McCallum Enterprises I, Limited Partnership and Shelton Canal Company; Notice Rejecting Application, Waiving Regulations, and Soliciting Applications, 22711-22712 [2024-06871]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 89, No. 64 / Tuesday, April 2, 2024 / Notices
Docket Numbers: ER24–1620–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2024–03–26_SA 743 ATC–WPSC 3rd
Rev. G–TIA to be effective 3/19/2024.
Filed Date: 3/26/24.
Accession Number: 20240326–5104.
Comment Date: 5 p.m. ET 4/16/24.
Docket Numbers: ER24–1621–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to CTOA re: FE Service Co.
TO CTOA Signature Date to be effective
5/26/2024.
Filed Date: 3/26/24.
Accession Number: 20240326–5107.
Comment Date: 5 p.m. ET 4/16/24.
Docket Numbers: ER24–1622–000.
Applicants: Michigan Electric
Transmission Company, LLC.
Description: § 205(d) Rate Filing:
Filing of a Contribution in Aid of
Construction Agreement to be effective
5/26/2024.
Filed Date: 3/26/24.
Accession Number: 20240326–5169.
Comment Date: 5 p.m. ET 4/16/24.
Docket Numbers: ER24–1623–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, SA No. 5591;
Queue No. AE2–054 (amend) to be
effective 5/26/2024.
Filed Date: 3/26/24.
Accession Number: 20240326–5186.
Comment Date: 5 p.m. ET 4/16/24.
Docket Numbers: ER24–1624–000.
Applicants: Sayreville Power, LLC.
Description: Tariff Amendment:
Notice of Cancellation, Informational
Filing, and Req. for Limited Tariff
Waiver to be effective 12/31/9998.
Filed Date: 3/26/24.
Accession Number: 20240326–5197.
Comment Date: 5 p.m. ET 4/16/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
VerDate Sep<11>2014
17:06 Apr 01, 2024
Jkt 262001
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: March 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06876 Filed 4–1–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6066–041]
McCallum Enterprises I, Limited
Partnership and Shelton Canal
Company; Notice Rejecting
Application, Waiving Regulations, and
Soliciting Applications
On March 1, 2024, McCallum
Enterprises I, Limited Partnership and
Shelton Canal Company (McCallum and
Shelton), co-licensees for the Derby Dam
Hydroelectric Project No. 6066 (project),
filed an application for a new license for
the project pursuant to section 15(c)(1)
of the Federal Power Act (FPA). The
license application was untimely filed
and is hereby rejected.1
The project is located on the
Housatonic River in Fairfield and New
Haven Counties, Connecticut. The
project consists of: (a) a 23.7-foot-high,
675-foot-long dam made of concrete
capped cut stone with flashboards of
varying heights, ranging from 1.8-foothigh to 2.2-foot-high, and a crest
elevation of 25.2 feet National Geodetic
Vertical Datum of 1988 (NGVD 88); (b)
1 Eveready Machinery Company, Inc. was issued
a major license for the project on March 25, 1986,
for a term of 40 years, effective the first day of the
month in which the order was issued. See Eveready
Machinery Company, Inc., 34 FERC ¶ 62,578 (1986).
Therefore, the license would expire on February 28,
2026, and the statutory deadline for filing a new
license application was February 29, 2024. See FPA
§ 15(c)(1), 16 U.S.C. 808(c)(1). The Commission
received the application via the internet at 12:09
a.m. Eastern Time on March 1, 2024.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
22711
a 400-foot-long earth dike with a
maximum height of 10 feet, located at
the east abutment and oriented in a
northwest-southwest direction; (c) a
reservoir (Lake Housatonic) with a
normal maximum water surface
elevation of 25.2 feet NGVD 88 and a
usable storage capacity of 500 acre-feet;
(d) a gatehouse (Derby gatehouse) and
2,135 foot-long, 40-foot-wide canal
paralleling the east bank of the river; (e)
a gatehouse (Shelton gatehouse) and
130-foot-long, 94-foot-wide headrace
channel extending downstream from the
dam; (f) a navigation lock located at the
west abutment, which constitutes the
first 70 feet of the Shelton canal; (g) a
powerhouse (Shelton powerhouse) at
the west abutment, in the existing
Shelton canal and lock structure, and
located approximately 130 feet
downstream of the Shelton gatehouse,
containing two horizontal A–C tube
Kaplan turbines with two direct drive
generators with a total rated capacity of
7.8 megawatts and a rated flow of 4,600
cubic feet per second; (h) a 775-footlong, 13.8 kilovolt underwater
transmission line tying into the existing
United Illuminating Company system;
and (i) appurtenant facilities.
As a result of the rejection of
McCallum and Shelton’s application
and pursuant to section 16.25 of the
Commission’s regulations, the
Commission is soliciting license
applications from potential applicants.
