Intent To Prepare a Draft Environmental Impact Statement for the Proposed River Islands Project, in San Joaquin County, CA; Withdrawal, 22701 [2024-06908]

Download as PDF Federal Register / Vol. 89, No. 64 / Tuesday, April 2, 2024 / Notices DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Department of the Navy Intent To Prepare a Draft Environmental Impact Statement for the Proposed River Islands Project, in San Joaquin County, CA; Withdrawal Proposed Collection; Comment Request ACTION: SUPPLEMENTARY INFORMATION: [Docket ID: USN–2024–HQ–0005] U.S. Army Corps of Engineers, DoD. Notice of intent; withdrawal. Department of the Navy (DoN), Department of Defense (DoD). ACTION: 60-Day information collection notice. AGENCY: David R. Hibner, Programs Director. In compliance with the Paperwork Reduction Act of 1995, the Naval Health Research Center announces a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; the accuracy of the agency’s estimate of the burden of the proposed information collection; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology. DATES: Consideration will be given to all comments received by June 3, 2024. ADDRESSES: You may submit comments, identified by docket number and title, by any of the following methods: Federal eRulemaking Portal: https:// www.regulations.gov. Follow the instructions for submitting comments. Mail: Department of Defense, Office of the Assistant to the Secretary of Defense for Privacy, Civil Liberties, and Transparency, 4800 Mark Center Drive, Mailbox #24, Suite 08D09, Alexandria, VA 22350–1700. Instructions: All submissions received must include the agency name, docket number and title for this Federal Register document. The general policy for comments and other submissions from members of the public is to make these submissions available for public viewing on the internet at https:// www.regulations.gov as they are received without change, including any personal identifiers or contact information. [FR Doc. 2024–06908 Filed 4–1–24; 8:45 am] FOR FURTHER INFORMATION CONTACT: SUMMARY: The U.S. Army Corps of Engineers, Sacramento District (Corps) is withdrawing its notice of intent (NOI) to prepare an environmental impact statement (EIS) for the River Islands Project in San Joaquin County, California. SUMMARY: The notice of intent to prepare an EIS published in the Federal Register on June 10, 2005 (70 FR 33885), is withdrawn as of April 2, 2024. DATES: U.S. Army Corps of Engineers, Sacramento District, Regulatory Division (CESPK–RD), 1325 J Street, Sacramento, CA 95814–2992. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Questions concerning this notice should be directed to Regional Regulatory Permit Specialist, Leah M. Fisher, at (916) 557–6639 or leah.m.fisher@ usace.army.mil. Please refer to identification number SPK–1995–00412. An NOI to prepare an EIS for the Arboretum Project was published in the Federal Register on June 10, 2005 (70 FR 33885). The proposed project required Department of the Army authorization under section 404 of the Clean Water Act. Since publication of the NOI, the applicant has revised their proposed action to avoid all impacts to waters of the United States. As a result, the Corps has determined no Department of the Army permit is required. As such, the Corps is terminating the EIS process, in accordance with Corps regulations at 33 CFR part 230, appendix C(2) and 33 CFR part 325, appendix B(8)(g). SUPPLEMENTARY INFORMATION: khammond on DSKJM1Z7X2PROD with NOTICES Washington, DC 20350–2000, ATTN: Ms. Jaylin Jones, or call 703–614–7585. DEPARTMENT OF DEFENSE AGENCY: BILLING CODE 3720–58–P VerDate Sep<11>2014 17:06 Apr 01, 2024 Jkt 262001 To request more information on this proposed information collection or to obtain a copy of the proposal and associated collection instruments, please write to OPNAV Forms/ Information Collections Office (DNS– 14), 2000 Navy Pentagon, Room 4E563, PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 22701 Title; Associated Form; and OMB Number: Male Survivors of Sexual Assault—Investigating Challenges Around Seeking Help; OMB Control Number 0703–MSIC. Needs and Uses: Given the devastating effects of Military Sexual Trauma (MST) and limited information on male MST specifically, the U.S. Congress specified a requirement to improve the prevention of and response to sexual trauma affecting male service members in the National Defense Authorization Act for Fiscal Year 2016 (Pub. L. 114–92). Furthermore, the Department of Defense (DoD) developed a formalized plan of action to improve prevention and response efforts for male MST. Despite these efforts and consistent with prior research, DoD reports found that active duty men are substantially less likely to report MST relative to active duty women counterparts. As part of the DoD-wide effort to promote help-seeking for sexual assault survivors, the DoN Office of Force Resiliency (OFR) developed and recently updated the Prevention Plan of Action (aka Prevention Plan of Action 2.0, 2022–2024; PPoA 2.0). The PPoA 2.0 is a strategy framework leveraging public health science in military environments to prevent sexual assault in the military and improve response efforts. As part of this initiative, OFR commissioned this study (Agreement #NMR–24–11717) to investigate the help-seeking among men who experienced military sexual violence (i.e., sexual assault or sexual harassment). The present study addresses this requirement by conducting interviews with men who have experienced military sexual violence. Affected Public: Individuals or households. Annual Burden Hours: 23. Number of Respondents: 20. Responses per Respondent: 1. Annual Responses: 20. Average Burden per Response: 70 minutes. Frequency: Once. Dated: March 26, 2024. Aaron T. Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2024–06916 Filed 4–1–24; 8:45 am] BILLING CODE 6001–FR–P E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 89, Number 64 (Tuesday, April 2, 2024)]
[Notices]
[Page 22701]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-06908]



[[Page 22701]]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Intent To Prepare a Draft Environmental Impact Statement for the 
Proposed River Islands Project, in San Joaquin County, CA; Withdrawal

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice of intent; withdrawal.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers, Sacramento District (Corps) 
is withdrawing its notice of intent (NOI) to prepare an environmental 
impact statement (EIS) for the River Islands Project in San Joaquin 
County, California.

DATES: The notice of intent to prepare an EIS published in the Federal 
Register on June 10, 2005 (70 FR 33885), is withdrawn as of April 2, 
2024.

ADDRESSES: U.S. Army Corps of Engineers, Sacramento District, 
Regulatory Division (CESPK-RD), 1325 J Street, Sacramento, CA 95814-
2992.

FOR FURTHER INFORMATION CONTACT: Questions concerning this notice 
should be directed to Regional Regulatory Permit Specialist, Leah M. 
Fisher, at (916) 557-6639 or [email protected]. Please refer 
to identification number SPK-1995-00412.

SUPPLEMENTARY INFORMATION: An NOI to prepare an EIS for the Arboretum 
Project was published in the Federal Register on June 10, 2005 (70 FR 
33885). The proposed project required Department of the Army 
authorization under section 404 of the Clean Water Act. Since 
publication of the NOI, the applicant has revised their proposed action 
to avoid all impacts to waters of the United States. As a result, the 
Corps has determined no Department of the Army permit is required. As 
such, the Corps is terminating the EIS process, in accordance with 
Corps regulations at 33 CFR part 230, appendix C(2) and 33 CFR part 
325, appendix B(8)(g).

David R. Hibner,
Programs Director.
[FR Doc. 2024-06908 Filed 4-1-24; 8:45 am]
BILLING CODE 3720-58-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.