Combined Notice of Filings #1, 32414-32415 [2024-08996]

Download as PDF 32414 Federal Register / Vol. 89, No. 82 / Friday, April 26, 2024 / Notices Dated: April 22, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08991 Filed 4–25–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG24–166–000. Applicants: North Fork Solar Project, LLC. Description: North Fork Solar Project, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 4/19/24. Accession Number: 0240419–5246. Comment Date: 5 p.m. ET 5/10/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER06–613–000; ER06–613–012. Applicants: ISO New England Inc., New England Power Pool. Description: ISO New England Inc. and New England Power Pool Submit semi-annual compliance report re forward reserve market with a motion to terminate. Filed Date: 4/18/24. Accession Number: 20240418–5320. Comment Date: 5 p.m. ET 5/9/24. Docket Numbers: ER24–1763–001. Applicants: FRP Tupelo Solar, LLC. Description: Tariff Amendment: CostBased PPA with Seminole Electric Coop., Inc. (ER24–1763–) Amend Metadata to be effective 8/15/2024. Filed Date: 4/22/24. Accession Number: 20240422–5138. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1780–000. Applicants: Lake Erie Connector Transmission, LLC. Description: Lake Erie Connector Transmission, LLC submits a Request for Order Confirming Negotiated Rate Authority and waiver of previously granted reporting requirements. Filed Date: 4/12/24. Accession Number: 20240412–5378. Comment Date: 5 p.m. ET 5/3/24. Docket Numbers: ER24–1803–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Implementation of Capacity Market Rules Applicable to DER Under Order No. 2222 to be effective 7/1/2023. VerDate Sep<11>2014 20:31 Apr 25, 2024 Jkt 262001 Filed Date: 4/22/24. Accession Number: 20240422–5081. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1804–000. Applicants: Clearwater Wind III, LLC. Description: Baseline eTariff Filing: Clearwater Wind III, LLC Application for Market-Based Rate Authorization to be effective 6/22/2024. Filed Date: 4/22/24. Accession Number: 20240422–5133. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1805–000. Applicants: ISO New England Inc., New England Power Company. Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: NEP; Filing of Revisions to Schedule 20A–NEP to be effective 5/1/2024. Filed Date: 4/22/24. Accession Number: 20240422–5165. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1806–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Letter Agreement Related to Last Hour to be effective 4/ 30/2024. Filed Date: 4/22/24. Accession Number: 20240422–5166. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1807–000. Applicants: Consolidated Edison Company of New York, Inc. Description: § 205(d) Rate Filing: Combined RDM Update and Idlewild Cost Recovery 4–2024 to be effective 4/ 22/2024. Filed Date: 4/22/24. Accession Number: 20240422–5182. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1808–000. Applicants: ISO New England Inc., England Power Company. Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: NEP; Filing of Revisions to Schedule 21–NEP to be effective 5/1/2024. Filed Date: 4/22/24, Accession Number: 20240422–5188. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1809–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Oncor Carbon Facilities Development Agreement to be effective 4/5/2024. Filed Date: 4/22/24. Accession Number: 20240422–5197. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1810–000. Applicants: FirstEnergy Pennsylvania Electric Company, PJM Interconnection, L.L.C. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Description: § 205(d) Rate Filing: FirstEnergy Pennsylvania Electric Company submits tariff filing per 35.13(a)(2)(iii: FE PA submits Amended IA, SA No. 4161 re: FirstEnergy Reorganization to be effective 1/1/2024. Filed Date: 4/22/24. Accession Number: 20240422–5201. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1811–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX–BRP Antlia BESS 3rd Amended Generator Interconnection Agreement to be effective 4/5/2024. Filed Date: 4/22/24. Accession Number: 20240422–5206. