Fall River Rural Electric Cooperative, Inc.; Notice of Scoping Meetings and Soliciting Scoping Comments, 21513-21514 [2024-06642]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 61 / Thursday, March 28, 2024 / Notices
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Dated: March 21, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Filings in Existing Proceedings
[Project No. 5089–027]
Docket Numbers: PR24–48–001.
Applicants: Wisconsin Power and
Light Company.
Description: § 284.123(g) Rate Filing:
Amendment in Docket No. PR24–48 to
be effective 2/4/2022.
Filed Date: 3/20/24.
Accession Number: 20240320–5174.
Comment Date: 5 p.m. ET 4/3/24.
Docket Numbers: RP24–333–001.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Compliance filing:
Petition for Approval of Settlement in
Docket Nos. RP24–333 and RP19–351 to
be effective N/A.
Filed Date: 3/20/24.
Accession Number: 20240320–5133.
Comment Date: 5 p.m. ET 4/1/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Fall River Rural Electric Cooperative,
Inc.; Notice of Scoping Meetings and
Soliciting Scoping Comments
VerDate Sep<11>2014
20:27 Mar 27, 2024
Jkt 262001
[FR Doc. 2024–06564 Filed 3–27–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 5089–027.
c. Date filed: August 31, 2021.
d. Applicant: Fall River Rural Electric
Cooperative, Inc.
e. Name of Project: Felt Hydroelectric
Project (Felt Project or project).
f. Location: On the Teton River, near
the town of Tetonia, in Teton County,
Idaho. The project occupies 114.4 acres
of federal land administered by the
Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nicholas Josten,
2742 Saint Charles Ave., Idaho Falls,
Idaho 83404; (208) 528–6152.
i. FERC Contact: John Matkowski at
(202) 502–8576; or email at
john.matkowski@ferc.gov.
j. Deadline for filing scoping
comments: May 21, 2024.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy via U.S. Postal Service to: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Room 1A,
Washington, DC 20426. Submissions
sent via any other carrier must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
21513
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. All
filings must clearly identify the project
name and docket number on the first
page: Felt Hydroelectric Project (P–
5089–027).
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. The Felt Project includes: (1) a
122.5-foot-long, 12-foot-high concrete
dam that includes the following
sections: (a) 25-foot-long sluiceway
section with a 4-foot-wide fish ladder
and a 14-foot-wide corrugated steel
radial gate and (b) a 96-foot-long
uncontrolled overflow spillway with a
crest elevation of 5,530-feet mean sea
level (msl); (2) a 7-acre impoundment
with a storage capacity of 28 acre-feet at
a normal water surface elevation of
5,530-feet msl; (3) a 178-foot-long, 8.5foot-deep fish screen structure equipped
with a bar rack with 3/8-inch clear bar
spacing and diamond mesh screen; (4)
three intake openings located behind
the fish screen each equipped with 10foot-wide intake gates and 10-foot-wide
trash racks with 3-inch clear bar
spacing; (5) three, 8-foot-square unlined
rock tunnels connecting the intakes to
penstocks and consisting of: (a) a 179foot-long Tunnel No. 1 connecting to a
280-foot-long, 78-inch-diameter steel
penstock that bifurcates into two, 180foot-long, 60-inch-diameter steel
penstocks that connect to Powerhouse
No. 1; and (b) a 177-foot-long Tunnel
No. 2 and a 196-foot-long Tunnel No. 3
each connecting to a 1,750-foot-long, 96inch-diameter steel penstock that
connects to Powerhouse No. 2; (6) an
83-foot-long, 26-foot-wide, 13-foot-high
reinforced concrete Powerhouse No. 1
containing two horizontal Francis
turbine-generator units with a combined
generating capacity of 1,950 kilowatts
(kW); (7) a 36-foot-long, 36-foot-wide,
25-foot-high reinforced concrete
Powerhouse No. 2 containing two
vertical Francis turbine-generator units
with a combined generating capacity of
5,500 kW; (8) two tailrace channels
discharging to the Teton River from
Powerhouses No. 1 and No. 2; (9) a
1,500-foot-long, 4.16 kilovolt (kV)
overhead transmission line connecting
Powerhouse No. 1 to a transformer
E:\FR\FM\28MRN1.SGM
28MRN1
ddrumheller on DSK120RN23PROD with NOTICES1
21514
Federal Register / Vol. 89, No. 61 / Thursday, March 28, 2024 / Notices
located next to Powerhouse No. 2; (10)
a 2,000-foot-long, 24.9 kV overhead
transmission line leading from the
transformer to the interconnection
point; and (11) appurtenant facilities.
