Blackstone Hydro Associates; Notice of Effectiveness of Withdrawal of Operations Compliance Monitoring Plan, 38892-38893 [2024-10037]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
38892
Federal Register / Vol. 89, No. 90 / Wednesday, May 8, 2024 / Notices
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. All
filings must clearly identify the project
name and docket number on the first
page: Balch Hydroelectric Project (P–
175–032).
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The Balch
Hydroelectric Project (project) consists
of the following facilities: (1) a 135-foothigh, 396-foot-long diversion dam with
a crest elevation of 4,098 feet that
includes a 364-foot-long spillway and is
located on the North Fork Kings River
9.9 miles upstream of the confluence
with Kings River; (2) the 35-acre Black
Rock Reservoir with a usable storage
capacity of 1,260 acre-feet at a normal
water surface elevation of 4,097 feet; (3)
an 11-foot-high, concrete tunnel intake;
(4) a water conveyance system
consisting of: (a) a 19,336-foot-long
tunnel with a maximum hydraulic
capacity of 760 cubic feet per second
(cfs) that includes the 308-foot-long
Black Rock Adit, the 350-foot-long Weir
Creek Adit, an unlined surge chamber,
and two sluice channels; (5) a 4,905.6foot-long penstock leading to the Balch
No. 1 Powerhouse and a 4,933.3-footlong penstock leading to the Balch No.
2 Powerhouse; (6) the 65.5-foot-long,
80.5-foot-wide Balch No. 1 Powerhouse
housing one turbine-generator unit with
an authorized installed capacity of 31.02
megawatts (MW) and a maximum
hydraulic capacity of 213 cfs; (7) the
149-foot-long, 84-foot-wide Balch No. 2
Powerhouse housing two turbinegenerator units with a total authorized
installed capacity of 105 MW and a
maximum hydraulic capacity of 315 cfs;
(8) a 165-foot-high, 238-foot-long
afterbay dam with a crest elevation of
1,704 feet that includes a 238-foot-long
spillway; (9) a 7-acre afterbay with a
usable storage capacity of 135 acre-feet;
(10) project roads and trails; (11)
recreation facilities; (12) a 22-mile-long,
115-kilovolt (kV) transmission line
connecting the project with the grid at
Piedra Junction; (13) the 76-acre Balch
Camp, which is the project operating
headquarters and includes personnel
housing; (14) a 6.2-mile-line, 12-kV
distribution line connecting Balch Camp
with the project’s diversion dam; and
(15) appurtenant facilities.
The Balch Project is located
downstream of PG&E’s Haas-Kings River
Hydroelectric Project No. 1988 and
Helms Pumped Storage Project No.
2735, which use the same reservoirs
(Courtright Lake and Lake Wilshon) for
VerDate Sep<11>2014
18:27 May 07, 2024
Jkt 262001
operation. The project is operated as a
peaking facility to generate power that
is released from upstream storage to
meet power demand and for irrigation
purposes. Project operation is
coordinated with Project No. 1988,
whose releases from Lake Wilshon
largely control inflow to Black Rock
Reservoir; however, spill fluctuations at
the project are possible at times when
inflow exceeds powerhouse capacity
and during powerhouse outages.
The current license requires PG&E to
maintain the following continuous
minimum flows in the North Kings
River: (1) during normal water years: (a)
from June 1 through November 31, 5 cfs
from Black Rock Reservoir, 15 cfs from
Balch Afterbay, and 30 cfs of total river
flow; and (b) from December 1 through
May 31, 2.5 cfs from Black Rock
Reservoir, 10 cfs from Balch Afterbay,
and 30 cfs of total river flow; (2) during
dry water years, as defined by the
California Department of Water
Resources, year-round flows of 2.5 cfs
from Black Rock Reservoir, 10 cfs from
Balch Afterbay, and 20 cfs of total river
flow.
PG&E proposes to continue operating
the project in a manner that is
consistent with current operation, with
the exception of the following new
proposed measures: (1) minimum flows
and water year types, (2) a recreation
plan, (3) a biological resources
management plan, (4) a historic
properties management plan, (5) lowlevel operations, (6) flood period
operations, (7) a hazardous substance
plan, (8) a gaging plan, (9) visual
resources management, (10) a fire
management and response plan, and
(11) a transportation system
management plan.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–175).
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
p. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
q. Procedural Schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter and Request
Additional Information—June 2024
Issue Scoping Document 1 for
comments—August 2024
Request Additional Information (if
necessary)—September 2024
Issue Acceptance Letter—November
2024
Issue Scoping Document 2 (if
necessary)—November 2024
Issue Notice of Ready for Environmental
Analysis—November 2024
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 2, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–10041 Filed 5–7–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3063–029]
Blackstone Hydro Associates; Notice
of Effectiveness of Withdrawal of
Operations Compliance Monitoring
Plan
On August 4, 2023 and supplemented
on August 21, 2023, Blackstone Hydro
Associates (licensee), filed an Operation
Compliance Monitoring Plan for the
Central Falls Hydroelectric Project No.
3063. On April 9, 2024, the licensee
filed a request to withdraw its Operation
Compliance Monitoring Plan.