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1812–000. Applicants: AES Redondo Beach, L.L.C. Description: Tariff Amendment: Notice of Cancellation of MBR Tariff to be effective 4/23/2024. Filed Date: 4/22/24. Accession Number: 20240422–5226. Comment Date: 5 p.m. ET 5/13/24. Docket Numbers: ER24–1813–000. Applicants: Hoosier Wind Project, LLC. Description: Tariff Amendment: Notice of Cancellation of MBR Tariff to be effective 4/23/2024. Filed Date: 4/22/24. Accession Number: 20240422–5227. Comment Date: 5 p.m. ET 5/13/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available E:\FR\FM\26APN1.SGM 26APN1 Federal Register / Vol. 89, No. 82 / Friday, April 26, 2024 / Notices information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: April 22, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08996 Filed 4–25–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: April 22, 2024. Debbie-Anne A. Reese, Acting Secretary. ddrumheller on DSK120RN23PROD with NOTICES1 Notice of Staff Attendance at North American Electric Reliability Corporation Working Group and Standard Drafting Meetings [FR Doc. 2024–08993 Filed 4–25–24; 8:45 am] BILLING CODE 6717–01–P The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the following meetings: North American Electric Reliability Corporation: System Planning Impacts from DER Working Group, WebEx April 30, 2024 | 9:00 a.m.–5:00 p.m. Eastern May 1, 2024 | 9:00 a.m.–5:00 p.m. Eastern Further information regarding this meeting may be found at: https:// www.nerc.com/comm/RSTC/ SPIDERWG/SPIDERWG_May_ Agenda.pdf. North American Electric Reliability Corporation: Project 2022–02 Modifications to PRC–024 (Generator Ride-through) and Project 2023–02 Analysis and Mitigation of BES IBR Performance Issues Joint Drafting Team Meeting, Hybrid May 7, 2023 | 8:30 a.m.–4:30 p.m. Eastern (Joint Meeting) North American Electric Reliability Corporation: Project 2022–02 Modifications to PRC–024 (Generator Ride-through) Standard Drafting Team Meeting, Hybrid May 8, 2023 | 8:30 a.m.–4:30 p.m. Eastern May 9, 2023 | 8:30 a.m.–4:30 p.m. Eastern North American Electric Reliability Corporation: Project 2023–02 Analysis and Mitigation of BES Inverter-Based Resource Performance Issues Standard Drafting Team Meeting, Hybrid May 8, 2023| 9:00 a.m.–5:00 p.m. VerDate Sep<11>2014 20:31 Apr 25, 2024 Jkt 262001 Eastern May 9, 2023 | 9:00 a.m.–5:00 p.m. Eastern Further information regarding these meetings and how to join remotely may be found at: https://www.nerc.com/ Pages/Calendar.aspx. The discussions at the meetings, which are open to the public, may address matters at issue in the following Commission proceedings: Docket No. RR24–2–000 North American Electric Reliability Corporation For further information, please contact Leigh Anne Faugust (202) 502– 6396 or leigh.faugust@ferc.gov. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 703–001, 20–117] PacifiCorp; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC) regulations, 18 CFR part 380, Commission staff reviewed PacifiCorp’s applications, filed with the Commission on March 16, 2023, to decommission project facilities and surrender the Paris Hydroelectric Project (P–703) conduit exemption, and to amend Article 408(b) of its license for the Bear River Hydroelectric Project (P–20) to adjust minimum instream flows in the Grace Development’s bypass reach. Commission staff have prepared a single Environmental Assessment (EA) for the proposed surrender of conduit exemption and amendment of license given the inter-relatedness of the proposals. The Paris Hydroelectric Project is located on Paris Creek in Bear Lake County, Idaho and does not occupy Federal lands. The Bear River Hydroelectric Project is located on Bear River is Franklin and Caribou counties, Idaho and occupies Federal lands administered by the Bureau of Land Management. The EA contains Commission staff’s analysis of the potential environmental effects of the proposed surrender of conduit exemption and amendment of license, alternatives to the proposed action, and concludes that the proposed PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 32415 surrender and amendment, with appropriate environmental protective measures, would not constitute a major Federal action that would significantly affect the quality of the human environment. The EA may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket numbers (P–703–001 for the Paris Hydroelectric Project, or P– 20–117 for the Bear River Hydroelectric Project) in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. For further information, contact Jennifer Ambler at 202–502–8586 or jennifer.ambler@ferc.gov, or Holly Frank at 202–502–6833 or holly.frank@ ferc.gov. Dated: April 22, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08992 Filed 4–25–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–1–000] Cameron Interstate Pipeline, LLC; Notice of Availability of the Environmental Assessment for the Proposed Holbrook Expansion Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Holbrook Expansion Project, proposed by Cameron Interstate Pipeline, LLC E:\FR\FM\26APN1.SGM 26APN1

