Download as PDF 29320 Federal Register / Vol. 89, No. 78 / Monday, April 22, 2024 / Notices DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2715–026] Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings in Existing Proceedings Docket Numbers: RP24–163–001. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: Compliance filing: TIGT RP24–163 Stipulation and Agreement Compliance Filing to be effective 6/1/ 2024. Filed Date: 4/15/24. Accession Number: 20240415–5175. Comment Date: 5 p.m. ET 4/29/24. lotter on DSK11XQN23PROD with NOTICES1 Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: April 16, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08536 Filed 4–19–24; 8:45 am] BILLING CODE 6717–01–P Kaukauna Utilities; Notice of Reasonable Period of Time for Water Quality Certification Application On April 12, 2024, the Wisconsin Department of Natural Resources (DNR) submitted to the Federal Energy Regulatory Commission (Commission) notice that it received a complete request for a Clean Water Act section 401(a)(1) water quality certification from Kaukauna Utilities, in conjunction with the above captioned project, on March 12, 2024. Pursuant to section 4.34(b)(5) of the Commission’s regulations,1 we hereby notify the Wisconsin DNR of the following: Date of Receipt of the Certification Request: March 12, 2024. Reasonable Period of Time to Act on the Certification Request: One year, March 12, 2025. If the Wisconsin DNR fails or refuses to act on the water quality certification request on or before the above date, then the certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1). Dated: April 16, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08534 Filed 4–19–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2300–052; 2300–052; 2311–067; 2326–054; 2327–047; 2422–058; 2423–031] Great Lakes Hydro America, LLC; Notice of Revised Procedural Schedule for Environmental Assessments for the Proposed Project Relicenses On August 1, 2022, Great Lakes Hydro America, LLC filed applications for new major licenses for the 3.7–MW Shelburne Hydroelectric Project, the 4.8–MW Upper Gorham Hydroelectric Project, the 3.2–MW Cross Power Hydroelectric Project, the 7.9–MW Cascade Hydroelectric Project, the 3.2– MW Sawmill Hydroelectric Project, and the 7.9–MW Riverside Hydroelectric Project. On October 12, 2023, Commission staff issued a notice of intent to prepare an environmental 1 18 VerDate Sep<11>2014 06:41 Apr 20, 2024 Jkt 262001 PO 00000 CFR 4.34(b)(5). Frm 00039 Fmt 4703 Sfmt 4703 assessment (EA) to evaluate the effects of relicensing these projects. The notice identified an anticipated schedule for issuance of draft and final EAs. By this notice, Commission staff is updating the procedural schedule for completing the draft and final EAs. The revised schedule is shown below. Further revisions to the schedule may be made as appropriate. Milestone Commission issues draft EAs. Commission issues final EAs. Target date May 2024. September 2024. 1 Any questions regarding this notice may be directed to Ryan Hansen at (202) 502–8074, or by email at ryan.hansen@ ferc.gov. Dated: April 11, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08497 Filed 4–19–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2259–003. Applicants: Turquoise Nevada LLC. Description: Compliance filing: Turquoise Nevada LLC Change in Status to be effective 4/16/2024. Filed Date: 4/15/24. Accession Number: 20240415–5253. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER19–2276–006. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: NYISO Compliance: DER program effective date to be effective 4/16/2024. Filed Date: 4/16/24. Accession Number: 20240416–5121. Comment Date: 5 p.m. ET 5/7/24. Docket Numbers: ER21–280–001. Applicants: CO Buffalo Flats, LLC. Description: Compliance filing: CO Buffalo Flats, LLC Change in Status to be effective 4/16/2024. Filed Date: 4/15/24. 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) (2022) require that EAs be completed within 1 year of the Federal action agency’s decision to prepare an EA. See National Environmental Policy Act, 42 U.S.C. 4321 et seq., as amended by section 107(g)(1)(B)(iii) of the Fiscal Responsibility Act of 2023, Public Law 118–5, sec. 4336a, 137 Stat. 42. E:\FR\FM\22APN1.SGM 22APN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 89, No. 78 / Monday, April 22, 2024 / Notices Accession Number: 20240415–5244. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER22–2646–002. Applicants: Graphite Solar 1, LLC. Description: Compliance filing: Graphite Solar I, LLC submits tariff filing per 35: Graphite Solar I, LLC Change in Status to be effective 4/16/ 2024. Filed Date: 4/15/24. Accession Number: 20240415–5248. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER22–2689–002. Applicants: MTSun LLC. Description: Compliance filing: MTSun LLC Change in Status to be effective 4/16/2024. Filed Date: 4/15/24. Accession Number: 20240415–5250. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER22–2850–002. Applicants: Fall River Solar, LLC. Description: Compliance filing: Fall River Solar, LLC Change in Status to be effective 4/16/2024. Filed Date: 4/15/24. Accession Number: 20240415–5246. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER23–1928–002. Applicants: Appaloosa Solar I, LLC. Description: Compliance filing: Appaloosa Solar I, LLC Change in Status to be effective 4/16/2024. Filed Date: 4/15/24. Accession Number: 20240415–5242. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER24–1761–000. Applicants: Harmony Florida Solar II, LLC. Description: Baseline eTariff Filing: Harmony Florida Solar II, LLC CostBased PPA with Orlando Utilities Commission to be effective 8/15/2024. Filed Date: 4/15/24. Accession Number: 20240415–5255. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER24–1762–000. Applicants: Storey Bend Solar, LLC. Description: Baseline eTariff Filing: Storey Bend Solar, LLC Cost-Based PPA with Orlando Utilities Commission to be effective 8/15/2024. Filed Date: 4/15/24. Accession Number: 20240415–5265. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER24–1763–000. Applicants: FRP Tupelo Solar, LLC. Description: Baseline eTariff Filing: FRP Tupelo Solar, LLC Cost-Based PPA with Orlando Utilities Commission to be effective 8/15/2024. Filed Date: 4/15/24. Accession Number: 20240415–5277. Comment Date: 5 p.m. ET 5/6/24. Docket Numbers: ER24–1764–000. Applicants: FirstEnergy Service Company, PJM Interconnection, L.L.C. VerDate Sep<11>2014 06:41 Apr 20, 2024 Jkt 262001 Description: § 205(d) Rate Filing: FirstEnergy Service Company submits tariff filing per 35.13(a)(2)(iii: ATSI submits Revised Interconnection Agreement (IA) SA No. 3994 to be effective 6/16/2024. Filed Date: 4/16/24. Accession Number: 20240416–5010. Comment Date: 5 p.m. ET 5/7/24. Docket Numbers: ER24–1765–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 4247 Minco II Energy Storage Surplus Interconnection GIA to be effective 6/ 15/2024. Filed Date: 4/16/24. Accession Number: 20240416–5066. Comment Date: 5 p.m. ET 5/7/24. Docket Numbers: ER24–1767–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA No. 7232, Queue No. AD2–031 & AF1–159 to be effective 6/ 16/2024. Filed Date: 4/16/24. Accession Number: 20240416–5073. Comment Date: 5 p.m. ET 5/7/24. Docket Numbers: ER24–1768–000. Applicants: Arizona Public Service Company. Description: Tariff Amendment: Rate Schedule 198—Notice of Cancellation to be effective 6/16/2014. Filed Date: 4/16/24. Accession Number: 20240416–5173. Comment Date: 5 p.m. ET 5/7/24. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES24–34–000. Applicants: Orange and Rockland Utilities, Inc. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Orange and Rockland Utilities, Inc. Filed Date: 4/15/24. Accession Number: 20240415–5337. Comment Date: 5 p.m. ET 5/6/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 29321 eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: April 16, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–08537 Filed 4–19–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER24–1739–000] Wolf Run Solar LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Wolf Run Solar LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 6, 2024. The Commission encourages electronic submission of protests and E:\FR\FM\22APN1.SGM 22APN1

