Alice Falls Hydro, LLC; Notice of Availability of Environmental Assessment, 16548-16549 [2024-04804]
Download as PDF
16548
Federal Register / Vol. 89, No. 46 / Thursday, March 7, 2024 / Notices
U3O8 to UF6 for input to enrichment
facilities; (3) enrichment in up to three
steps (a) from natural uranium to LEU
of no more than 5 weight percent U–
235, (b) from LEU to HALEU of less than
10 weight percent U–235, and (c) to
HALEU of less than 20 weight percent
U–235; (4) HALEU deconversion from
UF6 to uranium oxide, metal, and other
forms; (5) storage; (6) transportation of
uranium/HALEU between facilities; and
(7) DOE acquisition of HALEU of
between at least 19.75 weight percent
and less than 20 weight percent U–235.
In addition to the activities above, the
following actions could result from
implementation of the Proposed Action:
(1) fuel fabrication for a variety of fuel
types in a U.S. Nuclear Regulatory
Commission (NRC) Category II facility;
(2) HALEU-fueled reactor
(demonstration and test, power, isotope
production) operations; and (3) spent
fuel storage and disposition. While not
specifically a part of the Proposed
Action, these activities are reasonably
foreseeable and therefore acknowledged
and addressed to the extent possible in
the Draft HALEU EIS.
While the Draft HALEU EIS provides
information that could be used to
identify impacts from the construction
and operation of HALEU fuel cycle
facilities, the selection of specific
locations and facilities will not be a part
of the Record of Decision for this EIS.
khammond on DSKJM1Z7X2PROD with NOTICES
Preferred Alternative
The Preferred Alternative is the
Proposed Action, to acquire, through
procurement from commercial sources,
HALEU enriched to at least 19.75 and
less than 20 weight percent U–235 over
a 10-year period of performance, and to
facilitate the establishment of
commercial HALEU fuel production.
The No Action Alternative would not
implement the Proposed Action, leaving
development of a domestic commercial
supply of HALEU to industry or
industry would remain reliant on
foreign supplies of HALEU, contrary to
Congressional direction under section
2001 of the Energy Act of 2020.
Virtual Public Hearings
DOE will host three interactive,
virtual public hearings during the
public comment period on Wednesday,
April 3, 2024, at 6 p.m. ET, 8 p.m. ET,
and 10 p.m. ET. During these public
hearings, DOE will give a brief
presentation on the Draft HALEU EIS,
followed by a period during which DOE
will accept oral comments on the Draft
HALEU EIS. Parties interested in
providing oral comments are
encouraged to preregister for the public
hearings and indicate their desire to
VerDate Sep<11>2014
16:13 Mar 06, 2024
Jkt 262001
comment. Oral comments will be
transcribed. Written comments on the
Draft HALEU EIS may also be submitted
during the public comment period as
indicated under the ADDRESSES section.
All comments, received before the end
of the comment period, whether oral or
written, will be considered by DOE as
the HALEU EIS is finalized. DOE will
post information regarding the public
hearings on the HALEU EIS website at
https://www.energy.gov/ne/haleuenvironmental-impact-statement. The
hearings will also be announced in
newspapers.
Signing Authority
This document of the Department of
Energy was signed on March 1, 2024, by
Dr. Kathryn Huff, Assistant Secretary for
Nuclear Energy, pursuant to delegated
authority from the Secretary of Energy.
That document with the original
signature and date is maintained by the
Department of Energy. For
administrative purposes only, and in
compliance with requirements of the
Office of the Federal Register, the
undersigned Department of Energy
Federal Register Liaison Officer has
been authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on March 1,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–04799 Filed 3–6–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5867–054]
Alice Falls Hydro, LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a new license to
continue to operate and maintain the
Alice Falls Hydroelectric Project No.
5867 (project). The project is located on
the Ausable River in Clinton and Essex
counties, New York. Commission staff
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
has prepared an Environmental
Assessment (EA) for the project.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or at
(866) 208–3676 (toll-free), or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/FERC
Online.aspx to be notified via email of
new filings and issuances related to this
or other pending projects. For
assistance, contact FERC Online
Support.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595, or OPP@
ferc.gov.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
FERCOnline.aspx. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
ferconline.ferc.gov/Quick
Comment.aspx. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
E:\FR\FM\07MRN1.SGM
07MRN1
Federal Register / Vol. 89, No. 46 / Thursday, March 7, 2024 / Notices
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include docket number P–5867–054.
For further information, contact Kelly
Wolcott at 202–502–6480 or
kelly.wolcott@ferc.gov.
Dated: February 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04804 Filed 3–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC24–54–000.
Applicants: Public Service Company
of New Mexico, Arroyo Solar LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Public Service
Company of New Mexico, et al.
Filed Date: 2/28/24.