This solicitation is necessary because
the deadline for filing an application for
a new license and any competing
license applications, pursuant to section
16.9 of the Commission’s regulations,
was February 29, 2024, and no other
license applications for this project were
filed. With this notice, we are waiving
those parts of section 16.24(a) and
16.25(a) which bar an existing licensee
that missed the two-year application
filing deadline from filing another
application. Further, because McCallum
and Shelton completed the consultation
requirements pursuant to Part 4 of the
Commission’s regulations, we are
waiving the consultation requirements
in section 16.8 for the existing licensees.
Consequently, McCallum and Shelton
will be allowed to refile a license
application and compete for the license,
and the incumbent preference
established by the FPA section 15(a)(2)
will apply.2
The licensees are required to make
available certain information described
in section 16.7 of the regulations. For
2 See Pacific Gas and Electric Co., 98 FERC
¶ 61,032 (2002), reh’g denied, 99 FERC ¶ 61,045
(2002), aff’d, City of Fremont v. FERC, 336 F.3d 910
(9th Cir. 2003).
E:\FR\FM\02APN1.SGM
02APN1
22712
Federal Register / Vol. 89, No. 64 / Tuesday, April 2, 2024 / Notices
more information from the licensees,
please contact Mr. Joseph W. Szarmach
Jr., Managing Partner, McCallum
Enterprises I Limited Partnership, 2874
Main Street, Stratford, Connecticut
06614, (203) 386–1745.
Pursuant to section 16.25(b), a
potential applicant that files a notice of
intent within 90 days from the date of
this notice: (1) may apply for a license
under Part I of the FPA and Part 4
(except section 4.38) of the
Commission’s regulations within 18
months of the date on which it files its
notice; and (2) must comply with
sections 16.8 and 16.10 of the
Commission’s regulations.
Questions concerning this notice
should be directed to Brandi WelchAcosta, (202) 502–8964 or
Brandi.Welch-Acosta@ferc.gov.
Dated: March 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06871 Filed 4–1–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6115–016]
khammond on DSKJM1Z7X2PROD with NOTICES
Pyrites Hydro, LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a new license to
continue to operate and maintain the
Pyrites Hydroelectric Project No. 6115
(project). The project is located on the
Grass River in St. Lawrence County,
New York. Commission staff has
prepared an Environmental Assessment
(EA) for the project.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
VerDate Sep<11>2014
17:06 Apr 01, 2024
Jkt 262001
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or at
(866) 208–3676 (toll-free), or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/FERC
Online.aspx to be notified via email of
new filings and issuances related to this
or other pending projects. For
assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/FERC
Online.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://ferconline.
ferc.gov/QuickComment.aspx. You must
include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include docket number P–6115–016.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595, or OPP@
ferc.gov.
For further information, contact
Joshua Dub at 202–502–8138 or
Joshua.Dub@ferc.gov.
Dated: March 27, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06952 Filed 4–1–24; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–149–000.
Applicants: SBESS TX 5, LLC.
Description: SBESS TX 5, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 3/27/24.
Accession Number: 20240327–5053.
Comment Date: 5 p.m. ET 4/17/24.
Docket Numbers: EG24–150–000.
Applicants: SBESS TX 6, LLC.
Description: SBESS TX 6, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 3/27/24.
Accession Number: 20240327–5054.
Comment Date: 5 p.m. ET 4/17/24.
Docket Numbers: EG24–151–000.
Applicants: SBESS TX 7, LLC.
Description: SBESS TX 7, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 3/27/24.
Accession Number: 20240327–5056.
Comment Date: 5 p.m. ET 4/17/24.
Docket Numbers: EG24–152–000.
Applicants: Cottonwood Bayou Solar,
LLC.
Description: Cottonwood Bayou Solar,
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 3/27/24.
Accession Number: 20240327–5058.
Comment Date: 5 p.m. ET 4/17/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–2022–002.
Applicants: Pacific Gas and Electric
Company.
Description: Compliance filing:
Compliance Filing Appendix G
(Wireless Carriers) ER22–2022 (WDT SA
275) to be effective 7/12/2022.
Filed Date: 3/27/24.
Accession Number: 20240327–5080.
Comment Date: 5 p.m. ET 4/17/24.
Docket Numbers: ER23–1928–001.
Applicants: Appaloosa Solar I, LLC.
Description: Notice of Non-Material
Change in Status of Appaloosa Solar I,
LLC.
Filed Date: 3/27/24.
Accession Number: 20240327–5292.
Comment Date: 5 p.m. ET 4/17/24.
