Combined Notice of Filings #1, 20959-20961 [2024-06427]
Download as PDF
Federal Register / Vol. 89, No. 59 / Tuesday, March 26, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
To file via any other courier: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is April 10, 2024.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
6 18
CFR 385.102(d).
7 18 CFR 385.214.
8 18 CFR 157.10.
VerDate Sep<11>2014
18:10 Mar 25, 2024
number CP24–88–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP24–88–000.
To file via USPS: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First
Street NE, Washington, DC 20426
To file via any other courier: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: Blair Lichtenwalter, Senior
Director of Regulatory Affairs, 1300
Main Street, Houston, Texas 77002 or by
email at blair.lichtenwalter@
energytransfer.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Jkt 262001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
20959
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on April 10, 2024.
Dated: March 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06425 Filed 3–25–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–405–003;
ER17–406–003; EL23–51–002.
Applicants: American Municipal
Power, Inc., et al. v. AEP Appalachian
Transmission Company Inc., et al., AEP
Appalachian Transmission Company,
Inc., Appalachian Power Company.
Description: American Power East
Companies submit compliance filing as
directed by the January 18, 2024 Order.
Filed Date: 3/18/24.
Accession Number: 20240318–5279.
Comment Date: 5 p.m. ET 4/8/24.
Docket Numbers: ER24–943–001.
Applicants: Cottontail Solar 5, LLC.
11 18
E:\FR\FM\26MRN1.SGM
CFR 385.214(b)(3) and (d).
26MRN1
ddrumheller on DSK120RN23PROD with NOTICES1
20960
Federal Register / Vol. 89, No. 59 / Tuesday, March 26, 2024 / Notices
Description: Compliance filing:
Revised Rate Schedule FERC No. 1 to be
effective 1/31/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5053.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–978–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2024–03–20_SA 4228 GRE–OTPDiscovery Wind Sub Original GIA
(S1036) to be effective 3/24/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5195.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1030–001.
Applicants: Arizona Public Service
Company.
Description: Tariff Amendment:
Service Agreement No. 406,
Amendment 3 Refile to be effective 3/
30/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5106.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: ER24–1574–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA, SA
No. 6072; Queue No. AF2–293 to be
effective 5/10/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5064.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1575–000.
Applicants: PJM Interconnection,
L.L.C.
Description: 205(d) Rate Filing:
Original NSA SA No. 7198, Queue No.
AF1–130 to be effective 5/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5076.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1576–000.
Applicants: Maple Flats Solar Energy
Center LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate
Authorization to be effective 3/21/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5094.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1577–000.
Applicants: Arizona Public Service
Company.
Description: 205(d) Rate Filing: Rate
Schedule No. 320, Babbitt Ranch
Pseudo-Tie to be effective 5/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5099.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1578–000.
Applicants: Arizona Public Service
Company.
Description: 205(d) Rate Filing:
Service Agreement No. 419, E&P w/
VerDate Sep<11>2014
18:10 Mar 25, 2024
Jkt 262001
Elisabeth Solar to be effective 3/11/
2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5112.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1579–000.
Applicants: Arizona Public Service
Company.
Description: 205(d) Rate Filing:
Administrative Filing for Collation
Correction to be effective 3/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5121.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1580–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Double Run
Solar LGIA Amendment Filing to be
effective 3/6/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5127.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1581–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Kirkham Solar
Farms I (Kirkham L&MA) LGIA Filing to
be effective 3/8/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5129.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1582–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing: 4239
Little Blue Wind II GIA to be effective
3/12/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5143.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1583–000.
Applicants: Southwest Power Pool,
Inc.
Description: 205(d) Rate Filing:
Revisions to Att J to Reallocate
Remaining ATRR for Byway Upgrades
(RR 584) to be effective 6/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5166.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1584–000.
Applicants: Tucson Electric Power
Company.
Description: 205(d) Rate Filing:
Concurrence to PSE Rate Schedule No.
160 to be effective 5/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5172.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1585–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Applicants: California State
University Channel Islands Site
Authority.
Description: 205(d) Rate Filing:
CSUCI–SA Settlement Agreement with
Participants to be effective 2/1/2022.
Filed Date: 3/20/24.
Accession Number: 20240320–5182.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24–1586–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2024–
03–20_MISO Petition for a Prospective
Tariff Waiver of SPP Tariff to be
effective N/A.
Filed Date: 3/20/24.