Agencies

[Federal Register Volume 89, Number 82 (Friday, April 26, 2024)]
[Notices]
[Pages 32414-32415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-08996]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG24-166-000.
    Applicants: North Fork Solar Project, LLC.
    Description: North Fork Solar Project, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 4/19/24.
    Accession Number: 0240419-5246.
    Comment Date: 5 p.m. ET 5/10/24.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER06-613-000; ER06-613-012.
    Applicants: ISO New England Inc., New England Power Pool.
    Description: ISO New England Inc. and New England Power Pool Submit 
semi-annual compliance report re forward reserve market with a motion 
to terminate.
    Filed Date: 4/18/24.
    Accession Number: 20240418-5320.
    Comment Date: 5 p.m. ET 5/9/24.

    Docket Numbers: ER24-1763-001.
    Applicants: FRP Tupelo Solar, LLC.
    Description: Tariff Amendment: Cost-Based PPA with Seminole 
Electric Coop., Inc. (ER24-1763-) Amend Metadata to be effective 8/15/
2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5138.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1780-000.
    Applicants: Lake Erie Connector Transmission, LLC.
    Description: Lake Erie Connector Transmission, LLC submits a 
Request for Order Confirming Negotiated Rate Authority and waiver of 
previously granted reporting requirements.
    Filed Date: 4/12/24.
    Accession Number: 20240412-5378.
    Comment Date: 5 p.m. ET 5/3/24.

    Docket Numbers: ER24-1803-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Implementation of Capacity 
Market Rules Applicable to DER Under Order No. 2222 to be effective 7/
1/2023.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5081.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1804-000.
    Applicants: Clearwater Wind III, LLC.
    Description: Baseline eTariff Filing: Clearwater Wind III, LLC 
Application for Market-Based Rate Authorization to be effective 6/22/
2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5133.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1805-000.
    Applicants: ISO New England Inc., New England Power Company.
    Description: Sec.  205(d) Rate Filing: ISO New England Inc. submits 
tariff filing per 35.13(a)(2)(iii: NEP; Filing of Revisions to Schedule 
20A-NEP to be effective 5/1/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5165.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1806-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Initial Filing of Letter 
Agreement Related to Last Hour to be effective 4/30/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5166.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1807-000.
    Applicants: Consolidated Edison Company of New York, Inc.
    Description: Sec.  205(d) Rate Filing: Combined RDM Update and 
Idlewild Cost Recovery 4-2024 to be effective 4/22/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5182.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1808-000.
    Applicants: ISO New England Inc., England Power Company.
    Description: Sec.  205(d) Rate Filing: ISO New England Inc. submits 
tariff filing per 35.13(a)(2)(iii: NEP; Filing of Revisions to Schedule 
21-NEP to be effective 5/1/2024.
    Filed Date: 4/22/24,
    Accession Number: 20240422-5188.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1809-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Oncor Carbon 
Facilities Development Agreement to be effective 4/5/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5197.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1810-000.
    Applicants: FirstEnergy Pennsylvania Electric Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: FirstEnergy Pennsylvania 
Electric Company submits tariff filing per 35.13(a)(2)(iii: FE PA 
submits Amended IA, SA No. 4161 re: FirstEnergy Reorganization to be 
effective 1/1/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5201.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1811-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-BRP Antlia BESS 3rd 
Amended Generator Interconnection Agreement to be effective 4/5/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5206.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1812-000.
    Applicants: AES Redondo Beach, L.L.C.
    Description: Tariff Amendment: Notice of Cancellation of MBR Tariff 
to be effective 4/23/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5226.
    Comment Date: 5 p.m. ET 5/13/24.

    Docket Numbers: ER24-1813-000.
    Applicants: Hoosier Wind Project, LLC.
    Description: Tariff Amendment: Notice of Cancellation of MBR Tariff 
to be effective 4/23/2024.
    Filed Date: 4/22/24.
    Accession Number: 20240422-5227.
    Comment Date: 5 p.m. ET 5/13/24.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available

[[Page 32415]]

information and navigate Commission processes. For public inquiries and 
assistance with making filings such as interventions, comments, or 
requests for rehearing, the public is encouraged to contact OPP at 
(202) 502-6595 or [email protected].

    Dated: April 22, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-08996 Filed 4-25-24; 8:45 am]
BILLING CODE 6717-01-P