The project operates in a run-of-river
mode such that outflow from the project
approximates inflow. The project has a
maximum hydraulic capacity of 900
cubic feet per second (cfs) when all four
turbine generator units in Powerhouse
No. 1 (upper powerhouse) and
Powerhouse No. 2 (lower powerhouse)
are operating. The project is required to
discharge a minimum flow into the
1,950-foot-long bypassed reach of 20 cfs
from July 1 to March 14 and 50 cfs from
March 15 to June 30. The project
generates an average of 33,100
megawatt-hours per year.
m. Copies of the application can be
viewed on the Commission’s website at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the project’s
docket number, excluding the last three
digits in the docket number field, to
access the document. For assistance,
contact FERC Online Support.
You may also register at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595, or at
OPP@ferc.gov.
n. Scoping Process:
Pursuant to the National
Environmental Policy Act (NEPA),
Commission staff intends to prepare
either an environmental assessment
(EA) or an environmental impact
statement (EIS) (collectively referred to
as the ‘‘NEPA document’’) that describes
and evaluates the probable effects,
including an assessment of the sitespecific and cumulative effects, if any,
of the proposed action and alternatives.
The Commission’s scoping process will
help determine the required level of
analysis and satisfy the NEPA scoping
requirements, irrespective of whether
the Commission issues an EA or an EIS.
VerDate Sep<11>2014
20:27 Mar 27, 2024
Jkt 262001
Scoping Meetings
Procedures
Commission staff will hold two public
scoping meetings to receive input on the
scope of the NEPA document. An
evening meeting will focus on receiving
input from the public and a daytime
meeting will focus on the concerns of
resource agencies, non-governmental
organizations (NGOs), and Indian
Tribes. We invite all interested agencies,
Indian Tribes, NGOs, and individuals to
attend one or both meetings. The times
and locations of these meetings are as
follows:
The meetings are recorded by a
stenographer and become part of the
formal record of the Commission
proceeding on the project. Individuals,
NGOs, Indian Tribes, and agencies with
environmental expertise and concerns
are encouraged to attend the meeting
and to assist the staff in defining and
clarifying the issues to be addressed in
the NEPA document.
Dated: March 22, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
Daytime Scoping Meeting
[FR Doc. 2024–06642 Filed 3–27–24; 8:45 am]
Date: Tuesday, April 23, 2024
Time: 1:00 p.m. MT
Place: AmericInn Lodge
Address: 1098 Golden Beauty Dr,
Rexburg, Idaho 83440
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Evening Scoping Meeting
Date: Tuesday, April 23, 2024
Time: 6:00 p.m. MT
Place: AmericInn Lodge
Address: 1098 Golden Beauty Dr,
Rexburg, Idaho 83440
Copies of the Scoping Document
(SD1) outlining the subject areas to be
addressed in the NEPA document were
distributed to the parties on the
Commission’s mailing list. Copies of the
SD1 will be available at the scoping
meeting or may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link (see item m above).
An environmental site review is
typically held in conjunction with the
scoping meeting. However, access to the
project site is likely to be limited by
winter weather and/or poor vehicular
access conditions when scoping for this
project will occur. For these reasons, an
environmental site review will not be
conducted at this time.
Objectives
At the scoping meetings, Commission
staff will: (1) summarize the
environmental issues tentatively
identified for analysis in the NEPA
document; (2) solicit from the meeting
participants all available information,
especially quantifiable data, on the
resources at issue; (3) encourage
statements from experts and the public
on issues that should be analyzed in the
NEPA document, including viewpoints
in opposition to, or in support of, the
staff’s preliminary views; (4) determine
the resource issues to be addressed in
the NEPA document; and (5) identify
those issues that require a detailed
analysis, as well as those issues that do
not require a detailed analysis.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Combined Notice of Filings # 1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1739–007.