Accession Number: 20240320–5193.
Comment Date: 5 p.m. ET 4/10/24.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR24–2–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for approval of revisions to
the NERC Rules of Procedure to address
unregistered inverter-based resources.
Filed Date: 3/19/24.
Accession Number: 20240319–5204.
Comment Date: 5 p.m. ET 4/18/24.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
E:\FR\FM\26MRN1.SGM
26MRN1
Federal Register / Vol. 89, No. 59 / Tuesday, March 26, 2024 / Notices
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: March 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06427 Filed 3–25–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
ddrumheller on DSK120RN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: RP24–534–000.
Applicants: UGI Sunbury, LLC.
Description: 4(d) Rate Filing: Annual
Retainage Adjustment 2024 w/Waivers
to be effective 4/1/2024.
Filed Date: 3/19/24.
Accession Number: 20240319–5131.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–535–000.
Applicants: Northwest Pipeline LLC.
Description: 4(d) Rate Filing: Non
Conforming Service Agreement—
Spotlight to be effective 4/1/2024.
Filed Date: 3/19/24.
Accession Number: 20240319–5171.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–536–000.
Applicants: Equitrans, L.P.
Description: 4(d) Rate Filing:
Negotiated Rate Agreement—4/1/2024
to be effective 4/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5016.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–537–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 4(d) Rate Filing: 3.20.24
Negotiated Rates—Emera Energy
Services, Inc. R–2715–86 to be effective
4/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5041.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–538–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 4(d) Rate Filing: 3.20.24
Negotiated Rates—Emera Energy
Services, Inc. R–2715–87 to be effective
4/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5046.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–539–000.
VerDate Sep<11>2014
18:10 Mar 25, 2024
Jkt 262001
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 4(d) Rate Filing: 3.20.24
Negotiated Rates—Koch Energy
Services, LLC R–7755–05 to be effective
4/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5049.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–540–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 4(d) Rate Filing: 3.20.24
Negotiated Rates—Koch Energy
Services, LLC R–7755–06 to be effective
4/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5052.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–541–000.
Applicants: Big Sandy Pipeline, LLC,
Bobcat Gas Storage, East Tennessee
Natural Gas, LLC, Egan Hub Storage,
LLC, Garden Banks Gas Pipeline, LLC,
Maritimes & Northeast Pipeline, L.L.C.,
Mississippi Canyon Gas Pipeline, L.L.C.,
Moss Bluff Hub, LLC, Nautilus Pipeline
Company, L.L.C., NEXUS Gas
Transmission, LLC, Sabal Trail
Transmission, LLC, Saltville Gas Storage
Company L.L.C., Southeast Supply
Header, LLC, Steckman Ridge, LP, Texas
Eastern Transmission, LP, Tres Palacios
Gas Storage LLC, Algonquin Gas
Transmission, LLC.
Description: Compliance filing: Big
Sandy Pipeline, LLC submits tariff filing
per 154.203: Enbridge (U.S.) Pipelines—
LINK System Maintenance—Request for
Waivers 2024 to be effective N/A.
Filed Date: 3/20/24.
Accession Number: 20240320–5058.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–542–000.
Applicants: Bear Creek Storage
Company, L.L.C.
Description: Compliance filing:
Annual Report on Operational
Transactions 2024 to be effective N/A.
Filed Date: 3/20/24.
Accession Number: 20240320–5087.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–543–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: 4(d) Rate Filing:
Negotiated Rates—Yankee Gas to Emera
Energy eff 3–20–24 to be effective 3/20/
2024.
Filed Date: 3/20/24.
Accession Number: 20240320–5100.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: RP24–544–000.
Applicants: Portland Natural Gas
Transmission System.
Description: 4(d) Rate Filing: Northern
Utliites Neg Rate Agreement #284292 to
be effective 4/1/2024.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
20961
Filed Date: 3/20/24.
Accession Number: 20240320–5103.
Comment Date: 5 p.m. ET 4/1/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.vferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: March 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–06426 Filed 3–25–24; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–11849–01–OAR]
Notice of Denial of Petition for Partial
Waiver of 2023 Cellulosic Biofuel
Standard Under the Renewable Fuel
Standard Program
Environmental Protection
Agency (EPA).
ACTION: Denial of petition.
