Notice of Availability of a Final Environmental Assessment for Additional Site Assessment Activities on Beacon Wind, LLC's Renewable Energy Lease OCS-A 0520, 38183 [2024-09844]
Download as PDF
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
informed decision regarding the
membership requirements of the MAC
and permit the Department to contact a
potential member. Nominees are
strongly encouraged to include
supporting letters from employers,
associations, professional organizations,
and/or other organizations that indicate
support by a meaningful constituency
for the nominee. Please indicate any
BLM permits, leases, or licenses that
you hold personally or are held by your
employer.
Members of the MAC serve without
compensation. However, while away
from their homes or regular places of
business, members engaged in MAC
business may be allowed travel
expenses, including per diem in lieu of
subsistence, as authorized by 5 U.S.C.
5703, in the same manner as persons
employed intermittently in Federal
Government service.
Simultaneous with this notice, the
BLM will issue a press releases
providing additional information for
submitting nominations.
Before including any address, phone
number, email address, or other
personal identifying information in the
application, nominees should be aware
this information may be made publicly
available at any time. While the
nominee may ask to withhold the
personal identifying information from
public review, the BLM cannot
guarantee that it will be able to do so.
Authority: 43 CFR 1784.4–1.
Stephen Small,
District Manager, Spokane District.
[FR Doc. 2024–09950 Filed 5–6–24; 8:45 am]
BILLING CODE 4331–24–P
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM–2024–0027]
Notice of Availability of a Final
Environmental Assessment for
Additional Site Assessment Activities
on Beacon Wind, LLC’s Renewable
Energy Lease OCS–A 0520
Bureau of Ocean Energy
Management, Interior.
ACTION: Notice of availability.
AGENCY:
The Bureau of Ocean Energy
Management (BOEM) announces the
availability of a final environmental
assessment (EA) and its finding that
additional site assessment activities in
Lease Area OCS–A 0520 offshore
Massachusetts will not significantly
impact the environment. Beacon Wind,
LLC (Beacon Wind), the leaseholder,
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
requested to conduct the additional
activities in the lease area, which were
not analyzed in the initial EA titled
‘‘Commercial Wind Lease Issuance and
Site Assessment Activities on the
Atlantic Outer Continental Shelf
Offshore Massachusetts’’ (2014 EA).
This final EA analyzed the potential
environmental impacts of the proposed
additional site assessment activities.
Those activities comprise 35
deployments and removals of a single
suction bucket foundation at 26
locations within the lease area to gather
engineering information to inform
Beacon Wind’s foundation design for
wind turbines and offshore substations.
This EA will inform BOEM’s decision
whether to approve Beacon Wind’s site
assessment plan (SAP) amendment for
suction bucket foundation testing.
FOR FURTHER INFORMATION CONTACT:
Laura Lee Wolfson, BOEM Office of
Renewable Energy Programs, 45600
Woodland Road, Sterling, Virginia
20166, (703) 787–1433 or
lauralee.wolfson@boem.gov.
SUPPLEMENTARY INFORMATION:
Proposed Action: The final EA
analyzes the proposed action
alternative, which is approving the
additional site assessment activities
proposed in the Beacon Wind SAP
amendment to the lease area. The EA
considers the reasonably foreseeable
environmental consequences associated
with the deployment and recovery of
suction bucket foundations to further
assess the site conditions and gather
information to support the engineering
design of wind turbine and offshore
substation foundations that would
potentially be installed within the lease
area for the proposed Beacon Wind
project. BOEM prepared an EA for this
proposed action in order to assist the
agency’s planning and decision-making
(40 CFR 1501.5(b)).
Alternatives: In addition to the
proposed action, BOEM considered the
no action alternative. Under the no
action alternative, BOEM would not
approve the SAP amendment, and the
additional site assessment activities for
foundation testing would not occur
within the Beacon Wind lease area
OCS–A 0520. BOEM’s preferred
alternative is the proposed action.
Finding of no significant Impact: After
carefully considering alternatives
described and analyzed in the final EA
and comments from the public and
cooperating and consulting agencies on
the draft EA, BOEM finds that approval
of the SAP amendment for suction
bucket foundation testing within the
Beacon Wind lease area would have no
significant impact on the environment.
PO 00000
Frm 00166
Fmt 4703
Sfmt 4703
38183
Availability of the final EA and
finding: This EA, its finding, and
associated information are available on
BOEM’s website at: https://
www.boem.gov/renewable-energy/stateactivities/beacon-wind.
Authority: 42 U.S.C. 4231 et seq.
(NEPA, as amended) and 40 CFR 1506.6.
Walter Cruickshank,
Deputy Director, Bureau of Ocean Energy
Management.
