appropriate operating limit parameters
for ventilation draft include, but are not
limited to, volumetric flow rate through
each separately ducted hood, total
volumetric flow rate at the inlet to
control device to which the capture
system is vented, fan motor amperage,
or static pressure. Any parameter for
damper position setting may be used
that indicates the duct damper position
relative to the fully open setting.
(ii) For each operating limit parameter
selected in paragraph (b)(3)(i) of this
section, designate the value or setting
for the parameter at which the capture
system operates during batch copper
converter blowing. If your blister copper
production operations allow for more
than one batch copper converter to be
operating simultaneously in the blowing
mode, designate the value or setting for
the parameter at which the capture
system operates during each possible
batch copper converter blowing
configuration that you may operate at
E:\FR\FM\13MYR3.SGM
13MYR3
41698
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
your smelter (i.e., the operating limits
with one converter blowing, with two
converters blowing, with three
converters blowing, as applicable to
your smelter).
(iii) Include documentation in the
plan to support your selection of the
operating limits established for the
capture system. This documentation
must include a description of the
capture system design, a description of
the capture system operation during
blister copper production, a description
of each selected operating limit
parameter, a rationale for why you
chose the parameter, a description of the
method used to monitor the parameter
according to the requirements in
§ 63.1452(a), and the data used to set the
value or setting for the parameter for
each of your batch copper converter
configurations.
(4) Baghouse leak detection corrective
actions. In the event a bag leak detection
system alarm is triggered, you must
initiate corrective action according to
written procedures specified in your
operation and maintenance plan to
determine the cause of the alarm within
1 hour of the alarm, initiate corrective
action to correct the cause of the
problem within 24 hours of the alarm,
and complete the corrective action as
soon as practicable. Corrective actions
may include, but are not limited to, the
activities listed in paragraphs (b)(3)(i)
through (vi) of this section.
(i) Inspecting the baghouse for air
leaks, torn or broken bags or filter
media, or any other condition that may
cause an increase in emissions.
(ii) Sealing off defective bags or filter
media.
(iii) Replacing defective bags or filter
media or otherwise repairing the control
device.
(iv) Sealing off a defective baghouse
compartment.
(v) Cleaning the bag leak detection
system probe, or otherwise repair the
bag leak detection system.
(vi) Shutting down the process
producing the particulate emissions.
lotter on DSK11XQN23PROD with RULES3
§ 63.1448 What are my general
requirements for complying with this
subpart?
(a) Before November 12, 2024, you
must be in compliance with the
emission limitations, work practice
standards, and operation and
maintenance requirements in this
subpart at all times, except during
periods of startup, shutdown, and
malfunction as defined in § 63.2. On or
after November 12, 2024, you must be
in compliance with the emission
limitations, work practice standards,
design standards, and operation and
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
maintenance requirements in this
subpart at all times.
(b) During the period between the
compliance date specified for your
affected source in § 63.1443, and the
date upon which continuous monitoring
systems have been installed and
certified and any applicable operating
limits have been set, you must maintain
a log detailing the operation and
maintenance of the process and
emissions control equipment.
(c) Before November 12, 2024, you
must develop a written startup,
shutdown, and malfunction plan
according to the provisions in
§ 63.6(e)(3). For affected sources, a
startup, shutdown, and malfunction
plan is not required on or after
November 12, 2024.
§ 63.1449 By what dates must I conduct
performance tests or other initial
compliance demonstrations?
(a) As required in § 63.7(a)(2), you
must conduct a performance test within
180 calendar days of the compliance
date that is specified in § 63.1443 for
your affected source to demonstrate
initial compliance with each emission
and opacity limit in §§ 63.1444 and
63.1446 that applies to you.
(b) For each work practice standard
and operation and maintenance
requirement that applies to you where
initial compliance is not demonstrated
using a performance test or opacity
observation, you must demonstrate
initial compliance within 30 calendar
days after the compliance date that is
specified for your affected source in
§ 63.1443.
§ 63.1450 What test methods and other
procedures must I use to demonstrate
initial compliance with the emission
limitations and design standards?
(a) Filterable particulate matter
emission limits. Before November 12,
2024, you must conduct each
performance test to determine
compliance with the filterable
particulate matter emission limits in
§ 63.1444 or § 63.1446 that apply to you
according to the requirements for
representative test conditions specified
in § 63.7(e)(1) and using the test
methods and procedures in paragraphs
(a)(1) through (5) of this section. On or
after November 12, 2024, you must
conduct each performance test to
determine compliance with the
filterable particulate matter emission
limits in § 63.1444 or § 63.1446 that
apply to you according to the
requirements for representative test
conditions specified in paragraph (a)(6)
of this section and using the test
methods and procedures in paragraphs
(a)(1) through (5) of this section.
PO 00000
Frm 00052
Fmt 4701
Sfmt 4700
(1) Determine the concentration of
filterable particulate matter according to
the test methods in appendices A–1
through A–8 to 40 CFR part 60 as
specified in paragraphs (a)(1)(i) through
(v) of this section.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas. The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(v) Method 5, 5D, or 17, as applicable,
to determine the concentration of
filterable particulate matter.
(2) As an alternative to using the
applicable method specified in
paragraph (a)(1)(v) of this section, you
may determine filterable particulate
matter emissions from the control
device using Method 29 in appendix A–
8 to 40 CFR part 60 provided that you
follow the procedures and precautions
prescribed in Method 29. If the control
device is a positive pressure baghouse,
you must also follow the measurement
procedure specified in sections 8.1
through 8.3 of Method 5D in appendix
A–3 to 40 CFR part 60.
(3) You must conduct three separate
test runs for each performance test. Each
test run must have a minimum sampling
time of 60 minutes and a minimum
sampling volume of 0.85 dscm. For the
purpose of determining compliance
with the applicable filterable particulate
matter emission limit, the arithmetic
mean of the results for the three separate
test runs is used.
(4) For a venturi wet scrubber applied
to emissions from an affected source
and subject to emission limits and work
practice standards in § 63.1444(j) or
§ 63.1446(d) for pressure drop and
scrubber water flow rate, you must
establish site-specific operating limits
according to the procedures in
paragraphs (a)(4)(i) and (ii) of this
section.
(i) Using the continuous parameter
monitoring system (CPMS) required in
§ 63.1452, measure and record the
pressure drop and scrubber water flow
rate during each run of the particulate
matter performance test.
(ii) Compute and record the hourly
average pressure drop and scrubber
water flow rate for each individual test
run. Your operating limits are the lowest
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
average pressure drop and scrubber
water flow rate value in any of the three
runs that meet the applicable emission
limit.
(5) For a control device other than a
baghouse or venturi wet scrubber
applied to emissions from an affected
source and subject to work practice
standards and emission limit(s) in
§ 63.1444(k) or § 63.1446(e) for
appropriate, site-specific operating
parameters that are representative and
reliable indicators of the control device
performance, you must establish a sitespecific operating limit(s) according to
the procedures in paragraphs (a)(5)(i)
through (iv) of this section.
(i) Select one or more operating
parameters, as appropriate for the
control device design, that can be used
as representative and reliable indicators
of the control device operation.
(ii) Using the CPMS required in
§ 63.1452, measure and record the
selected operating parameters for the
control device during each run of the
filterable particulate matter performance
test.
(iii) Compute and record the hourly
average value for each of the selected
operating parameters for each
individual test run. Your operating
limits are the lowest value or the highest
value, as appropriate for the selected
operating parameter, measured in any of
the three runs that meet the applicable
emission limit.
(iv) You must prepare written
documentation to support your
selection of the operating parameters
used for the control device. This
documentation must include a
description of each selected parameter,
a rationale for why you chose the
parameter, a description of the method
used to monitor the parameter, and the
data recorded during the performance
test and used to set the operating
limit(s).
(6) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The use of the bypass stack
during a performance test of the process
shall invalidate the performance test.
The owner or operator must record the
process information that is necessary to
document operating conditions during
the test and include in such record an
explanation to support that such
conditions represent the entire range of
normal operation, including operational
conditions for maximum emissions if
such emissions are not expected during
maximum production. The owner or
operator shall make available to the
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Administrator such records as may be
necessary to determine the conditions of
performance tests.
(b) Nonsulfuric acid particulate
matter emission limits. Before
November 12, 2024, you must conduct
each performance test to determine
compliance with the nonsulfuric acid
particulate matter emission limits in
§ 63.1444 that apply to you according to
the requirements for representative test
conditions specified in § 63.7(e)(1) and
using the test methods and procedures
in paragraphs (b)(1) and (2) of this
section. On or after November 12, 2024,
you must conduct each performance test
to determine compliance with the
nonsulfuric acid particulate matter
emission limits in § 63.1444 that apply
to you according to the requirements for
representative test conditions specified
in paragraph (b)(4) of this section and
using the test methods and procedures
in paragraphs (b)(1) through (3) of this
section.
(1) Determine the concentration of
nonsulfuric acid particulate matter
according to the test methods in
appendices A–1 through A–8 to 40 CFR
part 60 as specified in paragraphs
(b)(1)(i) through (v) of this section.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas. The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(v) Method 5B to determine the
nonsulfuric acid particulate matter
emissions.
(2) You must conduct three separate
test runs for each performance test. Each
test run must have a minimum sampling
time of 240 minutes and a minimum
sampling volume of 3.4 dscm. For the
purpose of determining compliance
with the nonsulfuric acid particulate
matter emission limit, the arithmetic
mean of the results for the three separate
test runs is used.
(3) For a control device applied to
emissions from an affected source and
subject to work practice standards and
emission limit(s) in § 63.1444(i), (j), or
(k) or § 63.1446(e) for appropriate, sitespecific operating parameters that are
representative and reliable indicators of
the control device performance, you
must establish a site-specific operating
PO 00000
Frm 00053
Fmt 4701
Sfmt 4700
41699
limit(s) according to the procedures in
paragraphs (a)(5)(i) through (iv) of this
section.
(4) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The use of the bypass stack
during a performance test of the process
shall invalidate the performance test.
The owner or operator must record the
process information that is necessary to
document operating conditions during
the test and include in such record an
explanation to support that such
conditions represent the entire range of
normal operation, including operational
conditions for maximum emissions if
such emissions are not expected during
maximum production. The owner or
operator shall make available to the
Administrator such records as may be
necessary to determine the conditions of
performance tests.
(c) Copper converter department
capture system opacity limit. You must
conduct each performance test to
determine compliance with the opacity
limit in § 63.1444 using the test methods
and procedures in paragraphs (c)(1)
through (9) of this section and during
the particulate matter performance test.
(1) You must conduct the
performance test during the period
when the primary copper smelter is
operating under conditions
representative of the smelter’s normal
blister copper production rate. You may
not conduct a performance test during a
malfunction. Before conducting the
performance test, you must prepare a
written test plan specifying the copper
production conditions to be maintained
throughout the opacity observation
period and including a copy of the
written documentation you have
prepared according to paragraph (a)(3)
of this section to support the established
operating limits for the copper converter
department capture system. You must
submit a copy of the test plan for review
and approval by the Administrator or
delegated authority. During the
observation period, you must collect
appropriate process information and
copper converter department capture
system operating information to prepare
documentation sufficient to verify that
all opacity observations were made
during the copper production and
capture system operating conditions
specified in the approved test plan.
(2) You must notify the Administrator
or delegated authority before conducting
the opacity observations to allow the
Administrator or delegated authority the
opportunity to have authorized
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41700
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
representatives attend the test. Written
notification of the location and
scheduled date for conducting the
opacity observations must be received
by the Administrator on or before 30
calendar days before this scheduled
date.
(3) You must gather the data needed
for determining compliance with the
opacity limit using qualified visible
emission observers and process
monitors as described in paragraphs
(c)(3)(i) and (ii) of this section.
(i) Opacity observations must be
performed by a sufficient number of
qualified visible emission observers to
obtain two complete concurrent sets of
opacity readings for the required
observation period. Each visible
emission observer must be certified as a
qualified observer by the procedure
specified in section 3 of Method 9 in
appendix A–4 to 40 CFR part 60. The
entire set of readings during the
required observation period does not
need to be made by the same two
observers. More than two observers may
be used to allow for substitutions and
provide for observer rest breaks. The
owner or operator must obtain proof of
current visible emission reading
certification for each observer. ASTM
D7520–16 (incorporated by reference,
see § 63.14) is an acceptable alternative
to EPA Method 9 with the specified
conditions in paragraphs (c)(3)(i)(A)
through (E) of this section.
(A) During the digital camera opacity
technique (DCOT) certification
procedure outlined in section 9.2 of
ASTM D7520–16, you or the DCOT
vendor must present the plumes in front
of various backgrounds of color and
contrast representing conditions
anticipated during field use such as blue
sky, trees, and mixed backgrounds
(clouds and/or a sparse tree stand).
(B) You must also have standard
operating procedures in place including
daily or other frequency quality checks
to ensure the equipment is within
manufacturing specifications as
outlined in section 8.1 of ASTM D7520–
16.
(C) You must follow the record
keeping procedures outlined in
§ 63.10(b)(1) for the DCOT certification,
compliance report, data sheets, and all
raw unaltered JPEGs used for opacity
and certification determination.
(D) You or the DCOT vendor must
have a minimum of four (4)
independent technology users apply the
software to determine the visible
opacity of the 300 certification plumes.
For each set of 25 plumes, the user may
not exceed 15% opacity of anyone
reading and the average error must not
exceed 7.5% opacity.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(E) This approval does not provide or
imply a certification or validation of any
vendor’s hardware or software. The
onus to maintain and verify the
certification and/or training of the
DCOT camera, software and operator in
accordance with ASTM D7520–16 and
this letter is on the facility, DCOT
operator, and DCOT vendor.
(ii) A person (or persons) familiar
with the copper production operations
conducted at the smelter must serve as
the indoor process monitor. The indoor
process monitor is stationed at a
location inside the building housing the
batch copper converters such that he or
she can visually observe and record
operations that occur in the batch
copper converter aisle during the times
that the visible emission observers are
making opacity readings. More than one
indoor process monitor may be used to
allow for substitutions and provide for
rest breaks.
(4) You must make all opacity
observations using Method 9 in
appendix A–4 to 40 CFR part 60 and
following the procedures described in
paragraphs (c)(4)(i) and (ii) of this
section. ASTM D7520–16 (incorporated
by reference, see § 63.14) is an
acceptable alternative to EPA Method 9
with the specified conditions in
paragraphs (c)(3)(i)(A) through (E) of
this section.
(i) Each visible emission observer
must make his or her readings at a
position from the outside of the building
that houses the copper converter
department such that the observer’s
line-of-sight is approximately
perpendicular to the longer axis of the
converter building, and the observer has
an unobstructed view of the building
roof monitor sections or roof exhaust fan
outlets that are positioned over each of
the batch copper converters inside the
building. Opacity readings can only be
made during those times when the
observer’s position meets the sun
orientation and other conditions
specified in section 2.1 of Method 9 in
appendix A–4 to 40 CFR part 60.
(ii) At 15-second intervals, each
visible emission observer views the
building roof monitor sections or roof
exhaust fan outlets that are positioned
over each of the batch copper converters
inside the building and reads the
opacity of the visible plumes. If no
plume is visible, the observer records
zero as the opacity value for the 15second interval. In situations when it is
possible for an observer to distinguish
two or more visible emission plumes
from the building roof monitor sections
or roof exhaust fan outlets, the observer
must identify, to the extent feasible, the
plume having the highest opacity and
PO 00000
Frm 00054
Fmt 4701
Sfmt 4700
record his or her opacity reading for that
plume as the opacity value for the 15second interval.
(5) You must make opacity
observations for a period of sufficient
duration to obtain a minimum of 120 1minute intervals during which at least
one copper converter is blowing and no
interferences have occurred from other
copper production events, as specified
in paragraph (c)(7) of this section, which
generate visible emissions inside the
building that potentially can interfere
with the visible emissions from the
converter capture systems as seen by the
outside observers. To obtain the
required number of 1-minute intervals,
the observation period may be divided
into two or more segments performed on
the same day or on different days if
conditions prevent the required number
of opacity readings from being obtained
during one continuous time period.
Examples of these conditions include,
but are not limited to, changes in the
sun’s orientation relative to visible
emission observers’ positions such that
the conditions in Method 9 in appendix
A–4 to 40 CFR part 60 are no longer met
or an unexpected thunderstorm. If the
total observation period is divided into
two or more segments, all opacity
observations must be made during the
same set of copper production
conditions described in your approved
test plan as required by paragraph (c)(1)
of this section.
(6) You must gather indoor process
information during all times that the
visible emission observers are making
opacity readings outside the building
housing the copper converter
department. The indoor process monitor
must continually observe the operations
occurring in the copper converter
department and prepare a written record
of his or her observations using the
procedure specified in paragraphs
(c)(6)(i) through (iv) of this section.
(i) At the beginning of each
observation period or segment, the clock
time setting on the watch or clock to be
used by the indoor process monitor
must be synchronized with the clock
time settings for the timepieces to be
used by the outdoor opacity observers.
(ii) During each period or segment
when opacity readings are being made
by the visible emission observers, the
indoor process monitor must
continuously observe the operations
occurring in the copper converter
department and record his or her
observations in a log book, on data
sheets, or other type of permanent
written format.
(iii) When a batch copper converter is
blowing, a record must be prepared for
the converter that includes, but is not
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
limited to, the clock times for when
blowing begins and when blowing ends
and the converter blowing rate. This
information may be recorded by the
indoor process monitor or by a separate,
automated computer data system.
(iv) The process monitor must record
each event other than converter blowing
that occurs in or nearby the converter
aisle that he or she observes to generate
visible emissions inside the building.
The recorded entry for each event must
include, but is not limited to, a
description of the event and the clock
times when the event begins and when
the event ends.
(7) You must prepare a summary of
the data for the entire observation
period using the information recorded
during the observation period by the
outdoor visible emission observers and
the indoor process monitor and the
procedure specified in paragraphs
(c)(7)(i) through (iv) of this section.
(i) Using the field data sheets, identify
the 1-minute clock times for which a
total of eight opacity readings were
made and recorded by both observers at
15-second intervals according to the test
procedures (i.e., a total of four opacity
values have been recorded for the 1minute interval by each of the two
observers). Calculate the average of the
eight 15-second interval readings
recorded on the field data sheets by the
two observers during the clock time
minute interval (add the four
consecutive 15-second interval opacity
readings made by Observer A during the
specified clock time minute, plus the
four consecutive 15-second interval
opacity readings made by Observer B
during the same clock time minute, and
divide the resulting total by eight).
Record the clock time and the opacity
average for the 1-minute interval on a
data summary sheet. Figure 1 to this
subpart shows an example of the format
for the data summary sheet you may
use, but are not required to use.
(ii) Using the data summary sheets
prepared according to paragraph (c)(7)(i)
of this section and the process
information recorded according to
paragraph (c)(6)(iii) of this section,
identify those 1-minute intervals for
which at least one of the batch copper
converters was blowing.
(iii) Using the data summary sheets
prepared according to paragraph
(c)(7)(ii) of this section and the process
information recorded according to
paragraph (c)(6)(iv) of this section,
identify the 1-minute intervals during
which at least one copper converter was
blowing but none of the interference
events listed in paragraphs (c)(7)(iii)(A)
through (F) of this section occurred.
Other ancillary activities not listed but
conducted in or adjacent to the
converter aisle during the opacity
observations are not considered to be
interference events (e.g., converter aisle
cleaning, placement of smoking ladles
or skulls on the converter aisle floor).
(A) Charging of copper matte, reverts,
or other materials to a batch copper
converter;
(B) Skimming slag or other molten
materials from a batch copper converter;
(C) Pouring of blister copper or other
molten materials from a batch copper
converter;
(D) Return of slag or other molten
materials to the flash smelting vessel or
slag cleaning vessel;
(E) Roll-out or roll-in of the batch
copper converter; or
(F) Smoke and fumes generated inside
the converter building by operation of
41701
the smelting vessel, the slag cleaning
vessel (if used), anode refining and
casting processes that drift into the
copper converter department.
(iv) Using the data summary sheets
prepared according to paragraph
(c)(7)(iii) of this section, up to five 1minute intervals following an
interference event may be eliminated
from data used for the compliance
determination calculation specified in
paragraph (c)(8) of this section by
applying a time delay factor. The time
delay factor must be a constant number
of minutes not to exceed 5 minutes that
is added to the clock time recorded
when cessation of the interference event
occurs. The same time delay factor must
be used for all interference events (i.e.,
a constant time delay factor for the
smelter of 1 minute, 2 minutes, 3
minutes, 4 minutes, or 5 minutes). The
number of minutes to be used for the
time delay factor is determined based on
the site-specific equipment and
converter building configuration. An
explanation of the rationale for selecting
the value used for the time delay factor
must be prepared and included in the
test report.
(8) You must use the data summary
prepared in paragraph (c)(7) of this
section to calculate the average opacity
value for a minimum of 120 1-minute
intervals during which at least one
copper converter was blowing with no
interference events as determined
according to paragraphs (c)(7)(iii) and
(iv) of this section. Average opacity is
calculated using equation 1 to this
paragraph (c)(8):
Equation 1 to paragraph (c)(8)
n
VEave = ¾I VEi
Where:
VEave = Average opacity to be used for
compliance determination (percent);
n = Total number of 1-minute intervals
during which at least one copper
converter was blowing with no
interference events as determined
according to paragraphs (c)(7)(iii) and
(iv) of this section (at least 120 1-minute
intervals);
i = 1-minute interval ‘‘i’’ during which at
least one copper converter was blowing
with no interference events as
determined according to paragraphs
(c)(7)(iii) and (iv) of this section; and
VEi = Average opacity value calculated for
the eight opacity readings recorded
during 1-minute interval ‘‘i’’ (percent).
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(9) You must certify that the copper
converter department capture system
operated during the performance test at
the operating limits established in your
capture system operation and
maintenance plan using the procedure
specified in paragraphs (c)(9)(i) through
(iv) of this section.
(i) Concurrent with all opacity
observations, measure and record values
for each of the operating limit
parameters in your capture system
operation and maintenance plan
according to the monitoring
requirements specified in § 63.1452(a).
PO 00000
Frm 00055
Fmt 4701
Sfmt 4700
(ii) For any dampers that are manually
set and remain in the same position at
all times the capture system is
operating, the damper position must be
visually checked and recorded at the
beginning and end of each opacity
observation period segment.
(iii) Review the recorded monitoring
data. Identify and explain any times
during batch copper converter blowing
when the capture system operated
outside the applicable operating limits.
(iv) Certify in your performance test
report that during all observation period
segments, the copper converter
department capture system was
E:\FR\FM\13MYR3.SGM
13MYR3
ER13MY24.110
lotter on DSK11XQN23PROD with RULES3
i=1
lotter on DSK11XQN23PROD with RULES3
41702
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
operating at the values or settings
established in your capture system
operation and maintenance plan.
(d) Mercury emissions. You must
conduct each performance test to
determine compliance with the mercury
emission limits in § 63.1444 that apply
to you according to the requirements for
representative test conditions specified
in paragraph (d)(4) of this section and
using the test methods and procedures
in paragraphs (d)(1) through (3) of this
section.
(1) Determine the concentration of
mercury according to the test methods
in appendices A–1 through A–8 to 40
CFR part 60 as specified in paragraphs
(d)(1)(i) through (v) of this section.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas. The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(v) Method 29, 30A, or 30B, as
applicable, to determine the
concentration of mercury. You can also
use ASTM D6784–16 (incorporated by
reference, see § 63.14) or equivalent.
(2) You must conduct three separate
test runs for each performance test.
Duration of sampling is at least two
hours per run. If performing
measurements using Method 29 in
appendix A–8 to 40 CFR part 60, you
must collect a minimum sample volume
of 1.7 dscm (60 dscf). For the purpose
of determining compliance with the
applicable mercury emission limit, the
arithmetic mean of the results for the
three separate test runs is used.
(3) For a control device or process
operating parameter applied to
emissions from an affected source and
subject to site-specific operating limit(s)
in § 63.1444(n) for appropriate, sitespecific operating parameters that are
representative and reliable indicators of
the control device performance, you
must establish a site-specific operating
limit(s) according to the procedures in
paragraphs (d)(3)(i) through (iv) of this
section.
(i) Select one or more operating
parameters, as appropriate for the
control device design or process
parameter (i.e., mercury content of
concentrate feed), that can be used as
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
representative and reliable indicators of
the control device or process operation.
(ii) Using the CPMS required in
§ 63.1452, measure and record the
selected operating parameters for the
control device during each run of the
mercury performance test.
(iii) Compute and record the hourly
average value for each of the selected
operating parameters for each
individual test run. Your operating
limits are the lowest value or the highest
value, as appropriate for the selected
operating parameter, measured in any of
the three runs that meet the applicable
emission limit.
(iv) You must prepare written
documentation to support your
selection of the operating parameters
used for the control device. This
documentation must include a
description of each selected parameter,
a rationale for why you chose the
parameter, a description of the method
used to monitor the parameter, and the
data recorded during the performance
test and used to set the operating
limit(s).
(4) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The use of the bypass stack
during a performance test of the process
shall invalidate the performance test.
The owner or operator must record the
process information that is necessary to
document operating conditions during
the test and include in such record an
explanation to support that such
conditions represent the entire range of
normal operation, including operational
conditions for maximum emissions if
such emissions are not expected during
maximum production. The owner or
operator shall make available to the
Administrator such records as may be
necessary to determine the conditions of
performance tests.
(e) Anode refining department, copper
converter department, slag cleaning
vessels, and smelting vessels process
fugitive roofline vent filterable
particulate matter emission limit. You
must conduct each performance test to
determine compliance with the roofline
vent process fugitive filterable
particulate matter emission limits in
§ 63.1444 that apply to you according to
the requirements for representative test
conditions specified in paragraph (e)(3)
of this section and using the test
methods and procedures in paragraphs
(e)(1) and (2) of this section.
(1) Determine the concentration of
anode refining department, copper
converter department, slag cleaning
PO 00000
Frm 00056
Fmt 4701
Sfmt 4700
vessels, and smelting vessels process
fugitive roofline vent filterable
particulate matter according to the test
methods in appendices A–1 through A–
8 to 40 CFR part 60 as specified in
paragraphs (e)(1)(i) through (vi) of this
section.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
Use Method 5D, section 8.1.3, Roof
Monitor or Monovent, or approved
sample locations by EPA Office of Air
and Radiation (OAR), OAQPS,
Measurement Technology Group or
delegated authority.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas
or calibrated anemometer.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas.
The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(v) Method 17 to determine in-stack
mass volume of the anode refining,
converter and smelting process fugitive
roof vent filterable particulate matter
emissions. Isokinetic calculations are
waived due to low flow rates and high
variability. Use the filter specified in
section 7.2.1 of Method 29. An
approved Federal reference method
(FRM)/Federal equivalent method
(FEM) may be used if it can tolerate the
150 °F temperatures on the roof vents.
Tapered element oscillating
microbalances (TEOMs) are not
appropriate for this sampling. An
alternative test method may be
requested to EPA OAR, OAQPS,
Measurement Technology Group.
(vi) Method 9 to establish opacity as
an operating parameter, if appropriate.
ASTM D7520–16 (incorporated by
reference, see § 63.14) is an acceptable
alternative to EPA Method 9 with the
specified conditions in paragraphs
(c)(3)(i)(A) through (E) of this section.
(2) You must conduct three separate
test runs for each performance test. Each
test run must have a minimum sampling
time of 12 hours. For the purpose of
determining compliance with the
filterable particulate matter emission
limit, the arithmetic mean of the results
for the three separate test runs for each
roofline vent (i.e., anode refining
department, copper converter
department, smelting vessels, slag
cleaning vessels) is used. The three test
run average of the filterable particulate
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
matter emission rates from each vent
should be summed to compare to the
emission limit in § 63.1444.
(3) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The use of the bypass stack
during a performance test of the process
shall invalidate the performance test.
The owner or operator must record the
process information that is necessary to
document operating conditions during
the test and include in such record an
explanation to support that such
conditions represent the entire range of
normal operation, including operational
conditions for maximum emissions if
such emissions are not expected during
maximum production. The owner or
operator shall make available to the
Administrator such records as may be
necessary to determine the conditions of
performance tests.
(f) Benzene, toluene, chlorine,
hydrogen chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene, and dioxins/furans
emissions. You must conduct each
performance test to determine
compliance with the benzene, toluene,
chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding
naphthalene, naphthalene, and dioxins/
furans emission limits in table 2 to this
subpart that apply to you according to
the requirements for representative test
conditions specified in paragraph (f)(8)
of this section and using the test
methods and procedures in paragraphs
(f)(1) through (7) of this section.
(1) Use the test methods in
appendices A–1 through A–8 to 40 CFR
part 60 as specified in paragraphs
(f)(1)(i) through (iv) of this section to
select sampling port locations and the
number of traverse points and to
determine the volumetric flow rate, dry
molecular weight, and moisture content
of the stack gas.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas. The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(2) Determine the concentration of
benzene and toluene for each stack
using Method 18 in to appendix A–6 to
40 CFR part 60 to determine the
concentration of benzene and toluene;
or as an alternative ASTM D6420–99
(Reapproved 2010) (incorporated by
reference, see § 63.14), may be used
provided that the target compound(s)
are those listed in section 1.1 of ASTM
D6420–99 (Reapproved 2010) as
measurable; the target compounds do
not include methane and ethane
because their atomic mass is less than
35; and the test results are not a total
VOC method. Each test must consist of
three separate runs. The duration of
sampling must be at least two hours per
run.
(3) Determine the concentration of
chlorine and hydrogen chloride for each
stack using Method 26A in appendix A–
L c, ;
41703
8 to 40 CFR part 60. Each test must
consist of three separate runs. The
minimum sample volume must be at
least 2 dry cubic meters per run. Each
run must be conducted for a minimum
of 1 hour.
(4) Determine the concentration of
polycyclic aromatic hydrocarbons
excluding naphthalene, naphthalene,
and dioxins/furans for each stack using
Method 23 in appendix A–7 to 40 CFR
part 60. Each test must consist of three
separate runs. The test duration must be
at least 3 hours and the must be at least
3 dscm (106 dscf). Method 23 complete
list of PAHs and dioxin and furan
congeners must be analyzed and
reported.
(5) During each stack test run,
measure the weight of copper
concentrate feed charged to the smelting
vessel and calculate the emissions rate
in pounds of pollutant per ton of copper
concentrate feed charged to the smelting
vessel (lb/ton), except for dioxins/furans
which should be calculated in
nanograms of pollutant Toxicity
Equivalent Quotient (TEQ) per
megagram of copper concentrate feed
charged to the smelting vessel (ng/Mg)
for each test run. To calculate the TEQ,
multiply each D/F congener emission
concentration times the appropriate
Toxicity Equivalent Factor (TEF) in
table 3 to this subpart. If any
measurement result is reported as below
the method detection limit, use the
method detection limit for that value
when calculating the emission rate.
Calculate the total emissions rate for
each test run by summing the emissions
across all stacks, as shown in equation
2 to this paragraph (f)(5).
Equation 2 to Paragraph (f)(5)
n
Er., =
Q,
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Qs = Average volumetric flow rate of stack
gas measured at stack ‘‘s’’ during test run
‘‘i’’ at facility ‘‘f’’, dscf/hour;
P = Copper concentrate feed charged to the
smelting vessel during the stack test, ton/
hour or Mg/hour, as applicable; and
n = Number of emissions stacks at facility
‘‘f’’.
runs, as shown in equation 3 to this
paragraph (f)(6). For the purposes of
determining compliance with the
applicable emission limits in table 2 to
this subpart, the arithmetic mean of the
results for the three separate test runs is
used as calculated using equation 3.
(6) Calculate the average emissions
rate for each facility using the three test
Equation 3 to paragraph (f)(6)
PO 00000
Frm 00057
Fmt 4701
Sfmt 4725
E:\FR\FM\13MYR3.SGM
ER13MY24.112
Where:
Ef,i = Emissions rate for test run ‘‘i’’ for all
emission stacks at the facility ‘‘f’’, lb/ton
or ng/Mg, as applicable of copper
concentrate feed charged to the smelting
vessel;
Cs = Emission rate for stack ‘‘s’’ measured
during test run ‘‘i’’ on at facility ‘‘f’’, lb/
dscf;
13MYR3
ER13MY24.111
lotter on DSK11XQN23PROD with RULES3
s=l
41704
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Where:
Ef = Average emission rate for facility ‘‘f’’, lb/
ton or ng/Mg of copper concentrate feed
charged to the smelting vessel, as
applicable.
E1 = Emissions rate for run 1 for facility ‘‘f’’,
lb/ton or ng/Mg of copper concentrate
feed charged to the smelting vessel, as
applicable.
E2 = Emissions rate for run 2 for facility ‘‘f’’,
lb/ton or ng/Mg of copper concentrate
feed charged to the smelting vessel, as
applicable.
E3 = Emissions rate for run 3 for facility ‘‘f’’,
lb/ton or ng/Mg of copper concentrate
feed charged to the smelting vessel, as
applicable.
lotter on DSK11XQN23PROD with RULES3
*
*
*
*
*
(7) For a control device applied to
emissions from an affected source and
subject to work practice standards and
emission limit(s) in § 63.1444(o) for
appropriate, site-specific operating
parameters that are representative and
reliable indicators of the control device
performance, you must establish a sitespecific operating limit(s) according to
the procedures in paragraphs (f)(7)(i)
through (iv) of this section.
(i) Select one or more operating
parameters, as appropriate for the
control device design, that can be used
as representative and reliable indicators
of the control device operation.
(ii) Using the CPMS required in
§ 63.1452, measure and record the
selected operating parameters for the
control device during each run of the
benzene, toluene, chlorine, hydrogen
chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene and dioxins/furans
performance test.
(iii) Compute and record the hourly
average value for each of the selected
operating parameters for each
individual test run. Your operating
limits are the lowest value or the highest
value, as appropriate for the selected
operating parameter, measured in any of
the three runs that meet the applicable
emission limit.
(iv) You must prepare written
documentation to support your
selection of the operating parameters
used for the control device. This
documentation must include a
description of each selected parameter,
a rationale for why you chose the
parameter, a description of the method
used to monitor the parameter, and the
data recorded during the performance
test and used to set the operating
limit(s).
(8) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. You
may not conduct a performance test
during a malfunction. The use of the
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
bypass stack during a performance test
of the process shall invalidate the
performance test. The owner or operator
must record the process information
that is necessary to document operating
conditions during the test and include
in such record an explanation to
support that such conditions represent
the entire range of normal operation,
including operational conditions for
maximum emissions if such emissions
are not expected during maximum
production. The owner or operator shall
make available to the Administrator
such records as may be necessary to
determine the conditions of
performance tests.
(g) Peirce-Smith converter
department, Inco flash furnace, and
anode refining department process
fugitive roofline vent lead. For facilities
using a combination of Peirce-Smith
converter department, Inco flash
furnace, and anode refining department,
you must conduct each performance test
to determine compliance with the
roofline vent process fugitive lead
emission limits in § 63.1444(p)(1) that
apply to you according to the
requirements for representative test
conditions specified in paragraph (g)(3)
of this section and using the test
methods and procedures in paragraphs
(g)(1) and (2) of this section. You must
also comply with establishing operating
parameters in paragraphs (g)(4) through
(7) of this section.
(1) Determine the concentration of
Peirce-Smith converter department, Inco
flash furnace, and anode refining
department process fugitive roofline
vent lead according to the test methods
in appendices A–1 through A–8 to 40
CFR part 60 as specified in paragraphs
(g)(1)(i) through (vii) of this section.
(i) Method 1 to select sampling port
locations and the number of traverse
points. Sampling ports must be located
at the outlet of the control device and
prior to any releases to the atmosphere.
Use Method 5D section 8.1.3 Roof
Monitor or Monovent or approved
sample locations by MTG or delegated
authority.
(ii) Method 2, 2F, or 2G to determine
the volumetric flow rate of the stack gas
or calibrated anemometer.
(iii) Method 3, 3A, or 3B to determine
the dry molecular weight of the stack
gas. The ANSI/ASME PTC 19–10–1981
Part 10 (incorporated by reference, see
§ 63.14) is an acceptable alternative to
EPA Method 3B manual portion only
but not the instrumental portion.
(iv) Method 4 to determine the
moisture content of the stack gas.
(v) Method 17 to determine in-stack
mass volume of the anode refining,
converter and smelting process fugitive
PO 00000
Frm 00058
Fmt 4701
Sfmt 4700
roof vent lead emissions. Isokinetic
calculations are waived due to low flow
rates and high variability. Use the filter
specified in section 7.2.1 of Method 29.
An approved FRM/FEM may be used if
it can tolerate the 150 F temperatures on
the roof vents. TEOMs are not
appropriate for this sampling. An
alternative test method may be
requested to EPA OAR, OAQPS,
Measurement Technology Group.
(vi) Method 29 filter analysis by
inductively coupled plasma mass
spectrometry (ICP–MS) for lead.
(vii) Method 9 to establish opacity as
an operating parameter, if appropriate.
ASTM D7520–16 (incorporated by
reference, see § 63.14) is an acceptable
alternative to EPA Method 9 with the
specified conditions in paragraphs
(c)(3)(i)(A) through (E) of this section.
(2) You must conduct three separate
test runs for each performance test. Each
test run must have a minimum sampling
time of 12 hours. For the purpose of
determining compliance with the lead
emission limit, the arithmetic mean of
the results for the three separate test
runs for each roofline vent (i.e., anode
refining department, copper converter
department, smelting vessels, slag
cleaning vessels) is used. The three test
run average of the lead emission rates
from each vent should be summed to
compare to the emission limit in
§ 63.1444.
(3) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The use of the bypass stack
during a performance test of the process
shall invalidate the performance test.
The owner or operator must record the
process information that is necessary to
document operating conditions during
the test and include in such record an
explanation to support that such
conditions represent the entire range of
normal operation, including operational
conditions for maximum emissions if
such emissions are not expected during
maximum production. The owner or
operator shall make available to the
Administrator such records as may be
necessary to determine the conditions of
performance tests.
(4) Establish a site-specific operating
limit for a parameter, like opacity, based
on values measured during the
performance test.
(5) For your flash furnace capture
system you must establish site specific
operating parameters as specified in
§ 63.1444(p)(2)(i).
(6) For your fuming ladle capture
system, you must establish site specific
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
operating parameters as specified in
§ 63.1444(p)(2)(ii).
(7) For your anode furnace secondary
capture and control system, you must
establish site specific operating
parameters as specified in
§ 63.1444(p)(2)(iii).
lotter on DSK11XQN23PROD with RULES3
§ 63.1451 How do I demonstrate initial
compliance with the emission limitations,
work practice standards, design standards,
and operation and maintenance
requirements that apply to me?
(a) Filterable particulate matter
emission limits. For each copper
concentrate dryer, smelting vessel, slag
cleaning vessel, copper converter
department, anode refining department,
and combination of anode refining
department and Hoboken converter
process fugitive capture system subject
to a filterable particulate matter
emission limit in § 63.1444 or § 63.1446,
you have demonstrated initial
compliance if you meet both of the
conditions in paragraphs (a)(1) and (2)
of this section.
(1) The average concentration of
filterable particulate matter from the
affected source, any capture system, or
control device applied to emissions
from the affected source, measured
according to the performance test
procedures in § 63.1450(a), did not
exceed the applicable emission limit,
and establishes operating parameter.
(2) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(b) Nonsulfuric acid particulate
matter emissions limits. For each
smelting vessel, slag cleaning vessel,
and copper converter departments
subject to the nonsulfuric acid
particulate matter emissions limit in
§ 63.1444 as applies to you, you have
demonstrated initial compliance if you
meet both of the conditions in
paragraphs (b)(1) and (2) of this section.
(1) The average concentration of
nonsulfuric acid particulate matter in
the process off-gas discharged from the
affected source, measured according to
the performance test procedures in
§ 63.1450(b), did not exceed 6.2 mg/
dscm.
(2) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(c) Copper converter department
visible emissions. For each existing
copper converter department subject to
the opacity limit in § 63.1444, you have
demonstrated initial compliance if you
meet both of the conditions in
paragraphs (c)(1) and (2) of this section.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(1) The opacity of visible emissions
exiting the roof monitors or roof exhaust
fans on the building housing the copper
converter department measured
according to the performance test
procedures in § 63.1450(c), did not
exceed 4 percent opacity.
(2) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e).
(d) Copper converter department
capture systems. You have
demonstrated initial compliance of the
copper converter department capture
system if you meet all of the conditions
in paragraphs (d)(1) through (4) of this
section.
(1) Prepared the capture system
operation and maintenance plan
according to the requirements in
§ 63.1447(b);
(2) Conducted an initial performance
test according to the procedures of
§ 63.1450(c) demonstrating the opacity
of any visible emissions exiting the roof
monitors or roof exhaust fans on the
building housing the copper converter
department does not exceed 4 percent
opacity;
(3) Included in your notification of
compliance status a copy of your
written capture system operation and
maintenance plan and have certified in
your notification of compliance status
that you will operate the copper
converter department capture system at
all times during blowing at the values or
settings established for the operating
limits in that plan; and
(4) Submitted a notification of
compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(e) Baghouses. For each baghouse
subject to operating limits in
§ 63.1444(i) or § 63.1446(c), you have
demonstrated initial compliance if you
meet all of the conditions in paragraphs
(e)(1) through (3) of this section.
(1) You have included in your written
operation and maintenance plan
required under § 63.1447(b) detailed
descriptions of the procedures you use
for inspection, maintenance, bag leak
detection, and corrective action for the
baghouse.
(2) You have certified in your
notification of compliance status that
you will operate the baghouse according
to your written operation and
maintenance plan.
(3) You have submitted the
notification of compliance status
according to the requirements in
§ 63.1454(e).
(f) Venturi wet scrubbers. For each
venturi wet scrubber subject to
operating limits in § 63.1444(j) or
PO 00000
Frm 00059
Fmt 4701
Sfmt 4700
41705
§ 63.1446(d), you have demonstrated
initial compliance if you meet all of the
conditions in paragraphs (f)(1) through
(3) of this section.
(1) Established site-specific operating
limits for pressure drop and scrubber
water flow rate and have a record of the
pressure drop and scrubber water flow
rate measured during the performance
test you conduct to demonstrate initial
compliance with paragraph (a) or (k) of
this section.
(2) Certified in your notification of
compliance status that you will operate
the venturi wet scrubber within the
established operating limits for pressure
drop and scrubber water flow rate.
(3) Submitted a notification of
compliance status according to the
requirements in § 63.1454(e).
(g) Other control devices. For each
control device other than a baghouse or
venturi wet scrubber subject to
operating limits in § 63.1444(k) or (n) or
§ 63.1446(e), you have demonstrated
initial compliance if you meet all of the
conditions in paragraphs (g)(1) through
(4) of this section.
(1) Selected one or more operating
parameters, as appropriate for the
control device design, that can be used
as representative and reliable indicators
of the control device operation.
(2) Established site-specific operating
limits for each of the selected operating
parameters based on values measured
during the performance test you
conduct to demonstrate initial
compliance with paragraph (a) of this
section and have prepared written
documentation according to the
requirements in § 63.1450(a)(5)(iv).
(3) Included in your notification of
compliance status a copy of the written
documentation you have prepared to
demonstrate compliance with paragraph
(g)(2) of this section and have certified
in your notification of compliance status
that you will operate the control device
within the established operating limits.
(4) Submitted a notification of
compliance status according to the
requirements in § 63.1454(e).
(h) Fugitive dust sources. For all
fugitive dust sources subject to work
practice standards in § 63.1445, you
have demonstrated initial compliance if
you meet all of the conditions in
paragraphs (h)(1) through (3) of this
section.
(1) Prepared a written fugitive dust
control plan according to the
requirements in § 63.1445 and it has
been approved by the delegated
authority.
(2) Certified in your notification of
compliance status that you will control
emissions from the fugitive dust sources
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41706
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
according to the procedures in the
approved plan.
(3) Submitted the notification of
compliance status according to the
requirements in § 63.1454(e).
(i) Operation and maintenance
requirements. You have demonstrated
initial compliance with the operation
and maintenance requirements that
apply to you if you meet all of the
conditions in paragraphs (i)(1) through
(3) of this section.
(1) Prepared an operation and
maintenance plan according to the
requirements in § 63.1447(b).
(2) Certified in your notification of
compliance status that you will operate
each capture system and control device
according to the procedures in the plan.
(3) Submitted the notification of
compliance status according to the
requirements in § 63.1454(e).
(j) Mercury emissions. For any
combination of copper concentrate
dryers, smelting vessel, copper
converter department, slag cleaning
vessel and anode refining department
subject to a mercury emission limit in
§ 63.1444, you have demonstrated initial
compliance if you meet the conditions
in paragraphs (j)(1) through (3) of this
section.
(1) The sum of the mercury emissions
(lb/hr) from the affected sources
measured according to the performance
test procedures in § 63.1450(d), did not
exceed the applicable emission limit.
(2) Established a site-specific
operating limit for a parameter based on
values measured during the
performance test you conduct to
demonstrate initial compliance with
this paragraph (j) and have prepared
written documentation according to the
requirements in § 63.1450(d)(3)(iv).
(3) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(k) Process fugitive filterable
particulate matter from roofline vents.
For emissions from roofline vents
associated with the smelting vessels,
slag cleaning vessels, copper converter
department, and anode refining
department subject to a filterable
particulate matter emission limit in
§ 63.1444(h), you have demonstrated
initial compliance if you meet the
conditions in paragraphs (k)(1) through
(3) of this section.
(1) The sum of filterable particulate
matter emissions from the combination
of roofline vents as measured according
to the performance test procedures in
§ 63.1450(e), did not exceed 6.3 lb/hr.
(2) Established a site-specific
operating limit for a parameter, like
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
opacity, based on values measured
during the performance test you
conduct to demonstrate initial
compliance with this paragraph (k) and
have prepared written documentation
according to the requirements in
§ 63.1450(e).
(3) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(l) Benzene, toluene, chlorine,
hydrogen chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene, and dioxins/furans
emissions. For any combination of
copper concentrate dryer, smelting
vessel, slag cleaning vessel, copper
converter department, and anode
refining department subject to the
benzene, toluene, chlorine, hydrogen
chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene, and dioxins/furans
emission limits in table 2 to this
subpart, you have demonstrated initial
compliance if you meet both of the
conditions in paragraphs (l)(1) and (2) to
this section.
(1) The emissions of benzene, toluene,
chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding
naphthalene, naphthalene, and dioxins/
furans emissions per mass of copper
concentrate feed to the smelting vessel
from the affected sources measured
according to the performance test
procedures in § 63.1450(f), did not
exceed the applicable emission limit.
(2) You have submitted a notification
of compliance status according to the
requirements in § 63.1454(e) and
performance test results according to the
requirements in § 63.1455(e).
(m) Process fugitive lead from roofline
vents. For emissions from the
combination of roofline vents associated
with the Peirce-Smith converter
department, Inco flash furnace, and
anode refining department subject to a
lead emission limit and design
standards in § 63.1444(p), you have
demonstrated initial compliance if you
meet the conditions in paragraphs
(m)(1) through (5) of this section.
(1) The sum of lead emissions from
the combination of roofline vents as
measured according to the performance
test procedures in § 63.1450(g), did not
exceed 0.326 lb/hr.
(2) You have submitted a notification
of compliance status and performance
test results according to requirements of
§§ 63.1454(e), 63.1455(e)(1), and 63.9(k)
(3) For your flash furnace capture
system, you have established timed
interlock on the slag return launder.
PO 00000
Frm 00060
Fmt 4701
Sfmt 4700
(4) For your fuming ladle capture
system, you have determined flow rate
by a calibrated flowmeter or test.
(5) For your anode furnace secondary
hood capture and control system, you
have determined flow rate by a
calibrated flowmeter or test.
§ 63.1452 What are my monitoring
requirements?
(a) Copper converter department
capture systems. For each operating
limit established under your capture
system operation and maintenance plan,
you must install, operate, and maintain
an appropriate monitoring device
according to the requirements in
paragraphs (a)(1) through (6) of this
section to measure and record the
operating limit value or setting at all
times the copper converter department
capture system is operating during batch
copper converter blowing. Dampers that
are manually set and remain in the same
position at all times the capture system
is operating are exempted from the
requirements of this paragraph (a).
(1) Install the monitoring device,
associated sensor(s), and recording
equipment according to the
manufacturers’ specifications. Locate
the sensor(s) used for monitoring in or
as close to a position that provides a
representative measurement of the
parameter being monitored.
(2) If a flow measurement device is
used to monitor the operating limit
parameter, you must meet the
requirements in paragraphs (a)(2)(i)
through (iv) of this section.
(i) Locate the flow sensor and other
necessary equipment such as
straightening vanes in a position that
provides a representative flow.
(ii) Use a flow sensor with a minimum
tolerance of 2 percent of the flow rate.
(iii) Reduce swirling flow or abnormal
velocity distributions due to upstream
and downstream disturbances.
(iv) Conduct a flow sensor calibration
check at least semiannually.
(3) If a pressure measurement device
is used to monitor the operating limit
parameter, you must meet the
requirements in paragraphs (a)(3)(i)
through (v) of this section.
(i) Locate the pressure sensor(s) in or
as close to a position that provides a
representative measurement of the
pressure.
(ii) Minimize or eliminate pulsating
pressure, vibration, and internal and
external corrosion.
(iii) Use a gauge with a minimum
tolerance of 0.5 inch of water or a
transducer with a minimum tolerance of
1 percent of the pressure range.
(iv) Check pressure tap pluggage
daily.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(v) Using a manometer, check gauge
calibration quarterly and transducer
calibration monthly.
(4) Conduct calibration and validation
checks any time the sensor exceeds the
manufacturer’s specifications or you
install a new sensor.
(5) At least monthly, inspect all
components for integrity, all electrical
connections for continuity, and all
mechanical connections for leakage.
(6) Record the results of each
inspection, calibration, and validation
check.
(b) Baghouses. For each baghouse
subject to the operating limit in
§ 63.1444(i) or § 63.1446(c) for the bag
leak detection system alarm, you must
at all times monitor the relative change
in particulate matter loadings using a
bag leak detection system according to
the requirements in paragraph (b)(1) of
this section and conduct regular
inspections according to the
requirements in paragraph (b)(2) of this
section.
(1) You must install, operate, and
maintain each bag leak detection system
according to the requirements in
paragraphs (b)(1)(i) through (vii) of this
section.
(i) The system must be certified by the
manufacturer to be capable of detecting
emissions of particulate matter at
concentrations of 10 milligrams per
actual cubic meter (0.0044 grains per
actual cubic foot) or less.
(ii) The system must provide output
of relative changes in particulate matter
loadings.
(iii) The system must be equipped
with an alarm that will sound when an
increase in relative particulate loadings
is detected over a preset level. The
alarm must be located such that it can
be heard by the appropriate plant
personnel.
(iv) Each system that works based on
the triboelectric effect must be installed,
operated, and maintained in a manner
consistent with the guidance document
‘‘Fabric Filter Bag Leak Detection
Guidance,’’ EPA–454/R–98–015,
September 1997. You may obtain a copy
of this guidance document by contacting
the National Technical Information
Service (NTIS) at 800–553–6847. You
may install, operate, and maintain other
types of bag leak detection systems in a
manner consistent with the
manufacturer’s written specifications
and recommendations.
(v) To make the initial adjustment of
the system, establish the baseline output
by adjusting the sensitivity (range) and
the averaging period of the device.
Then, establish the alarm set points and
the alarm delay time.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(vi) Following the initial adjustment,
do not adjust the sensitivity or range,
averaging period, alarm set points, or
alarm delay time, except as detailed in
your operation and maintenance plan.
Do not increase the sensitivity by more
than 100 percent or decrease the
sensitivity by more than 50 percent over
a 365-day period unless a responsible
official certifies, in writing, that the
baghouse has been inspected and found
to be in good operating condition.
(vii) Where multiple detectors are
required, the system’s instrumentation
and alarm may be shared among
detectors.
(2) You must conduct baghouse
inspections at their specified
frequencies according to the
requirements in paragraphs (b)(2)(i)
through (viii) of this section.
(i) Monitor the pressure drop across
each baghouse cell each day to ensure
pressure drop is within the normal
operating range identified in the
manual.
(ii) Confirm that dust is being
removed from hoppers through weekly
visual inspections or other means of
ensuring the proper functioning of
removal mechanisms.
(iii) Check the compressed air supply
for pulse-jet baghouses each day.
(iv) Monitor cleaning cycles to ensure
proper operation using an appropriate
methodology.
(v) Check bag cleaning mechanisms
for proper functioning through monthly
visual inspection or equivalent means.
(vi) Make monthly visual checks of
bag tension on reverse air and shakertype baghouses to ensure that bags are
not kinked (kneed or bent) or laying on
their sides. You do not have to make
this check for shaker-type baghouses
using self-tensioning (spring-loaded)
devices.
(vii) Confirm the physical integrity of
the baghouse through quarterly visual
inspections of the baghouse interior for
air leaks.
(viii) Inspect fans for wear, material
buildup, and corrosion through
quarterly visual inspections, vibration
detectors, or equivalent means.
(c) Venturi wet scrubbers. For each
venturi wet scrubber subject to the
operating limits for pressure drop and
scrubber water flow rate in § 63.1444(j)
or § 63.1446(d), you must at all times
monitor the hourly average pressure
drop and water flow rate using a CPMS.
You must install, operate, and maintain
each CPMS according to the
requirements in paragraphs (c)(1) and
(2) of this section.
(1) For the pressure drop CPMS, you
must meet the requirements in
PO 00000
Frm 00061
Fmt 4701
Sfmt 4700
41707
paragraphs (c)(1)(i) through (vi) of this
section.
(i) Locate the pressure sensor(s) in or
as close to a position that provides a
representative measurement of the
pressure and that minimizes or
eliminates pulsating pressure, vibration,
and internal and external corrosion.
(ii) Use a gauge with a minimum
measurement sensitivity of 0.5 inch of
water or a transducer with a minimum
measurement sensitivity of 1 percent of
the pressure range.
(iii) Check the pressure tap for
pluggage daily.
(iv) Using a manometer, check gauge
calibration quarterly and transducer
calibration monthly.
(v) Conduct calibration checks any
time the sensor exceeds the
manufacturer’s specified maximum
operating pressure range, or install a
new pressure sensor.
(vi) At least monthly, inspect all
components for integrity, all electrical
connections for continuity, and all
mechanical connections for leakage.
(2) For the scrubber water flow rate
CPMS, you must meet the requirements
in paragraphs (c)(2)(i) through (iv) of
this section.
(i) Locate the flow sensor and other
necessary equipment in a position that
provides a representative flow and that
reduces swirling flow or abnormal
velocity distributions due to upstream
and downstream disturbances.
(ii) Use a flow sensor with a minimum
measurement sensitivity of 2 percent of
the flow rate.
(iii) Conduct a flow sensor calibration
check at least semiannually according to
the manufacturer’s instructions.
(iv) At least monthly, inspect all
components for integrity, all electrical
connections for continuity, and all
mechanical connections for leakage.
(d) Other control devices and
operating parameters. For each control
device other than a baghouse or venturi
wet scrubber subject to the operating
limits for appropriate parameters in
§ 63.1444(k) or § 63.1446(e), or a control
device for mercury subject to
§ 63.1444(n), you must at all times
monitor each of your selected
parameters using an appropriate CPMS.
You must install, operate, and maintain
each CPMS according to the equipment
manufacturer’s specifications and the
requirements in paragraphs (d)(1)
though (5) of this section.
(1) Locate the sensor(s) used for
monitoring in or as close to a position
that provides a representative
measurement of the parameter being
monitored.
(2) Determine the hourly average of all
recorded readings.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41708
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(3) Conduct calibration and validation
checks any time the sensor exceeds the
manufacturer’s specifications or you
install a new sensor.
(4) At least monthly, inspect all
components for integrity, all electrical
connections for continuity, and all
mechanical connections for leakage.
(5) Record the results of each
inspection, calibration, and validation
check.
(e) Continuous monitoring. Except for
monitoring malfunctions, associated
repairs, and required quality assurance
or control activities (including as
applicable, calibration checks and
required zero and span adjustments),
you must monitor continuously (or
collect data at all required intervals) at
all times an affected source is operating.
(f) Data collection for assessing
compliance. You may not use data
recorded during monitoring
malfunctions, associated repairs, and
required quality assurance or control
activities in data averages and
calculations used to report emission or
operating levels or to fulfill a minimum
data availability requirement, if
applicable. You must use all the data
collected during all other periods in
assessing compliance.
(g) Monitoring malfunctions. A
monitoring malfunction is any sudden,
infrequent, not reasonably preventable
failure of the monitor to provide valid
data. Monitoring failures that are caused
in part by poor maintenance or careless
operation are not malfunctions.
(h) Bypass stacks. You must maintain
an appropriate monitoring device
according to the requirements in
paragraph (h)(1) or (2) of this section to
demonstrate the work practice standards
are limiting the emissions at all times
the bypass stack is in use.
(1) If a SO2 continuous emissions
monitoring system (CEMS) is utilized as
a continuous monitor during planned
maintenance events, a cylinder gas audit
(CGA) and daily calibration or a 3-point
linearity test must be conducted prior to
the performance test according to
Procedure 1, section 5.1.2, in appendix
F to 40 CFR part 60 to conduct the CGA.
(2) If a particulate matter (PM)
detector is CPMS, you must install,
operate, and maintain each PM detector
according to the equipment
manufacturer’s specifications and the
requirements in paragraphs (h)(2)(i)
through (v) of this section.
(i) Locate the detector(s) used for
monitoring in or as close to a position
that provides a representative
measurement of the parameter being
monitored.
(ii) Determine the hourly average of
all recorded readings.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(iii) Conduct calibration and
validation checks any time the detector
exceeds the manufacturer’s
specifications or you install a new
detector.
(iv) At least monthly, inspect all
components for integrity, all electrical
connections for continuity, and all
mechanical connections for leakage.
(v) Record the results of each
inspection, calibration, and validation
check.
§ 63.1453 How do I demonstrate
continuous compliance with the emission
limitations, work practice standards, design
standards, and operation and maintenance
requirements that apply to me?
(a) Filterable particulate matter
emission limits. For each affected source
subject to a particulate matter emission
limit in § 63.1444 or § 63.1446 as
applies to you, you must demonstrate
continuous compliance according to the
requirements in paragraphs (a)(1) and
(2) of this section.
(1) For each copper concentrate dryer,
smelting vessel, slag cleaning vessel,
copper converter department, anode
refining department, and combination of
anode refining department and Hoboken
converter process fugitive capture
system subject to a filterable particulate
matter emission limit in § 63.1444 or
§ 63.1446 as applies to you, you must
demonstrate continuous compliance by
meeting the conditions in paragraphs
(a)(1)(i) through (iii) or paragraphs
(a)(1)(i) and (iv) through (vii) of this
section.
(i) Maintain the average concentration
of filterable particulate matter in the
gases discharged from the affected
source at or below the applicable
emission limit. If a particulate matter
continuous emissions monitoring
system (PM CEMS) is used, you must
demonstrate continued compliance
according to the requirements in
paragraphs (a)(1)(iv) through (vii) of this
section.
(ii) Monitor the operating parameter(s)
established during the performance test
according to the requirements in
§§ 63.1450(a) and 63.1452 and collect,
reduce, and record the monitoring data
for each of the operating limit
parameters according to the applicable
requirements of this subpart.
(iii) Conduct subsequent performance
tests following your initial performance
test no less frequently than once per
year according to the performance test
procedures in § 63.1450(a). New
operating limits may be established
during subsequent performance tests as
long as the performance tests
demonstrate compliance with the
emission limits.
PO 00000
Frm 00062
Fmt 4701
Sfmt 4700
(iv) Install, operate, and maintain a
PM CEMS to measure and record PM
concentrations and gas stream flow rates
for the exhaust gases discharged to the
atmosphere from each affected source
subject to the emissions limit in this
paragraph (a)(1). A single PM CEMS
may be used for the combined exhaust
gas streams from multiple affected
sources at a point before the gases are
discharged to the atmosphere. For each
PM CEMS used to comply with this
paragraph (a)(1), you must meet the
requirements in this paragraph (a)(1)(iv)
and paragraphs (a)(1)(v) through (vii) of
this section.
(v) You must install, certify, operate,
and maintain the PM CEMS according
to EPA Performance Specification 11 in
appendix B to 40 CFR part 60, and the
quality assurance requirements of
Procedure 2 in appendix F to 40 CFR
part 60.
(vi) You must conduct an initial
performance evaluation of the PM
CEMS according to the requirements of
Performance Specification 11 in
appendix B to 40 CFR part 60.
Thereafter, you must perform the
performance evaluations as required by
Procedure 2 in appendix F to 40 CFR
part 60.
(vii) You must perform quarterly
accuracy determinations and daily
calibration drift tests for the PM CEMS
according to Procedure 2 in appendix F
to 40 CFR part 60.
(2) For each smelting vessel, slag
cleaning vessel, and copper converter
department subject to the nonsulfuric
acid particulate matter emission limit in
§ 63.1444 as applies to you, you must
demonstrate continuous compliance by
meeting the conditions in paragraphs
(a)(2)(i) through (iii) of this section.
(i) Maintain the average concentration
of nonsulfuric acid particulate matter in
the process off-gas discharged from the
affected source at or below 6.2 mg/
dscm.
(ii) Monitor the operating parameter
established during the performance tests
according to the requirements in
§§ 63.1450(b) and 63.1452 and collect,
reduce, and record the monitoring data
for each of the operating limit
parameters according to the applicable
requirements of this subpart.
(iii) Conduct subsequent performance
tests following your initial performance
test no less frequently than once per
year according to the performance test
procedures in § 63.1450(b). New
operating limits may be established
during subsequent performance tests as
long as the performance tests
demonstrate compliance with the
emission limits.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(b) Copper converter department
capture systems. You must demonstrate
continuous compliance of the copper
converter department capture system by
meeting the requirements in paragraphs
(b)(1) through (4) of this section.
(1) Operate the copper converter
department capture system at all times
during blowing at or above the lowest
values or settings established for the
operating limits and demonstrated to
achieve the opacity limit according to
the applicable requirements of this
subpart;
(2) Inspect and maintain the copper
converter department capture system
according to the applicable
requirements in § 63.1447 and recording
all information needed to document
conformance with these requirements;
(3) Monitor the copper converter
department capture system according to
the requirements in § 63.1452(a) and
collecting, reducing, and recording the
monitoring data for each of the
operating limit parameters according to
the applicable requirements of this
subpart; and
(4) Conduct subsequent performance
tests according to the requirements of
§ 63.1450(c) following your initial
performance test no less frequently than
once per year to demonstrate that the
opacity of any visible emissions exiting
the roof monitors or roof exhaust fans
on the building housing the copper
converter department does not exceed 4
percent opacity.
(c) Baghouses. For each baghouse
subject to the operating limit for the bag
leak detection system alarm in
§ 63.1444(i) or § 63.1446(c), you must
demonstrate continuous compliance by
meeting the requirements in paragraphs
(c)(1) through (3) of this section.
(1) Maintain the baghouse such that
the bag leak detection system alarm
does not sound for more than 5 percent
of the operating time during any
semiannual reporting period. To
determine the percent of time the alarm
sounded use the procedures in
paragraphs (c)(1)(i) through (v) of this
section.
(i) Alarms that occur due solely to a
malfunction of the bag leak detection
system are not included in the
calculation.
(ii) Before November 12, 2024, alarms
that occur during startup, shutdown, or
malfunction are not included in the
calculation if the condition is described
in the startup, shutdown, and
malfunction plan, and you operated the
source during such periods in
accordance with § 63.6(e)(1). On or after
November 12, 2024, alarms that occur
due solely to a malfunction of the bag
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
leak detection system are not included
in the calculation.
(iii) Count 1 hour of alarm time for
each alarm when you initiated
procedures to determine the cause of the
alarm within 1 hour.
(iv) Count the actual amount of time
you took to initiate procedures to
determine the cause of the alarm if you
did not initiate procedures to determine
the cause of the alarm within 1 hour of
the alarm.
(v) Calculate the percentage of time
the alarm on the bag leak detection
system sounds as the ratio of the sum of
alarm times to the total operating time
multiplied by 100.
(2) Maintain records of the times the
bag leak detection system alarm
sounded, and for each valid alarm, the
time you initiated corrective action, the
corrective action(s) taken, and the date
on which corrective action was
completed.
(3) Inspect and maintain each
baghouse according to the requirements
in § 63.1452(b)(2) and recording all
information needed to document
conformance with these requirements. If
you increase or decrease the sensitivity
of the bag leak detection system beyond
the limits specified in
§ 63.1452(b)(1)(vi), you must include a
copy of the required written
certification by a responsible official in
the next semiannual compliance report.
(d) Venturi wet scrubbers. For each
venturi wet scrubber subject to the
operating limits for pressure drop and
scrubber water flow rate in § 63.1444(j)
or § 63.1446(d), you must demonstrate
continuous compliance by meeting the
requirements of paragraphs (d)(1)
through (3) of this section.
(1) Maintain the hourly average
pressure drop and scrubber water flow
rate at levels no lower than those
established during the initial or
subsequent performance test;
(2) Inspect and maintain each venturi
wet scrubber CPMS according to
§ 63.1452(c) and recording all
information needed to document
conformance with these requirements;
and
(3) Collect and reduce monitoring
data for pressure drop and scrubber
water flow rate according to § 63.1452(e)
and recording all information needed to
document conformance with these
requirements.
(e) Other control devices. For each
control device other than a baghouse or
venturi wet scrubber subject to the
operating limits for site-specific
operating parameters in § 63.1444(k) or
§ 63.1446(e), you must demonstrate
continuous compliance by meeting the
PO 00000
Frm 00063
Fmt 4701
Sfmt 4700
41709
requirements of paragraphs (e)(1)
through (3) of this section:
(1) Maintain the hourly average rate at
levels no lower than those established
during the initial or subsequent
performance test;
(2) Inspect and maintain each CPMS
operated according to § 63.1452(d) and
record all information needed to
document conformance with these
requirements; and
(3) Collect and reduce monitoring
data for selected parameters according
to § 63.1452(e) and recording all
information needed to document
conformance with these requirements.
(f) Fugitive dust sources. For each
fugitive dust source subject to work
practice standards in § 63.1445, you
must demonstrate continuous
compliance by implementing all of
fugitive control measures specified for
the source in your written fugitive dust
control plan.
(g) Mercury emissions. For each
affected source subject to mercury
emissions limit in § 63.1444 as applies
to you must demonstrate continuous
compliance according to the
requirements in paragraph (g)(1) or
paragraphs (g)(2) and (3) of this section.
(1) Maintain the average
concentration of mercury discharged
from the facility at or below the
emission limit in § 63.1444 monitored
by a mercury continuous emissions
monitoring system (Hg CEMS). If the Hg
CEMS is used, you must demonstrate
continuous compliance according to the
requirements in paragraphs (g)(1)(i)
through (v) of this section.
(i) Install and operate a Hg CEMS in
accordance with Performance
Specification 12A (PS 12A) of appendix
B to 40 CFR part 60.
(ii) Maintain each Hg CEMS according
to the quality assurance requirements in
Procedure 5 of appendix F to 40 CFR
part 60. The relative accuracy testing of
Hg CEMS must be conducted at normal
operating conditions.
(iii) Use a span value for any Hg
CEMS that represents the mercury
concentration corresponding to
approximately two times the emissions
standard and may be rounded up to the
nearest multiple of 5 mg/m3 of total
mercury or higher level if necessary to
include Hg concentrations which may
occur.
(iv) Determine the average on a 6-hour
rolling basis.
(v) Install, operate, calibrate, and
maintain an instrument for
continuously measuring and recording
the exhaust gas flow rate to the
atmosphere.
