McCallum Enterprises I, Limited Partnership and Shelton Canal Company; Notice Rejecting Application, Waiving Regulations, and Soliciting Applications, 22711-22712 [2024-06871]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 89, No. 64 / Tuesday, April 2, 2024 / Notices Docket Numbers: ER24–1620–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2024–03–26_SA 743 ATC–WPSC 3rd Rev. G–TIA to be effective 3/19/2024. Filed Date: 3/26/24. Accession Number: 20240326–5104. Comment Date: 5 p.m. ET 4/16/24. Docket Numbers: ER24–1621–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to CTOA re: FE Service Co. TO CTOA Signature Date to be effective 5/26/2024. Filed Date: 3/26/24. Accession Number: 20240326–5107. Comment Date: 5 p.m. ET 4/16/24. Docket Numbers: ER24–1622–000. Applicants: Michigan Electric Transmission Company, LLC. Description: § 205(d) Rate Filing: Filing of a Contribution in Aid of Construction Agreement to be effective 5/26/2024. Filed Date: 3/26/24. Accession Number: 20240326–5169. Comment Date: 5 p.m. ET 4/16/24. Docket Numbers: ER24–1623–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, SA No. 5591; Queue No. AE2–054 (amend) to be effective 5/26/2024. Filed Date: 3/26/24. Accession Number: 20240326–5186. Comment Date: 5 p.m. ET 4/16/24. Docket Numbers: ER24–1624–000. Applicants: Sayreville Power, LLC. Description: Tariff Amendment: Notice of Cancellation, Informational Filing, and Req. for Limited Tariff Waiver to be effective 12/31/9998. Filed Date: 3/26/24. Accession Number: 20240326–5197. Comment Date: 5 p.m. ET 4/16/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings VerDate Sep<11>2014 17:06 Apr 01, 2024 Jkt 262001 can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: March 26, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–06876 Filed 4–1–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6066–041] McCallum Enterprises I, Limited Partnership and Shelton Canal Company; Notice Rejecting Application, Waiving Regulations, and Soliciting Applications On March 1, 2024, McCallum Enterprises I, Limited Partnership and Shelton Canal Company (McCallum and Shelton), co-licensees for the Derby Dam Hydroelectric Project No. 6066 (project), filed an application for a new license for the project pursuant to section 15(c)(1) of the Federal Power Act (FPA). The license application was untimely filed and is hereby rejected.1 The project is located on the Housatonic River in Fairfield and New Haven Counties, Connecticut. The project consists of: (a) a 23.7-foot-high, 675-foot-long dam made of concrete capped cut stone with flashboards of varying heights, ranging from 1.8-foothigh to 2.2-foot-high, and a crest elevation of 25.2 feet National Geodetic Vertical Datum of 1988 (NGVD 88); (b) 1 Eveready Machinery Company, Inc. was issued a major license for the project on March 25, 1986, for a term of 40 years, effective the first day of the month in which the order was issued. See Eveready Machinery Company, Inc., 34 FERC ¶ 62,578 (1986). Therefore, the license would expire on February 28, 2026, and the statutory deadline for filing a new license application was February 29, 2024. See FPA § 15(c)(1), 16 U.S.C. 808(c)(1). The Commission received the application via the internet at 12:09 a.m. Eastern Time on March 1, 2024. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 22711 a 400-foot-long earth dike with a maximum height of 10 feet, located at the east abutment and oriented in a northwest-southwest direction; (c) a reservoir (Lake Housatonic) with a normal maximum water surface elevation of 25.2 feet NGVD 88 and a usable storage capacity of 500 acre-feet; (d) a gatehouse (Derby gatehouse) and 2,135 foot-long, 40-foot-wide canal paralleling the east bank of the river; (e) a gatehouse (Shelton gatehouse) and 130-foot-long, 94-foot-wide headrace channel extending downstream from the dam; (f) a navigation lock located at the west abutment, which constitutes the first 70 feet of the Shelton canal; (g) a powerhouse (Shelton powerhouse) at the west abutment, in the existing Shelton canal and lock structure, and located approximately 130 feet downstream of the Shelton gatehouse, containing two horizontal A–C tube Kaplan turbines with two direct drive generators with a total rated capacity of 7.8 megawatts and a rated flow of 4,600 cubic feet per second; (h) a 775-footlong, 13.8 kilovolt underwater transmission line tying into the existing United Illuminating Company system; and (i) appurtenant facilities. As a result of the rejection of McCallum and Shelton’s application and pursuant to section 16.25 of the Commission’s regulations, the Commission is soliciting license applications from potential applicants. This solicitation is necessary because the deadline for filing an application for a new license and any competing license applications, pursuant to section 16.9 of the Commission’s