Triton Power Company; Notice of Continuation of Relicense Proceeding, 38120-38121 [2024-09828]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
38120
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
penstock bridges over Salmon Creek
that have not been recently rebuilt
would be replaced with new bridges to
support the new penstock.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–09830 Filed 5–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD22–11–000, AD21–9–000]
Office of Public Participation
Fundamentals for Participating in
FERC Matters; Notice of Video
Workshop: ‘‘WorkshOPP on FERC’s
eLibrary’’
The Office of Public Participation
(OPP)’s ‘‘WorkshOPP on FERC’s
eLibrary’’ video is now available for the
public. The WorkshOPP provides an
overview of FERC’s online library of
documents issued or received by FERC,
including its organization, services, and
search functions. The video is posted on
FERC’s YouTube channel under OPP’s
Playlist at https://www.youtube.com/@
FERC/playlists. It includes captioning in
English and Spanish and is compliant
with Section 508 of the Rehabilitation
Act of 1973. Additionally, a standalone
demonstration video of how to search
eLibrary is available.
OPP supports meaningful public
engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
[FR Doc. 2024–09838 Filed 5–6–24; 8:45 am]
BILLING CODE 6717–01–P
Frm 00103
Fmt 4703
Federal Energy Regulatory
Commission
[Project No. 5698–022]
Triton Power Company; Notice of
Continuation of Relicense Proceeding
On December 31, 2020, Triton Power
Company (Triton), licensee for the
Chateaugay High Falls Hydroelectric
Project No. 5698 (project), filed a notice
of intent (NOI) to file an application for
a new license for the project pursuant to
section 15(b)(1) of the Federal Power
Act (FPA).1 On February 26, 2021,
Commission staff issued public notice of
the NOI and approved the use of the
traditional licensing process to develop
the license application.
Pursuant to section 15(c)(1) of the
FPA 2 and section 16.9 of the
Commission’s regulations,3 an existing
licensee must file an application for a
new license at least 24 months prior to
the expiration of the current license.
The current license for the project
expires on December 31, 2025,4 so the
deadline for filing an application for a
new license was December 31, 2023.
Triton did not file an application for a
new license by the filing deadline.
After Triton failed to file a timely
license application, on January 12, 2024,
the Commission issued a notice
soliciting applications from potential
applicants other than the existing
licensee, pursuant to sections
16.24(a)(2) and 16.25(a) of the
Commission’s regulations.5 Notices of
intent to file an application for a new
license were due by April 11, 2024. No
potential applicants other than the
existing licensee filed a notice of intent
for the project.
In comments filed on January 31,
2024, Triton states that it was not able
to file a timely license application due
to a number of extenuating
circumstances, but it intends to file a
license application as soon as possible.6
On April 26, 2024, Triton filed another
letter stating that it intends to resume
the relicensing process and file a license
application for the project.
Because no other potential applicant
filed a notice of intent to file an
application for the project in response to
the January 12 notice, we are waiving
sections 16.24(a)(2) and 16.25(a) of the
1 16
U.S.C. 808(b)(1).
U.S.C. 808(c)(1).
3 18 CFR 16.9 (2023).
4 Triton Power Company, 34 FERC ¶ 61,055
(1986).
5 18 CFR 16.24(a), 16.25(a) (2023).
6 We consider Triton’s January 31, 2024 letter to
be a notice of intent under section 16.25(a).
2 16
Dated: April 30, 2024.
Debbie-Anne Reese,
Acting Secretary.
PO 00000
DEPARTMENT OF ENERGY
Sfmt 4703
E:\FR\FM\07MYN1.SGM
07MYN1
Federal Register / Vol. 89, No. 89 / Tuesday, May 7, 2024 / Notices
Commission’s regulations that bar an
existing licensee that missed the twoyear application filing deadline from
filing an application.7 An application
for a new license for the project may be
filed within 18 months of Triton’s
January 31 filing (i.e., by July 31, 2025).8
Failure to file an application by July 31,
2025, may result in Triton being
directed to file a schedule for filing a
surrender application pursuant to
section 16.25(c)(2) of the Commission’s
regulations.
Questions concerning this notice
should be directed to Arash Barsari at
(202) 502–6207 or email at
Arash.JalaliBarsari@ferc.gov.
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–09828 Filed 5–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–1871–000.
Applicants: ORNI 18 LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5013.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1872–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: East
River Electric Power Cooperative, Inc.
Formula Rates Revisions to be effective
1/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5014.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1873–000.
Applicants: Ormesa LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5015.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1874–000.
Applicants: Mammoth Three LLC.
7 See Pacific Gas and Electric Co., 98 FERC
¶ 61,032 (2002), reh’g denied, 99 FERC ¶ 61,045,
aff’d, City of Fremont v. FERC, 336 F.3d 910 (9th
Cir. 2003).
8 See 18 CFR 16.25(b)(1).
VerDate Sep<11>2014
15:55 May 06, 2024
Jkt 262001
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5016.
Comment Date: 5 p.m. ET 5/21/24
Docket Numbers: ER24–1875–000.
Applicants: Heber Geothermal
Company LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5017.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1876–000.
Applicants: ORNI 36 LLC.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariffs
to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5018.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1877–000.
Applicants: Ormat Stillwater Solar PV
II LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Tariff
Revisions to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5020.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1878–000.
Applicants: Ormat Stillwater Solar
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Tariff
Revisions to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5021.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1879–000.
Applicants: Ormat Stillwater LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Tariff
Revisions to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5022.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1880–000.
Applicants: Ormat Cove Fort LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Tariff
Revisions to be effective 6/30/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5023.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1881–000.