(2) Monitor the operating parameter
established during the performance tests
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41710
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
according to the requirements in
§§ 63.1450(d) and 63.1452 and
collecting, reducing, and recording the
monitoring data for each of the
operating limit parameters according to
the applicable requirements of this
subpart.
(3) Conduct subsequent performance
tests following your initial performance
test no less frequently than once per
year according to the performance test
procedures in § 63.1450(d). New
operating limits may be established
during subsequent performance tests as
long as the performance tests
demonstrate compliance with the
emission limits.
(h) Process fugitive filterable
particulate matter and lead from
roofline vents. For emissions from
roofline vents associated with the
smelting vessels, slag cleaning vessels,
copper converter department, and anode
refining department subject to a
filterable particulate matter emission
limit in § 63.1444(h), and for emissions
from the combination of roofline vents
associated with the Peirce-Smith
converter department, Inco flash
furnace, and anode refining department
subject to a lead emission limit in
§ 63.1444(p), you must demonstrate
continuous compliance according to the
requirements in paragraph (h)(1) or (2)
and paragraph (h)(3) of this section. For
the applicable design standards in
§ 63.1444(p), you must demonstrate
continuous compliance according to the
requirements in paragraphs (h)(4)
through (6) of this section.
(1) Operating parameter. You must
demonstrate continuous compliance
with the established site-specific
operating limit for a parameter, like
opacity, based on values measured
during the performance test you
conduct to demonstrate initial
compliance. If the operating parameter
is visible emissions (VE) at each roofline
vent, you must meet the requirements in
paragraphs (h)(1)(i) through (v) of this
section.
(i) Perform daily VE observations of
each roofline vent according to the
procedures of Method 22 of appendix
A–7 to 40 CFR part 60. You must
conduct the Method 22 test while the
affected source is operating under
normal conditions. The duration of each
Method 22 test must be at least 15
minutes.
(ii) If VE are observed during any
daily test conducted using Method 22 of
appendix A–7 to 40 CFR part 60, you
must promptly conduct an opacity test,
according to the procedures of Method
9 of appendix A–4 to 40 CFR part 60.
ASTM D7520–16 (incorporated by
reference, see § 63.14) is an acceptable
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
alternative to EPA Method 9 with the
specified conditions in
§ 63.1450(c)(3)(i)(A) through (E).
(iii) You may decrease the frequency
of Method 22 testing from daily to
weekly for a roofline vent if one of the
conditions in paragraph (h)(1)(iii)(A) or
(B) of this section is met.
(A) No VE are observed in 30
consecutive daily Method 22 tests for
any roofline vent; or
(B) No opacity greater than the sitespecific operating limit is observed
during any of the tests under Method 9
of appendix A–4 to 40 CFR part 60 for
any roofline vent.
(iv) If VE are observed during any
weekly test and opacity greater than the
site-specific operating limit is observed
in the subsequent test under Method 9
of appendix A–4 to 40 CFR part 60, you
must promptly initiate and complete
corrective actions according to your
operation, maintenance, and monitoring
plan (OM&M) plan, resume testing of
that roof vent following Method 22 of
appendix A–7 to 40 CFR part 60, on a
daily basis, as described in paragraph
(h)(1)(i) of this section, and maintain
that schedule until one of the conditions
in paragraph (h)(1)(iii)(A) or (B) of this
section is met, at which time you may
again decrease the frequency of Method
22 testing to a weekly basis.
(v) If greater than the site-specific
opacity operating limit is observed
during any test conducted using Method
9 of appendix A–4 to 40 CFR part 60,
you must report these deviations by
following the requirements in § 63.1455.
(2) Monitor the site-specific operating
parameter established during the
performance tests according to the
requirements in § 63.1450(e) for
filterable particulate matter and
§ 63.1450(g) for lead if applicable, and
§ 63.1452, collect, reduce, and record
the monitoring data for each of the
operating limit parameters according to
the applicable requirements of this
subpart.
(3) Conduct subsequent performance
tests following your initial performance
test no less frequently than once per
year according to the performance test
procedures in § 63.1450(e) for filterable
particulate matter and § 63.1450(g) for
lead if applicable. New operating limits
may be established during subsequent
performance tests as long as the
performance tests demonstrate
compliance with the emission limits.
(4) For your flash furnace capture
system, you must inspect the hooding,
walls, and damper quarterly.
(5) For your fuming ladle capture
system, you must inspect the hooding,
walls, and ladle during maintenance
periods.
PO 00000
Frm 00064
Fmt 4701
Sfmt 4700
(6) For your anode furnace secondary
hood capture and control system, you
must inspect the hood, walls, and
damper during maintenance periods,
and operate anode furnace secondary
hood system at all times the anode
furnaces are operating.
(i) Benzene, toluene, chlorine,
hydrogen chloride, polycyclic aromatic
hydrocarbons excluding naphthalene,
naphthalene, and dioxins/furans
emissions. For each affected source
subject to the benzene, toluene,
chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding
naphthalene, naphthalene, and dioxins/
furans emission limits in table 2 to this
subpart, you must demonstrate
continuous compliance according to
paragraphs (i)(1) and (2) to this section.
(1) You must monitor the site-specific
operating parameter established during
the performance tests according to the
requirements in § 63.1450(f) and collect,
reduce, and record the monitoring data
for each of the operating limit
parameters according to the applicable
requirements of this subpart.
(2) You must demonstrate continuous
compliance by conducting subsequent
performance tests following your initial
performance test at least once every five
years according to the performance test
procedures in § 63.1450(f). New
operating limits may be established
during subsequent performance tests as
long as the performance tests
demonstrate compliance with the
emission limits.
§ 63.1454 What notifications must I submit
and when?
(a) You must submit all of the
notifications in §§ 63.6(h)(4) and (5),
63.7(b) and (c), 63.8(f)(4), and 63.9(b)
through (h) that apply to you by the
specified dates.
(b) As specified in § 63.9(b)(2), if you
start your affected source before June 12,
2002, you must submit your initial
notification not later than October 10,
2002, or no later than 120 days after the
source becomes subject to this subpart
(see § 63.1441), whichever is later.
(c) As specified in § 63.9(b)(3), if you
start your new affected source on or
after June 12, 2002, you must submit
your initial notification not later than
120 calendar days after you become
subject to this subpart (see § 63.1441).
(d) If you are required to conduct a
performance test, you must submit a
notification of intent to conduct a
performance test at least 60 calendar
days before the performance test is
scheduled to begin as required in
§ 63.7(b)(1).
(e) If you are required to conduct a
performance test, opacity observation,
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
or other initial compliance
demonstration, you must submit a
notification of compliance status
according to § 63.9(h)(2)(ii) by the date
specified in paragraph (e)(1) or (2) of
this section as applies to you.
(1) For each initial compliance
demonstration that does not include a
performance test, you must submit the
notification of compliance status before
the close of business on the 30th
calendar day following the completion
of the initial compliance demonstration.
(2) For each initial compliance
demonstration that includes a
performance test, you must submit the
notification of compliance status,
including the performance test results,
before the close of business on the 60th
calendar day following the completion
of the performance test according to
§ 63.10(d)(2).
lotter on DSK11XQN23PROD with RULES3
§ 63.1455
when?
What reports must I submit and
(a) You must submit each report in
paragraphs (a)(1) and (2) of this section
that applies to you.
(1) You must submit a compliance
report semiannually according to the
requirements in paragraph (b) of this
section and containing the information
in paragraph (c) of this section.
(2) Before November 12, 2024, you
must submit an immediate startup,
shutdown, and malfunction report if
you had a startup, shutdown, or
malfunction during the reporting period
that is not consistent with your startup,
shutdown, and malfunction plan. You
must report the actions taken for the
event by fax or telephone within 2
working days after starting actions
inconsistent with the plan. You must
submit the information in
§ 63.10(d)(5)(ii) by letter within 7
working days after the end of the event
unless you have made alternative
arrangements with the delegated
authority. On or after November 12,
2024, you must report any deviation
from an applicable standard in
§§ 63.1444, 63.1445, and 63.1446 as part
of your semiannual compliance report
and include the information required in
paragraph (c) of this section. In an event
of an emergency situation, you must
report the emergency and the actions
taken for the event by email or
telephone within 2 working days of the
time when emissions limitations were
exceeded due to the emergency (or an
alternate timeframe acceptable to the
delegated authority). For the purposes of
complying with this paragraph (a)(2), an
emergency situation is any situation
arising from sudden and reasonably
unforeseeable events beyond the control
of the facility owner or operator that
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
requires immediate corrective action to
restore normal operation, and that
causes the affected source to exceed an
applicable emissions limitation under
this subpart, due to unavoidable
increases in emissions attributable to
the emergency. An emergency must not
include noncompliance to the extent it
is caused by improperly designed
equipment, lack of preventive
maintenance, careless or improper
operation, or operator error. You must
submit the report within 7 working days
after the end of the event unless you
have made alternative arrangements
with the delegated authority. This report
must contain a description of the
emergency, any steps take to mitigate
the emissions and corrective actions
taken.
(b) Unless the Administrator has
approved a different schedule under
§ 63.10(a), you must submit each
compliance report required in paragraph
(a) of this section according to the
applicable requirements in paragraphs
(b)(1) through (5) of this section
following the procedures in § 63.9(k).
(1) The first compliance report must
cover the period beginning on the
compliance date that is specified for
your affected source in § 63.1443 and
ending on June 30 or December 31,
whichever date comes first after the
compliance date that is specified for
your source in § 63.1443.
(2) The first compliance report must
be delivered no later than July 31 or
January 31, whichever date comes first
after your first compliance report is due.
(3) Each subsequent compliance
report must cover the semiannual
reporting period from January 1 through
June 30 or the semiannual reporting
period from July 1 through December
31.
(4) Each subsequent compliance
report must be delivered no later than
July 31 or January 31, whichever date
comes first after the end of the
semiannual reporting period.
(5) For each affected source that is
subject to permitting regulations
pursuant to 40 CFR part 70 or 71, and
if the delegated authority has
established dates for submitting
semiannual reports pursuant to 40 CFR
70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), you
may submit the first and subsequent
compliance reports according to the
dates the delegated authority has
established instead of according to the
dates in paragraphs (b)(1) through (4) of
this section.
(c) Each compliance report must
contain the information in paragraphs
(c)(1) through (3) of this section and, as
applicable, paragraphs (c)(4) through (8)
of this section.
PO 00000
Frm 00065
Fmt 4701
Sfmt 4700
41711
(1) Company name and address.
(2) Statement by a responsible official,
as defined in § 63.2, with that official’s
name, title, and signature, certifying the
accuracy and completeness of the
content of the report.
(3) Date of report and beginning and
ending dates of the reporting period.
(4) Before November 12, 2024, if you
had a startup, shutdown or malfunction
during the reporting period and you
took actions consistent with your
startup, shutdown, and malfunction
plan, the compliance report must
include the information in
§ 63.10(d)(5)(i). On or after November
12, 2024, you are not required to have
a startup, shutdown, and malfunction
plan and you are not required to include
in your report the information in
§ 63.10(d)(5)(i).
(5) If there are no deviations from any
emission limitations (emission limit,
operating limit, opacity limit) that
applies to you and there are no
deviations from the requirements for
work practice standards in this subpart,
a statement that there were no
deviations from the emission
limitations, work practice standards, or
operation and maintenance
requirements during the reporting
period.
(6) If there were no periods during
which an operating parameter
monitoring system was out-of-control as
specified in § 63.8(c)(7), a statement that
there were no periods during which the
monitoring system was out-of-control
during the reporting period.
(7) For each deviation from an
emission limitation (emission limit,
operating limit, opacity limit) and for
each deviation from the requirements
for work practice standards that occurs
at an affected source where you are not
using a continuous monitoring system
to comply with the emission limitations
or work practice standards in this
subpart, the compliance report must
contain the information in paragraphs
(c)(1) through (4) of this section and the
information in paragraphs (c)(7)(i) and
(ii) of this section.
(i) The total operating time of each
affected source during the reporting
period.
(ii) Information on the number, date,
time, duration, and cause of deviations
(including unknown cause, if
applicable), as applicable, the corrective
action taken, a list of the affected
sources or equipment, an estimate of the
quantity of each regulated pollutant
emitted over any emission limit, and a
description of the method used to
estimate the emissions.
(8) For each deviation from an
emission limitation (emission limit,
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41712
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
operating limit, opacity limit, and
visible emission limit) occurring at an
affected source where you are using an
operating parameter monitoring system
to comply with the emission limitation
in this subpart, you must include the
information in paragraphs (c)(1) through
(4) of this section and the information
in paragraphs (c)(8)(i) through (xi) of
this section.
(i) The cause of each deviations
(including unknown cause, if
applicable), the corrective action taken,
a list of the affected sources or
equipment, an estimate of the quantity
of each regulated pollutant emitted over
any emission limit, and a description of
the method used to estimate the
emissions.
(ii) If the monitoring system was
inoperative, the date and time that each
monitoring system was inoperative,
except for zero (low-level) and highlevel checks.
(iii) If the monitoring system was
inoperative, the date, time and duration
that each monitoring system was out-ofcontrol, including the information in
§ 63.8(c)(8).
(iv) The number, date and time that
each deviation started and stopped.
(v) A summary of the total duration of
the deviation during the reporting
period and the total duration as a
percent of the total source operating
time during that reporting period.
(vi) A breakdown of the total duration
of the deviations during the reporting
period into those that are due to control
equipment problems, process problems,
other known causes, and other
unknown causes.
(vii) A summary of the total duration
of monitoring system downtime during
the reporting period and the total
duration of monitoring system
downtime as a percent of the total
source operating time during that
reporting period.
(viii) A brief description of the
process units.
(ix) A brief description of the
monitoring system.
(x) The date of the latest monitoring
system certification or audit.
(xi) A description of any changes in
continuous monitoring systems,
processes, or controls since the last
reporting period.
(d) If you have obtained a title V
operating permit pursuant to 40 CFR
part 70 or 71 must report all deviations
as defined in this subpart in the
semiannual monitoring report required
by 40 CFR 70.6(a)(3)(iii)(A) or
71.6(a)(3)(iii)(A). If you submit a
compliance report pursuant to
paragraph (a) of this section along with,
or as part of, the semiannual monitoring
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
report required by 40 CFR
70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), and
the compliance report includes all
required information concerning
deviations from any emission limitation
(including any operating limit), or work
practice requirement in this subpart,
submission of the compliance report is
deemed to satisfy any obligation to
report the same deviations in the
semiannual monitoring report.
However, submission of a compliance
report does not otherwise affect any
obligation you may have to report
deviations from permit requirements to
the permit authority.
(e) Within 60 days after the date of
completing each performance test or
continuous monitoring system (CMS)
performance evaluation (as defined in
§ 63.2) required by this subpart, the
owner or operator must submit the
results of the performance test or
performance evaluation following the
procedures specified in § 63.9(k).
(1) Data collected using test methods
supported by the EPA’s Electronic
Reporting Tool (ERT) as listed on the
EPA’s ERT website (https://
www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert)
at the time of the test. Submit the results
of the performance test or the
performance evaluation of CMS
measuring relative accuracy test audit
(RATA) pollutants to the EPA via the
Compliance and Emissions Data
Reporting Interface (CEDRI), which can
be accessed through the EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov/). The data must be
submitted in a file format generated
through the use of the EPA’s ERT.
Alternatively, you may submit an
electronic file consistent with the
extensible markup language (XML)
schema listed on the EPA’s ERT
website.
(2) Data collected using test methods
that are not supported by the EPA’s ERT
as listed on the EPA’s ERT website at
the time of the test. The results of the
performance test or the performance
evaluation of CMS measuring RATA
pollutants by methods that are not
supported by the ERT, must be included
as an attachment in the ERT or an
alternate electronic file consistent with
the XML schema listed on the EPA’s
ERT website. Submit the ERT generated
package or alternative file to the EPA via
CEDRI.
§ 63.1456 What records must I keep and
how long must I keep my records?
(a) You must keep the records listed
in paragraphs (a)(1) through (8) of this
section.
PO 00000
Frm 00066
Fmt 4701
Sfmt 4700
(1) A copy of each notification and
report that you submitted to comply
with this subpart, including all
documentation supporting any initial
notification or notification of
compliance status that you submitted,
according to the requirements in
§ 63.10(b)(2)(xiv).
(2) Before November 12, 2024, the
records in § 63.6(e)(3)(iii) through (v)
related to startup, shutdown, and
malfunction. On or after November 12,
2024, you are not required to keep the
records required in § 63.6(e)(3)(iii)
through (v) related to compliance with
a startup, shutdown, and malfunction
plan.
(3) Records of performance tests and
performance evaluations as required in
§ 63.10(b)(2)(viii).
(4) For each monitoring system, you
must keep the records specified in
paragraphs (a)(4)(i) through (iv) of this
section.
(i) Records described in
§ 63.10(b)(2)(vi) through (xi).
(ii) Monitoring data recorded by the
monitoring system during a
performance evaluation as required in
§ 63.6(h)(7)(i) and (ii).
(iii) Before November 12, 2024,
previous (i.e., superseded) versions of
the performance evaluation plan as
required in § 63.8(d)(3). On or after
November 12, 2024, you must comply
with the requirements in § 63.8(d)(1)
and (2). The owner or operator shall
keep the written procedures required in
§ 63.8(d)(1) and (2) on record for the life
of the affected source or until the
affected source is no longer subject to
the provisions of this part, to be made
available for inspection, upon request,
by the Administrator. If the performance
evaluation plan is revised, the owner or
operator shall keep previous (i.e.,
superseded) versions of the performance
evaluation plan on record to be made
available for inspection, upon request,
by the Administrator, for a period of 5
years after each revision to the plan. The
program of corrective action should be
included in the plan required under
§ 63.8(d)(2).
(iv) Before November 12, 2024,
records of the date and time that each
deviation started and stopped, and
whether the deviation occurred during a
period of startup, shutdown, or
malfunction or during another period.
On or after November 12, 2024, for each
failure to meet an applicable standard,
you must record the information in
paragraphs (a)(4)(iv)(A) through (D) of
this section. Examples of such methods
to estimate emissions include productloss calculations, mass balance
calculations, measurements, or
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
engineering judgment based on known
process parameters.
(A) The occurrence and duration of
each startup, shutdown, or malfunction
of process, air pollution control, and
monitoring equipment.
(B) In the event that an affected unit
fails to meet an applicable standard,
record the number of failures. For each
failure record the date, time, cause and
duration of each failure.
(C) For each failure to meet an
applicable standard, record and retain a
list of the affected sources or equipment,
whether the failure occurred during a
period of startup, shutdown or
malfunction, actions taken to minimize
emissions, an estimate of the quantity of
each regulated pollutant emitted over
any emission limit and a description of
the method used to estimate the
emissions.
(D) Record actions taken to minimize
emissions in accordance with
§ 63.1447(a), and any corrective actions
taken to return the affected unit to its
normal or usual manner of operation.
(5) For each performance test you
conduct to demonstrate compliance
with an opacity limit according to
§ 63.1450(c), you must keep the records
specified in paragraphs (a)(5)(i) through
(ix) of this section.
(i) Dates and time intervals of all
opacity observation period segments;
(ii) Description of overall smelter
operating conditions during each
observation period. Identify, if any, the
smelter copper production process
equipment that was out-of-service
during the performance test and explain
why this equipment was not in
operation;
(iii) Name, affiliation, and copy of
current visible emission reading
certification for each visible emission
observer participating in the
performance test;
(iv) Name, title, and affiliation for
each indoor process monitor
participating in the performance test;
(v) Copies of all visible emission
observer opacity field data sheets;
(vi) Copies of all indoor process
monitor operating log sheets;
(vii) Copies of all data summary
sheets used for data reduction;
(viii) Copy of calculation sheets of the
average opacity value used to
demonstrate compliance with the
opacity limit; and
(ix) Documentation according to the
requirements in § 63.1450(c)(9)(iv) to
support your selection of the sitespecific capture system operating limits
used for each batch copper converter
capture system when blowing.
(6) For each baghouse subject to the
operating limit in § 63.1444(i) or
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
§ 63.1446(c), you must keep the records
specified in paragraphs (a)(6)(i) and (ii)
of this section.
(i) Records of alarms for each bag leak
detection system.
(ii) Description of the corrective
actions taken following each bag leak
detection alarm.
(7) For each control device other than
a baghouse or venturi wet scrubber
subject to site-specific operating limits
in § 63.1444(k) or § 63.1446(e), you must
keep documentation according to the
requirements in § 63.1450(a)(5)(iv) to
support your selection of the sitespecific operating limits for the control
device.
(8) You must keep records of bypass
stack usage, including the flow rate and
operating parameter(s).
(b) Your records must be in a form
suitable and readily available for
expeditious review, according to
§ 63.10(b)(1).
(c) As specified in § 63.10(b)(1), you
must keep each record for 5 years
following the date of each occurrence,
measurement, maintenance, corrective
action, report, or record.
(d) You must keep each record on site
for at least 2 years after the date of each
occurrence, measurement, maintenance,
corrective action, report, or record,
according to § 63.10(b)(1). You can keep
the records off site for the remaining 3
years.
§ 63.1457 What part of the general
provisions apply to me?
Table 1 to this subpart shows which
parts of the general provisions in §§ 63.1
through 63.15 apply to you.
§ 63.1458 Who implements and enforces
this subpart?
(a) This subpart can be implemented
and enforced by us, the United States
Environmental Protection Agency (U.S.
EPA), or a delegated authority such as
your State, local, or tribal agency. If the
U.S. EPA Administrator has delegated
authority to your State, local, or tribal
agency, then that agency has the
authority to implement and enforce this
subpart. You should contact your U.S.
EPA Regional Office to find out if this
subpart is delegated to your State, local,
or tribal agency.
(b) In delegating implementation and
enforcement authority of this subpart to
a State, local, or tribal agency under
subpart E of this part, the authorities
listed in paragraph (c) of this section are
retained by the U.S. EPA Administrator
and are not transferred to the State,
local, or tribal agency.
(c) The authorities that will not be
delegated to State, local, or tribal
agencies are as listed in paragraphs
(c)(1) through (5) of this section.
PO 00000
Frm 00067
Fmt 4701
Sfmt 4700
41713
(1) Approval of alternatives to the
emission limitations and work practice
standards in §§ 63.1444 through 63.1446
under § 63.6(g).
(2) Approval of major alternatives to
test methods under § 63.7(f) and as
defined in § 63.90.
(3) Approval of major alternatives to
monitoring under § 63.8(f) and as
defined in § 63.90.
(4) Approval of major alternatives to
recordkeeping and reporting under
§ 63.10(f) and as defined in § 63.90.
(5) Approval of an alternative to any
electronic reporting to the EPA required
by this subpart.
§ 63.1459
subpart?
What definitions apply to this
Terms used in this subpart are
defined in the Clean Air Act, in § 63.2,
and in this section as follows:
Anode refining department means the
area at a primary copper smelter in
which anode copper refining operations
are performed. Emission sources in the
anode refining department include
anode refining furnaces and utility
vessels.
Baghouse means a control device that
collects particulate matter by filtering
the gas stream through bags. A baghouse
is also referred to as a ‘‘fabric filter.’’
Bag leak detection system means a
system that is capable of continuously
monitoring relative particulate matter
(dust) loadings in the exhaust of a
baghouse in order to detect bag leaks
and other upset conditions. A bag leak
detection system includes, but is not
limited to, an instrument that operates
on triboelectric, light scattering,
transmittance or other effect to
continuously monitor relative
particulate matter loadings.
Batch copper converter means a
Peirce-Smith converter or Hoboken
converter in which copper matte is
oxidized to form blister copper by a
process that is performed in discrete
batches using a sequence of charging,
blowing, skimming, and pouring.
Blowing means the operating mode for
a batch copper converter during which
air or oxygen-enriched air is injected
into the molten converter bath.
Bypass stack means a device used for
discharging combustion gases to avoid
severe damage to the air pollution
control device or other equipment and
conduct planned maintenance safely in
accordance with the work practice
standard in § 63.1444(q). The use of a
bypass stack during a performance test
of a process or control device will
invalidate the test.
Capture system means the collection
of components used to capture gases
and fumes released from one or more
E:\FR\FM\13MYR3.SGM
13MYR3
41714
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
emission points, and to convey the
captured gases and fumes to a control
device. A capture system may include,
but is not limited to, the following
components as applicable to a given
capture system design: duct intake
devices, hoods, enclosures, ductwork,
dampers, manifolds, plenums, and fans.
Charging means the operating mode
for a batch copper converter during
which molten or solid material is added
into the vessel.
Control device means the air pollution
control equipment used to collect
particulate matter and other emissions
from a gas stream.
Converting vessel means a furnace,
reactor, or other type of vessel in which
copper matte is oxidized to form blister
copper.
Copper concentrate dryer means a
vessel in which copper concentrates are
heated in the presence of air to reduce
the moisture content of the material.
Supplemental copper-bearing feed
materials and fluxes may be added or
mixed with the copper concentrates fed
to a copper concentrate dryer.
Copper concentrate feed means the
mixture of copper concentrate,
secondary copper-bearing materials,
recycled slags and dusts, fluxes, and
other materials blended together for
feeding to the smelting vessel.
Copper converter department means
the area at a primary copper smelter in
which the copper converters are located.
This could include a batch copper
converter or other type of copper
converter, such as a continuous copper
converter.
Copper matte means a material
predominately composed of copper and
iron sulfides produced by smelting
copper ore concentrates.
Deviation means any instance in
which an affected source subject to this
subpart, or an owner or operator of such
a source:
(1) Fails to meet any requirement or
obligation established by this subpart
including, but not limited to, any
emission limitation (including any
operating limit) or work practice
standard;
(2) Fails to meet any term or condition
that is adopted to implement an
applicable requirement in this subpart
and that is included in the operating
lotter on DSK11XQN23PROD with RULES3
Citation
§ 63.1
§ 63.2
§ 63.3
§ 63.4
§ 63.5
Subject
.............................................
.............................................
.............................................
.............................................
.............................................
VerDate Sep<11>2014
22:07 May 10, 2024
permit for any affected source required
to obtain such a permit; or
(3) Fails to meet any emission
limitation (including any operating
limit) or work practice standard in this
subpart during startup, shutdown, or
malfunction, regardless of whether or
not such failure is permitted by this
subpart.
Emission limitation means any
emission limit, opacity limit, operating
limit, or visible emission limit.
Fugitive dust material means copper
concentrate, dross, reverts, slag, speiss,
or other solid copper-bearing materials.
Fugitive dust source means a
stationary source of particulate matter
emissions resulting from the handling,
storage, transfer, or other management
of fugitive dust materials where the
source is not associated with a specific
process, process vent, or stack.
Examples of a fugitive dust source
include, but are not limited to, on-site
roadways used by trucks transporting
copper concentrate, unloading of
materials from trucks or railcars,
outdoor material storage piles, and
transfer of material to hoppers and bins.
Holding means the operating mode for
a batch copper converter or a holding
furnace associated with a smelting
vessel during which the molten bath is
maintained in the vessel but no blowing
or smelting is performed nor is material
added into or removed from the vessel.
New copper converter system means
the copper matte is oxidized and forms
copper blister by a process that is
performed continuously. This system
may include a flash smelting furnace,
flash converting furnace, secondary gas
system, a rotary dryer, anode area, matte
grinding plant, hydrometallurgical plant
and possibly an acid plant.
Opacity means the degree to which
emissions reduce the transmission of
light.
Particulate matter means any finely
divided solid or liquid material, other
than uncombined water, as measured by
the specific reference method.
Pouring means the operating mode for
a batch copper converter during which
molten copper is removed from the
vessel.
Primary copper smelter means any
installation or any intermediate process
engaged in the production of copper
from copper sulfide ore concentrates
PO 00000
Frm 00068
Table 1 to Subpart QQQ of Part 63—
Applicability of General Provisions to
This Subpart
As required in § 63.1457, you must
comply with the requirements of the
NESHAP General Provisions (subpart A
of this part) shown in the following
table:
Applies to this subpart
Applicability ...................................
Definitions .....................................
Units and Abbreviations ...............
Prohibited Activities ......................
Construction and Reconstruction
Jkt 262001
through the use of pyrometallurgical
techniques.
Responsible official means
responsible official as defined in 40 CFR
70.2.
Roofline vents means an exhaust
system designed to evacuate process
fugitive emissions that collect in the
roofline area of various process
buildings (e.g., smelting building roof
vents, converter building roof vents,
etc.).
Secondary gas system means a
capture system that collects the gases
and fumes released when removing and
transferring molten materials from one
or more vessels using tapping ports,
launders, and other openings in the
vessels. Examples of molten material
include, but are not limited to: Copper
matte, slag, and blister copper.
Skimming means the batch copper
converter operating mode during which
molten slag is removed from the vessel.
Slag cleaning vessel means a vessel
that receives molten copper-bearing
material and the predominant use of the
vessel is to separate this material into
molten copper matte and slag layers.
Smelting vessel means a furnace,
reactor, or other type of vessel in which
copper ore concentrate and fluxes are
smelted to form a molten mass of
material containing copper matte and
slag. Other copper-bearing materials
may also be charged to the smelting
furnace.
TEQ means the international method
of expressing toxicity equivalents for
dioxins/furans as defined in EPA/100/
R–10/005 (incorporated by reference,
see § 63.14). The Toxic Equivalency 49
Factors (TEFs) used to determine the
dioxin and furan TEQs are listed in
table 3 to this subpart.
Work practice standard means any
design, equipment, work practice, or
operational standard, or combination
thereof, that is promulgated pursuant to
section 112(h) of the Clean Air Act.
Fmt 4701
Explanation
Yes.
Yes.
Yes.
Yes.
Yes.
Sfmt 4700
E:\FR\FM\13MYR3.SGM
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Citation
Subject
§ 63.6(a) through (d), (e)(iii), and
(f)(2) and (3), (g).
§ 63.6(e)(1)(i) .................................
§ 63.6(e)(1)(ii) .................................
§ 63.6(e)(2) .....................................
§ 63.6(e)(3) .....................................
§ 63.6(f)(1) ......................................
§ 63.6(h) .........................................
§ 63.6(i) and (j) ...............................
Compliance with Standards and
Maintenance Requirements.
Operation and Maintenance Requirements.
Explanation
Yes.
Yes before November 12, 2024.
No on or after November 12,
2024.
Requirement to correct malfuncYes before November 12, 2024.
tions as soon as practicable.
No on or after November 12,
2024.
Reserved ...................................... No.
Requirement to develop a startup, Yes before November 12, 2024.
shutdown, and malfunction plan.
No on or after November 12,
2024.
Compliance with nonopacity emis- Yes before November 12, 2024.
sion standards during periods
No on or after November 12,
of startup, shutdown, and mal2024.
function.
Determining compliance with
No .................................................
Opacity and VE standards.
Extension of Compliance and
Presidential Compliance Exemption.
Applicability and Performance
Test Dates.
Yes.
§ 63.7(a)(3), (b) through (d), (f)
through (h).
§ 63.7(e)(1) .....................................
Performance Testing Requirements.
Performance Testing ....................
Yes.
§ 63.8 except for (a)(4), (c)(1)(i)
and (iii), (c)(4), (d)(3), and (f)(6).
§ 63.8(a)(4) .....................................
Monitoring Requirements .............
§ 63.7(a)(1) and (2) ........................
No .................................................
General duty requirements to minimize emissions at all times are
contained in § 63.1447(a).
Malfunctions are no longer exempt.
Startup, shutdown, and malfunction (SSM) plans are no longer
necessary.
Source category rules apply at all
times.
This subpart specifies the requirements and test protocol used to
determine compliance with the
opacity limits.
This subpart specifies performance test applicability and
dates.
Yes before November 12, 2024.
No on or after November 12,
2024.
Yes.
See §§ 63.1450 and 63.1444.
Additional Monitoring Requirements for Control devices in
§ 63.11.
Operation and Maintenance of
and SSM plan for Continuous
Monitoring Systems.
No .................................................
This subpart does not require
flares.
Yes before November 12, 2024.
No on or after November 12,
2024.
No .................................................
§ 63.8(d)(3) .....................................
Continuous Monitoring System
Requirements.
Quality Control Program ...............
§ 63.8(f)(6) ......................................
RATA Alternative ..........................
Yes before November 12, 2024.
No on or after November 12,
2024.
No .................................................
Cross references to the general
duty and SSM plan requirements in those paragraphs are
no longer necessary.
This subpart specifies requirements for operation of CMS.
See § 63.1456(a)(4)(iii).
§ 63.9 .............................................
§ 63.9(g)(5) .....................................
Notification Requirements ............
DATA reduction ............................
Yes.
No .................................................
§ 63.10 except for (b)(2)(i), (ii), (iv),
(v), and (xiii), (c)(7), (8), and
(15), and (d)(5).
§ 63.10(b)(2)(i) ...............................
Recordkeeping and reporting Requirements.
Yes.
General Recordkeeping Requirements during Startup and Shutdown.
Yes before November 12, 2024.
No on or after November 12,
2024.
§ 63.10(b)(2)(ii) ...............................
General Recordkeeping Requirements during Startup, Shutdown, and Malfunction and Failures to Meet Standards.
Actions Taken to Minimize Emissions during Startup, Shutdown,
and Malfunction.
Yes before November 12, 2024.
No on or after November 12,
2024.
§ 63.10(b)(2)(v) ..............................
Actions Taken to Minimize Emissions during Startup, Shutdown,
and Malfunction.
Yes before November 12, 2024.
No on or after November 12,
2024.
§ 63.10(b)(2)(xiii) ............................
CMS Records for RATA Alternative.
No .................................................
§ 63.8(c)(1)(i) and (iii) .....................
§ 63.8(c)(4) .....................................
§ 63.10(b)(2)(iv) ..............................
lotter on DSK11XQN23PROD with RULES3
Applies to this subpart
41715
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00069
Fmt 4701
E:\FR\FM\13MYR3.SGM
This subpart specifies data reduction requirements.
No longer necessary because
recordkeeping and reporting applicable to normal operations
will apply to startup and shutdown.
See § 63.1456(a)(4)(iv) for recordkeeping requirements for a deviation from a standard.
Yes before November 12, 2024.
No on or after November 12,
2024.
Sfmt 4700
This subpart does not require
continuous emission monitoring
systems.
See § 63.1456 for the recordkeeping requirements of actions
taken to minimize emissions
and record corrective actions.
Requirements to document that
actions taken during SSM
events are consistent with SSM
plan are no longer required.
This subpart does not require
continuous emission monitoring
systems.
13MYR3
41716
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Citation
Subject
Applies to this subpart
§ 63.10(c)(7)–(8) ............................
Records of Excess Emissions and
Parameter Monitoring
Exceedances for CMS.
Use of SSM Plan ..........................
No .................................................
This subpart specifies record
keeping requirements.
Yes before November 12, 2024.
No on or after November 12,
2024.
§ 63.10(d)(5) ...................................
SSM Reporting and Recordkeeping Requirements.
§ 63.11 ...........................................
Control Device Requirements ......
Yes before November 12, 2024.
No on or after November 12,
2024.
No .................................................
This provision would be eliminated because it referenced the
source’s SSM plan, which is no
longer required.
See §§ 63.1455(c)(4) and
63.1456.
§ 63.12 ...........................................
§§ 63.13 through 63.16 ..................
State Authority and Delegations ...
Addresses, Incorporation by Reference, Availability of Information, Performance Track Provisions.
§ 63.10(c)(15) .................................
Explanation
This subpart does not require
flares.
Yes.
Yes.
Table 2 to Subpart QQQ of Part 63—
Non-Mercury HAP Emission Limits
As required in § 63.1444(o), you must
meet each emission limit in the
following table that applies to you.
For. . .
You must meet the following emission limit
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Benzene emissions must not exceed 1.7E–03 lb/ton
copper concentrate feed charged to the smelting vessel.
Toluene emissions must not exceed 8.4E–04 lb/ton copper concentrate feed charged to the smelting vessel.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Each new and existing combination of stacks or other vents from the copper concentrate dryers, converting department, the anode refining department, and the
smelting vessels.
Chlorine emissions must not exceed 5.4E–03 lb/ton copper concentrate feed charged to the smelting vessel.
Hydrogen chloride emissions must not exceed 1.5E–03
lb/ton copper concentrate feed charged to the smelting
vessel.
Polycyclic aromatic hydrocarbons (excluding naphthalene) emissions must not exceed 1.0E–04 lb/ton
copper concentrate feed charged to the smelting vessel.
Naphthalene emissions must not exceed 2.8E–04 lb/ton
copper concentrate feed charged to the smelting vessel.
Dioxins/Furans emissions 1 must not exceed 6.0E+01 ng
TEQ/Mg copper concentrate feed charged to the
smelting vessel.
1 Determined using the toxic equivalency factors listed in Table 2 of Recommended Toxicity Equivalence Factors (TEFs) for Human Health
Risk Assessments of 2, 3, 7, 8- Tetrachlorodibenzo-p-dioxin and Dioxin-Like Compounds (incorporated by reference, see § 63.14).
TABLE 3 TO SUBPART QQQ OF PART
63—2010 TOXIC EQUIVALENCY FACTORS (TEFS)
TEF
(mammals)
Congener
lotter on DSK11XQN23PROD with RULES3
2,3,7,8-Te CDD .....................................
1,2,3,7,8-Pe CDD ..................................
1,2,3,4,7,8-HxCDD ................................
1,2,3,6,7,8-HxCDD ................................
1,2,3,7,8,9-HxCDD ................................
1,2,3,4,6,7,8-HpCDD .............................
VerDate Sep<11>2014
22:07 May 10, 2024
TABLE 3 TO SUBPART QQQ OF PART
63—2010 TOXIC EQUIVALENCY FACTORS (TEFS)—Continued
Jkt 262001
1
1
0.1
0.1
0.1
0.01
TEF
(mammals)
Congener
OCDD ....................................................
2,3,7,8-Te CDF .....................................
1,2,3,7,8-Pe CDF ..................................
2,3,4,7,8-Pe CDF ..................................
1,2,3,4,7,8-HxCDF ................................
1,2,3,6,7,8-HxCDF ................................
PO 00000
Frm 00070
Fmt 4701
TABLE 3 TO SUBPART QQQ OF PART
63—2010 TOXIC EQUIVALENCY FACTORS (TEFS)—Continued
Sfmt 4700
0.0003
0.1
0.03
0.3
0.1
0.1
Congener
2,3,4,6,7,8-HxCDF ................................
1,2,3,7,8,9-HxCDF ................................
1,2,3,4,6,7,8-HpCDF .............................
1,2,3,4,7,8,9-HpCDF .............................
OCDF ....................................................
E:\FR\FM\13MYR3.SGM
13MYR3
TEF
(mammals)
0.1
0.1
0.01
0.01
0.0003
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
41717
TABLE 4 TO SUBPART QQQ OF PART 63—COMPLIANCE DATES FOR AMENDMENTS BEING PROMULGATED ON MAY 13,
2024
If the construction/reconstruction date is . . .
Then the owner or operator must comply with . . .
And the owner or operator must
achieve compliance . . .
On or before January 11,
2022.
Requirements for existing sources in §§ 63.1444(f)(2) and (3), (l); 63.1446;
63.1449; 1 63.1450(a) and (d); and 63.1451 through 63.1456, as applicable.
Requirements for existing sources in §§ 63.1444(h); 63.1449; 1 63.1450(e);
and 63.1451 through 63.1456, as applicable.
Requirements for new sources in §§ 63.1444(e)(1) and (2), (f)(2) and (3),
(h), (m); 63.1446; 63.1449; 1 63.1450(a), (d), (e); and 63.1451 through
63.1456, as applicable.
Requirements for existing sources in §§ 63.1444(g); 63.1449; 1 63.1450(a);
and 63.1451 through 63.1456, as applicable.
Requirements for existing sources in §§ 63.1444(o); 63.1449; 1 63.1450(f);
and 63.1451 through 63.1456, as applicable.
Requirements for existing sources in §§ 63.1444(q); 63.1449; 1 63.1450(a),
(g); and 63.1451 through 63.1456, as applicable.
Requirements for new sources in §§ 63.1444(o), (q); 63.1449; 1 63.1450(a),
(f), (g); and 63.1451 through 63.1456, as applicable.
Requirements for existing sources in §§ 63.1444(p); 63.1449; 1 63.1450(g);
and 63.1451 through 63.1456, as applicable.
On or before May 13, 2025.
After January 11, 2022 ....
On or before July 24,
2023.
After July 24, 2023 ..........
On or before May 13,
2024.
1 Section
On or before May 13, 2026.
Upon initial startup or May 13, 2024,
whichever is later.
On or before May 13, 2027.
On or before May 13, 2025.
On or before November 12, 2024.
Upon initial startup or May 13, 2024,
whichever is later.
On or before May 13, 2027.
63.1449(a) provides that any necessary performance test is conducted within 180 days of the compliance date.
FIGURE 1 TO SUBPART QQQ OF PART 63—DATA SUMMARY SHEET FOR DETERMINATION OF AVERAGE OPACITY
Clock time
Number of converters blowing
Converter aisle activity
lotter on DSK11XQN23PROD with RULES3
Subpart EEEEEE—National Emission
Standards for Hazardous Air Pollutants
for Primary Copper Smelting Area
Sources
5. Amend § 63.11147 by revising
paragraphs (b)(6), (c)(1) and (5), (d), and
(e) to read as follows:
■
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
Average opacity for
1-minute interval
(percent)
Visible emissions interference
observed during 1-minute interval?
(yes or no)
§ 63.11147 What are the standards and
compliance requirements for existing
sources not using batch copper
converters?
*
*
*
*
*
(b) * * *
(6) You must submit to the permitting
authority by the 20th day of each month
a report summarizing the 24-hour
average mass PM10 emissions rates for
the previous month. Beginning
PO 00000
Frm 00071
Fmt 4701
Sfmt 4700
Average opacity for 1-minute
interval blowing without visible
emission interferences
(percent)
November 12, 2024, the owner or
operator must electronically submit all
subsequent reports in PDF format to the
EPA via CEDRI, which can be accessed
through EPA’s CDX (https://
cdx.epa.gov/) following the procedures
specified in § 63.9(k).
*
*
*
*
*
(c) * * *
(1) At all times, you must maintain
and operate any affected source,
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41718
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
including associated air pollution
control equipment and monitoring
equipment, in a manner consistent with
safety and good air pollution control
practices for minimizing emissions. The
general duty to minimize emissions
does not require the owner or operator
to make any further efforts to reduce
emissions if levels required by the
applicable standard have been achieved.
Determination of whether a source is
operating in compliance with operation
and maintenance requirements will be
based on information available to the
permitting authority which may
include, but is not limited to,
monitoring results, review of operation
and maintenance procedures, review of
operation and maintenance records, and
inspection of the source.
*
*
*
*
*
(5) Before November 12, 2024, as an
alternative to the requirements in
paragraph (c)(4) of this section, you
must comply with the startup,
shutdown, and malfunction
requirements in § 63.6(e)(3). On or after
November 12, 2024, you may not use
the requirements in § 63.6(e)(3) as an
alternative to the requirements in
paragraph (c)(4) of this section. You
must comply with all emissions
limitation or work practice standards in
this subpart at all times.
(d) Deviations. You must submit
written notification to the permitting
authority of any deviation from the
requirements of this subpart, including
the number, date, time, duration, and
the cause of such events (including
unknown cause, if applicable); a list of
the affected sources or equipment; an
estimate of the quantity of each
regulated pollutant emitted over any
emission limit and a description of the
method used to estimate the emissions;
and the probable cause of such
deviations and any corrective actions or
preventative measures taken. You must
submit this notification within 14 days
of the date the deviation started.
(e) Reports. (1) You must submit
semiannual monitoring reports to your
permitting authority. All instances of
deviations from the requirements of this
subpart must be clearly identified in the
reports. The report must contain the
number, date, time, duration, and the
cause of each deviation (including
unknown cause, if applicable); a list of
the affected sources or equipment; an
estimate of the quantity of each
regulated pollutant emitted over any
emission limit and a description of the
method used to estimate the emissions;
and the probable cause of such
deviations and any corrective actions or
preventative measures taken. Examples
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
of methods used to estimate the
emissions would include product-loss
calculations, mass balance calculations,
measurements when available, or
engineering judgment based on known
process parameters.
(2) Beginning November 13, 2024, the
owner or operator must electronically
submit all subsequent semiannual
monitoring reports in PDF format to the
EPA via CEDRI, which can be accessed
through EPA’s CDX (https://
cdx.epa.gov/) following the procedures
specified in § 63.9(k).
*
*
*
*
*
■ 6. Amend § 63.11148 by:
■ a. Revising paragraphs (a)(1), (a)(3)(ii),
(a)(4)(iv), (b)(1), (b)(2)(i), (b)(4), (c)(2)
and (4), (e)(3), (f)(1), (f)(4)(ii) and (iii),
(f)(5), (g), and (h); and
■ b. Adding paragraph (i).
The revisions and addition read as
follows:
§ 63.11148 What are the standards and
compliance requirements for existing
sources using batch copper converters?
(a) * * *
(1) For each copper concentrate dryer,
you must not discharge to the
atmosphere from the dryer vent any
gases that contain filterable particulate
matter (PM) in excess of 0.022 grains per
dry standard cubic foot (gr/dscf).
*
*
*
*
*
(3) * * *
(ii) You must not cause to be
discharged to the atmosphere from the
capture system used to comply with
paragraph (a)(3)(i) of this section any
gases that contain filterable PM in
excess of 0.022 gr/dscf.
(4) * * *
(iv) For each secondary capture
system that is used to comply with
paragraph (a)(4)(ii) of this section and is
not vented to a gas cleaning system
controlling PM and a sulfuric acid plant,
you must not cause to be discharged to
the atmosphere any gases that contain
filterable particulate matter in excess of
0.02 grains/dscf.
(b) * * *
(1) Each COMS must meet
Performance Specification 1 in
appendix B to 40 CFR part 60.
(2) * * *
(i) You must automatically (intrinsic
to the opacity monitor) check the zero
and upscale (span) calibration drifts at
least once daily. For a particular COMS,
the acceptable range of zero and upscale
calibration materials is as defined in the
applicable version of Performance
Specification 1 in appendix B to 40 CFR
part 60.
*
*
*
*
*
(4) You must log in ink or electronic
format and maintain a record of 24-hour
PO 00000
Frm 00072
Fmt 4701
Sfmt 4700
opacity measurements performed in
accordance with paragraph (b)(3) of this
section and any corrective actions taken,
if any. A record of corrective actions
taken must include the start date, start
time, and duration in hours during
which the 24-hour rolling average
opacity exceeded 15 percent and the
start date, start time and type of the
corrective action and the date and time
the corrective action was completed.
(c) * * *
(2) The baghouse leak detection
system must meet the specifications and
requirements in paragraphs (c)(2)(i)
through (vi) of this section.
(i) The bag leak detection system must
be certified by the manufacturer to be
capable of detecting particulate matter
emissions at concentrations that can
effectively discern any dysfunctional
leaks of the baghouse.
(ii) The bag leak detection system
sensor must provide output of relative
or absolute particulate matter loadings.
(iii) The bag leak detection system
must be equipped with a device to
continuously record the output signal
from the sensor.
(iv) The bag leak detection system
must be equipped with an alarm system
that will sound automatically when an
increase in relative particulate
emissions over a preset level is detected.
The alarm must be located where it is
easily heard by plant operating
personnel.
(v) The bag leak detection system
must be installed downstream of the
baghouse.
(vi) The bag leak detection system
must be installed, operated, calibrated,
and maintained in a manner consistent
with the manufacturer’s written
specifications and recommendations.
The calibration of the system must, at a
minimum, consist of establishing the
relative baseline output level by
adjusting the sensitivity and the
averaging period of the device and
establishing the alarm set points and the
alarm delay time.
*
*
*
*
*
(4) You must log in ink or electronic
format and maintain a record of
installation, calibration, maintenance,
and operation of the bag leak detection
system. If the bag leak detection system
alarm sounds, the records must include
an identification of the date and time of
all bag leak detection alarms, their
cause, the time you initiated corrective
actions, and an explanation of the
corrective actions taken, including the
date corrective actions were completed,
if any.
*
*
*
*
*
(e) * * *
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(3) Before November 12, 2024, you
must conduct each performance test
according to § 63.7(e)(1) using the test
methods and procedures in paragraphs
(e)(3)(i) through (v) of this section. On
or after November 12, 2024, you must
conduct each performance test using the
test methods and procedures in
paragraphs (e)(3)(i) through (vi) of this
section.
(i) Method 1 or 1A in appendix A–1
to 40 CFR part 60 to select sampling
port locations and the number of
traverse points in each stack or duct.
Sampling sites must be located at the
outlet of the control device (or at the
outlet of the emissions source if no
control device is present) prior to any
releases to the atmosphere.
(ii) Method 2, 2A, 2C, 2D, 2F, or 2G
in appendices A–1 and A–2 to 40 CFR
part 60 to determine the volumetric flow
rate of the stack gas.
(iii) Method 3, 3A, or 3B in appendix
A–2 to 40 CFR part 60 to determine the
dry molecular weight of the stack gas.
You may use ANSI/ASME PTC 19.10–
1981 (incorporated by reference—see
§ 63.14) as an alternative to EPA Method
3B manual portion only and not the
instrumental portion.
(iv) Method 4 in appendix A–3 to 40
CFR part 60 to determine the moisture
content of the stack gas.
(v) Method 5 in appendix A–3 to 40
CFR part 60 to determine the PM
concentration for negative pressure
baghouses or Method 5D in appendix
A–3 to 40 CFR part 60 for positive
pressure baghouses. A minimum of
three valid test runs are needed to
comprise a PM performance test.
(vi) You must conduct each
performance test that applies to your
affected source under normal operating
conditions of the affected source. The
owner or operator may not conduct
performance tests during periods of
malfunction. The owner or operator
must record the process information
that is necessary to document operating
conditions during the test and include
in such record an explanation to
support that such conditions represent
the entire range of normal operation,
including operational conditions for
maximum emissions if such emissions
are not expected during maximum
production. The owner or operator shall
make available to the Administrator
such records as may be necessary to
determine the conditions of
performance tests.
(f) * * *
(1) At all times, you must maintain
and operate any affected source,
including associated air pollution
control equipment and monitoring
equipment, in a manner consistent with
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
safety and good air pollution control
practices for minimizing emissions. The
general duty to minimize emissions
does not require the owner or operator
to make any further efforts to reduce
emissions if levels required by the
applicable standard have been achieved.
Determination of whether a source is
operating in compliance with operation
and maintenance requirements will be
based on information available to the
permitting authority which may
include, but is not limited to,
monitoring results, review of operation
and maintenance procedures, review of
operation and maintenance records, and
inspection of the source.
*
*
*
*
*
(4) * * *
(ii) You must document through
signed contemporaneous logs or other
relevant evidence that an emergency
occurred, and you can identify the
probable cause, your facility was being
operated properly at the time the
emergency occurred, and the corrective
actions taken to minimize emissions as
required by paragraph (f)(4)(i) of this
section. Documentation must include
the date, time, duration, of such events
(including unknown cause, if
applicable); a list of the affected sources
or equipment; and an estimate of the
quantity of each regulated pollutant
emitted over any emission limit and a
description of the method used to
estimate the emissions.
(iii) You must submit a notice of the
emergency to the permitting authority
within two working days of the time
when emission limitations were
exceeded due to the emergency (or an
alternate timeframe acceptable to the
permitting authority). This notice must
contain the number, date, time,
duration, and the cause of such events
(including unknown cause, if
applicable); a list of the affected sources
or equipment; an estimate of the
quantity of each regulated pollutant
emitted over any emission limit and a
description of the method used to
estimate the emissions; and the probable
cause of such deviations and any
corrective actions or preventative
measures taken.
(5) Before November 12, 2024, as an
alternative to the requirements in
paragraph (f)(4) of this section, you must
comply with the startup, shutdown, and
malfunction requirements in
§ 63.6(e)(3). On or after November 12,
2024, you may not use the requirements
in § 63.6(e)(3) as an alternative to the
requirements in paragraph (f)(4) of this
section. Emissions limitation or work
practice standards in this subpart apply
at all times.
PO 00000
Frm 00073
Fmt 4701
Sfmt 4700
41719
(g) Recordkeeping requirements. (1)
You must maintain records of the
occurrence and duration in hours of
each startup, shutdown, or malfunction
of process, air pollution control, and
monitoring equipment.
(2) In the event that an affected unit
fails to meet an applicable standard,
record the number of failures. For each
failure record the date, time, cause and
duration of each failure.
(3) For each failure to meet an
applicable standard, record and retain a
list of the affected sources or equipment,
whether the failure occurred during a
period of startup, shutdown or
malfunction, actions taken to minimize
emissions, an estimate of the quantity of
each regulated pollutant emitted over
any emission limit and a description of
the method used to estimate the
emissions.
(4) Record actions taken to minimize
emissions in accordance with
§ 63.11147(c), paragraph (f) of this
section, or § 63.11149(c)(3) as
applicable, and any corrective actions
taken to return the affected unit to its
normal or usual manner of operation.
(5) You must maintain a file of all
measurements, including continuous
monitoring system, monitoring device,
and performance testing measurements;
all continuous monitoring system
performance evaluations; all continuous
monitoring system or monitoring device
calibration checks; adjustments and
maintenance performed on these
systems or devices; and all other
information required by this section
recorded in a permanent form suitable
for inspection. The file must be retained
for at least 5 years following the date of
such measurements, maintenance, and
reports.
(6) Any records required to be
maintained by this subpart that are
submitted electronically via the EPA’s
CEDRI may be maintained in electronic
format. This ability to maintain
electronic copies does not affect the
requirement for facilities to make
records, data, and reports available
upon request to a delegated air agency
or the EPA as part of an on-site
compliance evaluation.
(h) Reporting requirements. (1) You
must prepare and submit to the
permitting authority an excess
emissions and monitoring systems
performance report and summary report
every calendar quarter. A less frequent
reporting interval may be used for either
report as approved by the permitting
authority.
(2) The summary report must include
the information in paragraphs (h)(2)(i)
through (iv) of this section.
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
41720
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
(i) The magnitude of excess emissions
computed, any conversion factor(s)
used, and the date and time of
commencement and completion of each
time period of excess emissions. The
process operating time during the
reporting period. Examples of methods
used to estimate the emissions would
include product-loss calculations, mass
balance calculations, measurements
when available, or engineering
judgment based on known process
parameters.
(ii) Specific identification of each
period of excess emissions that occurs
during startups, shutdowns, and
malfunctions of the affected facility. The
nature and cause of any malfunction (if
known), the corrective action taken or
preventative measures adopted.
(iii) The date, time, and duration in
hours identifying each period during
which the continuous monitoring
system was inoperative except for zero
and span checks and the nature of the
system repairs or adjustments.
(iv) When no excess emissions have
occurred or the continuous monitoring
system(s) have not been inoperative,
repaired, or adjusted, such information
must be stated in the report.
(i) Electronic reporting requirements.
Beginning on November 13, 2024,
within 60 days after the date of
completing each performance test
required by this subpart, you must
submit the results of the performance
test following the procedures specified
in § 63.9(k).
(1) Data collected using test methods
supported by the EPA’s Electronic
Reporting Tool (ERT) as listed on the
EPA’s ERT website (https://
www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert)
at the time of the test. Submit the results
of the performance test to the EPA via
the Compliance and Emissions Data
Reporting Interface (CEDRI), which can
be accessed through the EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov/). The data must be
submitted in a file format generated
using the EPA’s ERT. Alternatively, you
may submit an electronic file consistent
with the extensible markup language
(XML) schema listed on the EPA’s ERT
website.
(2) Data collected using test methods
that are not supported by the EPA’s ERT
as listed on the EPA’s ERT website at
the time of the test. The results of the
performance test must be included as an
attachment in the ERT or an alternate
electronic file consistent with the XML
schema listed on the EPA’s ERT
website. Submit the ERT generated
package or alternative file to the EPA via
CEDRI.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
7. Revise § 63.11149 to read as
follows:
■
§ 63.11149 What are the standards and
compliance requirements for new sources?
(a) Emissions limits and work practice
standards. (1) You must not discharge to
the atmosphere exhaust gases that
contain filterable PM in excess of 0.6
pound per ton of copper concentrate
feed charged on a 24-hour average basis
from any combination of stacks, vents,
or other openings on furnaces, reactors,
or other types of process vessels used
for the production of anode copper from
copper sulfide ore concentrates by
pyrometallurgical techniques. Examples
of such process equipment include, but
are not limited to, copper concentrate
dryers, smelting flash furnaces, smelting
bath furnaces, converting vessels,
combined smelting and converting
reactors, anode refining furnaces, and
anode shaft furnaces.
(2) You must operate a capture system
that collects the gases and fumes
released during the transfer of molten
materials from smelting vessels and
converting vessels and conveys the
collected gas stream to a baghouse or
other PM control device.
(3) You must operate one or more
capture systems that collect the gases
and fumes released from each vessel
used to refine blister copper, remelt
anode copper, or remelt anode scrap
and convey each collected gas stream to
a baghouse or other PM control device.
One control device may be used for
multiple collected gas streams.
(b) Monitoring requirements. (1) You
must install, operate, and maintain a PM
continuous emissions monitoring
system (CEMS) to measure and record
PM concentrations and gas stream flow
rates for the exhaust gases discharged to
the atmosphere from each affected
source subject to the emissions limit in
paragraph (a)(1) of this section. A single
PM CEMS may be used for the
combined exhaust gas streams from
multiple affected sources at a point
before the gases are discharged to the
atmosphere. For each PM CEMS used to
comply with this paragraph (b)(1), you
must meet the requirements in
paragraphs (b)(1)(i) through (iii) of this
section.
(i) You must install, certify, operate,
and maintain the PM CEMS according
to EPA Performance Specification 11 in
appendix B to 40 CFR part 60, and the
quality assurance requirements of
Procedure 2 in appendix F to 40 CFR
part 60.
(ii) You must conduct an initial
performance evaluation of the PM
CEMS according to the requirements of
Performance Specification 11 in
PO 00000
Frm 00074
Fmt 4701
Sfmt 4700
appendix B to 40 CFR part 60.
Thereafter, you must perform the
performance evaluations as required by
Procedure 2 in appendix F to 40 CFR
part 60.
(iii) You must perform quarterly
accuracy determinations and daily
calibration drift tests for the PM CEMS
according to Procedure 2 in appendix F
to 40 CFR part 60.
(2) You must install, operate, and
maintain a weight measurement system
to measure and record the weight of the
copper concentrate feed charged to the
smelting vessel on a daily basis.
(3)(i) You must comply with the
requirements in § 63.8(d)(1) and (2).
(ii) The owner or operator shall keep
the written procedures required in
§ 63.8(d)(1) and (2) on record for the life
of the affected source or until the
affected source is no longer subject to
the provisions of this part, to be made
available for inspection, upon request,
by the Administrator. If the performance
evaluation plan is revised, the owner or
operator shall keep previous (i.e.,
superseded) versions of the performance
evaluation plan on record to be made
available for inspection, upon request,
by the Administrator, for a period of 5
years after each revision to the plan. The
program of corrective action should be
included in the plan required under
§ 63.8(d)(2).
(c) Compliance requirements. (1) You
must demonstrate initial compliance
with the emissions limit in paragraph
(a)(1) of this section using the
procedures in paragraph (c)(2) this
section within 180 days after startup
and report the results in your
notification of compliance status no
later than 30 days after the end of the
compliance demonstration.
(2) You must demonstrate continuous
compliance with the emissions limit in
paragraph (a)(1) of this section using the
procedures in paragraphs (c)(2)(i)
through (iii) of this section whenever
your facility is producing copper from
copper concentrate.
(i) You must continuously monitor
and record PM emissions, determine
and record the daily (24-hour) value for
each day, and calculate and record the
daily average pounds of filterable PM
per ton of copper concentrate feed
charged to the smelting vessel according
to the requirements in paragraph (b) of
this section.
(ii) You must calculate the daily
average at the end of each calendar day
for the preceding 24-hour period.
(iii) You must maintain records of the
calculations of daily averages with
supporting information and data,
including measurements of the weight
of copper concentrate feed charged to
E:\FR\FM\13MYR3.SGM
13MYR3
lotter on DSK11XQN23PROD with RULES3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
the smelting vessel. Collected PM CEMS
data must be made available for
inspection.
(3)(i) At all times, you must maintain
and operate any affected source,
including associated air pollution
control equipment and monitoring
equipment, in a manner consistent with
safety and good air pollution control
practices for minimizing emissions. The
general duty to minimize emissions
does not require the owner or operator
to make any further efforts to reduce
emissions if levels required by the
applicable standard have been achieved.
Determination of whether a source is
operating in compliance with operation
and maintenance requirements will be
based on information available to the
permitting authority which may
include, but is not limited to,
monitoring results, review of operation
and maintenance procedures, review of
operation and maintenance records, and
inspection of the source.
(ii) All pollution control equipment
must be installed, maintained, and
operated properly. Instructions from the
vendor or established maintenance
practices that maximize pollution
control must be followed. All necessary
equipment control and operating
devices, such as pressure gauges, amp
meters, volt meters, flow rate indicators,
temperature gauges, continuous
emissions monitor, etc., must be
installed, operated properly and easily
accessible to compliance inspectors. A
copy of all manufacturers’ operating
instructions for pollution control
equipment and pollution emitting
equipment must be maintained at your
facility site. These instructions must be
available to all employees who operate
the equipment and must be made
available to the permitting authority
upon request. Maintenance records
must be made available to the
permitting authority upon request.
(iii) You must document the activities
performed to assure proper operation
and maintenance of the air pollution
control equipment and monitoring
systems or devices. Records of these
activities must be maintained as
required by the permitting authority.
(4)(i) In the event that an affected unit
fails to meet an applicable standard,
record the number of failures. For each
failure record the date, time, the cause
and duration of each failure.
(ii) For each failure to meet an
applicable standard, record and retain a
list of the affected sources or equipment,
an estimate of the quantity of each
regulated pollutant emitted over any
emission limit and a description of the
method used to estimate the emissions.
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
(iii) Record actions taken in
accordance with the general duty
requirements to minimize emissions in
paragraph (c)(3) of this section and any
corrective actions taken to return the
affected unit to its normal or usual
manner of operation.
(d) Alternative startup, shutdown, and
malfunction requirements. Before
November 12, 2024, you must comply
with the requirements specified in this
paragraph (d) as an alternative to the
requirements in § 63.6(e)(3). On or after
November 12, 2024, you may not use
the requirements in § 63.6(e)(3) as an
alternative to the requirements in this
paragraph (d). Emissions limitation or
work practice standards in this subpart
apply at all times. In the event of an
emergency situation, you must comply
with the requirements specified in
paragraphs (d)(1) through (3) of this
section. For the purpose of complying
with this paragraph (d), an emergency
situation is any situation arising from
sudden and reasonably unforeseeable
events beyond the control of the facility
owner or operator that requires
immediate corrective action to restore
normal operation, and that causes the
affected source to exceed an applicable
emissions limitation under this subpart,
due to unavoidable increases in
emissions attributable to the emergency.
An emergency must not include
noncompliance to the extent it is caused
by improperly designed equipment, lack
of preventive maintenance, careless or
improper operation, or operator error.
(1) During the period of the
emergency, you must implement all
reasonable steps to minimize levels of
emissions that exceeded the emission
standards or other applicable
requirements in this subpart.
(2) You must document through
signed contemporaneous logs or other
relevant evidence that an emergency
occurred and you can identify the
probable cause, your facility was being
operated properly at the time the
emergency occurred, and the corrective
actions taken to minimize emissions as
required by paragraph (d)(1) of this
section.
(3) You must submit a notice of the
emergency to the permitting authority
within two working days of the time
when emissions limitations were
exceeded due to the emergency (or an
alternate timeframe acceptable to the
permitting authority). This notice must
contain a description of the emergency,
any steps taken to mitigate emissions,
and corrective actions taken.
(e) Reports. (1) You must submit to
the permitting authority by the 20th day
of each month a summary of the daily
average PM per ton of copper
PO 00000
Frm 00075
Fmt 4701
Sfmt 4700
41721
concentrate feed charged to the smelting
vessel for the previous month.
(2) Beginning November 12, 2024, the
owner or operator must electronically
submit all subsequent monthly PM
emission reports and notification of
compliance status in PDF format to the
EPA via CEDRI, which can be accessed
through EPA’s CDX (https://
cdx.epa.gov/) following the procedures
specified in § 63.9(k).
(3) For each deviation from an
emission limitation in paragraph (a)(1)
of this section occurring at an affected
source, you must include in your
semiannual monitoring report the
information in paragraphs (e)(3)(i)
through (x) of this section.
(i) The date and time that each
malfunction started and stopped.
(ii) The start date, and start time, and
duration in hours (or minutes for CEMS)
that each continuous monitoring system
was inoperative, except for zero (lowlevel) and high-level checks.
(iii) The start date, start time, and
duration in hours (or minutes for CEMS)
that each continuous monitoring system
was out-of-control, including the
information in § 63.8(c)(8).
(iv) The total duration in hours (or
minutes for CEMS) of all deviations for
each CMS during the reporting period,
the total operating time in hours of the
affected source during the reporting
period, a summary of the total duration
of the deviation during the reporting
period and the total duration as a
percent of the total source operating
time during that reporting period.
(v) A breakdown of the total duration
in hours (or minutes for CEMS) of the
deviations during the reporting period
including those that are due to control
equipment problems, process problems,
other known causes, and other
unknown causes.
(vi) The total duration in hours (or
minutes for CEMS) of continuous
monitoring system downtime for each
CMS during the reporting period, the
total operating time in hours of the
affected source during the reporting
period, and the total duration of CMS
downtime as a percent of the total
source operating time during the
reporting period.
(vii) A brief description of the process
units.
(viii) The monitoring equipment
manufacturer and model number and
the pollutant or parameter monitored.
(ix) The date of the latest continuous
monitoring system certification or audit.
(x) A description of any changes in
continuous monitoring systems,
processes, or controls since the last
reporting period.
E:\FR\FM\13MYR3.SGM
13MYR3
41722
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
8. Amend § 63.11151 by adding the
definition ‘‘Blowing’’ in alphabetical
order and revising the definition
‘‘Capture system’’ to read as follows:
■
§ 63.11151
subpart?
What definitions apply to this
*
*
*
*
*
Blowing means the operating mode for
a batch copper converter during which
air or oxygen-enriched air is injected
into the molten converter bath.
Capture system means the collection
of components used to capture gases
and fumes released from one or more
emissions points and then convey the
captured gas stream to a control device.
A capture system may include, but is
not limited to, the following
§ 63.11152 Who implements and enforces
this subpart?
*
*
*
*
*
(c) The authorities that will not be
delegated to State, local, or tribal
agencies are listed in paragraphs (c)(1)
through (6) of this section.
*
*
*
*
*
(6) Approval of an alternative to any
electronic reporting to the EPA required
by this subpart.
10. Revise table 1 to subpart EEEEEE
of part 63 to read as follows:
■
Table 1 to Subpart EEEEEE of Part 63—
Applicability of General Provisions to
This Subpart
As required in § 63.11150(a), you
must comply with the requirements of
the NESHAP General Provisions
(subpart A of this part) as shown in the
following table.
Citation
Subject
§ 63.1(a)(1) through (4), (6), and
(10) through (12), (b)(1) and (3),
(c)(1), (2), and (5), (e).
§ 63.1(a)(5) and (7) through (9),
(b)(2), (c)(3) and (4), (d).
§ 63.2 .............................................
§ 63.3 .............................................
§ 63.4 .............................................
Applicability ...................................
Yes..
Reserved ......................................
No..
Definitions .....................................
Units and Abbreviations ...............
Prohibited Activities and Circumvention.
