ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 38124-38126 [2024-09834]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
38124
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
Description: Notice of Non-Material
Change in Status of Alta Oak Realty,
LLC, et al.
Filed Date: 4/26/24.
Accession Number: 20240426–5391.
Comment Date: 5 p.m. ET 5/17/24.
Docket Numbers: ER22–2116–005;
ER22–2115–005.
Applicants: Timber Road Solar Park
LLC, Blue Harvest Solar Park LLC.
Description: Notice of Change in
Status of Blue Harvest Solar Park LLC,
et al.
Filed Date: 4/29/24.
Accession Number: 20240429–5352.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER23–1584–002.
Applicants: Pearl River Solar Park
LLC.
Description: Notice of Non-Material
Change in Status of Pearl River Solar
Park LLC.
Filed Date: 4/29/24.
Accession Number: 20240429–5354.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER24–55–002.
Applicants: Silver Peak Energy, LLC.
Description: Notice of Change in
Status of Silver Peak Energy, LLC.
Filed Date: 4/29/24.
Accession Number: 20240429–5454.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER24–1376–001.
Applicants: Yuma Solar Energy LLC.
Description: Tariff Amendment:
Response to Request for Additional
Information to be effective 3/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5001.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1865–000.
Applicants: GridLiance West LLC.
Description: § 205(d) Rate Filing:
GridLiance West VEA Upgrades CWIP
filing to be effective 6/28/2024.
Filed Date: 4/29/24.
Accession Number: 20240429–5325.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER24–1866–000.
Applicants: Power Authority of the
State of New York, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
Power Authority of the State of New
York submits tariff filing per
35.13(a)(2)(iii: NYPA Section 205 filing
of formula rate template revisions to be
effective 7/1/2024.
Filed Date: 4/29/24.
Accession Number: 20240429–5336.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER24–1867–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence and a Tariff
Record SA 5105 to be effective 4/12/
2024.
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
Filed Date: 4/29/24.
Accession Number: 20240429–5348.
Comment Date: 5 p.m. ET 5/20/24.
Docket Numbers: ER24–1868–000
Applicants: El Paso Electric Company.
Description: Compliance filing: OATT
Attachment M and N revisions to be
effective 6/3/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5002.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1869–000.
Applicants: VESI Pomona Energy
Storage, Inc.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5011.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1870–000.
Applicants: USG Nevada LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5012.
Comment Date: 5 p.m. ET 5/21/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–09837 Filed 5–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–239–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on April 26, 2024,
ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205 and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA), and
ANR’s blanket certificate issued in
Docket No. CP82–480–000, for
authorization to abandon one injection/
withdrawal well located in its Loreed
Storage Field in Osceola County,
Michigan (Loreed PN 8868 Well
Abandonment Project). The project will
allow ANR to limit integrity risk in
alignment with the U.S. Department of
Transportation’s Pipeline and
Hazardous Materials Safety
Administration’s Storage Final Rule.
ANR estimates the cost for the project to
be $265,000, all as more fully set forth
in the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). From the Commission’s
Home Page on the internet, this
information is available on eLibrary.
The full text of this document is
available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from
FERC Online Support at (202) 502–6652
(toll free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
E:\FR\FM\07MYN1.SGM
07MYN1
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
Public Reference Room at
public.referenceroom@ferc.gov.
Any questions concerning this request
should be directed to David A. Alonzo,
Manager of Project Authorizations, ANR
Pipeline Company, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at (832) 320–5477, or
david_alonzo@tcenergy.com.
khammond on DSKJM1Z7X2PROD with NOTICES
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on July 1, 2024. How to
file protests, motions to intervene, and
comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is July 1,
2024. A protest may also serve as a
motion to intervene so long as the
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
2 Persons
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
38125
protestor states it also seeks to be an
intervenor.
How To File Protests, Interventions,
and Comments
Interventions
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP24–239–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP24–239–
000.
To file via USPS: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First
Street NE, Washington, DC 20426
To file via any other method: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager of Project Authorizations, ANR
Pipeline Company, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, or david_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is July 1, 2024. As
described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before July 1,
2024. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
4 18
5 18
PO 00000
CFR 385.214.
CFR 157.10.
Frm 00108
Fmt 4703
Sfmt 4703
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\07MYN1.SGM
07MYN1
38126
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–09834 Filed 5–6–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2024–0093; FRL–11877–01–
OCSPP]
Notice of Receipt of Requests to
Voluntarily Cancel Certain Pesticide
Registrations and/or Amend
Registrations To Terminate Certain
Uses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In accordance with the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), EPA is issuing
a notice of receipt of requests by the
registrants to voluntarily cancel their
registrations of certain products and/or
to amend their product registrations to
terminate one or more uses. EPA
intends to grant these requests at the
close of the comment period for this
SUMMARY:
announcement unless the Agency
receives substantive comments within
the comment period that would merit its
further review of the request, or unless
the registrants withdraw its requests. If
these requests are granted, any sale,
distribution, or use of products listed in
this notice will be permitted after the
registrations have been cancelled and/or
uses terminated only if such sale,
distribution, or use is consistent with
the terms as described in the final order.
