Combined Notice of Filings #1, 25259-25261 [2024-07599]
Download as PDF
Federal Register / Vol. 89, No. 70 / Wednesday, April 10, 2024 / Notices
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: April 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–07597 Filed 4–9–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–1696–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Holden BESS 1 LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Holden
BESS 1 LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 24,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
VerDate Sep<11>2014
18:10 Apr 09, 2024
Jkt 262001
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: April 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–07594 Filed 4–9–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR24–63–000.
Applicants: Impulsora Pipeline, LLC.
Description: Compliance 2024 to be
effective N/A.
Filed Date: 4/3/24.
Accession Number: 20240403–5167.
Comment Date: 5 p.m. ET 4/24/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
25259
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP24–501–001.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: Compliance filing: Ozark
Gas Transmission Amended NCA Filing
to be effective 4/1/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5072.
Comment Date: 5 p.m. ET 4/16/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: April 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–07598 Filed 4–9–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC24–56–000.
E:\FR\FM\10APN1.SGM
10APN1
ddrumheller on DSK120RN23PROD with NOTICES1
25260
Federal Register / Vol. 89, No. 70 / Wednesday, April 10, 2024 / Notices
Applicants: Burgess Biopower, LLC,
North Country Generation Holdings
LLC.
Description: Supplement to March 5,
2024 Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Burgess BioPower,
LLC, et al.
Filed Date: 4/3/24.
Accession Number: 20240403–5207.
Comment Date: 5 p.m. ET 4/15/24.
Docket Numbers: EC24–66–000.
Applicants: Bellflower Solar 1, LLC,
Bighorn Solar 1, LLC, Black Bear
Alabama Solar 1, LLC, Black Bear
Alabama Solar Tenant, LLC, Cottontail
Solar 2, LLC, Cottontail Solar 8, LLC,
Happy Solar 1, LLC, Honeysuckle Solar,
LLC, Oxbow Solar Farm 1, LLC, Sun
Mountain Solar 1, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Bellflower Solar 1,
LLC, et al.
Filed Date: 4/3/24.
Accession Number: 20240403–5210.
Comment Date: 5 p.m. ET 4/24/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–311–001.
Applicants: Condor Energy Storage,
LLC.
Description: Notice of Non-Material
Change in Status of Condor Energy
Storage, LLC.
Filed Date: 4/3/24.
Accession Number: 20240403–5206.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24–377–002.
Applicants: Devon Energy Production
Company, LP.
Description: Tariff Amendment: DEPC
MBR Second Response Letter to be
effective 12/26/2023.
Filed Date: 4/4/24.
Accession Number: 20240404–5137.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–842–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.17(b): Yellowhammer
Renewable Energy (Yellowhammer
Solar) LGIA Deficiency Response to be
effective 12/27/2023.
Filed Date: 4/4/24.
Accession Number: 20240404–5085.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–1682–000.
Applicants: Eagle Point Power
Generation LLC.
Description: Eagle Point Power
Generation LLC requests a one-time,
limited waiver of the 90-day prior notice
VerDate Sep<11>2014
18:10 Apr 09, 2024
Jkt 262001
requirement set forth in Schedule 2 of
the PJM Tariff.
Filed Date: 3/29/24.
Accession Number: 20240329–5497.
Comment Date: 5 p.m. ET 4/19/24.
Docket Numbers: ER24–1694–000
Applicants: Groton BESS 1 LLC.
Description: Baseline eTariff Filing:
Groton BESS 1 LLC MBR Tariff to be
effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403–5196.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24–1695–000.
Applicants: Groton BESS 2 LLC.
Description: Baseline eTariff Filing:
Groton BESS 2 LLC MBR Tariff to be
effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403–5197.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24–1696–000.
Applicants: Holden BESS 1 LLC.
Description: Baseline eTariff Filing:
Holden BESS 1 LLC MBR Tariff to be
effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403–5200.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24–1697–000.
Applicants: AES Westwing II ES, LLC.