Preconstruction Review and Notification Requirements.
Compliance with Standards and
Maintenance Requirements—
Applicability and Compliance
Dates.
Operation and Maintenance Requirements—general duty to
minimize emissions.
Yes..
Yes..
Yes..
§ 63.6(e)(1)(ii) .................................
Requirement to correct malfunctions as soon as practicable..
§ 63.6(e)(1)(iii) ................................
§ 63.6(e)(3) .....................................
.......................................................
Startup, Shutdown, and Manufacturing Plan.
Yes before November 12, 2024 ...
No on or after November 12,
2024.
Yes..
Yes before November 12, 2024 ...
No on or after November 12,
2024.
§ 63.6(f)(1) ......................................
Compliance with Nonopacity
Emission Standards.
Yes before November 12, 2024 ...
No on or after November 12,
2024.
§ 63.6(f)(2) through (3) ...................
§ 63.6(g), (i), (j) ..............................
.......................................................
Compliance with Nonopacity
Emission Standards.
Compliance with Opacity and Visible Emission Standards.
Yes..
Yes..
Reserved ......................................
No..
§ 63.5 .............................................
§ 63.6(a), (b)(1) through (5) and
(7), (c)(1), (2), and (5).
§ 63.6(e)(1)(i) .................................
§ 63.6(h)(1) .....................................
lotter on DSK11XQN23PROD with RULES3
components as applicable to a given
capture system design: duct intake
devices, hoods, enclosures, ductwork,
dampers, manifolds, plenums, and fans.
*
*
*
*
*
■ 9. Amend § 63.11152 by:
■ a. Revising paragraph (c) introductory
text;
■ b. Removing the undesignated
paragraph after paragraph (c)(5); and
■ c. Adding paragraph (c)(6).
The revision and addition read as
follows:
§ 63.6(b)(6), (c)(3) and (4), (d),
(e)(2), (e)(3)(ii), (h)(2)(ii), (h)(3),
(h)(5)(iv), (i)(15).
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00076
Fmt 4701
Applies to this subpart?
Explanation
Yes before November 12, 2024 ...
No on or after November 12,
2024.
See §§ 63.11147(c) and
63.11148(f) for the general duty
to minimize emissions at all
times at existing sources. See
§ 63.11149(c)(3) for the general
duty to minimize emissions at
all times at new sources.
Malfunctions are no longer exempt.
No..
Yes..
Yes before November 12, 2024 ...
No on or after November 12,
2024.
Sfmt 4700
E:\FR\FM\13MYR3.SGM
The requirements for emergency
situations for existing sources
are contained in
§§ 63.11147(c)(5) and
63.11148(f)(5). See
§ 63.11149(d) for the emergency requirements for new
sources.
Emission standards apply at all
times. Some requirements of
§ 63.6(f)(1) are no longer applicable.
Requirements apply to new
sources but not existing
sources. Emission standards
apply at all times. Some requirements of § 63.6(h)(1) are
no longer applicable.
13MYR3
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Citation
Subject
Applies to this subpart?
§ 63.6(h)(2) through (4), (h)(5)(i)
through (iii), (h)(6) through (9).
.......................................................
Yes/No. .........................................
§ 63.7(a), (e)(2) through (4), (f),
(g), (h).
§ 63.7(e)(1) .....................................
Performance Testing Requirements.
Performance Testing Requirements.
.......................................................
Yes..
No .................................................
Monitoring Requirements .............
Yes..
§ 63.8(a)(3) .....................................
§ 63.8(a)(4) .....................................
General Duty and SSM Plan Requirements for Continuous
Monitoring Systems.
Reserved ......................................
.......................................................
Yes before November 12, 2024. ..
No on or after November 12,
2024..
No..
No .................................................
§ 63.8(d)(1) and (2), (e) .................
Quality Control ..............................
Yes/No ..........................................
§ 63.8(d)(3) .....................................
Written Procedures for Continuous Monitoring Systems.
Yes before November 12, 2024 ...
No on or after November 12,
2024.
§ 63.9(a), (b)(1), (2), and (5), (c),
(d), (h)(1) through (3), (5), and
(6), (i), (j).
§ 63.9(b)(3), (h)(4) ..........................
§ 63.9(b)(4), (f) ...............................
§ 63.9(e), (g) ..................................
Notification Requirements ............
Yes..
Reserved ......................................
.......................................................
.......................................................
No..
No..
Yes/No ..........................................
§ 63.9(k) .........................................
Electronic submission of notifications or reports.
Recordkeeping and Reporting Requirements.
Yes..
.......................................................
Yes/No ..........................................
General Recordkeeping Requirements and Actions to Minimize
Emissions During Startup, Shutdown, and Malfunction.
Yes before November 12, 2024 ...
No on or after November 12,
2024.
§ 63.10(c)(2) and (4) and (9) .........
§ 63.10(c)(15) .................................
Reserved ......................................
Use of Startup, Shutdown, and
Malfunction Plan.
No..
For new sources, Yes before November 12, 2024.
No on or after November 12,
2024.
§ 63.10(d)(3), (e)(4) ........................
.......................................................
No .................................................
§ 63.10(d)(5) ...................................
Startup, Shutdown, and Malfunction Reporting.
§ 63.10(e)(3) ...................................
.......................................................
For new sources, Yes before November 12, 2024.
No on or after November 12,
2024.
Yes/No ..........................................
§ 63.11 ...........................................
Control Device Requirements ......
No .................................................
§ 63.7(b), (c) ...................................
§ 63.8(a)(1) and (2), (b), (c)(1)(ii),
(c)(2) through (8), (f), (g).
§ 63.8(c)(1)(i) and (iii) .....................
§ 63.10(a), (b)(1), (d)(1), (2), and
(4), (f).
lotter on DSK11XQN23PROD with RULES3
§ 63.10(b)(2)(iii) and (vi) through
(xiv), (b)(3), (c)(1), (5) through
(8), and (10) through (14), (e)(1)
and (2).
§ 63.10(b)(2)(i) through (ii) and (iv)
through (v).
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00077
Fmt 4701
Explanation
Yes/No ..........................................
Yes/No ..........................................
Sfmt 4700
E:\FR\FM\13MYR3.SGM
41723
Requirements apply to new
sources but not existing
sources.
See § 63.11148(e) for performance testing requirements.
Notification of performance tests
and quality assurance program
apply to new sources but not
existing sources.
This subpart does not require
flares.
Requirements for quality control
program and performance evaluations apply to new sources
but not existing sources.
Requirements for quality control
program and performance evaluations apply to new sources
but not existing sources. See
§ 63.11149(b)(3).
Notification requirements for performance test and use of continuous monitoring systems
apply to new sources but not
existing sources.
Recordkeeping requirements
apply to new sources but not
existing sources.
Recordkeeping requirements
apply to new sources but not
existing sources.
Recordkeeping requirements
apply to new sources but not
existing sources. See
§ 63.11149(c)(4).
Startup, Shutdown, and Malfunction are no longer exempt from
emission standards. See
§ 63.11148(g).
Recordkeeping requirements
apply to new sources but not
existing sources.
Startup, Shutdown, and Malfunction Plans are no longer required.
Reporting requirements apply to
new sources but not existing
sources.
Reporting requirements apply to
new sources but not existing
sources. See §§ 63.11147(e),
63.11148(h), 63.11149(e)(2).
Reporting requirements apply to
new sources but not existing
sources.
This subpart does not require
flares.
13MYR3
41724
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and Regulations
Citation
§ 63.12
§ 63.13
§ 63.14
§ 63.15
Subject
...........................................
...........................................
...........................................
...........................................
§ 63.16 ...........................................
Applies to this subpart?
State Authorities and Delegations
Addresses .....................................
Incorporations by Reference ........
Availability of Information and
Confidentiality.
Performance Track Provisions .....
Explanation
Yes..
Yes..
Yes..
Yes..
Yes..
[FR Doc. 2024–09883 Filed 5–10–24; 8:45 am]
lotter on DSK11XQN23PROD with RULES3
BILLING CODE 6560–50–P
VerDate Sep<11>2014
22:07 May 10, 2024
Jkt 262001
PO 00000
Frm 00078
Fmt 4701
Sfmt 9990
E:\FR\FM\13MYR3.SGM
13MYR3
Agencies
[Federal Register Volume 89, Number 93 (Monday, May 13, 2024)]
[Rules and Regulations]
[Pages 41648-41724]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-09883]
[[Page 41647]]
Vol. 89
Monday,
No. 93
May 13, 2024
Part V
Environmental Protection Agency
-----------------------------------------------------------------------
40 CFR Part 63
National Emission Standards for Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and Technology Review and Primary Copper
Smelting Area Source Technology Review; Final Rule
Federal Register / Vol. 89, No. 93 / Monday, May 13, 2024 / Rules and
Regulations
[[Page 41648]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 63
[EPA-HQ-OAR-2020-0430; FRL-7522-02-OAR]
RIN 2060-AU63
National Emission Standards for Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and Technology Review and Primary Copper
Smelting Area Source Technology Review
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This action finalizes the residual risk and technology review
(RTR) conducted for the Primary Copper Smelting major source category
regulated under national emission standards for hazardous air
pollutants (NESHAP). This action also finalizes the technology review
for the Primary Copper Smelting area source NESHAP. The final
amendments for the major source NESHAP include particulate matter (PM)
emission standards as a surrogate for metal hazardous air pollutants
(HAP) other than mercury (primarily lead and arsenic) for anode
refining point sources, process fugitive emissions from roofline vents,
Hoboken converter process fugitive capture systems where they combine
with anode refining point sources, and new converters. We are also
finalizing emission standards for previously unregulated HAP including
mercury, benzene, toluene, hydrogen chloride (HCl), chlorine,
polycyclic aromatic hydrocarbons (PAH), and dioxins and furans (D/F).
In addition, we are taking final action in the major source NESHAP to
establish work practice standards for bypass stacks, and add a new
emissions limit for lead and emissions control design standards to
minimize process fugitive emissions at facilities with flash furnaces
and Peirce-Smith converters. Final amendments for both the major source
NESHAP and the area source NESHAP include removing exemptions and
associated provisions for periods of startup, shutdown, and malfunction
(SSM), specifying that the emission standards apply at all times, and
requiring electronic reporting of performance test results and
notification of compliance reports.
DATES: This final rule is effective May 13, 2024, except for amendatory
instruction 3, which is effective July 15, 2024. The incorporation by
reference (IBR) of certain publications listed in the rule is approved
by the Director of the Federal Register as of May 13, 2024.
ADDRESSES: The U.S. Environmental Protection Agency (EPA) has
established a docket for this action under Docket ID No. EPA-HQ-OAR-
2020-0430. All documents in the docket are listed on the https://www.regulations.gov/website. Although listed, some information is not
publicly available, e.g., Confidential Business Information or other
information whose disclosure is restricted by statute. Certain other
material, such as copyrighted material, is not placed on the internet
and will be publicly available only in hard copy form. Publicly
available docket materials are available either electronically through
https://www.regulations.gov/, or in hard copy at the EPA Docket Center,
WJC West Building, Room Number 3334, 1301 Constitution Ave. NW,
Washington, DC. The Public Reading Room hours of operation are 8:30
a.m. to 4:30 p.m. Eastern Standard Time (EST), Monday through Friday.
The telephone number for the Public Reading Room is (202) 566-1744, and
the telephone number for the EPA Docket Center is (202) 566-1742.
FOR FURTHER INFORMATION CONTACT: For questions about this final action,
contact U.S. EPA, Attn: Amanda Hansen, Mail Drop: D243-04, 109 T.W.
Alexander Drive, P.O. Box 12055, RTP, North Carolina 27711; telephone
number: (919) 541-3165; email address: [email protected]. For
specific information regarding the risk modeling methodology, contact
U.S. EPA, Attn: James Hirtz, Mail Drop: C539-02, 109 T.W. Alexander
Drive, P.O. Box 12055, RTP, North Carolina 27711; telephone number:
(919) 541-0881; email address: [email protected].
SUPPLEMENTARY INFORMATION: Preamble acronyms and abbreviations. We use
multiple acronyms and terms in this preamble. While this list may not
be exhaustive, to ease the reading of this preamble and for reference
purposes, the EPA defines the following terms and acronyms here:
ACI activated carbon injection
ADEQ Arizona Department of Environmental Quality
ANSI American National Standards Institute
BTF beyond-the-floor
CAA Clean Air Act
CEDRI Compliance and Emissions Data Reporting Interface
CEMS continuous emissions monitoring system
CFR Code of Federal Regulations
CRA Congressional Review Act
CMS continuous monitoring systems
DCOT digital camera opacity technique
D/F dioxins and furans
DSI dry sorbent injection
EAF electric arc furnaces
EJ Environmental Justice
EPA Environmental Protection Agency
ERT Electronic Reporting Tool
FEM Federal equivalent method
FR Federal Register
FRM Federal reference method
GACT generally available control technology
gr/dscf grains per dry standard cubic feet
HAP hazardous air pollutants
HCl hydrogen chloride
HEM-4 Human Exposure Model, Version 1.5.5
HI hazard index
HQ hazard quotient
ICR information collection request
lbs pounds
lb/hr pounds per hour
LEAN Louisiana Environmental Action Network
MACT maximum achievable control technology
mg/dscm milligrams per dry standard cubic meter
MIR maximum individual risk
MTG Measurement Technology Group
NAAQS National Ambient Air Quality Standards
NAICS North American Industry Classification System
NESHAP National Emission Standards for Hazardous Air Pollutants
NTTAA National Technology Transfer and Advancement Act
OAR Office of Air and Radiation
OMB Office of Management and Budget
PAH polycyclic aromatic hydrocarbons
Pb lead
PDF portable document format
PM particulate matter
PRA Paperwork Reduction Act
RATA Relative Accuracy Test Audit
REL reference exposure level
RFA Regulatory Flexibility Act
RIN Regulatory Information Number
RTR risk and technology review
SIP state implementation plan
SO2 sulfur dioxide
SSM startup, shutdown, and malfunction
TEQ toxic equivalency quotient
TOSHI target organ-specific hazard index
tpy ton per year
ug/m\3\ micrograms per cubic meter
UMRA Unfunded Mandates Reform Act
UPL upper prediction limit
VCS voluntary consensus standards
WESP wet electrostatic precipitator
Background information. On January 11, 2022 (87 FR 1616), and July
24, 2023 (88 FR 47415), the EPA proposed revisions to the Primary
Copper Smelting major source NESHAP based on our RTR. In this action,
we are finalizing decisions and revisions for the major source rule. On
January 11, 2022 (87 FR 1616), the EPA also proposed revisions to the
Primary Copper Smelting area source NESHAP based on our technology
review. In this action, we are also finalizing decisions and revisions
for the area source rule.
[[Page 41649]]
We summarize some of the more significant comments we timely received
regarding the proposed rules and provide our responses in this
preamble. A summary of all other public comments on the proposals and
the EPA's responses to those comments is available in National Emission
Standards for Hazardous Air Pollutant Emissions: Primary Copper
Smelting Residual Risk and Technology Review and Primary Copper
Smelting Area Source Technology Review: Summary of Public Comments and
Responses, Docket ID No. EPA-HQ-OAR-2020-0430. ``Track changes''
versions of the regulatory language that incorporate the changes to the
two rules in this action are available in the docket.
Organization of this document. The information in this preamble is
organized as follows:
I. General Information
A. Executive Summary
B. Does this action apply to me?
C. Where can I get a copy of this document and other related
information?
D. Judicial Review and Administrative Reconsideration
II. Background
A. What is the statutory authority for this action?
B. What is the Primary Copper Smelting source category and how
does the NESHAP regulate HAP emissions from the source category?
C. What changes did we propose for the Primary Copper Smelting
source category in our January 11, 2022, proposal and in our July
24, 2023, supplemental proposal?
III. What is included in this final rule?
A. What are the final rule amendments based on the risk review
for the Primary Copper Smelting source category?
B. What are the final rule amendments based on the technology
review for the Primary Copper Smelting source category?
C. What are the final rule amendments pursuant to CAA sections
112(d)(2) and (3) for the Primary Copper Smelting source category?
D. What are the final rule amendments addressing emissions
during periods of startup, shutdown, and malfunction?
E. What other changes have been made to the NESHAP?
F. What are the effective and compliance dates of the standards?
IV. What is the rationale for our final decisions and amendments for
the Primary Copper Smelting source category?
A. Residual Risk Review for the Primary Copper Smelting Source
Category
B. Technology Review for the Primary Copper Smelting Source
Category
C. CAA Sections 112(d)(2) and (3) Revisions for the Primary
Copper Smelting Source Category
D. Final Rule Amendments Addressing Bypass Stack Emissions
E. Final Rule Amendments Addressing Compliance Dates
F. Other Major Comments
V. Summary of Cost, Environmental, and Economic Impacts and
Additional Analyses Conducted
A. What are the affected facilities?
B. What are the air quality impacts?
C. What are the cost impacts?
D. What are the economic impacts?
E. What are the benefits?
F. What analysis of environmental justice did we conduct?
VI. Statutory and Executive Order Reviews
A. Executive Orders 12866: Regulatory Planning and Review and
Executive Order 13563: Improving Regulation and Regulatory Review
B. Paperwork Reduction Act (PRA)
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act (UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation and Coordination With
Indian Tribal Governments
G. Executive Order 13045: Protection of Children From
Environmental Health Risks and Safety Risks
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
I. National Technology Transfer and Advancement Act (NTTAA) and
1 CFR Part 51
J. Executive Order 12898: Federal Actions To Address
Environmental Justice in Minority Populations and Low-Income
Populations and Executive Order 14096: Revitalizing Our Nation's
Commitment to Environmental Justice for All
K. Congressional Review Act (CRA)
I. General Information
A. Executive Summary
This action presents the results of the U.S. Environmental
Protection Agency (EPA or the Agency) residual risk and technology
review (RTR) for the National Emission Standards for Hazardous Air
Pollutants (NESHAP) for major source Primary Copper Smelters as
required under the Clean Air Act (CAA). Pursuant to the CAA, this
action also presents the results of the technology review for the
Primary Copper Smelting area source NESHAP.
Based on the results of the risk review, the EPA is finalizing a
determination that risks from emissions of air toxics from this major
source category are currently unacceptable. This unacceptable risk
determination considers all health information, including the EPA's
analysis of health risks associated with emissions of lead and arsenic
from these facilities. The modeled exceedance of the lead National
Ambient Air Quality Standard (NAAQS) of 0.15 ug/m\3\ at Freeport
represents an important health metric in EPA's unacceptability
determination for the Primary Copper source category. The EPA estimated
that the highest modeled rolling 3-month concentration of lead at a
residential location is 0.17 ug/m\3\ based on 2019 actual emissions and
0.24 ug/m\3\ based on allowable emissions, at the Freeport facility,
refer to appendix 1; section 9 of the Residual Risk Assessment for the
Primary Copper Smelting Source Category in Support of the 2021 Risk and
Technology Review Proposed Rule for additional details of the monitor
to model comparison for this rule. The NAAQS off-site lead (Pb) monitor
(at Miami Golf Course) recorded Pb levels for 2019 were below the NAAQS
with a maximum 3-month Pb concentration at the monitor of 0.038 ug/
m\3\, while the modeled Pb concentration based upon actual emissions
for this site was 0.045 ug/m\3\. This close alignment of the monitor
with model results for the Miami Golf Course site provides us with
additional confidence in our maximum off-site model concentration of
0.17 ug/m\3\ at a residential location. The EPA also found that the
maximum individual risk (MIR) of cancer was estimated to be 70-in-1
million based on actual emissions and 90-in-1 million based on
allowable emissions (driven by arsenic emissions), which is approaching
the presumptive level of unacceptability of 100-in-1 million. In
addition, the EPA found that the maximum acute hazard quotient (HQ) was
7 (also driven by arsenic emissions). Considering all of the health
risk information and factors discussed above, along with the risk
information and uncertainties discussed in the 2022 proposed rule
preamble (87 FR 1616), the EPA has determined that the current risks
for this source category are unacceptable.
To reduce risks to an acceptable level, the EPA is finalizing a new
emission limit for particulate matter (PM) as a surrogate for
particulate hazardous air pollutant (HAP) metals (such as lead and
arsenic) in the major source NESHAP for a combination of process
fugitive roofline emissions from the anode refining department, copper
converter departments, slag cleaning vessels and smelting vessels (also
known as smelting furnaces). This standard will achieve significant
reductions of lead and arsenic emissions and their associated health
risks (as described in section IV.A. of this preamble).
Pursuant to the LEAN decision (which is described further in
section II.A. of this preamble), the EPA is also finalizing new
emissions standards based on maximum achievable control technology
(MACT) for the major source NESHAP to address currently
[[Page 41650]]
unregulated emissions of HAP, as follows: PM, as a surrogate for
particulate HAP metals, for (1) anode refining furnace point source
emissions; (2) new converters; and (3) the combination of process
fugitive roofline emissions from the anode refining department, copper
converter departments, slag cleaning vessels and smelting vessels (also
known as smelting furnaces). The EPA is also finalizing new pollutant-
specific emissions limits based on MACT for the following HAP: mercury,
lead, benzene, toluene, hydrogen chloride (HCl), chlorine, polycyclic
aromatic hydrocarbons (PAH), naphthalene and dioxins and furans (D/F).
Furthermore, in this final action, after reviewing and considering
public comments, the EPA is finalizing work practice standards
according to CAA 112(h) for bypass stacks which were previously an
unregulated emissions source.
Pursuant to the CAA mandated technology review, we are finalizing a
PM limit (as a surrogate for nonmercury metal HAP) for the combined
emissions from the Hoboken converter process fugitive capture systems
where they combine with anode refining point source emissions. This
standard will achieve significant reductions of lead and arsenic
emissions (as described in sections III.B. and IV.B. of this preamble).
Furthermore, we are finalizing emissions control design standards to
minimize process fugitive HAP metals emissions from roof vents at
facilities with flash furnaces and Peirce-Smith converters. In
addition, under the technology review the EPA is finalizing work
practice standards to minimize fugitive dust emissions which will
achieve further emissions reductions beyond the reductions that will be
achieved from the rooflines under the risk review for major sources
(described above).
With regard to primary copper smelting area sources, the Agency did
not identify any developments in practices, processes, or control
technologies. Therefore, the EPA is not finalizing any new or revised
standards pursuant to the CAA technology review for the area source
NESHAP.
In addition to the new and revised standards described in the
previous paragraphs, consistent with Sierra Club v. EPA (which is
described further in section III.D. of this preamble), the EPA is also
finalizing rule changes to remove exemptions and associated provisions
for periods of startup, shutdown, and malfunction (SSM) and to specify
that the emission standards apply at all times. The EPA is also
finalizing rule changes to require electronic reporting of performance
test results and notification of compliance reports for both area and
major sources. Implementation of the rules is expected to reduce HAP
metal emissions from primary copper smelters, improve human health, and
reduce environmental impacts associated with those emissions. This
final action will also result in improved monitoring, compliance, and
implementation of the existing standards.
During development of these proposed and final rules, the EPA also
completed a demographic analysis which indicates that cancer risks
associated with emissions from the major source category
disproportionately affect communities with environmental justice
concerns, including low-income residents, American Indians, and
Hispanics living near these facilities. Once the new and revised
standards (described in this preamble) are implemented, risks in nearby
communities due to HAP emissions will be reduced to acceptable levels
and the NESHAP will provide an ample margin of safety to protect public
health.
B. Does this action apply to me?
The source categories that are the subject of this action are
Primary Copper Smelting Major Sources regulated under 40 CFR part 63,
subpart QQQ, and Primary Copper Smelting Area Sources, regulated under
40 CFR part 63, subpart EEEEEE. The North American Industry
Classification System (NAICS) code for the primary copper smelting
industry is 331410. This list of categories and NAICS codes is not
intended to be exhaustive, but rather provides a guide for readers
regarding the entities that this final action is likely to affect. The
final standards will be directly applicable to the affected sources.
State, local, and Tribal governments would not be directly affected by
this final action. As defined in the Initial List of Categories of
Sources Under Section 112(c)(1) of the Clean Air Act Amendments of 1990
(see 57 FR 31576, July 16, 1992) and Documentation for Developing the
Initial Source Category List, Final Report (see EPA-450/3-91-030, July
1992), the Primary Copper Smelting major source category addresses any
major source facility engaged in the pyrometallurgical process used for
the extraction of copper from sulfur oxides, native ore concentrates,
or other copper bearing minerals. As originally defined, the category
includes, but is not limited to, the following smelting process units:
roasters, smelting furnaces, and converters. Affected sources under the
current major source NESHAP are concentrate dryers, smelting furnaces,
slag cleaning vessels, converters, and fugitive emission sources. The
area source category was added to the source category list in 2002 (67
FR 70427, 70428). Affected sources under the area source NESHAP are
concentrate dryers, smelting vessels (e.g., furnaces), converting
vessels, matte drying and grinding plants, secondary gas systems, and
anode refining operations.
C. Where can I get a copy of this document and other related
information?
In addition to being available in the docket, an electronic copy of
this final action will also be available on the internet. Following
signature by the EPA Administrator, the EPA will post a copy of this
final action at https://www.epa.gov/stationary-sources-air-pollution/primary-copper-smelting-national-emissions-standards-hazardous-air and
at https://www.epa.gov/stationary-sources-air-pollution/primary-copper-smelting-area-sources-national-emissions-standards. Following
publication in the Federal Register, the EPA will post the Federal
Register version and key technical documents at this same website.
Additional information is available on the RTR website at https://www.epa.gov/stationary-sources-air-pollution/risk-and-technology-review-national-emissions-standards-hazardous. This information
includes an overview of the RTR program and links to project websites
for the RTR source categories.
D. Judicial Review and Administrative Reconsideration
Under Clean Air Act (CAA) section 307(b)(1), judicial review of
this final action is available only by filing a petition for review in
the United States Court of Appeals for the District of Columbia Circuit
(the Court) by July 12, 2024. Under CAA section 307(b)(2), the
requirements established by this final rule may not be challenged
separately in any civil or criminal proceedings brought by the EPA to
enforce the requirements.
Section 307(d)(7)(B) of the CAA further provides that only an
objection to a rule or procedure which was raised with reasonable
specificity during the period for public comment (including any public
hearing) may be raised during judicial review. This section also
provides a mechanism for the EPA to reconsider the rule if the person
raising an objection can demonstrate to the Administrator that it was
impracticable
[[Page 41651]]
to raise such objection within the period for public comment or if the
grounds for such objection arose after the period for public comment
(but within the time specified for judicial review) and if such
objection is of central relevance to the outcome of the rule. Any
person seeking to make such a demonstration should submit a Petition
for Reconsideration to the Office of the Administrator, U.S. EPA, Room
3000, WJC South Building, 1200 Pennsylvania Ave. NW, Washington, DC
20460, with a copy to both the person(s) listed in the preceding FOR
FURTHER INFORMATION CONTACT section, and the Associate General Counsel
for the Air and Radiation Law Office, Office of General Counsel (Mail
Code 2344A), U.S. EPA, 1200 Pennsylvania Ave. NW, Washington, DC 20460.
II. Background
A. What is the statutory authority for this action?
Section 112 of the CAA establishes a two-stage regulatory process
to address emissions of HAP from stationary sources. In the first
stage, we must identify categories of sources emitting one or more of
the HAP listed in CAA section 112(b) and then promulgate technology-
based NESHAP for those sources. ``Major sources'' are those that emit,
or have the potential to emit, any single HAP at a rate of 10 tons per
year (tpy) or more, or 25 tpy or more of any combination of HAP. For
major sources, these standards are commonly referred to as MACT
standards and must reflect the maximum degree of emission reductions of
HAP achievable (after considering cost, energy requirements, and non-
air quality health and environmental impacts). In developing MACT
standards, CAA section 112(d)(2) directs the EPA to consider the
application of measures, processes, methods, systems, or techniques,
including, but not limited to, those that reduce the volume of or
eliminate HAP emissions through process changes, substitution of
materials, or other modifications; enclose systems or processes to
eliminate emissions; collect, capture, or treat HAP when released from
a process, stack, storage, or fugitive emissions point; are design,
equipment, work practice, or operational standards; or any combination
of the above.
For these MACT standards, the statute specifies certain minimum
stringency requirements, which are referred to as MACT floor
requirements, and which may not be based on cost considerations. See
CAA section 112(d)(3). For new sources, the MACT floor cannot be less
stringent than the emission control achieved in practice by the best-
controlled similar source. The MACT standards for existing sources can
be less stringent than floors for new sources, but they cannot be less
stringent than the average emission limitation achieved by the best-
performing 12 percent of existing sources in the category or
subcategory (or the best-performing five sources for categories or
subcategories with fewer than 30 sources). In developing MACT
standards, we must also consider control options that are more
stringent than the floor under CAA section 112(d)(2). We may establish
standards more stringent than the floor, based on the consideration of
the cost of achieving the emissions reductions, any non-air quality
health and environmental impacts, and energy requirements. Standards
more stringent than the floor are commonly referred to as beyond-the-
floor (BTF) standards. In certain instances, as provided in CAA section
112(h), the EPA may set work practice standards in lieu of numerical
emission standards. For area sources, CAA section 112(d)(5) gives the
EPA discretion to set standards based on generally available control
technologies or management practices (Generally Available Control
Technology (GACT) standards) in lieu of MACT standards.
In the second stage of the regulatory process, the CAA requires the
EPA to undertake two different analyses, which we refer to as the
technology review and the residual risk review. Under the technology
review, we must review the technology-based standards and revise them
``as necessary (taking into account developments in practices,
processes, and control technologies)'' no less frequently than every 8
years, pursuant to CAA section 112(d)(6). In conducting this review,
the EPA is not required to recalculate the MACT floors that were
established in earlier rulemakings. Natural Resources Defense Council
(NRDC) v. EPA, 529 F.3d 1077, 1084 (D.C. Cir. 2008). Association of
Battery Recyclers, Inc. v. EPA, 716 F.3d 667 (D.C. Cir. 2013). The EPA
may consider cost in deciding whether to revise the standards pursuant
to CAA section 112(d)(6). The EPA is required to address regulatory
gaps, such as missing standards for listed air toxics known to be
emitted from the source category, and any new MACT standards must be
established under CAA sections 112(d)(2) and (3), or, in specific
circumstances, CAA sections 112(d)(4) or (h). Louisiana Environmental
Action Network (LEAN) v. EPA, 955 F.3d 1088 (D.C. Cir. 2020). Under the
residual risk review, we must evaluate the risk to public health
remaining after application of the technology-based standards and
revise the standards, if necessary, to provide an ample margin of
safety to protect public health or to prevent, taking into
consideration costs, energy, safety, and other relevant factors, an
adverse environmental effect. The residual risk review is required
within 8 years after promulgation of the technology-based standards,
pursuant to CAA section 112(f). In conducting the residual risk review,
if the EPA determines that the current standards provide an ample
margin of safety to protect public health, it is not necessary to
revise the MACT standards pursuant to CAA section 112(f).\1\ Section
112(d)(5) of the CAA provides that this residual risk review is not
required for categories of area sources subject to GACT standards. For
more information on the statutory authority for this rule, see 87 FR
1616 and 88 FR 47415.
---------------------------------------------------------------------------
\1\ The Court has affirmed this approach of implementing CAA
section 112(f)(2)(A): NRDC v. EPA, 529 F.3d 1077, 1083 (D.C. Cir.
2008) (``If EPA determines that the existing technology-based
standards provide an `ample margin of safety,' then the Agency is
free to readopt those standards during the residual risk
rulemaking.'').
---------------------------------------------------------------------------
B. What is the Primary Copper Smelting source category and how does the
NESHAP regulate HAP emissions from the source category?
The primary copper smelting source category includes any facility
that uses a pyrometallurgical process to produce anode copper from
copper ore concentrates. Primary copper smelting begins with copper
mines supplying the ore concentrate (typically 30 percent copper). In
most cases, the moisture is reduced from the ore concentrate in dryers,
and then the ore concentrate is fed through a smelting furnace where it
is melted and reacts to produce copper matte. One existing smelter is
able to feed its copper concentrate directly to the smelting furnace
without prior drying. Copper matte is a molten solution of copper
sulfide mixed with iron sulfide and is about 60 percent copper. The
solution is further refined using converters to make blister copper,
which is approximately 98 percent copper. Converters use oxidation to
remove sulfide as sulfur dioxide (SO2) gas and the iron as a
ferrous oxide slag. The majority of the SO2 gases are sent
to a sulfuric acid plant. The slag is removed, cooled, and often
processed again to remove any residual copper. The blister copper is
reduced in the anode furnace to remove impurities and oxygen, typically
by injecting natural gas and steam, to produce a high purity
[[Page 41652]]
copper. The molten copper from the anode refining furnace is poured
into molds and cooled to produce solid copper ingots called anodes.
This process is known as casting. The anodes are sent to a copper
refinery, either on-site or at an off-site location, for further
purification using an electrolytic process to obtain high purity copper
that is sold as a product.
The processing units of interest at primary copper smelters,
because of their potential to generate HAP emissions, are the
following: dryers, smelting furnaces, copper converters, anode refining
furnaces, and, if present, copper holding vessels, slag cleaning
vessels, and matte drying and grinding plants. In addition, fugitive
emissions are sources of HAP at primary copper smelters. The transfer
of matte, converter slag, and blister copper is the primary source of
fugitive emissions.
There are three primary copper smelting facilities in the U.S. that
are subject to the NESHAPs in this review. Two of the facilities,
Asarco and Freeport (also referred to as FMMI), are both located in
Arizona and are major sources of HAP emissions that are subject to
subpart QQQ, the major source NESHAP. The third facility, Kennecott, is
located in Utah and is an area source subject to subpart EEEEEE, the
area source NESHAP.
Two of the facilities (Asarco and Kennecott) use flash smelting
furnaces (the INCO smelting furnace and the Outotec[supreg],
respectively). Flash smelting furnaces consist of blowing fine, dried
copper sulfide concentrate and silica flux with air, oxygen-enriched
air or oxygen into a hot hearth-type furnace. The sulfide minerals in
the concentrate react with oxygen resulting in oxidation of the iron
and sulfur, which produces heat and therefore melting of the solids.
The molten matte and slag are removed separately from the furnace as
they accumulate, and at the facility using the INCO furnace, the matte
is transferred via ladles to the copper converters. The Freeport
facility uses an ISASMELT furnace. The ISASMELT process involves
dropping wet feed through a feed port, such that dryers are not needed.
A mixture of air, oxygen, and natural gas is blown through a vertical
lance in the center of the furnace, generating heat and melting the
feed. The molten metal is then tapped from the bottom and sent to an
electric furnace to separate the matte from slag. The slag is removed
from the electric furnace through tapholes and is transferred to slag
pots via ladles. The matte is also removed from the electric furnace
through tapholes and transferred to the converter via ladles.
At the area source primary copper smelter, molten copper matte
tapped from the Outotec[supreg] smelting furnace is not transferred as
molten material directly to the converting vessel as is performed at
the two major source smelters. Instead, the matte is first quenched
with water to form solid granules of copper matte. These matte granules
are then ground to a finer texture and fed to the flash converting
furnace for the continuous converting of copper. The continuous copper
converter differs significantly in design and operation from the
cylindrical batch converters operated at the other U.S. smelters.
Because there are no transfers of molten material between the smelting
furnace and the continuous copper converter, this technology has
inherently lower potential HAP emissions than a smelter using batch
copper converting technology.
In either a facility using batch copper converting or a facility
using continuous copper converting, and as discussed above in this
section, molten blister copper is next transferred from the converting
vessel to an anode furnace for refining to further remove residual
impurities and oxygen, and then poured into molds to produce solid
copper ingots called anodes. The anode copper is sent to a copper
refinery, either on-site or at another location, where it is further
purified using an electrolytic process to obtain the high purity copper
that is sold as a product. The copper refinery is not part of the
primary copper smelting source category.
The current NESHAP for major sources (40 CFR part 63, subpart QQQ)
was proposed on April 20, 1998 (63 FR 19582), with a supplement to the
proposed rule published on June 26, 2000 (65 FR 39326). The final rule,
promulgated on June 12, 2002 (67 FR 40478), established PM standards as
a surrogate for HAP metals for copper concentrate dryers, smelting
furnaces, slag cleaning vessels, and existing converters. The major
source NESHAP applies to major sources that use batch copper
converters. Regarding new sources, the NESHAP prohibits batch
converters for new sources, which indirectly means that any new source
would need to have continuous converters, similar to the area source
(Kennecott), or another technology. The converter building is subject
to an opacity limit that only applies during performance testing. A
fugitive dust plan is required to minimize fugitive dust emissions.
Subpart QQQ also establishes requirements to demonstrate initial and
continuous compliance with all applicable emission limitations, work
practice standards, and operation and maintenance requirements. Annual
performance testing is required to demonstrate compliance.
The NESHAP for area sources (40 CFR part 63, subpart EEEEEE)
establishes GACT standards for primary copper smelting area sources and
was proposed on October 6, 2006 (71 FR 59302) and finalized on January
23, 2007 (72 FR 2930). Technical corrections were then published on
July 3, 2007, via direct final rule (72 FR 36363). The affected sources
(i.e., copper concentrate dryers, smelting vessels, converting vessels,
matte drying and grinding plants, secondary gas systems and anode
refining departments) are subject to PM limits as a surrogate for HAP
metals. Compliance is demonstrated by either continuously measuring PM,
conducting a performance test every 2.5 years, or operating a PM
continuous emission monitoring system (CEMS).
C. What changes did we propose for the Primary Copper Smelting source
category in our January 11, 2022, proposal and in our July 24, 2023,
supplemental proposal?
On January 11, 2022, the EPA published a proposed rule in the
Federal Register (87 FR 1616) for the NESHAP for Primary Copper
Smelting, 40 CFR part 63, subpart QQQ, that took into consideration the
RTR analyses and for the NESHAP for Primary Copper Smelting Area
Sources, 40 CF part 63, subpart EEEEEE, that took into consideration
the technology review. In the 2022 proposed rule, we proposed:
PM limits based on the MACT floor for anode refining point
sources at new and existing major sources;
PM limits based on the MACT floor for process fugitive
emissions from roofline vents of smelting furnaces at new and existing
major sources;
PM limits based on the MACT floor for process fugitive
emissions from roofline vents of converters at new and existing major
sources;
PM limits based on beyond-the-floor (BTF) for process
fugitive emissions from roofline vents at anode refining operations at
new and existing major sources;
PM limits based on the MACT floor for new converters at
major sources;
Facility-wide mercury limit based on BTF for any
combination of stacks or other vents from the copper concentrate
dryers, copper converter department, the anode refining department, and
the smelting vessels at existing major sources;
Facility-wide mercury limit based on the MACT floor for
new major sources;
[[Page 41653]]
Revisions to the existing fugitive dust control work
practice standards to make them more robust than what is currently
required by the major source NESHAP;
Removal of SSM exemptions and associated provisions and
specify that emissions standards apply at all times for both area
sources and major sources; and
Requirements for electronic reporting of performance test
reports and notification of compliance reports for both area sources
and major sources.
During the comment period for the 2022 proposal, the EPA received
public comments from industry, Tribal nations, environmental groups,
Arizona Department of Environmental Quality (ADEQ), and private
citizens. After reviewing the comments, and after consideration of
additional data and information received since the 2022 proposal, the
EPA determined it was appropriate to gather additional data, revise
some of the analyses associated with that proposal, and to publish a
supplemental proposal for the major source NESHAP.
In support of the supplemental proposal, the EPA sent a section 114
information request to the Freeport facility only, as the Asarco
facility has been idled since October 2019. The section 114 information
request was delivered to the Freeport facility on August 31, 2022. In
response to this section 114 information request, the EPA received
performance test results for the Freeport facility containing emission
rates of benzene, 1,4-dichlorobenzene, chlorine, formaldehyde, hexane,
hydrogen fluoride, hydrogen chloride, toluene, total hydrocarbons, PAH
including naphthalene, and dioxins and furans. The section 114
information request response from Freeport also provided data regarding
costs and feasibility of installing additional controls for the aisle
scrubber including a wet electrostatic precipitator (WESP) and a
baghouse to control emissions from the Hoboken converter process
fugitive capture system. Finally, the section 114 information request
response from Freeport provided detailed information for input
materials, emission sources, and process information.
In addition to the information collected through the section 114
information request, the EPA also received information during and after
the public comment period of the 2022 proposed RTR. This additional
information included cost estimates for the control devices which we
expect would be needed to comply with the emission limits proposed in
the 2022 proposal (e.g., for mercury, lead and arsenic). It also
included additional performance testing results for the roofline vents,
vent fume stack, aisle scrubber, and acid plant stack. Finally,
Freeport also voluntarily performed an additional performance test for
mercury in 2022 and submitted those results to the EPA.
Based on evaluation of all the data, we proposed several revised
and new MACT standards in a supplemental proposal published in the
Federal Register (88 FR 47415) on July 24, 2023, pursuant to CAA
sections 112(d)(2), (d)(3), (d)(6), and (f). For the supplemental
proposal, which addressed only the major source NESHAP, we proposed:
Benzene, toluene, HCl, chlorine, PAH, naphthalene and D/F
limits based on the MACT floor for any new and existing combination of
stacks or other vents from the copper concentrate dryers, copper
converter department, the anode refining department, and the smelting
vessels at major sources based on test data submitted by the only
operating major source;
Revisions to the proposed PM limits for process fugitive
emissions from roofline vents of smelting vessels, converters, and
anode refining operations at new and existing sources to provide a
combined emission limit for all roofline vents based on additional test
data and comments submitted by affected facilities;
Revisions to the proposed mercury limits for any new and
existing combination of stacks or other vents from the copper
concentrate dryers, converting department, the anode refining
department, and the smelting vessels to provide a limit based on the
MACT floor after considering additional test data and comments
submitted by affected facilities; and
Prohibition of the use of bypass stacks for major sources.
We also co-proposed two options for further controlling HAP metals
at the aisle scrubber source at Freeport as follows:
Option 1--PM limits based on the addition of a WESP
downstream of the aisle scrubber to provide additional control of the
combined emissions stream from the secondary capture system for the
converter department \2\ and the anode refining department (i.e., the
same option evaluated by the EPA in the ample margin of safety analysis
included in the January 2022 proposal);
---------------------------------------------------------------------------
\2\ Based on comments on the supplemental proposal, this system
should be referred to as a process fugitive capture system for the
Hoboken converters; we are clarifying this terminology in the final
rule.
---------------------------------------------------------------------------
Option 2--PM limits based on the addition of a baghouse
upstream of the aisle scrubber to provide additional control of the
secondary capture system for the converter department.
III. What is included in this final rule?
This action finalizes the EPA's determinations pursuant to the RTR
provisions of CAA section 112 for the Primary Copper Smelting major
source category and amends the Primary Copper Smelting major source
NESHAP, 40 CFR part 63, subpart QQQ, based on those determinations. The
changes being finalized for the major sources in this action include
promulgation of MACT floor-based PM limits for the anode refining
department point source emissions; BTF PM limits to address process
fugitive emissions from the smelting vessels, copper converter
department, and anode refining roofline vents combined; MACT floor-
based PM limits for new copper converter departments; MACT floor-based
emission standards for previously unregulated HAP (e.g., mercury,
benzene, toluene, HCl, chlorine, PAH, naphthalene and D/F); and PM
limits for the combined anode refining department and Hoboken converter
process fugitive capture systems. This action also finalizes design
standards to limit HAP metals and a BTF lead emissions limit to
minimize process fugitive emissions from roofline vents for certain
processes. In addition, this action finalizes work practice standards
for the use of bypass stacks and revisions to the fugitive dust control
plan requirements. This action also finalizes other changes to the
major source NESHAP including electronic reporting requirements and the
removal of SSM exemptions. This final action includes several changes
to the proposed requirements in the 2022 proposal and 2023 supplemental
proposal based on consideration of comments and information received
during the public comment periods as described in section IV. of this
preamble.
This action also finalizes the EPA's determination pursuant to the
technology review provisions of CAA section 112 for the Primary Copper
Smelting area source category. We determined that there are no
developments in practices, processes, and control technologies that
warrant revisions to the NESHAP for Primary Copper Smelting Area
Sources, 40 CFR part 63, subpart EEEEEE, pursuant to CAA section
112(d)(6). However, this action finalizes amendments to the area
[[Page 41654]]
source NESHAP to remove SSM exemptions and associated provisions and
provide electronic reporting requirements.
A. What are the final rule amendments based on the risk review for the
Primary Copper Smelting source category?
This section introduces the final amendments to the Primary Copper
Smelting NESHAP, 40 CFR part 63, subpart QQQ, being promulgated
pursuant to CAA section 112(f). The EPA is promulgating a PM emission
limit (as a surrogate for HAP metals other than mercury) of 6.3 pounds
per hour (lb/hour) for process fugitive emissions from roofline vents
of the smelting vessels, copper converter departments, slag cleaning
vessels and anode refining departments combined, at new and existing
sources. This emission limit is the same as proposed in the 2023
supplemental proposal. This combined PM emission limit for process
fugitive emissions from roofline vents is also being promulgated under
CAA section 112(d)(2) and (d)(3) as described in section III.C. of this
preamble.
B. What are the final rule amendments based on the technology review
for the Primary Copper Smelting source category?
We determined that there are developments in practices, processes,
and control technologies that warrant revisions to the MACT standards
for this source category. Therefore, to satisfy the requirements of CAA
section 112(d)(6), we are revising the MACT standards to include a
combined emission standard for the anode refining department point
source emissions and Hoboken converter process fugitive capture system
of 4.1 milligrams per dry standard cubic meter (mg/dscm). The
promulgated standard was co-proposed in the 2023 supplemental proposal
as one of the two options expected to require additional controls of
the combined emission streams. The promulgated standard is expected to
require the installation of PM controls (such as a baghouse) to control
the emissions from the Hoboken converter process fugitive capture
system before this emission stream combines with the anode refining
department point source exhaust in the aisle scrubber.
We are also promulgating, as proposed in the 2022 proposal,
amendments to the existing requirements for facilities to develop and
implement a fugitive dust control plan pursuant to CAA section
112(d)(6) as part of technology review.
In addition, the EPA is promulgating a lead emission limit of 0.326
lb/hour under CAA section 112(d)(2) and (3) and design standards under
CAA section 112(d)(6) for minimizing process fugitive emissions from
any combination of roofline vents associated with the Peirce-Smith
copper converter department, Inco flash furnace and the anode refining
department, at new and existing sources. The design standards are being
promulgated for the flash furnace area capture system, fuming ladle
capture system, and the anode furnace secondary hood capture and
control system to further reduce process fugitive HAP metals at
facilities with a combination of the Peirce-Smith copper converter
department, Inco flash furnace and the anode refining department. We
note that the combined lead emission limit for reducing process
fugitive emissions from roofline vents is being promulgated under CAA
section 112(d)(2) and (d)(3) as described in section III.C. of this
preamble. However, the design standards are being promulgated under CAA
section 112(d)(6).
As part of the technology review for the major source NESHAP, we
also identified regulatory gaps (previously unregulated processes or
pollutants) and are establishing new standards to fill those gaps as
described in section III.C. of this preamble.
C. What are the final rule amendments pursuant to CAA sections
112(d)(2) and (3) for the Primary Copper Smelting source category?
Pursuant to CAA sections 112(d)(2) and (3), we are promulgating
MACT floor limits for emissions of PM (as a surrogate for HAP metals
other than mercury) from new and existing anode refining departments
and new copper converter departments, which were previously unregulated
sources of HAP metals. We are also promulgating, pursuant to CAA
sections 112(d)(2) and (3), a BTF limit for emissions of PM (as a
surrogate for HAP metals other than mercury) from new and existing
sources of process fugitive emissions from the roofline vents from the
smelting vessels, slag cleaning vessels, the copper converter
department, and the anode refining department combined, which were
previously unregulated sources of HAP metals. As described in section
III.A. of this preamble, the emissions standard for new and existing
sources of process fugitive gases from the roofline vents from the
smelting vessels, slag cleaning vessels, the converter department, and
the anode refining department is also being finalized pursuant to CAA
section 112(f)(2) to address the source category unacceptable risk
determination. In addition, we are also promulgating, pursuant to CAA
sections 112(d)(2) and (3), a BTF lead emission limit to minimize
process fugitive emissions from any combination of roofline vents
associated with the Peirce-Smith copper converter department, Inco
flash furnace and the anode refining department. Lastly, we are
promulgating, pursuant to CAA sections 112(d)(2) and (3), MACT emission
limits for mercury, benzene, toluene, HCl, chlorine, PAH excluding
naphthalene, naphthalene, and D/F, all of which were previously
unregulated HAP. A summary of the MACT standards promulgated pursuant
to CAA sections 112(d)(2) and (3) is provided in table 1 below. For
more information on these standards, including their rationale, see
section IV.C. of this preamble.
BILLING CODE 6560-50-P
[[Page 41655]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.101
[[Page 41656]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.102
BILLING CODE 6560-50-C
D. What are the final rule amendments addressing emissions during
periods of startup, shutdown, and malfunction?
We are finalizing the elimination of SSM exemptions and associated
provisions in the Primary Copper Smelting NESHAPs (40 CFR part 63,
subparts QQQ and EEEEEE) as proposed in the 2022 proposal, other than
clarifications and other non-substantive updates in SSM exemption
removal explanation and provisions. In its 2008 decision in Sierra Club
v. EPA, 551 F.3d 1019 (D.C. Cir. 2008), the court vacated portions of
two provisions in the EPA's CAA section 112 regulations governing the
emissions of HAP during periods of SSM. Specifically, the court vacated
the SSM exemption contained in 40 CFR 63.6(f)(1) and (h)(1), holding
that under section 302(k) of the CAA, emissions standards or
limitations must be continuous in nature and that the SSM exemption
violates the CAA's requirement that some section 112 standards apply
continuously. Consistent with Sierra Club v. EPA, the EPA is
establishing standards in these rules that apply at all times. We have
revised table 1 (the General Provisions Applicability Table) in both
rules in several respects related to SSM. For example, we have
eliminated the incorporation of the General Provisions requirement that
the sources develop an SSM plan, changed several references related to
requirements that apply during periods of SSM, and eliminated or
revised certain recordkeeping and reporting requirements related to the
eliminated SSM exemption. The EPA also made changes to the rules to
remove or modify inappropriate, unnecessary, or redundant language in
the absence of the SSM exemption. See the 2022 proposed rule for
additional information on removal of SSM exemptions. In addition, for
40 CFR part 63, subpart QQQ, we are finalizing a work practice standard
allowing the venting of process gases through a bypass stack during
planned maintenance events under limited conditions as described in
section IV.D.
E. What other changes have been made to the NESHAP?
1. Electronic Reporting
To increase the ease and efficiency of data submittal and data
accessibility, the EPA is finalizing, as proposed in the 2022 proposal,
a requirement that owners and operators of sources subject to the
Primary Copper Smelting NESHAP for major sources (subpart QQQ) submit
electronic copies of required performance test reports and performance
evaluations of continuous monitoring systems (CMS) measuring relative
accuracy test audit (RATA) pollutants (being finalized at 40 CFR
63.1455) through the EPA's Central Data Exchange (CDX) using the
Compliance and Emissions Data Reporting Interface (CEDRI). A
description of the electronic data submission process is provided in
the memorandum Electronic Reporting Requirements for New Source
Performance Standards (NSPS) and National Emission Standards for
Hazardous Air Pollutants (NESHAP) Rules, available in the docket for
this action (Docket ID No. EPA-HQ-OAR-2020-0430-0031). The final rule
requires that performance test results or performance evaluation of CMS
measuring RATA pollutants collected using test methods that are
supported by the EPA's Electronic Reporting Tool (ERT) as listed on the
ERT website \3\ at the time of the test be submitted in the format
generated through the use of the ERT; or alternatively, owners or
operators may submit an electronic file consistent with the extensible
markup language (XML) schema listed on the EPA's ERT website. Other
performance tests or performance evaluations of CMS measuring RATA
pollutants collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test
must be included as an attachment in the ERT or an alternate electronic
file consistent with the XML schema listed on the EPA's ERT website.
The final rule also requires that notification of compliance reports be
submitted as a portable document format (PDF) upload in CEDRI.
---------------------------------------------------------------------------
\3\ https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert.
---------------------------------------------------------------------------
We are finalizing the electronic reporting requirements for the
Primary Copper Smelting NESHAP for area sources (40 CFR part 63,
subpart EEEEEE) as proposed in the 2022 proposal. The electronic
reporting requirements are in 40 CFR 63.11147, 63.11148, and 63.11149
of the rule, and include electronic reporting requirements for monthly
emissions reports, emergency notifications, notifications of a
deviation, semi-annual monitoring reports; and performance tests, where
applicable.
2. Other Changes
The EPA is finalizing, as proposed in the 2022 proposal, the
revision to the applicability description under Sec. 63.1441 to
clarify that the NESHAP applies to major source smelting facilities
that use any type of converter, not just batch converters because the
current definition limits applicability to only major sources that use
batch converters. The major source NESHAP should apply to any Primary
Copper major source regardless of what type of converter they use.
Therefore, we are finalizing this change.
Regarding revisions to testing requirements, the Agency is
finalizing, as proposed in the 2022 proposal,
[[Page 41657]]
revisions to the wording in Sec. 63.1450 clarifying that facilities
must test for filterable particulate, not total particulate. The test
methods in Sec. 63.1450(a) have not changed for PM from the existing
regulation. The methods in the existing regulation (Methods 5, 5D, and
17) are methods for filterable PM. Total PM includes filterable PM and
condensable PM. The condensable PM test method (Method 202) is not
included in the existing regulation for the emission standards set in
2002. In conjunction with clarifying that facilities must test for
filterable particulate, not total particulate, we are changing all
instances of the wording ``total particulate matter'' in the current
rule to ``filterable particulate matter.''
The Agency is finalizing, as proposed in the 2022 proposal and 2023
supplemental proposal, the addition of appropriate test methods for
PM10, fugitive PM, mercury, benzene, toluene, chlorine,
hydrogen chloride, PAH excluding naphthalene, naphthalene, and dioxins/
furans, as well as updating test methods that are incorporated by
reference because the affected facilities will need to know what test
methods they need to use to demonstrate compliance with the new
standards.
Finally, the EPA is finalizing, as proposed in the 2022 proposal,
to revise the definitions under Sec. 63.1459 by changing the term
``smelting furnace'' to ``smelting vessel'' to be consistent with the
definition in the area source rule, 40 CFR part 63, subpart EEEEEE,
because we find it is appropriate that both rules include the broader
definition of smelting vessel, which is already in the area source
rule. The specific definition is as follows: Smelting vessel means a
furnace, reactor, or other type of vessel in which copper ore
concentrate and fluxes are smelted to form a molten mass of material
containing copper matte and slag. Other copper-bearing materials may
also be charged to the smelting vessel.
F. What are the effective and compliance dates of the standards?
For the additional MACT floor emission limits (mercury, HCl,
chlorine, D/F, benzene, toluene, PAHs excluding naphthalene, and
naphthalene) in 40 CFR part 63, subpart QQQ, the EPA is finalizing, as
proposed in the 2023 supplemental proposal, the requirement that
existing facilities must comply with these limits within 1 year after
promulgation because we estimated both facilities can meet these MACT
floor limits without having to install new controls. Similarly, for the
new PM emission standard for anode refining point sources where the
anode emissions are not combined with Hoboken converter process
fugitive capture system emissions in an aisle scrubber, the Agency is
finalizing, as proposed in the 2022 proposal, the proposed requirement
that existing facilities must comply within 1 year after promulgation
of the final rule as major source facilities that do not combine their
anode point source emissions are expected to meet the limit without
additional controls. For anode refining point sources that combine
their anode emissions with Hoboken converter process fugitive capture
system emissions in an aisle scrubber, compliance with the anode
refining point source limit will be demonstrated through compliance
with the combined PM limit at the aisle scrubber outlet and its
associated compliance date.
For the combined PM limit at the aisle scrubber outlet, which
treats combined emissions from the Hoboken converter process fugitive
capture system and anode refining point source, the EPA is finalizing
that facilities must comply with this limit within 3 years after
promulgation of the final rule. We are allowing up to 3 years to meet
this limit as we expect facilities will need up to 3 years to design,
construct and operate the necessary capture and control equipment to
meet the limit.
For the combined process fugitive PM roofline emissions limit for
copper converter departments, anode refining departments, slag cleaning
vessels and smelting vessel roofline vents, the EPA is finalizing, as
proposed in the 2023 supplemental proposal, the requirement that
existing facilities comply with this limit within 2 years after
promulgation of the final rule. We are allowing up to two years to meet
this limit as we expect facilities will need up to 2 years to design,
construct and operate the necessary capture and control equipment to
meet the limit.
For the combined process fugitive lead roofline emissions limit for
Peirce-Smith copper converter department, Inco flash furnace and the
anode refining department roofline vents, the EPA is finalizing that
facilities must comply with this limit within 3 years after
promulgation of the final rule. We are allowing up to 3 years to meet
this limit as we expect facilities will need up to 3 years to design,
construct and operate the necessary capture and control equipment to
meet the limit.
For all other changes in this action we are finalizing, as
proposed, that existing facilities must comply within 180 days after
promulgation of the final rule.
New sources must comply with all of the standards immediately upon
the effective date of the standard, May 13, 2024, or upon startup,
whichever is later.
We are also finalizing amendments to Sec. Sec. 63.1442 and 63.1443
and adding a new table (table 4 to 40 CFR part 63, subpart QQQ) which
provides the applicability dates for previously unregulated affected
sources (e.g., anode refining department, bypass stack), as well as the
effective dates and compliance dates for the emission standards
proposed in the 2022 proposal and 2023 supplemental proposal which are
being promulgated in this final action.
IV. What is the rationale for our final decisions and amendments for
the Primary Copper Smelting source category?
For each issue, this section provides a description of what we
proposed and what we are finalizing for the issue, the EPA's rationale
for the final decisions and amendments, and a summary of key comments
and responses. For all comments not discussed in this preamble, comment
summaries and the EPA's responses can be found in the National Emission
Standards for Hazardous Air Pollutant Emissions: Primary Copper
Smelting Residual Risk and Technology Review and Primary Copper
Smelting Area Source Technology Review: Summary of Public Comments and
Responses document, available in the docket for this action (Docket ID
No. EPA-HQ-OAR-2020-0430).
A. Residual Risk Review for the Primary Copper Smelting Source Category
1. What did we propose pursuant to CAA section 112(f) for the Primary
Copper Smelting source category?
Pursuant to CAA section 112(f), the EPA conducted a residual risk
review and presented the results of this review, along with the
proposed decisions regarding risk acceptability and ample margin of
safety, in the January 11, 2022, proposed rule (87 FR 1616). In the
2022 proposed rule, the EPA determined that risks from the primary
copper smelting source category were unacceptable due to HAP metal
(primarily lead and arsenic) emissions. Based on new information and
data received after the 2022 proposal through the comment period and
issuance of a 2022 CAA section 114 information request from the
Freeport facility, the EPA updated the baseline risk assessment,
updated control Option 1, and added a new control Option 2 that
affected the Freeport facility only. The Asarco facility has been idle
since October 2019, and therefore, a section
[[Page 41658]]
114 information request was not issued to them. The risk results for
the Asarco facility did not change in the 2023 supplemental proposal
because we did not receive any new data or information after the 2022
proposal was published and before the supplemental proposal was
published.
The results of the risk assessment for the 2022 proposal are
described in more detail in the Residual Risk Assessment for the
Primary Copper Smelting Major Source Category in Support of the 2021
Risk and Technology Review Proposed Rule document, which is available
in the docket (Docket ID No. EPA-HQ-OAR-2020-0430-0051). The results of
the baseline risk assessment for the 2023 supplemental proposal are
presented in table 2 and in more detail in the residual risk document,
Revised Residual Risk Assessment for the Freeport Smelter (Miami, AZ)
in Support of the 2023 Supplemental Proposal for the Primary Copper
Smelting Source Category, which is available in the Docket for this
action (Docket ID No. EPA-HQ-OAR-2020-0430-0187).
[GRAPHIC] [TIFF OMITTED] TR13MY24.103
A refined modeling analysis for the 2022 proposal was conducted at
the facility with the highest annual concentration of lead, Freeport,
to characterize ambient concentrations of lead for 3-month intervals.
The maximum 3-month concentration was predicted for each off-site
receptor. The concentrations were then compared to the Pb NAAQS of 0.15
micrograms per cubic meter (ug/m3). The maximum 3-month off-site
modeled concentration was 0.17 ug/m3 for actual emissions and 0.24 ug/
m3 for allowable emissions, and these results occurred near the
Freeport facility. These results did not change in the 2023
supplemental proposal.
The inhalation risk assessment in the 2023 supplemental proposal
estimated that the baseline cancer maximum individual risk (MIR) was
70-in-1 million for the source category based on actual emissions. The
total estimated cancer incidence from the source category was 0.002
excess cancer cases per year, or one excess case every 500 years, with
arsenic compounds contributing 97 percent of the cancer incidence for
the source category in the 2023 supplemental proposal. Approximately
22,900 people of the 46,460 people within 50 km of the facility were
estimated to have cancer risks above 1-in-1 million from HAP emitted
from the source category. The HEM-4 model predicted the maximum chronic
noncancer hazard index (HI) value for the source category was 1
(developmental), with an acute non-cancer HQ value equal to 7 driven by
emissions of arsenic from the anode refining roofline at Freeport and,
to a lesser degree, the anode furnace point source and Hoboken
converter process fugitive capture system emissions emitted through the
aisle scrubber at Freeport.
The inhalation risk assessment based on MACT-allowable emissions
did not change from the 2022 proposal and indicated that the cancer MIR
was 90-in-1 million. The total estimated cancer incidence from the
source category was
[[Page 41659]]
0.003 excess cancer cases per year, or one excess case every 333 years,
with arsenic contributing 90 percent and cadmium contributing 8 percent
of the cancer incidence for the source category. Approximately 29,001
people were estimated to have cancer risks above 1-in-1 million from
exposure to HAP emissions if HAP were emitted at the levels allowed
under the NESHAP as it existed prior to finalization of this regulatory
action. The chronic non-cancer risks remained the same as actuals, with
acute non-cancer hazards not being modeled due to the uncertainty of
estimating acute impacts based upon hourly allowable emission
estimates.
Regarding multipathway risk, we concluded in the 2022 proposal that
there was no significant potential for multipathway health effects
based upon EPA's Tier 3 screening analysis. Due to the conservative
nature of the screens and the level of additional refinements that
would go into a site-specific multipathway assessment, were one to be
conducted, we are confident that the
HQ for ingestion exposure, specifically cadmium and mercury through
fish ingestion, is less than 1. For arsenic, maximum cancer risk posed
by fish ingestion would also be reduced to levels below 1-in-1 million,
and maximum cancer risk under the rural gardener scenario would
decrease to 20-in-1 million or less. The estimated risks for the garden
scenario seem unlikely due to the arid climate of the area and the
hypothetical nature of the scenario. Further details on the Tier 3
screening assessment can be found in Appendix 10-11 of Residual Risk
Assessment for the Primary Copper Smelting Major Source Category in
Support of the Risk and Technology Review 2021 Proposed Rule.
In the 2023 supplemental proposal, we estimated that the
multipathway and inhalation risk results would be reduced further due
to baseline arsenic emissions at proposal (2022) being lowered based
upon additional data being received. We also estimated in the 2023
supplemental proposal that, although the mercury emissions increased
from the 2022 proposal baseline, the mercury HQ would still be less
than 1 (0.2) for the fisher scenario.
For the 2023 supplemental proposal, the Agency weighed all the
health risk factors in the risk acceptability determination and
proposed that the risks from the Primary Copper Smelting source
category are unacceptable at baseline. To address the unacceptable
risks, in the supplemental proposal, we proposed a combined PM emission
limit for process fugitive emissions from roofline vents of smelting
furnaces, converters, and anode refining operations, which would
significantly reduce risks. We estimated in the supplemental proposal
that this combined PM limit would reduce emissions of HAP metal
(primarily lead and arsenic) by 4.59 tpy. To be able to comply with the
limit, we estimated that the Freeport facility would need to install
controls (e.g., improved capture system, including hoods, ductwork, and
fans, and one additional baghouse) to reduce process fugitive roofline
emissions from the anode refining source, the main risk driver. As
described in the supplemental proposal, we estimated that these
controls would reduce the MIR at Freeport from 70-in-1 million to an
estimated 20-in-1 million and that the acute noncancer HQ (for arsenic)
would be reduced from 7 to 2 (based on actual emissions). In addition,
the modeled lead concentrations would be reduced below the NAAQS. We
estimated that the MIR for Asarco would remain at 60-in-1 million and
would be the source category MIR after the proposed controls are
applied at Freeport. In the supplemental proposal, we concluded that
these risks, after implementation of proposed controls, were
acceptable. We also proposed that existing facilities would need to
comply within two years after promulgation of the final rule and new
facilities must comply with all requirements in the final rule upon
start up. We proposed that compliance would be demonstrated through an
initial performance test followed by a compliance test once per year.
We then considered whether the Primary Copper Smelting NESHAP
provides an ample margin of safety to protect public health and whether
more stringent standards are necessary to prevent an adverse
environmental effect, taking into consideration costs, energy, safety,
and other relevant factors. In considering whether the standards should
be tightened to provide an ample margin of safety to protect public
health, we considered the same risk factors that we considered for our
acceptability determination and also considered the costs,
technological feasibility, and other relevant factors related to
emissions control options that might reduce risks associated with
emissions from the source category.
As discussed in the 2023 supplemental proposal, pursuant to CAA
section 112(d)(6) and to provide an ample margin of safety to protect
public health pursuant to CAA section 112(f)(2), the EPA co-proposed
two regulatory options for additional control of either the secondary
capture system for the converter department \4\ or additional control
of the combined emissions stream of the secondary capture system for
the converter department and the point source emissions from the anode
refining department. For Option 1, a WESP would be located downstream
of the aisle scrubber and therefore further control the combined
emissions stream of the secondary capture system for the converter
department and the point source emissions from the anode refining
department. Under Option 2, a baghouse would be installed upstream of
the aisle scrubber to provide additional control of the secondary
capture system for the converter department. The EPA proposed that
these control options would result in more stringent emission standards
for these emission sources than were currently required in 40 CFR part
63, subpart QQQ.
---------------------------------------------------------------------------
\4\ Based on cmments on the supplement proposal, this system
should be referred to as a roofline capture sysem for the Hoboken
converters; we are claarifying this termionlogy in the final rule.
---------------------------------------------------------------------------
In the 2022 proposal, the EPA evaluated additional work practices
to reduce fugitive dust emissions, and the Agency found that the
implementation of a more robust fugitive dust plan would result in an
unquantified reduction of HAP, and we therefore proposed this
requirement in the 2022 proposal. In the 2022 proposal, the EPA
proposed that the combination of the standards for anode refining roof
vents, fugitive dust plan and all other current standards in the NESHAP
would ensure the NESHAP provides an ample margin of safety to protect
public health.
2. How did the risk review change for the Primary Copper Smelting
source category?
While reviewing the information provided during the 2023
supplemental proposal public comment period and reviewing the data
provided during the section 114 process, a correction was made to the
spreadsheet used to calculate the average emissions from the aisle
scrubber based on stack tests provided by Freeport. The correction
resulted in a slightly lower average arsenic emission rate for this
source (from 0.626 tpy in the supplemental proposal to 0.563 tpy in the
final rule), and therefore we re-modeled the baseline and roofline vent
control scenarios as well as the two control options for the aisle
scrubber. In addition to the corrected emission rate for the aisle
scrubber, the EPA re-evaluated the estimated control efficiencies of
the control options co-
[[Page 41660]]
proposed for the aisle scrubber source at Freeport based on the
comments and information received on the supplemental proposal. These
comments and our responses are discussed further in section IV.A.3. of
this preamble.