regulations, was February 29, 2024, and no other license applications for this project were filed. With this notice, we are waiving those parts of section 16.24(a) and 16.25(a) which bar an existing licensee that missed the two-year application filing deadline from filing another application. Further, because McCallum and Shelton completed the consultation requirements pursuant to Part 4 of the Commission’s regulations, we are waiving the consultation requirements in section 16.8 for the existing licensees. Consequently, McCallum and Shelton will be allowed to refile a license application and compete for the license, and the incumbent preference established by the FPA section 15(a)(2) will apply.2 The licensees are required to make available certain information described in section 16.7 of the regulations. For 2 See Pacific Gas and Electric Co., 98 FERC ¶ 61,032 (2002), reh’g denied, 99 FERC ¶ 61,045 (2002), aff’d, City of Fremont v. FERC, 336 F.3d 910 (9th Cir. 2003). E:\FR\FM\02APN1.SGM 02APN1 22712 Federal Register / Vol. 89, No. 64 / Tuesday, April 2, 2024 / Notices more information from the licensees, please contact Mr. Joseph W. Szarmach Jr., Managing Partner, McCallum Enterprises I Limited Partnership, 2874 Main Street, Stratford, Connecticut 06614, (203) 386–1745. Pursuant to section 16.25(b), a potential applicant that files a notice of intent within 90 days from the date of this notice: (1) may apply for a license under Part I of the FPA and Part 4 (except section 4.38) of the Commission’s regulations within 18 months of the date on which it files its notice; and (2) must comply with sections 16.8 and 16.10 of the Commission’s regulations. Questions concerning this notice should be directed to Brandi WelchAcosta, (202) 502–8964 or Brandi.Welch-Acosta@ferc.gov. Dated: March 26, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–06871 Filed 4–1–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6115–016] khammond on DSKJM1Z7X2PROD with NOTICES Pyrites Hydro, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license to continue to operate and maintain the Pyrites Hydroelectric Project No. 6115 (project). The project is located on the Grass River in St. Lawrence County, New York. Commission staff has prepared an Environmental Assessment (EA) for the project. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the EA via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the VerDate Sep<11>2014 17:06 Apr 01, 2024 Jkt 262001 document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or at (866) 208–3676 (toll-free), or (202) 502– 8659 (TTY). You may also register online at https://ferconline.ferc.gov/FERC Online.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 45 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/FERC Online.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline. ferc.gov/QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–6115–016. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595, or OPP@ ferc.gov. For further information, contact Joshua Dub at 202–502–8138 or Joshua.Dub@ferc.gov. Dated: March 27, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–06952 Filed 4–1–24; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG24–149–000. Applicants: SBESS TX 5, LLC. Description: SBESS TX 5, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/27/24. Accession Number: 20240327–5053. Comment Date: 5 p.m. ET 4/17/24. Docket Numbers: EG24–150–000. Applicants: SBESS TX 6, LLC. Description: SBESS TX 6, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/27/24. Accession Number: 20240327–5054. Comment Date: 5 p.m. ET 4/17/24. Docket Numbers: EG24–151–000. Applicants: SBESS TX 7, LLC. Description: SBESS TX 7, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/27/24. Accession Number: 20240327–5056. Comment Date: 5 p.m. ET 4/17/24. Docket Numbers: EG24–152–000. Applicants: Cottonwood Bayou Solar, LLC. Description: Cottonwood Bayou Solar, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/27/24. Accession Number: 20240327–5058. Comment Date: 5 p.m. ET 4/17/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2022–002. Applicants: Pacific Gas and Electric Company. Description: Compliance filing: Compliance Filing Appendix G (Wireless Carriers) ER22–2022 (WDT SA 275) to be effective 7/12/2022. Filed Date: 3/27/24. Accession Number: 20240327–5080. Comment Date: 5 p.m. ET 4/17/24. Docket Numbers: ER23–1928–001. Applicants: Appaloosa Solar I, LLC. Description: Notice of Non-Material Change in Status of Appaloosa Solar I, LLC. Filed Date: 3/27/24. Accession Number: 20240327–5292. Comment Date: 5 p.m. ET 4/17/24. Docket Numbers: ER24–784–001. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 89, Number 64 (Tuesday, April 2, 2024)]
[Notices]
[Pages 22711-22712]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-06871]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6066-041]