DATES: Comments must be received on
or before June 6, 2024.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2024–0093,
through the Federal eRulemaking Portal
at https://www.regulations.gov. Follow
the online instructions for submitting
comments. Do not submit electronically
any information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Additional
instructions on commenting and visiting
the docket, along with more information
about dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
Christopher Green, Registration Division
(7505T), Office of Pesticide Programs,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460–0001; telephone number: (202)
566–2707; email address:
green.christopher@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Does this action apply to me?
This action is directed to the public
in general and may be of interest to a
wide range of stakeholders including
environmental, human health, and
agricultural advocates; the chemical
industry; pesticide users; and members
of the public interested in the sale,
distribution, or use of pesticides. Since
others also may be interested, the
Agency has not attempted to describe all
the specific entities that may be affected
by this action.
B. What should I consider as I prepare
my comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through
regulations.gov or email. Clearly mark
the part or all of the information that
you claim to be CBI. For CBI
information in a disk or CD–ROM that
you mail to EPA, mark the outside of the
disk or CD–ROM as CBI and then
identify electronically within the disk or
CD–ROM the specific information that
is claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
2. Tips for preparing your comments.
When preparing and submitting your
comments, see the commenting tips at
https://www.epa.gov/dockets.
II. What action is the Agency taking?
This notice announces receipt by EPA
of requests from registrants to cancel
certain and/or terminate certain
pesticide product registrations. The
affected products and the registrants
making the requests are identified in
Tables 1–3 of this unit.
Unless a request is withdrawn by the
registrant or if the Agency determines
that there are substantive comments that
warrant further review of this request,
EPA intends to issue an order canceling
and/or amending the affected
registrations.
TABLE 1—PRODUCT REGISTRATIONS WITH PENDING REQUESTS FOR CANCELLATION
khammond on DSKJM1Z7X2PROD with NOTICES
Registration No.
Company No.
Product name
Active ingredients
Basic copper sulfate (008101/1344–73–6)—(5%), Pyrethrins
(069001/8003–34–7)—(.03%), Sulfur (077501/7704–34–
9)—(25%).
Basic copper sulfate (008101/1344–73–6)—(13.72%),
Carbaryl (056801/63–25–2)—(1.25%).
Chlorothalonil (081901/1897–45–6)—(40%), Difenoconazole
(128847/119446–68–3)—(4%).
2,4–D, dimethylamine salt (030019/2008–39–1)—(25.4%),
Dicamba (029801/1918–00–9)—(2.64%), Quinclorac
(128974/84087–01–4)—(7.91%).
2,4–D, dimethylamine salt (030019/2008–39–1)—(.331%),
Dicamba (029801/1918–00–9)—(.034%), Quinclorac
(128974/84087–01–4)—(.206%).
2,4–D (030001/94–75–7)—(.331%), Dicamba (029801/
1918–00–9)—(.034%), Quinclorac (128974/84087–01–
4)—(.137%).
4–473 .................
4
Bonide Garden Dust ......................................
4–474 .................
4
Bonide Vegetable-Floral Dust ........................
100–1441 ...........
100
Bravo Top .......................................................
228–423 .............
228
DQD Selective Herbicide ...............................
228–594 .............
228
Quincept Herbicide Ready to Use .................
228–703 .............
228
Quincept LT Herbicide Ready-to-Use ............
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
PO 00000
Frm 00109
Fmt 4703
Sfmt 4703
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 89, Number 89 (Tuesday, May 7, 2024)]
[Notices]
[Pages 38124-38126]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-09834]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-239-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on April 26, 2024, ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, filed in the
above referenced docket, a prior notice request pursuant to sections
157.205 and 157.216 of the Commission's regulations under the Natural
Gas Act (NGA), and ANR's blanket certificate issued in Docket No. CP82-
480-000, for authorization to abandon one injection/withdrawal well
located in its Loreed Storage Field in Osceola County, Michigan (Loreed
PN 8868 Well Abandonment Project). The project will allow ANR to limit
integrity risk in alignment with the U.S. Department of
Transportation's Pipeline and Hazardous Materials Safety
Administration's Storage Final Rule. ANR estimates the cost for the
project to be $265,000, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov). From
the Commission's Home Page on the internet, this information is
available on eLibrary. The full text of this document is available on
eLibrary in PDF and Microsoft Word format for viewing, printing, and/or
downloading. To access this document in eLibrary, type the docket
number excluding the last three digits of this document in the docket
number field.
User assistance is available for eLibrary and the Commission's
website during normal business hours from FERC Online Support at (202)
502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the
[[Page 38125]]
Public Reference Room at [email protected].
Any questions concerning this request should be directed to David
A. Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at (832) 320-
5477, or [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on July 1, 2024. How
to file protests, motions to intervene, and comments is explained
below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is July 1, 2024. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is July 1, 2024. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 1, 2024. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP24-239-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP24-239-000.
To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other method: Debbie-Anne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, or
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link
[[Page 38126]]
as described above. The eLibrary link also provides access to the texts
of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-09834 Filed 5-6-24; 8:45 am]
BILLING CODE 6717-01-P