Docket Numbers: ER24–784–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 89, Number 64 (Tuesday, April 2, 2024)]
[Notices]
[Pages 22711-22712]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-06871]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6066-041]
McCallum Enterprises I, Limited Partnership and Shelton Canal
Company; Notice Rejecting Application, Waiving Regulations, and
Soliciting Applications
On March 1, 2024, McCallum Enterprises I, Limited Partnership and
Shelton Canal Company (McCallum and Shelton), co-licensees for the
Derby Dam Hydroelectric Project No. 6066 (project), filed an
application for a new license for the project pursuant to section
15(c)(1) of the Federal Power Act (FPA). The license application was
untimely filed and is hereby rejected.\1\
---------------------------------------------------------------------------
\1\ Eveready Machinery Company, Inc. was issued a major license
for the project on March 25, 1986, for a term of 40 years, effective
the first day of the month in which the order was issued. See
Eveready Machinery Company, Inc., 34 FERC ] 62,578 (1986).
Therefore, the license would expire on February 28, 2026, and the
statutory deadline for filing a new license application was February
29, 2024. See FPA Sec. 15(c)(1), 16 U.S.C. 808(c)(1). The
Commission received the application via the internet at 12:09 a.m.
Eastern Time on March 1, 2024.
---------------------------------------------------------------------------
The project is located on the Housatonic River in Fairfield and New
Haven Counties, Connecticut. The project consists of: (a) a 23.7-foot-
high, 675-foot-long dam made of concrete capped cut stone with
flashboards of varying heights, ranging from 1.8-foot-high to 2.2-foot-
high, and a crest elevation of 25.2 feet National Geodetic Vertical
Datum of 1988 (NGVD 88); (b) a 400-foot-long earth dike with a maximum
height of 10 feet, located at the east abutment and oriented in a
northwest-southwest direction; (c) a reservoir (Lake Housatonic) with a
normal maximum water surface elevation of 25.2 feet NGVD 88 and a
usable storage capacity of 500 acre-feet; (d) a gatehouse (Derby
gatehouse) and 2,135 foot-long, 40-foot-wide canal paralleling the east
bank of the river; (e) a gatehouse (Shelton gatehouse) and 130-foot-
long, 94-foot-wide headrace channel extending downstream from the dam;
(f) a navigation lock located at the west abutment, which constitutes
the first 70 feet of the Shelton canal; (g) a powerhouse (Shelton
powerhouse) at the west abutment, in the existing Shelton canal and
lock structure, and located approximately 130 feet downstream of the
Shelton gatehouse, containing two horizontal A-C tube Kaplan turbines
with two direct drive generators with a total rated capacity of 7.8
megawatts and a rated flow of 4,600 cubic feet per second; (h) a 775-
foot-long, 13.8 kilovolt underwater transmission line tying into the
existing United Illuminating Company system; and (i) appurtenant
facilities.
As a result of the rejection of McCallum and Shelton's application
and pursuant to section 16.25 of the Commission's regulations, the
Commission is soliciting license applications from potential
applicants. This solicitation is necessary because the deadline for
filing an application for a new license and any competing license
applications, pursuant to section 16.9 of the Commission's regulations,
was February 29, 2024, and no other license applications for this
project were filed. With this notice, we are waiving those parts of
section 16.24(a) and 16.25(a) which bar an existing licensee that
missed the two-year application filing deadline from filing another
application. Further, because McCallum and Shelton completed the
consultation requirements pursuant to Part 4 of the Commission's
regulations, we are waiving the consultation requirements in section
16.8 for the existing licensees. Consequently, McCallum and Shelton
will be allowed to refile a license application and compete for the
license, and the incumbent preference established by the FPA section
15(a)(2) will apply.\2\
---------------------------------------------------------------------------
\2\ See Pacific Gas and Electric Co., 98 FERC ] 61,032 (2002),
reh'g denied, 99 FERC ] 61,045 (2002), aff'd, City of Fremont v.
FERC, 336 F.3d 910 (9th Cir. 2003).
---------------------------------------------------------------------------
The licensees are required to make available certain information
described in section 16.7 of the regulations. For
[[Page 22712]]
more information from the licensees, please contact Mr. Joseph W.
Szarmach Jr., Managing Partner, McCallum Enterprises I Limited
Partnership, 2874 Main Street, Stratford, Connecticut 06614, (203) 386-
1745.
Pursuant to section 16.25(b), a potential applicant that files a
notice of intent within 90 days from the date of this notice: (1) may
apply for a license under Part I of the FPA and Part 4 (except section
4.38) of the Commission's regulations within 18 months of the date on
which it files its notice; and (2) must comply with sections 16.8 and
16.10 of the Commission's regulations.
Questions concerning this notice should be directed to Brandi
Welch-Acosta, (202) 502-8964 or [email protected].
Dated: March 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-06871 Filed 4-1-24; 8:45 am]