Applicants: Canisteo Wind Energy
LLC.
Description: Canisteo Wind Energy
LLC requests a prospective waiver of
Section 30.4.4.5.1 in Attachment X of
the NYISO OATT.
Filed Date: 4/26/24.
Accession Number: 20240426–5393.
Comment Date: 5 p.m. ET 5/17/24.
PO 00000
Frm 00104
Fmt 4703
Sfmt 4703
38121
Docket Numbers: ER24–1882–000.
Applicants: Clover Creek Solar
Project, LLC.
Description: Request for Limited
Waiver of Clover Creek Solar Project,
LLC.
Filed Date: 4/30/24.
Accession Number: 20240430–5121.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1883–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: Q1
2024 Quarterly Filing of City and
County of San Francisco’s WDT SA (SA
275) to be effective 3/31/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5168.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1884–000.
Applicants: Franklin Solar LLC.
Description: Baseline eTariff Filing:
Co-Tenancy and Shared Facilities
Agreement to be effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5177.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1885–000.
Applicants: Jackpot Holdings, LLC.
Description: Baseline eTariff Filing:
Amended and Restated Co-Tenancy and
Shared Facilities Agreement to be
effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5181.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1886–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Transmission Company of
Illinois.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2024–04–30_ATXI
Request for Transmission Rate Incentive
RE DZTM Project to be effective 6/30/
2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5185.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1887–000.
Applicants: Franklin Solar LLC.
Description: § 205(d) Rate Filing:
Certificate of Concurrence to A&R CoTenancy and Shared Facilities
Agreement to be effective 5/1/2024.
Filed Date: 4/30/24.
Accession Number: 20240430–5188.
Comment Date: 5 p.m. ET 5/21/24.
Docket Numbers: ER24–1888–000.
Applicants: NMRD Data Center II,
LLC.
Description: § 205(d) Rate Filing:
NMRD DC II MBR Tariff Change-Notice
of Cancellation to be effective 5/1/2024.
Filed Date: 4/30/24.
E:\FR\FM\07MYN1.SGM
07MYN1
Agencies
[Federal Register Volume 89, Number 89 (Tuesday, May 7, 2024)]
[Notices]
[Pages 38120-38121]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-09828]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5698-022]
Triton Power Company; Notice of Continuation of Relicense
Proceeding
On December 31, 2020, Triton Power Company (Triton), licensee for
the Chateaugay High Falls Hydroelectric Project No. 5698 (project),
filed a notice of intent (NOI) to file an application for a new license
for the project pursuant to section 15(b)(1) of the Federal Power Act
(FPA).\1\ On February 26, 2021, Commission staff issued public notice
of the NOI and approved the use of the traditional licensing process to
develop the license application.
---------------------------------------------------------------------------
\1\ 16 U.S.C. 808(b)(1).
---------------------------------------------------------------------------
Pursuant to section 15(c)(1) of the FPA \2\ and section 16.9 of the
Commission's regulations,\3\ an existing licensee must file an
application for a new license at least 24 months prior to the
expiration of the current license. The current license for the project
expires on December 31, 2025,\4\ so the deadline for filing an
application for a new license was December 31, 2023. Triton did not
file an application for a new license by the filing deadline.
---------------------------------------------------------------------------
\2\ 16 U.S.C. 808(c)(1).
\3\ 18 CFR 16.9 (2023).
\4\ Triton Power Company, 34 FERC ] 61,055 (1986).
---------------------------------------------------------------------------
After Triton failed to file a timely license application, on
January 12, 2024, the Commission issued a notice soliciting
applications from potential applicants other than the existing
licensee, pursuant to sections 16.24(a)(2) and 16.25(a) of the
Commission's regulations.\5\ Notices of intent to file an application
for a new license were due by April 11, 2024. No potential applicants
other than the existing licensee filed a notice of intent for the
project.
---------------------------------------------------------------------------
\5\ 18 CFR 16.24(a), 16.25(a) (2023).
---------------------------------------------------------------------------
In comments filed on January 31, 2024, Triton states that it was
not able to file a timely license application due to a number of
extenuating circumstances, but it intends to file a license application
as soon as possible.\6\ On April 26, 2024, Triton filed another letter
stating that it intends to resume the relicensing process and file a
license application for the project.
---------------------------------------------------------------------------
\6\ We consider Triton's January 31, 2024 letter to be a notice
of intent under section 16.25(a).
---------------------------------------------------------------------------
Because no other potential applicant filed a notice of intent to
file an application for the project in response to the January 12
notice, we are waiving sections 16.24(a)(2) and 16.25(a) of the
[[Page 38121]]
Commission's regulations that bar an existing licensee that missed the
two-year application filing deadline from filing an application.\7\ An
application for a new license for the project may be filed within 18
months of Triton's January 31 filing (i.e., by July 31, 2025).\8\
Failure to file an application by July 31, 2025, may result in Triton
being directed to file a schedule for filing a surrender application
pursuant to section 16.25(c)(2) of the Commission's regulations.
---------------------------------------------------------------------------
\7\ See Pacific Gas and Electric Co., 98 FERC ] 61,032 (2002),
reh'g denied, 99 FERC ] 61,045, aff'd, City of Fremont v. FERC, 336
F.3d 910 (9th Cir. 2003).
\8\ See 18 CFR 16.25(b)(1).
---------------------------------------------------------------------------
Questions concerning this notice should be directed to Arash
Barsari at (202) 502-6207 or email at [email protected].
Dated: April 30, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-09828 Filed 5-6-24; 8:45 am]
BILLING CODE 6717-01-P