As discussed in the memorandum Cost Estimates for Additional
Controls of Freeport's Aisle Scrubber--REVISED, which is available in
the docket for this action, and as further discussed in section IV.B.
of this preamble, we updated the control efficiency estimates for the
aisle scrubber control options. In the 2023 supplemental proposal, we
estimated that under Option 1, installing a WESP downstream of the
aisle scrubber would achieve 95 percent control efficiency, and we
estimated 6.3 tpy metal HAP reductions. Based on the comments received
from Freeport regarding the technical feasibility of controlling the
high-volume aisle scrubber exhaust stream using a WESP and our
evaluation of those comments, we updated the estimated control
efficiency for the WESP option to 73 percent, and we now estimate 4.9
tpy metal HAP reduced. In the 2023 supplemental proposal, we estimated
that under Option 2 (Baghouse option), installing a baghouse upstream
of the aisle scrubber to control the Hoboken converter process fugitive
capture system gas stream for the copper converter department would
reduce metal HAP emissions by 4.5 tpy. Note that in the supplemental
proposal, we referred to the process fugitive capture system as a
``secondary'' capture system. However, Freeport commented that the
capture system is better characterized as a tertiary capture system.
Therefore, for the remainder of this preamble, we refer to this capture
system as the Hoboken converter process fugitive capture system.
Furthermore, based on comments received from Freeport in response to
the 2023 supplemental proposal regarding the technical feasibility of
controlling the high-volume Hoboken converter process fugitive capture
system using a baghouse and our evaluation of those comments, we now
estimate the baghouse will achieve 61 percent control efficiency of the
Hoboken converter process fugitive capture system gas stream, and using
the same assumption that this gas stream contributes 75 percent to the
aisle scrubber, we estimate that HAP metals will be reduced under this
option by 3.0 tpy (which represents an overall control efficiency of 46
percent for the aisle scrubber). Therefore, the modeling conducted in
support of the final rule was updated to reflect these new control
efficiencies. The results of the updated modeling for the aisle
scrubber control options, in addition to our consideration of public
comment on this issue, resulted in a change to what we proposed for
ample margin of safety. The details of what we are finalizing for the
ample margin of safety analysis are in section IV.A.3. of this
preamble. The details of what we are promulgating for the aisle
scrubber source are in section IV.B.3.
With the exception of the revised emissions described above, the
risk assessment supporting the final rule was conducted in the same
manner, using the same models and methods, as that conducted for the
supplemental proposal. The documentation for the final rule risk
assessment can be found in the memorandum titled Freeport Baseline and
Control Options Re-model Risk Analysis Memo, which is available in the
docket for this rulemaking.
Inhalation Risk Assessment Results.
Table 3 presents the updated summary of the inhalation risk
assessment results based on the updated modeling supporting the final
rule. The results are very similar to those of the 2023 supplemental
proposal. The only changes are to the number of people at increased
risk of cancer greater than or equal to 1-in-1 million.
BILLING CODE 6560-50-P
[[Page 41661]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.104
3. What key comments did we receive on the risk review, and what are
our responses?
We received comments regarding the risk assessment for the Primary
Copper Smelting source category. The following is a summary of some of
the more significant comments and our responses to those comments.
Other comments received and our responses to those comments can be
found in the document titled National Emission Standards for Hazardous
Air Pollutant Emissions: Primary Copper Smelting Residual Risk and
Technology Review and Primary Copper Smelting Area Source Technology
Review: Summary of Public Comments and Responses, available in the
docket for this action (Docket ID No. EPA-HQ-OAR-2020-0430).
Comment: In response to the EPA's request for comment on our ample
margin of safety analysis in the 2022 proposal, in which we discussed
and sought comment on but decided not to propose additional controls
for the aisle scrubber, specifically a WESP, one commenter stated that
they agreed with our decision. The commenter suggested that the aisle
scrubber should be subject to a concentration-based filterable
particulate matter (fPM) limit of 23 mg/dscm similar to other vents
processing emissions from the vessels managing
[[Page 41662]]
molten material, and that the existing MACT floor emissions from the
aisle scrubber do not significantly contribute to the estimated risks
from metal HAP. Other commenters supported our consideration of
additional controls for the aisle scrubber. In the 2023 supplemental
proposal, we discussed another ample margin of safety analysis in which
we co-proposed two possible control options for the aisle scrubber, a
WESP downstream of the aisle scrubber or a baghouse upstream of the
aisle scrubber. One commenter expressed support for the additional
controls on the aisle scrubber and for the associated reduction to
risk. Several commenters stated the proposed options do not meet the
requirements for ample margin of safety, which according to the
commenters must be cost effective, feasible, and provide meaningful
improvement in risk to public health. One of the commenters explained
that the two metrics for evaluating risk reduction are based on the MIR
cancer risk and the noncancer HQ. Concerning these control options, the
commenters asserted the MIR is unchanged when reducing to significant
digits and that it remains at 20-in-1 million after accounting for the
associated reductions. One commenter noted that these MIR values
consider expected reductions from other risk-based standards in the
2022 proposal and 2023 supplemental proposal (e.g., the process
fugitive roofline vent standard). One of the commenters took issue with
the standard being applied only to the Freeport facility. The commenter
contended that the roofline controls to achieve acceptable risk leave
the MIR for the other major source copper smelter (Asarco)
``untouched'' at 60-in-1 million, asserting that this is ``unfair,
arbitrary and capricious, and unsupported by the record.'' While the
EPA estimated the HQ would drop from 2 to 1 for both options in the
2023 proposed rule, the commenter argued that the acute arsenic HQ
value is based on a poorly documented and outdated study, and that more
recent studies have failed to demonstrate the developmental impact
which is at the foundation of the EPA's HQ assessment. The commenters
added that the EPA has accepted much higher HQ values for arsenic in
other rules (e.g., Integrated Iron and Steel Manufacturing NESHAP 85 FR
42074, 42083; Primary Aluminum Reduction Plants NESHAP 80 FR 62390,
62398). The commenters also noted that emission reductions were
overestimated by the EPA and resulted in overstated reductions to risk.
Response: The finding of unacceptable risks is not based on any one
risk metric (e.g., acute hazard quotients), but rather considering all
health information available and the degree of uncertainty associated
with that information. In the 2015 final rule for Primary Aluminum
(Docket ID No. EPA-HQ-OAR-2011-0797), EPA weighed all health risk
factors and uncertainties in the risk acceptability determination for
the Prebake ovens subcategory. The current acute methodology, while
similar between the two rules, is still considered a screening
assessment. While the chronic cancer risks for both source categories
were comparable, the acute screening methodologies differ and must be
weighted in regard to the accuracy and uncertainty of each piece of
information in a weight-of-evidence approach for each decision. This
relevant body of information is growing fast (and will likely continue
to grow even faster), necessitating a flexible weight-of-evidence
approach that acknowledges both complexity and uncertainty in the
simplest and most transparent way possible. The acute screening risks
posed by arsenic are based upon the most up to date review of the REL
by EPA and considered the best available benchmark for assessing
current risks posed by this pollutant. The application of the acute
benchmarks when paired with our acute methodology to assess
``reasonable worst-case one-hour concentrations (i.e., 99th
percentile)'' for off-site locations where people maybe present
provides a realistic estimate or screen for short-term exposures while
we consider EPA's chronic assessment for this source category to be a
refined site-specific assessment.
Based on comments and information provided during the comment
period, we have updated the estimated control efficiency for both
options co-proposed in the 2023 supplemental proposal, and therefore
the final rule expected emission reductions are less than those
proposed in the 2023 supplemental proposal. We have taken this and all
comments into consideration and determined that it is necessary to
promulgate a PM emission limit for the combined emissions from the
anode refining point source and the Hoboken converter process fugitive
capture system pursuant to CAA section 112(d)(6) but not pursuant to
CAA section 112(f)(2) because after further consideration and
comparison to other source categories, in this specific case, we agree
with the commenter that the risk reductions are minimal and that these
controls are not necessary to ensure the NESHAP provides an ample
margin of safety pursuant to CAA section 112(f). Given the space and
infrastructure issues and challenges and effort needed to construct and
operate such a new control system at Freeport, we conclude that the
facility will likely need up to 3 years to demonstrate compliance with
the new standards, which are described in more detail in section IV.B.
of this preamble. Given the factors described above, we are finalizing
Option 2, with a revised PM emission standard of 4.1 mg/dscm, under the
CAA section 112(d)(6) technology review because we conclude that this
option represents a development in technologies, processes or practices
pursuant to section 112(d)(6). As described in more detail in section
IV.B. of this preamble, the baghouse technology to reduce metal HAP
emissions at the aisle scrubber identified in the 2023 supplemental
proposal is feasible, readily available and already in use at primary
copper smelting facilities (including Freeport) as well as in use at
facilities in other source categories. We are allowing up to 3 years to
comply with this standard because we conclude the facility will need up
to 3 years to plan, design, install and operate new controls to reduce
emissions from the aisle scrubber. The rationale for our decision to
promulgate a standard under CAA 112(d)(6) is described further in
section IV.B. of this preamble.
4. What is the rationale for our final approach and final decisions for
the risk review?
The EPA sets standards under CAA section 112(f)(2) using ``a two-
step standard-setting approach, with an analytical first step to
determine an `acceptable risk' that considers all health information,
including risk estimation uncertainty and includes a presumptive limit
on MIR of approximately 1-in-10 thousand.\5\ If risks are unacceptable,
the EPA must determine the emissions standards necessary to reduce risk
to an acceptable level without considering costs. A second step follows
in which the actual standard is set at a level that provides `an ample
margin of safety' in consideration of all health information, including
the number of persons at risk levels higher than approximately 1-in-1
million, as well as other relevant factors including costs and economic
impacts, technological feasibility, and other
[[Page 41663]]
factors relevant to each particular decision.'' As discussed in more
detail in the 2022 proposal and in the Benzene NESHAP, there is
flexibility regarding factors the EPA may consider in making
determinations and how the EPA may weigh those factors for each source
category. The EPA conducts a risk assessment that provides estimates of
the MIR posed by emissions of HAP that are carcinogens from each source
in the source category, the HI for chronic exposures to HAP with the
potential to cause noncancer health effects, the HQ for acute exposures
to HAP with the potential to cause noncancer health effects,\6\ and to
assess risks for lead, the EPA compares ambient air concentrations with
the lead NAAQS, which is 0.15 ug/m3 based on 3-month rolling averages.
The assessment also provides estimates of the distribution of cancer
risk within the exposed populations, cancer incidence, and an
evaluation of the potential for an adverse environmental effect. (54 FR
38045, September 14, 1989) As discussed in the 2022 proposed rule, the
scope of the EPA's risk analysis is consistent with the explanation in
EPA's response to comments on our policy under the Benzene NESHAP (54
FR 38057) summarized hereafter: In summary, the EPA's policy permits
consideration of multiple measures of health risk including, but not
limited to, the MIR, the presence of non-cancer health effects, and the
uncertainties of the risk estimates such that these factors can then be
weighed in each individual case. The EPA's policy, as discussed in the
Benzene NESHAP response to comments, also complies with the
Congressional intent behind the CAA.
---------------------------------------------------------------------------
\5\ 1-in-10 thousand is equivalent to 100-in-1 million. The EPA
currently describes cancer risks as `n-in-1 million.'
\6\ The MIR is defined as the cancer risk associated with a
lifetime of exposure at the highest concentration of HAP where
people are likely to live. The HQ is the ratio of the potential HAP
exposure concentration to the noncancer dose-response value; the HI
is the sum of HQs for HAP that affect the same target organ or organ
system.
---------------------------------------------------------------------------
Thus, the level of the MIR is only one factor to be weighed in
determining acceptability of risk. The Benzene NESHAP explained that
``an MIR of approximately one in 10 thousand should ordinarily be the
upper end of the range of acceptability. As risks increase above this
benchmark, they become presumptively less acceptable under CAA section
112, and would be weighed with the other health risk measures and
information in making an overall judgment on acceptability. Or, the
Agency may find, in a particular case, that a risk that includes an MIR
less than the presumptively acceptable level is unacceptable in the
light of other health risk factors.'' Id. at 38045. In other words,
risks that include an MIR above 100-in-1 million may be determined to
be acceptable, and risks with an MIR below that level may be determined
to be unacceptable, depending on all of the available health
information.
a. Acceptability Determination
In this final rule, as in the 2023 supplemental proposal and in the
2022 proposal, the EPA concludes that the baseline risks are
unacceptable. This determination, as described in the 2022 proposal and
the 2023 supplemental proposal, is largely based on the estimated
exceedance of the lead NAAQS, along with the maximum acute HQ of 7 for
arsenic, which indicate there are significant risks of acute noncancer
health effects--especially for children, infants, and developing
fetuses, all of whom are particularly vulnerable to chemical exposures
as they undergo key developmental processes. Also contributing to this
determination, although to a lesser extent, are the inhalation cancer
MIRs due to arsenic, with an estimated MIR of 70-in-1 million for
actual emissions and 90-in-1 million for allowable emissions, which are
approaching the presumptive level of unacceptability of 100-in-1
million.
b. What is EPA requiring in the final rule to address the unacceptable
risk?
To address the unacceptable risk, the Agency is promulgating a
combined PM emission limit (as a surrogate for HAP metals other than
mercury) for process fugitive emissions from roofline vents of a
combination of smelting vessels, copper converter departments, slag
cleaning vessels and anode refining departments at new and existing
sources as proposed in the 2023 supplemental proposal. We are also
finalizing the PM emission standard pursuant to CAA section 112(d)(2)
and (d)(3) as discussed further in section IV.C. of this preamble. We
are also finalizing, as proposed, that compliance would be demonstrated
through an initial performance test followed by a compliance test once
per year.
c. Remaining Risks After Implementation of the Requirements To Address
Unacceptable Risk
To determine the remaining risks after implementation of the new
combined PM emission limit to control process fugitive emissions from
the roofline vents, we conducted a post-control risk assessment. As
described in section IV.A.2., the baseline emissions for the aisle
scrubber source at Freeport were corrected and the baseline modeling
was conducted again for the final rule along with the roofline vents
control option. The revised baseline modeling results, as discussed in
section IV.A.2., did not result in any change to the acceptability
determination or to the main risk driver under section 112(f) of the
CAA. More details on the modeling for the final rule are in the
memorandum Freeport Baseline and Control Options Re-model Risk Analysis
Memo, found in the docket for this action. More details on the modeling
analysis for the 2023 supplemental proposal are described in the
document Revised Residual Risk Assessment for the Freeport Smelter
(Miami, AZ) in Support of the 2023 Supplemental Proposal for the
Primary Copper Smelting Source Category, available in the docket for
this action (Docket ID No. EPA-HQ-OAR-2020-0430-0187).
The post-control modeled risks were updated as described in the
memorandum Freeport Baseline and Control Options Re-model Risk Analysis
Memo, available in the docket for this rule (Docket ID No. EPA-HQ-OAR-
2020-0430). The risk assessment after implementing the PM limit for
process fugitive emission from roof vents as discussed in this section
of this preamble indicates that the modeled lead concentrations would
be reduced to 0.06 [micro]g/m3, which is below the NAAQS of 0.15
[micro]g/m3. The MIR at Freeport is reduced from 70-in-1 million to 20-
in-1 million and the population with cancer risks greater than or equal
to 1-in-1 million is reduced from 21,875 to 16,035. We estimate that at
Freeport the maximum chronic noncancer inhalation TOSHI will be reduced
from 1 to less than 1 (0.3), and the acute HQ will be reduced from a
value of 7 to 2. We estimate that the source category MIR after
implementation of the PM limit for process fugitive emissions from
roofline vents will be 60-in-1 million, which is the maximum baseline
cancer risk near the Asarco facility. We expect that Asarco can comply
with the PM standard for process fugitive emissions from roofline vents
without additional controls, and therefore it will not achieve emission
reductions at Asarco as a result of this PM limit. However, as
described in sections III.B. and III.C., and IV.B. and IV.C. of this
preamble, we are finalizing a lead limit under CAA sections 112(d)(2)
and (3) and design standards under our CAA section 112(d)(6) technology
review, respectively, that will achieve reductions of HAP metal
emissions at Asarco. We note that the facility already has plans to
implement improvements (consistent with the design standards in
[[Page 41664]]
this final rule) that will reduce their process fugitive emissions of
metal HAP as well as SO2 emissions. In fact, these
improvements have been adopted into their most recent state operating
permit (finalized in October 2023). As mentioned elsewhere in this
preamble, Asarco is currently not operating. However, we expect that
these improvement projects will likely reduce the MIR when Asarco
returns to operating status.
Based on the post-control risk assessment, we conclude that, after
the requirements described in this preamble to address unacceptable
risk are implemented, the risks to public health will be reduced to an
acceptable level.
d. Ample Margin of Safety Analysis
Under the ample margin of safety analysis, we again considered all
of the health factors evaluated in the acceptability determination and
evaluated the cost and feasibility of available control technologies
and other measures (including the controls, measures, and costs
reviewed under the technology review) that could be applied to further
reduce the risks due to emission of HAP identified in our risk
assessment.
While the additional controls for the combined gas stream from the
anode refining department and the Hoboken converter process fugitive
capture system identified under the technology review will provide some
additional risk reduction, in this case the additional risk reduction
is minimal (for example, no change in the cancer MIR of 20-in-1
million), and therefore we are not finalizing this emission standard to
provide an ample margin of safety. We conclude that the standards we
are finalizing to achieve acceptable risk will also provide an ample
margin of safety to protect public health and that, as proposed, a more
stringent standard is not necessary to prevent an adverse environmental
effect in accordance with CAA section 112(f)(2).
B. Technology Review for the Primary Copper Smelting Source Category
1. What did we propose pursuant to CAA section 112(d)(6) for the
Primary Copper Smelting source category?
In the 2022 proposal, as part of our ample margin of safety
analysis and technology review, we considered additional controls for
the Freeport aisle scrubber which was the second highest contributor to
the baseline risks, estimated to represent 23 percent of the MIR. We
estimated emission reductions and costs for controlling the combined
emissions stream of the anode refining department and Hoboken converter
process fugitive capture system (i.e., the aisle scrubber) with a WESP.
We also estimated the impacts on risk reductions of these additional
controls. The Agency sought comment on this control option but did not
propose it in the 2022 proposal. We received comments on the control
option for the aisle scrubber as well as additional information from
the Freeport facility in response to the EPA's 2022 section 114
information request.
Subsequently, in the 2023 supplemental proposal, based on the
comments on the 2022 proposal and the new information from the section
114 information request, the EPA co-proposed regulatory options for
additional control of either the Hoboken converter process fugitive
capture system or additional control of the combined emissions stream
of the Hoboken converter process fugitive capture system and the anode
refining department (i.e., aisle scrubber). These standards were
proposed as technology developments pursuant to CAA section 112(d)(6)
and to provide an ample margin of safety to protect public health
pursuant to CAA section 112(f)(2). As described in the 2023
supplemental proposal, the first option (hereafter referred to as
Option 1) was the addition of a WESP downstream of the aisle scrubber
providing additional control of the combined emissions stream from the
Hoboken converter process fugitive capture system and the anode
refining department point source (i.e., the same option evaluated by
the EPA in our ample margin of safety analysis included in the 2022
proposal). The second option (hereafter referred to as Option 2) was
the addition of a baghouse upstream of the aisle scrubber providing
additional control of the Hoboken converter process fugitive capture
system. As noted in the 2023 supplemental proposal, using performance
test data from Freeport we estimated the baseline emissions for the
aisle scrubber to be 6.63 tpy metal HAP. We also used these test data
as the basis to establish an emissions limit along with an estimate of
the expected reductions that would be achieved with the additional
controls (i.e., a new baghouse up-stream of current Aisle scrubber or a
WESP after the Aisle scrubber). To do this, we first used the data to
develop the 99 percent upper prediction limit (UPL). The 99 percent UPL
for the combined emissions stream from the anode refining department
and the Hoboken converter process fugitive capture system is 7.48 mg/
dscm. This UPL served as the baseline for the development of the
potential emission standards for each option. Secondly, the UPL value
was adjusted (decreased) based on the expected percent reduction that
would be achieved by each option. Finally, we estimated costs and risk
reductions for each control option. A summary of the options as
presented in the 2023 supplemental proposal is included here for
reference. Because we proposed these standards under both the
technology review authority of CAA section 112(d)(6) and the risk
review authority of CAA section 112(f)(2), we estimated risk reductions
associated with each of the options consistent with a CAA section
112(f)(2) ample margin of safety analysis and our summary that follows
includes those results even though the risk results would not typically
be part of the analysis to support a CAA section 112(d)(6) technology
review. The summary of the risk reductions presented are the
incremental changes attributed to the control option after considering
the effects of the implementation of the other risk-based standards in
this rulemaking (i.e., the process fugitive roofline vent standards).
For Option 1, we estimated that the control technology could
achieve 95 percent emissions reduction which was estimated to be 6.3
tpy metal HAP. The emission limit for this option was 0.374 mg/dscm.
The estimated costs were $98.5 million capital costs, $25.2 million
total annualized costs, and a cost effectiveness of $4.0 million/ton
metal HAP. Risks would be reduced below 1-in-1 million for an
additional 1,900 people (the number of people with risk greater than 1-
in-1 million would be reduced from 17,400 to 15,500). The maximum acute
HQ due to arsenic emissions would be reduced from 2 to 1. The MIR at
Freeport (20-in-1 million) and for the source category (60-in-1
million) would be unchanged by this control option.
For Option 2, we estimated that the control technology could
achieve 90 percent reduction of the Hoboken converter process fugitive
capture system emissions (or 68 percent reduction of the aisle scrubber
emissions overall) which was estimated to be 4.5 tpy metal HAP. The
emission limit for this option was 2.43 mg/dscm. The estimated costs
were $37 million capital costs, $6.2 million total annualized costs,
and a cost effectiveness of $1.38 million/ton metal HAP. Risks would be
reduced below 1-in-1 million for an additional 700 people (the number
of people with risk greater than 1-in-1 million would be reduced from
17,400 to 16,700). The maximum acute HQ due to arsenic
[[Page 41665]]
emissions would be reduced from 2 to 1. The MIR at Freeport (20-in-1
million) and for the source category (60-in-1 million) would be
unchanged by this control option.
The Agency also proposed, in the 2022 proposal, additional work
practices to reduce fugitive dust emissions and development of a
fugitive dust control plan that must be reviewed, updated (if
necessary), and approved by the Administrator or delegated permitting
authority. We proposed these requirements in order to provide an ample
margin of safety under CAA section 112(f)(2) and as a development in
practices pursuant to CAA section 112(d)(6).
With regard to the emission sources at the area source primary
copper smelting facility, including sources of fugitive dust emissions,
the Agency did not identify any developments in practices, processes,
or control technologies. For more details, refer to the document
Technology Review for the Primary Copper Smelting Source Category,
which is available in Docket ID No. EPA-HQ-OAR-2020-0430.
2. How did the technology review change for the Primary Copper Smelting
major source category?
Based on comments received during the comment period for the 2023
supplemental proposal, as discussed in more detail in section IV.B.3.
of this preamble, we revised our expected emission reductions and
control costs for the aisle scrubber control options. A detailed
description of the emission reduction estimates and cost estimates
associated with these options is provided in the memorandum Cost
Estimates for Additional Controls of Freeport's Aisle Scrubber--
REVISED, which is available in the docket for this rulemaking.
Specifically, for Option 1, we now estimate the control efficiency
as 73 percent and estimate emissions reductions of 4.9 tpy metal HAP.
We did not amend our cost estimates for this option from those
presented in the 2023 supplemental proposal. So, combining our revision
to the estimated emission reductions with the costs presented in the
2023 supplemental proposal yields a revised cost effectiveness value of
$5.2 million/ton HAP metal. We received additional information from
Freeport regarding the costs for site preparation well after the close
of the public comment period in a letter dated January 29, 2024, which
is available in the docket. In this letter, Freeport estimated costs to
demolish and relocate part of the aisle scrubber motor control center
(MCC) room, a parking and storage area, and part of the converter
maintenance building in order to install a WESP. They estimated these
site preparation costs to be $9.2M in capital. As noted above, we
received this information about four months after the close of the
comment period. Furthermore, the letter did not provide sufficient
details to determine the validity of the estimate. Therefore we have
not included it in our cost estimates. However, we note that if we did
include these costs, the total capital costs would be $108M, the
annualized costs would be $26M, and the cost effectiveness would be
slightly higher at $5.4M/ton of HAP metal reduced.
For Option 2, we now estimate the baghouse will achieve 61 percent
control efficiency of the Hoboken converter process fugitive capture
system gas stream and estimate emissions reductions of 3.0 tpy metal
HAP (which represents an overall control efficiency of 46 percent for
the aisle scrubber). We also revised our cost estimates for Option 2.
The revised cost estimates provide a total capital investment of $59.5
million, total annualized costs of $10.8 million and a cost
effectiveness of $3.6 million/ton HAP metal. As noted above under
Option 1, we received additional information from Freeport, well after
the close of the comment period, regarding costs for site preparation
in the area where a baghouse would be installed. They estimated it
would cost $5.2M to demolish and relocate the anode baghouse MCC room,
storage bunkers, and demolition and rerouting of the aisle scrubber
piping that is currently located in the area where they estimate the
baghouse would be installed. As stated under Option 1, we have not
included this cost in our estimates because we received this
information well after the close of the comment period and we have
insufficient details to evaluate its validity. However, we note that if
we did include their estimate for site preparation, the total capital
investment would increase to $64.8M, with total annualized costs of
$11.5M and a slightly higher cost effectiveness of $3.8M/ton HAP metal
reduced.
In addition, we received new information regarding the Asarco
facility since publication of the 2023 supplemental proposal. Asarco is
located in the Hayden area of Gila and Pinal Counties in Arizona and is
the primary source of lead emissions in this area. As discussed in the
2022 proposed rule, the Hayden area is currently designated as
nonattainment for the 2010, 1-hour primary SO2 NAAQS and
2008 lead NAAQS. There have been various regulatory actions to reduce
emissions in this area and at the Asarco facility including, but not
limited to, a consent decree between EPA and Asarco to bring the
facility into compliance with the NESHAP by December 2018 and revisions
to the state implementation plan (SIP) to help achieve attainment of
the lead NAAQS by October 2019. However, effective March 2, 2022, the
EPA determined that the Hayden lead nonattainment area failed to attain
the 2008 lead primary and secondary lead NAAQS and the 2010 1-hour
primary SO2 NAAQS (87 FR 4805, January 31, 2022) by the
applicable date of October 3, 2019. As a result, the State of Arizona
is required to submit revisions of the SIP to EPA. As part of this
process, EPA Region 9 staff informed the EPA Office of Air Quality
Planning and Standards staff in October 2023 of several projects that
Asarco has planned as part of the most recent SIP revisions and that
ADEQ has adopted into Appendix A of Asarco's operating permit (October
3, 2023), which is available in the docket for this action. The
projects include engineering controls and work practices which Asarco
estimates will reduce fugitive metal HAP emissions at the facility. The
projects that are in Asarco's operating permit include the following:
Flash Furnace Control System: This project involves
installing and ventilating a partial enclosure around the Inco flash
furnace uptake shaft to improve the capture of process fugitives.
Fuming Ladle Capture System: This project involves the
construction of a hood and retaining walls to improve capture of
process fugitives from fuming ladles.
Anode Furnace Secondary Hood Capture and Control System:
This project involves the construction of secondary hoods to improve
capture and then ducts the emissions to a planned new anode secondary
hood baghouse.
These projects will help ensure that process fugitive metal HAP
roofline emissions would be reduced and will ensure that the roofline
emissions at Asarco can meet a lead limit of 0.326 lb/hour, which is
based on modeling demonstration submitted by the facility to the state
in support of a revision to the lead SIP. We expect no additional costs
to comply with the lead limit other than compliance testing costs. The
lead limit is further discussed in section IV.C.2.
[[Page 41666]]
3. What key comments did we receive on the technology review, and what
are our responses?
Comment: Commenters objected to the EPA's change in position in the
supplemental proposal about using a WESP to control aisle scrubber
emissions. The commenters stated that the EPA rejected the technology
in the 2022 proposal yet co-proposed it as an option in the 2023
supplemental proposal. Commenters stated that in the 2022 proposal, the
EPA concluded with regards to using a WESP to control aisle scrubber
emissions that ``[g]iven the relatively high estimated capital costs,
uncertainties, and moderate risk reductions . . . the Agency is not
proposing these additional controls'' under the ample margin of safety
analysis. Yet in the supplemental proposal the EPA stated the ``cost
impacts'' of $4.0 million/ton metal HAP for a WESP are ``reasonable.''
The commenters point out the new cost effectiveness in the supplemental
is more than 2 times the cost effectiveness that the EPA considered
excessive for a WESP in the 2022 proposal, and that it far exceeds the
precedent set in the recent Coke Oven proposed NESHAP revisions, where
the agency found that $1.3 million/ton is the reasonable upper
threshold of cost effectiveness for nonmercury metal HAP.
In addition to objecting to the EPA's change of position on using a
WESP, another commenter stated that the EPA overestimated the
achievable removal efficiency for a WESP in the dilute, high volume gas
stream at the aisle scrubber. The commenter asserted that the actual
removal efficiency would be 60 percent, rather than the 95 percent
estimated by the EPA. The commenter performed their own estimate of
emission reductions and cost and estimated a cost effectiveness of $6.3
million/ton HAP metal. Other commenters expressed support for using a
WESP to control aisle scrubber emissions as it would reduce metal
emissions from the converter department and the anode refining
department. The commenter stated that while the EPA does not express a
preference for either the WESP or baghouse option, the WESP-based limit
is consistent with the Clean Air Act, while the baghouse-based limit is
not. Clean Air Act section 112(d)(2) expressly provides that the EPA's
air toxics standards must require the ``maximum'' reduction that is
``achievable'' considering cost and other statutory factors. As such,
both proposed limits are achievable considering cost and other
statutory factors, however, the ``maximum'' degree of reduction that is
achievable is the one provided by the WESP-based limit. The commenter
also noted the WESP-based limit would yield substantially greater
reductions in metal HAP emissions (6.3 tpy as opposed to 4.5 tpy from
the baghouse-based limit) and would reduce cancer risk below 1-in-1
million for 1,900 people, whereas the baghouse-based limit would reduce
cancer risk below 1-in-1 million for only 700 people. Another commenter
added that emissions from smelters are virtually certain to increase in
the future as the demand for copper increases, which means that the
difference in reductions in using a WESP versus a baghouse will also
increase. The commenter stated that the cost effectiveness ``of the
WESP option will increase relative to the baghouse option, therefore,
the EPA should issue a strong limit based on the reductions that are
achievable with a WESP.'' Several commenters stated that the San Carlos
Apache Tribe is directly impacted by both major source smelters, and
emissions of lead and arsenic are of particular concern due to their
persistent and bioaccumulative nature. The same commenters stated their
support for the WESP option to achieve maximum emission reductions.
These commenters also claimed that EPA underestimated the emissions of
lead and other pollutants from the copper smelters based on a
comparison to Toxics Release Inventory (TRI) data. One commenter
provided TRI estimates for lead from the Freeport smelter, stating ``In
2020, for example, the Freeport smelter alone reported emitting more
than 14 tons of lead. In 2019, it reported emitting 21 tons of lead
and, in 2018, it reported emitting more than 29 tons of lead . . .''.
Response: In the 2022 proposal, we stated that we were not
proposing the WESP control option at that time, however we solicited
comments regarding our analysis and whether we should establish more
stringent standards to reduce HAP metal emissions from the aisle
scrubber. We also subsequently requested in a 2022 section 114
information request that the Freeport facility perform feasibility
analyses for additional control of the aisle scrubber. In response to
the 2022 proposal, we received comment that we should establish more
stringent standards to reduce HAP metal from the aisle scrubber.
Therefore, we used the new information collected during the comment
period and from Freeport's response to the CAA section 114 information
request to develop the WESP and baghouse options presented in the 2023
supplemental proposal.
Based on comments we received on the 2023 supplemental proposal, we
also revised our emission reductions estimates for the WESP. As
described in the 2023 supplemental proposal, the expected control
efficiency for the WESP was 95 percent, however, we acknowledge that a
number of factors can affect control efficiency, including the
particulate concentration of the inlet stream to the control device.
The aisle scrubber handles a high volume of gas (flowrate of
approximately 1 million actual cubic feet per minute) and low
particulate loading relative to the flowrate. We agree with commenters
that the low concentration of particulate in the exhaust stream of the
aisle scrubber, which would be the inlet to the WESP, may present
technical feasibility issues in achieving a 95 percent reduction.
Therefore, we updated our estimates of emission reductions. As detailed
in the technical memorandum Cost Estimates for Additional Controls of
Freeport's Aisle Scrubber--REVISED, which is available in the docket
for this rulemaking, we back-calculated the control efficiency of the
WESP by assuming the aisle scrubber exhaust particulate would be
reduced to 1 milligram per cubic meter (mg/m3) by the WESP,
which is an assumed minimum outlet concentration for this control
technology. Based on this back-calculation, the resulting control
efficiency of the WESP is 73 percent. Applying this revised control
efficiency to the baseline emissions for the aisle scrubber (6.63 tpy
metal HAP) yields an estimated reduction of 4.9 tpy metal HAP. We did
not receive information during the 2023 supplemental proposal comment
period on our total annualized costs for the WESP option. Therefore,
when we combine the revised emission reductions (4.9 tpy metal HAP)
with the total annualized costs ($25.2 million) presented in the 2023
supplemental proposal for the WESP option, the cost effectiveness is
$5.2 million/ton HAP metal.
As described in this final rule preamble, we have concluded that,
after taking public comment into consideration and making the
appropriate revisions to our estimates, the costs for Option 1 are not
reasonable. For this reason and others discussed in this preamble, we
are not promulgating the WESP option.
In regard to comments on Tribal impacts and their concerns about
lead and arsenic, the EPA recognizes the concerns of Tribal commenters
and their representatives and we have taken their
[[Page 41667]]
comments into consideration in this action. With regard to impacts,
although the EPA determined that risks due to HAP emissions are
unacceptable at baseline for populations living close to the Freeport
facility, the EPA's risk assessment completed for this source category
indicates that health risks due to HAP emissions from primary copper
smelting sources on Tribal lands, which are further away (about 10
miles from the facility) are well within acceptability at baseline.
After the amendments in this final rule are implemented, the NESHAP
will provide an ample margin of safety for all populations, including
the San Carlos Apache Tribe. More information regarding the estimated
health risks due to lead and arsenic emissions to humans at baseline
(due to current emissions) and post-control (due to emissions after the
amendments in this action are implemented) are described in sections
III.A. and IV.A. of this preamble, and the estimated impacts to various
demographic groups are described in section V.F. of this preamble. More
details of the risk assessment are available in the document titled
Residual Risk Assessment for the Primary Copper Smelting Major Source
Category in Support of the 2021 Risk and Technology Review Proposed
Rule, which is available in the docket.
Regarding the comments supporting the addition of WESP to control
HAP metal emissions, for the reasons described elsewhere in this
preamble, we are not promulgating the WESP option and are promulgating
the baghouse option for the aisle scrubber. We estimate that the
amendments in the final rule will reduce total metal HAP emissions
(primarily lead and arsenic) by 8 tpy for the major source category.
Regarding the TRI emissions estimates provided by the commenter
compared to our estimates, we estimate that the two major source
facilities currently emit a total of 16.7 tpy of metal HAP (the
majority of these emissions are from Freeport). We estimated these
emissions primarily using test data provided by the facility for the
sources subject to the Primary Copper Smelting major source NESHAP. The
TRI is a ``whole facility'' inventory, which means that it includes
estimates of stack and fugitive air emissions for all HAPs that are
emitted at the facility which also include emissions from non-source
category processes. Our emission estimates include those applicable to
the primary copper smelting source category only. However, as noted in
previous paragraph, this final rule will achieve an estimated reduction
of 8 tpy of HAP metals, therefore after these amendments to the NESHAP
are implemented, total estimated emissions will be about 8.7 tpy for
the major source category.
Comment: Commenters stated that the EPA erroneously describes their
facility's converters as having ``primary and secondary capture systems
and controls, but no tertiary controls.'' According to the commenter,
Hoboken converters use a side-flue intake capture system, and the
roofline canopy system (installed in 2017 as part of facility-wide
improvements to ensure the Miami area's compliance with revised
standards for SO2) is properly described as a tertiary
capture system. Therefore, the commenter noted that the proposed
standards would not appropriately apply to the converters at their
facility as they do not have ``secondary capture systems.''
Response: We have corrected the characterization of the capture and
control systems for converters at the Freeport facility in the preamble
and regulatory text associated with the final rule.
Comment: Several commenters asserted that the aisle scrubber
standards are not justified pursuant to section 112(d)(6). The
commenters argued that the EPA has not identified any ``developments in
practice, processes or control technologies'' since the original
publication of the Primary Copper Smelting NESHAP that would justify
additional controls on the aisle scrubber. Commenters noted that the
EPA cites section 112(d)(6) to claim that ``developments'' warrant the
imposition of new controls, but the EPA fails to recognize that section
112(d)(6) only authorizes revisions that are ``necessary.'' The
commenter asserted the word ``necessary'' cannot be ignored, and that
it clearly requires some showing of necessity beyond the identification
of ``developments'' because the mere existence of a development does
not make it ``necessary.'' According to commenters, the fact that the
term ``developments'' is found only in a parenthetical confirms it is
merely one component of the analysis that ultimately must conclude a
revision to a standard is ``necessary,'' a showing that the EPA has not
made here.
Response: We disagree that, in this case, additional controls to
reduce emissions at the aisle scrubber are not necessary. The aisle
scrubber stack was identified in the 2022 proposal as one of the
largest sources of metal HAP emissions at Freeport. We currently
estimate it emits 6.63 tpy of HAP metals (primarily lead and arsenic).
The aisle scrubber is a control device that is mainly used to control
SO2 emissions. This device controls emissions from the anode
refining point source and emissions from the Hoboken converter process
fugitive capture system. The anode refining point source gas stream
passes through a PM control device (i.e., a baghouse) before entering
the aisle scrubber for SO2 control, but the converter
process fugitive capture system is ducted directly to the aisle
scrubber without PM control prior to the aisle scrubber. We identified
and proposed in the 2023 supplemental proposal 2 options to reduce
metal HAP emissions from the aisle scrubber stack at Freeport. Our
analysis shows that the technologies to reduce metal HAP emissions at
the aisle scrubber identified in the 2023 supplemental proposal are
readily available and already in use at primary copper smelting
facilities (including Freeport) as well as in use at facilities in
other source categories. This is especially true for baghouses.
Regarding the WESP, although this technology has been applied at some
emissions points at these facilities and other metals sectors (e.g.,
Secondary Lead Smelters), we are not aware of the WESP being
successfully applied to emissions sources similar to the aisle
scrubber. Specifically, the aisle scrubber has a very high flow rate
and low concentration of PM compared to other point source emissions
sources where the WESP has been applied.
Another factor we considered in our decision is that the Asarco
facility has a secondary hood capture system to collect secondary
emissions from their Peirce-Smith converters and that secondary hood
capture system is vented to a baghouse for PM control (which also
controls metal HAP emissions). We find these PM controls are especially
important for lead and arsenic because these two pollutants are
persistent, bioaccumulative and highly toxic HAPs.
Given all of this information, we conclude that additional PM
controls are necessary to further reduce metal HAP at the aisle
scrubber source, and that the baghouse technology that we proposed in
the 2023 supplemental proposal (i.e., Option 2 in the supplemental
proposed rule) represents a development that will further reduce metal
HAP emissions at Freeport. The baghouse is a common, well demonstrated
technology used to control PM emissions from various industrial
emissions sources.
Comment: One commenter was supportive of the baghouse option
despite expressing a preference for the WESP option.
[[Page 41668]]
Other commenters were opposed to the baghouse option. These
commenters noted that the cost effectiveness of this option exceeds the
threshold for cost effectiveness for nonmercury metal HAP despite being
underestimated. Commenters stated that the EPA overstated emission
reductions and underestimated costs by about a factor of 2.
Commenters asserted that the EPA overstated the emission reductions
from this option. One commenter explained that due to the high volume
of the exhaust stream and the low particulate concentration in the
exhaust stream (estimated to be on the order of 0.001 gr/ft\3\),
control efficiency is expected to be closer to 50 percent, rather than
the 90 percent used by the EPA. The commenter explained this is because
they are not aware of any vendor guarantee of a minimum exhaust
concentration of 0.0001 gr/ft\3\ which would be required to achieve 90
percent control.
Commenters provided their own estimate of the baghouse costs of
$70-88 million and noted that the discrepancy between their estimate
and the EPA's estimate in the supplemental proposal (which differed by
about a factor of 2) can be attributed to: under sizing and, thus,
underestimating costs for ductwork; using a shaker instead of more
modern pulse jet style baghouse; using too small of a scaling factor to
size the baghouse; underestimating the cost of the lime injection
system; omitting indirect costs (e.g., freight, spare parts,
engineering procurement and construction management services, equipment
rental); and omitting contingency which the commenter included at a
value of 25 percent. Using their own emission reduction estimates of
2.5 tpy HAP metal and total annualized cost estimates ranging from
$12.7M to $14.5M (with 25 percent contingency included), commenters
estimated the cost effectiveness value for this option as being between
$4.8 to $5.8 million/ton HAP.
Response: As described in the previous comment response, we
conclude that additional PM controls are necessary to further reduce
metal HAP at the aisle scrubber source, and that the baghouse
technology represents a development that will further reduce metal HAP
emissions at Freeport. To inform our decision under the technology
review, we evaluated the types of technology used in the industry and
other source categories. We found that baghouse technology is readily
available, feasible, well demonstrated and is being used to control a
similar source at the other major source primary copper smelter in this
source category. However, we have revised our emission reductions
estimates and our cost estimates for this option after considering the
comments.
As described in the 2023 supplemental proposal, for a baghouse we
generally expect achievable control efficiencies to be at least 90
percent. We acknowledge that a number of factors can affect the control
efficiency, including the particulate concentration of the inlet stream
to the control device. Based on the engineering evaluation provided by
Freeport in their 2022 section 114 information collection request
response, the Hoboken converter process fugitive capture system has a
high flowrate and low particulate loading relative to the flowrate. We
agree with commenters that the expected concentration of particulate in
the inlet stream may present technical feasibility issues achieving a
90 percent reduction. Therefore, we updated our estimates of emission
reductions.
First, we note that through CAA section 114 information requests
for other EPA rules (e.g., electric arc furnaces (EAF), foundries), we
have collected data demonstrating that baghouses achieve average
particulate outlet concentrations below 0.001 grains per dry standard
cubic feet (gr/dscf). We found that baghouses with similar flowrates to
those expected for the Hoboken process fugitive capture system in the
EAF source category achieve, on average, outlet concentrations of
filterable particulate of 0.0006 gr/dscf with a range of 0.0001 to
0.0017 gr/dscf. For foundries, there were 2 facilities that were used
to set the new source standard which had average PM emissions of 0.0002
gr/dscf and a high value of 0.0004 gr/dscf. The other had an average of
0.0008 gr/dscf and a high value of 0.00086 gr/dscf. Considering this
information and the information provided in Freeport's engineering
evaluation for the Hoboken converter process fugitive capture system,
we back-calculated the control efficiency of the baghouse assuming that
the Hoboken converter process fugitive capture system particulate would
be reduced to 0.0005 gr/dscf which is an assumed achievable outlet
concentration for this control option when estimating the control
efficiency. The expected baghouse flowrate was taken from the Freeport
engineering analysis, and the particulate loading was assumed to be 75
percent of the aisle scrubber outlet. The resulting control efficiency
is 61 percent. Applying this revised control efficiency to the baseline
emissions for the Hoboken converter process fugitive capture system
(assumed to be 75 percent of the aisle scrubber or 4.97 tpy metal HAP)
yields an estimated reduction of 3.0 tpy metal HAP. The expected
reduction is 46 percent of the aisle scrubber emissions overall, after
the Hoboken converter process fugitive capture system baghouse stream
combines with the controlled anode refining department stream in the
aisle scrubber.
Next, concerning costs, we have updated our cost estimates after
considering the comments. We revised the estimated costs for total
capital investment to include those costs provided by the commenter for
equipment supply. We utilized the EPA cost control manual to estimate
all indirect costs including contingency in accordance with section 6,
Chapter 1--Baghouses and Filters. The revised cost estimates provide a
total capital investment of $59.5 million and total annualized costs of
$10.8 million. Using our emission reduction estimate and the total
annualized cost estimate, the cost effectiveness is $3.6 million/ton
metal HAP reduced.
While this cost effectiveness is higher than we have accepted in
the past for reducing metal HAP in some standards, there are other
relevant factors that EPA can consider, and has considered. The highest
cost effectiveness accepted in the past was $1.5M/ton of metal HAP in
2009 dollars (which is about $2M/ton of metal HAP in 2022 dollars) in
the Secondary Lead Smelting NESHAP (77 FR 556, January 5, 2012).
However, it is important to note that EPA considers other factors
besides cost-effectiveness when considering requirements under the
technology reviews, such as feasibility of controls, how well certain
controls have been demonstrated, and overall economic impacts. In this
case, as described previously in this section, we determined that
baghouse technology is readily available, feasible, well demonstrated
and is being used to control a similar source at the other major source
primary copper smelter in this source category. Furthermore, in this
specific case, we have collectively considered the significant emission
reductions of persistent, bioaccumulative, and toxic (PBT) HAPs
(primarily lead and arsenic, which are both PBT HAPs), non-air
environmental impacts, feasibility concerns, and the costs of each of
the options. We note that lead and arsenic are known developmental
toxicants that can cause particular harm to infants, children, and the
developing fetus. Furthermore, arsenic is classified as a human
carcinogen by the EPA and the World Health Organization. In addition,
we do
[[Page 41669]]
not expect that the overall economic impacts of this rule will lead to
significant changes in domestic copper production; the market price for
commercial grade copper or any products comprised of copper inputs; or
employment, as described in section V.D. of this preamble. This
rationale and these considerations are discussed in more detail in
section IV.B.4. of this preamble.
The details of our emission reduction estimates and cost estimates
have been provided in the technical memorandum Cost Estimates for
Additional Controls of Freeport's Aisle Scrubber--REVISED, which is
available in the docket for this rulemaking.
4. What is the rationale for our final approach for the technology
review?
As noted in section IV.A. of this preamble, we updated our risk
modeling based on the revisions to the expected emission reductions for
each of the options proposed in the 2023 supplemental proposal. We
conclude that, in this case, the risk reductions achieved are not
sufficient to promulgate this standard (i.e., the PM limit for the
Aisle scrubber described previously in this section) pursuant to CAA
section 112(f); however, we continue to maintain that baghouses are
proven technologies for achieving high degrees of particulate control.
We also find that additional controls on similar exhaust streams are
used in the source category. As discussed in section IV.B.3. of this
preamble, the aisle scrubber stack is one of the largest sources of
metal HAP emissions at Freeport. We estimate it emits 6.63 tpy of HAP
metals (primarily lead and arsenic). The aisle scrubber is a control
device that is mainly used to control SO2 emissions from the
anode refining point source and from the Hoboken converter process
fugitive capture system. While the anode refining point source gases
are vented to a PM control device before entering the aisle scrubber,
the gas stream from the Hoboken converter process fugitive capture
system vents directly to the aisle scrubber without prior PM control.
We conclude that further reduction of metal HAP emissions from the
aisle scrubber are necessary and that there are developments in
practices, processes, or control technologies that will achieve further
reductions of metal HAP emissions at Freeport. The PM controls on this
source are especially important for reducing lead and arsenic because
these two pollutants are PBT HAPs.
To inform our decision under the technology review, we evaluated
the types of technology used in the industry and in other source
categories to control PM emissions. As discussed in this preamble, we
proposed two options in the 2023 supplemental proposal: Option 1
evaluated a tighter PM limit based on the application of a WESP
downstream of the aisle scrubber and Option 2 evaluated a tighter PM
limit based on using baghouse technology upstream of the aisle
scrubber. We next analyzed the technical feasibility, estimated costs,
and non-air environmental impacts for each option. As described in
section IV.B.3. of this preamble, we are not aware of a WESP (Option 1)
being successfully applied to emissions sources similar to the aisle
scrubber, which has a very high flow rate and low concentration of PM
compared to other point source emissions sources where the WESP has
been applied. As described previously in this preamble, we determined
that baghouse technology (Option 2) is readily available, feasible, and
is being used to control a similar source at the other major source
copper smelter in this source category.
With regard to feasibility, the Freeport facility property does not
extend far beyond its core manufacturing operations and is bordered on
one side by a railroad track; therefore, space to install large
equipment such as that required in either option is limited. In their
feasibility analysis for these control options, Freeport explained that
Option 1 requires a larger footprint than Option 2. We also considered
the secondary impacts of the two control options and found that Option
1 would require the use of significant amounts of water, which is of
particular concern because the facility is located in an arid climate
where water resources are limited.
As is permitted under CAA section 112(d)(6), we also considered the
costs of each option. The cost estimates for the WESP option include a
total capital investment of $98.5M and total annualized costs of
$25.2M. With an estimated reduction of 4.9 tpy of total metal HAP
emissions, we estimate the cost effectiveness of installing a WESP is
$5.2M/ton of HAP metal reduced. We have updated our cost and emission
reduction estimates for the baghouse option after considering the
comments as described in section IV.B.3. The revised cost estimates
include a total capital investment of $59.5 million and total
annualized costs of $10.8 million. Using our emission reduction
estimate of 3.0 tpy and the total annualized cost estimate, the cost
effectiveness is $3.6 million/ton metal HAP reduced for the baghouse
option (Option 2).
In collectively considering the emission reductions, secondary
impacts, feasibility concerns, and the costs of each of the options, we
find that Option 2 provides sizeable reductions of HAP metals,
including two highly toxic persistent bioaccumulative HAPs (i.e., lead
and arsenic) at reasonable costs while minimizing secondary impacts and
feasibility concerns. Therefore, taking into consideration the comments
and other information and data as well as the other factors discussed
in this preamble, we are promulgating a PM standard of 4.1 mg/dscm for
the combined emissions stream from the Hoboken converter process
fugitive capture system and the anode refining department (i.e., the
aisle scrubber) pursuant to CAA section 112(d)(6). We estimate this
will reduce HAP metal emissions by 3.0 tpy.
A detailed description on the development of this emission standard
is provided in the memorandum Final Emission Standard Development for
the Aisle Scrubber, which is available in the docket for this
rulemaking.
In the 2022 proposal, additional work practice standards to
minimize fugitive dust and development of a fugitive dust control plan
that must be reviewed, updated (if necessary), and approved by the
Administrator or delegated permitting authority were proposed. These
standards were proposed in order to provide an ample margin of safety
to protect public health and pursuant to CAA section 112(d)(6). In this
specific case, for the Primary Copper Smelting source category, we have
decided to promulgate the additional work practices to minimize
fugitive dust and the development of a fugitive dust control plan under
only the technology review. The work practices and dust plan
requirements are the same as proposed in the 2022 proposal. The
fugitive dust plan and work practices are appropriate under CAA section
112(d)(6) because they are practices that will ensure emissions will be
minimized. It is our understanding that the facilities are already
doing these types of practices so, although these measures are
anticipated to further address fugitive emissions and advance the goal
of minimizing HAP metal emissions, we are unable to quantify and assure
significant enough reductions in actual emissions that would
significantly reduce health risk; therefore, we are not promulgating
under CAA 112(f) in this particular case. We expect that since
facilities are already implementing most of the additional work
practices as part of requirements in the facility's operating permit or
to comply with consent
[[Page 41670]]
decree, there will be minimal additional costs to comply with the final
rule work practices and fugitive dust plan requirements. The only
additional costs would be a slight increase related to recordkeeping
and reporting requirements. For details on the work practices see the
2022 proposal preamble (87 FR 1616).
As noted in section IV.A.3., one of the commenters took issue with
the aisle scrubber standard being applied only to the Freeport facility
when their post-roofline control MIR is 20-in-1 million. They stated
that roofline controls to achieve acceptable risk leave the MIR for the
other major source copper smelter (Asarco) ``untouched'' at 60-in-1
million, asserting this is ``unfair, arbitrary and capricious, and
unsupported by the record.'' After considering this comment, our prior
proposals, and the information in the record, we evaluated options
under CAA section 112(d)(6) and 112(d)(2) and (3) to reduce process
fugitive emissions from Asarco. In the 2022 proposal, we solicited
comment on a BTF limit to control process fugitives from the flash
furnace roofline vent to reduce risk at Asarco. We estimated that to
comply with a BTF limit, the facility would need to install improved
capture and control of the flash furnaces as well as the large ladle
containing hot liquid matte from the flash furnace taping/pouring
operations, called the fuming ladle. In our cost estimates, we assumed
a new baghouse would be needed as well as a roofline ventilation
capture system. We did not receive comments on this specific BTF
standard or our cost estimation. However, as noted above in this
paragraph, we did receive the general comment that said our proposal
would do nothing to reduce the MIR of 60-in-1 million at Asarco.
Nevertheless, as described in section IV.B.2., we received new
information regarding developments in technology (3 projects to reduce
process fugitive emissions from roof vents) currently planned for the
Asarco facility (and have been incorporated into their state permit and
draft SIP), which are estimated to achieve a 30 percent reduction in
process fugitive metal HAP emissions from the roofline vents. We have
reviewed this information and agree that these developments will reduce
fugitive metal HAP emissions. We estimate, based on the roofline vent
metal HAP emissions estimates we had for the 2022 proposal and applying
a 30 percent reduction, that the total process fugitive metal HAP
emissions (including lead and arsenic, which are persistent,
bioaccumulative HAPs) from the roofline will be reduced by 0.39 tpy.
These estimates are available in the docket for this action (see
memorandum Cost Estimates for Enhanced Capture and Control of Process
Fugitive Emissions at Asarco). We expect that the reductions in process
fugitive metal HAP emissions will also reduce risk; however, we have
not yet quantified this risk reduction because the facility is not
currently operating and their future operational emission profile may
be different than what we have modeled in support of the 2022 proposed
rule. Furthermore, we received this information regarding the three
projects well after the end of the comment period and therefore we did
not have sufficient time to remodel and calculate the risk reductions
that will be achieved.
With regard to cost impacts, we estimate that for the facility to
comply with these design standards (and comply with the lead limit,
promulgated under CAA section 112(d)(2) and (3), which is discussed in
section IV.C.2. of this preamble), the facility will need to install
improved capture and control consistent with what is expected under the
state permit and SIP. As mentioned in section IV.B. of this preamble,
the improvements needed to comply with the design standards and
emissions limit are already adopted into the facility's operating
permit and therefore costs impacts are already expected regardless of
the requirements we are including in this final rule. However, since
the facility has not yet begun construction for these improvements, we
estimated costs for these projects as part of this action. We estimate
that the total costs for complying with the design standards and lead
emission limit are $15.4M in capital costs and $3.9M in annualized
costs. Asarco provided estimated costs for these projects in a letter
provided on February 26, 2024, which is available in the docket for
this action. They estimate total capital costs of $22.4M and $5.8M in
annualized costs for all three projects. Given the late submittal and
the court-ordered promulgation deadline of May 2, 2024, we did not have
sufficient time to review these estimates and determine their validity.
However, we note again that the projects are already requirements in
their operating permit and the facility is already expecting to incur
these costs unrelated to the NESHAP. More details on the estimated
costs are found in the memorandum Cost Estimates for Enhanced Capture
and Control of Process Fugitive Emissions at Asarco, which is available
in the docket for this action. To achieve reduction of HAP metals at
Asarco, we are finalizing design standards consistent with their 2023
operating permit which include improved capture and control of the
Peirce-Smith flash furnaces, fuming ladles, and anode furnaces.
C. CAA Sections 112(d)(2) and (3) Revisions for the Primary Copper
Smelting Source Category
1. Anode Refining Point Source Emissions
a. What did we propose for the anode refining point source pursuant to
CAA section 112(d)(2) and (d)(3)?
We proposed a MACT floor PM limit as a surrogate for metal HAP in
40 CFR 63.1444(i) (finalized at 40 CFR 63.1444(f)) for new and existing
anode refining departments in the 2022 proposal. The MACT floor
emissions standard for new and existing sources, 5.78 mg/dscm, was
developed based on the 99 percent UPL for PM emissions from the
available emissions data (which was from Asarco) and represents the
MACT floor level of control. We considered beyond-the-floor options for
the standard, but we did not identify any feasible, cost-effective
beyond-the-floor options. It should be noted that at the Freeport
facility, the anode refining department gas stream and the Hoboken
converter process fugitive capture system exhaust stream are both
routed to and combined in the aisle scrubber from which they are
emitted to the atmosphere. The facility conducts performance tests
after the anode refining department stream is combined with the Hoboken
converter process fugitive capture system exhaust stream (i.e., at the
aisle scrubber outlet). Therefore, the EPA also proposed amendments to
the existing alternative emission limit in 40 CFR 63.1446 to include
the anode refining department stream, as we expected Freeport would be
able to use this option to demonstrate compliance with the anode
refining department emission limit at the aisle scrubber outlet.
Lastly, we proposed in 40 CFR 63.1451(a) and 63.1453(a), respectively,
that compliance with the PM emissions limit for the anode refining
department will be demonstrated through an initial performance test
followed by a compliance test at least once per year.
b. How did the anode refining point source revisions made pursuant to
CAA section 112(d)(2) and (3) change since proposal?
There are no changes to the emission standard for the anode
refining point source since the proposals, except that we rounded the
5.78 mg/dscm to 2
[[Page 41671]]
significant figures (i.e., 5.8 mg/dscm). We are promulgating the MACT
floor-based PM emission standard of 5.8 mg/dscm for the anode refining
department point source emissions (i.e., emissions exiting the anode
baghouse) and related compliance requirements, as proposed in the 2022
proposal. However, because Freeport combines their anode refining point
source emissions with the fugitive capture system from the Hoboken
converters, we are also finalizing, as proposed, to include the anode
refining department point source emissions as an emission source to be
included in the alternative emission limit calculation for the combined
stream.
Additionally, in the final rule based on comments, we are also
providing that facilities that combine the anode refining department
and Hoboken converter process fugitive capture system streams must
comply with the combined stream PM limit of 4.1 mg/dscm and related
compliance requirements to demonstrate compliance with the anode
refining department emission standard and related compliance
requirements. As discussed in section IV.B. of this preamble and
pursuant to CAA section 112 (d)(6), we are finalizing a PM emission
standard of 4.1 mg/dscm for the combined stream of the anode refining
department and Hoboken converter process fugitive capture system and an
annual compliance testing requirement.
c. What key comments did we receive on the proposed anode refining
point source revisions made pursuant to CAA section 112(d)(2) and (3)
and what are our responses?
Comment: One commenter stated that the EPA should set the PM MACT
floor based on a concentration limit of 23 mg/dscm, which is an
existing technology-based limit for similar emission points in the
current NESHAP rather than the 99 percent UPL emission standard
developed using only data from Asarco. The commenter explained that
this limit should be applied at their aisle scrubber stack, which is
the emission point for emissions from their Hoboken converter process
fugitive capture system and their anode refining department, thus each
affected source would be subject to the same 23 mg/dscm limit. The
commenter added that the EPA does not have sufficient data to set a
mass rate for the anode refining department MACT floor since the only
data used to set the limit are from Asarco, which does not reflect the
operating performance of their anode refining department and does not
reflect the best 5 sources as is required by the EPA's procedure for
source categories with less than 30 sources. The commenter explained
that they cannot provide performance tests of their anode refining
department emissions using EPA methods because of the duct
configuration of the baghouse controlling these emissions. However, in
their comment letter they submitted an engineering evaluation which
characterized the flowrate and particulate emissions for the anode
refining department's baghouse. The engineering evaluation was not
conducted following EPA methods. The commenter used the data from the
engineering evaluation with the data the EPA used in the development of
the 99 percent UPL (i.e., Asarco's data) to estimate a revised MACT
standard, 7.3 mg/dscm. The commenter stated that the purpose of the
recalculation of the MACT standard was to demonstrate their argument
that more data collection is necessary to support the development of a
representative MACT standard for the anode refining department.
Response: First, as described in the preamble of the 2022 proposal,
the emission standard for the anode refining point source was proposed
pursuant to CAA section 112(d)(2) and (3). This standard is not being
proposed pursuant to CAA section 112(d)(6). The 1998 proposal for
primary copper smelting identified the anode refining department in the
definition of primary copper smelters; however, the EPA did not have
sufficient data at the time to set a standard for this emission source.
In contrast, in the 2007 area source NESHAP for primary copper
smelting, data were available to set an emissions standard for the
anode refining department. With the recently acquired Asarco data, we
now have sufficient data to develop a MACT floor emission standard for
the anode refining point source at major sources. The Asarco data
includes 9 data points, which exceeds the minimum sample size of 3 data
points necessary to develop a MACT floor. Therefore, we disagree that
we have insufficient data to develop the emission standard. We also do
not find the data included in Freeport's engineering evaluation
appropriate to include in the MACT floor dataset since these data were
not collected following EPA methods. In regard to the comment that the
MACT floor limit does not reflect the best 5 sources, there are only
two major sources in this category, and as stated, only one of these
major sources had valid data from an anode refining department. We used
all available valid data from the best performing sources for which the
EPA could reasonably obtain emissions information in the category,
which is in accordance with CAA section 112 (d)(3)(B).
Comment: One commenter explained that the configuration of their
anode refining department baghouse makes the proposed test methods
infeasible. The commenter stated that the anode refining department
exhaust at their facility is controlled by a baghouse, which is ducted
to the aisle scrubber where it combines with exhaust from the
facility's Hoboken converter process fugitive capture system. The point
of emission for their anode refining department exhaust is the outlet
of the aisle scrubber. The commenter stated implementing the
alternative emission limit option to comply with the anode refining
limit (as proposed by the EPA) is not feasible due to the inability to
measure flowrate using EPA Method 1 in the duct between the baghouse
outlet and aisle scrubber inlet. The commenter explained the ductwork
does not have enough straight passes to measure flowrate according to
EPA Method 1.
Response: Based on reviewing information submitted by the commenter
and observations made by the EPA during a November 7, 2023, site visit
to the facility, the EPA agrees that there is currently no viable
testing location for flowrates using EPA Method 1 from the anode
refining department baghouse to the aisle scrubber. In light of this
new information, we agree that the use of the alternative emission
limit is not an option for demonstrating compliance with the anode
refining department for this facility. However, this alternative
emission limit procedure may be appropriate at a new facility; thus, we
are finalizing the proposed amendment to add the anode refining
department to the list of emission sources which could be included in
the emission alternative limit calculation option. However, as
discussed elsewhere, we are promulgating a limit for the combined
stream of the anode refining department and Hoboken converter process
fugitive capture system (i.e., the Freeport aisle scrubber). Based on
the data provided by the Freeport facility in their section 114
information request response, an estimated 75 percent of the
particulate emissions emitted from the aisle scrubber are from the
Hoboken converter process fugitive capture system while the remaining
25 percent are from the anode refining baghouse. The emission standard
for the combined stream of the anode refining department and Hoboken
converter process fugitive capture system based on 61 percent control
of the emissions by a baghouse controlling the emissions from the
[[Page 41672]]
Hoboken converter process fugitive capture system is 4.1 mg/dscm. The
emission standard for the combined stream of the anode refining
department and Hoboken converter process fugitive capture system is
more stringent than the anode refining department emission standard
alone (5.8 mg/dscm). Therefore, we are finalizing that compliance with
the emission standard for the combined stream of the anode refining
department and Hoboken converter process fugitive capture system
demonstrates compliance with the anode refining department emission
standard.
Comment: One commenter stated that in the 2022 proposal the EPA
proposed a new MACT floor limit for the anode refining department. The
commenter requested clarification if the PM limits for the aisle
scrubber in the 2023 supplemental proposal replace the anode refining
department limit in the 2022 proposal (because their anode refining
department baghouse vents to the aisle scrubber), or if the EPA intends
to retain the separate anode baghouse requirement.
Response: As described in section IV.B. of this preamble, we are
promulgating a particulate emission limit for the combined stream of
the anode refining department and the Hoboken converter process
fugitive capture system (i.e., aisle scrubber) as proposed in the 2023
supplemental proposal, as well as an independent anode refining
department emission limit as proposed in the 2022 proposal. Compliance
with the anode refining department emission limit will be demonstrated
by complying with the appropriate limit, i.e., if there is a combined
emission stream then the affected source will comply with the combined
emission standard, or if the anode refining department is independent
(i.e., not combined with other emission streams), then the affected
source will comply with the independent limit for anode refining
department.
d. What is the rationale for our final approach and final decisions for
the anode refining point source revisions made pursuant to CAA section
112(d)(2) and (3)?
As discussed in the 2022 proposal preamble, the 1998 proposal for
primary copper smelting major sources identified anode refining in the
definition of primary copper smelters. However, at that time, the EPA
did not have sufficient data to set an emission limit for anode
refining, and therefore did not propose specific emission standards for
anode refining operations in the major source NESHAP. The 2007 area
source NESHAP includes emission standards for anode refining operations
at area sources. Therefore, in the 2022 proposal, we concluded that
anode refining is part of the source category and emits HAP emissions.
In the 2022 proposal, we considered a BTF option, but did not consider
going BTF in this case due to cost effectiveness. Pursuant to section
112(d)(2) and (3), we are finalizing, as proposed in the 2022 proposal,
a MACT floor PM limit of 5.8 mg/dscm as a surrogate for metal HAP for
new and existing anode refining departments. We are finalizing, as
proposed, that compliance with the PM emissions limit for the anode
refining department will be demonstrated through an initial performance
test followed by a compliance test at least once per year. We are also
finalizing to include the anode refining department as an emission
source to be included in the alternative emission limit calculation for
new facilities.
Based on the comments received on the 2022 proposal and the 2023
supplemental proposal and on information collected during a November 7,
2023, site visit to the Freeport facility, we are promulgating that
compliance with the combined emission standard of 4.1 mg/dscm, for the
combination of anode refining department emissions and Hoboken
converter process fugitive capture system emissions (being promulgated
under CAA section 112(d)(6) as described in section IV.B. of this
preamble) will demonstrate compliance with the anode refining MACT
floor PM limit. Under section 112(d)(6), we are finalizing initial and
continuous compliance requirements for the combined emission standard
including initial and subsequent annual performance testing. The
combined standard and associated compliance requirements will ensure
that affected sources can demonstrate compliance with the rule
requirements.
2. Process Fugitive Emissions From Roofline Vents
a. What did we propose for process fugitive emissions from roofline
vents pursuant to CAA section 112(d)(2) and (d)(3)?
As noted previously in the preamble for this final rule, the
standards and associated compliance requirements for the process
fugitive emissions from roofline vents source are being finalized
pursuant CAA section 112(f)(2) to address unacceptable risk for the
source category as well as pursuant to CAA section 112(d)(2) and (3).
As proposed in the 2022 proposal and the 2023 supplemental proposal, we
are promulgating the same emission standard to reduce risk to a level
that would be considered acceptable and to satisfy the requirements of
CAA section 112(d)(2) and (3). As discussed in the context of risk in
section IV.A. of the preamble for this final rule, we proposed emission
standards for the process fugitive emissions from roofline vents. In
the 2022 proposal, we proposed separate standards for each roofline
vent (i.e., smelting vessels, copper converter department, and anode
refining department) based on emissions data received from the Freeport
facility. We performed a BTF analysis for additional controls of each
roofline vent and concluded in the 2022 proposal that a BTF standard
was appropriate for the anode refining process fugitive roofline vent
while MACT floor standards were appropriate for the smelting and copper
converter roofline vents.