Description: Baseline eTariff Filing:
AES Westwing II ES, LLC MBR Tariff to
be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5067.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–1698–000.
Applicants: AES ES Alamitos 2, LLC.
Description: Baseline eTariff Filing:
AES ES Alamitos 2, LLC MBR Tariff to
be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5068.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–1699–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Amendment to WMPA No. 6426 AD1–
105 (AA_MCD) to be effective 6/4/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5070.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–1700–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii): EDF
Renewables (Rock House Solar) LGIA
Amendment Filing to be effective 3/22/
2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5090.
Comment Date: 5 p.m. ET 4/25/24.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Docket Numbers: ER24–1701–000.
Applicants: California Independent
System Operator Corporation.
Description: 205(d) Rate Filing: 2024–
04–04 Revision to TCA—Adding DCR
Transmission to be effective 6/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5095.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: R24–1702–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Original ISA, Service Agreement No.
7200; AF1–114 to be effective 3/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5108.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24–1703–000.
Applicants: Entergy Mississippi, LLC.
Description: 205(d) Rate Filing:
Harvest Gold Solar, LLC, LBA
Agreement to be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404–5149.
Comment Date: 5 pm ET 4/25/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
E:\FR\FM\10APN1.SGM
10APN1
Federal Register / Vol. 89, No. 70 / Wednesday, April 10, 2024 / Notices
Dated: April 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–07599 Filed 4–9–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2023–0111; FRL–11864–01–
OMS]
This is a
proposed extension of the ICR, which is
currently approved through April 30,
2024. An agency may neither conduct
nor sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
AGENCY: Environmental Protection
Public comments were previously
Agency (EPA).
requested in the Federal Register on
ACTION: Notice.
May 18, 2023, during a 60-Day comment
SUMMARY: The Environmental Protection period (88 FR 31748). This notice allows
for an additional 30 days for public
Agency (EPA) has submitted an
comments. Supporting documents,
information collection request (ICR),
which explain in detail the information
NSPS for Asphalt Processing and
Roofing Manufacture (EPA ICR Number that the EPA will be collecting, are
available in the public docket for this
0661.14, OMB Control Number 2060–
ICR. The docket can be viewed online
0002), to the Office of Management and
at www.regulations.gov, or in person at
Budget (OMB) for review and approval
the EPA Docket Center, WJC West
in accordance with the Paperwork
Building, Room 3334, 1301 Constitution
Reduction Act. This is a proposed
extension of the ICR, which is currently Ave. NW, Washington, DC. The
approved through April 30, 2024. Public telephone number for the Docket Center
is 202–566–1744. For additional
comments were previously requested
information about EPA’s public docket,
via the Federal Register on May 18,
visit https://www.epa.gov/dockets.
2023, during a 60-day comment period.
Abstract: The New Source
This notice allows for an additional 30
Performance Standards (NSPS) for
days for public comments.
Asphalt Processing and Roofing
DATES: Comments may be submitted on
Manufacture (40 CFR part 60, subpart
or before May 10, 2024.
UU) were promulgated on August 6,
ADDRESSES: Submit your comments,
1982, and most-recently amended on
referencing Docket ID Number EPA–
February 27, 2014. These regulations
HQ–OAR–2023–0111, to EPA online
apply to both existing and new
using www.regulations.gov/ (our
saturators and mineral handling and
preferred method), by email to a-and-rasphalt storage facilities at asphalt
docket@epa.gov, or by mail to: EPA
roofing manufacturing plants and to
Docket Center, Environmental
asphalt storage tanks and blowing stills
Protection Agency, Mail Code 28221T,
at asphalt processing plants, petroleum
1200 Pennsylvania Ave. NW,
refineries, and asphalt roofing plants.
Washington, DC 20460. EPA’s policy is
New facilities include those that
that all comments received will be
commenced construction, modification,
included in the public docket without
or reconstruction after the date of
change, including any personal
proposal. This information is being
information provided, unless the
collected to assure compliance with 40
comment includes profanity, threats,
CFR part 60, subpart UU.
information claimed to be Confidential
Form Numbers: None.