[FR Doc. 2024–09844 Filed 5–6–24; 8:45 am]
BILLING CODE 4340–98–P
DEPARTMENT OF JUSTICE
[OMB Number 1122–0013]
Agency Information Collection
Activities; Extension of Previously
Approved eCollection eComments
Requested; Semi-Annual Progress
Report for Grantees From the Rural
Domestic Violence, Dating Violence,
Sexual Assault, Stalking, and Child
Abuse Enforcement Assistance
Program
Office on Violence Against
Women, Department of Justice.
ACTION: 30-Day notice.
AGENCY:
The Department of Justice
(DOJ), Office on Violence Against
Women, will be submitting the
following information collection request
to the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act of 1995.
DATES: Comments are encouraged and
will be accepted for 30 days until June
6, 2024.
FOR FURTHER INFORMATION CONTACT: If
you have comments especially on the
estimated public burden or associated
response time, suggestions, or need a
copy of the proposed information
collection instrument with instructions
or additional information, please
contact: Catherine Poston, Office on
Violence Against Women, at 202–514–
5430 or Catherine.poston@usdoj.gov.
SUPPLEMENTARY INFORMATION: The
proposed information collection was
previously published in the Federal
Register on March 26, 2024 allowing a
60-day comment period.
Written comments and suggestions
from the public and affected agencies
concerning the proposed collection of
information are encouraged. Your
comments should address one or more
of the following four points:
—Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
SUMMARY:
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 89, Number 89 (Tuesday, May 7, 2024)]
[Notices]
[Page 38183]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-09844]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management
[Docket No. BOEM-2024-0027]
Notice of Availability of a Final Environmental Assessment for
Additional Site Assessment Activities on Beacon Wind, LLC's Renewable
Energy Lease OCS-A 0520
AGENCY: Bureau of Ocean Energy Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Ocean Energy Management (BOEM) announces the
availability of a final environmental assessment (EA) and its finding
that additional site assessment activities in Lease Area OCS-A 0520
offshore Massachusetts will not significantly impact the environment.
Beacon Wind, LLC (Beacon Wind), the leaseholder, requested to conduct
the additional activities in the lease area, which were not analyzed in
the initial EA titled ``Commercial Wind Lease Issuance and Site
Assessment Activities on the Atlantic Outer Continental Shelf Offshore
Massachusetts'' (2014 EA). This final EA analyzed the potential
environmental impacts of the proposed additional site assessment
activities. Those activities comprise 35 deployments and removals of a
single suction bucket foundation at 26 locations within the lease area
to gather engineering information to inform Beacon Wind's foundation
design for wind turbines and offshore substations. This EA will inform
BOEM's decision whether to approve Beacon Wind's site assessment plan
(SAP) amendment for suction bucket foundation testing.
FOR FURTHER INFORMATION CONTACT: Laura Lee Wolfson, BOEM Office of
Renewable Energy Programs, 45600 Woodland Road, Sterling, Virginia
20166, (703) 787-1433 or [email protected].
SUPPLEMENTARY INFORMATION:
Proposed Action: The final EA analyzes the proposed action
alternative, which is approving the additional site assessment
activities proposed in the Beacon Wind SAP amendment to the lease area.
The EA considers the reasonably foreseeable environmental consequences
associated with the deployment and recovery of suction bucket
foundations to further assess the site conditions and gather
information to support the engineering design of wind turbine and
offshore substation foundations that would potentially be installed
within the lease area for the proposed Beacon Wind project. BOEM
prepared an EA for this proposed action in order to assist the agency's
planning and decision-making (40 CFR 1501.5(b)).
Alternatives: In addition to the proposed action, BOEM considered
the no action alternative. Under the no action alternative, BOEM would
not approve the SAP amendment, and the additional site assessment
activities for foundation testing would not occur within the Beacon
Wind lease area OCS-A 0520. BOEM's preferred alternative is the
proposed action.
Finding of no significant Impact: After carefully considering
alternatives described and analyzed in the final EA and comments from
the public and cooperating and consulting agencies on the draft EA,
BOEM finds that approval of the SAP amendment for suction bucket
foundation testing within the Beacon Wind lease area would have no
significant impact on the environment.
Availability of the final EA and finding: This EA, its finding, and
associated information are available on BOEM's website at: https://www.boem.gov/renewable-energy/state-activities/beacon-wind.
Authority: 42 U.S.C. 4231 et seq. (NEPA, as amended) and 40 CFR
1506.6.
Walter Cruickshank,
Deputy Director, Bureau of Ocean Energy Management.
[FR Doc. 2024-09844 Filed 5-6-24; 8:45 am]
BILLING CODE 4340-98-P