During the comment period for the 2022 proposal, we received
additional test data of the roofline vents from the Freeport facility.
We received comments from both facilities in the major source category
requesting that the roofline vent be a combined limit because there is
comingling of emissions in the building where the processes are
located. We received significant comment regarding the proposed test
methods for demonstrating compliance with the roofline vent emission
standards. We also received comments on our cost estimates for the BTF
control option of the anode refining roofline vent.
In the 2023 supplemental proposal, we proposed a combined limit.
The combined limit was calculated using the 99 percent UPL methodology.
Specifically, for calculating the combined emission limit, we first
determined the 99 percent UPL of the combined emission rates based on
all test data now available for filterable PM. We then determined the
average fraction of emissions which are attributable to the anode
refining roof vent (72 percent). Then we adjusted the anode refining
roof vent's portion of the 99 percent UPL by reducing that portion of
the value by 90 percent. We also adjusted our costs in response to
public comments on the proposed option to reflect the design
requirements at the Freeport facility primarily by increasing the
baghouse flowrate, lowering the air to cloth ratio and adding a lime
injection system. The revised capital costs were $10.2 million and
annualized costs were $2.14 million. The baghouse is expected to
achieve 4.59 tpy reduction of lead and arsenic with a cost
[[Page 41673]]
effectiveness of $467,000/ton metal HAP.
In addition, in the 2022 proposal we solicited comment on a lead
limit for the roofline vents in addition to, or instead of, the PM
limit for the anode refining roof vents. The agency considered a
possible lead limit of 0.26 lb/hr as a potential BTF MACT limit for
anode refining process fugitive emissions.
b. How did the requirements for process fugitive emissions from
roofline vents proposed pursuant to CAA section 112(d)(2) and (3)
change since proposal?
As discussed in this preamble, we are promulgating the combined BTF
PM limit of 6.3 lb/hour for the roofline vents as proposed in the 2023
supplemental proposal. The BTF control cost estimates were updated to
incorporate the most current bank prime interest rate resulting in a
small increase in total annualized costs which are now estimated as
$2.30 million with a resulting cost effectiveness of $500,000/ton metal
HAP with 4.6 tpy (rounded from 4.59 tpy) reduction of lead and arsenic.
The revised cost estimates are documented in the memorandum Cost
Estimates for Enhanced Capture and Control of Process Fugitive
Emissions from the Anode Refining Operations at Freeport--REVISED,
which is available in the docket for this rulemaking. The cost
estimates were otherwise unchanged and the adjustments do not change
our conclusions about the necessity of promulgating the BTF standard.
However, we received significant comment on the proposed compliance
test methods. To address some of the concerns raised by the commenters,
we are promulgating revised methods and allowing the use of Federal
reference method (FRM) and Federal equivalent method (FEM) monitors as
discussed in section IV.C.2.c.
We are promulgating a lead emission limit of 0.326 lb/hour for
minimizing process fugitive emissions from any combination of roofline
vents associated with the Peirce-Smith copper converter department,
Inco flash furnace and the anode refining department, at existing
sources. This emissions limit reflects the estimated reductions that
will be achieved by the design standards described in section IV.B. We
are also finalizing that facilities must demonstrate compliance with
this emission limit once per year. We note that Peirce-Smith converters
are batch converters and the NESHAP prohibits the use of batch
converters for new sources. Therefore, this lead limit is not relevant
for new sources.
c. What key comments did we receive on the proposed requirements for
process fugitive emissions from roofline vents pursuant to CAA section
112(d)(2) and (3) and what are our responses?
Comment: Numerous comments were received on the proposed test
methods for measuring PM at roof vents, which include EPA Test Methods
1, 2/2F/2G, 3/3A/3B, 4, 5D and Oregon Method 8. Most comments were that
the proposed test methods are not suited for testing PM from roof
vents; that MiniVol portable samplers should be used for sampling PM at
the roof vents instead of the proposed test methods; and that the
proposed test methods are unsafe to conduct at rooflines.
Commenters discussed the lack of isokinetic conditions at the
roofline, which they stated inhibits the use of Method 1. For example,
a commenter explained that Method 1 provides two alternative
procedures: a ``simplified procedure,'' and an ``alternative
procedure.'' Citing section 1.2 of the method, the commenter stated the
simplified procedure ``cannot be used when the measurement site is less
than 2 stack or duct diameters or less than a half diameter upstream
from a flow disturbance.'' The commenter stated that neither stack
diameters nor duct diameters can be defined for the smelter facilities'
roofline vents, within the meaning and purposes of section 1.2. With
regards to the alternative procedure, the commenter stated this
procedure depends on the ability to develop representative pitch and
yaw angles of the gas flow to be sampled, based on directional flow-
sensing probe measurements of pitch and yaw angles at forty or more
traverse points within the flow. The commenter stated this procedure is
not possible to perform at the smelter facilities' roofline vents
because fugitive emissions at the vents occur at a variety of angles
that are constantly changing due to ambient winds.
Another commenter discussed the lack of isokinetic conditions at
the roofline and referenced a feasibility study (EPA-HQ-OAR-2020-0430-
0062) that concluded that the roofline vents at the Miami smelter
cannot meet the minimum methods of Method 1, including either the
simplified procedure or alternative procedure. The commenter stated
that if Method 1 cannot be utilized effectively at the 2 facilities
subject to the major source rule, the rule is not practical to
implement or enforce.
A commenter discussed in depth the limitations of Method 5D,
stating that, unlike a positive pressure baghouse for which Method 5D
was designed, the roofline vent air flow is induced by natural buoyance
of the warmer gas inside the smelter building and by outside air wind
pressures--not by use of a forced air blower like those used in a
baghouse. The commenter referenced an illustration in a technical
analysis of the proposed vent test methods, which shows that the flow
rate varies significantly over short periods of time and occasionally
is negative (i.e., air flows into the vent). Another commenter stated,
``FMMI identified the incompatibility of Method 5D to the roofline vent
configurations as part of its original comments on April 26, 2022 . . .
Nevertheless, the EPA left the issue unaddressed in the supplemental
rule proposal, and the agency has not provided any guidance or
technical analysis explaining how Method 5D could be adapted to the
distinctly different conditions presented by the roofline vents.'' A
commenter stated because EPA Method 5D is not compatible with the low,
variable air velocities and physical configuration of the roofline
vents, FMMI has utilized a sampling methodology and test protocol
negotiated with the ADEQ (the ``ADEQ test method'').
Commenters advocated using MiniVol portable air samplers as an
alternative to the proposed test methods for measuring PM from roof
vents. They stated that using MiniVol portable air samplers is the most
representative sampling method for the roofline emissions application,
and while not a FRM sampler, they provide results that closely
approximate data from FRM samplers to obtain representative
concentrations of PM without the need for isokinetic sampling. The
commenter noted that the portable air samplers can be run concurrently
at several locations along the roofline, which the commenter notes
offers several benefits: (1) fluctuations in flows and emissions along
the roofline are better managed, (2) sampling is not dependent on
linear air flow, so constant adjustments are not required, and (3)
sampling can occur for longer periods of time, which provides a more
representative sample of the process operations occurring in the
smelter buildings. The commenter noted use of this sampling protocol
will require the collection of velocity and temperature measurements
using the existing roofline monitoring system equipment. As an added
benefit, the portable air samplers also are capable of speciating
samples of PM, PM10, and PM2.5.
A commenter noted that Asarco's 2015 consent decree with ADEQ,
which governs the operation of their Hayden
[[Page 41674]]
smelter, requires process fugitive emissions studies (FES) pursuant to
a protocol (``FES Protocol'' or ``Protocol'') approved by the EPA on
May 24, 2017. Within the FES Protocol is a determination that process
fugitive PM emissions at the roofline shall be quantified via a
sampling methodology that centers on the use of MiniVol portable air
samplers at the roofline vents. The commenter stated that the EPA's
approval of the Protocol constitutes a determination by the EPA that
this sampling method is appropriate for determining the rate of
fugitive PM emissions at the roofline. The MiniVol sampler, in
particular, is a low-flow sampler, which is well-suited to low,
variable air flows at the roofline--unlike the iso-kinetic sampling
methods specified in paragraph (e)(1) of proposed 40 CFR 63.1450. The
commenter attached copies of the Protocol and the EPA's approval of the
Protocol to their comment letters submitted on the 2022 proposed RTR
and on the 2023 supplemental proposal (Docket ID Nos. EPA-HQ-OAR-2020-
0430-0135 and EPA-HQ-OAR-2020-0430-0204, respectively).
A commenter stated the final rulemaking should include a provision
that explicitly authorizes the use of MiniVol portable air samplers,
together with appropriate temperature and flow sensors to determine PM
emissions at the roofline. The commenter advocated the use of a
fugitive emissions monitoring protocol specific to the relevant smelter
and approved by the EPA's Office of Air Quality Planning and Standards,
Measurement Technology Group (MTG) or other reviewing body such as ADEQ
and believes (a) 6 months after the date of the final rulemaking's
publication in the Federal Register would be an appropriate deadline
for submittal of the protocol for agency approval; and (b) 2 years
after agency approval of the protocol would be an appropriate deadline
for commencing measurements of the rate of fugitive PM emissions at the
roofline to determine whether they exceed the fugitive PM emissions-
rate limit. Correspondingly, the commenter noted the final rulemaking
should provide that, during the pendency of the protocol's
implementation, only the work practice standards and operation and
maintenance requirements of the revised subpart QQQ rules shall apply
to the process fugitive PM emissions. This would be consistent with 42
U.S.C. 7412(h)(1)-(2)(B) and the approach the EPA took in the Mercury
and Air Toxics Standards (MATS) and Industrial Boilers rulemakings.
The commenter stated that the ADEQ test method was utilized to
collect all of the emission data that the EPA relied on for the UPL
calculation that is the sole basis for the combined roofline PM
emission limit in the supplemental proposed rule. According to the
commenter, it is not appropriate for the EPA to set emission limits
based upon the ADEQ test method and then prohibit the use of that very
same method to demonstrate compliance. If the ADEQ test method was good
enough to set enforceable emission limits, it should also be good
enough to demonstrate compliance. The commenter stated that if the ADEQ
test method (or some reasonable modification of that method) does not
meet the EPA's requirements, then no limit should be established at
this time because that approach necessarily means that a valid data
basis for a limit does not yet exist. If that is indeed the EPA's
position FMMI and the EPA can work together to develop an acceptable
test method, FMMI can collect the necessary data to support the
calculation of a UPL based on that agreed method, and the agency can
set emission limits based on that data set.
In a related point, a commenter stated that they are concerned that
the proposed roofline lead limit is based on data collected using
samplers that are not designated as an FRM. Use of non-FRM sampler data
could create a standard that is not achievable if tested using an FRM.
It is unclear from the EPA's proposed rule how to address a potential
discrepancy between a standard based on non-FRM and testing using an
FRM. The commenter goes on to say that the EPA's proposed PM limit was
established using data that were collected using a method other than
EPA Method 5. Another commenter has similar concerns with the EPA's
rule in regard to the proposed limit being based on data collected
using samplers that are not designated as an FRM: First, they state it
is not clear from the EPA's rule that a Method 5 test conducted at the
same time would have produced the same result as the alternative method
used to obtain the data the rule is based on. Second, they state it is
unknown whether this standard is achievable, as determined by the
proposed test methodology.
Lastly, commenters had concerns about the safety of the personnel
conducting testing at the roofline. The commenter stated it would be
unsafe, due to the elevated temperature environment and other
conditions at the roofline, for humans to perform roofline activities
required by paragraph (e) of proposed 40 CFR 63.1450. Many areas of the
roofline are currently only accessible by narrow catwalks that do not
currently have approved tie-off points or sufficient space to
accommodate the personnel and the required sampling equipment. Some
roofline areas require respirators or other personal protective
equipment, and the EPA's proposed testing methods would require
continuous presence of multiple personnel working directly in the
pathway of exiting fumes for 3, 12-hour test runs. The commenter stated
the Method 5 sampling protocol requires adequate sample locations to
account for variations in the flows along the roofline, which then
necessitates a large number of sampling staff to be located in a
dangerous, high temperature environment for extended periods of 12
hours or more. The commenter noted the temperatures at the roofline can
reach 140 degrees Fahrenheit and pose a significant safety concern for
the testing personnel.
Response: In reviewing the comments and as a result of a site
visit, the EPA is revising the methods for the roof-vent testing. For
sample location determination, if EPA method 1 is inappropriate, the
facilities need to use method 5D, section 8.1.3, Roof Monitor or
Monovent, and also use section 8.2 to determine how many traverse
points should be sampled or have proposed sampling locations approved
by EPA Office of Air and Radiation (OAR), Office of Air Quality
Planning and Standards, MTG or the delegated authority. Due to the
variability in the flow rates, an anemometer may be used to determine
the flow. For the PM concentration measurements, a constant sample flow
rate and mass volume is required due to the highly variable process
flow rate. EPA method 17 may be used for this constant flow rate
sampling. EPA Method 17 particulate matter samples will be collected at
the roofline vent temperatures to maintain the same temperature basis
as the samples used in setting the standard. EPA Methods 5 and 5D have
been removed since these methods require heating the filter to 248
25 Fahrenheit, which would not be representative of the
roofline temperatures. It is understood that isokinetics may not be met
with this sampling and this calculation is waived for this sampling.
The MiniVol samplers are not EPA- approved samplers. There is a
concern because these are battery operated and may not provide a
constant rate of sampling. As an alternative, an approved FRM or FEM
ambient PM monitor may be used, which will also address the commenter's
safety
[[Page 41675]]
concerns. A list of designated reference and equivalent methods is
provided here: https://www.epa.gov/amtic/air-monitoring-methods-criteria-pollutants. However, tapered oscillating microbalances are not
appropriate for this sampling. The FRM or FEM ambient PM monitor must
be able to tolerate temperatures up to 150 degrees Fahrenheit.
The commenter has raised concerns on the use of the MiniVol sampler
to set the standard while different methods are used for determining
compliance. The EPA has mitigated these issues through the adaptations
to the methodology finalized, the use of calibrated anemometer for low
and variable process flow rates, fixed rate sampling and the allowance
for in stack filter methodology (EPA Method 17). The primary sampling
difference between the methods now is the more stable operation of the
EPA Method 17 sampling system or an FRM/FEM, ensuring that the sampled
flow rate is consistent.
The EPA alternative methods approval is conducted by the
Measurement Technology Group (MTG). The MiniVol roof-vent sampling
protocols/sampling methods have not been submitted or approved by MTG.
The Asarco protocol included FRM sampling side-by-side with the MiniVol
sampling. This side-by-side sampling could use Method 301 to validate
the MiniVol samplers, but the proposed sampling has not yet occurred.
This Method 301 validation could still occur, and the data could be
used to support an alternative method approval from MTG. If these
revised methods are not appropriate or the tester/facility wants to use
alternative methods, the tester/facility can apply for an alternative
test method approval through MTG. A Method 301 study should be
conducted to verify that the selected monitors used provide equivalent
data to the EPA methods.
Comment: A commenter agreed with the EPA's reasoning and
determination not to propose a BTF lead emissions limit in addition to,
or instead of, the fugitive PM emissions limit in proposed 40 CFR
63.1444(i)(3). Similarly, another commenter stated that, in response to
EPA's request for comments, an additional lead limit on the roofline
vents is not necessary. They explained that they agreed with the EPA's
conclusion that PM is the most appropriate surrogate for metal HAPs.
Response: While we agree that PM is an appropriate surrogate for
metal HAP, we are also finalizing a process fugitive lead limit for
facilities using flash furnaces and associated with the Peirce-Smith
converters of 0.326 lb/hr for a combination of roof vents associated
with Peirce-Smith copper converter department, Inco flash furnace and
the anode refining department. We estimate that this final standard
will reduce lead emissions by 0.39 tpy.
Comment: Commenters requested that the EPA establish direct lead
limits, either in addition to or instead of the PM limit because it is
one of the risk drivers for this source category and would be
appropriate to control for it directly.
Response: We have determined that filterable particulate is an
adequate surrogate for lead and other HAP metals for this source
category. The use of PM as a surrogate for particulate metal HAP is
consistent with the approach used to limit particulate metal HAP
emissions from other copper smelting processes in the current NESHAP
and for many other source categories (i.e., Ferroalloys Production,
Integrated Iron and Steel Manufacturing, and Integrated Iron and Steel
Foundries). Therefore, providing PM emission standards which require
reductions as a surrogate for metal HAPs is expected to result in
commensurate reductions of metal HAP. We are also finalizing a process
fugitive lead limit for facilities using Inco flash furnaces and
Peirce-Smith converters of 0.326 lb/hr for a combination of roof vents
associated with the Peirce-Smith copper converter department, Inco
flash furnace and the anode refining department which we estimate will
reduce lead emissions by 0.39 tpy.
d. What is the rationale for our final approach and final decisions for
the process fugitive emissions from roofline vents revisions made
pursuant to CAA section 112(d)(2) and (3)?
As described in the 2022 proposal and in the 2023 supplemental
proposal, the 2002 major source NESHAP does not include standards for
process fugitive emissions from the rooflines of smelting vessels,
converters, or anode refining operations, except for an opacity limit
for converter roof vents that applies during testing. Therefore, we are
finalizing, as proposed in the 2023 supplemental proposal, a BTF
combined PM limit of 6.3 lb/hr as a surrogate for metal HAP for new and
existing process fugitive emissions from roofline vents pursuant to CAA
section 112(d)(2) and (3). As described in section IV.A., we are also
finalizing this combined roofline PM limit under CAA section 112(f) to
reduce emissions of HAP metals (especially lead and arsenic, which are
two persistent, bioaccumulative and highly toxic HAPs), and their
associated risks, to achieve acceptable risks levels. We are
finalizing, as proposed, that compliance with the PM emissions limit
for the process fugitive emissions from roofline vents will be
demonstrated through an initial performance test followed by a
compliance test at least once per year. Based on comments we received
on the 2022 proposal and the 2023 supplemental proposal, we are
finalizing adaptations to the test methods by which compliance with
this limit can be demonstrated including the use of fixed rate sampling
and the allowance for in stack filter methodology (EPA Method 17). The
costs for Freeport to comply with this combined PM limit are described
in section IV.C.2.b., and we estimate that Asarco can already comply
with this limit and therefore will not incur costs to comply with the
combine PM roofline limit except testing costs. We estimate that both
facilities will incur testing costs of $107,000 per year to comply with
the performance test requirements.
In addition, we are finalizing a lead emission limit of 0.326 lb/
hour to minimize process fugitive lead emissions from any combination
of roofline vents associated with Peirce-Smith copper converter
departments, Inco flash furnaces and the anode refining departments, at
existing sources. This limit will only apply to the Asarco facility
(since they are the only existing major source with Peirce-Smith copper
converter departments and Inco flash furnaces), and we estimate this
will reduce metal HAP by 0.39 tpy and ensure that future violations of
the lead NAAQS will not occur. As mentioned in section IV.B.2. of this
preamble, Asarco has been a major contributer to the Hayden Arizona
lead NAAQS non-attainment status. This limit is consistent with the
modeling demonstration submitted by the facility to the state in
support of a revision to the lead SIP. This document is available in
the docket for this action (Docket ID No. EPA-HQ-OAQ-2020-0430). As
discussed in section IV.B., we are also promulgating design standards
under CAA section 112 (d)(6) that will ensure this limit is met. As
discussed in section IV.B., the costs to comply with the design
standards are already expected to be incurred by the facility. We are
finalizing, that compliance with the lead emissions limit for the
process fugitive emissions from roofline vents will be demonstrated
through an initial performance test followed by a compliance test at
least once per year. The facility can test for lead at the same time as
the performance test for PM; however, they will have some
[[Page 41676]]
additional costs for the laboratory analysis that we estimate to be
$18,000 per year.
3. Mercury
a. What did we propose for mercury emissions pursuant to CAA section
112(d)(2) and (3)?
In the 2022 proposal, the EPA proposed a BTF mercury limit of
0.0043 lb/hr for existing sources, based on emissions data from
Freeport and Asarco, and a MACT floor mercury limit of 0.00097 lb/hr
for new sources, based on emissions data from Asarco. As noted in the
preamble of the 2022 proposal, in order to comply with the proposed
emission limit for existing sources, the EPA expected that the Freeport
facility would have to install and operate an activated carbon
injection (ACI) system and a polishing baghouse on the stack emissions
release point, the acid plant. The EPA expected the installation of
these additional controls would result in a 90 percent reduction of
mercury emissions from the acid plant source and that the cost-
effectiveness of mercury control would be $27,500 per pound (in 2019
dollars).
During and after public comment period of the 2022 proposal, the
EPA received a number of comments and additional data concerning the
BTF limit for existing sources including:
Mercury testing results obtained in 2018-2021 by the
Freeport facility which did not fully follow EPA Method 29;
Additional mercury testing results collected at the
Freeport facility in 2022 which fully followed EPA Method 29; and
Comments regarding the technical infeasibility of adding
mercury controls (e.g., polishing baghouse with ACI) at the acid plant,
including explanations that the conditions of the acid plant exhaust
streams are unsuited for the control option since the stream has a high
moisture content, low mercury concentrations, and high concentrations
of SO2/SO3 which inhibit mercury removal.
As discussed in the 2023 supplemental proposal, the EPA evaluated
the emissions data from all of Freeport's performance tests (i.e.,
2018-2022) and concluded that only the test conducted in 2022 which
fully followed Method 29 should be used in the MACT floor emission
limit development. The EPA also agreed that characteristics of the
exhaust stream from the acid plant stack and equipment configuration at
the acid plant may inhibit mercury control (e.g., moisture content,
acid gas content, mercury concentration) which could result in
diminished emission reductions. Therefore, we evaluated controlling
mercury from the aisle scrubber stack and the vent fume stack and
determined the latter was best suited for mercury control (see
discussion in the 2023 supplemental proposal). Based on a new stack
location and a new emissions data set, which includes the original
Asarco data and data from Freeport's 2022 test, the revised mercury
limit for existing sources in the 2023 supplemental proposal, as
determined using the 99 percent UPL approach, is a MACT floor limit of
0.033 lb/hr for combined facility wide emissions. We also evaluated BTF
control options in the 2023 supplemental proposal and concluded that
the costs were unreasonable, and we proposed the MACT floor emission
standard. We proposed that compliance with the mercury emissions limit
for new and existing sources would be demonstrated through an initial
compliance test for each of the affected sources (e.g., furnaces,
converters, anode refining) followed by a compliance test at least once
every year.
b. How did the mercury emissions standard made pursuant to CAA section
112(d)(2) and (3) change since proposal?
The mercury emission standard for new sources, 0.00097 lb/hr, is
being promulgated as proposed in 2022. In the 2023 supplemental
proposal, we proposed a revised mercury emission standard of 0.033 lb/
hr for existing sources and are finalizing that standard as proposed.
Both emission standards are based on the MACT floor.
c. What key comments did we receive on the mercury revisions made
pursuant to CAA section 112(d)(2) and (3) and what are our responses?
Comment: Commenters contend that the EPA does not have sufficient
data to develop a MACT floor for mercury. They stated that they do not
believe the single 3-run test results are sufficient to establish the
proposed MACT floor emission standard for existing sources. The
commenter noted there was significant run-to-run variability which the
commenter stated can be attributed to the profile of the process feed
and the nature of a batch process. Commenters noted that additional
performance testing of mercury will be conducted at the Freeport
facility in the fourth quarter of 2023, and first quarter of 2024 using
EPA Method 29, and they asked that the EPA allow for submittal and
consideration of these data (which they say they will be able to
provide at least several weeks prior to the May 2, 2024, deadline for
final rule publication) when establishing limits in the final rule. In
the absence of additional data, commenters believe that a
representative MACT floor cannot be established, and any regulatory
action should be postponed or limited to workplace standards. They
rationalized this comment by citing the NESHAP for Secondary Lead
Smelting (77 FR 570) where the EPA did not promulgate standards because
of incomplete testing and lack of testing data for furnaces that burn
varying types of fuel.
Response: As described in the 2023 supplemental proposal, the EPA
revised its calculations by only using the stack test data that
followed EPA Method 29. The proposed mercury standard was developed
based on the 99 percent UPL of the available emissions data for this
source category, which included data collected from Freeport through
the 2022 section 114 information request from Freeport as well as test
data from Asarco, yielding a sample size of 5 data points. The test
report associated with Freeport's section 114 information request
response was conducted using EPA test Method 29 and was reviewed by EPA
measurement experts upon submission. A dataset of more than 3 data
points meets the sample size necessary to use the 99 percent UPL
approach to develop a MACT standard. We acknowledge that a sample size
of 5 is considered a limited dataset; however, we have followed our
documented approach for MACT floor development for limited datasets
included in Appendix B of the aforementioned memorandum (Docket ID No.
EPA-HQ-OAR-2020-0430-0153). Therefore, we disagree that we have
insufficient data to develop a numerical emission standard based on the
MACT floor.
We note that we received two additional test reports from Freeport;
one on January 29, 2024 (non-metal HAPs) and one on February 16, 2024
(mercury), well after close of the public comment period (i.e.,
September 22, 2023) and have been notified that Freeport plans to send
a third test report in mid-April 2024. Based on a preliminary review of
the new test data, we determined that some tests were not valid due to
deviation from the EPA method and that incorporation of the valid tests
would not result in significant changes to the proposed emission
limits. We did not incorporate these late-submitted data for two timing
related reasons. First, other stakeholders would not have an
opportunity to review and comment on these new data; and second, given
the court-ordered promulgation deadline of May 2, 2024, we had
insufficient time to complete the
[[Page 41677]]
necessary quality control and assurance of the data, and to perform new
calculations and analyses to establish revised limits before the May 2,
2024, deadline. Thus, we are promulgating the existing source MACT
floor emission standards for mercury, as well as for the other non-
metal HAP, as proposed in the 2023 supplemental proposal and as
discussed in sections IV.C.3. and IV.C.4. of this preamble.
Comment: Some commenters expressed support for the decision in the
2023 supplemental proposal not to move forward with a BTF standard for
mercury, while other commenters suggested that the EPA adopt the BTF
standard for mercury. Commenters stated that indirect costs including
engineering, procurement, and construction management, as well as
startup costs had not been included in our estimates. Specifically
concerning costs for baghouses, commenters stated that most modern
baghouses are of the pulse jet, rather than shaker style,
configuration.
Response: As described in the 2023 supplemental proposal, the EPA
re-proposed a MACT floor standard for mercury after considering the
technical feasibility and costs of BTF control options. In
consideration of the comments regarding costs, we performed a holistic
review of the cost estimates for controls included in this rulemaking.
As described in the 2023 supplemental proposal, we estimated costs for
controlling mercury at the vent fume stack using a polishing baghouse
with ACI. We found that our BTF cost estimates for mercury controls
omitted indirect costs and assumed costs for a shaker style baghouse.
In response to the comments received on the 2023 supplemental proposal,
we have revised our BTF cost estimates for mercury control of the vent
fume stack at the Freeport facility to include indirect costs and to
more appropriately assume a pulse jet configuration baghouse. The
details of these revisions can be found in the memorandum Estimated
Cost for Beyond-the-floor Controls for Mercury Emissions from Primary
Copper Smelting Facilities--REVISED, available in the docket for this
rulemaking. Our revised estimates of the cost of BTF mercury are
capital costs of $10.7 million and total annualized costs of $3.0
million. We did not receive additional test data or other information
that would result in revisions to the expected emission reductions we
presented in the 2023 supplemental proposal. Using the expected
reductions, 40.5 lb/yr, the resulting cost effectiveness is $73,300/lb
mercury. We continue to maintain, as proposed in the 2023 supplemental
proposal, that the cost effectiveness for the BTF control of mercury is
unreasonable and are promulgating the MACT floor emission standard for
existing sources.
d. What is the rationale for our final approach and final decisions for
the mercury revisions made pursuant to CAA section 112(d)(2) and (3)?
As described in the 2022 proposal and the 2023 supplemental
proposal, the 2002 major source NESHAP does not include standards for
mercury. We are finalizing, as proposed in the 2022 proposal, the new
source MACT floor mercury limit of 0.00097 lb/hr mercury. As stated in
the 2022 proposal, the new source MACT floor mercury limit was
calculated based on emissions data from the best performing facility,
which is Asarco in this case. We are finalizing, as proposed in the
2023 supplemental proposal, the existing source MACT floor mercury
limit of 0.033 lb/hr mercury. As discussed in section IV.C.3.c. of this
preamble, we made some revisions to the cost of mercury controls that
were included in the 2023 supplemental proposal. These revisions
improved the completeness of our estimates but did not change our
conclusion that the costs of the BTF option for controlling mercury
with a polishing baghouse and ACI at the vent fume stack are
unreasonable ($73,000/lb mercury reduced). We also considered other BTF
options, but all other options were less cost-effective than additional
controls of the vent fume stack using the baghouse/ACI option. We note
the BTF options we considered are higher than historic acceptable cost
effectiveness values for mercury. The highest historic acceptable cost-
effective values in the 2011 final MATS rule were up to $22,400 per
pound of mercury reduced in 2007 dollars (which equates to about
$32,000 per pound in current dollars). We are finalizing, as proposed,
that compliance with the mercury emissions limit for new and existing
sources will be demonstrated through an initial compliance test for
each of the affected sources (e.g., furnaces, converters, anode
refining) followed by a compliance test at least once every year.
4. Other Unregulated HAP
a. What did we propose for the unregulated HAP pursuant to CAA section
112(d)(2) and (d)(3)?
During the public comment period of the 2022 proposal, the EPA
received comments claiming there were additional unregulated HAP from
the source category beyond those we addressed in the 2022 proposal. In
response to these public comments, the EPA issued a CAA section 114
information request to collect further information. The information
request was sent to the Freeport facility only, as the Asarco facility
has been idled since October 2019. The collected data indicated the
following additional unregulated pollutants are emitted from the source
category: benzene, D/F, HCl, chlorine, PAH (including naphthalene), and
toluene. These pollutants are mainly emitted due to the combustion of
natural gas and coke. Based on this new information, the EPA proposed
the following MACT floor emission limits for these pollutants in the
2023 supplemental proposal:
1.7E-03 lbs benzene/ton concentrated ore fed for new and
existing sources;
8.4E-04 lbs toluene/ton concentrated ore fed for new and
existing sources;
1.5E-03 lb/ton concentrated ore fed for HCl for new and
existing sources;
5.4E-03 lbs chlorine/ton concentrated ore fed for new and
existing sources;
1.0E-04 lbs PAH excluding naphthalene/ton concentrated ore
fed for new and existing sources;
2.8E-04 lbs naphthalene/ton concentrated ore fed for new
and existing sources; and
60 ng D/F TEQ/Mg concentrated ore fed for new and existing
sources.
We also proposed that compliance with the unregulated HAP emissions
limits for each affected source will be demonstrated through an initial
performance test followed by a compliance test at least once every 5
years.
b. How did the unregulated HAP revisions made pursuant to CAA section
112(d)(2) and (3) change since proposal?
As described in section IV.C.4.a., we proposed MACT floor emission
limits for benzene, D/F, HCl, chlorine, PAH (including naphthalene),
and toluene. The decision not to propose BTF emission limits was based
on the results of our BTF analysis. The BTF analysis assumed ACI or DSI
would be installed with an existing scrubber to achieve the expected
emission reductions. However, based on comments received on this
analysis as discussed in section IV.C.4.c. of this preamble and the
promulgation of additional controls for the Hoboken converter process
fugitive capture system, we made revisions to our BTF analysis.
Specifically, we revised the BTF control options to be the addition of
ACI or DSI to the baghouse control device we expect will be installed
upstream of the aisle scrubber to control
[[Page 41678]]
the Hoboken converter process fugitive capture system, rather than a
scrubber. We revised the expected emission reductions for each
unregulated HAP (i.e., benzene, D/F, HCl, chlorine, PAH (including
naphthalene), and toluene) to reflect the assumption that the baghouse
will receive about 75 percent of the loading to the aisle scrubber. The
performance test results that were used to quantify emission reductions
of the unregulated HAP were conducted at the outlet of the aisle
scrubber. Therefore, we are revising the emission reduction estimates
provided in the 2023 supplemental proposal to be based on the expected
loading to the baghouse. We did not identify any BTF options for HCl
because the MACT floor emission standard was set at 3 times the
representative detection limit (3xRDL) and it is infeasible to measure
lower levels of this pollutant. For Cl, we adjusted our expected
emission reductions from the addition of DSI based on an expected
control efficiency of 98 percent to 20 percent. This control efficiency
adjustment was in response to a comment we received from Freeport.
Freeport commented that the stack test data was taken from the aisle
scrubber outlet; because the aisle scrubber is a caustic scrubber
additional reduction of acid gases would be expected to be far lower
than our proposed 98 percent. They estimated it should be 0 to 20
percent. We agree and thus updated the expected control efficiency to
20 percent. Finally, as noted previously in this preamble, during the
comment period for the 2023 supplemental proposal, we received comments
on control costs and performed a holistic review of all control cost
estimates for this rulemaking. These comments stated that installation
costs and indirect costs including engineering, procurement, and
construction management, as well as startup costs and contingency had
not been included in our estimates. We also received comments regarding
the sizing of a DSI system for the baghouse for the Hoboken converter
process fugitive capture system as discussed in section IV.B. The costs
for ACI and DSI were updated to include installation and indirect costs
including contingency for completeness and were updated in response to
comments regarding the sizing of such systems for the baghouse expected
to be required for controlling the Hoboken converter process fugitive
capture system. Based on these revisions, the quantity of expected
emission reductions from the addition of DSI or ACI was reduced, and
the overall cost effectiveness increased for unregulated HAP. This did
not change our proposal to base numerical emission standards for these
pollutants on the MACT floor. The detailed emission reductions and cost
estimates for the revised BTF options for this final rule are provided
in a memorandum entitled Estimated Cost for Beyond-the-floor Controls
for Unregulated HAP Emissions from Primary Copper Smelting Facilities--
REVISED, which is available in the docket for this action. Units of
unregulated HAP were also revised from pounds (or nanograms) per ton
(or Mg) concentrated ore fed, as applicable, to pounds (or nanograms)
per ton (or Mg) of copper concentrate feed charged to the smelting
vessel.
c. What key comments did we receive on the unregulated HAP revisions
made pursuant to CAA section 112(d)(2) and (3) and what are our
responses?
Comment: Commenters appreciated that the EPA proposed MACT
standards for the unregulated pollutants, but they also encouraged the
EPA to reconsider the BTF options for control of these pollutants and
require the additional control requirements. Commenters questioned the
approach used to evaluate the BTF cost of controls for the nonregulated
pollutants. By taking a pollutant-by-pollutant approach to assessing
the cost per ton of pollution, the EPA's approach makes the cost
assessment very high. For example, the BTF control options for benzene,
PAH, naphthalene, and D/F were all estimated with the addition of ACI
to the existing control device. So, the capital outlay and operational
cost should include the tons per year (tpy) reduction of all pollutants
instead of looking at the cost per ton for each one individually.
Similarly, the BTF control for HCl and Cl is DSI, so one control will
address both pollutants.
Response: We conclude that even by evaluating the combination of
pollutants noted by the commenter, we would still consider the costs of
complying with the BTF standards for these HAP not reasonable in this
case. Generally, we find that the annualized emissions of these
unregulated HAP are quite low, and our BTF analysis which informed the
2023 supplemental proposal concluded that the costs and cost-
effectiveness associated with the BTF options were not reasonable. For
more details on the BTF analysis, see the memorandum entitled Estimated
Cost for Beyond-the-floor Controls for HAP Emissions from Primary
Copper Smelting Facilities--REVISED, which is available in the docket
for this action.
Comment: Commenters stated the proposed MACT standards for the
unregulated HAP are inappropriate because they would apply to both the
Freeport facility and the Asarco facility when they are based on
emissions data and information collected exclusively from the Freeport
facility, and unique to Freeport's use of fuels and other raw materials
which are precursors to such HAP emissions from the Freeport facility.
Commenters stated that promulgation of the MACT standards would,
therefore, violate 42 U.S.C. 7412(d)(3)(B) for failing to be based
empirically or predictively on HAP emissions data and information
pertaining also to the Asarco facility. Commenters stated the EPA
should engage with Asarco to determine whether the facility has
relevant HAP emissions data for consideration in the rulemaking, or not
set standards for HCl, Cl or D/F because: (1) the overall emissions
profiles of these HAP would be particularly sensitive to variations in
feed to the smelter, including changes in quantities and qualities of
fuel and additives, such as coke, flux and scrap; and (2) the
individual stack emissions profiles of these HAP--including
distributions and emissions rates--would vary greatly between the point
sources at the Freeport facility and the point sources at the Asarco
facility, due to the substantial differences between the process flows
and gas flows (including capture) at the Freeport facility and the
process flows and gas flows (including capture) at the Asarco facility.
Commenters also contended that the MACT standards for unregulated HAP
are based on a single testing campaign; therefore, a representative
MACT floor cannot be established. Commenters noted that additional
performance testing of the unregulated HAP will be conducted at the
Freeport facility in the fourth quarter of 2023 and first quarter of
2024, and they asked that the EPA allow for submittal and consideration
of these data (which they said they will be able to provide at least
several weeks prior to the May 4, 2024, deadline for final rule
publication) when establishing limits in the final rule. In the absence
of additional data, commenters believe that a representative MACT floor
cannot be established, and any regulatory action should be postponed or
limited to workplace standards.
Response: The proposed unregulated HAP standards were developed
based on the 99 percent UPL of the available emissions data for this
source category, which included data collected through the 2022 section
114 information request to Freeport. The testing associated with
Freeport's section 114 information request response was
[[Page 41679]]
conducted using the EPA prescribed test methods, and the results were
reviewed by EPA measurement experts upon submission. We did not find
equivalent data from Asarco in the administrative record. Nevertheless,
the EPA is allowed to and required to establish MACT standards for a
source category based on sources for which we have emissions data;
thus, the data for Freeport must be used for the source category in the
absence of data from Asarco. The 3 data points we used to set the floor
are the minimum sample size necessary to use the 99 percent UPL
approach to develop a MACT standard. While we acknowledge this is a
limited dataset, we followed the EPA protocol for developing MACT from
limited datasets which was described in Appendix B of the Proposed
Maximum Achievable Control Technology (MACT) Floor Analysis for
Unregulated HAP for the Primary Copper Smelting Major Source Category
memorandum (Docket ID No. EPA-HQ-OAR-2020-0430-0153); therefore, we
disagree that we have insufficient data to develop numerical emission
standards based on the MACT floor.
As described in section IV.C.3.c. of this preamble, we note that we
received an additional test report for these non-metal HAPs on January
29, 2024, well after close of the public comment period (i.e.,
September 22, 2023). However, for the reasons described in section
IV.C.3.c., we did not incorporate these new data in our analyses to
establish revised standards for the final rule. Therefore, we are
promulgating the MACT floor emission standards for these unregulated
HAP, as proposed.
Comment: Commenters agreed with the EPA's conclusion that the BTF
options for controlling unregulated HAP are not cost effective. They
also noted these control options, which include the use of ACI and DSI
in combination with the aisle scrubber, are not technically feasible.
Commenters noted that the aisle scrubber is a wet scrubber designed for
acid gas control, and the use of either ACI or DSI would require a
high-efficiency particulate control device such as a baghouse to
collect the injected material. The commenter stated that the addition
of a baghouse would significantly increase control costs for the
pollutants, making the cost effectiveness of their control poorer. With
regards to HCl and Cl, commenters stated the EPA's estimated emissions
reductions of 98 percent for these pollutants using DSI injection is
not practical given their already efficient removal by the aisle
scrubber and thus already very low stack concentrations. DSI could not
be expected to reduce emissions of these pollutants by more than 20
percent and could potentially result in 0 percent emission reduction.
Response: As described elsewhere in this preamble, we are
promulgating a combined emission standard for the combination of
exhaust streams from the anode refining department and the Hoboken
converter process fugitive capture system. At the Freeport facility,
the anode refining department and the Hoboken converter process
fugitive capture system exhaust streams combine in the aisle scrubber
from which they are emitted to the atmosphere. The Freeport facility
controls the anode refining department emissions with a baghouse prior
to routing the exhaust to the aisle scrubber. We expect that the
combined standard we are promulgating in this action will require the
installation of a baghouse to control the emissions stream from the
Hoboken converter process fugitive capture system. Therefore, the costs
for a primary particulate control device of the emission streams which
combine in the aisle scrubber will be incurred to comply with the
combined emission standard. As discussed in section IV.C.4.b., in
response to comments for this rulemaking we are amending our cost
estimates included in the 2023 supplemental proposal for controlling
these unregulated HAP to include installation and indirect costs
including contingency as well as to address comments regarding the
sizing of these injection systems. We continue to expect that DSI/ACI
systems would be required to provide control for these pollutants, and,
thus, our revised estimates continue to represent the incremental costs
of adding these systems to an existing control device, which will now
be the baghouse required for compliance with other requirements in this
final rulemaking. As noted in our previous discussion of the baghouse
for the Hoboken converter process fugitive capture system, the baghouse
receives about 75 percent of the loading to the aisle scrubber. The
performance test results which were used to inform the emission
standards and to quantify emission reductions of the unregulated HAP
(i.e., benzene, D/F, HCl, chlorine, PAH (including naphthalene), and
toluene) were conducted at the outlet of the aisle scrubber. Therefore,
we are revising our emission reduction estimates provided in the 2023
supplemental proposal to be based on the expected loading to the
baghouse (i.e., 75 percent of the emission rates from the aisle
scrubber outlet). Concerning the control efficiency applied to HCl and
Cl emissions, we note that the measurements of emission rates were
taken at the outlet of the aisle scrubber. The aisle scrubber is
designed to reduce acid gases including HCl and Cl; therefore, we agree
with commenters that assuming an additional 98 percent reduction of the
emission rates at the aisle scrubber in our BTF evaluation is likely
technically infeasible. In reviewing the data for HCl, we note that the
99 percent UPL was less than 3 times the representative detection limit
(3xRDL), thus the emission standard was set at 3xRDL consistent with
EPA emission standard development procedures. Therefore, it is
infeasible to measure lower levels of HCl and we are no longer
considering BTF options for this pollutant. However, we have revised
our estimated emission reductions for Cl to assume a 20 percent
reduction. The revisions to the expected quantity of emission
reductions and our cost estimates result in increased cost
effectiveness for these unregulated HAP. For chlorine, benzene,
toluene, and PAH, the cost effectiveness ranges from $8.1 million/ton
HAP reduced to $120 million/ton of HAP reduced. For D/F, the cost
effectiveness is $107 million/gram of HAP reduced. These revisions do
not change our conclusion that the BTF costs for controlling these
pollutants are unreasonable, and we are therefore promulgating the MACT
floor standards. The details of our BTF analysis can be found in
Estimated Cost for Beyond-the-floor Controls for HAP Emissions from
Primary Copper Smelting Facilities--REVISED, which is available in the
docket for this rulemaking.
Comment: Commenters noted that the proposed standards for
unregulated HAP are a function of concentrated ore fed, i.e., the
emission limits are pounds per ton concentrated ore fed. Commenters
stated that some of these compounds are not correlated with ore
composition, but instead with natural gas consumption or impurities
from third party copper scrap recycling. The commenters noted that
additional performance testing should be conducted to inform whether
other operating parameters influence emissions.
Response: We used production-based thresholds to provide equitable
emission standards for other facilities in the source category. No data
was provided by FMMI indicating whether copper scrap was part of the
feed during the performance tests which informed the emission
standards. However, in light of the possibility that copper scrap was
part of the feed during the tests conducted in response to the 2022
[[Page 41680]]
section 114 information request, we are changing the denominator from a
concentrated ore fed basis to a copper concentrate feed charged to the
smelting vessel basis, where ``copper concentrate feed'' is defined in
40 CFR 63.1459.
d. What is the rationale for our final approach and final decisions for
the unregulated HAP revisions made pursuant to CAA section 112(d)(2)
and (3)?
As discussed in the 2023 supplemental proposal, the EPA identified
benzene, toluene, HCl, Cl, PAHs, and D/F in the major source category
for which the 2002 major source NESHAP did not include standards.
Except for HCl, the standards we are promulgating for unregulated HAP
are MACT floor limits based on the 99 percent UPL. For HCl, the 99
percent UPL was less than 3xRDL for HCl, therefore, consistent with EPA
guidelines, the latter was used to set the MACT floor limit. As
discussed in the 2023 supplemental proposal, the EPA evaluated BTF
limits for each pollutant but did not propose them due to unreasonable
costs. Therefore, consistent with the 2023 supplemental proposal, we
are promulgating numerical emission standards for each unregulated HAP
(i.e., benzene, D/F, HCl, chlorine, PAH excluding naphthalene,
naphthalene, and toluene). We are also promulgating, as proposed, that
compliance with these standards will be demonstrated by an initial
performance test and subsequent performance testing at least once every
5 years.
5. New Copper Converter Departments
a. What did we propose for the new copper converter departments
pursuant to CAA section 112(d)(2) and (d)(3)?
The EPA proposed in the 2022 proposal a MACT floor limit for new
copper converters of 0.031 lbs of PM10 per ton of copper
concentrate feed charged to the smelting vessel. We also proposed that
compliance with the PM10 emissions limit for new copper
converter departments will be demonstrated through an initial
performance test followed by compliance test at least once per year.
b. How did the new copper converter departments revisions made pursuant
to CAA section 112(d)(2) and (3) change since proposal?
The proposed limit and compliance requirements were not changed.
c. What key comments did we receive on the proposed new copper
converter departments revisions made pursuant to CAA section 112(d)(2)
and (3) and what are our responses?
The EPA did not receive notable comments on the proposed limit or
proposed compliance requirements.
d. What is the rationale for our final approach and final decisions for
the new copper converter departments revisions made pursuant to CAA
section 112(d)(2) and (3)?
As discussed in the 2022 proposal, the 2002 major source NESHAP
current requirement for new converters is that the use of new batch
copper converters is prohibited. Any new copper converters covered by
the major source NESHAP would need to be continuous converters or some
other currently unknown non-batch converter technology. However, the
2002 major NESHAP did not include an emissions standard for new
converters. Therefore, pursuant to CAA section 112(d)(2) and (3), the
EPA is finalizing, as proposed in the 2022 proposal, the MACT floor
limit for new copper converters of 0.031 lbs of PM10 per ton
of copper concentrate feed charged to the smelting vessel and related
compliance requirements. As discussed in the 2022 proposal, there are
currently no existing continuous converters in the major source
category, and therefore, we did not propose and are not finalizing an
emission standard for existing continuous copper converters. Also as
discussed in the 2022 proposal, since there are no existing continuous
copper converters in the major source category, the PM10
limit is based on the performance of the best similar source, which is
the Kennecott primary copper smelting facility. We did not identify any
cost-effective BTF options.
D. Final Rule Amendments Addressing Bypass Stack Emissions
1. What revisions did we propose for bypass stack emissions?
We proposed in the 2023 supplemental proposal prohibiting the use
of a bypass stack. We also proposed in the 2023 supplemental proposal a
definition of ``bypass stack'' in 40 CFR 63.1459 and proposed that use
of a bypass stack will result in a violation of the numerical emission
standards contained in the Primary Copper Smelting NESHAP in 40 CFR
63.1444. We proposed that the use of a bypass stack during a
performance test will invalidate the test.
2. How did the bypass stack revisions change since proposal?
Based on consideration of comments, the EPA is not prohibiting the
use of a by-pass stack. Instead, EPA is promulgating a work practice
standard pursuant to CAA section 112(h) to minimize HAP emissions
vented through a bypass stack during planned maintenance events. We are
promulgating work practices instead of an emissions limit because we
determined it is not economically or technically feasible to complete
valid PM compliance tests during these events. When it is infeasible to
reliable conduct valid compliance tests, such as in this case, the CAA
section 112(h) allows EPA to establish work practice standards instead
of a numerical emissions limit.
When the bypass stack is used, the process concentrate feed will be
ceased, but pollution controls will remain operating until no copper is
being processed by the converters. During these periods, a charge
remains in the electric furnace to ensure the material remains molten,
any additional emissions from the smelting process are nominal because
the smelting furnace and converters are not operating, and a crust will
form on the slag surface of the electric furnace minimizing flow rate
and emissions. Only once the crust is formed, the bypass is then opened
to vent residual gases prior to conducting maintenance. A CEMS for flow
and SO2 or a PM detector at the duct for the bypass stack
may be used, and data from the CEMS confirms the emissions during these
planned maintenance activities are minimal. We are revising the
definition of a bypass stack to reflect this approved purpose.
3. What key comments did we receive on the proposed bypass stack
revisions and what are our responses?
Comment: Several commenters supported the EPA's proposal to
prohibit the use of bypass stacks, noting that a bypass stack is a
negligent mechanism that promotes a reactive rather than a proactive
approach to a facility's pollution. One user of bypass stacks disagreed
with the proposal to eliminate their use, noting it is overly broad and
ignores essential work practices designed to ensure the safe
maintenance of process and pollution control equipment. The commenter
noted that the bypass is used during maintenance and in particular
prior to entering process vessels or confined spaces. In these
instances, the commenter explained that the concentrate feed is ceased,
but pollution
[[Page 41681]]
controls remain operating until no more copper is being processed by
the converters. During these periods, a charge remains in the electric
furnace to ensure the material remains molten, any additional emissions
from the smelting process are nominal because the smelting furnace and
converters are not operating, and a crust will form on the slag surface
of the electric furnace minimizing emissions. The commenter further
explained that the bypass is then opened to vent residual gases prior
to conducting maintenance. The commenter noted that they operate a CEMS
for flow and SO2 at the duct for the bypass stack, and data
from this CEMS confirms the SO2 emissions during these
maintenance activities are minimal. The commenter does not believe it
is appropriate for the use of the bypass to be considered a violation
of the numerical emission standards of the NESHAP or a bypass of the
associated air pollution control devices (APCDs). In the maintenance
periods when the bypass is used, emissions are expected to be small and
below applicable limits, and air pollution control equipment is either
not possible or unnecessary. The commenter recommended that the EPA
promulgate work practice standards to regulate the use of the bypass.
An additional comment was submitted after the comment period ended
which also explained in more detail the challenges of testing the
bypass stack siting zero or near zero velocities and volumetric flow
rates at the stack.
Response: The EPA has reviewed the information provided and we are
establishing a work practice standard for use of the bypass stack to
allow planned maintenance of the control devices and processes to be
conducted safely. When the bypass stack is used, the work practice must
be followed, and the smelting furnaces and converters must not be
operating. The control devices will remain operational until a crust is
formed on the slag and emissions are minimal. The HAP emission limits
are on a concentrate feed basis and during the work practice standards
the feed concentrate ceases so the HAP limit is not applicable. Since
the bypass stack is only used in planned maintenance, flow rate and
SO2 will be minimal but need to be monitored and emissions
are expected to be minimal due to the low or lack of flow rate and when
the work practice standards are implemented. We are finalizing the
definition ``bypass stack'' in 40 CFR 63.1459. We are also finalizing
that the use of a bypass stack during a performance test will
invalidate the test. These conditions are consistent with the EPA's
interpretation of the application of the court's decision in Sierra
Club v. EPA, 551 F. 3d 1019 (D.C. Cir. 2008).
4. What is the rationale for our final approach and final decisions for
bypass stack emissions?
The EPA's rationale for allowing the use of a bypass stack is to
ensure safety during essential planned maintenance events, and the
approach being finalized ensures that applicable emission limits
continue to be met. For this reason, we are promulgating the following
work practice standard for the use of bypass stacks at Primary Copper
Smelters:
In the case of planned maintenance, feed to the IsaSmelt[supreg]
Furnace must cease; power to the electric furnace must be lowered and a
crust must be allowed to form on the surface of the slag; the operation
of the converters must cease and the converters rolled out; and the
operation of the anode vessels must cease. Once the main process units
are shut down, residual process gases may be re-directed from the acid
plant. If the fan to the anode refining point source baghouse is
functioning, then the residual process gases must be redirected to the
control device. If there is a shutdown or emergency shutdown event, the
control devices should continue to run until process emissions cease.
If the control devices are shut down before the process emissions cease
and the bypass stack is used to vent to the process gas to the
atmosphere, there will be a violation of the work practice standards.
In addition to this work practice standard, we finalize, as proposed,
that the use of a bypass stack is not permitted during compliance
performance tests of the processes. We estimate that Freeport will not
incur costs to comply with the final work practices because they are
already implementing them at their facility.
E. Final Rule Amendments Addressing Compliance Dates
1. What compliance dates did we propose?
In the 2022 proposal, the EPA proposed that existing facilities
must comply with the anode refining point source limit within one year.
In the supplemental proposal, we proposed a combined roofline PM
emission limit with a compliance timeframe of 2 years following
promulgation, and a 1-year compliance timeframe following promulgation
for emission limits for mercury, HCl, chlorine, D/F, benzene, toluene,
PAHs excluding naphthalene, and naphthalene. We also proposed in the
supplemental proposal a compliance timeframe of 2 years following
promulgation for the co-proposed options for the aisle scrubber at
Freeport.
2. How did the compliance dates change since proposal?
We are promulgating option 2 for the aisle scrubber at Freeport,
which we expect will require the installation of PM controls (such as a
baghouse) to control emissions from the Hoboken converter process
fugitive capture system in order to comply with the emission standard
(a combined PM limit at the aisle scrubber outlet). Option 2 is being
promulgated pursuant to section 112(d)(6); therefore, we are revising
its compliance date to 3 years following promulgation. We are also
revising the compliance time for anode refining point sources. As
discussed in section III.F., for anode refining point sources where the
anode emissions are not combined with Hoboken converter process
fugitive capture system emissions in an aisle scrubber, we are
finalizing the proposed requirement that existing facilities must
comply within 1 year after promulgation. For anode refining point
sources that combine their anode emissions with Hoboken converter
process fugitive capture system emissions in an aisle scrubber,
compliance with the anode refining point source limit will be
demonstrated through compliance with the combined PM limit at the aisle
scrubber outlet and its associated compliance date.
3. What key comments did we receive on the proposed compliance dates
and what are our responses?
Comment: Commenters stated that the EPA should allow 3 years for
compliance with the combined roofline PM emission limit. The commenters
stated there are also significant practical reasons for a 3-year
compliance period including the complex design and engineering of the
most cost efficient and reliable combination of control options to
achieve the targeted emission reductions. According to the commenters,
the design and engineering involves multiple time-consuming steps to
(i) assess the emission sources, (ii) evaluate the potential control
options for effectiveness, reliability and cost, (iii) design
engineering of the final scope, (iv) procurement in a current
environment where supply issues are common, (v) construction, and
finally (vi) startup, which will be challenging to accomplish in 3
years, much less 2.
Response: We acknowledge the complex nature of the engineering
involved to evaluate the best controls to
[[Page 41682]]
use to comply with the final combine roofline PM standard, as well as
the potential supply issues; however, the combined roofline PM emission
limit is being promulgated pursuant to CAA section 112(f)(2), to
address unacceptable risk. Section 112(f)(2) of the CAA allows up to
two years after the effective date of a standard to comply if the
Administrator finds it is necessary for the installation of controls.
4. What is the rationale for our final approach and final decisions for
compliance dates?
We are promulgating compliance times for the standards in the rule
based on time frames allowed in CAA, which includes up to 2 years for
section 112(f)(2), and up to 3 years for sections 112(d)(2) and (3),
and 112(d)(6), along with our judgement of when the standards can be
met. The final compliance dates are as follows:
Three years within promulgation for meeting the combined
PM limit for the anode point source emissions that are combined with
Hoboken converter process fugitive capture system emissions;
Three years within promulgation for meeting the anode
refining point source standard for anode point source emissions that
are combined with Hoboken converter process fugitive capture system
emissions;
One year within promulgation for meeting the anode
refining point source standard for anode point source emissions that
are not combined with Hoboken converter process fugitive capture system
emissions; and
Two years within promulgation for meeting the combined
roofline PM emission limit;
Three years within promulgation for meeting the combined
roofline lead emission limit and design standards;
One year within promulgation or meeting standards for
mercury, HCl, chlorine, D/F, benzene, toluene, PAHs excluding
naphthalene, and naphthalene; and
180 days within promulgation for all other revisions
including compliance with SSM revisions and bypass stack revisions.
For new sources, all standards in the rule are effective
immediately upon the effective date of the standard, or upon startup,
whichever is later. We are finalizing a new table, table 4, in the 40
CFR part 63, subpart QQQ, to provide the applicability and compliance
dates for the new standards to assist facilities with determining these
timeframes.
F. Other Major Comments
Comment: A commenter stated that they understood the EPA's
assertion that fenceline monitoring is not appropriate for this source
category given roof top emissions would not be measured at the
fenceline. The Commenter stated that HAP metals tend to deposit within
a few miles of the facility and therefore suggested that EPA consider
community monitoring similar to those proposed in the Ethylene Oxide
Sterilizer Rule.
Another commenter noted that the EPA's assertion that fenceline
monitoring is not appropriate for this source category is refuted by
EPA's air toxics standards for integrated iron and steel mills (``Steel
Mills''), in which the agency finds that fugitive emissions come from
heights of 100 feet or more and proposed fenceline monitoring.
Alternatively to fenceline monitoring, the EPA could provide for
monitors placed higher up, either on existing structures or structures
built for the purpose but does not even discuss this possibility.
Response: As stated in the 2023 supplemental proposal, we
considered the possibility of a fenceline monitoring requirement and
determined that it is not appropriate for this source category. When
considering whether fenceline monitoring was appropriate for this
source category, we examined the potential for fugitive HAP emissions
to be significant, particularly at or near ground level, and whether
there are measurement capabilities for the expected pollutants to be
monitored, in this case lead and/or arsenic. For this source category,
we did not identify any significant sources of ground level emissions.
Other considerations included whether there are similar sources located
at facilities in other source categories where fenceline monitoring is
already being conducted. For example, we recognize that one similarity
between integrated iron and steel facilities and primary copper
facilities is that both source categories have fugitive metal HAP
emissions from roof vents, and as mentioned by the commenter, EPA is
requiring fenceline monitoring of chromium at the II&S facilities.
However, there are also important differences. First, we are
promulgating process fugitive numeric emission limits for the roofline
vents at major source primary copper smelters and requirements for
annual compliance testing of the roofline vents at these sources. In
contrast, the integrated iron and steel final rule (89 FR 23294, April
3, 2024) did not include numeric emission limits for the roofline vents
and does not require any emissions testing from the roof vents (other
than opacity readings). Instead, in the Integrated Iron and Steel
NESHAP, the EPA finalized the following: (1) work practice standards
for the basic oxygen process furnaces (BOPFs), Bell Leaks (charging
operation) and beaching; and (2) opacity limits for slag processing and
planned bleeder valve openings. Secondly, we note that some of the
sources of fugitive emissions at integrated iron and steel are at
ground level such as slag processing and beaching. We have not
identified any significant sources of ground level fugitive emissions
at the primary copper smelters. Furthermore, regarding fugitive
emissions from the roof vents, unlike Primary Copper facilities (for
which we have test data and will obtain future test data through
emissions testing requirements), we have no emissions test data from
roof vents at integrated iron and steel (II&S) facilities. Therefore,
in the integrated iron and steel rulemaking, fenceline monitoring for
chromium was proposed and finalized to ensure that the work practices
and opacity limits for these unmeasured fugitive and particulate
emissions sources at integrated iron and steel facilities are achieving
the anticipated reductions.
In addition, we disagree with the commenter's suggestion to place
monitors at an elevated height. Fenceline ambient air monitors are
typically used to monitor the potential exposure of nearby communities
to ground level pollutant emissions; therefore, placing monitors at a
height higher than the standard 1.5 meters (the breathing zone) would
not be appropriate.
Furthermore, there are lead monitors and arsenic monitors already
in the surrounding community nearby the major source facilities, and,
as stated in the 2022 proposal, Utah Division of Air Quality (UDAQ),
conducted lead ambient monitoring near the area source facility
(Kennecott) from January 2010 through June 2017. With EPA's
concurrence, this lead monitor was shutdown after UDAQ was able to
demonstrate that the likelihood of violating the NAAQS for lead was so
low that it was no longer necessary to monitor.
We maintain in the final rule, as stated in the 2023 supplemental
proposal, that these characteristics suggest that fenceline
monitoring-- which is typically used to detect emissions that can be
difficult to control or measure at the points where they are emitted,
and to identify the need for follow-up investigation and corrective
action--would have relatively limited
[[Page 41683]]
value in the context of this primary copper smelting source category.
We also note that while the EPA's EtO Sterilizers proposal
requested comment on the appropriateness of community monitoring, EPA
did not propose or finalize fenceline or ambient air monitoring
requirements in the EtO Sterilizers rule (88 FR 22790, April 13, 2023;
89 FR 24090, April 5, 2024).
Comment: A commenter stated that process fugitive emissions
captured and ducted to a baghouse, emissions from the secondary capture
system for the converter department and the anode refining department
or the alternative proposed baghouse-based emissions from the converter
department should be monitored by PM CEMS to ensure compliance.
Response: The EPA has included PM CEMS as an option for continued
compliance in the final rule. Either an operating parameter established
during the performance test or PM CEMS will be utilized to demonstrate
continued compliance.
V. Summary of Cost, Environmental, and Economic Impacts and Additional
Analyses Conducted
A. What are the affected facilities?
The Primary Copper Smelting source category includes any facility
that uses a pyrometallurgical process to extract copper from copper
sulfur ore concentrates, native ore concentrates, or other copper
bearing minerals. There are currently 3 copper smelting facilities: 2
are major sources and 1 is an area source. No new copper smelting
facilities are currently being constructed or are planned in the near
future.
1. 40 CFR Part 63, Subpart QQQ
The affected sources subject to 40 CFR part 63, subpart QQQ, the
major source NESHAP, are copper concentrate dryers, smelting furnaces,
slag cleaning vessels, copper converter departments, and fugitive
emission sources.
2. 40 CFR Part 63, Subpart EEEEEE
Under 40 CFR part 63, subpart EEEEEE, the area source NESHAP, the
affected sources are copper concentrate dryers, smelting vessels,
converting vessels, matte drying and grinding plant, secondary gas
systems, anode refining furnaces, and anode shaft furnaces.
B. What are the air quality impacts?
The final amendments in this action would achieve about 8.0 tpy
(7.99 tpy rounded) reduction of HAP metals emissions (primarily lead,
arsenic, cadmium) from process fugitives associated with roofline vents
and emissions from the aisle scrubber (combined primary emissions from
anode refining department and emissions from the Hoboken converter
process fugitive capture system). In this action, we are also
finalizing additional work practices that we estimate will achieve some
additional unquantified HAP emissions reductions. These final
amendments will also reduce risks to public health and the environment,
as described above in this preamble.
Furthermore, we are finalizing new standards for mercury, benzene,
toluene, HCl, chlorine, PAH, and dioxins/furans. We do not expect to
achieve reductions in emissions with these new standards. However,
these standards will ensure that the emissions remain controlled and
minimized moving forward. The final amendments also include removal of
the SSM exemptions.
C. What are the cost impacts?
As described above, the PM standard for the combined emissions from
roofline vents would require additional controls to be installed at the
Freeport facility. We estimate capital costs of $10.2 million and total
annual costs of $2.3 million (includes annual testing costs) for
Freeport (2022 dollars). Total annual costs include annualized capital
costs, annual operating and maintenance costs, and annual testing
costs. Additionally, we estimate that the Freeport facility will need
to install additional controls to comply with the emission limit for
the combined gas stream including the anode refining point source and
the Hoboken converter process fugitive capture system. We estimate
capital costs of $59.5 million and total annual costs of $10.8 million
will be incurred by Freeport. The Asarco facility will need to install
additional controls to comply with the design standards and lead
emission limit in this final rule. We estimate capital costs of $15.4
million and total annual costs (including testing) of $3.9 million will
be incurred by Asarco.
We expect that both Asarco and Freeport will incur additional costs
for compliance testing. The estimated annual costs for performance
testing of the previously unregulated HAP are $87,980 for the Freeport
facility and $113,340 for the Asarco facility. The estimated annual
costs for compliance testing for the anode refining point source and
roofline PM emissions standards for the Asarco facility is $138,157.
The total annual costs of all the final requirements (i.e.,
annualized capital, annual operating and maintenance, and annual
emissions testing costs) are estimated to be about $17.3 million. The
total capital costs of the final rule are estimated to be about $85.1
million.
D. What are the economic impacts?
The economic impacts associated with this final rule were estimated
over an 8-year time frame from 2024 to 2031 using 3 percent and 7
percent discount rates. The present value (PV) of the estimated costs
of this final rule, discounted at a 7 percent rate over the 2024 to
2031 period, is $139 million in 2022 dollars. The equivalent annual
value (EAV) of the estimated costs is $23 million at a 7 percent
discount rate. At a 3 percent discount rate, the PV and EAV of the cost
impacts are estimated to be $146 million and $21 million, respectively.
This final rule does not impact any small entities.
This final rule is not expected to have significant impacts on
domestic copper production; the market price for commercial grade
copper or any products comprised of copper inputs; or employment, for
several reasons. First, the estimated annual costs of this final rule
are expected to be small compared to the potential annual revenues of
the U.S. primary copper smelting industry. For example, the U.S.
Geological Survey (USGS) estimates 2020 primary copper smelter
production was 315,000 mt.\7\ Applying an export price for
unmanufactured anodes and blister of $5,400 per mt that year, industry
revenues in 2020 would have been an estimated $1.7 billion.\8\ The
estimated annual costs of the final rule ($18 million) represent about
one percent of this 2020 annual revenue estimate. Additionally, the
affected companies are accustomed to spending large sums on annual
maintenance. The 2022 annual report for Freeport-McMoran noted that
they spent $87 million on annual maintenance in 2021 at the Miami
smelter.\9\ The estimated annual costs of this final rule for this
Freeport facility are $13 million, which is much lower than those
maintenance expenditures. In addition, Freeport benefits from
integrating its mining operations with its smelter. By being vertically
integrated, Freeport is able to insulate itself from volatility in the
cost of
[[Page 41684]]
smelting relative to a scenario where it outsources the smelting
process. For this reason, the EPA expects that Freeport's incentive to
maintain its smelting operation may extend beyond the margins earned
solely on the smelting process. The EPA expects that Freeport can
comply with this rule while continuing to operate its smelter at a
similar capacity as it would under baseline conditions. Finally, due to
trade exposure and the commodified nature of copper products (i.e., the
interchangeability of copper products manufactured by different
producers), the EPA expects that the affected companies are price
takers, and thus we would not expect price impacts due to this final
rule. The complete economic analysis can be found in the memorandum
Economic Impact Analysis for the Final Residual Risk and Technology
Review of the National Emission Standards for Hazardous Air Pollutants
for Primary Copper Smelting Sources, available in the docket.
---------------------------------------------------------------------------
\7\ See U.S. Geological Survey. Copper Statistics and
Information. National Minerals Information Center. Annual
Publication for 2020. Available at: https://www.usgs.gov/centers/national-minerals-information-center/copper-statistics-and-information. Note that 2020, which was a year of relatively low
production compared to previous years is the most recent year for
which USGS has this information available.
\8\ Ibid.
\9\ Freeport -McMoran. 2022 Annual Report. Available at: https://s22.q4cdn.com/529358580/files/doc_financials/annual/AR_2022.pdf.
---------------------------------------------------------------------------
E. What are the benefits?
1. 40 CFR Part 63, Subpart QQQ
As described above, the final amendments would result in
significant reductions in emissions of HAP metals, especially lead and
arsenic. Both lead and arsenic are persistent bioaccumulative toxic
(PBT) HAPs and developmental toxicants, with particular impacts on
infants, children and the developing fetus. The final amendments will
reduce risk from the source category to acceptable levels and ensure
the NESHAP provides an ample margin of safety to protect public health.