Business Information (CBI), or other
Respondents/affected entities:
information whose disclosure is
Asphalt processing and asphalt roofing
restricted by statute.
manufacture facilities.
Submit written comments and
Respondent’s obligation to respond:
recommendations to OMB for the
Mandatory (40 CFR 60, Subpart UU).
proposed information collection within
Estimated number of respondents:
30 days of publication of this notice to
144 (total).
https://www.reginfo.gov/public/do/
Frequency of response: Initially and
PRAMain. Find this specific information
collection by selecting ‘‘Currently under semiannually.
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Comment Request;
NSPS for Asphalt Processing and
Roofing Manufacture (Renewal)
ddrumheller on DSK120RN23PROD with NOTICES1
Review—Open for Public Comments’’ or
by using the search function.
FOR FURTHER INFORMATION CONTACT:
Muntasir Ali, Sector Policies and
Program Division (D243–05), Office of
Air Quality Planning and Standards,
U.S. Environmental Protection Agency,
Research Triangle Park, North Carolina
27711; telephone number: (919) 541–
0833; email address: ali.muntasir@
epa.gov.
VerDate Sep<11>2014
18:10 Apr 09, 2024
Jkt 262001
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
25261
Total estimated burden: 34,100 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $11,700,000 (per
year), which includes $7,430,000 in
annualized capital//startup and/or
operation & maintenance costs.
Changes in the estimates: There is no
change in burden from the most recently
approved ICR as currently identified in
the OMB Inventory of Approved
Burdens. This is due to two
considerations: (1) the regulations have
not changed over the past three years
and are not anticipated to change over
the next three years; and (2) the growth
rate for this industry is very low or nonexistent, so there is no significant
change in the overall burden. There is
a slight increase in costs, which is
wholly due to the use of updated labor
rates. There is an increase in capital/
startup and/or operation & maintenance
costs due to an adjustment to increase
from 2008 to 2022 dollars using the
CEPCI Equipment Cost Index.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2024–07625 Filed 4–9–24; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–11562–01–R6]
Notice of Proposed Administrative
Settlement Agreement and Order on
Consent for Recovery of Past
Response Costs
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed settlement;
request for public comment.
AGENCY:
In accordance with the
Comprehensive Environmental
Response, Compensation, and Liability
Act (‘‘CERCLA’’), notice is hereby given
that a proposed CERCLA Section
122(h)(1) Cashout Settlement Agreement
for Past Response Costs by Settling
Parties (‘‘Proposed Agreement’’)
associated with the Chemical Recycling
Inc., Superfund Site in Wylie, Collin
County, Texas (‘‘Site’’) was executed by
the Environmental Protection Agency
(‘‘EPA’’) and is now subject to public
comment, after which EPA may modify
or withdraw its consent if comments
received disclose facts or considerations
that indicate that the Proposed
Agreement is inappropriate, improper,
or inadequate.
DATES: Comments must be received on
or before May 10, 2024.
SUMMARY:
E:\FR\FM\10APN1.SGM
10APN1
Agencies
[Federal Register Volume 89, Number 70 (Wednesday, April 10, 2024)]
[Notices]
[Pages 25259-25261]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-07599]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC24-56-000.
[[Page 25260]]
Applicants: Burgess Biopower, LLC, North Country Generation
Holdings LLC.
Description: Supplement to March 5, 2024 Joint Application for
Authorization Under Section 203 of the Federal Power Act of Burgess
BioPower, LLC, et al.
Filed Date: 4/3/24.
Accession Number: 20240403-5207.
Comment Date: 5 p.m. ET 4/15/24.
Docket Numbers: EC24-66-000.