Applicants: Bethel Wind Energy LLC.
Description: Notice of Non-Material
Change in Status of Bethel Wind Energy
LLC.
Filed Date: 3/20/24.
Accession Number: 20240320–5222.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER17–2011–002;
ER22–1703–004.
Applicants: Salem Harbor Power
Development LP, Castleton
Commodities Merchant Trading L.P.
Description: Supplement to July 28,
2023 Notice of Change in Status of
Salem Harbor Power Development LP,
et al.
Filed Date: 3/20/24.
Accession Number: 20240320–5221.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER20–1505–007.
Applicants: Basin Electric Power
Cooperative.
Description: Notice of Change in
Status of Basin Electric Power
Cooperative.
Filed Date: 3/22/24.
Accession Number: 20240322–5214.
Comment Date: 5 p.m. ET 4/12/24.
Docket Numbers: ER24–596–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to Filing, WMPA SA No.
5981; Queue No. AG1–386 to be
effective 2/6/2024.
Filed Date: 3/22/24.
Accession Number: 20240322–5058.
Comment Date: 5 p.m. ET 4/12/24.
Docket Numbers: ER24–761–001.
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 89, Number 61 (Thursday, March 28, 2024)]
[Notices]
[Pages 21513-21514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-06642]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5089-027]
Fall River Rural Electric Cooperative, Inc.; Notice of Scoping
Meetings and Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 5089-027.
c. Date filed: August 31, 2021.
d. Applicant: Fall River Rural Electric Cooperative, Inc.
e. Name of Project: Felt Hydroelectric Project (Felt Project or
project).
f. Location: On the Teton River, near the town of Tetonia, in Teton
County, Idaho. The project occupies 114.4 acres of federal land
administered by the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Nicholas Josten, 2742 Saint Charles Ave.,
Idaho Falls, Idaho 83404; (208) 528-6152.
i. FERC Contact: John Matkowski at (202) 502-8576; or email at
[email protected].
j. Deadline for filing scoping comments: May 21, 2024.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy via
U.S. Postal Service to: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All
filings must clearly identify the project name and docket number on the
first page: Felt Hydroelectric Project (P-5089-027).
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. The Felt Project includes: (1) a 122.5-foot-long, 12-foot-high
concrete dam that includes the following sections: (a) 25-foot-long
sluiceway section with a 4-foot-wide fish ladder and a 14-foot-wide
corrugated steel radial gate and (b) a 96-foot-long uncontrolled
overflow spillway with a crest elevation of 5,530-feet mean sea level
(msl); (2) a 7-acre impoundment with a storage capacity of 28 acre-feet
at a normal water surface elevation of 5,530-feet msl; (3) a 178-foot-
long, 8.5-foot-deep fish screen structure equipped with a bar rack with
3/8-inch clear bar spacing and diamond mesh screen; (4) three intake
openings located behind the fish screen each equipped with 10-foot-wide
intake gates and 10-foot-wide trash racks with 3-inch clear bar
spacing; (5) three, 8-foot-square unlined rock tunnels connecting the
intakes to penstocks and consisting of: (a) a 179-foot-long Tunnel No.
1 connecting to a 280-foot-long, 78-inch-diameter steel penstock that
bifurcates into two, 180-foot-long, 60-inch-diameter steel penstocks
that connect to Powerhouse No. 1; and (b) a 177-foot-long Tunnel No. 2
and a 196-foot-long Tunnel No. 3 each connecting to a 1,750-foot-long,
96-inch-diameter steel penstock that connects to Powerhouse No. 2; (6)
an 83-foot-long, 26-foot-wide, 13-foot-high reinforced concrete
Powerhouse No. 1 containing two horizontal Francis turbine-generator
units with a combined generating capacity of 1,950 kilowatts (kW); (7)
a 36-foot-long, 36-foot-wide, 25-foot-high reinforced concrete
Powerhouse No. 2 containing two vertical Francis turbine-generator
units with a combined generating capacity of 5,500 kW; (8) two tailrace
channels discharging to the Teton River from Powerhouses No. 1 and No.