Agencies

[Federal Register Volume 89, Number 78 (Monday, April 22, 2024)]
[Notices]
[Pages 29320-29321]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-08537]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2259-003.
    Applicants: Turquoise Nevada LLC.
    Description: Compliance filing: Turquoise Nevada LLC Change in 
Status to be effective 4/16/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5253.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER19-2276-006.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: NYISO Compliance: DER program 
effective date to be effective 4/16/2024.
    Filed Date: 4/16/24.
    Accession Number: 20240416-5121.
    Comment Date: 5 p.m. ET 5/7/24.

    Docket Numbers: ER21-280-001.
    Applicants: CO Buffalo Flats, LLC.
    Description: Compliance filing: CO Buffalo Flats, LLC Change in 
Status to be effective 4/16/2024.
    Filed Date: 4/15/24.

[[Page 29321]]

    Accession Number: 20240415-5244.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER22-2646-002.
    Applicants: Graphite Solar 1, LLC.
    Description: Compliance filing: Graphite Solar I, LLC submits 
tariff filing per 35: Graphite Solar I, LLC Change in Status to be 
effective 4/16/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5248.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER22-2689-002.
    Applicants: MTSun LLC.
    Description: Compliance filing: MTSun LLC Change in Status to be 
effective 4/16/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5250.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER22-2850-002.
    Applicants: Fall River Solar, LLC.
    Description: Compliance filing: Fall River Solar, LLC Change in 
Status to be effective 4/16/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5246.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER23-1928-002.
    Applicants: Appaloosa Solar I, LLC.
    Description: Compliance filing: Appaloosa Solar I, LLC Change in 
Status to be effective 4/16/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5242.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER24-1761-000.
    Applicants: Harmony Florida Solar II, LLC.
    Description: Baseline eTariff Filing: Harmony Florida Solar II, LLC 
Cost-Based PPA with Orlando Utilities Commission to be effective 8/15/
2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5255.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER24-1762-000.
    Applicants: Storey Bend Solar, LLC.
    Description: Baseline eTariff Filing: Storey Bend Solar, LLC Cost-
Based PPA with Orlando Utilities Commission to be effective 8/15/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5265.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER24-1763-000.
    Applicants: FRP Tupelo Solar, LLC.
    Description: Baseline eTariff Filing: FRP Tupelo Solar, LLC Cost-
Based PPA with Orlando Utilities Commission to be effective 8/15/2024.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5277.
    Comment Date: 5 p.m. ET 5/6/24.

    Docket Numbers: ER24-1764-000.
    Applicants: FirstEnergy Service Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: FirstEnergy Service Company 
submits tariff filing per 35.13(a)(2)(iii: ATSI submits Revised 
Interconnection Agreement (IA) SA No. 3994 to be effective 6/16/2024.
    Filed Date: 4/16/24.
    Accession Number: 20240416-5010.
    Comment Date: 5 p.m. ET 5/7/24.

    Docket Numbers: ER24-1765-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 4247 Minco II Energy Storage 
Surplus Interconnection GIA to be effective 6/15/2024.
    Filed Date: 4/16/24.
    Accession Number: 20240416-5066.
    Comment Date: 5 p.m. ET 5/7/24.

    Docket Numbers: ER24-1767-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA No. 7232, Queue 
No. AD2-031 & AF1-159 to be effective 6/16/2024.
    Filed Date: 4/16/24.
    Accession Number: 20240416-5073.
    Comment Date: 5 p.m. ET 5/7/24.

    Docket Numbers: ER24-1768-000.
    Applicants: Arizona Public Service Company.
    Description: Tariff Amendment: Rate Schedule 198--Notice of 
Cancellation to be effective 6/16/2014.
    Filed Date: 4/16/24.
    Accession Number: 20240416-5173.
    Comment Date: 5 p.m. ET 5/7/24.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES24-34-000.
    Applicants: Orange and Rockland Utilities, Inc.
    Description: Application Under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Orange and Rockland Utilities, 
Inc.
    Filed Date: 4/15/24.
    Accession Number: 20240415-5337.
    Comment Date: 5 p.m. ET 5/6/24.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: April 16, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-08537 Filed 4-19-24; 8:45 am]