No motion in opposition to the
request for withdrawal has been filed,
and the Commission has taken no action
to disallow the withdrawal. Pursuant to
Rule 216(b) of the Commission’s Rules
E:\FR\FM\08MYN1.SGM
08MYN1
Federal Register / Vol. 89, No. 90 / Wednesday, May 8, 2024 / Notices
of Practice and Procedure,1 the
withdrawal of the application became
effective on April 24, 2024, and this
proceeding is hereby terminated.
Dated: May 2, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–10037 Filed 5–7–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: PR24–67–000.
Applicants: NET Mexico Pipeline
Partners, LLC.
Description: 284.123 Rate Filing:
Audit Compliance to be effective 5/1/
2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5261.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: RP24–717–000.
Applicants: Rover Pipeline LLC.
Description: 4(d) Rate Filing:
Amended Non-Conforming
Agreement—Ascent to be effective 5/1/
2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5193.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–718–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: 4(d) Rate Filing: LSS and
SS–2 Tracker Filing effective May 1,
2024 to be effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5202.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–719–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rate Agreement Filing
Various Effective May 1, 2024 to be
effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5246.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–720–000.
Applicants: Northern Natural Gas
Company.
Description: 4(d) Rate Filing:
20240430 Negotiated Rate to be effective
5/1/2024.
1 18
CFR 385.216(b) (2023).
VerDate Sep<11>2014
17:03 May 07, 2024
Jkt 262001
Filed Date: 4/30/24.
Accession Number: 20240430–5260.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–721–000.
Applicants: Ruby Pipeline, L.L.C.
Description: 4(d) Rate Filing: RP
2024–04–30 FL&U and EPC Rate
Adjustment to be effective 6/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5269.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–722–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: 4(d) Rate Filing: 2024
Apr Quarterly FL&U Filing to be
effective 6/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5272.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–723–000.
Applicants: Cove Point LNG, LP.
Description: 4(d) Rate Filing: Cove
Point—LTD–1 Abandonment
Implementation (CP23–539) to be
effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5284.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–724–000.
Applicants: Cheyenne Plains Gas
Pipeline Company, L.L.C.
Description: 4(d) Rate Filing: Fuel and
LU Annual Update and OPS Report
2024 to be effective 6/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5325.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–725–000.
Applicants: Alliance Pipeline L.P.
Description: Annual Report of
Operational Purchases and Sales of
Alliance Pipeline L.P.
Filed Date: 4/30/24.
Accession Number: 20240430–5335.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–726–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: 4(d) Rate Filing: Fuel_LU
Quarterly Update Filing Eff June 2024 to
be effective 6/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5344.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–727–000.
Applicants: Double E Pipeline, LLC.
Description: 4(d) Rate Filing:
Negotiated Rate & Non-Conforming
Agreement- MRC Permian Company to
be effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5374.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–728–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: 4(d) Rate Filing: GT&C
Section 49—Open Season Postings for
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
38893
Future (91Day–3Yr) Capacity to be
effective 6/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5003.
Comment Date: 5 pm ET 5/13/24.
Docket Numbers: RP24–729–000.
Applicants: Northern Natural Gas
Company.
Description: 4(d) Rate Filing:
20240501 Winter PRA to be effective 11/
1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5084.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–730–000.
Applicants: Texas Eastern
Transmission, LP.
Description: 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
5–1–24 to be effective 5/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5115.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–731–000.
Applicants: Southeast Supply Header,
LLC.
Description: 4(d) Rate Filing: 2024
SESH TUP/SBA Annual Filing to be
effective 6/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5118.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–732–000.
Applicants: Alliance Pipeline L.P.
Description: 4(d) Rate Filing:
Negotiated Rates—Various May 1 2024
Releases to be effective 5/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5120.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–733–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: 4(d) Rate Filing: Cap Rel
Neg Rate Agmts (Santa Rosa 42487 to
Southern Company Services 58164) to
be effective 5/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5129.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–734–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: 4(d) Rate Filing:
Negotiated Rates—Northern to NRG
Business 3093 eff 5–1–24 to be effective
5/1/2024.
Filed Date: 5/1/24.
Accession Number: 20240501–5131.
Comment Date: 5 p.m. ET 5/13/24.
Docket Numbers: RP24–735–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
5–1–2024 to be effective 5/1/2024.
Filed Date: 5/1/24.
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 89, Number 90 (Wednesday, May 8, 2024)]
[Notices]
[Pages 38892-38893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-10037]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3063-029]
Blackstone Hydro Associates; Notice of Effectiveness of
Withdrawal of Operations Compliance Monitoring Plan
On August 4, 2023 and supplemented on August 21, 2023, Blackstone
Hydro Associates (licensee), filed an Operation Compliance Monitoring
Plan for the Central Falls Hydroelectric Project No. 3063. On April 9,
2024, the licensee filed a request to withdraw its Operation Compliance
Monitoring Plan.
No motion in opposition to the request for withdrawal has been
filed, and the Commission has taken no action to disallow the
withdrawal. Pursuant to Rule 216(b) of the Commission's Rules
[[Page 38893]]
of Practice and Procedure,\1\ the withdrawal of the application became
effective on April 24, 2024, and this proceeding is hereby terminated.
---------------------------------------------------------------------------
\1\ 18 CFR 385.216(b) (2023).
Dated: May 2, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-10037 Filed 5-7-24; 8:45 am]
BILLING CODE 6717-01-P