2; (9) a 1,500-foot-long, 4.16 kilovolt (kV) overhead transmission line
connecting Powerhouse No. 1 to a transformer
[[Page 21514]]
located next to Powerhouse No. 2; (10) a 2,000-foot-long, 24.9 kV
overhead transmission line leading from the transformer to the
interconnection point; and (11) appurtenant facilities.
The project operates in a run-of-river mode such that outflow from
the project approximates inflow. The project has a maximum hydraulic
capacity of 900 cubic feet per second (cfs) when all four turbine
generator units in Powerhouse No. 1 (upper powerhouse) and Powerhouse
No. 2 (lower powerhouse) are operating. The project is required to
discharge a minimum flow into the 1,950-foot-long bypassed reach of 20
cfs from July 1 to March 14 and 50 cfs from March 15 to June 30. The
project generates an average of 33,100 megawatt-hours per year.
m. Copies of the application can be viewed on the Commission's
website at https://www.ferc.gov, using the ``eLibrary'' link. Enter the
project's docket number, excluding the last three digits in the docket
number field, to access the document. For assistance, contact FERC
Online Support.
You may also register at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, please
contact FERC Online Support at [email protected].
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595, or at [email protected].
n. Scoping Process:
Pursuant to the National Environmental Policy Act (NEPA),
Commission staff intends to prepare either an environmental assessment
(EA) or an environmental impact statement (EIS) (collectively referred
to as the ``NEPA document'') that describes and evaluates the probable
effects, including an assessment of the site-specific and cumulative
effects, if any, of the proposed action and alternatives. The
Commission's scoping process will help determine the required level of
analysis and satisfy the NEPA scoping requirements, irrespective of
whether the Commission issues an EA or an EIS.
Scoping Meetings
Commission staff will hold two public scoping meetings to receive
input on the scope of the NEPA document. An evening meeting will focus
on receiving input from the public and a daytime meeting will focus on
the concerns of resource agencies, non-governmental organizations
(NGOs), and Indian Tribes. We invite all interested agencies, Indian
Tribes, NGOs, and individuals to attend one or both meetings. The times
and locations of these meetings are as follows:
Daytime Scoping Meeting
Date: Tuesday, April 23, 2024
Time: 1:00 p.m. MT
Place: AmericInn Lodge
Address: 1098 Golden Beauty Dr, Rexburg, Idaho 83440
Evening Scoping Meeting
Date: Tuesday, April 23, 2024
Time: 6:00 p.m. MT
Place: AmericInn Lodge
Address: 1098 Golden Beauty Dr, Rexburg, Idaho 83440
Copies of the Scoping Document (SD1) outlining the subject areas to
be addressed in the NEPA document were distributed to the parties on
the Commission's mailing list. Copies of the SD1 will be available at
the scoping meeting or may be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link (see item m above).
An environmental site review is typically held in conjunction with
the scoping meeting. However, access to the project site is likely to
be limited by winter weather and/or poor vehicular access conditions
when scoping for this project will occur. For these reasons, an
environmental site review will not be conducted at this time.
Objectives
At the scoping meetings, Commission staff will: (1) summarize the
environmental issues tentatively identified for analysis in the NEPA
document; (2) solicit from the meeting participants all available
information, especially quantifiable data, on the resources at issue;
(3) encourage statements from experts and the public on issues that
should be analyzed in the NEPA document, including viewpoints in
opposition to, or in support of, the staff's preliminary views; (4)
determine the resource issues to be addressed in the NEPA document; and
(5) identify those issues that require a detailed analysis, as well as
those issues that do not require a detailed analysis.
Procedures
The meetings are recorded by a stenographer and become part of the
formal record of the Commission proceeding on the project. Individuals,
NGOs, Indian Tribes, and agencies with environmental expertise and
concerns are encouraged to attend the meeting and to assist the staff
in defining and clarifying the issues to be addressed in the NEPA
document.
Dated: March 22, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-06642 Filed 3-27-24; 8:45 am]