Applicants: Bellflower Solar 1, LLC, Bighorn Solar 1, LLC, Black
Bear Alabama Solar 1, LLC, Black Bear Alabama Solar Tenant, LLC,
Cottontail Solar 2, LLC, Cottontail Solar 8, LLC, Happy Solar 1, LLC,
Honeysuckle Solar, LLC, Oxbow Solar Farm 1, LLC, Sun Mountain Solar 1,
LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Bellflower Solar 1, LLC, et al.
Filed Date: 4/3/24.
Accession Number: 20240403-5210.
Comment Date: 5 p.m. ET 4/24/24.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER24-311-001.
Applicants: Condor Energy Storage, LLC.
Description: Notice of Non-Material Change in Status of Condor
Energy Storage, LLC.
Filed Date: 4/3/24.
Accession Number: 20240403-5206.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24-377-002.
Applicants: Devon Energy Production Company, LP.
Description: Tariff Amendment: DEPC MBR Second Response Letter to
be effective 12/26/2023.
Filed Date: 4/4/24.
Accession Number: 20240404-5137.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-842-001.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.17(b): Yellowhammer Renewable Energy (Yellowhammer Solar)
LGIA Deficiency Response to be effective 12/27/2023.
Filed Date: 4/4/24.
Accession Number: 20240404-5085.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1682-000.
Applicants: Eagle Point Power Generation LLC.
Description: Eagle Point Power Generation LLC requests a one-time,
limited waiver of the 90-day prior notice requirement set forth in
Schedule 2 of the PJM Tariff.
Filed Date: 3/29/24.
Accession Number: 20240329-5497.
Comment Date: 5 p.m. ET 4/19/24.
Docket Numbers: ER24-1694-000
Applicants: Groton BESS 1 LLC.
Description: Baseline eTariff Filing: Groton BESS 1 LLC MBR Tariff
to be effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403-5196.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24-1695-000.
Applicants: Groton BESS 2 LLC.
Description: Baseline eTariff Filing: Groton BESS 2 LLC MBR Tariff
to be effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403-5197.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24-1696-000.
Applicants: Holden BESS 1 LLC.
Description: Baseline eTariff Filing: Holden BESS 1 LLC MBR Tariff
to be effective 5/1/2024.
Filed Date: 4/3/24.
Accession Number: 20240403-5200.
Comment Date: 5 p.m. ET 4/24/24.
Docket Numbers: ER24-1697-000.
Applicants: AES Westwing II ES, LLC.
Description: Baseline eTariff Filing: AES Westwing II ES, LLC MBR
Tariff to be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5067.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1698-000.
Applicants: AES ES Alamitos 2, LLC.
Description: Baseline eTariff Filing: AES ES Alamitos 2, LLC MBR
Tariff to be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5068.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1699-000.
Applicants: PJM Interconnection, L.L.C.
Description: 205(d) Rate Filing: Amendment to WMPA No. 6426 AD1-105
(AA_MCD) to be effective 6/4/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5070.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1700-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing: Alabama Power Company submits
tariff filing per 35.13(a)(2)(iii): EDF Renewables (Rock House Solar)
LGIA Amendment Filing to be effective 3/22/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5090.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1701-000.
Applicants: California Independent System Operator Corporation.
Description: 205(d) Rate Filing: 2024-04-04 Revision to TCA--Adding
DCR Transmission to be effective 6/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5095.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: R24-1702-000.
Applicants: PJM Interconnection, L.L.C.
Description: 205(d) Rate Filing: Original ISA, Service Agreement
No. 7200; AF1-114 to be effective 3/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5108.
Comment Date: 5 p.m. ET 4/25/24.
Docket Numbers: ER24-1703-000.
Applicants: Entergy Mississippi, LLC.
Description: 205(d) Rate Filing: Harvest Gold Solar, LLC, LBA
Agreement to be effective 4/5/2024.
Filed Date: 4/4/24.
Accession Number: 20240404-5149.
Comment Date: 5 pm ET 4/25/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
[[Page 25261]]
Dated: April 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-07599 Filed 4-9-24; 8:45 am]
BILLING CODE 6717-01-P