The benefits associated with the emission reductions were not able to
be monetized but include reductions in both cancer and noncancer (e.g.,
developmental) endpoints. Some unquantified benefits of these
amendments will accrue to Tribal nations living in proximity to these
facilities; the reduction in cancer and non-cancer risks due to
emissions of PBT HAP metals will benefit Tribal and other communities
overburdened by air pollution. The final amendments also revise the
standards such that they apply at all times, which includes SSM
periods. Furthermore, the final requirements to submit reports and test
results electronically will improve monitoring, compliance, and
implementation of the rule.
2. 40 CFR Part 63, Subpart EEEEEE
The final amendments under 40 CFR part 63, subpart EEEEEE, revise
the standards such that they apply at all times, which includes SSM
periods. Furthermore, the final requirements to submit reports and test
results electronically will improve monitoring, compliance, and
implementation of the rule.
F. What analysis of environmental justice did we conduct?
For purposes of analyzing regulatory impacts, the EPA relies upon
its June 2016 Technical Guidance for Assessing Environmental Justice in
Regulatory Analysis, which provides recommendations that encourage
analysts to conduct the highest quality analysis feasible, recognizing
that data limitations, time, resource constraints, and analytical
challenges will vary by media and circumstance. The Technical Guidance
states that a regulatory action may involve potential environmental
justice (EJ) concerns if it could: (1) create new disproportionate
impacts on communities with EJ concerns; (2) exacerbate existing
disproportionate impacts on communities with EJ concerns; or (3)
present opportunities to address existing disproportionate impacts on
communities with EJ concerns through this action under development.
The EPA's EJ technical guidance states that ``[t]he analysis of
potential EJ concerns for regulatory actions should address three
questions: (A) Are there potential EJ concerns associated with
environmental stressors affected by the regulatory action for
population groups of concern in the baseline? (B) Are there potential
EJ concerns associated with environmental stressors affected by the
regulatory action for population groups of concern for the regulatory
option(s) under consideration? (C) For the regulatory option(s) under
consideration, are potential EJ concerns created or mitigated compared
to the baseline?'' \10\
---------------------------------------------------------------------------
\10\ Technical Guidance for Assessing Environmental Justice in
Regulatory Analysis, U.S. EPA, June 2016. Quote is from section 3--
Key Analytic Considerations, page 11.
---------------------------------------------------------------------------
The environmental justice analysis is presented for the purpose of
providing the public with as full as possible an understanding of the
potential impacts of this final action. The EPA notes that analysis of
such impacts is distinct from the determinations finalized in this
action under CAA section 112, which are based solely on the statutory
factors the EPA is required to consider under that section.
To examine the potential for Environmental Justice concerns, the
EPA conducted a baseline proximity analysis, baseline risk-based
analysis (i.e., before implementation of any controls proposed by this
action), and post-control risk-based analysis (i.e., after
implementation of the controls proposed by this action) for the
Freeport facility (tables 4 and 5). The total population, population
percentages, and population count for each demographic group for the
entire U.S. population are shown in the column titled ``Nationwide
Average'' in tables 4 and 5 of this preamble. These national data are
provided as a frame of reference.
BILLING CODE 6560-50-P
[[Page 41685]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.105
[[Page 41686]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.106
[GRAPHIC] [TIFF OMITTED] TR13MY24.107
[[Page 41687]]
[GRAPHIC] [TIFF OMITTED] TR13MY24.108
BILLING CODE 6560-50-C
The baseline proximity demographic analysis is an assessment of
individual demographic groups in the total population living within 5
km (~3.1 miles) and 50 km (~31 miles) of the facility. Approximately
32,300 and 6,600 people live within 50km and 5 km, respectively of the
Freeport facility. The results of the proximity demographic analysis
indicate that the percent of the population that is Hispanic or Latino
and that is American Indian or Alaska Native is higher than the
corresponding national averages. This is particularly true for the
population within 50km, which is 24 percent American Indian or Alaska
Native, which is significantly above the 0.6 percent national average.
The percent of people living below the poverty level and percent of
people over the age of 25 without a high school diploma are also higher
than the national averages.
The risk-based demographic analysis focused on the populations
living within 5 km (~3.1 miles) and 50 km of the Freeport facility with
estimated cancer risks greater than or equal to 1-in-1 million and
greater than or equal to 10-in-1 million resulting from Primary Copper
Smelting source category emissions. The baseline risk analysis
indicated that emissions from the source category, prior to controls in
this action, expose 6,600 people living within 5 km and 21,900 people
living within 50 km to a cancer risk greater than or equal to 1-in-1
million, and 1,500 people living within 5 km and 4,600 people living
within 50 km to a cancer risk greater than or equal to 10-in-1 million.
The post-control risk-based demographic analysis, which is an
assessment of risks to individual demographic groups in the population
living within 5 km and 50 km of the facilities after implementation of
the controls in this action (``post-control''), indicated that post-
control emissions from the source category expose 6,600 people living
within 5 km and 16,000 people living within 50 km to a cancer risk
greater than or equal to 1-in-1 million and 150 people living within 5
km and 150 people living within 50 km to a cancer risk greater than or
equal to 10-in-1 million.
The demographics of the population living within 5 km with baseline
cancer risks greater than or equal to 1-in-1 million is the same as the
total population living within 5 km (i.e., all individuals living
within 5 km have a baseline cancer risk greater than or equal to 1-in-1
million). Also, since the controls do not reduce the number of
individuals living within 5km with risks greater than or equal to 1-in-
1 million, the post-control demographics are also the same as the
baseline. The demographics of the population living within 5 km with
baseline and post-control cancer risks greater than or equal to 10-in-1
million indicates that the percentage of the population that is
Hispanic or Latino, living below the poverty level, over 25 without a
high school diploma and in linguistic isolation are significantly above
the corresponding national averages. However, the number of individuals
exposed to post-control risks greater than or equal to 10-in-1 million
is reduced by a factor of 10 for each demographic.
The demographics of the population living within 50 km with
baseline cancer risks greater than or equal to 1-in-1 million indicates
that the percentage of the population that is American Indian or Alaska
Native, Hispanic or Latino, living below the poverty level, over 25
without a high school diploma and in linguistic isolation are
significantly above the corresponding national averages. The
demographics of the population living within 50 km with post-control
cancer risks greater than or equal to 1-in-1 million indicates that the
percentage of the population that is Hispanic or Latino, living below
the poverty level, over 25 without a high school diploma and in
linguistic isolation are significantly above the corresponding national
averages. The percentage of the population that is American Indian or
Alaska Native with post-control cancer risks greater than or equal to
1-in-1 million dropped significantly from 24 percent to 4 percent, with
the number of American Indian or Alaska Native individuals at this risk
level dropping from 5,700 in the baseline to 640 post-control.
The demographics of the population living within 50 km with
baseline cancer risks greater than or equal to 10-in-1 million
indicates that the percentage of the population that is Hispanic or
Latino is significantly above the national average. The percentage of
the population that is living below the poverty level or over 25
without a high school diploma are closer to the national averages. The
number of individuals living within 50 km exposed to post-control risks
greater
[[Page 41688]]
than or equal to 10-in-1 million is reduced by about a factor of 30 for
each demographic.
The EPA provided meaningful participation opportunities for
communities with environmental justice concerns. The EPA proposed the
Primary Copper Smelting NESHAP in January 2022, and received comments,
and published a supplemental proposal in July of 2023, and received
additional comments. Communities with environmental justice concerns
had the opportunity to comment and request public hearings in response
to both proposals. The EPA received a combined comment from the San
Carlos Apache Tribe, Sierra Club, and Earthjustice; comment from The
National Tribal Air Association; a combined comment from several non-
governmental organizations including but not limited to the Allergy and
Asthma Network and the Children's Environmental Health Network. Section
IV. of this preamble provides a summary of key comments and responses.
For all comments not discussed in this preamble, comment summaries and
the EPA's responses can be found in the National Emission Standards for
Hazardous Air Pollutant Emissions: Primary Copper Smelting Residual
Risk and Technology Review and Primary Copper Smelting Area Source
Technology Review: Summary of Public Comments and Responses document,
available in the docket for this action (Docket ID No. EPA-HQ-OAR-2020-
0430). In addition to the response to comments, the EPA conducted
outreach with potentially affected communities by participating in the
National Tribal Air Association calls and conducted Tribal
consultations during this rule making process. We believe this final
action will reduce adverse human health or environmental effects on
communities with environmental justice concerns and that the EPA
provided meaningful participation opportunities for these communities
to participate in the development of this action.
VI. Statutory and Executive Order Reviews
Additional information about these statutes and Executive orders
can be found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.
A. Executive Orders 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory Review
This action is a ``significant regulatory action'' as defined in
Executive Order 12866, as amended by Executive Order 14094.
Accordingly, the EPA submitted this action to the Office of Management
and Budget (OMB) for Executive Order 12866 review. Documentation of any
changes made in response to the Executive Order 12866 review is
available in the docket. The EPA prepared an economic analysis of the
potential impacts associated with this action. This analysis, Economic
Impact Analysis for the Final Residual Risk and Technology Review of
the National Emission Standards for Hazardous Air Pollutants for
Primary Copper Smelting Sources, is also available in the docket.
B. Paperwork Reduction Act (PRA)
1. 40 CFR Part 63, Subpart QQQ
The information collection activities in this final rule have been
submitted for approval to OMB under the PRA. The ICR document that the
EPA prepared has been assigned OMB Control Number 2060-0476 and EPA ICR
number 1850.10. You can find a copy of the ICR in the docket for this
action, and it is briefly summarized here. The information collection
requirements are not enforceable until OMB approves them.
In this action, we are finalizing amendments that require
electronic reporting of results of performance tests and CEMS
performance evaluations, fugitive dust plans and notification of
compliance reports, remove the requirement to submit certain
information related to the malfunction exemption, and impose other rule
revisions that affect reporting and recordkeeping requirements for
primary copper smelting facilities, such as requirements to submit new
performance test reports and to maintain new operating parameter
records to demonstrate compliance with new standards. This information
will be collected to assure compliance with 40 CFR part 63, subpart
QQQ.
Respondents/affected entities: Owners or operators of primary
copper smelting facilities. Respondent's obligation to respond:
Mandatory (40 CFR part 63, subpart QQQ).
Estimated number of respondents: Two (total). Frequency of
response: Initial, semiannual, and annual.
Total estimated burden: The annual recordkeeping and reporting
burden for facilities to comply with all of the requirements in the
NESHAP is estimated to be 6,500 hours (per year). Burden is defined at
5 CFR 1320.3(b).
Total estimated cost: The annual recordkeeping and reporting burden
for facilities to comply with all of the requirements in the NESHAP is
estimated to be $860,000 (per year), of which $150,000 is for this
rule, and $710,000 is for the other costs related to continued
compliance with the NESHAP.
There are no annualized capital costs. There are an estimated
$302,000 in operation & maintenance costs associated with periodic
performance testing.
An agency may not conduct or sponsor, and a person is not required
to respond to, a collection of information unless it displays a
currently valid OMB control number. The OMB control numbers for the
EPA's regulations in 40 CFR are listed in 40 CFR Part 9. When OMB
approves this ICR, the Agency will announce that approval in the
Federal Register and publish a technical amendment to 40 CFR part 9 to
display the OMB control number for the approved information collection
activities contained in this final rule.
2. 40 CFR Part 63, Subpart EEEEEE
The information collection activities in this final rule have been
submitted for approval to OMB under the PRA. The ICR document that the
EPA prepared has been assigned EPA ICR number 2240.09. You can find a
copy of the ICR in the docket for this action, and it is briefly
summarized here. The information collection requirements are not
enforceable until OMB approves them.
In this action, we are finalizing amendments that require
electronic reporting of results of performance tests and CEMS
performance evaluations and notification of compliance reports, remove
the malfunction exemption, and impose other revisions that affect
reporting and recordkeeping for primary copper smelting facilities.
This information will be collected to assure compliance with 40 CFR
part 63, subpart EEEEEE.
Respondents/affected entities: Owners or operators of primary
copper smelting facilities. Respondent's obligation to respond:
Mandatory (40 CFR part 63, subpart EEEEEE).
Estimated number of respondents: One (total).
Frequency of response: Initial, semiannual, and quarterly.
Total estimated burden: The annual recordkeeping and reporting
burden for facilities to comply with all of the requirements in the
NESHAP is estimated to be 15 hours (per year). Burden is defined at 5
CFR 1320.3(b).
Total estimated cost: The annual recordkeeping and reporting burden
for facilities to comply with all of the requirements in the NESHAP is
estimated to be $1,973 (per year).
There are no annualized capital or operation and maintenance costs.
[[Page 41689]]
An agency may not conduct or sponsor, and a person is not required
to respond to, a collection of information unless it displays a
currently valid OMB control number. The OMB control numbers for the
EPA's regulations in 40 CFR are listed in 40 CFR part 9. When OMB
approves this ICR, the Agency will announce that approval in the
Federal Register and publish a technical amendment to 40 CFR part 9 to
display the OMB control number for the approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic
impact on a substantial number of small entities under the RFA. This
action will not impose any requirements on small entities. Based on the
Small Business Administration size category for this source category,
no small entities are subject to this action.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain any unfunded mandate as described in
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect
small governments. The action imposes no enforceable duty on any State,
local, or Tribal governments or the private sector.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the National Government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have Tribal implications as specified in
Executive Order 13175. The Executive order defines Tribal implications
as ``actions that have substantial direct effects on one or more Indian
tribes, on the relationship between the Federal Government and Indian
tribes, or on the distribution of power and responsibilities between
the Federal Government and Indian tribes''. Based on all of our
analyses, we conclude that the amendments in this action will not have
a substantial direct effect on one or more Tribes, change the
relationship between the Federal Government and Tribes, or affect the
distribution of power and responsibilities between the Federal
Government and Indian Tribes. Thus, Executive Order 13175 does not
apply to this action.
Although this action does not have Tribal implications as defined
by Executive Order 13175, consistent with the EPA policy on
coordination and consultation with Indian Tribes, the EPA offered
government-to-government consultation with Tribes during the rulemaking
process. The EPA held a consultation with the San Carlos Apache Tribe
on June 7, 2022, to discuss the 2022 proposal (Docket ID No. EPA-HQ-
OAR-2020-0430-0185) and ensure that the views of the San Carlos Apache
Tribe were taken into consideration in the rulemaking process in
accordance with the EPA Policy on Consultation with Indian Tribes
(December 2023). The EPA Policy on Consultation with Indian Tribes is
available in the docket for this action. The topics discussed during
the consultation are described in the consultation request letter,
dated April 4, 2022 (Docket ID No. EPA-HQ-OAR-2020-0430-0139). In
addition, the EPA also received letters from representatives of the San
Carlos Apache Tribe expressing their concerns due to emissions of lead
and arsenic from the primary copper smelting facilities, which are
available in the docket for this action. In the letter, dated September
21, 2023 (which is available in the docket for this action), the Tribe
requested consultation. We reached out to the Tribe on several
occasions to schedule consultation but did not receive a response.
G. Executive Order 13045: Protection of Children From Environmental
Health Risks and Safety Risks
This action is not subject to Executive Order 13045 because it is
not a significant regulatory action under section 3(f)(1) of Executive
Order 12866, and because the EPA does not believe the environmental
health or safety risks addressed by this action present a
disproportionate risk to children. This action's health and risk
assessments are contained in sections III. and IV. of this preamble and
further documented in the document titled Freeport Baseline and Control
Options Re-model Risk Analysis Memo, which is available in the docket
for this rule (Docket ID No. EPA-HQ-OAR-2020-0430).
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
This action is not a ``significant energy action'' because it is
not likely to have a significant adverse effect on the supply,
distribution, or use of energy. We have concluded that this action is
not likely to have any adverse energy effects because it contains no
regulatory requirements that will have an adverse impact on
productivity, competition, or prices in the energy sector.
I. National Technology Transfer and Advancement Act (NTTAA) and 1 CFR
Part 51
This rulemaking involves technical standards. Therefore, the EPA
conducted searches for the 2022 proposal and 2023 supplemental proposal
through the Enhanced NSSN Database managed by the American National
Standards Institute (ANSI). The Agency also contacted VCS organizations
and accessed and searched their databases. Searches were conducted for
the EPA Methods 1, 1A, 2, 2A, 2C, 2D, 2F, 2G, 3, 3A, 3B, 4, 5, 5B, 5D,
9, 17, 18, 22, 23, 26A, 29, 30A, and 30B of 40 CFR part 60, appendix A,
and EPA Method 201A of 40 CFR part 51, appendix M. No applicable VCS
were identified for EPA Method 1A, 2A, 2D, 2F, 2G, 5B, 5D, 22, 30A,
30B, or 201A. During the searches, if the title or abstract (if
provided) of the VCS described technical sampling and analytical
procedures that are similar to the EPA's reference method, the EPA
considered it as a potential equivalent method. All potential standards
were reviewed to determine the practicality of the VCS for this rule.
This review requires significant method validation data which meets the
requirements of the EPA Method 301 for accepting alternative methods or
scientific, engineering and policy equivalence to procedures in the EPA
reference methods. The EPA may reconsider determinations of
impracticality when additional information is available for particular
VCS. Four VCS were identified as an acceptable alternative to the EPA
test methods for the purposes of this rule.
The VCS ANSI/ASME PTC 19.10-1981 Part 10, Flue and Exhaust Gas
Analyses, is an acceptable alternative to the EPA Method 3B manual
portion only and not the instrumental portion. The ANSI/ASME PTC 19.10-
1981 Part 10 method incorporates both manual and instrumental
methodologies for the determination of O2 content. The
manual method segment of the O2 determination is performed
through the absorption of O2. This VCS may be obtained from https://webstore.ansi.org/ or from the ANSI Headquarters at 1899 L Street NW,
11th Floor, Washington, DC 20036.
The VCS ASTM D7520-16, Standard Test Method for Determining the
Opacity of a Plume in the Outdoor
[[Page 41690]]
Ambient Atmosphere, is an instrumental method to determine plume
opacity in the outdoor ambient environment as an alternative to visual
measurements made by certified smoke readers in accordance with EPA
Method 9. The concept of ASTM D7520-16, also known as the Digital
Camera Opacity Technique or DCOT, is a test protocol to determine the
opacity of visible emissions using a digital camera. It was based on
previous method development using digital still cameras and field
testing of those methods. The purpose of ASTM D7520-16 is to set a
minimum level of performance for products that use DCOT to determine
plume opacity in ambient environments. The ASTM D7520-16 is an
acceptable alternative to the EPA Method 9 with the following
conditions:
1. During the digital camera opacity technique (DCOT) certification
procedure outlined in section 9.2 of ASTM D7520-16, you or the DCOT
vendor must present the plumes in front of various backgrounds of color
and contrast representing conditions anticipated during field use such
as blue sky, trees, and mixed backgrounds (clouds and/or a sparse tree
stand).
2. You must also have standard operating procedures in place
including daily or other frequency quality checks to ensure the
equipment is within manufacturing specifications as outlined in section
8.1 of ASTM D7520-16.
3. You must follow the record keeping procedures outlined in 40 CFR
63.10(b)(1) for the DCOT certification, compliance report, data sheets,
and all raw unaltered Joint Photographic Experts Group (JPEG) files
used for opacity and certification determination.
4. You or the DCOT vendor must have a minimum of four (4)
independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15 percent opacity of anyone reading
and the average error must not exceed 7.5 percent opacity.
5. This approval does not provide or imply a certification or
validation of any vendor's hardware or software. The onus to maintain
and verify the certification and/or training of the DCOT camera,
software and operator in accordance with ASTM D7520-16 and this letter
is on the facility, DCOT operator, and DCOT vendor.
The voluntary consensus standard ASTM D6420-99 (Reapproved 2010),
Test Method for Determination of Gaseous Organic Compounds by Direct
Interface Gas Chromatography/Mass Spectrometry, employs a direct
interface gas chromatograph/mass spectrometer (GCMS) to identify and
quantify the 36 volatile organic compounds (or sub-set of these
compounds). This ASTM procedure has been approved by the EPA as an
alternative to EPA Method 18 only when the target compounds are all
known and the target compounds are all listed in ASTM D6420 as
measurable.
The VCS ASTM D6784-16, Standard Test Method for Elemental,
Oxidized, Particle-Bound and Total Mercury Gas Generated from Coal-
Fired Stationary Sources (Ontario Hydro Method), is an acceptable
alternative to the EPA Methods 101A and 29 (portion for mercury only)
as a method for measuring mercury. This method applies to
concentrations approximately 0.5-100 [mu]g/Nm3. This test method
describes equipment and procedures for obtaining samples from effluent
ducts and stacks, equipment and procedures for laboratory analysis, and
procedures for calculating results.
The ASTM standards are available from ASTM at https://www.astm.org
or 1100 Barr Harbor Drive, West Conshohocken, PA 19428-2959, telephone
number: (610) 832-9500, fax number: (610) 832-9555 email address:
[email protected].
The searches conducted for the 2022 proposal and 2023 supplemental
proposal identified 26 VCS that were potentially applicable for these
rules in lieu of the EPA reference methods. After reviewing the
available standards, the EPA determined that 26 candidate VCS (ASTM
D3154-00 (2014), ASTM D3464-96 (2014), ASTM 3796-09 (2016), ASTM D3796-
90 (2004) ISO 10780:1994 (2016), ASME B133.9-1994 (2001), ISO
10396:(2007), ANSI/ASME PTC 19-10-1981--Part 10 (2010) Flue and Exhaust
Gas Analyses--Instrumental Procedure Only, ISO 12039:2001 (2012), ASTM
D5835-95 (2013), ASTM D6522-11, CAN/CSA Z223.2-M86 (R1999), ISO
9096:1992 (2003), ANSI/ASME PTC-38-1980 (1985), ASTM D3685/D3685M- 98-
13, CAN/CSA Z223.1-M1977, National Institute of Occupational Safety and
Health (NIOSH) Method 2010 ``Amines, Aliphatic'', ASTM D6060-96 (2009),
EN 1948-3 (2006), EN 1911-1,2,3 (1998), ASTM D6735-01 (2009), ISO
10397:1993, ASTM D6331 (2014), EN13211:2001, CAN/CSA Z223.26-M1987,
ASTM E1979-21, ASTM D4358-05) identified for measuring emissions of
pollutants or their surrogates subject to emission standards in the
rule would not be practical due to lack of equivalency, documentation,
validation data and other important technical and policy
considerations. Additional information for the VCS search and
determinations can be found in the memorandums Voluntary Consensus
Standard Results for National Emission Standards for Hazardous Air
Pollutants: Primary Copper Smelting Residual Risk and Technology Review
and Primary Copper Smelting Area Source Technology Review (Docket ID
No. EPA-HQ-OAR-2020-0430-0065) and Voluntary Consensus Standard Results
for National Emission Standards for Hazardous Air Pollutants: Primary
Copper Smelting Residual Risk and Technology Review and Primary Copper
Smelting Area Source Technology Review and Voluntary Consensus Standard
Results for National Emission Standards of Hazardous Air Pollutants:
Primary Copper Smelting Supplemental Proposal (Docket ID No. EPA-HQ-
OAR-2020-0430-0150), which are available in the docket for this action.
Under 40 CFR 63.7(f) and 63.8(f), a source may apply to the EPA to use
alternative test methods or alternative monitoring requirements in
place of any required testing methods, performance specifications or
procedures in the final rule or any amendments.
The EPA is also incorporating by reference EPA/100/R-10/005,
Recommended Toxicity Equivalence Factors (TEFs) for Human Health Risk
Assessments of 2, 3, 7, 8-Tetrachlorodibenzo-p-dioxin and Dioxin-Like
Compounds, December 2010. This is the international method of
expressing toxicity equivalents for dioxins/furans where a recommended
toxicity equivalent factor (TEF) is multiplied by each individual
compound's (congener) emission concentration to calculate the toxic
equivalent quotient (TEQ). To estimate risk associated with the
mixture, the dose-response function for the index chemical is evaluated
at this sum, which is an estimate of the total index chemical
equivalent dose for the mixture components being considered. This
method may be obtained from https://www.epa.gov/sites/default/files/2013-09/documents/tefs-for-dioxin-epa-00-r-10-005-final.pdf. or U.S.
Environmental Protection Agency, 1200 Pennsylvania Avenue NW,
Washington, DC 20460, (202) 272-0167, https://www.epa.gov.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations and
Executive Order 14096: Revitalizing Our Nation's Commitment to
Environmental Justice for All
The EPA believes that the human health or environmental conditions
that
[[Page 41691]]
exist prior to this action result in or have the potential to result in
disproportionate and adverse human health or environmental effects on
communities with environmental justice concerns. The EPA evaluated the
demographic characteristics of communities located near the major
source facilities and determined that elevated cancer risks associated
with emissions from these facilities disproportionately affect Native
American, Hispanic, populations Below Poverty Level and Over 25 without
High School Diploma individuals living nearby. As part of its
environmental justice analysis, EPA evaluated whether the final action
for the Primary Copper Smelting Major Source Category would address the
existing disproportionately high and adverse human health effect on
these individuals and EPA further evaluated the projected distribution
of reductions in risk resulting from this action.
The EPA believes that this action is likely to reduce existing
disproportionate and adverse effects on communities with environmental
justice concerns. The agency estimated the MIR at Freeport will be
reduced from 70-in-1 million to 20-in-1 million and the population with
cancer risks greater than or equal to 1-in-1 million will be reduced
from 21,875 to 16,962 because of this action. We estimate that the
maximum chronic noncancer inhalation TOSHI will be reduced from 1 to
less than 1 (0.3), and the acute HQ will be reduced from a value of 7
to 2 at Freeport. Given the uncertainties in the emissions data at
Asarco and the short timeframe to complete the final rule, we did not
evaluate the impact of the final standards on the population living in
the vicinity of the Asarco facility. The standards in this final rule
are estimated to reduce metal HAP emissions, primarily lead and
arsenic, from this source category by 8.0 tpy.
The methodology and the results of the demographic analysis are
presented in section V.F. of this preamble and in the technical report
Risk and Technology Review--Analysis of Demographic Factors for
Populations Living Near Primary Copper Smelting Source Category
Operations--Final Rule (Docket ID No. EPA-HQ-OAR-2020-0430). The
information supporting this Executive order review is contained in
section V.F. of this preamble.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. This action is not a ``major rule'' as defined by 5
U.S.C. 804(2).
List of Subjects in 40 CFR Part 63
Environmental protection, Administrative practice and procedures,
Air pollution control, Hazardous substances, Incorporation by
reference, Intergovernmental relations, Reporting and recordkeeping
requirements.
Michael S. Regan,
Administrator.
For the reasons stated in the preamble, title 40, chapter I of the
Code of Federal Regulations is amended as follows:
PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
FOR SOURCE CATEGORIES
0
1. The authority citation for part 63 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart A--General Provisions
0
2. Amend Sec. 63.14 by revising paragraphs (f)(1) and (i)(95), (105),
and (110) and adding paragraph (o)(30) to read as follows:
Sec. 63.14 Incorporations by reference.
* * * * *
(f) * * *
(1) ANSI/ASME PTC 19.10-1981, Flue and Exhaust Gas Analyses [Part
10, Instruments and Apparatus], issued August 31, 1981, IBR approved
for Sec. Sec. 63.309(k); 63.365(b); 63.457(k); 63.772(e) and (h);
63.865(b); 63.997(e); 63.1282(d) and (g); 63.1450(a), (b), (d), and (e)
through (g); 63.1625(b); table 5 to subpart EEEE; Sec. Sec.
63.3166(a); 63.3360(e); 63.3545(a); 63.3555(a); 63.4166(a); 63.4362(a);
63.4766(a); 63.4965(a);63.5160(d); table 4 to subpart UUUU; table 3 to
subpart YYYY; Sec. Sec. 63.7822(b); 63.7824(e); 63.7825(b);
63.8000(d); 63.9307(c); 63.9323(a); 63.9621(b) and (c); 63.11148(e);
63.11155(e); 63.11162(f); 63.11163(g); 63.11410(j); 63.11551(a);
63.11646(a); 63.11945; table 4 to subpart AAAAA; table 5 to subpart
DDDDD; table 4 to subpart JJJJJ; table 4 to subpart KKKKK; table 4 to
subpart SSSSS; tables 4 and 5 to subpart UUUUU; table 1 to subpart
ZZZZZ; table 4 to subpart JJJJJJ.
* * * * *
(i) * * *
(95) ASTM D6420-99 (Reapproved 2010), Standard Test Method for
Determination of Gaseous Organic Compounds by Direct Interface Gas
Chromatography-Mass Spectrometry, Approved October 1, 2010, IBR
approved for Sec. Sec. 63.670(j); table 4 to subpart UUUU; 63.1450(f);
63.7142(b); appendix A to this part.
* * * * *
(105) ASTM D6784-16, Standard Test Method for Elemental, Oxidized,
Particle-Bound and Total Mercury in Flue Gas Generated from Coal-Fired
Stationary Sources (Ontario Hydro Method), Approved March 1, 2016; IBR
approved for Sec. Sec. 63.1450(d); 63.9621; table 5 to subpart UUUUU;
appendix A to subpart UUUUU.
* * * * *
(110) ASTM D7520-16, Standard Test Method for Determining the
Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1,
2016; IBR approved for Sec. Sec. 63.1450(c), (e), and (g); 63.1453(h);
63.1625(b); table 3 to subpart LLLLL; Sec. Sec. 63.7823(c) through
(e); 63.7833(g); 63.11423(c).
* * * * *
(o) * * *
(30) EPA/100/R-10/005, Recommended Toxicity Equivalence Factors
(TEFs) for Human Health Risk Assessments of 2, 3, 7, 8-
Tetrachlorodibenzo-p-dioxin and Dioxin-Like Compounds, December 2010;
IBR approved for Sec. 63.1459 and table 2 to subpart QQQ. (Available
at https://www.epa.gov/sites/default/files/2013-09/documents/tefs-for-dioxin-epa-00-r-10-005-final.pdf.)
* * * * *
0
3. Effective July 15, 2024, further amend Sec. 63.14 by:
0
a. Revising paragraphs (f)(1) and (i)(110);
0
b. Redesignating paragraphs (o)(1) through (30) as paragraphs (o)(2)
through (31); and
0
c. Adding new paragraph (o)(1).
The revisions and addition read as follows:
Sec. 63.14 Incorporations by reference.
* * * * *
(f) * * *
(1) ANSI/ASME PTC 19.10-1981, Flue and Exhaust Gas Analyses [Part
10, Instruments and Apparatus], issued August 31, 1981, IBR approved
for Sec. Sec. 63.116(c); 63.116 and (h); 63.128(a); 63.145(i);
63.309(k); 63.365(b); 63.457(k); 63.490(g); 63.772(e) and (h);
63.865(b); 63.997(e); 63.1282(d) and (g); 63.1450(a), (b), and (e)
through (g); 63.1625(b); table 5 to subpart EEEE; Sec. Sec.
63.3166(a); 63.3360(e); 63.3545(a); 63.3555(a); 63.4166(a); 63.4362(a);
63.4766(a); 63.4965(a); 63.5160(d); table 4 to subpart UUUU; table 3 to
subpart YYYY; Sec. Sec. 63.7822(b); 63.7824(e); 63.7825(b);
63.8000(d); 63.9307(c); 63.9323(a); 63.9621(b) and (c); 63.11148(e);
63.11155(e); 63.11162(f);
[[Page 41692]]
63.11163(g); 63.11410(j); 63.11551(a); 63.11646(a); 63.11945; table 4
to subpart AAAAA; table 5 to subpart DDDDD; table 4 to subpart JJJJJ;
table 4 to subpart KKKKK; table 4 to subpart SSSSS; tables 4 and 5 to
subpart UUUUU; table 1 to subpart ZZZZZ; table 4 to subpart JJJJJJ.
* * * * *
(i) * * *
(110) ASTM D7520-16, Standard Test Method for Determining the
Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1,
2016; IBR approved for Sec. Sec. 63.1450(c), (e), and (g); 63.1453(h);
63.1625(b); table 3 to subpart LLLLL; Sec. Sec. 63.7823(c) through
(f), 63.7833(g); 63.11423(c).
* * * * *
(o) * * *
(1) EPA/100/R-10/005, Recommended Toxicity Equivalence Factors
(TEFs) for Human Health Risk Assessments of 2, 3, 7, 8-
Tetrachlorodibenzo-p-dioxin and Dioxin-Like Compounds, December 2010;
IBR approved for Sec. 63.1459 and table 2 to subpart QQQ. (Available
at https://www.epa.gov/sites/default/files/2013-09/documents/tefs-for-dioxin-epa-00-r-10-005-final.pdf).
* * * * *
0
4. Revise subpart QQQ, consisting of Sec. Sec. 63.1440 through
63.1459, to read as follows:
Subpart QQQ--National Emission Standards for Hazardous Air Pollutants
for Primary Copper Smelting
Sec.
63.1440 What is the purpose of this subpart?
63.1441 Am I subject to this subpart?
63.1442 What parts of my plant does this subpart cover?
63.1443 When do I have to comply with this subpart?
63.1444 What emissions limitations, work practice standards, and
design standards must I meet for my copper concentrate dryers,
smelting vessels, slag cleaning vessels, copper converter
departments, anode refining departments, process fugitive emissions
from roofline vents, and bypass stacks?
63.1445 What work practice standards must I meet for my fugitive
dust sources?
63.1446 What alternative emission limitation may I meet for my
combined gas streams?
63.1447 What are my operation and maintenance requirements?
63.1448 What are my general requirements for complying with this
subpart?
63.1449 By what dates must I conduct performance tests or other
initial compliance demonstrations?
63.1450 What test methods and other procedures must I use to
demonstrate initial compliance with the emission limitations and
design standards?
63.1451 How do I demonstrate initial compliance with the emission
limitations, work practice standards, design standards, and
operation and maintenance requirements that apply to me?
63.1452 What are my monitoring requirements?
63.1453 How do I demonstrate continuous compliance with the emission
limitations, work practice standards, design standards, and
operation and maintenance requirements that apply to me?
63.1454 What notifications must I submit and when?
63.1455 What reports must I submit and when?
63.1456 What records must I keep and how long must I keep my
records?
63.1457 What part of the general provisions apply to me?
63.1458 Who implements and enforces this subpart?
63.1459 What definitions apply to this subpart?
Table 1 to Subpart QQQ of Part 63--Applicability of General
Provisions to This Subpart
Table 2 to Subpart QQQ of Part 63--Non-Mercury HAP Emission Limits
Table 3 to Subpart QQQ of Part 63--2010 Toxic Equivalency Factors
(TEFs)
Table 4 to Subpart QQQ of Part 63--Compliance Dates for Amendments
Being Promulgated on May 13, 2024
Figure 1 to Subpart QQQ of Part 63--Data Summary Sheet for
Determination of Average Opacity
Subpart QQQ--National Emission Standards for Hazardous Air
Pollutants for Primary Copper Smelting
Sec. 63.1440 What is the purpose of this subpart?
This subpart establishes national emission standards for hazardous
air pollutants (NESHAP) for primary copper smelters. This subpart also
establishes requirements to demonstrate initial and continuous
compliance with all applicable emission limitations, work practice
standards, design standards, and operation and maintenance requirements
in this subpart.
Sec. 63.1441 Am I subject to this subpart?
You are subject to this subpart if you own or operate a primary
copper smelter that is (or is part of) a major source of hazardous air
pollutant (HAP) emissions on the first compliance date that applies to
you (see Sec. 63.1443). Your primary copper smelter is a major source
of HAP if it emits or has the potential to emit any single HAP at the
rate of 10 tons or more per year or any combination of HAP at a rate of
25 tons or more per year.
Sec. 63.1442 What parts of my plant does this subpart cover?
(a) This subpart applies to each new and existing affected source
at your primary copper smelter. The affected sources are each copper
concentrate dryer, each smelting vessel, each slag cleaning vessel,
each copper converter department, each anode refining department,
process fugitive emission sources (i.e., roofline vents) from smelting
vessels, slag cleaning vessels, copper converter department and anode
refining department, each bypass stack, and the entire group of
fugitive dust sources, as defined in Sec. 63.1459.
(b) The following affected sources: each copper concentrate dryer,
each smelting vessel, each slag cleaning vessel, each copper converter
department, and the entire group of fugitive dust sources at your
primary copper smelter are existing if you commenced construction or
reconstruction of the affected source before April 20, 1998.
(c) The following affected sources: each copper concentrate dryer,
each smelting vessel, each slag cleaning vessel, each copper converter
department and the entire group of fugitive dust sources at your
primary copper smelter are new if you commenced construction or
reconstruction of the affected source on or after April 20, 1998. An
affected source is reconstructed if it meets the definition of
``reconstruction'' in Sec. 63.2.
(d) The following affected sources: each anode refining department
and process fugitive emission sources (i.e., roofline vents) from
smelting vessels, slag cleaning vessels, copper converter department
and anode refining department are existing if you commenced
construction or reconstruction of the affected source before January
11, 2022.
(e) The following affected sources: each anode refining department
and process fugitive emission sources (i.e., roofline vents) from
smelting vessels, slag cleaning vessels, copper converter department
and anode refining department at your primary copper smelter are new if
you commenced construction or reconstruction of the affected source on
or after January 11, 2022. An affected source is reconstructed if it
meets the definition of ``reconstruction'' in Sec. 63.2.
(f) The bypass stack is existing if you commenced construction or
reconstruction of the affected source before July 24, 2023.
(g) The bypass stack is new if you commenced construction or
reconstruction of the affected source on or after July 24, 2023. An
affected source is reconstructed if it meets the definition of
``reconstruction'' in Sec. 63.2.
[[Page 41693]]
Sec. 63.1443 When do I have to comply with this subpart?
(a) If you have an existing affected source, you must comply with
each emission limitation, work practice standard, design standard, and
operation and maintenance requirement in this subpart that applies to
you no later than June 13, 2005, except as specified in table 4 to this
subpart.
(b) If you have a new affected source and its initial startup date
is on or before June 12, 2002, you must comply with each emission
limitation, work practice standard, design standard, and operation and
maintenance requirement in this subpart that applies to you by June 12,
2002, except as specified in table 4 to this subpart.
(c) If you have a new affected source and its initial startup date
is after June 12, 2002, you must comply with each emission limitation,
work practice standard, design standard, and operation and maintenance
requirement in this subpart that applies to you upon initial startup,
except as specified in in table 4 to this subpart.
(d) If your primary copper smelter is an area source that becomes a
major source of HAP (see Sec. 63.1441), the compliance dates listed in
paragraphs (d)(1) and (2) of this section apply to you.
(1) Any portion of the existing primary copper smelter that is a
new affected source or a new reconstructed source must be in compliance
with this subpart upon startup.
(2) All other parts of the primary copper smelter must be in
compliance with this subpart no later than 3 years after it becomes a
major source (see Sec. 63.1441).
(e) You must meet the notification and schedule requirements in
Sec. 63.1454. Several of these notifications must be submitted before
the compliance date for your affected source.
Sec. 63.1444 What emissions limitations, work practice standards, and
design standards must I meet for my copper concentrate dryers, smelting
vessels, slag cleaning vessels, copper converter departments, anode
refining departments, process fugitive emissions from roofline vents,
and bypass stacks?
(a) Copper concentrate dryers. For each copper concentrate dryer,
you must comply with the emission limitation in paragraph (a)(1) or (2)
of this section that applies to you.
(1) For each existing copper concentrate dryer, you must not cause
to be discharged to the atmosphere from the dryer vent any gases that
contain filterable particulate matter in excess of 50 milligrams per
dry standard cubic meter (mg/dscm) as measured using the test methods
specified in Sec. 63.1450(a).
(2) For each new copper concentrate dryer, you must not cause to be
discharged to the atmosphere from the dryer vent any gases that contain
filterable particulate matter in excess of 23 mg/dscm as measured using
the test methods specified in Sec. 63.1450(a).
(b) Smelting vessels. For each smelting vessel, you must comply
with the emission limitations and work practice standards in paragraphs
(b)(1) and (2) of this section.
(1) For each smelting vessel, you must not cause to be discharged
to the atmosphere any process off-gas that contains nonsulfuric acid
particulate matter in excess of 6.2 mg/dscm as measured using the test
methods specified in Sec. 63.1450(b). Process off-gas from a smelting
vessel is generated when copper ore concentrates and fluxes are being
smelted to form molten copper matte and slag layers.
(2) For each smelting vessel, you must control the process fugitive
emissions released when tapping copper matte or slag from the smelting
vessel according to paragraphs (b)(2)(i) and (ii) of this section.
(i) At all times when copper matte or slag is tapped from the
smelting vessel, you must operate a capture system that collects the
gases and fumes released from the tapping port in use. The design and
placement of this capture system must be such that the tapping port
opening, launder, and receiving vessel (e.g., ladle, slag pot) are
positioned within the confines or influence of the capture system's
ventilation draft during those times when the copper matte or slag is
flowing from the tapping port opening.
(ii) You must not cause to be discharged to the atmosphere from the
capture system used to comply with paragraph (b)(2)(i) of this section
any gases that contain filterable particulate matter in excess of 23
mg/dscm as measured using the test methods specified in Sec.
63.1450(a).
(c) Slag cleaning vessels. For each slag cleaning vessel, you must
comply with the emission limitations and work practice standards in
paragraphs (c)(1) through (3) of this section that apply to you.
(1) For each slag cleaning vessel, except as provided for in
paragraph (c)(2) of this section, you must not cause to be discharged
to the atmosphere any process off-gas that contains nonsulfuric acid
particulate matter in excess of 6.2 mg/dscm as measured using the test
methods specified in Sec. 63.1450(b).
(2) As an alternative to complying with the emission limit for
nonsulfuric acid particulate matter in paragraph (c)(1) of this
section, for each existing slag cleaning vessel you may choose to
comply with the emission limit for filterable particulate matter
specified in this paragraph (c)(2). You must not cause to be discharged
to the atmosphere any process off-gas that contains filterable
particulate matter in excess of 46 mg/dscm as measured using the test
methods specified in Sec. 63.1450(a).
(3) For each slag cleaning vessel, you must control process
fugitive emissions released when tapping copper matte or slag from the
slag cleaning vessel according to paragraphs (c)(3)(i) and (ii) of this
section.
(i) At all times when copper matte or slag is tapped from the slag
cleaning vessel, you must operate a capture system that collects the
gases and fumes released from the tapping port in use. The design and
placement of this capture system must be such that the tapping port
opening, launder, and receiving vessel (e.g., ladle, slag pot) are
positioned within the confines or influence of the capture system's
ventilation draft during those times when the copper matte or slag is
flowing from the tapping port opening.
(ii) You must not cause to be discharged to the atmosphere from the
capture system used to comply with paragraph (c)(3)(i) of this section
any gases that contain filterable particulate matter in excess of 23
mg/dscm as measured using the test methods specified in Sec.
63.1450(a).
(d) Existing copper converter departments. For each existing copper
converter department, you must comply with the emission limitations and
work practice standards in paragraphs (d)(1) through (6) of this
section that apply to you.
(1) You must operate a capture system that collects the process off
gas vented from each batch copper converter. At all times when one or
more batch copper converters are blowing, you must operate the capture
system according to the written operation and maintenance plan that has
been prepared according to the requirements in Sec. 63.1447(b).
(2) If your copper converter department uses Peirce-Smith
converters, the capture system design must include use of a primary
hood that covers the entire mouth of the converter vessel when the
copper converter is positioned for blowing. Additional hoods (e.g.,
secondary hoods) or other capture devices must be included in the
capture system design as needed to achieve the opacity limit in
paragraph (d)(4) of this section. The capture system design may use
multiple intake
[[Page 41694]]
and duct segments through which the ventilation rates are controlled
independently of each other, and individual duct segments may be
connected to separate control devices.
(3) If your copper converter department uses Hoboken converters,
the capture system must collect all process off-gas vented during
blowing through the side-flue intake on each converter vessel.
(4) You must operate the capture system such that any visible
emissions exiting the roof monitors or roof exhaust fans on the
building housing the copper converter department meet the opacity limit
as specified in paragraphs (d)(4)(i) and (ii) of this section.
(i) The opacity of any visible emissions exiting the roof monitors
or roof exhaust fans on the building housing the copper converter
department must not exceed 4 percent as determined by a performance
test conducted according to Sec. 63.1450(c).
(ii) The opacity limit in paragraph (d)(4)(i) of this section
applies only at those times when a performance test is conducted
according to Sec. 63.1450(c). The requirements for compliance with
opacity and visible emission standards specified in Sec. 63.6(h) do
not apply to this opacity limit.
(5) You must not cause to be discharged to the atmosphere from any
Peirce-Smith converter primary hood capture system or Hoboken converter
side-flue intake capture system any process off-gas that contains
nonsulfuric acid particulate matter in excess of 6.2 mg/dscm as
measured using the test methods specified in Sec. 63.1450(b).
(6) You must not cause to be discharged to the atmosphere from any
secondary capture system any gases that contain filterable particulate
matter in excess of 23 mg/dscm as measured using the test methods
specified in Sec. 63.1450(a).
(e) New copper converter departments. For each new copper converter
department for which construction commenced on or after April 20, 1998,
the use of batch copper converters is prohibited. For each new copper
converter department which will contain a copper converter other than a
batch converter (such as a continuous converter), you must comply with
the emission limitation and work practice standards in paragraphs
(e)(1) and (2) of this section.
(1) You must not cause to be discharged to the atmosphere from any
combination of stacks or other vents any captured process off-gas that
contains filterable particulate matter greater than a daily (24-hour)
average of 0.031 pounds of particulate matter per ton of copper
concentrate feed charged to the smelting vessel as measured using the
test methods specified in Sec. 63.1450(a).
(2) You must operate a capture system that collects the gases and
fumes released from converting vessels and conveys the collected gas
stream to a control device.
(f) New and existing anode refining departments. Except as provided
in paragraph (f)(1) of this section, for each new and existing anode
refining department, you must comply with the emission limitation and
work practice standards in paragraphs (f)(2) and (3) of this section.
(1) If the anode refining department process exhaust gases are
combined with the Hoboken converter process fugitive capture system,
you must demonstrate compliance with the emission limitation and work
practice standards in paragraph (g) of this section.
(2) For each new and existing anode refining department, you must
not discharge to the atmosphere captured process exhaust gases from the
anode refining furnaces containing filterable particulate matter
emissions in excess of 5.8 mg/dscm as measured using the test methods
specified in Sec. 63.1450(a).
(3) You must operate a capture system that collects the process
off-gases and fumes released from the anode refining department and
convey the collected gas stream to a control device.
(g) Existing combined anode refining department and Hoboken
converter process fugitive capture system. For each new and existing
anode refining department and Hoboken converter process fugitive
capture system, you must comply with the emission limitation and work
practice standards in paragraphs (g)(1) through (3) of this section.
(1) You must not discharge to the atmosphere gases from the
combination of the anode refining department and Hoboken converter
process fugitive capture system filterable particulate matter emissions
in excess of 4.1 mg/dscm as measured using the test methods specified
in Sec. 63.1450(a).
(2) You must operate a Hoboken converter process fugitive capture
system that collects the process off-gases and fumes released from the
copper converter department.
(3) You must operate a capture system that collects the process
off-gases and fumes released from the anode refining department and
convey the collected gas stream to a control device.
(h) New and existing sources of process fugitive gases from the
roofline vents associated with the smelting vessels, the slag cleaning
vessels, copper converter department, and the anode refining
department. You must not discharge to the atmosphere process fugitive
gases from any combination of new and existing roofline vents
associated with the smelting vessels, slag cleaning vessels, copper
converter departments and the anode refining departments containing
filterable particulate matter emissions in excess of 6.3 lb/hr as
measured using the test methods specified in Sec. 63.1450(e).
(i) Baghouses. For each baghouse applied to meet any filterable
particulate matter emission limit in paragraphs (a) through (h) of this
section, you must operate the baghouse such that the bag leak detection
system does not alarm for more than 5 percent of the total operating
time in any semiannual reporting period.
(j) Venturi wet scrubbers. For each venturi wet scrubber applied to
meet any filterable particulate matter emission limit in paragraphs (a)
through (h) of this section, you must comply with the site-specific
operating limit(s) of maintaining the hourly average pressure drop and
scrubber water flow rate established during the initial or subsequent
performance test in accordance with Sec. 63.1450(a)(4).
(k) Other control devices. For each control device other than a
baghouse or venturi wet scrubber applied to meet any filterable
particulate matter emission limit in paragraphs (a) through (h) of this
section, you must operate the control device as specified in paragraphs
(k)(1) and (2) of this section.
(1) You must select one or more operating parameters, as
appropriate for the control device design, that can be used as
representative and reliable indicators of the control device operation.
(2) You must maintain the hourly average value for each of the
selected parameters at or above the minimum level or at or below the
maximum level, as appropriate for the selected parameter, established
during the initial or subsequent performance test in accordance with
Sec. 63.1450(a)(5).
(l) Existing source mercury emissions. You must not discharge
exhaust gases to the atmosphere through any combination of stacks or
other vents from copper concentrate dryers, copper converter
department, the anode refining department, slag cleaning vessel and
smelting vessels containing mercury emissions in excess of 0.033 lb/hr
for existing sources as measured by the test methods in Sec.
63.1450(d).
(m) New source mercury emissions. You must not discharge exhaust
gases to the atmosphere through any combination of stacks or other
vents
[[Page 41695]]
from the copper concentrate dryers, copper converter department, the
anode refining department, slag cleaning vessel and smelting vessels
containing mercury emissions in excess of 0.00097 lb/hr for new sources
as measured by the test methods in Sec. 63.1450(d).
(n) Control devices for mercury. For each control device applied to
meet the mercury emission limit in paragraph (l) or (m) of this
section, you must operate the control device as specified in paragraphs
(n)(1) and (2) of this section.
(1) You must select one or more operating parameters, as
appropriate for the control device design, that can be used as
representative and reliable indicators of the control device operation.
(2) You must maintain the hourly average value for each of the
selected parameters at or above the minimum level or at or below the
maximum level, as appropriate for the selected parameter, established
during the initial or subsequent performance test in accordance with
Sec. 63.1450(d)(3).
(o) New and existing sources of benzene, toluene, chlorine,
hydrogen chloride, polycyclic aromatic hydrocarbons excluding
naphthalene, naphthalene, and dioxins/furans emissions. You must not
discharge exhaust gases to the atmosphere through any combination of
stacks or other vents from the copper concentrate dryers, copper
converter department, the anode refining department, slag cleaning
vessels and the smelting vessels in excess the emission limits in table
2 to this subpart as measured by the test methods in Sec. 63.1450(f).
(p) Existing sources of process fugitive gases from the combination
of roofline vents associated with the Peirce-Smith converter
department, Inco flash furnace, and anode refining department. For any
combination of new and existing roofline vents associated with the
Peirce-Smith converter department, Inco flash furnace, and anode
refining department, you must comply with the emission limitation and
design standards in paragraph (p)(1) and (2) of this section.
(1) Roofline emission limit for the Peirce-Smith converter
department, Inco flash furnace, and anode refining department. You must
not discharge to the atmosphere process fugitive gases from any
combination of existing roofline vents associated with the Peirce-Smith
copper converter department, Inco flash furnace, and the anode refining
department containing lead emissions in excess of 0.326 lb/hr as
measured using the test methods specified in Sec. 63.1450(g).
(2) Design standards for the Peirce-Smith converter department,
Inco flash furnace, and anode refining department. You must comply with
design standards in paragraphs (p)(2)(i) through (iii) of this section
at all times when the primary copper smelter is operating, except as
provided herein.
(i) Flash furnace area capture system. Operate hooding and
interceptor walls with a design evacuation rate of at least 50,000 cfm
hourly average to capture fugitive emissions from the flash furnace
area, matte tapping and slag skimming areas, and route emissions to a
control device whenever the flash furnace is in operation except for
brief periods when slag is being returned to the flash furnace using
the slag return launder.
(ii) Fuming ladle capture system. Operate hood and interceptor
walls with a design evacuation rate of at least 40,000 cfm to capture
fugitive emissions from fuming ladles in the converter aisle and
material transfer areas, and route emissions to a control device
whenever a fuming ladle is detected.
(iii) Anode furnace secondary hood capture and control system.
Operate a secondary hood around each in-use anode furnace to capture
process fugitive emissions and route emissions to a control device. The
design evacuation rate for the total system of all anode furnace
secondary hoods shall be at least 150,000 cfm hourly average.
(q) Bypass stack work practice standards. When using the bypass
stack for planned maintenance of control devices and processes, the
work practice standard is applicable for the bypass stack for the
duration of the planned maintenance. You must comply with work practice
standards in paragraphs (q)(1) through (3) of this section.
(1) In the case of planned control device or process maintenance,
feed to the smelting vessel must cease; power to the electric furnace
must be lowered, and a crust allowed to form on the surface of the
slag; the operation of the converters must cease and the converters
rolled out; and the operation of the anode vessels must cease.
(2) If the fan to the anode refining point source baghouse is
functioning, then the residual process gases must be redirected to the
control device. If the process gas from a device being maintenanced can
be rerouted to a different control device instead of the bypass stack,
it must be redirected to the control device. Control devices must be
used until emissions are minimized.
(3) If there is a shutdown or emergency shutdown event, the control
devices should continue to run until process emissions cease. If the
control devices are shut down before the process emissions cease and
the bypass stack is used to vent the process gas to the atmosphere,
there will be a violation of the emission and work practice standards.
Sec. 63.1445 What work practice standards must I meet for my fugitive
dust sources?
(a) You must control particulate matter emissions from fugitive
dust sources at your primary copper smelter by operating according to a
written fugitive dust control plan that has been approved by the
Administrator or approved authority under 40 CFR part 70 or 71. For the
purpose of complying with this paragraph (a) you must submit a fugitive
dust control plan which addresses the fugitive dust sources specified
in paragraph (b) of this section and includes the information specified
in paragraph (c) of this section on the schedule provided in paragraphs
(e) and (f) of this section.
(b) Before November 12, 2024, your fugitive dust control plan must
address each of the fugitive dust emission sources listed in paragraphs
(b)(1) through (6), except paragraphs (b)(1)(i) and (ii), of this
section that are located at your primary copper smelter. On or after
November 12, 2024, your fugitive dust control plan must address each of
the fugitive dust emission sources listed in paragraphs (b)(1) through
(7) of this section that are located at your primary copper smelter.
(1) On-site roadways used by trucks or other motor vehicles (e.g.,
front-end loaders) when transporting bulk quantities of fugitive dust
materials. Paved roads and parking areas that are not used by these
vehicles do not need to be included in the plan (e.g., employee and
visitor parking lots).
(i) You must conduct routine cleaning of paved roads with a
sweeper, vacuum or wet broom (in accordance with applicable
recommendations by the manufacturer of the street sweeper, vacuum, or
wet broom), with such cleaning to occur no less frequently than on a
daily basis unless the roads have sufficient surface moisture such that
fugitive dust is not generated.
(ii) Chemical dust suppressants will be applied not less frequently
than once per month at slag haul roads and not less frequently than
every 6 weeks on all other unpaved roads unless the roads have
sufficient surface moisture such that fugitive dust is not generated.
(2) Unloading of fugitive dust materials from trucks or railcars.
(3) Outdoor piles used for storage of fugitive dust materials.
[[Page 41696]]
(4) Bedding areas used for blending copper concentrate and other
feed constituents.
(5) Each transfer point in conveying systems used to transport
fugitive dust materials. These points include, but are not limited to,
transfer of material from one conveyor belt to another and transfer of
material to a hopper or bin.
(6) Other site-specific sources of fugitive dust emissions that the
Administrator or delegated authority under 40 CFR part 70 or 71
designate to be included in your fugitive dust control plan.
(7) The cargo compartment of all trucks or other motor vehicles
(e.g., front-end loaders) when transporting bulk quantities of fugitive
dust materials must be maintained to ensure:
(i) The floor, sides, and/or tailgate(s) are free of holes or other
openings.
(ii) All loads of trucks containing copper concentrate arriving at
the facility are covered with a tarp to prevent spills and fugitive
emissions.
(iii) Trucks are loaded only to such a level as to prevent spillage
over the side.
(iv) A speed limit of 15 mph is required.
(v) All dust producing material internally transferred or moved by
truck at the facility is covered with a tarp to prevent spills and
fugitive emissions.
(c) Your fugitive dust control plan must describe the control
measures you use to control fugitive dust emissions from each source
addressed in the plan, as applicable and appropriate for your site
conditions. Examples of control measures include, but are not limited
to, locating the source inside a building or other enclosure,
installing and operating a local hood capture system over the source
and venting the captured gas stream to a control device, placing
material stockpiles below grade, installing wind screens or wind fences
around the source, spraying water on the source as weather conditions
require, applying appropriate dust suppression agents on the source, or
combinations of these control measures.
(d) The requirement for you to operate according to a written
fugitive dust control plan must be incorporated in your operating
permit that is issued by the approved authority under 40 CFR part 70 or
71. A copy of your fugitive dust control plan must be sent to the
approved authority under 40 CFR part 70 or 71 on or before the
compliance date for your primary copper smelter, as specified in Sec.
63.1443 or paragraph (b) of this section.
(e) For any element of the fugitive dust control plan that requires
new construction at the facility, the owner or operator shall complete
such construction, in accordance with the specifications and schedule
set forth in the approved fugitive dust control plan.
(f) The fugitive dust control plan must be reviewed, updated (if
necessary), and then submitted to the approved permitting authority
under 40 CFR part 70 or 71 with each application for the title V
operating permit renewal and with each permit application for the
construction or modification of lead-bearing fugitive dust generating
sources. On or after November 12, 2024, the owner or operator must
submit a copy fugitive dust plan in PDF format to the EPA via
Compliance and Emissions Data Reporting Interface (CEDRI), which can be
accessed through EPA's Central Data Exchange (CDX) (https://cdx.epa.gov) following the procedure specified in Sec. Sec. 63.1455(e)
and 63.9(k).
Sec. 63.1446 What alternative emission limitation may I meet for my
combined gas streams?
(a) For situations where you combine gas streams from two or more
affected sources for discharge to the atmosphere through a single vent,
you may choose to meet the requirements in paragraph (b) of this
section as an alternative to complying with the individual filterable
particulate matter emission limits specified in Sec. 63.1444 that
apply to you. This alternative emission limit for a combined gas stream
may be used for any combination of the affected source gas steams
specified in paragraphs (a)(1) through (6) of this section.
(1) Gas stream discharged from a copper concentrate dryer vent that
would otherwise be subject to Sec. 63.1444(a)(1) or (2);
(2) Gas stream discharged from a smelting vessel capture system
that would otherwise be subject to Sec. 63.1444(b)(2)(ii);
(3) Process off-gas stream discharged from a slag cleaning vessel
that would otherwise be subject to Sec. 63.1444(c)(2);
(4) Gas stream discharged from a slag cleaning vessel capture
system that would otherwise be subject to Sec. 63.1444(c)(3)(ii);
(5) Gas stream discharged from an existing batch copper converter
secondary capture system that would otherwise be subject to Sec.
63.1444(d)(6); and
(6) Gas stream discharged from anode refining departments that
would otherwise be subject to Sec. 63.1444(f)(2).
(b) You must meet the requirements specified in paragraphs (b)(1)
and (2) of this section for the combined gas stream discharged through
a single vent.
(1) For each combined gas stream discharged through a single vent,
you must not cause to be discharged to the atmosphere any gases that
contain filterable particulate matter in excess of the emission limit
calculated using the procedure in paragraph (b)(2) of this section and
measured using the test methods specified in Sec. 63.1450(a).
(2) You must calculate the alternative filterable particulate
matter emission limit for your combined gas stream using equation 1 to
this paragraph (b)(2). The volumetric flow rate value for each of the
individual affected source gas streams that you use for equation 1
(i.e., the flow rate of the gas stream discharged from the affected
source but before this gas stream is combined with the other gas
streams) is to be the average of the volumetric flow rates measured
using the test method specified in Sec. 63.1450(a)(1)(ii):
Equation 1 to Paragraph (b)(2)
[GRAPHIC] [TIFF OMITTED] TR13MY24.109
Where:
EAlt = Alternative filterable particulate matter emission
limit for the combined gas stream discharged to atmosphere through a
single vent (mg/dscm);
Ed = Filterable particulate matter emission limit
applicable to copper concentrate dryer as specified in Sec.
63.1444(a)(1) or (2) (mg/dscm);
Qd = Copper concentrate dryer exhaust gas stream
volumetric flow rate before being combined with other gas streams
(dscm/hr);
Esv = Filterable particulate matter emission limit for smelting
vessel capture system as specified in Sec. 63.1444(b)(2)(ii) (mg/
dscm);
Qsv = Smelting vessel capture system exhaust gas stream volumetric
flow rate before being combined with other gas streams (dscm/hr);
Escvp = Filterable particulate matter emission limit for slag
cleaning vessel process off-gas as specified in Sec. 63.1444(c)(2)
(mg/dscm);
[[Page 41697]]
Qscvp = Slag cleaning vessel process off-gas volumetric flow rate
before being combined with other gas streams (dscm/hr);
Escvf = Filterable particulate matter emission limit for slag
cleaning vessel capture system as specified in Sec.
63.1444(c)(3)(ii) (mg/dscm);
Qscvf = Slag cleaning vessel capture system exhaust gas stream
volumetric flow rate before being combined with other gas streams
(dscm/hr);
Ecc = Filterable particulate emission limit for the existing batch
copper converter secondary capture system as specified in Sec.
63.1444(d)(6) (mg/dscm);
Qcc = Batch copper converter capture system exhaust gas stream
volumetric flow rate before being combined with other gas streams
(dscm/hr);
Eard = Filterable particulate matter emission limit for
the anode refining department as specified in Sec. 63.1444(f)(2);
and
Qard = Anode refining department exhaust gas stream
volumetric flow rate before being combined with other gas streams
(dscm/hr).
(c) For each baghouse applied to meet any filterable particulate
matter emission limit in paragraph (b) of this section, you must
operate the baghouse such that the bag leak detection system does not
alarm for more than 5 percent of the total operating time in any
semiannual reporting period.
(d) For each venturi wet scrubber applied to meet any filterable
particulate matter emission limit in paragraph (b) of this section, you
must maintain the hourly average pressure drop and scrubber water flow
rate at or above the minimum levels established during the initial or
subsequent performance test in accordance with Sec. 63.1450(a)(4).
(e) For each control device other than a baghouse or venturi wet
scrubber applied to meet any filterable particulate matter emission
limit in paragraph (b) of this section, you must operate the control
device as specified in paragraphs (e)(1) and (2) of this section.
(1) You must select one or more operating parameters, as
appropriate for the control device design, that can be used as
representative and reliable indicators of the control device operation.
(2) You must maintain the hourly average value for each of the
selected parameters at or above the minimum level or at or below the
maximum level, as appropriate for the selected parameter, established
during the initial or subsequent performance test in accordance with
Sec. 63.1450(a)(5).
Sec. 63.1447 What are my operation and maintenance requirements?
(a) Before November 12, 2024, as required by Sec. 63.6(e)(1)(i),
you must always operate and maintain your affected source, including
air pollution control and monitoring equipment, in a manner consistent
with good air pollution control practices for minimizing emissions at
least to the levels required by this subpart. On or after November 12,
2024, at all times, you must maintain and operate any affected source,
including associated air pollution control equipment and monitoring
equipment, in a manner consistent with safety and good air pollution
control practices for minimizing emissions. The general duty to
minimize emissions does not require the owner or operator to make any
further efforts to reduce emissions if levels required by the
applicable standard have been achieved. Determination of whether a
source is operating in compliance with operation and maintenance
requirements will be based on information available to the
Administrator which may include, but is not limited to, monitoring
results, review of operation and maintenance procedures, review of
operation and maintenance records, and inspection of the source.
(b) You must prepare and operate at all times according to a
written operation and maintenance plan for each capture system and
control device subject to standards in Sec. 63.1444 or Sec. 63.1446.
The plan must address the requirements in paragraphs (b)(1) through (4)
of this section as applicable to the capture system or control device.
(1) Preventative maintenance. You must perform preventative
maintenance for each capture system and control device according to
written procedures specified in your operation and maintenance plan.
The procedures must include a preventative maintenance schedule that is
consistent with the manufacturer's instructions for routine and long-
term maintenance.
(2) Capture system inspections. You must conduct monthly
inspections of the equipment components of the capture system that can
affect the performance of the system to collect the gases and fumes
emitted from the affected source (e.g., hoods, exposed ductwork,
dampers, fans) according to written procedures specified in your
operation and maintenance plan. The inspection procedure must include
the requirements in paragraphs (b)(2)(i) through (iii) of this section
as applicable to the capture system or control device.
(i) Observations of the physical appearance of the equipment to
confirm the physical integrity of the equipment (e.g., verify by visual
inspection no holes in ductwork or hoods, no flow constrictions caused
by dents, or accumulated dust in ductwork).
(ii) Inspection, and if necessary testing, of equipment components
to confirm that the component is operating as intended (e.g., verify by
appropriate measures that flow or pressure sensors, damper plates,
automated damper switches and motors are operating according to
manufacture or engineering design specifications).
(iii) In the event that a defective or damaged component is
detected during an inspection, you must initiate corrective action
according to written procedures specified in your operation and
maintenance plan to correct the defect or deficiency as soon as
practicable.
(3) Copper converter department capture system operating limits.
You must establish, according to the requirements in paragraph
(b)(3)(i) through (iii) of this section, operating limits for the
capture system that are representative and reliable indicators of the
performance of capture system when it is used to collect the process
off-gas vented from batch copper converters during blowing.
(i) Select operating limit parameters appropriate for the capture
system design that are representative and reliable indicators of the
performance of the capture system when it is used to collect the
process off-gas vented from batch copper converters during blowing. At
a minimum, you must use appropriate operating limit parameters that
indicate the level of the ventilation draft and the damper position
settings for the capture system when operating to collect the process
off-gas from the batch copper converters during blowing. Appropriate
operating limit parameters for ventilation draft include, but are not
limited to, volumetric flow rate through each separately ducted hood,
total volumetric flow rate at the inlet to control device to which the
capture system is vented, fan motor amperage, or static pressure. Any
parameter for damper position setting may be used that indicates the
duct damper position relative to the fully open setting.
(ii) For each operating limit parameter selected in paragraph
(b)(3)(i) of this section, designate the value or setting for the
parameter at which the capture system operates during batch copper
converter blowing. If your blister copper production operations allow
for more than one batch copper converter to be operating simultaneously
in the blowing mode, designate the value or setting for the parameter
at which the capture system operates during each possible batch copper
converter blowing configuration that you may operate at
[[Page 41698]]
your smelter (i.e., the operating limits with one converter blowing,
with two converters blowing, with three converters blowing, as
applicable to your smelter).
(iii) Include documentation in the plan to support your selection
of the operating limits established for the capture system. This
documentation must include a description of the capture system design,
a description of the capture system operation during blister copper
production, a description of each selected operating limit parameter, a
rationale for why you chose the parameter, a description of the method
used to monitor the parameter according to the requirements in Sec.
63.1452(a), and the data used to set the value or setting for the
parameter for each of your batch copper converter configurations.
(4) Baghouse leak detection corrective actions. In the event a bag
leak detection system alarm is triggered, you must initiate corrective
action according to written procedures specified in your operation and
maintenance plan to determine the cause of the alarm within 1 hour of
the alarm, initiate corrective action to correct the cause of the
problem within 24 hours of the alarm, and complete the corrective
action as soon as practicable. Corrective actions may include, but are
not limited to, the activities listed in paragraphs (b)(3)(i) through
(vi) of this section.
(i) Inspecting the baghouse for air leaks, torn or broken bags or
filter media, or any other condition that may cause an increase in
emissions.
(ii) Sealing off defective bags or filter media.
(iii) Replacing defective bags or filter media or otherwise
repairing the control device.
