Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4; Final Site-Specific Environmental Impact Statement, 24045-24046 [2024-07152]
Download as PDF
Federal Register / Vol. 89, No. 67 / Friday, April 5, 2024 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2023–0154, in your
comment submission.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that comment
submissions are not routinely edited to
remove such information before making
the comment submissions available to
the public or entering the comment into
ADAMS.
II. Background
In accordance with the Paperwork
Reduction Act of 1995 (44 U.S.C.
chapter 35), the NRC is requesting
public comment on its intention to
request the OMB’s approval for the
information collection summarized
below.
1. The title of the information
collection: Reactor Site Criteria.
2. OMB approval number: 3150–0093.
3. Type of submission: Extension.
4. The form number, if applicable:
Not applicable.
5. How often the collection is required
or requested: As necessary in order for
the NRC to assess the adequacy of
proposed seismic design bases and the
design bases for other site hazards for
small modular reactors (SMRs) and/or
non-light water reactors (LWRs)
constructed and licensed in accordance
with parts 50 and 52 of title 10 of the
Code of Federal Regulations (10 CFR)
and the Atomic Energy Act of 1954, as
amended.
6. Who will be required or asked to
respond: Applicants who apply for an
early site permit (ESP), combined
license (COL) or a construction permit
(CP) or operating license (OL) on or after
January 10, 1997.
7. The estimated number of annual
responses: 13.
8. The estimated number of annual
respondents: 13.
9. The estimated number of hours
needed annually to comply with the
VerDate Sep<11>2014
16:44 Apr 04, 2024
Jkt 262001
information collection requirement or
request: 482,412 hours.
10. Abstract: 10 CFR part 100,
‘‘Reactor Site Criteria,’’ establishes
approval requirements for proposed
sites for the purpose of constructing and
operating stationary SMRs and/or nonLWRs. Subpart B, ‘‘Evaluation Factors
for Stationary Power Reactor Site
Applications on or After January 10,
1997,’’ requirements apply to applicants
who apply for an ESP, COL or a CP or
OL on or after January 10, 1997. This
clearance is necessary since the NRC is
expecting approximately 8 SMR and/or
non-LWR siting applications over the
next 3 years. The applicants must
provide information regarding the
physical characteristics of the site in
addition to the potential for natural
phenomena and man-made hazards.
This includes information on
meteorological hazards (such as
hurricanes, tornadoes, snowfall, and
extreme temperatures), hydrologic
hazards (such as floods, tsunami, and
seiches) geologic hazards (such as
faulting, seismic hazards, and the
maximum credible earthquake) and
factors such as population density, the
proximity of man-related hazards (e.g.,
airports, dams, transportation routes,
military and chemical facilities), and
site hydrological and atmospheric
dispersion characteristics. The NRC staff
reviews the submitted information and,
if necessary, may generate a request for
additional information. The staff meets
with the applicant and conducts a site
visit to resolve any open issues. When
the open issues have been resolved, the
staff writes the final safety evaluation
report, which is published and used as
a basis for the remainder of the NRC
licensing process.
III. Specific Requests for Comments
The NRC is seeking comments that
address the following questions:
1. Is the proposed collection of
information necessary for the NRC to
properly perform its functions? Does the
information have practical utility?
Please explain your answer.
2. Is the estimate of the burden of the
information collection accurate? Please
explain your answer.
3. Is there a way to enhance the
quality, utility, and clarity of the
information to be collected?
4. How can the burden of the
information collection on respondents
be minimized, including the use of
automated collection techniques or
other forms of information technology?
Dated: April 1, 2024.
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
24045
For the Nuclear Regulatory Commission.
David Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2024–07207 Filed 4–4–24; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–250 and 50–251; NRC–
2022–0172]
Florida Power & Light Company;
Turkey Point Nuclear Generating Unit
Nos. 3 and 4; Final Site-Specific
Environmental Impact Statement
Nuclear Regulatory
Commission.
ACTION: Notice; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing final sitespecific environmental impact
statement (EIS) NUREG–1437,
Supplement 5a, Second Renewal, ‘‘SiteSpecific Environmental Impact
Statement for License Renewal of
Nuclear Plants Regarding Subsequent
License Renewal for Turkey Point
Nuclear Generating Unit Nos. 3 and 4,
Final Report.’’ This EIS is related to the
subsequent renewal of Renewed Facility
Operating License Nos. DPR–31 and
DPR–41 for an additional 20 years of
operation for Turkey Point Nuclear
Generating Unit Nos. 3 and 4 (Turkey
Point). Turkey Point is located in
Homestead, Florida, approximately 25
miles south-southwest of Miami.
Possible alternatives to the proposed
action of subsequent license renewal for
Turkey Point include the no-action
alternative and reasonable replacement
power and alternative cooling water
system alternatives.
DATES: NUREG–1437, Supplement 5a,
Second Renewal, is available as of
March 29, 2024.