AGENCY:
The Environmental Protection
Agency (EPA) is providing notice of its
final action entitled Denial of AFPM
Petition for Partial Waiver of 2023
Cellulosic Biofuel Standard (‘‘AFPM
Petition Denial Action’’), in which EPA
SUMMARY:
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 89, Number 59 (Tuesday, March 26, 2024)]
[Notices]
[Pages 20959-20961]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-06427]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-405-003; ER17-406-003; EL23-51-002.
Applicants: American Municipal Power, Inc., et al. v. AEP
Appalachian Transmission Company Inc., et al., AEP Appalachian
Transmission Company, Inc., Appalachian Power Company.
Description: American Power East Companies submit compliance filing
as directed by the January 18, 2024 Order.
Filed Date: 3/18/24.
Accession Number: 20240318-5279.
Comment Date: 5 p.m. ET 4/8/24.
Docket Numbers: ER24-943-001.
Applicants: Cottontail Solar 5, LLC.
[[Page 20960]]
Description: Compliance filing: Revised Rate Schedule FERC No. 1 to
be effective 1/31/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5053.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-978-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2024-03-20_SA 4228 GRE-OTP-Discovery
Wind Sub Original GIA (S1036) to be effective 3/24/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5195.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1030-001.
Applicants: Arizona Public Service Company.
Description: Tariff Amendment: Service Agreement No. 406, Amendment
3 Refile to be effective 3/30/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5106.
Comment Date: 5 p.m. ET 4/1/24.
Docket Numbers: ER24-1574-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA, SA
No. 6072; Queue No. AF2-293 to be effective 5/10/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5064.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1575-000.
Applicants: PJM Interconnection, L.L.C.
Description: 205(d) Rate Filing: Original NSA SA No. 7198, Queue
No. AF1-130 to be effective 5/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5076.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1576-000.
Applicants: Maple Flats Solar Energy Center LLC.
Description: Baseline eTariff Filing: Application for Market Based
Rate Authorization to be effective 3/21/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5094.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1577-000.
Applicants: Arizona Public Service Company.
Description: 205(d) Rate Filing: Rate Schedule No. 320, Babbitt
Ranch Pseudo-Tie to be effective 5/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5099.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1578-000.
Applicants: Arizona Public Service Company.
Description: 205(d) Rate Filing: Service Agreement No. 419, E&P w/
Elisabeth Solar to be effective 3/11/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5112.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1579-000.
Applicants: Arizona Public Service Company.
Description: 205(d) Rate Filing: Administrative Filing for
Collation Correction to be effective 3/20/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5121.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1580-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing: Alabama Power Company submits
tariff filing per 35.13(a)(2)(iii: Double Run Solar LGIA Amendment
Filing to be effective 3/6/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5127.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1581-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: 205(d) Rate Filing: Alabama Power Company submits
tariff filing per 35.13(a)(2)(iii: Kirkham Solar Farms I (Kirkham L&MA)
LGIA Filing to be effective 3/8/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5129.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1582-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: 4239 Little Blue Wind II GIA to be
effective 3/12/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5143.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1583-000.
Applicants: Southwest Power Pool, Inc.
Description: 205(d) Rate Filing: Revisions to Att J to Reallocate
Remaining ATRR for Byway Upgrades (RR 584) to be effective 6/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5166.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1584-000.
Applicants: Tucson Electric Power Company.
Description: 205(d) Rate Filing: Concurrence to PSE Rate Schedule
No. 160 to be effective 5/1/2024.
Filed Date: 3/20/24.
Accession Number: 20240320-5172.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1585-000.
Applicants: California State University Channel Islands Site
Authority.
Description: 205(d) Rate Filing: CSUCI-SA Settlement Agreement with
Participants to be effective 2/1/2022.
Filed Date: 3/20/24.
Accession Number: 20240320-5182.
Comment Date: 5 p.m. ET 4/10/24.
Docket Numbers: ER24-1586-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2024-03-20_MISO Petition for a
Prospective Tariff Waiver of SPP Tariff to be effective N/A.
Filed Date: 3/20/24.
Accession Number: 20240320-5193.
Comment Date: 5 p.m. ET 4/10/24.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR24-2-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for approval of revisions to the NERC Rules of Procedure to
address unregistered inverter-based resources.
Filed Date: 3/19/24.
Accession Number: 20240319-5204.
Comment Date: 5 p.m. ET 4/18/24.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
[[Page 20961]]
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: March 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-06427 Filed 3-25-24; 8:45 am]
BILLING CODE 6717-01-P