McCallum Enterprises I, Limited Partnership and Shelton Canal 
Company; Notice Rejecting Application, Waiving Regulations, and 
Soliciting Applications

    On March 1, 2024, McCallum Enterprises I, Limited Partnership and 
Shelton Canal Company (McCallum and Shelton), co-licensees for the 
Derby Dam Hydroelectric Project No. 6066 (project), filed an 
application for a new license for the project pursuant to section 
15(c)(1) of the Federal Power Act (FPA). The license application was 
untimely filed and is hereby rejected.\1\
---------------------------------------------------------------------------

    \1\ Eveready Machinery Company, Inc. was issued a major license 
for the project on March 25, 1986, for a term of 40 years, effective 
the first day of the month in which the order was issued. See 
Eveready Machinery Company, Inc., 34 FERC ] 62,578 (1986). 
Therefore, the license would expire on February 28, 2026, and the 
statutory deadline for filing a new license application was February 
29, 2024. See FPA Sec.  15(c)(1), 16 U.S.C. 808(c)(1). The 
Commission received the application via the internet at 12:09 a.m. 
Eastern Time on March 1, 2024.
---------------------------------------------------------------------------

    The project is located on the Housatonic River in Fairfield and New 
Haven Counties, Connecticut. The project consists of: (a) a 23.7-foot-
high, 675-foot-long dam made of concrete capped cut stone with 
flashboards of varying heights, ranging from 1.8-foot-high to 2.2-foot-
high, and a crest elevation of 25.2 feet National Geodetic Vertical 
Datum of 1988 (NGVD 88); (b) a 400-foot-long earth dike with a maximum 
height of 10 feet, located at the east abutment and oriented in a 
northwest-southwest direction; (c) a reservoir (Lake Housatonic) with a 
normal maximum water surface elevation of 25.2 feet NGVD 88 and a 
usable storage capacity of 500 acre-feet; (d) a gatehouse (Derby 
gatehouse) and 2,135 foot-long, 40-foot-wide canal paralleling the east 
bank of the river; (e) a gatehouse (Shelton gatehouse) and 130-foot-
long, 94-foot-wide headrace channel extending downstream from the dam; 
(f) a navigation lock located at the west abutment, which constitutes 
the first 70 feet of the Shelton canal; (g) a powerhouse (Shelton 
powerhouse) at the west abutment, in the existing Shelton canal and 
lock structure, and located approximately 130 feet downstream of the 
Shelton gatehouse, containing two horizontal A-C tube Kaplan turbines 
with two direct drive generators with a total rated capacity of 7.8 
megawatts and a rated flow of 4,600 cubic feet per second; (h) a 775-
foot-long, 13.8 kilovolt underwater transmission line tying into the 
existing United Illuminating Company system; and (i) appurtenant 
facilities.
    As a result of the rejection of McCallum and Shelton's application 
and pursuant to section 16.25 of the Commission's regulations, the 
Commission is soliciting license applications from potential 
applicants. This solicitation is necessary because the deadline for 
filing an application for a new license and any competing license 
applications, pursuant to section 16.9 of the Commission's regulations, 
was February 29, 2024, and no other license applications for this 
project were filed. With this notice, we are waiving those parts of 
section 16.24(a) and 16.25(a) which bar an existing licensee that 
missed the two-year application filing deadline from filing another 
application. Further, because McCallum and Shelton completed the 
consultation requirements pursuant to Part 4 of the Commission's 
regulations, we are waiving the consultation requirements in section 
16.8 for the existing licensees. Consequently, McCallum and Shelton 
will be allowed to refile a license application and compete for the 
license, and the incumbent preference established by the FPA section 
15(a)(2) will apply.\2\
---------------------------------------------------------------------------

    \2\ See Pacific Gas and Electric Co., 98 FERC ] 61,032 (2002), 
reh'g denied, 99 FERC ] 61,045 (2002), aff'd, City of Fremont v. 
FERC, 336 F.3d 910 (9th Cir. 2003).
---------------------------------------------------------------------------

    The licensees are required to make available certain information 
described in section 16.7 of the regulations. For

[[Page 22712]]

more information from the licensees, please contact Mr. Joseph W. 
Szarmach Jr., Managing Partner, McCallum Enterprises I Limited 
Partnership, 2874 Main Street, Stratford, Connecticut 06614, (203) 386-
1745.
    Pursuant to section 16.25(b), a potential applicant that files a 
notice of intent within 90 days from the date of this notice: (1) may 
apply for a license under Part I of the FPA and Part 4 (except section 
4.38) of the Commission's regulations within 18 months of the date on 
which it files its notice; and (2) must comply with sections 16.8 and 
16.10 of the Commission's regulations.
    Questions concerning this notice should be directed to Brandi 
Welch-Acosta, (202) 502-8964 or [email protected].

    Dated: March 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-06871 Filed 4-1-24; 8:45 am]