ADDRESSES: Please refer to Docket ID
NRC–2022–0172 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0172. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
SUMMARY:
E:\FR\FM\05APN1.SGM
05APN1
24046
Federal Register / Vol. 89, No. 67 / Friday, April 5, 2024 / Notices
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, at
301–415–4737, or by email to
PDR.Resource@nrc.gov. NUREG–1437,
Supplement 5a, Second Renewal, is
available in ADAMS under Accession
No. ML24087A061.
• NRC’s PDR: The PDR, where you
may examine and order copies of
publicly available documents, is open
by appointment. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
• Public Library: NUREG–1437,
Supplement 5a, Second Renewal, will
be available for public inspection at the
Naranja Branch Library, 14850 SW
280th Street, Homestead, Florida 33032.
FOR FURTHER INFORMATION CONTACT:
Lance J. Rakovan, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2589; email: Lance.Rakovan@
nrc.gov.
SUPPLEMENTARY INFORMATION:
khammond on DSKJM1Z7X2PROD with NOTICES
I. Background
II. Discussion
As discussed in Chapter 3 of NUREG–
1437, Supplement 5a, Second Renewal,
the NRC staff’s recommendation is that
the adverse environmental impacts of
subsequent license renewal for Turkey
Point for an additional 20 years beyond
16:44 Apr 04, 2024
Dated: April 1, 2024.
For the Nuclear Regulatory Commission.
John M. Moses,
Deputy Director, Division of Rulemaking,
Environmental, and Financial Support, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2024–07152 Filed 4–4–24; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–99875; File No. SR–
CboeEDGA–2024–009]
Self-Regulatory Organizations; Cboe
EDGA Exchange, Inc.; Notice of Filing
and Immediate Effectiveness of a
Proposed Rule Change To Amend Its
Fees Schedule To Adopt Fees for
Dedicated Cores
April 1, 2024.
In accordance with section 51.118 of
title 10 of the Code of Federal
Regulations (10 CFR), the NRC is
making available for public inspection
NUREG–1437, Supplement 5a, Second
Renewal, regarding the subsequent
renewal of Florida Power & Light
Company’s (FPL) Renewed Facility
Operating License Nos. DPR–31 and
DPR–41 for an additional 20 years of
operation for Turkey Point. A notice of
availability of the draft of NUREG–1437,
Supplement 5a, Second Renewal, was
published in the Federal Register on
September 8, 2023, by the NRC (88 FR
62110) and by the Environmental
Protection Agency (88 FR 62078). The
public comment period on the draft EIS
ended on November 7, 2023, and the
comments received are addressed in the
final EIS.
VerDate Sep<11>2014
the expiration dates of the initial
renewed licenses are not so great that
preserving the option of subsequent
license renewal for energy-planning
decisionmakers would be unreasonable.
This recommendation is based on: (1)
FPL’s environmental report, as
supplemented; (2) the NRC staff’s
consultations with Federal, State,
Tribal, and local government agencies;
(3) the NRC staff’s independent
environmental review, which is
documented in NUREG–1437,
Supplement 5a, Second Renewal; and
(4) the NRC staff’s consideration of
public comments.
Jkt 262001
Pursuant to Section 19(b)(1) of the
Securities Exchange Act of 1934 (the
‘‘Act’’),1 and Rule 19b–4 thereunder,2
notice is hereby given that on March 20,
2024, Cboe EDGA Exchange, Inc. (the
‘‘Exchange’’ or ‘‘EDGA’’) filed with the
Securities and Exchange Commission
(the ‘‘Commission’’) the proposed rule
change as described in Items I, II, and
III below, which Items have been
prepared by the Exchange. The
Commission is publishing this notice to
solicit comments on the proposed rule
change from interested persons.
I. Self-Regulatory Organization’s
Statement of the Terms of Substance of
the Proposed Rule Change
Cboe EDGA Exchange, Inc. (the
‘‘Exchange’’ or ‘‘EDGA Equities’’)
proposes to amend its Fees Schedule.
The text of the proposed rule change is
provided in Exhibit 5.
The text of the proposed rule change
is also available on the Exchange’s
website (https://markets.cboe.com/us/
1 15
2 17
PO 00000
U.S.C. 78s(b)(1).
CFR 240.19b–4.
Frm 00086
Fmt 4703
Sfmt 4703
equities/regulation/rule_filings/edga/),
at the Exchange’s Office of the
Secretary, and at the Commission’s
Public Reference Room.
II. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
In its filing with the Commission, the
Exchange included statements
concerning the purpose of and basis for
the proposed rule change and discussed
any comments it received on the
proposed rule change. The text of these
statements may be examined at the
places specified in Item IV below. The
Exchange has prepared summaries, set
forth in sections A, B, and C below, of
the most significant aspects of such
statements.
A. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
1. Purpose
The Exchange proposes to amend its
fee schedule to adopt fees relating to the
use of Dedicated Cores.3
The Exchange proposes to introduce a
new connectivity offering relating to the
use of Dedicated Cores. By way of
background, all Central Processing Units
(‘‘CPU Cores’’) have historically been
shared by logical order entry ports (i.e.,
multiple logical ports from multiple
firms may connect to a single CPU
Core). Starting February 26, 2024, the
Exchange began to allow Users 4 to
assign a single BOE logical entry port to
a single dedicated CPU Core
(‘‘Dedicated Core’’).5 Use of Dedicated
Cores can provide reduced latency,
enhanced throughput, and improved
performance since a firm using a
Dedicated Core is utilizing the full
processing power of a CPU Core instead
of sharing that power with other firms.
This offering is completely voluntary
3 On March 19, 2024, the Exchange filed a
proposal to introduce Dedicated Cores (SR–
CboeEDGA–2024–008).
4 A User may be either a Member or Sponsored
Participant. The term ‘‘Member’’ shall mean any
registered broker or dealer that has been admitted
to membership in the Exchange. limited liability
company or other organization which is a registered
broker or dealer pursuant to Section 15 of the Act,
and which has been approved by the Exchange. A
Sponsored Participant may be a Member or nonMember of the Exchange whose direct electronic
access to the Exchange is authorized by a
Sponsoring Member subject to certain conditions.
See Exchange Rule 11.3.
5 The Exchange notes that firms will not have
physical access to their Dedicated Core and thus
cannot make any modifications to the Dedicated
Core or server. All Dedicated Cores (including
servers used for this service) are owned and
operated by the Exchange.
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 89, Number 67 (Friday, April 5, 2024)]
[Notices]
[Pages 24045-24046]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-07152]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-250 and 50-251; NRC-2022-0172]
Florida Power & Light Company; Turkey Point Nuclear Generating
Unit Nos. 3 and 4; Final Site-Specific Environmental Impact Statement
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing final
site-specific environmental impact statement (EIS) NUREG-1437,
Supplement 5a, Second Renewal, ``Site-Specific Environmental Impact
Statement for License Renewal of Nuclear Plants Regarding Subsequent
License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4,
Final Report.'' This EIS is related to the subsequent renewal of
Renewed Facility Operating License Nos. DPR-31 and DPR-41 for an
additional 20 years of operation for Turkey Point Nuclear Generating
Unit Nos. 3 and 4 (Turkey Point). Turkey Point is located in Homestead,
Florida, approximately 25 miles south-southwest of Miami. Possible
alternatives to the proposed action of subsequent license renewal for
Turkey Point include the no-action alternative and reasonable
replacement power and alternative cooling water system alternatives.
DATES: NUREG-1437, Supplement 5a, Second Renewal, is available as of
March 29, 2024.
ADDRESSES: Please refer to Docket ID NRC-2022-0172 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0172. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
[[Page 24046]]
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. NUREG-1437, Supplement 5a, Second
Renewal, is available in ADAMS under Accession No. ML24087A061.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
Public Library: NUREG-1437, Supplement 5a, Second Renewal,
will be available for public inspection at the Naranja Branch Library,
14850 SW 280th Street, Homestead, Florida 33032.
FOR FURTHER INFORMATION CONTACT: Lance J. Rakovan, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-2589; email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Background
In accordance with section 51.118 of title 10 of the Code of
Federal Regulations (10 CFR), the NRC is making available for public
inspection NUREG-1437, Supplement 5a, Second Renewal, regarding the
subsequent renewal of Florida Power & Light Company's (FPL) Renewed
Facility Operating License Nos. DPR-31 and DPR-41 for an additional 20
years of operation for Turkey Point. A notice of availability of the
draft of NUREG-1437, Supplement 5a, Second Renewal, was published in
the Federal Register on September 8, 2023, by the NRC (88 FR 62110) and
by the Environmental Protection Agency (88 FR 62078). The public
comment period on the draft EIS ended on November 7, 2023, and the
comments received are addressed in the final EIS.
II. Discussion
As discussed in Chapter 3 of NUREG-1437, Supplement 5a, Second
Renewal, the NRC staff's recommendation is that the adverse
environmental impacts of subsequent license renewal for Turkey Point
for an additional 20 years beyond the expiration dates of the initial
renewed licenses are not so great that preserving the option of
subsequent license renewal for energy-planning decisionmakers would be
unreasonable. This recommendation is based on: (1) FPL's environmental
report, as supplemented; (2) the NRC staff's consultations with
Federal, State, Tribal, and local government agencies; (3) the NRC
staff's independent environmental review, which is documented in NUREG-
1437, Supplement 5a, Second Renewal; and (4) the NRC staff's
consideration of public comments.
Dated: April 1, 2024.
For the Nuclear Regulatory Commission.
John M. Moses,
Deputy Director, Division of Rulemaking, Environmental, and Financial
Support, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2024-07152 Filed 4-4-24; 8:45 am]
BILLING CODE 7590-01-P