(iv) Sealing off a defective baghouse compartment.
(v) Cleaning the bag leak detection system probe, or otherwise
repair the bag leak detection system.
(vi) Shutting down the process producing the particulate emissions.
Sec. 63.1448 What are my general requirements for complying with this
subpart?
(a) Before November 12, 2024, you must be in compliance with the
emission limitations, work practice standards, and operation and
maintenance requirements in this subpart at all times, except during
periods of startup, shutdown, and malfunction as defined in Sec. 63.2.
On or after November 12, 2024, you must be in compliance with the
emission limitations, work practice standards, design standards, and
operation and maintenance requirements in this subpart at all times.
(b) During the period between the compliance date specified for
your affected source in Sec. 63.1443, and the date upon which
continuous monitoring systems have been installed and certified and any
applicable operating limits have been set, you must maintain a log
detailing the operation and maintenance of the process and emissions
control equipment.
(c) Before November 12, 2024, you must develop a written startup,
shutdown, and malfunction plan according to the provisions in Sec.
63.6(e)(3). For affected sources, a startup, shutdown, and malfunction
plan is not required on or after November 12, 2024.
Sec. 63.1449 By what dates must I conduct performance tests or other
initial compliance demonstrations?
(a) As required in Sec. 63.7(a)(2), you must conduct a performance
test within 180 calendar days of the compliance date that is specified
in Sec. 63.1443 for your affected source to demonstrate initial
compliance with each emission and opacity limit in Sec. Sec. 63.1444
and 63.1446 that applies to you.
(b) For each work practice standard and operation and maintenance
requirement that applies to you where initial compliance is not
demonstrated using a performance test or opacity observation, you must
demonstrate initial compliance within 30 calendar days after the
compliance date that is specified for your affected source in Sec.
63.1443.
Sec. 63.1450 What test methods and other procedures must I use to
demonstrate initial compliance with the emission limitations and design
standards?
(a) Filterable particulate matter emission limits. Before November
12, 2024, you must conduct each performance test to determine
compliance with the filterable particulate matter emission limits in
Sec. 63.1444 or Sec. 63.1446 that apply to you according to the
requirements for representative test conditions specified in Sec.
63.7(e)(1) and using the test methods and procedures in paragraphs
(a)(1) through (5) of this section. On or after November 12, 2024, you
must conduct each performance test to determine compliance with the
filterable particulate matter emission limits in Sec. 63.1444 or Sec.
63.1446 that apply to you according to the requirements for
representative test conditions specified in paragraph (a)(6) of this
section and using the test methods and procedures in paragraphs (a)(1)
through (5) of this section.
(1) Determine the concentration of filterable particulate matter
according to the test methods in appendices A-1 through A-8 to 40 CFR
part 60 as specified in paragraphs (a)(1)(i) through (v) of this
section.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas. The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
3B manual portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 5, 5D, or 17, as applicable, to determine the
concentration of filterable particulate matter.
(2) As an alternative to using the applicable method specified in
paragraph (a)(1)(v) of this section, you may determine filterable
particulate matter emissions from the control device using Method 29 in
appendix A-8 to 40 CFR part 60 provided that you follow the procedures
and precautions prescribed in Method 29. If the control device is a
positive pressure baghouse, you must also follow the measurement
procedure specified in sections 8.1 through 8.3 of Method 5D in
appendix A-3 to 40 CFR part 60.
(3) You must conduct three separate test runs for each performance
test. Each test run must have a minimum sampling time of 60 minutes and
a minimum sampling volume of 0.85 dscm. For the purpose of determining
compliance with the applicable filterable particulate matter emission
limit, the arithmetic mean of the results for the three separate test
runs is used.
(4) For a venturi wet scrubber applied to emissions from an
affected source and subject to emission limits and work practice
standards in Sec. 63.1444(j) or Sec. 63.1446(d) for pressure drop and
scrubber water flow rate, you must establish site-specific operating
limits according to the procedures in paragraphs (a)(4)(i) and (ii) of
this section.
(i) Using the continuous parameter monitoring system (CPMS)
required in Sec. 63.1452, measure and record the pressure drop and
scrubber water flow rate during each run of the particulate matter
performance test.
(ii) Compute and record the hourly average pressure drop and
scrubber water flow rate for each individual test run. Your operating
limits are the lowest
[[Page 41699]]
average pressure drop and scrubber water flow rate value in any of the
three runs that meet the applicable emission limit.
(5) For a control device other than a baghouse or venturi wet
scrubber applied to emissions from an affected source and subject to
work practice standards and emission limit(s) in Sec. 63.1444(k) or
Sec. 63.1446(e) for appropriate, site-specific operating parameters
that are representative and reliable indicators of the control device
performance, you must establish a site-specific operating limit(s)
according to the procedures in paragraphs (a)(5)(i) through (iv) of
this section.
(i) Select one or more operating parameters, as appropriate for the
control device design, that can be used as representative and reliable
indicators of the control device operation.
(ii) Using the CPMS required in Sec. 63.1452, measure and record
the selected operating parameters for the control device during each
run of the filterable particulate matter performance test.
(iii) Compute and record the hourly average value for each of the
selected operating parameters for each individual test run. Your
operating limits are the lowest value or the highest value, as
appropriate for the selected operating parameter, measured in any of
the three runs that meet the applicable emission limit.
(iv) You must prepare written documentation to support your
selection of the operating parameters used for the control device. This
documentation must include a description of each selected parameter, a
rationale for why you chose the parameter, a description of the method
used to monitor the parameter, and the data recorded during the
performance test and used to set the operating limit(s).
(6) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The use of the bypass stack during a
performance test of the process shall invalidate the performance test.
The owner or operator must record the process information that is
necessary to document operating conditions during the test and include
in such record an explanation to support that such conditions represent
the entire range of normal operation, including operational conditions
for maximum emissions if such emissions are not expected during maximum
production. The owner or operator shall make available to the
Administrator such records as may be necessary to determine the
conditions of performance tests.
(b) Nonsulfuric acid particulate matter emission limits. Before
November 12, 2024, you must conduct each performance test to determine
compliance with the nonsulfuric acid particulate matter emission limits
in Sec. 63.1444 that apply to you according to the requirements for
representative test conditions specified in Sec. 63.7(e)(1) and using
the test methods and procedures in paragraphs (b)(1) and (2) of this
section. On or after November 12, 2024, you must conduct each
performance test to determine compliance with the nonsulfuric acid
particulate matter emission limits in Sec. 63.1444 that apply to you
according to the requirements for representative test conditions
specified in paragraph (b)(4) of this section and using the test
methods and procedures in paragraphs (b)(1) through (3) of this
section.
(1) Determine the concentration of nonsulfuric acid particulate
matter according to the test methods in appendices A-1 through A-8 to
40 CFR part 60 as specified in paragraphs (b)(1)(i) through (v) of this
section.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas. The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
3B manual portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 5B to determine the nonsulfuric acid particulate matter
emissions.
(2) You must conduct three separate test runs for each performance
test. Each test run must have a minimum sampling time of 240 minutes
and a minimum sampling volume of 3.4 dscm. For the purpose of
determining compliance with the nonsulfuric acid particulate matter
emission limit, the arithmetic mean of the results for the three
separate test runs is used.
(3) For a control device applied to emissions from an affected
source and subject to work practice standards and emission limit(s) in
Sec. 63.1444(i), (j), or (k) or Sec. 63.1446(e) for appropriate,
site-specific operating parameters that are representative and reliable
indicators of the control device performance, you must establish a
site-specific operating limit(s) according to the procedures in
paragraphs (a)(5)(i) through (iv) of this section.
(4) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The use of the bypass stack during a
performance test of the process shall invalidate the performance test.
The owner or operator must record the process information that is
necessary to document operating conditions during the test and include
in such record an explanation to support that such conditions represent
the entire range of normal operation, including operational conditions
for maximum emissions if such emissions are not expected during maximum
production. The owner or operator shall make available to the
Administrator such records as may be necessary to determine the
conditions of performance tests.
(c) Copper converter department capture system opacity limit. You
must conduct each performance test to determine compliance with the
opacity limit in Sec. 63.1444 using the test methods and procedures in
paragraphs (c)(1) through (9) of this section and during the
particulate matter performance test.
(1) You must conduct the performance test during the period when
the primary copper smelter is operating under conditions representative
of the smelter's normal blister copper production rate. You may not
conduct a performance test during a malfunction. Before conducting the
performance test, you must prepare a written test plan specifying the
copper production conditions to be maintained throughout the opacity
observation period and including a copy of the written documentation
you have prepared according to paragraph (a)(3) of this section to
support the established operating limits for the copper converter
department capture system. You must submit a copy of the test plan for
review and approval by the Administrator or delegated authority. During
the observation period, you must collect appropriate process
information and copper converter department capture system operating
information to prepare documentation sufficient to verify that all
opacity observations were made during the copper production and capture
system operating conditions specified in the approved test plan.
(2) You must notify the Administrator or delegated authority before
conducting the opacity observations to allow the Administrator or
delegated authority the opportunity to have authorized
[[Page 41700]]
representatives attend the test. Written notification of the location
and scheduled date for conducting the opacity observations must be
received by the Administrator on or before 30 calendar days before this
scheduled date.
(3) You must gather the data needed for determining compliance with
the opacity limit using qualified visible emission observers and
process monitors as described in paragraphs (c)(3)(i) and (ii) of this
section.
(i) Opacity observations must be performed by a sufficient number
of qualified visible emission observers to obtain two complete
concurrent sets of opacity readings for the required observation
period. Each visible emission observer must be certified as a qualified
observer by the procedure specified in section 3 of Method 9 in
appendix A-4 to 40 CFR part 60. The entire set of readings during the
required observation period does not need to be made by the same two
observers. More than two observers may be used to allow for
substitutions and provide for observer rest breaks. The owner or
operator must obtain proof of current visible emission reading
certification for each observer. ASTM D7520-16 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
9 with the specified conditions in paragraphs (c)(3)(i)(A) through (E)
of this section.
(A) During the digital camera opacity technique (DCOT)
certification procedure outlined in section 9.2 of ASTM D7520-16, you
or the DCOT vendor must present the plumes in front of various
backgrounds of color and contrast representing conditions anticipated
during field use such as blue sky, trees, and mixed backgrounds (clouds
and/or a sparse tree stand).
(B) You must also have standard operating procedures in place
including daily or other frequency quality checks to ensure the
equipment is within manufacturing specifications as outlined in section
8.1 of ASTM D7520-16.
(C) You must follow the record keeping procedures outlined in Sec.
63.10(b)(1) for the DCOT certification, compliance report, data sheets,
and all raw unaltered JPEGs used for opacity and certification
determination.
(D) You or the DCOT vendor must have a minimum of four (4)
independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15% opacity of anyone reading and the
average error must not exceed 7.5% opacity.
(E) This approval does not provide or imply a certification or
validation of any vendor's hardware or software. The onus to maintain
and verify the certification and/or training of the DCOT camera,
software and operator in accordance with ASTM D7520-16 and this letter
is on the facility, DCOT operator, and DCOT vendor.
(ii) A person (or persons) familiar with the copper production
operations conducted at the smelter must serve as the indoor process
monitor. The indoor process monitor is stationed at a location inside
the building housing the batch copper converters such that he or she
can visually observe and record operations that occur in the batch
copper converter aisle during the times that the visible emission
observers are making opacity readings. More than one indoor process
monitor may be used to allow for substitutions and provide for rest
breaks.
(4) You must make all opacity observations using Method 9 in
appendix A-4 to 40 CFR part 60 and following the procedures described
in paragraphs (c)(4)(i) and (ii) of this section. ASTM D7520-16
(incorporated by reference, see Sec. 63.14) is an acceptable
alternative to EPA Method 9 with the specified conditions in paragraphs
(c)(3)(i)(A) through (E) of this section.
(i) Each visible emission observer must make his or her readings at
a position from the outside of the building that houses the copper
converter department such that the observer's line-of-sight is
approximately perpendicular to the longer axis of the converter
building, and the observer has an unobstructed view of the building
roof monitor sections or roof exhaust fan outlets that are positioned
over each of the batch copper converters inside the building. Opacity
readings can only be made during those times when the observer's
position meets the sun orientation and other conditions specified in
section 2.1 of Method 9 in appendix A-4 to 40 CFR part 60.
(ii) At 15-second intervals, each visible emission observer views
the building roof monitor sections or roof exhaust fan outlets that are
positioned over each of the batch copper converters inside the building
and reads the opacity of the visible plumes. If no plume is visible,
the observer records zero as the opacity value for the 15-second
interval. In situations when it is possible for an observer to
distinguish two or more visible emission plumes from the building roof
monitor sections or roof exhaust fan outlets, the observer must
identify, to the extent feasible, the plume having the highest opacity
and record his or her opacity reading for that plume as the opacity
value for the 15-second interval.
(5) You must make opacity observations for a period of sufficient
duration to obtain a minimum of 120 1-minute intervals during which at
least one copper converter is blowing and no interferences have
occurred from other copper production events, as specified in paragraph
(c)(7) of this section, which generate visible emissions inside the
building that potentially can interfere with the visible emissions from
the converter capture systems as seen by the outside observers. To
obtain the required number of 1-minute intervals, the observation
period may be divided into two or more segments performed on the same
day or on different days if conditions prevent the required number of
opacity readings from being obtained during one continuous time period.
Examples of these conditions include, but are not limited to, changes
in the sun's orientation relative to visible emission observers'
positions such that the conditions in Method 9 in appendix A-4 to 40
CFR part 60 are no longer met or an unexpected thunderstorm. If the
total observation period is divided into two or more segments, all
opacity observations must be made during the same set of copper
production conditions described in your approved test plan as required
by paragraph (c)(1) of this section.
(6) You must gather indoor process information during all times
that the visible emission observers are making opacity readings outside
the building housing the copper converter department. The indoor
process monitor must continually observe the operations occurring in
the copper converter department and prepare a written record of his or
her observations using the procedure specified in paragraphs (c)(6)(i)
through (iv) of this section.
(i) At the beginning of each observation period or segment, the
clock time setting on the watch or clock to be used by the indoor
process monitor must be synchronized with the clock time settings for
the timepieces to be used by the outdoor opacity observers.
(ii) During each period or segment when opacity readings are being
made by the visible emission observers, the indoor process monitor must
continuously observe the operations occurring in the copper converter
department and record his or her observations in a log book, on data
sheets, or other type of permanent written format.
(iii) When a batch copper converter is blowing, a record must be
prepared for the converter that includes, but is not
[[Page 41701]]
limited to, the clock times for when blowing begins and when blowing
ends and the converter blowing rate. This information may be recorded
by the indoor process monitor or by a separate, automated computer data
system.
(iv) The process monitor must record each event other than
converter blowing that occurs in or nearby the converter aisle that he
or she observes to generate visible emissions inside the building. The
recorded entry for each event must include, but is not limited to, a
description of the event and the clock times when the event begins and
when the event ends.
(7) You must prepare a summary of the data for the entire
observation period using the information recorded during the
observation period by the outdoor visible emission observers and the
indoor process monitor and the procedure specified in paragraphs
(c)(7)(i) through (iv) of this section.
(i) Using the field data sheets, identify the 1-minute clock times
for which a total of eight opacity readings were made and recorded by
both observers at 15-second intervals according to the test procedures
(i.e., a total of four opacity values have been recorded for the 1-
minute interval by each of the two observers). Calculate the average of
the eight 15-second interval readings recorded on the field data sheets
by the two observers during the clock time minute interval (add the
four consecutive 15-second interval opacity readings made by Observer A
during the specified clock time minute, plus the four consecutive 15-
second interval opacity readings made by Observer B during the same
clock time minute, and divide the resulting total by eight). Record the
clock time and the opacity average for the 1-minute interval on a data
summary sheet. Figure 1 to this subpart shows an example of the format
for the data summary sheet you may use, but are not required to use.
(ii) Using the data summary sheets prepared according to paragraph
(c)(7)(i) of this section and the process information recorded
according to paragraph (c)(6)(iii) of this section, identify those 1-
minute intervals for which at least one of the batch copper converters
was blowing.
(iii) Using the data summary sheets prepared according to paragraph
(c)(7)(ii) of this section and the process information recorded
according to paragraph (c)(6)(iv) of this section, identify the 1-
minute intervals during which at least one copper converter was blowing
but none of the interference events listed in paragraphs (c)(7)(iii)(A)
through (F) of this section occurred. Other ancillary activities not
listed but conducted in or adjacent to the converter aisle during the
opacity observations are not considered to be interference events
(e.g., converter aisle cleaning, placement of smoking ladles or skulls
on the converter aisle floor).
(A) Charging of copper matte, reverts, or other materials to a
batch copper converter;
(B) Skimming slag or other molten materials from a batch copper
converter;
(C) Pouring of blister copper or other molten materials from a
batch copper converter;
(D) Return of slag or other molten materials to the flash smelting
vessel or slag cleaning vessel;
(E) Roll-out or roll-in of the batch copper converter; or
(F) Smoke and fumes generated inside the converter building by
operation of the smelting vessel, the slag cleaning vessel (if used),
anode refining and casting processes that drift into the copper
converter department.
(iv) Using the data summary sheets prepared according to paragraph
(c)(7)(iii) of this section, up to five 1-minute intervals following an
interference event may be eliminated from data used for the compliance
determination calculation specified in paragraph (c)(8) of this section
by applying a time delay factor. The time delay factor must be a
constant number of minutes not to exceed 5 minutes that is added to the
clock time recorded when cessation of the interference event occurs.
The same time delay factor must be used for all interference events
(i.e., a constant time delay factor for the smelter of 1 minute, 2
minutes, 3 minutes, 4 minutes, or 5 minutes). The number of minutes to
be used for the time delay factor is determined based on the site-
specific equipment and converter building configuration. An explanation
of the rationale for selecting the value used for the time delay factor
must be prepared and included in the test report.
(8) You must use the data summary prepared in paragraph (c)(7) of
this section to calculate the average opacity value for a minimum of
120 1-minute intervals during which at least one copper converter was
blowing with no interference events as determined according to
paragraphs (c)(7)(iii) and (iv) of this section. Average opacity is
calculated using equation 1 to this paragraph (c)(8):
Equation 1 to paragraph (c)(8)
[GRAPHIC] [TIFF OMITTED] TR13MY24.110
Where:
VEave = Average opacity to be used for compliance determination
(percent);
n = Total number of 1-minute intervals during which at least one
copper converter was blowing with no interference events as
determined according to paragraphs (c)(7)(iii) and (iv) of this
section (at least 120 1-minute intervals);
i = 1-minute interval ``i'' during which at least one copper
converter was blowing with no interference events as determined
according to paragraphs (c)(7)(iii) and (iv) of this section; and
VEi = Average opacity value calculated for the eight
opacity readings recorded during 1-minute interval ``i'' (percent).
(9) You must certify that the copper converter department capture
system operated during the performance test at the operating limits
established in your capture system operation and maintenance plan using
the procedure specified in paragraphs (c)(9)(i) through (iv) of this
section.
(i) Concurrent with all opacity observations, measure and record
values for each of the operating limit parameters in your capture
system operation and maintenance plan according to the monitoring
requirements specified in Sec. 63.1452(a).
(ii) For any dampers that are manually set and remain in the same
position at all times the capture system is operating, the damper
position must be visually checked and recorded at the beginning and end
of each opacity observation period segment.
(iii) Review the recorded monitoring data. Identify and explain any
times during batch copper converter blowing when the capture system
operated outside the applicable operating limits.
(iv) Certify in your performance test report that during all
observation period segments, the copper converter department capture
system was
[[Page 41702]]
operating at the values or settings established in your capture system
operation and maintenance plan.
(d) Mercury emissions. You must conduct each performance test to
determine compliance with the mercury emission limits in Sec. 63.1444
that apply to you according to the requirements for representative test
conditions specified in paragraph (d)(4) of this section and using the
test methods and procedures in paragraphs (d)(1) through (3) of this
section.
(1) Determine the concentration of mercury according to the test
methods in appendices A-1 through A-8 to 40 CFR part 60 as specified in
paragraphs (d)(1)(i) through (v) of this section.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas. The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
3B manual portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 29, 30A, or 30B, as applicable, to determine the
concentration of mercury. You can also use ASTM D6784-16 (incorporated
by reference, see Sec. 63.14) or equivalent.
(2) You must conduct three separate test runs for each performance
test. Duration of sampling is at least two hours per run. If performing
measurements using Method 29 in appendix A-8 to 40 CFR part 60, you
must collect a minimum sample volume of 1.7 dscm (60 dscf). For the
purpose of determining compliance with the applicable mercury emission
limit, the arithmetic mean of the results for the three separate test
runs is used.
(3) For a control device or process operating parameter applied to
emissions from an affected source and subject to site-specific
operating limit(s) in Sec. 63.1444(n) for appropriate, site-specific
operating parameters that are representative and reliable indicators of
the control device performance, you must establish a site-specific
operating limit(s) according to the procedures in paragraphs (d)(3)(i)
through (iv) of this section.
(i) Select one or more operating parameters, as appropriate for the
control device design or process parameter (i.e., mercury content of
concentrate feed), that can be used as representative and reliable
indicators of the control device or process operation.
(ii) Using the CPMS required in Sec. 63.1452, measure and record
the selected operating parameters for the control device during each
run of the mercury performance test.
(iii) Compute and record the hourly average value for each of the
selected operating parameters for each individual test run. Your
operating limits are the lowest value or the highest value, as
appropriate for the selected operating parameter, measured in any of
the three runs that meet the applicable emission limit.
(iv) You must prepare written documentation to support your
selection of the operating parameters used for the control device. This
documentation must include a description of each selected parameter, a
rationale for why you chose the parameter, a description of the method
used to monitor the parameter, and the data recorded during the
performance test and used to set the operating limit(s).
(4) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The use of the bypass stack during a
performance test of the process shall invalidate the performance test.
The owner or operator must record the process information that is
necessary to document operating conditions during the test and include
in such record an explanation to support that such conditions represent
the entire range of normal operation, including operational conditions
for maximum emissions if such emissions are not expected during maximum
production. The owner or operator shall make available to the
Administrator such records as may be necessary to determine the
conditions of performance tests.
(e) Anode refining department, copper converter department, slag
cleaning vessels, and smelting vessels process fugitive roofline vent
filterable particulate matter emission limit. You must conduct each
performance test to determine compliance with the roofline vent process
fugitive filterable particulate matter emission limits in Sec. 63.1444
that apply to you according to the requirements for representative test
conditions specified in paragraph (e)(3) of this section and using the
test methods and procedures in paragraphs (e)(1) and (2) of this
section.
(1) Determine the concentration of anode refining department,
copper converter department, slag cleaning vessels, and smelting
vessels process fugitive roofline vent filterable particulate matter
according to the test methods in appendices A-1 through A-8 to 40 CFR
part 60 as specified in paragraphs (e)(1)(i) through (vi) of this
section.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere. Use Method
5D, section 8.1.3, Roof Monitor or Monovent, or approved sample
locations by EPA Office of Air and Radiation (OAR), OAQPS, Measurement
Technology Group or delegated authority.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas or calibrated anemometer.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas.
The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by reference,
see Sec. 63.14) is an acceptable alternative to EPA Method 3B manual
portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 17 to determine in-stack mass volume of the anode
refining, converter and smelting process fugitive roof vent filterable
particulate matter emissions. Isokinetic calculations are waived due to
low flow rates and high variability. Use the filter specified in
section 7.2.1 of Method 29. An approved Federal reference method (FRM)/
Federal equivalent method (FEM) may be used if it can tolerate the 150
[deg]F temperatures on the roof vents. Tapered element oscillating
microbalances (TEOMs) are not appropriate for this sampling. An
alternative test method may be requested to EPA OAR, OAQPS, Measurement
Technology Group.
(vi) Method 9 to establish opacity as an operating parameter, if
appropriate. ASTM D7520-16 (incorporated by reference, see Sec. 63.14)
is an acceptable alternative to EPA Method 9 with the specified
conditions in paragraphs (c)(3)(i)(A) through (E) of this section.
(2) You must conduct three separate test runs for each performance
test. Each test run must have a minimum sampling time of 12 hours. For
the purpose of determining compliance with the filterable particulate
matter emission limit, the arithmetic mean of the results for the three
separate test runs for each roofline vent (i.e., anode refining
department, copper converter department, smelting vessels, slag
cleaning vessels) is used. The three test run average of the filterable
particulate
[[Page 41703]]
matter emission rates from each vent should be summed to compare to the
emission limit in Sec. 63.1444.
(3) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The use of the bypass stack during a
performance test of the process shall invalidate the performance test.
The owner or operator must record the process information that is
necessary to document operating conditions during the test and include
in such record an explanation to support that such conditions represent
the entire range of normal operation, including operational conditions
for maximum emissions if such emissions are not expected during maximum
production. The owner or operator shall make available to the
Administrator such records as may be necessary to determine the
conditions of performance tests.
(f) Benzene, toluene, chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding naphthalene, naphthalene, and dioxins/
furans emissions. You must conduct each performance test to determine
compliance with the benzene, toluene, chlorine, hydrogen chloride,
polycyclic aromatic hydrocarbons excluding naphthalene, naphthalene,
and dioxins/furans emission limits in table 2 to this subpart that
apply to you according to the requirements for representative test
conditions specified in paragraph (f)(8) of this section and using the
test methods and procedures in paragraphs (f)(1) through (7) of this
section.
(1) Use the test methods in appendices A-1 through A-8 to 40 CFR
part 60 as specified in paragraphs (f)(1)(i) through (iv) of this
section to select sampling port locations and the number of traverse
points and to determine the volumetric flow rate, dry molecular weight,
and moisture content of the stack gas.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas. The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
3B manual portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(2) Determine the concentration of benzene and toluene for each
stack using Method 18 in to appendix A-6 to 40 CFR part 60 to determine
the concentration of benzene and toluene; or as an alternative ASTM
D6420-99 (Reapproved 2010) (incorporated by reference, see Sec.
63.14), may be used provided that the target compound(s) are those
listed in section 1.1 of ASTM D6420-99 (Reapproved 2010) as measurable;
the target compounds do not include methane and ethane because their
atomic mass is less than 35; and the test results are not a total VOC
method. Each test must consist of three separate runs. The duration of
sampling must be at least two hours per run.
(3) Determine the concentration of chlorine and hydrogen chloride
for each stack using Method 26A in appendix A-8 to 40 CFR part 60. Each
test must consist of three separate runs. The minimum sample volume
must be at least 2 dry cubic meters per run. Each run must be conducted
for a minimum of 1 hour.
(4) Determine the concentration of polycyclic aromatic hydrocarbons
excluding naphthalene, naphthalene, and dioxins/furans for each stack
using Method 23 in appendix A-7 to 40 CFR part 60. Each test must
consist of three separate runs. The test duration must be at least 3
hours and the must be at least 3 dscm (106 dscf). Method 23 complete
list of PAHs and dioxin and furan congeners must be analyzed and
reported.
(5) During each stack test run, measure the weight of copper
concentrate feed charged to the smelting vessel and calculate the
emissions rate in pounds of pollutant per ton of copper concentrate
feed charged to the smelting vessel (lb/ton), except for dioxins/furans
which should be calculated in nanograms of pollutant Toxicity
Equivalent Quotient (TEQ) per megagram of copper concentrate feed
charged to the smelting vessel (ng/Mg) for each test run. To calculate
the TEQ, multiply each D/F congener emission concentration times the
appropriate Toxicity Equivalent Factor (TEF) in table 3 to this
subpart. If any measurement result is reported as below the method
detection limit, use the method detection limit for that value when
calculating the emission rate. Calculate the total emissions rate for
each test run by summing the emissions across all stacks, as shown in
equation 2 to this paragraph (f)(5).
Equation 2 to Paragraph (f)(5)
[GRAPHIC] [TIFF OMITTED] TR13MY24.111
Where:
Ef,i = Emissions rate for test run ``i'' for all emission
stacks at the facility ``f'', lb/ton or ng/Mg, as applicable of
copper concentrate feed charged to the smelting vessel;
Cs = Emission rate for stack ``s'' measured during test
run ``i'' on at facility ``f'', lb/dscf;
Qs = Average volumetric flow rate of stack gas measured
at stack ``s'' during test run ``i'' at facility ``f'', dscf/hour;
P = Copper concentrate feed charged to the smelting vessel during
the stack test, ton/hour or Mg/hour, as applicable; and
n = Number of emissions stacks at facility ``f''.
(6) Calculate the average emissions rate for each facility using
the three test runs, as shown in equation 3 to this paragraph (f)(6).
For the purposes of determining compliance with the applicable emission
limits in table 2 to this subpart, the arithmetic mean of the results
for the three separate test runs is used as calculated using equation
3.
Equation 3 to paragraph (f)(6)
[GRAPHIC] [TIFF OMITTED] TR13MY24.112
[[Page 41704]]
Where:
Ef = Average emission rate for facility ``f'', lb/ton or
ng/Mg of copper concentrate feed charged to the smelting vessel, as
applicable.
E1 = Emissions rate for run 1 for facility ``f'', lb/ton
or ng/Mg of copper concentrate feed charged to the smelting vessel,
as applicable.
E2 = Emissions rate for run 2 for facility ``f'', lb/ton
or ng/Mg of copper concentrate feed charged to the smelting vessel,
as applicable.
E3 = Emissions rate for run 3 for facility ``f'', lb/ton
or ng/Mg of copper concentrate feed charged to the smelting vessel,
as applicable.
* * * * *
(7) For a control device applied to emissions from an affected
source and subject to work practice standards and emission limit(s) in
Sec. 63.1444(o) for appropriate, site-specific operating parameters
that are representative and reliable indicators of the control device
performance, you must establish a site-specific operating limit(s)
according to the procedures in paragraphs (f)(7)(i) through (iv) of
this section.
(i) Select one or more operating parameters, as appropriate for the
control device design, that can be used as representative and reliable
indicators of the control device operation.
(ii) Using the CPMS required in Sec. 63.1452, measure and record
the selected operating parameters for the control device during each
run of the benzene, toluene, chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding naphthalene, naphthalene and dioxins/
furans performance test.
(iii) Compute and record the hourly average value for each of the
selected operating parameters for each individual test run. Your
operating limits are the lowest value or the highest value, as
appropriate for the selected operating parameter, measured in any of
the three runs that meet the applicable emission limit.
(iv) You must prepare written documentation to support your
selection of the operating parameters used for the control device. This
documentation must include a description of each selected parameter, a
rationale for why you chose the parameter, a description of the method
used to monitor the parameter, and the data recorded during the
performance test and used to set the operating limit(s).
(8) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. You may not conduct a performance test during a malfunction.
The use of the bypass stack during a performance test of the process
shall invalidate the performance test. The owner or operator must
record the process information that is necessary to document operating
conditions during the test and include in such record an explanation to
support that such conditions represent the entire range of normal
operation, including operational conditions for maximum emissions if
such emissions are not expected during maximum production. The owner or
operator shall make available to the Administrator such records as may
be necessary to determine the conditions of performance tests.
(g) Peirce-Smith converter department, Inco flash furnace, and
anode refining department process fugitive roofline vent lead. For
facilities using a combination of Peirce-Smith converter department,
Inco flash furnace, and anode refining department, you must conduct
each performance test to determine compliance with the roofline vent
process fugitive lead emission limits in Sec. 63.1444(p)(1) that apply
to you according to the requirements for representative test conditions
specified in paragraph (g)(3) of this section and using the test
methods and procedures in paragraphs (g)(1) and (2) of this section.
You must also comply with establishing operating parameters in
paragraphs (g)(4) through (7) of this section.
(1) Determine the concentration of Peirce-Smith converter
department, Inco flash furnace, and anode refining department process
fugitive roofline vent lead according to the test methods in appendices
A-1 through A-8 to 40 CFR part 60 as specified in paragraphs (g)(1)(i)
through (vii) of this section.
(i) Method 1 to select sampling port locations and the number of
traverse points. Sampling ports must be located at the outlet of the
control device and prior to any releases to the atmosphere. Use Method
5D section 8.1.3 Roof Monitor or Monovent or approved sample locations
by MTG or delegated authority.
(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of
the stack gas or calibrated anemometer.
(iii) Method 3, 3A, or 3B to determine the dry molecular weight of
the stack gas. The ANSI/ASME PTC 19-10-1981 Part 10 (incorporated by
reference, see Sec. 63.14) is an acceptable alternative to EPA Method
3B manual portion only but not the instrumental portion.
(iv) Method 4 to determine the moisture content of the stack gas.
(v) Method 17 to determine in-stack mass volume of the anode
refining, converter and smelting process fugitive roof vent lead
emissions. Isokinetic calculations are waived due to low flow rates and
high variability. Use the filter specified in section 7.2.1 of Method
29. An approved FRM/FEM may be used if it can tolerate the 150 F
temperatures on the roof vents. TEOMs are not appropriate for this
sampling. An alternative test method may be requested to EPA OAR,
OAQPS, Measurement Technology Group.
(vi) Method 29 filter analysis by inductively coupled plasma mass
spectrometry (ICP-MS) for lead.
(vii) Method 9 to establish opacity as an operating parameter, if
appropriate. ASTM D7520-16 (incorporated by reference, see Sec. 63.14)
is an acceptable alternative to EPA Method 9 with the specified
conditions in paragraphs (c)(3)(i)(A) through (E) of this section.
(2) You must conduct three separate test runs for each performance
test. Each test run must have a minimum sampling time of 12 hours. For
the purpose of determining compliance with the lead emission limit, the
arithmetic mean of the results for the three separate test runs for
each roofline vent (i.e., anode refining department, copper converter
department, smelting vessels, slag cleaning vessels) is used. The three
test run average of the lead emission rates from each vent should be
summed to compare to the emission limit in Sec. 63.1444.
(3) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The use of the bypass stack during a
performance test of the process shall invalidate the performance test.
The owner or operator must record the process information that is
necessary to document operating conditions during the test and include
in such record an explanation to support that such conditions represent
the entire range of normal operation, including operational conditions
for maximum emissions if such emissions are not expected during maximum
production. The owner or operator shall make available to the
Administrator such records as may be necessary to determine the
conditions of performance tests.
(4) Establish a site-specific operating limit for a parameter, like
opacity, based on values measured during the performance test.
(5) For your flash furnace capture system you must establish site
specific operating parameters as specified in Sec. 63.1444(p)(2)(i).
(6) For your fuming ladle capture system, you must establish site
specific
[[Page 41705]]
operating parameters as specified in Sec. 63.1444(p)(2)(ii).
(7) For your anode furnace secondary capture and control system,
you must establish site specific operating parameters as specified in
Sec. 63.1444(p)(2)(iii).
Sec. 63.1451 How do I demonstrate initial compliance with the
emission limitations, work practice standards, design standards, and
operation and maintenance requirements that apply to me?
(a) Filterable particulate matter emission limits. For each copper
concentrate dryer, smelting vessel, slag cleaning vessel, copper
converter department, anode refining department, and combination of
anode refining department and Hoboken converter process fugitive
capture system subject to a filterable particulate matter emission
limit in Sec. 63.1444 or Sec. 63.1446, you have demonstrated initial
compliance if you meet both of the conditions in paragraphs (a)(1) and
(2) of this section.
(1) The average concentration of filterable particulate matter from
the affected source, any capture system, or control device applied to
emissions from the affected source, measured according to the
performance test procedures in Sec. 63.1450(a), did not exceed the
applicable emission limit, and establishes operating parameter.
(2) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e) and performance test
results according to the requirements in Sec. 63.1455(e).
(b) Nonsulfuric acid particulate matter emissions limits. For each
smelting vessel, slag cleaning vessel, and copper converter departments
subject to the nonsulfuric acid particulate matter emissions limit in
Sec. 63.1444 as applies to you, you have demonstrated initial
compliance if you meet both of the conditions in paragraphs (b)(1) and
(2) of this section.
(1) The average concentration of nonsulfuric acid particulate
matter in the process off-gas discharged from the affected source,
measured according to the performance test procedures in Sec.
63.1450(b), did not exceed 6.2 mg/dscm.
(2) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e) and performance test
results according to the requirements in Sec. 63.1455(e).
(c) Copper converter department visible emissions. For each
existing copper converter department subject to the opacity limit in
Sec. 63.1444, you have demonstrated initial compliance if you meet
both of the conditions in paragraphs (c)(1) and (2) of this section.
(1) The opacity of visible emissions exiting the roof monitors or
roof exhaust fans on the building housing the copper converter
department measured according to the performance test procedures in
Sec. 63.1450(c), did not exceed 4 percent opacity.
(2) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e).
(d) Copper converter department capture systems. You have
demonstrated initial compliance of the copper converter department
capture system if you meet all of the conditions in paragraphs (d)(1)
through (4) of this section.
(1) Prepared the capture system operation and maintenance plan
according to the requirements in Sec. 63.1447(b);
(2) Conducted an initial performance test according to the
procedures of Sec. 63.1450(c) demonstrating the opacity of any visible
emissions exiting the roof monitors or roof exhaust fans on the
building housing the copper converter department does not exceed 4
percent opacity;
(3) Included in your notification of compliance status a copy of
your written capture system operation and maintenance plan and have
certified in your notification of compliance status that you will
operate the copper converter department capture system at all times
during blowing at the values or settings established for the operating
limits in that plan; and
(4) Submitted a notification of compliance status according to the
requirements in Sec. 63.1454(e) and performance test results according
to the requirements in Sec. 63.1455(e).
(e) Baghouses. For each baghouse subject to operating limits in
Sec. 63.1444(i) or Sec. 63.1446(c), you have demonstrated initial
compliance if you meet all of the conditions in paragraphs (e)(1)
through (3) of this section.
(1) You have included in your written operation and maintenance
plan required under Sec. 63.1447(b) detailed descriptions of the
procedures you use for inspection, maintenance, bag leak detection, and
corrective action for the baghouse.
(2) You have certified in your notification of compliance status
that you will operate the baghouse according to your written operation
and maintenance plan.
(3) You have submitted the notification of compliance status
according to the requirements in Sec. 63.1454(e).
(f) Venturi wet scrubbers. For each venturi wet scrubber subject to
operating limits in Sec. 63.1444(j) or Sec. 63.1446(d), you have
demonstrated initial compliance if you meet all of the conditions in
paragraphs (f)(1) through (3) of this section.
(1) Established site-specific operating limits for pressure drop
and scrubber water flow rate and have a record of the pressure drop and
scrubber water flow rate measured during the performance test you
conduct to demonstrate initial compliance with paragraph (a) or (k) of
this section.
(2) Certified in your notification of compliance status that you
will operate the venturi wet scrubber within the established operating
limits for pressure drop and scrubber water flow rate.
(3) Submitted a notification of compliance status according to the
requirements in Sec. 63.1454(e).
(g) Other control devices. For each control device other than a
baghouse or venturi wet scrubber subject to operating limits in Sec.
63.1444(k) or (n) or Sec. 63.1446(e), you have demonstrated initial
compliance if you meet all of the conditions in paragraphs (g)(1)
through (4) of this section.
(1) Selected one or more operating parameters, as appropriate for
the control device design, that can be used as representative and
reliable indicators of the control device operation.
(2) Established site-specific operating limits for each of the
selected operating parameters based on values measured during the
performance test you conduct to demonstrate initial compliance with
paragraph (a) of this section and have prepared written documentation
according to the requirements in Sec. 63.1450(a)(5)(iv).
(3) Included in your notification of compliance status a copy of
the written documentation you have prepared to demonstrate compliance
with paragraph (g)(2) of this section and have certified in your
notification of compliance status that you will operate the control
device within the established operating limits.
(4) Submitted a notification of compliance status according to the
requirements in Sec. 63.1454(e).
(h) Fugitive dust sources. For all fugitive dust sources subject to
work practice standards in Sec. 63.1445, you have demonstrated initial
compliance if you meet all of the conditions in paragraphs (h)(1)
through (3) of this section.
(1) Prepared a written fugitive dust control plan according to the
requirements in Sec. 63.1445 and it has been approved by the delegated
authority.
(2) Certified in your notification of compliance status that you
will control emissions from the fugitive dust sources
[[Page 41706]]
according to the procedures in the approved plan.
(3) Submitted the notification of compliance status according to
the requirements in Sec. 63.1454(e).
(i) Operation and maintenance requirements. You have demonstrated
initial compliance with the operation and maintenance requirements that
apply to you if you meet all of the conditions in paragraphs (i)(1)
through (3) of this section.
(1) Prepared an operation and maintenance plan according to the
requirements in Sec. 63.1447(b).
(2) Certified in your notification of compliance status that you
will operate each capture system and control device according to the
procedures in the plan.
(3) Submitted the notification of compliance status according to
the requirements in Sec. 63.1454(e).
(j) Mercury emissions. For any combination of copper concentrate
dryers, smelting vessel, copper converter department, slag cleaning
vessel and anode refining department subject to a mercury emission
limit in Sec. 63.1444, you have demonstrated initial compliance if you
meet the conditions in paragraphs (j)(1) through (3) of this section.
(1) The sum of the mercury emissions (lb/hr) from the affected
sources measured according to the performance test procedures in Sec.
63.1450(d), did not exceed the applicable emission limit.
(2) Established a site-specific operating limit for a parameter
based on values measured during the performance test you conduct to
demonstrate initial compliance with this paragraph (j) and have
prepared written documentation according to the requirements in Sec.
63.1450(d)(3)(iv).
(3) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e) and performance test
results according to the requirements in Sec. 63.1455(e).
(k) Process fugitive filterable particulate matter from roofline
vents. For emissions from roofline vents associated with the smelting
vessels, slag cleaning vessels, copper converter department, and anode
refining department subject to a filterable particulate matter emission
limit in Sec. 63.1444(h), you have demonstrated initial compliance if
you meet the conditions in paragraphs (k)(1) through (3) of this
section.
(1) The sum of filterable particulate matter emissions from the
combination of roofline vents as measured according to the performance
test procedures in Sec. 63.1450(e), did not exceed 6.3 lb/hr.
(2) Established a site-specific operating limit for a parameter,
like opacity, based on values measured during the performance test you
conduct to demonstrate initial compliance with this paragraph (k) and
have prepared written documentation according to the requirements in
Sec. 63.1450(e).
(3) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e) and performance test
results according to the requirements in Sec. 63.1455(e).
(l) Benzene, toluene, chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding naphthalene, naphthalene, and dioxins/
furans emissions. For any combination of copper concentrate dryer,
smelting vessel, slag cleaning vessel, copper converter department, and
anode refining department subject to the benzene, toluene, chlorine,
hydrogen chloride, polycyclic aromatic hydrocarbons excluding
naphthalene, naphthalene, and dioxins/furans emission limits in table 2
to this subpart, you have demonstrated initial compliance if you meet
both of the conditions in paragraphs (l)(1) and (2) to this section.
(1) The emissions of benzene, toluene, chlorine, hydrogen chloride,
polycyclic aromatic hydrocarbons excluding naphthalene, naphthalene,
and dioxins/furans emissions per mass of copper concentrate feed to the
smelting vessel from the affected sources measured according to the
performance test procedures in Sec. 63.1450(f), did not exceed the
applicable emission limit.
(2) You have submitted a notification of compliance status
according to the requirements in Sec. 63.1454(e) and performance test
results according to the requirements in Sec. 63.1455(e).
(m) Process fugitive lead from roofline vents. For emissions from
the combination of roofline vents associated with the Peirce-Smith
converter department, Inco flash furnace, and anode refining department
subject to a lead emission limit and design standards in Sec.
63.1444(p), you have demonstrated initial compliance if you meet the
conditions in paragraphs (m)(1) through (5) of this section.
(1) The sum of lead emissions from the combination of roofline
vents as measured according to the performance test procedures in Sec.
63.1450(g), did not exceed 0.326 lb/hr.
(2) You have submitted a notification of compliance status and
performance test results according to requirements of Sec. Sec.
63.1454(e), 63.1455(e)(1), and 63.9(k)
(3) For your flash furnace capture system, you have established
timed interlock on the slag return launder.
(4) For your fuming ladle capture system, you have determined flow
rate by a calibrated flowmeter or test.
(5) For your anode furnace secondary hood capture and control
system, you have determined flow rate by a calibrated flowmeter or
test.
Sec. 63.1452 What are my monitoring requirements?
(a) Copper converter department capture systems. For each operating
limit established under your capture system operation and maintenance
plan, you must install, operate, and maintain an appropriate monitoring
device according to the requirements in paragraphs (a)(1) through (6)
of this section to measure and record the operating limit value or
setting at all times the copper converter department capture system is
operating during batch copper converter blowing. Dampers that are
manually set and remain in the same position at all times the capture
system is operating are exempted from the requirements of this
paragraph (a).
(1) Install the monitoring device, associated sensor(s), and
recording equipment according to the manufacturers' specifications.
Locate the sensor(s) used for monitoring in or as close to a position
that provides a representative measurement of the parameter being
monitored.
(2) If a flow measurement device is used to monitor the operating
limit parameter, you must meet the requirements in paragraphs (a)(2)(i)
through (iv) of this section.
(i) Locate the flow sensor and other necessary equipment such as
straightening vanes in a position that provides a representative flow.
(ii) Use a flow sensor with a minimum tolerance of 2 percent of the
flow rate.
(iii) Reduce swirling flow or abnormal velocity distributions due
to upstream and downstream disturbances.
(iv) Conduct a flow sensor calibration check at least semiannually.
(3) If a pressure measurement device is used to monitor the
operating limit parameter, you must meet the requirements in paragraphs
(a)(3)(i) through (v) of this section.
(i) Locate the pressure sensor(s) in or as close to a position that
provides a representative measurement of the pressure.
(ii) Minimize or eliminate pulsating pressure, vibration, and
internal and external corrosion.
(iii) Use a gauge with a minimum tolerance of 0.5 inch of water or
a transducer with a minimum tolerance of 1 percent of the pressure
range.
(iv) Check pressure tap pluggage daily.
[[Page 41707]]
(v) Using a manometer, check gauge calibration quarterly and
transducer calibration monthly.
(4) Conduct calibration and validation checks any time the sensor
exceeds the manufacturer's specifications or you install a new sensor.
(5) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(6) Record the results of each inspection, calibration, and
validation check.
(b) Baghouses. For each baghouse subject to the operating limit in
Sec. 63.1444(i) or Sec. 63.1446(c) for the bag leak detection system
alarm, you must at all times monitor the relative change in particulate
matter loadings using a bag leak detection system according to the
requirements in paragraph (b)(1) of this section and conduct regular
inspections according to the requirements in paragraph (b)(2) of this
section.
(1) You must install, operate, and maintain each bag leak detection
system according to the requirements in paragraphs (b)(1)(i) through
(vii) of this section.
(i) The system must be certified by the manufacturer to be capable
of detecting emissions of particulate matter at concentrations of 10
milligrams per actual cubic meter (0.0044 grains per actual cubic foot)
or less.
(ii) The system must provide output of relative changes in
particulate matter loadings.
(iii) The system must be equipped with an alarm that will sound
when an increase in relative particulate loadings is detected over a
preset level. The alarm must be located such that it can be heard by
the appropriate plant personnel.
(iv) Each system that works based on the triboelectric effect must
be installed, operated, and maintained in a manner consistent with the
guidance document ``Fabric Filter Bag Leak Detection Guidance,'' EPA-
454/R-98-015, September 1997. You may obtain a copy of this guidance
document by contacting the National Technical Information Service
(NTIS) at 800-553-6847. You may install, operate, and maintain other
types of bag leak detection systems in a manner consistent with the
manufacturer's written specifications and recommendations.
(v) To make the initial adjustment of the system, establish the
baseline output by adjusting the sensitivity (range) and the averaging
period of the device. Then, establish the alarm set points and the
alarm delay time.
(vi) Following the initial adjustment, do not adjust the
sensitivity or range, averaging period, alarm set points, or alarm
delay time, except as detailed in your operation and maintenance plan.
Do not increase the sensitivity by more than 100 percent or decrease
the sensitivity by more than 50 percent over a 365-day period unless a
responsible official certifies, in writing, that the baghouse has been
inspected and found to be in good operating condition.
(vii) Where multiple detectors are required, the system's
instrumentation and alarm may be shared among detectors.
(2) You must conduct baghouse inspections at their specified
frequencies according to the requirements in paragraphs (b)(2)(i)
through (viii) of this section.
(i) Monitor the pressure drop across each baghouse cell each day to
ensure pressure drop is within the normal operating range identified in
the manual.
(ii) Confirm that dust is being removed from hoppers through weekly
visual inspections or other means of ensuring the proper functioning of
removal mechanisms.
(iii) Check the compressed air supply for pulse-jet baghouses each
day.
(iv) Monitor cleaning cycles to ensure proper operation using an
appropriate methodology.
(v) Check bag cleaning mechanisms for proper functioning through
monthly visual inspection or equivalent means.
(vi) Make monthly visual checks of bag tension on reverse air and
shaker-type baghouses to ensure that bags are not kinked (kneed or
bent) or laying on their sides. You do not have to make this check for
shaker-type baghouses using self-tensioning (spring-loaded) devices.
(vii) Confirm the physical integrity of the baghouse through
quarterly visual inspections of the baghouse interior for air leaks.
(viii) Inspect fans for wear, material buildup, and corrosion
through quarterly visual inspections, vibration detectors, or
equivalent means.
(c) Venturi wet scrubbers. For each venturi wet scrubber subject to
the operating limits for pressure drop and scrubber water flow rate in
Sec. 63.1444(j) or Sec. 63.1446(d), you must at all times monitor the
hourly average pressure drop and water flow rate using a CPMS. You must
install, operate, and maintain each CPMS according to the requirements
in paragraphs (c)(1) and (2) of this section.
(1) For the pressure drop CPMS, you must meet the requirements in
paragraphs (c)(1)(i) through (vi) of this section.
(i) Locate the pressure sensor(s) in or as close to a position that
provides a representative measurement of the pressure and that
minimizes or eliminates pulsating pressure, vibration, and internal and
external corrosion.
(ii) Use a gauge with a minimum measurement sensitivity of 0.5 inch
of water or a transducer with a minimum measurement sensitivity of 1
percent of the pressure range.
(iii) Check the pressure tap for pluggage daily.
(iv) Using a manometer, check gauge calibration quarterly and
transducer calibration monthly.
(v) Conduct calibration checks any time the sensor exceeds the
manufacturer's specified maximum operating pressure range, or install a
new pressure sensor.
(vi) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(2) For the scrubber water flow rate CPMS, you must meet the
requirements in paragraphs (c)(2)(i) through (iv) of this section.
(i) Locate the flow sensor and other necessary equipment in a
position that provides a representative flow and that reduces swirling
flow or abnormal velocity distributions due to upstream and downstream
disturbances.
(ii) Use a flow sensor with a minimum measurement sensitivity of 2
percent of the flow rate.
(iii) Conduct a flow sensor calibration check at least semiannually
according to the manufacturer's instructions.
(iv) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(d) Other control devices and operating parameters. For each
control device other than a baghouse or venturi wet scrubber subject to
the operating limits for appropriate parameters in Sec. 63.1444(k) or
Sec. 63.1446(e), or a control device for mercury subject to Sec.
63.1444(n), you must at all times monitor each of your selected
parameters using an appropriate CPMS. You must install, operate, and
maintain each CPMS according to the equipment manufacturer's
specifications and the requirements in paragraphs (d)(1) though (5) of
this section.
(1) Locate the sensor(s) used for monitoring in or as close to a
position that provides a representative measurement of the parameter
being monitored.
(2) Determine the hourly average of all recorded readings.
[[Page 41708]]
(3) Conduct calibration and validation checks any time the sensor
exceeds the manufacturer's specifications or you install a new sensor.
(4) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(5) Record the results of each inspection, calibration, and
validation check.
(e) Continuous monitoring. Except for monitoring malfunctions,
associated repairs, and required quality assurance or control
activities (including as applicable, calibration checks and required
zero and span adjustments), you must monitor continuously (or collect
data at all required intervals) at all times an affected source is
operating.
(f) Data collection for assessing compliance. You may not use data
recorded during monitoring malfunctions, associated repairs, and
required quality assurance or control activities in data averages and
calculations used to report emission or operating levels or to fulfill
a minimum data availability requirement, if applicable. You must use
all the data collected during all other periods in assessing
compliance.
(g) Monitoring malfunctions. A monitoring malfunction is any
sudden, infrequent, not reasonably preventable failure of the monitor
to provide valid data. Monitoring failures that are caused in part by
poor maintenance or careless operation are not malfunctions.
(h) Bypass stacks. You must maintain an appropriate monitoring
device according to the requirements in paragraph (h)(1) or (2) of this
section to demonstrate the work practice standards are limiting the
emissions at all times the bypass stack is in use.
(1) If a SO2 continuous emissions monitoring system
(CEMS) is utilized as a continuous monitor during planned maintenance
events, a cylinder gas audit (CGA) and daily calibration or a 3-point
linearity test must be conducted prior to the performance test
according to Procedure 1, section 5.1.2, in appendix F to 40 CFR part
60 to conduct the CGA.
(2) If a particulate matter (PM) detector is CPMS, you must
install, operate, and maintain each PM detector according to the
equipment manufacturer's specifications and the requirements in
paragraphs (h)(2)(i) through (v) of this section.
(i) Locate the detector(s) used for monitoring in or as close to a
position that provides a representative measurement of the parameter
being monitored.
(ii) Determine the hourly average of all recorded readings.
(iii) Conduct calibration and validation checks any time the
detector exceeds the manufacturer's specifications or you install a new
detector.
(iv) At least monthly, inspect all components for integrity, all
electrical connections for continuity, and all mechanical connections
for leakage.
(v) Record the results of each inspection, calibration, and
validation check.
Sec. 63.1453 How do I demonstrate continuous compliance with the
emission limitations, work practice standards, design standards, and
operation and maintenance requirements that apply to me?
(a) Filterable particulate matter emission limits. For each
affected source subject to a particulate matter emission limit in Sec.
63.1444 or Sec. 63.1446 as applies to you, you must demonstrate
continuous compliance according to the requirements in paragraphs
(a)(1) and (2) of this section.
(1) For each copper concentrate dryer, smelting vessel, slag
cleaning vessel, copper converter department, anode refining
department, and combination of anode refining department and Hoboken
converter process fugitive capture system subject to a filterable
particulate matter emission limit in Sec. 63.1444 or Sec. 63.1446 as
applies to you, you must demonstrate continuous compliance by meeting
the conditions in paragraphs (a)(1)(i) through (iii) or paragraphs
(a)(1)(i) and (iv) through (vii) of this section.
(i) Maintain the average concentration of filterable particulate
matter in the gases discharged from the affected source at or below the
applicable emission limit. If a particulate matter continuous emissions
monitoring system (PM CEMS) is used, you must demonstrate continued
compliance according to the requirements in paragraphs (a)(1)(iv)
through (vii) of this section.
(ii) Monitor the operating parameter(s) established during the
performance test according to the requirements in Sec. Sec. 63.1450(a)
and 63.1452 and collect, reduce, and record the monitoring data for
each of the operating limit parameters according to the applicable
requirements of this subpart.
(iii) Conduct subsequent performance tests following your initial
performance test no less frequently than once per year according to the
performance test procedures in Sec. 63.1450(a). New operating limits
may be established during subsequent performance tests as long as the
performance tests demonstrate compliance with the emission limits.
(iv) Install, operate, and maintain a PM CEMS to measure and record
PM concentrations and gas stream flow rates for the exhaust gases
discharged to the atmosphere from each affected source subject to the
emissions limit in this paragraph (a)(1). A single PM CEMS may be used
for the combined exhaust gas streams from multiple affected sources at
a point before the gases are discharged to the atmosphere. For each PM
CEMS used to comply with this paragraph (a)(1), you must meet the
requirements in this paragraph (a)(1)(iv) and paragraphs (a)(1)(v)
through (vii) of this section.
(v) You must install, certify, operate, and maintain the PM CEMS
according to EPA Performance Specification 11 in appendix B to 40 CFR
part 60, and the quality assurance requirements of Procedure 2 in
appendix F to 40 CFR part 60.
(vi) You must conduct an initial performance evaluation of the PM
CEMS according to the requirements of Performance Specification 11 in
appendix B to 40 CFR part 60. Thereafter, you must perform the
performance evaluations as required by Procedure 2 in appendix F to 40
CFR part 60.
(vii) You must perform quarterly accuracy determinations and daily
calibration drift tests for the PM CEMS according to Procedure 2 in
appendix F to 40 CFR part 60.
(2) For each smelting vessel, slag cleaning vessel, and copper
converter department subject to the nonsulfuric acid particulate matter
emission limit in Sec. 63.1444 as applies to you, you must demonstrate
continuous compliance by meeting the conditions in paragraphs (a)(2)(i)
through (iii) of this section.
(i) Maintain the average concentration of nonsulfuric acid
particulate matter in the process off-gas discharged from the affected
source at or below 6.2 mg/dscm.
(ii) Monitor the operating parameter established during the
performance tests according to the requirements in Sec. Sec.
63.1450(b) and 63.1452 and collect, reduce, and record the monitoring
data for each of the operating limit parameters according to the
applicable requirements of this subpart.
(iii) Conduct subsequent performance tests following your initial
performance test no less frequently than once per year according to the
performance test procedures in Sec. 63.1450(b). New operating limits
may be established during subsequent performance tests as long as the
performance tests demonstrate compliance with the emission limits.
[[Page 41709]]
(b) Copper converter department capture systems. You must
demonstrate continuous compliance of the copper converter department
capture system by meeting the requirements in paragraphs (b)(1) through
(4) of this section.
(1) Operate the copper converter department capture system at all
times during blowing at or above the lowest values or settings
established for the operating limits and demonstrated to achieve the
opacity limit according to the applicable requirements of this subpart;
(2) Inspect and maintain the copper converter department capture
system according to the applicable requirements in Sec. 63.1447 and
recording all information needed to document conformance with these
requirements;
(3) Monitor the copper converter department capture system
according to the requirements in Sec. 63.1452(a) and collecting,
reducing, and recording the monitoring data for each of the operating
limit parameters according to the applicable requirements of this
subpart; and
(4) Conduct subsequent performance tests according to the
requirements of Sec. 63.1450(c) following your initial performance
test no less frequently than once per year to demonstrate that the
opacity of any visible emissions exiting the roof monitors or roof
exhaust fans on the building housing the copper converter department
does not exceed 4 percent opacity.
(c) Baghouses. For each baghouse subject to the operating limit for
the bag leak detection system alarm in Sec. 63.1444(i) or Sec.
63.1446(c), you must demonstrate continuous compliance by meeting the
requirements in paragraphs (c)(1) through (3) of this section.
(1) Maintain the baghouse such that the bag leak detection system
alarm does not sound for more than 5 percent of the operating time
during any semiannual reporting period. To determine the percent of
time the alarm sounded use the procedures in paragraphs (c)(1)(i)
through (v) of this section.
(i) Alarms that occur due solely to a malfunction of the bag leak
detection system are not included in the calculation.
(ii) Before November 12, 2024, alarms that occur during startup,
shutdown, or malfunction are not included in the calculation if the
condition is described in the startup, shutdown, and malfunction plan,
and you operated the source during such periods in accordance with
Sec. 63.6(e)(1). On or after November 12, 2024, alarms that occur due
solely to a malfunction of the bag leak detection system are not
included in the calculation.
(iii) Count 1 hour of alarm time for each alarm when you initiated
procedures to determine the cause of the alarm within 1 hour.
(iv) Count the actual amount of time you took to initiate
procedures to determine the cause of the alarm if you did not initiate
procedures to determine the cause of the alarm within 1 hour of the
alarm.
(v) Calculate the percentage of time the alarm on the bag leak
detection system sounds as the ratio of the sum of alarm times to the
total operating time multiplied by 100.
(2) Maintain records of the times the bag leak detection system
alarm sounded, and for each valid alarm, the time you initiated
corrective action, the corrective action(s) taken, and the date on
which corrective action was completed.
(3) Inspect and maintain each baghouse according to the
requirements in Sec. 63.1452(b)(2) and recording all information
needed to document conformance with these requirements. If you increase
or decrease the sensitivity of the bag leak detection system beyond the
limits specified in Sec. 63.1452(b)(1)(vi), you must include a copy of
the required written certification by a responsible official in the
next semiannual compliance report.
(d) Venturi wet scrubbers. For each venturi wet scrubber subject to
the operating limits for pressure drop and scrubber water flow rate in
Sec. 63.1444(j) or Sec. 63.1446(d), you must demonstrate continuous
compliance by meeting the requirements of paragraphs (d)(1) through (3)
of this section.
(1) Maintain the hourly average pressure drop and scrubber water
flow rate at levels no lower than those established during the initial
or subsequent performance test;
(2) Inspect and maintain each venturi wet scrubber CPMS according
to Sec. 63.1452(c) and recording all information needed to document
conformance with these requirements; and
(3) Collect and reduce monitoring data for pressure drop and
scrubber water flow rate according to Sec. 63.1452(e) and recording
all information needed to document conformance with these requirements.
(e) Other control devices. For each control device other than a
baghouse or venturi wet scrubber subject to the operating limits for
site-specific operating parameters in Sec. 63.1444(k) or Sec.
63.1446(e), you must demonstrate continuous compliance by meeting the
requirements of paragraphs (e)(1) through (3) of this section:
(1) Maintain the hourly average rate at levels no lower than those
established during the initial or subsequent performance test;
(2) Inspect and maintain each CPMS operated according to Sec.
63.1452(d) and record all information needed to document conformance
with these requirements; and
(3) Collect and reduce monitoring data for selected parameters
according to Sec. 63.1452(e) and recording all information needed to
document conformance with these requirements.
(f) Fugitive dust sources. For each fugitive dust source subject to
work practice standards in Sec. 63.1445, you must demonstrate
continuous compliance by implementing all of fugitive control measures
specified for the source in your written fugitive dust control plan.
(g) Mercury emissions. For each affected source subject to mercury
emissions limit in Sec. 63.1444 as applies to you must demonstrate
continuous compliance according to the requirements in paragraph (g)(1)
or paragraphs (g)(2) and (3) of this section.
(1) Maintain the average concentration of mercury discharged from
the facility at or below the emission limit in Sec. 63.1444 monitored
by a mercury continuous emissions monitoring system (Hg CEMS). If the
Hg CEMS is used, you must demonstrate continuous compliance according
to the requirements in paragraphs (g)(1)(i) through (v) of this
section.
(i) Install and operate a Hg CEMS in accordance with Performance
Specification 12A (PS 12A) of appendix B to 40 CFR part 60.
(ii) Maintain each Hg CEMS according to the quality assurance
requirements in Procedure 5 of appendix F to 40 CFR part 60. The
relative accuracy testing of Hg CEMS must be conducted at normal
operating conditions.
(iii) Use a span value for any Hg CEMS that represents the mercury
concentration corresponding to approximately two times the emissions
standard and may be rounded up to the nearest multiple of 5 [mu]g/m3 of
total mercury or higher level if necessary to include Hg concentrations
which may occur.
(iv) Determine the average on a 6-hour rolling basis.
(v) Install, operate, calibrate, and maintain an instrument for
continuously measuring and recording the exhaust gas flow rate to the
atmosphere.
(2) Monitor the operating parameter established during the
performance tests
[[Page 41710]]
according to the requirements in Sec. Sec. 63.1450(d) and 63.1452 and
collecting, reducing, and recording the monitoring data for each of the
operating limit parameters according to the applicable requirements of
this subpart.
(3) Conduct subsequent performance tests following your initial
performance test no less frequently than once per year according to the
performance test procedures in Sec. 63.1450(d). New operating limits
may be established during subsequent performance tests as long as the
performance tests demonstrate compliance with the emission limits.
(h) Process fugitive filterable particulate matter and lead from
roofline vents. For emissions from roofline vents associated with the
smelting vessels, slag cleaning vessels, copper converter department,
and anode refining department subject to a filterable particulate
matter emission limit in Sec. 63.1444(h), and for emissions from the
combination of roofline vents associated with the Peirce-Smith
converter department, Inco flash furnace, and anode refining department
subject to a lead emission limit in Sec. 63.1444(p), you must
demonstrate continuous compliance according to the requirements in
paragraph (h)(1) or (2) and paragraph (h)(3) of this section. For the
applicable design standards in Sec. 63.1444(p), you must demonstrate
continuous compliance according to the requirements in paragraphs
(h)(4) through (6) of this section.
(1) Operating parameter. You must demonstrate continuous compliance
with the established site-specific operating limit for a parameter,
like opacity, based on values measured during the performance test you
conduct to demonstrate initial compliance. If the operating parameter
is visible emissions (VE) at each roofline vent, you must meet the
requirements in paragraphs (h)(1)(i) through (v) of this section.
(i) Perform daily VE observations of each roofline vent according
to the procedures of Method 22 of appendix A-7 to 40 CFR part 60. You
must conduct the Method 22 test while the affected source is operating
under normal conditions. The duration of each Method 22 test must be at
least 15 minutes.
(ii) If VE are observed during any daily test conducted using
Method 22 of appendix A-7 to 40 CFR part 60, you must promptly conduct
an opacity test, according to the procedures of Method 9 of appendix A-
4 to 40 CFR part 60. ASTM D7520-16 (incorporated by reference, see
Sec. 63.14) is an acceptable alternative to EPA Method 9 with the
specified conditions in Sec. 63.1450(c)(3)(i)(A) through (E).
(iii) You may decrease the frequency of Method 22 testing from
daily to weekly for a roofline vent if one of the conditions in
paragraph (h)(1)(iii)(A) or (B) of this section is met.
(A) No VE are observed in 30 consecutive daily Method 22 tests for
any roofline vent; or
(B) No opacity greater than the site-specific operating limit is
observed during any of the tests under Method 9 of appendix A-4 to 40
CFR part 60 for any roofline vent.
(iv) If VE are observed during any weekly test and opacity greater
than the site-specific operating limit is observed in the subsequent
test under Method 9 of appendix A-4 to 40 CFR part 60, you must
promptly initiate and complete corrective actions according to your
operation, maintenance, and monitoring plan (OM&M) plan, resume testing
of that roof vent following Method 22 of appendix A-7 to 40 CFR part
60, on a daily basis, as described in paragraph (h)(1)(i) of this
section, and maintain that schedule until one of the conditions in
paragraph (h)(1)(iii)(A) or (B) of this section is met, at which time
you may again decrease the frequency of Method 22 testing to a weekly
basis.
(v) If greater than the site-specific opacity operating limit is
observed during any test conducted using Method 9 of appendix A-4 to 40
CFR part 60, you must report these deviations by following the
requirements in Sec. 63.1455.
(2) Monitor the site-specific operating parameter established
during the performance tests according to the requirements in Sec.
63.1450(e) for filterable particulate matter and Sec. 63.1450(g) for
lead if applicable, and Sec. 63.1452, collect, reduce, and record the
monitoring data for each of the operating limit parameters according to
the applicable requirements of this subpart.
(3) Conduct subsequent performance tests following your initial
performance test no less frequently than once per year according to the
performance test procedures in Sec. 63.1450(e) for filterable
particulate matter and Sec. 63.1450(g) for lead if applicable. New
operating limits may be established during subsequent performance tests
as long as the performance tests demonstrate compliance with the
emission limits.
(4) For your flash furnace capture system, you must inspect the
hooding, walls, and damper quarterly.
(5) For your fuming ladle capture system, you must inspect the
hooding, walls, and ladle during maintenance periods.
(6) For your anode furnace secondary hood capture and control
system, you must inspect the hood, walls, and damper during maintenance
periods, and operate anode furnace secondary hood system at all times
the anode furnaces are operating.