Accession Number: 20240228–5265.
Comment Date: 5 p.m. ET 3/20/24.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–122–000.
Applicants: Flatland Storage LLC.
Description: Flatland Storage LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/29/24.
Accession Number: 20240229–5166.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: EG24–123–000.
Applicants: Hickory Solar LLC.
Description: Hickory Solar LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/29/24.
Accession Number: 20240229–5178.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: EG24–124–000.
Applicants: Ragsdale Solar, LLC.
Description: Ragsdale Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/29/24.
Accession Number: 20240229–5180.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: EG24–125–000.
Applicants: Randolph Solar Park LLC.
Description: Randolph Solar Park LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/29/24.
VerDate Sep<11>2014
16:13 Mar 06, 2024
Jkt 262001
Accession Number: 20240229–5183.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: EG24–126–000.
Applicants: Wolf Run Solar LLC.
Description: Wolf Run Solar LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/29/24.
Accession Number: 20240229–5188.
Comment Date: 5 p.m. ET 3/21/24.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–1525–000.
Applicants: Southwest Power Pool,
Inc.
Description: Refund Report:
People’s—Refund Report in Response to
Order in ER–22–1525 to be effective N/
A.
Filed Date: 2/29/24.
Accession Number: 20240229–5031.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–965–001.
Applicants: Versant Power.
Description: Tariff Amendment: Pause
Cancellation of PERC IA (ER24–965–) to
be effective 5/1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5215.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1361–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, SA No. 6254;
Queue No. AD2–135 to be effective 4/
29/2024.
Filed Date: 2/28/24.
Accession Number: 20240228–5236.
Comment Date: 5 p.m. ET 3/20/24.
Docket Numbers: ER24–1362–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to the GI Procedures to
Increase Study Deposits (RR 603) to be
effective 5/1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5033.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1363–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1313R18 Oklahoma Gas and Electric
Company NITSA and NOA to be
effective 2/1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5078.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1366–000.
Applicants: Tumbleweed Energy,
LLC.
Description: Initial rate filing: MarketBased Rate Application and Requests for
Waivers and Blanket Approvals to be
effective 3/1/2024.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
16549
Filed Date: 2/29/24.
Accession Number: 20240229–5097.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1367–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
2024.02.29 CAPX2020 Brookings2 Joint
Dev Agmt 749–NSP to be effective 2/2/
2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5120.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1368–000.
Applicants: Ameren Illinois
Company.
Description: § 205(d) Rate Filing:
Notices of Cancellation to be effective 8/
13/2023.
Filed Date: 2/29/24.
Accession Number: 20240229–5131.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1369–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: Mar
2024 Membership Filing to be effective
3/1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5222.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1370–000.
Applicants: Morgantown Power, LLC.
Description: Tariff Amendment:
Notice of Cancellation of Reactive
Service Rate Schedule to be effective 6/
1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5224.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1371–000.
Applicants: Atrisco Solar SF LLC.
Description: Petition for Waivers and
Blanket Authorization under Section
204 of Atrisco Solar SF LLC.
Filed Date: 2/28/24.
Accession Number: 20240228–5273.
Comment Date: 5 p.m. ET 3/20/24.
Docket Numbers: ER24–1373–000.
Applicants: Lanyard Power Holdings,
LLC.
Description: Tariff Amendment:
Notice of Cancellation of Reactive
Service Rate Schedule to be effective 6/
1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5237.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: ER24–1374–000.
Applicants: Sierra Estrella Energy
Storage LLC.
Description: Baseline eTariff Filing:
Application for MBR Authorization and
Request for Waivers to be effective 4/30/
2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5252.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 89, Number 46 (Thursday, March 7, 2024)]
[Notices]
[Pages 16548-16549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-04804]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5867-054]
Alice Falls Hydro, LLC; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a new license to continue to operate and
maintain the Alice Falls Hydroelectric Project No. 5867 (project). The
project is located on the Ausable River in Clinton and Essex counties,
New York. Commission staff has prepared an Environmental Assessment
(EA) for the project.
The EA contains the staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
The Commission provides all interested persons with an opportunity
to view and/or print the EA via the internet through the Commission's
Home Page (https://www.ferc.gov/), using the ``eLibrary'' link. Enter
the docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, contact FERC Online
Support at [email protected], or at (866) 208-3676 (toll-
free), or (202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595, or [email protected].
Any comments should be filed within 45 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support. In lieu
of electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Room 1A, Washington, DC 20426. Submissions sent via any
other carrier must be addressed to: Debbie-Anne A.
[[Page 16549]]
Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing
should include docket number P-5867-054.
For further information, contact Kelly Wolcott at 202-502-6480 or
[email protected].
Dated: February 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-04804 Filed 3-6-24; 8:45 am]