(i) Benzene, toluene, chlorine, hydrogen chloride, polycyclic
aromatic hydrocarbons excluding naphthalene, naphthalene, and dioxins/
furans emissions. For each affected source subject to the benzene,
toluene, chlorine, hydrogen chloride, polycyclic aromatic hydrocarbons
excluding naphthalene, naphthalene, and dioxins/furans emission limits
in table 2 to this subpart, you must demonstrate continuous compliance
according to paragraphs (i)(1) and (2) to this section.
(1) You must monitor the site-specific operating parameter
established during the performance tests according to the requirements
in Sec. 63.1450(f) and collect, reduce, and record the monitoring data
for each of the operating limit parameters according to the applicable
requirements of this subpart.
(2) You must demonstrate continuous compliance by conducting
subsequent performance tests following your initial performance test at
least once every five years according to the performance test
procedures in Sec. 63.1450(f). New operating limits may be established
during subsequent performance tests as long as the performance tests
demonstrate compliance with the emission limits.
Sec. 63.1454 What notifications must I submit and when?
(a) You must submit all of the notifications in Sec. Sec.
63.6(h)(4) and (5), 63.7(b) and (c), 63.8(f)(4), and 63.9(b) through
(h) that apply to you by the specified dates.
(b) As specified in Sec. 63.9(b)(2), if you start your affected
source before June 12, 2002, you must submit your initial notification
not later than October 10, 2002, or no later than 120 days after the
source becomes subject to this subpart (see Sec. 63.1441), whichever
is later.
(c) As specified in Sec. 63.9(b)(3), if you start your new
affected source on or after June 12, 2002, you must submit your initial
notification not later than 120 calendar days after you become subject
to this subpart (see Sec. 63.1441).
(d) If you are required to conduct a performance test, you must
submit a notification of intent to conduct a performance test at least
60 calendar days before the performance test is scheduled to begin as
required in Sec. 63.7(b)(1).
(e) If you are required to conduct a performance test, opacity
observation,
[[Page 41711]]
or other initial compliance demonstration, you must submit a
notification of compliance status according to Sec. 63.9(h)(2)(ii) by
the date specified in paragraph (e)(1) or (2) of this section as
applies to you.
(1) For each initial compliance demonstration that does not include
a performance test, you must submit the notification of compliance
status before the close of business on the 30th calendar day following
the completion of the initial compliance demonstration.
(2) For each initial compliance demonstration that includes a
performance test, you must submit the notification of compliance
status, including the performance test results, before the close of
business on the 60th calendar day following the completion of the
performance test according to Sec. 63.10(d)(2).
Sec. 63.1455 What reports must I submit and when?
(a) You must submit each report in paragraphs (a)(1) and (2) of
this section that applies to you.
(1) You must submit a compliance report semiannually according to
the requirements in paragraph (b) of this section and containing the
information in paragraph (c) of this section.
(2) Before November 12, 2024, you must submit an immediate startup,
shutdown, and malfunction report if you had a startup, shutdown, or
malfunction during the reporting period that is not consistent with
your startup, shutdown, and malfunction plan. You must report the
actions taken for the event by fax or telephone within 2 working days
after starting actions inconsistent with the plan. You must submit the
information in Sec. 63.10(d)(5)(ii) by letter within 7 working days
after the end of the event unless you have made alternative
arrangements with the delegated authority. On or after November 12,
2024, you must report any deviation from an applicable standard in
Sec. Sec. 63.1444, 63.1445, and 63.1446 as part of your semiannual
compliance report and include the information required in paragraph (c)
of this section. In an event of an emergency situation, you must report
the emergency and the actions taken for the event by email or telephone
within 2 working days of the time when emissions limitations were
exceeded due to the emergency (or an alternate timeframe acceptable to
the delegated authority). For the purposes of complying with this
paragraph (a)(2), an emergency situation is any situation arising from
sudden and reasonably unforeseeable events beyond the control of the
facility owner or operator that requires immediate corrective action to
restore normal operation, and that causes the affected source to exceed
an applicable emissions limitation under this subpart, due to
unavoidable increases in emissions attributable to the emergency. An
emergency must not include noncompliance to the extent it is caused by
improperly designed equipment, lack of preventive maintenance, careless
or improper operation, or operator error. You must submit the report
within 7 working days after the end of the event unless you have made
alternative arrangements with the delegated authority. This report must
contain a description of the emergency, any steps take to mitigate the
emissions and corrective actions taken.
(b) Unless the Administrator has approved a different schedule
under Sec. 63.10(a), you must submit each compliance report required
in paragraph (a) of this section according to the applicable
requirements in paragraphs (b)(1) through (5) of this section following
the procedures in Sec. 63.9(k).
(1) The first compliance report must cover the period beginning on
the compliance date that is specified for your affected source in Sec.
63.1443 and ending on June 30 or December 31, whichever date comes
first after the compliance date that is specified for your source in
Sec. 63.1443.
(2) The first compliance report must be delivered no later than
July 31 or January 31, whichever date comes first after your first
compliance report is due.
(3) Each subsequent compliance report must cover the semiannual
reporting period from January 1 through June 30 or the semiannual
reporting period from July 1 through December 31.
(4) Each subsequent compliance report must be delivered no later
than July 31 or January 31, whichever date comes first after the end of
the semiannual reporting period.
(5) For each affected source that is subject to permitting
regulations pursuant to 40 CFR part 70 or 71, and if the delegated
authority has established dates for submitting semiannual reports
pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), you may
submit the first and subsequent compliance reports according to the
dates the delegated authority has established instead of according to
the dates in paragraphs (b)(1) through (4) of this section.
(c) Each compliance report must contain the information in
paragraphs (c)(1) through (3) of this section and, as applicable,
paragraphs (c)(4) through (8) of this section.
(1) Company name and address.
(2) Statement by a responsible official, as defined in Sec. 63.2,
with that official's name, title, and signature, certifying the
accuracy and completeness of the content of the report.
(3) Date of report and beginning and ending dates of the reporting
period.
(4) Before November 12, 2024, if you had a startup, shutdown or
malfunction during the reporting period and you took actions consistent
with your startup, shutdown, and malfunction plan, the compliance
report must include the information in Sec. 63.10(d)(5)(i). On or
after November 12, 2024, you are not required to have a startup,
shutdown, and malfunction plan and you are not required to include in
your report the information in Sec. 63.10(d)(5)(i).
(5) If there are no deviations from any emission limitations
(emission limit, operating limit, opacity limit) that applies to you
and there are no deviations from the requirements for work practice
standards in this subpart, a statement that there were no deviations
from the emission limitations, work practice standards, or operation
and maintenance requirements during the reporting period.
(6) If there were no periods during which an operating parameter
monitoring system was out-of-control as specified in Sec. 63.8(c)(7),
a statement that there were no periods during which the monitoring
system was out-of-control during the reporting period.
(7) For each deviation from an emission limitation (emission limit,
operating limit, opacity limit) and for each deviation from the
requirements for work practice standards that occurs at an affected
source where you are not using a continuous monitoring system to comply
with the emission limitations or work practice standards in this
subpart, the compliance report must contain the information in
paragraphs (c)(1) through (4) of this section and the information in
paragraphs (c)(7)(i) and (ii) of this section.
(i) The total operating time of each affected source during the
reporting period.
(ii) Information on the number, date, time, duration, and cause of
deviations (including unknown cause, if applicable), as applicable, the
corrective action taken, a list of the affected sources or equipment,
an estimate of the quantity of each regulated pollutant emitted over
any emission limit, and a description of the method used to estimate
the emissions.
(8) For each deviation from an emission limitation (emission limit,
[[Page 41712]]
operating limit, opacity limit, and visible emission limit) occurring
at an affected source where you are using an operating parameter
monitoring system to comply with the emission limitation in this
subpart, you must include the information in paragraphs (c)(1) through
(4) of this section and the information in paragraphs (c)(8)(i) through
(xi) of this section.
(i) The cause of each deviations (including unknown cause, if
applicable), the corrective action taken, a list of the affected
sources or equipment, an estimate of the quantity of each regulated
pollutant emitted over any emission limit, and a description of the
method used to estimate the emissions.
(ii) If the monitoring system was inoperative, the date and time
that each monitoring system was inoperative, except for zero (low-
level) and high-level checks.
(iii) If the monitoring system was inoperative, the date, time and
duration that each monitoring system was out-of-control, including the
information in Sec. 63.8(c)(8).
(iv) The number, date and time that each deviation started and
stopped.
(v) A summary of the total duration of the deviation during the
reporting period and the total duration as a percent of the total
source operating time during that reporting period.
(vi) A breakdown of the total duration of the deviations during the
reporting period into those that are due to control equipment problems,
process problems, other known causes, and other unknown causes.
(vii) A summary of the total duration of monitoring system downtime
during the reporting period and the total duration of monitoring system
downtime as a percent of the total source operating time during that
reporting period.
(viii) A brief description of the process units.
(ix) A brief description of the monitoring system.
(x) The date of the latest monitoring system certification or
audit.
(xi) A description of any changes in continuous monitoring systems,
processes, or controls since the last reporting period.
(d) If you have obtained a title V operating permit pursuant to 40
CFR part 70 or 71 must report all deviations as defined in this subpart
in the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A). If you submit a compliance
report pursuant to paragraph (a) of this section along with, or as part
of, the semiannual monitoring report required by 40 CFR
70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), and the compliance report
includes all required information concerning deviations from any
emission limitation (including any operating limit), or work practice
requirement in this subpart, submission of the compliance report is
deemed to satisfy any obligation to report the same deviations in the
semiannual monitoring report. However, submission of a compliance
report does not otherwise affect any obligation you may have to report
deviations from permit requirements to the permit authority.
(e) Within 60 days after the date of completing each performance
test or continuous monitoring system (CMS) performance evaluation (as
defined in Sec. 63.2) required by this subpart, the owner or operator
must submit the results of the performance test or performance
evaluation following the procedures specified in Sec. 63.9(k).
(1) Data collected using test methods supported by the EPA's
Electronic Reporting Tool (ERT) as listed on the EPA's ERT website
(https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the
performance test or the performance evaluation of CMS measuring
relative accuracy test audit (RATA) pollutants to the EPA via the
Compliance and Emissions Data Reporting Interface (CEDRI), which can be
accessed through the EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be submitted in a file format generated
through the use of the EPA's ERT. Alternatively, you may submit an
electronic file consistent with the extensible markup language (XML)
schema listed on the EPA's ERT website.
(2) Data collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test.
The results of the performance test or the performance evaluation of
CMS measuring RATA pollutants by methods that are not supported by the
ERT, must be included as an attachment in the ERT or an alternate
electronic file consistent with the XML schema listed on the EPA's ERT
website. Submit the ERT generated package or alternative file to the
EPA via CEDRI.
Sec. 63.1456 What records must I keep and how long must I keep my
records?
(a) You must keep the records listed in paragraphs (a)(1) through
(8) of this section.
(1) A copy of each notification and report that you submitted to
comply with this subpart, including all documentation supporting any
initial notification or notification of compliance status that you
submitted, according to the requirements in Sec. 63.10(b)(2)(xiv).
(2) Before November 12, 2024, the records in Sec. 63.6(e)(3)(iii)
through (v) related to startup, shutdown, and malfunction. On or after
November 12, 2024, you are not required to keep the records required in
Sec. 63.6(e)(3)(iii) through (v) related to compliance with a startup,
shutdown, and malfunction plan.
(3) Records of performance tests and performance evaluations as
required in Sec. 63.10(b)(2)(viii).
(4) For each monitoring system, you must keep the records specified
in paragraphs (a)(4)(i) through (iv) of this section.
(i) Records described in Sec. 63.10(b)(2)(vi) through (xi).
(ii) Monitoring data recorded by the monitoring system during a
performance evaluation as required in Sec. 63.6(h)(7)(i) and (ii).
(iii) Before November 12, 2024, previous (i.e., superseded)
versions of the performance evaluation plan as required in Sec.
63.8(d)(3). On or after November 12, 2024, you must comply with the
requirements in Sec. 63.8(d)(1) and (2). The owner or operator shall
keep the written procedures required in Sec. 63.8(d)(1) and (2) on
record for the life of the affected source or until the affected source
is no longer subject to the provisions of this part, to be made
available for inspection, upon request, by the Administrator. If the
performance evaluation plan is revised, the owner or operator shall
keep previous (i.e., superseded) versions of the performance evaluation
plan on record to be made available for inspection, upon request, by
the Administrator, for a period of 5 years after each revision to the
plan. The program of corrective action should be included in the plan
required under Sec. 63.8(d)(2).
(iv) Before November 12, 2024, records of the date and time that
each deviation started and stopped, and whether the deviation occurred
during a period of startup, shutdown, or malfunction or during another
period. On or after November 12, 2024, for each failure to meet an
applicable standard, you must record the information in paragraphs
(a)(4)(iv)(A) through (D) of this section. Examples of such methods to
estimate emissions include product-loss calculations, mass balance
calculations, measurements, or
[[Page 41713]]
engineering judgment based on known process parameters.
(A) The occurrence and duration of each startup, shutdown, or
malfunction of process, air pollution control, and monitoring
equipment.
(B) In the event that an affected unit fails to meet an applicable
standard, record the number of failures. For each failure record the
date, time, cause and duration of each failure.
(C) For each failure to meet an applicable standard, record and
retain a list of the affected sources or equipment, whether the failure
occurred during a period of startup, shutdown or malfunction, actions
taken to minimize emissions, an estimate of the quantity of each
regulated pollutant emitted over any emission limit and a description
of the method used to estimate the emissions.
(D) Record actions taken to minimize emissions in accordance with
Sec. 63.1447(a), and any corrective actions taken to return the
affected unit to its normal or usual manner of operation.
(5) For each performance test you conduct to demonstrate compliance
with an opacity limit according to Sec. 63.1450(c), you must keep the
records specified in paragraphs (a)(5)(i) through (ix) of this section.
(i) Dates and time intervals of all opacity observation period
segments;
(ii) Description of overall smelter operating conditions during
each observation period. Identify, if any, the smelter copper
production process equipment that was out-of-service during the
performance test and explain why this equipment was not in operation;
(iii) Name, affiliation, and copy of current visible emission
reading certification for each visible emission observer participating
in the performance test;
(iv) Name, title, and affiliation for each indoor process monitor
participating in the performance test;
(v) Copies of all visible emission observer opacity field data
sheets;
(vi) Copies of all indoor process monitor operating log sheets;
(vii) Copies of all data summary sheets used for data reduction;
(viii) Copy of calculation sheets of the average opacity value used
to demonstrate compliance with the opacity limit; and
(ix) Documentation according to the requirements in Sec.
63.1450(c)(9)(iv) to support your selection of the site-specific
capture system operating limits used for each batch copper converter
capture system when blowing.
(6) For each baghouse subject to the operating limit in Sec.
63.1444(i) or Sec. 63.1446(c), you must keep the records specified in
paragraphs (a)(6)(i) and (ii) of this section.
(i) Records of alarms for each bag leak detection system.
(ii) Description of the corrective actions taken following each bag
leak detection alarm.
(7) For each control device other than a baghouse or venturi wet
scrubber subject to site-specific operating limits in Sec. 63.1444(k)
or Sec. 63.1446(e), you must keep documentation according to the
requirements in Sec. 63.1450(a)(5)(iv) to support your selection of
the site-specific operating limits for the control device.
(8) You must keep records of bypass stack usage, including the flow
rate and operating parameter(s).
(b) Your records must be in a form suitable and readily available
for expeditious review, according to Sec. 63.10(b)(1).
(c) As specified in Sec. 63.10(b)(1), you must keep each record
for 5 years following the date of each occurrence, measurement,
maintenance, corrective action, report, or record.
(d) You must keep each record on site for at least 2 years after
the date of each occurrence, measurement, maintenance, corrective
action, report, or record, according to Sec. 63.10(b)(1). You can keep
the records off site for the remaining 3 years.
Sec. 63.1457 What part of the general provisions apply to me?
Table 1 to this subpart shows which parts of the general provisions
in Sec. Sec. 63.1 through 63.15 apply to you.
Sec. 63.1458 Who implements and enforces this subpart?
(a) This subpart can be implemented and enforced by us, the United
States Environmental Protection Agency (U.S. EPA), or a delegated
authority such as your State, local, or tribal agency. If the U.S. EPA
Administrator has delegated authority to your State, local, or tribal
agency, then that agency has the authority to implement and enforce
this subpart. You should contact your U.S. EPA Regional Office to find
out if this subpart is delegated to your State, local, or tribal
agency.
(b) In delegating implementation and enforcement authority of this
subpart to a State, local, or tribal agency under subpart E of this
part, the authorities listed in paragraph (c) of this section are
retained by the U.S. EPA Administrator and are not transferred to the
State, local, or tribal agency.
(c) The authorities that will not be delegated to State, local, or
tribal agencies are as listed in paragraphs (c)(1) through (5) of this
section.
(1) Approval of alternatives to the emission limitations and work
practice standards in Sec. Sec. 63.1444 through 63.1446 under Sec.
63.6(g).
(2) Approval of major alternatives to test methods under Sec.
63.7(f) and as defined in Sec. 63.90.
(3) Approval of major alternatives to monitoring under Sec.
63.8(f) and as defined in Sec. 63.90.
(4) Approval of major alternatives to recordkeeping and reporting
under Sec. 63.10(f) and as defined in Sec. 63.90.
(5) Approval of an alternative to any electronic reporting to the
EPA required by this subpart.
Sec. 63.1459 What definitions apply to this subpart?
Terms used in this subpart are defined in the Clean Air Act, in
Sec. 63.2, and in this section as follows:
Anode refining department means the area at a primary copper
smelter in which anode copper refining operations are performed.
Emission sources in the anode refining department include anode
refining furnaces and utility vessels.
Baghouse means a control device that collects particulate matter by
filtering the gas stream through bags. A baghouse is also referred to
as a ``fabric filter.''
Bag leak detection system means a system that is capable of
continuously monitoring relative particulate matter (dust) loadings in
the exhaust of a baghouse in order to detect bag leaks and other upset
conditions. A bag leak detection system includes, but is not limited
to, an instrument that operates on triboelectric, light scattering,
transmittance or other effect to continuously monitor relative
particulate matter loadings.
Batch copper converter means a Peirce-Smith converter or Hoboken
converter in which copper matte is oxidized to form blister copper by a
process that is performed in discrete batches using a sequence of
charging, blowing, skimming, and pouring.
Blowing means the operating mode for a batch copper converter
during which air or oxygen-enriched air is injected into the molten
converter bath.
Bypass stack means a device used for discharging combustion gases
to avoid severe damage to the air pollution control device or other
equipment and conduct planned maintenance safely in accordance with the
work practice standard in Sec. 63.1444(q). The use of a bypass stack
during a performance test of a process or control device will
invalidate the test.
Capture system means the collection of components used to capture
gases and fumes released from one or more
[[Page 41714]]
emission points, and to convey the captured gases and fumes to a
control device. A capture system may include, but is not limited to,
the following components as applicable to a given capture system
design: duct intake devices, hoods, enclosures, ductwork, dampers,
manifolds, plenums, and fans.
Charging means the operating mode for a batch copper converter
during which molten or solid material is added into the vessel.
Control device means the air pollution control equipment used to
collect particulate matter and other emissions from a gas stream.
Converting vessel means a furnace, reactor, or other type of vessel
in which copper matte is oxidized to form blister copper.
Copper concentrate dryer means a vessel in which copper
concentrates are heated in the presence of air to reduce the moisture
content of the material. Supplemental copper-bearing feed materials and
fluxes may be added or mixed with the copper concentrates fed to a
copper concentrate dryer.
Copper concentrate feed means the mixture of copper concentrate,
secondary copper-bearing materials, recycled slags and dusts, fluxes,
and other materials blended together for feeding to the smelting
vessel.
Copper converter department means the area at a primary copper
smelter in which the copper converters are located. This could include
a batch copper converter or other type of copper converter, such as a
continuous copper converter.
Copper matte means a material predominately composed of copper and
iron sulfides produced by smelting copper ore concentrates.
Deviation means any instance in which an affected source subject to
this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this
subpart including, but not limited to, any emission limitation
(including any operating limit) or work practice standard;
(2) Fails to meet any term or condition that is adopted to
implement an applicable requirement in this subpart and that is
included in the operating permit for any affected source required to
obtain such a permit; or
(3) Fails to meet any emission limitation (including any operating
limit) or work practice standard in this subpart during startup,
shutdown, or malfunction, regardless of whether or not such failure is
permitted by this subpart.
Emission limitation means any emission limit, opacity limit,
operating limit, or visible emission limit.
Fugitive dust material means copper concentrate, dross, reverts,
slag, speiss, or other solid copper-bearing materials.
Fugitive dust source means a stationary source of particulate
matter emissions resulting from the handling, storage, transfer, or
other management of fugitive dust materials where the source is not
associated with a specific process, process vent, or stack. Examples of
a fugitive dust source include, but are not limited to, on-site
roadways used by trucks transporting copper concentrate, unloading of
materials from trucks or railcars, outdoor material storage piles, and
transfer of material to hoppers and bins.
Holding means the operating mode for a batch copper converter or a
holding furnace associated with a smelting vessel during which the
molten bath is maintained in the vessel but no blowing or smelting is
performed nor is material added into or removed from the vessel.
New copper converter system means the copper matte is oxidized and
forms copper blister by a process that is performed continuously. This
system may include a flash smelting furnace, flash converting furnace,
secondary gas system, a rotary dryer, anode area, matte grinding plant,
hydrometallurgical plant and possibly an acid plant.
Opacity means the degree to which emissions reduce the transmission
of light.
Particulate matter means any finely divided solid or liquid
material, other than uncombined water, as measured by the specific
reference method.
Pouring means the operating mode for a batch copper converter
during which molten copper is removed from the vessel.
Primary copper smelter means any installation or any intermediate
process engaged in the production of copper from copper sulfide ore
concentrates through the use of pyrometallurgical techniques.
Responsible official means responsible official as defined in 40
CFR 70.2.
Roofline vents means an exhaust system designed to evacuate process
fugitive emissions that collect in the roofline area of various process
buildings (e.g., smelting building roof vents, converter building roof
vents, etc.).
Secondary gas system means a capture system that collects the gases
and fumes released when removing and transferring molten materials from
one or more vessels using tapping ports, launders, and other openings
in the vessels. Examples of molten material include, but are not
limited to: Copper matte, slag, and blister copper.
Skimming means the batch copper converter operating mode during
which molten slag is removed from the vessel.
Slag cleaning vessel means a vessel that receives molten copper-
bearing material and the predominant use of the vessel is to separate
this material into molten copper matte and slag layers.
Smelting vessel means a furnace, reactor, or other type of vessel
in which copper ore concentrate and fluxes are smelted to form a molten
mass of material containing copper matte and slag. Other copper-bearing
materials may also be charged to the smelting furnace.
TEQ means the international method of expressing toxicity
equivalents for dioxins/furans as defined in EPA/100/R-10/005
(incorporated by reference, see Sec. 63.14). The Toxic Equivalency 49
Factors (TEFs) used to determine the dioxin and furan TEQs are listed
in table 3 to this subpart.
Work practice standard means any design, equipment, work practice,
or operational standard, or combination thereof, that is promulgated
pursuant to section 112(h) of the Clean Air Act.
Table 1 to Subpart QQQ of Part 63--Applicability of General Provisions
to This Subpart
As required in Sec. 63.1457, you must comply with the requirements
of the NESHAP General Provisions (subpart A of this part) shown in the
following table:
----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to this subpart Explanation
----------------------------------------------------------------------------------------------------------------
Sec. 63.1.......................... Applicability.......... Yes....................
Sec. 63.2.......................... Definitions............ Yes....................
Sec. 63.3.......................... Units and Abbreviations Yes....................
Sec. 63.4.......................... Prohibited Activities.. Yes....................
Sec. 63.5.......................... Construction and Yes....................
Reconstruction.
[[Page 41715]]
Sec. 63.6(a) through (d), (e)(iii), Compliance with Yes....................
and (f)(2) and (3), (g). Standards and
Maintenance
Requirements.
Sec. 63.6(e)(1)(i)................. Operation and Yes before November 12, General duty
Maintenance 2024. No on or after requirements to
Requirements. November 12, 2024. minimize emissions at
all times are
contained in Sec.
63.1447(a).
Sec. 63.6(e)(1)(ii)................ Requirement to correct Yes before November 12, Malfunctions are no
malfunctions as soon 2024. No on or after longer exempt.
as practicable. November 12, 2024.
Sec. 63.6(e)(2).................... Reserved............... No.....................
Sec. 63.6(e)(3).................... Requirement to develop Yes before November 12, Startup, shutdown, and
a startup, shutdown, 2024. No on or after malfunction (SSM)
and malfunction plan. November 12, 2024. plans are no longer
necessary.
Sec. 63.6(f)(1).................... Compliance with Yes before November 12, Source category rules
nonopacity emission 2024. No on or after apply at all times.
standards during November 12, 2024.
periods of startup,
shutdown, and
malfunction.
Sec. 63.6(h)....................... Determining compliance No..................... This subpart specifies
with Opacity and VE the requirements and
standards. test protocol used to
determine compliance
with the opacity
limits.
Sec. 63.6(i) and (j)............... Extension of Compliance Yes....................
and Presidential
Compliance Exemption.
Sec. 63.7(a)(1) and (2)............ Applicability and No..................... This subpart specifies
Performance Test Dates. performance test
applicability and
dates.
Sec. 63.7(a)(3), (b) through (d), Performance Testing Yes....................
(f) through (h). Requirements.
Sec. 63.7(e)(1).................... Performance Testing.... Yes before November 12, See Sec. Sec.
2024. No on or after 63.1450 and 63.1444.
November 12, 2024.
Sec. 63.8 except for (a)(4), Monitoring Requirements Yes....................
(c)(1)(i) and (iii), (c)(4), (d)(3),
and (f)(6).
Sec. 63.8(a)(4).................... Additional Monitoring No..................... This subpart does not
Requirements for require flares.
Control devices in
Sec. 63.11.
Sec. 63.8(c)(1)(i) and (iii)....... Operation and Yes before November 12, Cross references to the
Maintenance of and SSM 2024. No on or after general duty and SSM
plan for Continuous November 12, 2024. plan requirements in
Monitoring Systems. those paragraphs are
no longer necessary.
Sec. 63.8(c)(4).................... Continuous Monitoring No..................... This subpart specifies
System Requirements. requirements for
operation of CMS.
Sec. 63.8(d)(3).................... Quality Control Program Yes before November 12, See Sec.
2024. No on or after 63.1456(a)(4)(iii).
November 12, 2024.
Sec. 63.8(f)(6).................... RATA Alternative....... No..................... This subpart does not
require continuous
emission monitoring
systems.
Sec. 63.9.......................... Notification Yes....................
Requirements.
Sec. 63.9(g)(5).................... DATA reduction......... No..................... This subpart specifies
data reduction
requirements.
Sec. 63.10 except for (b)(2)(i), Recordkeeping and Yes....................
(ii), (iv), (v), and (xiii), (c)(7), reporting Requirements.
(8), and (15), and (d)(5).
Sec. 63.10(b)(2)(i)................ General Recordkeeping Yes before November 12, No longer necessary
Requirements during 2024. No on or after because recordkeeping
Startup and Shutdown. November 12, 2024. and reporting
applicable to normal
operations will apply
to startup and
shutdown.
Sec. 63.10(b)(2)(ii)............... General Recordkeeping Yes before November 12, See Sec.
Requirements during 2024. No on or after 63.1456(a)(4)(iv) for
Startup, Shutdown, and November 12, 2024. recordkeeping
Malfunction and requirements for a
Failures to Meet deviation from a
Standards. standard.
Sec. 63.10(b)(2)(iv)............... Actions Taken to Yes before November 12, See Sec. 63.1456 for
Minimize Emissions 2024. No on or after the recordkeeping
during Startup, November 12, 2024. requirements of
Shutdown, and actions taken to
Malfunction. minimize emissions and
record corrective
actions.
Sec. 63.10(b)(2)(v)................ Actions Taken to Yes before November 12, Requirements to
Minimize Emissions 2024. No on or after document that actions
during Startup, November 12, 2024. taken during SSM
Shutdown, and events are consistent
Malfunction. with SSM plan are no
longer required.
Sec. 63.10(b)(2)(xiii)............. CMS Records for RATA No..................... This subpart does not
Alternative. require continuous
emission monitoring
systems.
[[Page 41716]]
Sec. 63.10(c)(7)-(8)............... Records of Excess No..................... This subpart specifies
Emissions and record keeping
Parameter Monitoring requirements.
Exceedances for CMS.
Sec. 63.10(c)(15).................. Use of SSM Plan........ Yes before November 12, This provision would be
2024. No on or after eliminated because it
November 12, 2024. referenced the
source's SSM plan,
which is no longer
required.
Sec. 63.10(d)(5)................... SSM Reporting and Yes before November 12, See Sec. Sec.
Recordkeeping 2024. No on or after 63.1455(c)(4) and
Requirements. November 12, 2024. 63.1456.
Sec. 63.11......................... Control Device No..................... This subpart does not
Requirements. require flares.
Sec. 63.12......................... State Authority and Yes....................
Delegations.
Sec. Sec. 63.13 through 63.16..... Addresses, Yes....................
Incorporation by
Reference,
Availability of
Information,
Performance Track
Provisions.
----------------------------------------------------------------------------------------------------------------
Table 2 to Subpart QQQ of Part 63--Non-Mercury HAP Emission Limits
As required in Sec. 63.1444(o), you must meet each emission limit
in the following table that applies to you.
------------------------------------------------------------------------
You must meet the following
For. . . emission limit
------------------------------------------------------------------------
Each new and existing combination of Benzene emissions must not
stacks or other vents from the copper exceed 1.7E-03 lb/ton copper
concentrate dryers, converting concentrate feed charged to
department, the anode refining the smelting vessel.
department, and the smelting vessels.
Each new and existing combination of Toluene emissions must not
stacks or other vents from the copper exceed 8.4E-04 lb/ton copper
concentrate dryers, converting concentrate feed charged to
department, the anode refining the smelting vessel.
department, and the smelting vessels.
Each new and existing combination of Chlorine emissions must not
stacks or other vents from the copper exceed 5.4E-03 lb/ton copper
concentrate dryers, converting concentrate feed charged to
department, the anode refining the smelting vessel.
department, and the smelting vessels.
Each new and existing combination of Hydrogen chloride emissions
stacks or other vents from the copper must not exceed 1.5E-03 lb/
concentrate dryers, converting ton copper concentrate feed
department, the anode refining charged to the smelting
department, and the smelting vessels. vessel.
Each new and existing combination of Polycyclic aromatic
stacks or other vents from the copper hydrocarbons (excluding
concentrate dryers, converting naphthalene) emissions must
department, the anode refining not exceed 1.0E-04 lb/ton
department, and the smelting vessels. copper concentrate feed
charged to the smelting
vessel.
Each new and existing combination of Naphthalene emissions must not
stacks or other vents from the copper exceed 2.8E-04 lb/ton copper
concentrate dryers, converting concentrate feed charged to
department, the anode refining the smelting vessel.
department, and the smelting vessels.
Each new and existing combination of Dioxins/Furans emissions \1\
stacks or other vents from the copper must not exceed 6.0E+01 ng
concentrate dryers, converting TEQ/Mg copper concentrate
department, the anode refining feed charged to the smelting
department, and the smelting vessels. vessel.
------------------------------------------------------------------------
\1\ Determined using the toxic equivalency factors listed in Table 2 of
Recommended Toxicity Equivalence Factors (TEFs) for Human Health Risk
Assessments of 2, 3, 7, 8- Tetrachlorodibenzo-p-dioxin and Dioxin-Like
Compounds (incorporated by reference, see Sec. 63.14).
Table 3 to Subpart QQQ of Part 63--2010 Toxic Equivalency Factors (TEFs)
------------------------------------------------------------------------
TEF
Congener (mammals)
------------------------------------------------------------------------
2,3,7,8-Te CDD.............................................. 1
1,2,3,7,8-Pe CDD............................................ 1
1,2,3,4,7,8-HxCDD........................................... 0.1
1,2,3,6,7,8-HxCDD........................................... 0.1
1,2,3,7,8,9-HxCDD........................................... 0.1
1,2,3,4,6,7,8-HpCDD......................................... 0.01
OCDD........................................................ 0.0003
2,3,7,8-Te CDF.............................................. 0.1
1,2,3,7,8-Pe CDF............................................ 0.03
2,3,4,7,8-Pe CDF............................................ 0.3
1,2,3,4,7,8-HxCDF........................................... 0.1
1,2,3,6,7,8-HxCDF........................................... 0.1
2,3,4,6,7,8-HxCDF........................................... 0.1
1,2,3,7,8,9-HxCDF........................................... 0.1
1,2,3,4,6,7,8-HpCDF......................................... 0.01
1,2,3,4,7,8,9-HpCDF......................................... 0.01
OCDF........................................................ 0.0003
------------------------------------------------------------------------
[[Page 41717]]
Table 4 to Subpart QQQ of Part 63--Compliance Dates for Amendments Being Promulgated on May 13, 2024
----------------------------------------------------------------------------------------------------------------
And the owner or operator
If the construction/reconstruction date Then the owner or operator must comply must achieve compliance .
is . . . with . . . . .
----------------------------------------------------------------------------------------------------------------
On or before January 11, 2022........... Requirements for existing sources in Sec. On or before May 13, 2025.
Sec. 63.1444(f)(2) and (3), (l);
63.1446; 63.1449; \1\ 63.1450(a) and (d);
and 63.1451 through 63.1456, as
applicable.
Requirements for existing sources in Sec. On or before May 13, 2026.
Sec. 63.1444(h); 63.1449; \1\
63.1450(e); and 63.1451 through 63.1456,
as applicable.
After January 11, 2022.................. Requirements for new sources in Sec. Sec. Upon initial startup or
63.1444(e)(1) and (2), (f)(2) and (3), May 13, 2024, whichever
(h), (m); 63.1446; 63.1449; \1\ is later.
63.1450(a), (d), (e); and 63.1451 through
63.1456, as applicable.
On or before July 24, 2023.............. Requirements for existing sources in Sec. On or before May 13, 2027.
Sec. 63.1444(g); 63.1449; \1\
63.1450(a); and 63.1451 through 63.1456,
as applicable.
Requirements for existing sources in Sec. On or before May 13, 2025.
Sec. 63.1444(o); 63.1449; \1\
63.1450(f); and 63.1451 through 63.1456,
as applicable.
Requirements for existing sources in Sec. On or before November 12,
Sec. 63.1444(q); 63.1449; \1\ 2024.
63.1450(a), (g); and 63.1451 through
63.1456, as applicable.
After July 24, 2023..................... Requirements for new sources in Sec. Sec. Upon initial startup or
63.1444(o), (q); 63.1449; \1\ May 13, 2024, whichever
63.1450(a), (f), (g); and 63.1451 through is later.
63.1456, as applicable.
On or before May 13, 2024............... Requirements for existing sources in Sec. On or before May 13, 2027.
Sec. 63.1444(p); 63.1449; \1\
63.1450(g); and 63.1451 through 63.1456,
as applicable.
----------------------------------------------------------------------------------------------------------------
\1\ Section 63.1449(a) provides that any necessary performance test is conducted within 180 days of the
compliance date.
Figure 1 to Subpart QQQ of Part 63--Data Summary Sheet for Determination of Average Opacity
--------------------------------------------------------------------------------------------------------------------------------------------------------
Average opacity for 1-
Visible emissions minute interval
Number of converters Converter aisle Average opacity for 1- interference observed blowing without
Clock time blowing activity minute interval during 1-minute visible emission
(percent) interval? (yes or no) interferences
(percent)
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
Subpart EEEEEE--National Emission Standards for Hazardous Air
Pollutants for Primary Copper Smelting Area Sources
0
5. Amend Sec. 63.11147 by revising paragraphs (b)(6), (c)(1) and (5),
(d), and (e) to read as follows:
Sec. 63.11147 What are the standards and compliance requirements for
existing sources not using batch copper converters?
* * * * *
(b) * * *
(6) You must submit to the permitting authority by the 20th day of
each month a report summarizing the 24-hour average mass
PM10 emissions rates for the previous month. Beginning
November 12, 2024, the owner or operator must electronically submit all
subsequent reports in PDF format to the EPA via CEDRI, which can be
accessed through EPA's CDX (https://cdx.epa.gov/) following the
procedures specified in Sec. 63.9(k).
* * * * *
(c) * * *
(1) At all times, you must maintain and operate any affected
source,
[[Page 41718]]
including associated air pollution control equipment and monitoring
equipment, in a manner consistent with safety and good air pollution
control practices for minimizing emissions. The general duty to
minimize emissions does not require the owner or operator to make any
further efforts to reduce emissions if levels required by the
applicable standard have been achieved. Determination of whether a
source is operating in compliance with operation and maintenance
requirements will be based on information available to the permitting
authority which may include, but is not limited to, monitoring results,
review of operation and maintenance procedures, review of operation and
maintenance records, and inspection of the source.
* * * * *
(5) Before November 12, 2024, as an alternative to the requirements
in paragraph (c)(4) of this section, you must comply with the startup,
shutdown, and malfunction requirements in Sec. 63.6(e)(3). On or after
November 12, 2024, you may not use the requirements in Sec. 63.6(e)(3)
as an alternative to the requirements in paragraph (c)(4) of this
section. You must comply with all emissions limitation or work practice
standards in this subpart at all times.
(d) Deviations. You must submit written notification to the
permitting authority of any deviation from the requirements of this
subpart, including the number, date, time, duration, and the cause of
such events (including unknown cause, if applicable); a list of the
affected sources or equipment; an estimate of the quantity of each
regulated pollutant emitted over any emission limit and a description
of the method used to estimate the emissions; and the probable cause of
such deviations and any corrective actions or preventative measures
taken. You must submit this notification within 14 days of the date the
deviation started.
(e) Reports. (1) You must submit semiannual monitoring reports to
your permitting authority. All instances of deviations from the
requirements of this subpart must be clearly identified in the reports.
The report must contain the number, date, time, duration, and the cause
of each deviation (including unknown cause, if applicable); a list of
the affected sources or equipment; an estimate of the quantity of each
regulated pollutant emitted over any emission limit and a description
of the method used to estimate the emissions; and the probable cause of
such deviations and any corrective actions or preventative measures
taken. Examples of methods used to estimate the emissions would include
product-loss calculations, mass balance calculations, measurements when
available, or engineering judgment based on known process parameters.
(2) Beginning November 13, 2024, the owner or operator must
electronically submit all subsequent semiannual monitoring reports in
PDF format to the EPA via CEDRI, which can be accessed through EPA's
CDX (https://cdx.epa.gov/) following the procedures specified in Sec.
63.9(k).
* * * * *
0
6. Amend Sec. 63.11148 by:
0
a. Revising paragraphs (a)(1), (a)(3)(ii), (a)(4)(iv), (b)(1),
(b)(2)(i), (b)(4), (c)(2) and (4), (e)(3), (f)(1), (f)(4)(ii) and
(iii), (f)(5), (g), and (h); and
0
b. Adding paragraph (i).
The revisions and addition read as follows:
Sec. 63.11148 What are the standards and compliance requirements for
existing sources using batch copper converters?
(a) * * *
(1) For each copper concentrate dryer, you must not discharge to
the atmosphere from the dryer vent any gases that contain filterable
particulate matter (PM) in excess of 0.022 grains per dry standard
cubic foot (gr/dscf).
* * * * *
(3) * * *
(ii) You must not cause to be discharged to the atmosphere from the
capture system used to comply with paragraph (a)(3)(i) of this section
any gases that contain filterable PM in excess of 0.022 gr/dscf.
(4) * * *
(iv) For each secondary capture system that is used to comply with
paragraph (a)(4)(ii) of this section and is not vented to a gas
cleaning system controlling PM and a sulfuric acid plant, you must not
cause to be discharged to the atmosphere any gases that contain
filterable particulate matter in excess of 0.02 grains/dscf.
(b) * * *
(1) Each COMS must meet Performance Specification 1 in appendix B
to 40 CFR part 60.
(2) * * *
(i) You must automatically (intrinsic to the opacity monitor) check
the zero and upscale (span) calibration drifts at least once daily. For
a particular COMS, the acceptable range of zero and upscale calibration
materials is as defined in the applicable version of Performance
Specification 1 in appendix B to 40 CFR part 60.
* * * * *
(4) You must log in ink or electronic format and maintain a record
of 24-hour opacity measurements performed in accordance with paragraph
(b)(3) of this section and any corrective actions taken, if any. A
record of corrective actions taken must include the start date, start
time, and duration in hours during which the 24-hour rolling average
opacity exceeded 15 percent and the start date, start time and type of
the corrective action and the date and time the corrective action was
completed.
(c) * * *
(2) The baghouse leak detection system must meet the specifications
and requirements in paragraphs (c)(2)(i) through (vi) of this section.
(i) The bag leak detection system must be certified by the
manufacturer to be capable of detecting particulate matter emissions at
concentrations that can effectively discern any dysfunctional leaks of
the baghouse.
(ii) The bag leak detection system sensor must provide output of
relative or absolute particulate matter loadings.
(iii) The bag leak detection system must be equipped with a device
to continuously record the output signal from the sensor.
(iv) The bag leak detection system must be equipped with an alarm
system that will sound automatically when an increase in relative
particulate emissions over a preset level is detected. The alarm must
be located where it is easily heard by plant operating personnel.
(v) The bag leak detection system must be installed downstream of
the baghouse.
(vi) The bag leak detection system must be installed, operated,
calibrated, and maintained in a manner consistent with the
manufacturer's written specifications and recommendations. The
calibration of the system must, at a minimum, consist of establishing
the relative baseline output level by adjusting the sensitivity and the
averaging period of the device and establishing the alarm set points
and the alarm delay time.
* * * * *
(4) You must log in ink or electronic format and maintain a record
of installation, calibration, maintenance, and operation of the bag
leak detection system. If the bag leak detection system alarm sounds,
the records must include an identification of the date and time of all
bag leak detection alarms, their cause, the time you initiated
corrective actions, and an explanation of the corrective actions taken,
including the date corrective actions were completed, if any.
* * * * *
(e) * * *
[[Page 41719]]
(3) Before November 12, 2024, you must conduct each performance
test according to Sec. 63.7(e)(1) using the test methods and
procedures in paragraphs (e)(3)(i) through (v) of this section. On or
after November 12, 2024, you must conduct each performance test using
the test methods and procedures in paragraphs (e)(3)(i) through (vi) of
this section.
(i) Method 1 or 1A in appendix A-1 to 40 CFR part 60 to select
sampling port locations and the number of traverse points in each stack
or duct. Sampling sites must be located at the outlet of the control
device (or at the outlet of the emissions source if no control device
is present) prior to any releases to the atmosphere.
(ii) Method 2, 2A, 2C, 2D, 2F, or 2G in appendices A-1 and A-2 to
40 CFR part 60 to determine the volumetric flow rate of the stack gas.
(iii) Method 3, 3A, or 3B in appendix A-2 to 40 CFR part 60 to
determine the dry molecular weight of the stack gas. You may use ANSI/
ASME PTC 19.10-1981 (incorporated by reference--see Sec. 63.14) as an
alternative to EPA Method 3B manual portion only and not the
instrumental portion.
(iv) Method 4 in appendix A-3 to 40 CFR part 60 to determine the
moisture content of the stack gas.
(v) Method 5 in appendix A-3 to 40 CFR part 60 to determine the PM
concentration for negative pressure baghouses or Method 5D in appendix
A-3 to 40 CFR part 60 for positive pressure baghouses. A minimum of
three valid test runs are needed to comprise a PM performance test.
(vi) You must conduct each performance test that applies to your
affected source under normal operating conditions of the affected
source. The owner or operator may not conduct performance tests during
periods of malfunction. The owner or operator must record the process
information that is necessary to document operating conditions during
the test and include in such record an explanation to support that such
conditions represent the entire range of normal operation, including
operational conditions for maximum emissions if such emissions are not
expected during maximum production. The owner or operator shall make
available to the Administrator such records as may be necessary to
determine the conditions of performance tests.
(f) * * *
(1) At all times, you must maintain and operate any affected
source, including associated air pollution control equipment and
monitoring equipment, in a manner consistent with safety and good air
pollution control practices for minimizing emissions. The general duty
to minimize emissions does not require the owner or operator to make
any further efforts to reduce emissions if levels required by the
applicable standard have been achieved. Determination of whether a
source is operating in compliance with operation and maintenance
requirements will be based on information available to the permitting
authority which may include, but is not limited to, monitoring results,
review of operation and maintenance procedures, review of operation and
maintenance records, and inspection of the source.
* * * * *
(4) * * *
(ii) You must document through signed contemporaneous logs or other
relevant evidence that an emergency occurred, and you can identify the
probable cause, your facility was being operated properly at the time
the emergency occurred, and the corrective actions taken to minimize
emissions as required by paragraph (f)(4)(i) of this section.
Documentation must include the date, time, duration, of such events
(including unknown cause, if applicable); a list of the affected
sources or equipment; and an estimate of the quantity of each regulated
pollutant emitted over any emission limit and a description of the
method used to estimate the emissions.
(iii) You must submit a notice of the emergency to the permitting
authority within two working days of the time when emission limitations
were exceeded due to the emergency (or an alternate timeframe
acceptable to the permitting authority). This notice must contain the
number, date, time, duration, and the cause of such events (including
unknown cause, if applicable); a list of the affected sources or
equipment; an estimate of the quantity of each regulated pollutant
emitted over any emission limit and a description of the method used to
estimate the emissions; and the probable cause of such deviations and
any corrective actions or preventative measures taken.
(5) Before November 12, 2024, as an alternative to the requirements
in paragraph (f)(4) of this section, you must comply with the startup,
shutdown, and malfunction requirements in Sec. 63.6(e)(3). On or after
November 12, 2024, you may not use the requirements in Sec. 63.6(e)(3)
as an alternative to the requirements in paragraph (f)(4) of this
section. Emissions limitation or work practice standards in this
subpart apply at all times.
(g) Recordkeeping requirements. (1) You must maintain records of
the occurrence and duration in hours of each startup, shutdown, or
malfunction of process, air pollution control, and monitoring
equipment.
(2) In the event that an affected unit fails to meet an applicable
standard, record the number of failures. For each failure record the
date, time, cause and duration of each failure.
(3) For each failure to meet an applicable standard, record and
retain a list of the affected sources or equipment, whether the failure
occurred during a period of startup, shutdown or malfunction, actions
taken to minimize emissions, an estimate of the quantity of each
regulated pollutant emitted over any emission limit and a description
of the method used to estimate the emissions.
(4) Record actions taken to minimize emissions in accordance with
Sec. 63.11147(c), paragraph (f) of this section, or Sec.
63.11149(c)(3) as applicable, and any corrective actions taken to
return the affected unit to its normal or usual manner of operation.
(5) You must maintain a file of all measurements, including
continuous monitoring system, monitoring device, and performance
testing measurements; all continuous monitoring system performance
evaluations; all continuous monitoring system or monitoring device
calibration checks; adjustments and maintenance performed on these
systems or devices; and all other information required by this section
recorded in a permanent form suitable for inspection. The file must be
retained for at least 5 years following the date of such measurements,
maintenance, and reports.
(6) Any records required to be maintained by this subpart that are
submitted electronically via the EPA's CEDRI may be maintained in
electronic format. This ability to maintain electronic copies does not
affect the requirement for facilities to make records, data, and
reports available upon request to a delegated air agency or the EPA as
part of an on-site compliance evaluation.
(h) Reporting requirements. (1) You must prepare and submit to the
permitting authority an excess emissions and monitoring systems
performance report and summary report every calendar quarter. A less
frequent reporting interval may be used for either report as approved
by the permitting authority.
(2) The summary report must include the information in paragraphs
(h)(2)(i) through (iv) of this section.
[[Page 41720]]
(i) The magnitude of excess emissions computed, any conversion
factor(s) used, and the date and time of commencement and completion of
each time period of excess emissions. The process operating time during
the reporting period. Examples of methods used to estimate the
emissions would include product-loss calculations, mass balance
calculations, measurements when available, or engineering judgment
based on known process parameters.
(ii) Specific identification of each period of excess emissions
that occurs during startups, shutdowns, and malfunctions of the
affected facility. The nature and cause of any malfunction (if known),
the corrective action taken or preventative measures adopted.
(iii) The date, time, and duration in hours identifying each period
during which the continuous monitoring system was inoperative except
for zero and span checks and the nature of the system repairs or
adjustments.
(iv) When no excess emissions have occurred or the continuous
monitoring system(s) have not been inoperative, repaired, or adjusted,
such information must be stated in the report.
(i) Electronic reporting requirements. Beginning on November 13,
2024, within 60 days after the date of completing each performance test
required by this subpart, you must submit the results of the
performance test following the procedures specified in Sec. 63.9(k).
(1) Data collected using test methods supported by the EPA's
Electronic Reporting Tool (ERT) as listed on the EPA's ERT website
(https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the
performance test to the EPA via the Compliance and Emissions Data
Reporting Interface (CEDRI), which can be accessed through the EPA's
Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be
submitted in a file format generated using the EPA's ERT.
Alternatively, you may submit an electronic file consistent with the
extensible markup language (XML) schema listed on the EPA's ERT
website.
(2) Data collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test.
The results of the performance test must be included as an attachment
in the ERT or an alternate electronic file consistent with the XML
schema listed on the EPA's ERT website. Submit the ERT generated
package or alternative file to the EPA via CEDRI.
0
7. Revise Sec. 63.11149 to read as follows:
Sec. 63.11149 What are the standards and compliance requirements for
new sources?
(a) Emissions limits and work practice standards. (1) You must not
discharge to the atmosphere exhaust gases that contain filterable PM in
excess of 0.6 pound per ton of copper concentrate feed charged on a 24-
hour average basis from any combination of stacks, vents, or other
openings on furnaces, reactors, or other types of process vessels used
for the production of anode copper from copper sulfide ore concentrates
by pyrometallurgical techniques. Examples of such process equipment
include, but are not limited to, copper concentrate dryers, smelting
flash furnaces, smelting bath furnaces, converting vessels, combined
smelting and converting reactors, anode refining furnaces, and anode
shaft furnaces.
(2) You must operate a capture system that collects the gases and
fumes released during the transfer of molten materials from smelting
vessels and converting vessels and conveys the collected gas stream to
a baghouse or other PM control device.
(3) You must operate one or more capture systems that collect the
gases and fumes released from each vessel used to refine blister
copper, remelt anode copper, or remelt anode scrap and convey each
collected gas stream to a baghouse or other PM control device. One
control device may be used for multiple collected gas streams.
(b) Monitoring requirements. (1) You must install, operate, and
maintain a PM continuous emissions monitoring system (CEMS) to measure
and record PM concentrations and gas stream flow rates for the exhaust
gases discharged to the atmosphere from each affected source subject to
the emissions limit in paragraph (a)(1) of this section. A single PM
CEMS may be used for the combined exhaust gas streams from multiple
affected sources at a point before the gases are discharged to the
atmosphere. For each PM CEMS used to comply with this paragraph (b)(1),
you must meet the requirements in paragraphs (b)(1)(i) through (iii) of
this section.
(i) You must install, certify, operate, and maintain the PM CEMS
according to EPA Performance Specification 11 in appendix B to 40 CFR
part 60, and the quality assurance requirements of Procedure 2 in
appendix F to 40 CFR part 60.
(ii) You must conduct an initial performance evaluation of the PM
CEMS according to the requirements of Performance Specification 11 in
appendix B to 40 CFR part 60. Thereafter, you must perform the
performance evaluations as required by Procedure 2 in appendix F to 40
CFR part 60.
(iii) You must perform quarterly accuracy determinations and daily
calibration drift tests for the PM CEMS according to Procedure 2 in
appendix F to 40 CFR part 60.
(2) You must install, operate, and maintain a weight measurement
system to measure and record the weight of the copper concentrate feed
charged to the smelting vessel on a daily basis.
(3)(i) You must comply with the requirements in Sec. 63.8(d)(1)
and (2).
(ii) The owner or operator shall keep the written procedures
required in Sec. 63.8(d)(1) and (2) on record for the life of the
affected source or until the affected source is no longer subject to
the provisions of this part, to be made available for inspection, upon
request, by the Administrator. If the performance evaluation plan is
revised, the owner or operator shall keep previous (i.e., superseded)
versions of the performance evaluation plan on record to be made
available for inspection, upon request, by the Administrator, for a
period of 5 years after each revision to the plan. The program of
corrective action should be included in the plan required under Sec.
63.8(d)(2).
(c) Compliance requirements. (1) You must demonstrate initial
compliance with the emissions limit in paragraph (a)(1) of this section
using the procedures in paragraph (c)(2) this section within 180 days
after startup and report the results in your notification of compliance
status no later than 30 days after the end of the compliance
demonstration.
(2) You must demonstrate continuous compliance with the emissions
limit in paragraph (a)(1) of this section using the procedures in
paragraphs (c)(2)(i) through (iii) of this section whenever your
facility is producing copper from copper concentrate.
(i) You must continuously monitor and record PM emissions,
determine and record the daily (24-hour) value for each day, and
calculate and record the daily average pounds of filterable PM per ton
of copper concentrate feed charged to the smelting vessel according to
the requirements in paragraph (b) of this section.
(ii) You must calculate the daily average at the end of each
calendar day for the preceding 24-hour period.
(iii) You must maintain records of the calculations of daily
averages with supporting information and data, including measurements
of the weight of copper concentrate feed charged to
[[Page 41721]]
the smelting vessel. Collected PM CEMS data must be made available for
inspection.
(3)(i) At all times, you must maintain and operate any affected
source, including associated air pollution control equipment and
monitoring equipment, in a manner consistent with safety and good air
pollution control practices for minimizing emissions. The general duty
to minimize emissions does not require the owner or operator to make
any further efforts to reduce emissions if levels required by the
applicable standard have been achieved. Determination of whether a
source is operating in compliance with operation and maintenance
requirements will be based on information available to the permitting
authority which may include, but is not limited to, monitoring results,
review of operation and maintenance procedures, review of operation and
maintenance records, and inspection of the source.
(ii) All pollution control equipment must be installed, maintained,
and operated properly. Instructions from the vendor or established
maintenance practices that maximize pollution control must be followed.
All necessary equipment control and operating devices, such as pressure
gauges, amp meters, volt meters, flow rate indicators, temperature
gauges, continuous emissions monitor, etc., must be installed, operated
properly and easily accessible to compliance inspectors. A copy of all
manufacturers' operating instructions for pollution control equipment
and pollution emitting equipment must be maintained at your facility
site. These instructions must be available to all employees who operate
the equipment and must be made available to the permitting authority
upon request. Maintenance records must be made available to the
permitting authority upon request.
(iii) You must document the activities performed to assure proper
operation and maintenance of the air pollution control equipment and
monitoring systems or devices. Records of these activities must be
maintained as required by the permitting authority.
(4)(i) In the event that an affected unit fails to meet an
applicable standard, record the number of failures. For each failure
record the date, time, the cause and duration of each failure.
(ii) For each failure to meet an applicable standard, record and
retain a list of the affected sources or equipment, an estimate of the
quantity of each regulated pollutant emitted over any emission limit
and a description of the method used to estimate the emissions.
(iii) Record actions taken in accordance with the general duty
requirements to minimize emissions in paragraph (c)(3) of this section
and any corrective actions taken to return the affected unit to its
normal or usual manner of operation.
(d) Alternative startup, shutdown, and malfunction requirements.
Before November 12, 2024, you must comply with the requirements
specified in this paragraph (d) as an alternative to the requirements
in Sec. 63.6(e)(3). On or after November 12, 2024, you may not use the
requirements in Sec. 63.6(e)(3) as an alternative to the requirements
in this paragraph (d). Emissions limitation or work practice standards
in this subpart apply at all times. In the event of an emergency
situation, you must comply with the requirements specified in
paragraphs (d)(1) through (3) of this section. For the purpose of
complying with this paragraph (d), an emergency situation is any
situation arising from sudden and reasonably unforeseeable events
beyond the control of the facility owner or operator that requires
immediate corrective action to restore normal operation, and that
causes the affected source to exceed an applicable emissions limitation
under this subpart, due to unavoidable increases in emissions
attributable to the emergency. An emergency must not include
noncompliance to the extent it is caused by improperly designed
equipment, lack of preventive maintenance, careless or improper
operation, or operator error.
(1) During the period of the emergency, you must implement all
reasonable steps to minimize levels of emissions that exceeded the
emission standards or other applicable requirements in this subpart.
(2) You must document through signed contemporaneous logs or other
relevant evidence that an emergency occurred and you can identify the
probable cause, your facility was being operated properly at the time
the emergency occurred, and the corrective actions taken to minimize
emissions as required by paragraph (d)(1) of this section.
(3) You must submit a notice of the emergency to the permitting
authority within two working days of the time when emissions
limitations were exceeded due to the emergency (or an alternate
timeframe acceptable to the permitting authority). This notice must
contain a description of the emergency, any steps taken to mitigate
emissions, and corrective actions taken.
(e) Reports. (1) You must submit to the permitting authority by the
20th day of each month a summary of the daily average PM per ton of
copper concentrate feed charged to the smelting vessel for the previous
month.
(2) Beginning November 12, 2024, the owner or operator must
electronically submit all subsequent monthly PM emission reports and
notification of compliance status in PDF format to the EPA via CEDRI,
which can be accessed through EPA's CDX (https://cdx.epa.gov/)
following the procedures specified in Sec. 63.9(k).
(3) For each deviation from an emission limitation in paragraph
(a)(1) of this section occurring at an affected source, you must
include in your semiannual monitoring report the information in
paragraphs (e)(3)(i) through (x) of this section.
(i) The date and time that each malfunction started and stopped.
(ii) The start date, and start time, and duration in hours (or
minutes for CEMS) that each continuous monitoring system was
inoperative, except for zero (low-level) and high-level checks.
(iii) The start date, start time, and duration in hours (or minutes
for CEMS) that each continuous monitoring system was out-of-control,
including the information in Sec. 63.8(c)(8).
(iv) The total duration in hours (or minutes for CEMS) of all
deviations for each CMS during the reporting period, the total
operating time in hours of the affected source during the reporting
period, a summary of the total duration of the deviation during the
reporting period and the total duration as a percent of the total
source operating time during that reporting period.
(v) A breakdown of the total duration in hours (or minutes for
CEMS) of the deviations during the reporting period including those
that are due to control equipment problems, process problems, other
known causes, and other unknown causes.
(vi) The total duration in hours (or minutes for CEMS) of
continuous monitoring system downtime for each CMS during the reporting
period, the total operating time in hours of the affected source during
the reporting period, and the total duration of CMS downtime as a
percent of the total source operating time during the reporting period.
(vii) A brief description of the process units.
(viii) The monitoring equipment manufacturer and model number and
the pollutant or parameter monitored.
(ix) The date of the latest continuous monitoring system
certification or audit.
(x) A description of any changes in continuous monitoring systems,
processes, or controls since the last reporting period.
[[Page 41722]]
0
8. Amend Sec. 63.11151 by adding the definition ``Blowing'' in
alphabetical order and revising the definition ``Capture system'' to
read as follows:
Sec. 63.11151 What definitions apply to this subpart?
* * * * *
Blowing means the operating mode for a batch copper converter
during which air or oxygen-enriched air is injected into the molten
converter bath.
Capture system means the collection of components used to capture
gases and fumes released from one or more emissions points and then
convey the captured gas stream to a control device. A capture system
may include, but is not limited to, the following components as
applicable to a given capture system design: duct intake devices,
hoods, enclosures, ductwork, dampers, manifolds, plenums, and fans.
* * * * *
0
9. Amend Sec. 63.11152 by:
0
a. Revising paragraph (c) introductory text;
0
b. Removing the undesignated paragraph after paragraph (c)(5); and
0
c. Adding paragraph (c)(6).
The revision and addition read as follows:
Sec. 63.11152 Who implements and enforces this subpart?
* * * * *
(c) The authorities that will not be delegated to State, local, or
tribal agencies are listed in paragraphs (c)(1) through (6) of this
section.
* * * * *
(6) Approval of an alternative to any electronic reporting to the
EPA required by this subpart.
0
10. Revise table 1 to subpart EEEEEE of part 63 to read as follows:
Table 1 to Subpart EEEEEE of Part 63--Applicability of General
Provisions to This Subpart
As required in Sec. 63.11150(a), you must comply with the
requirements of the NESHAP General Provisions (subpart A of this part)
as shown in the following table.
----------------------------------------------------------------------------------------------------------------
Applies to this
Citation Subject subpart? Explanation
----------------------------------------------------------------------------------------------------------------
Sec. 63.1(a)(1) through (4), (6), Applicability.......... Yes....................
and (10) through (12), (b)(1) and
(3), (c)(1), (2), and (5), (e).
Sec. 63.1(a)(5) and (7) through Reserved............... No.....................
(9), (b)(2), (c)(3) and (4), (d).
Sec. 63.2.......................... Definitions............ Yes....................
Sec. 63.3.......................... Units and Abbreviations Yes....................
Sec. 63.4.......................... Prohibited Activities Yes....................
and Circumvention.
Sec. 63.5.......................... Preconstruction Review No.....................
and Notification
Requirements.
Sec. 63.6(a), (b)(1) through (5) Compliance with Yes....................
and (7), (c)(1), (2), and (5). Standards and
Maintenance
Requirements--Applicab
ility and Compliance
Dates.
Sec. 63.6(e)(1)(i)................. Operation and Yes before November 12, See Sec. Sec.
Maintenance 2024. 63.11147(c) and
Requirements--general No on or after November 63.11148(f) for the
duty to minimize 12, 2024. general duty to
emissions. minimize emissions at
all times at existing
sources. See Sec.
63.11149(c)(3) for the
general duty to
minimize emissions at
all times at new
sources.
Sec. 63.6(e)(1)(ii)................ Requirement to correct Yes before November 12, Malfunctions are no
malfunctions as soon 2024. longer exempt.
as practicable.. No on or after November
12, 2024.
Sec. 63.6(e)(1)(iii)............... ....................... Yes....................
Sec. 63.6(e)(3).................... Startup, Shutdown, and Yes before November 12, The requirements for
Manufacturing Plan. 2024. emergency situations
No on or after November for existing sources
12, 2024. are contained in Sec.
Sec. 63.11147(c)(5)
and 63.11148(f)(5).
See Sec. 63.11149(d)
for the emergency
requirements for new
sources.
Sec. 63.6(f)(1).................... Compliance with Yes before November 12, Emission standards
Nonopacity Emission 2024. apply at all times.
Standards. No on or after November Some requirements of
12, 2024. Sec. 63.6(f)(1) are
no longer applicable.
Sec. 63.6(f)(2) through (3)........ ....................... Yes....................
Sec. 63.6(g), (i), (j)............. Compliance with Yes....................
Nonopacity Emission
Standards.
Sec. 63.6(h)(1).................... Compliance with Opacity Yes before November 12, Requirements apply to
and Visible Emission 2024. new sources but not
Standards. No on or after November existing sources.
12, 2024. Emission standards
apply at all times.
Some requirements of
Sec. 63.6(h)(1) are
no longer applicable.
Sec. 63.6(b)(6), (c)(3) and (4), Reserved............... No.....................
(d), (e)(2), (e)(3)(ii), (h)(2)(ii),
(h)(3), (h)(5)(iv), (i)(15).
[[Page 41723]]
Sec. 63.6(h)(2) through (4), ....................... Yes/No................. Requirements apply to
(h)(5)(i) through (iii), (h)(6) new sources but not
through (9). existing sources.
Sec. 63.7(a), (e)(2) through (4), Performance Testing Yes....................
(f), (g), (h). Requirements.
Sec. 63.7(e)(1).................... Performance Testing No..................... See Sec. 63.11148(e)
Requirements. for performance
testing requirements.
Sec. 63.7(b), (c).................. ....................... Yes/No................. Notification of
performance tests and
quality assurance
program apply to new
sources but not
existing sources.
Sec. 63.8(a)(1) and (2), (b), Monitoring Requirements Yes....................
(c)(1)(ii), (c)(2) through (8), (f),
(g).
Sec. 63.8(c)(1)(i) and (iii)....... General Duty and SSM Yes before November 12,
Plan Requirements for 2024..
Continuous Monitoring No on or after November
Systems. 12, 2024..
Sec. 63.8(a)(3).................... Reserved............... No.....................
Sec. 63.8(a)(4).................... ....................... No..................... This subpart does not
require flares.
Sec. 63.8(d)(1) and (2), (e)....... Quality Control........ Yes/No................. Requirements for
quality control
program and
performance
evaluations apply to
new sources but not
existing sources.
Sec. 63.8(d)(3).................... Written Procedures for Yes before November 12, Requirements for
Continuous Monitoring 2024. quality control
Systems. No on or after November program and
12, 2024. performance
evaluations apply to
new sources but not
existing sources. See
Sec. 63.11149(b)(3).
Sec. 63.9(a), (b)(1), (2), and (5), Notification Yes....................
(c), (d), (h)(1) through (3), (5), Requirements.
and (6), (i), (j).
Sec. 63.9(b)(3), (h)(4)............ Reserved............... No.....................
Sec. 63.9(b)(4), (f)............... ....................... No.....................
Sec. 63.9(e), (g).................. ....................... Yes/No................. Notification
requirements for
performance test and
use of continuous
monitoring systems
apply to new sources
but not existing
sources.
Sec. 63.9(k)....................... Electronic submission Yes....................
of notifications or
reports.
Sec. 63.10(a), (b)(1), (d)(1), (2), Recordkeeping and Yes/No................. Recordkeeping
and (4), (f). Reporting Requirements. requirements apply to
new sources but not
existing sources.
Sec. 63.10(b)(2)(iii) and (vi) ....................... Yes/No................. Recordkeeping
through (xiv), (b)(3), (c)(1), (5) requirements apply to
through (8), and (10) through (14), new sources but not
(e)(1) and (2). existing sources.
Sec. 63.10(b)(2)(i) through (ii) General Recordkeeping Yes before November 12, Recordkeeping
and (iv) through (v). Requirements and 2024. requirements apply to
Actions to Minimize No on or after November new sources but not
Emissions During 12, 2024. existing sources. See
Startup, Shutdown, and Sec. 63.11149(c)(4).
Malfunction. Startup, Shutdown, and
Malfunction are no
longer exempt from
emission standards.
See Sec.
63.11148(g).
Sec. 63.10(c)(2) and (4) and (9)... Reserved............... No.....................
Sec. 63.10(c)(15).................. Use of Startup, For new sources, Yes Recordkeeping
Shutdown, and before November 12, requirements apply to
Malfunction Plan. 2024. new sources but not
No on or after November existing sources.
12, 2024. Startup, Shutdown, and
Malfunction Plans are
no longer required.
Sec. 63.10(d)(3), (e)(4)........... ....................... No..................... Reporting requirements
apply to new sources
but not existing
sources.
Sec. 63.10(d)(5)................... Startup, Shutdown, and For new sources, Yes Reporting requirements
Malfunction Reporting. before November 12, apply to new sources
2024. but not existing
No on or after November sources. See Sec.
12, 2024. Sec. 63.11147(e),
63.11148(h),
63.11149(e)(2).
Sec. 63.10(e)(3)................... ....................... Yes/No................. Reporting requirements
apply to new sources
but not existing
sources.
Sec. 63.11......................... Control Device No..................... This subpart does not
Requirements. require flares.
[[Page 41724]]
Sec. 63.12......................... State Authorities and Yes....................
Delegations.
Sec. 63.13......................... Addresses.............. Yes....................
Sec. 63.14......................... Incorporations by Yes....................
Reference.
Sec. 63.15......................... Availability of Yes....................
Information and
Confidentiality.
Sec. 63.16......................... Performance Track Yes....................
Provisions.
----------------------------------------------------------------------------------------------------------------
[FR Doc. 2024-09883 Filed 5-10-24; 8:45 am]
BILLING CODE 6560-50-P