Northern Natural Gas Company; Notice of Application and Establishing Intervention Deadline, 16551-16553 [2024-04802]
Download as PDF
16551
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 89, No. 46 / Thursday, March 7, 2024 / Notices
intake structure. The project generators
are connected to the regional electric
grid by a 90-foot-long, 4.16-kilovolt (kV)
underground transmission line and a
4.16/46-kV step-up transformer. There
are no project recreation facilities.
The minimum and maximum
hydraulic capacities of the powerhouse
are 100 and 710 cubic feet per second
(cfs), respectively. The average annual
energy production of the Saranac Project
from 2017 through 2023 was 783
megawatt-hours.
The current license requires Union
Falls to install flashboards annually by
the first week of June, unless flow
conditions warrant otherwise. From
October through May, the license
requires Union Falls to maintain the
surface elevation of the impoundment at
the spillway crest elevation of 1,408.49
feet NGVD 29, with a maximum daily
drawdown of 3 inches and a maximum
total drawdown of 6 inches below the
crest. From June through September, the
license requires Union Falls to maintain
the surface elevation of the
impoundment at the flashboard crest
elevation of 1,409.49 feet NGVD 29,
with a maximum daily drawdown of 3
inches and a maximum total drawdown
of 6 inches below the crest.
The current license requires the
following minimum flow releases from
the project dam: (1) 30 cfs from April 1
through June 30; and (2) 10 cfs from July
1 through March 31. The current license
also requires a minimum flow of 165 cfs
or inflow to the impoundment,
whichever is less, from the project to the
Saranac River downstream of the
tailrace, including the minimum flow
releases from the project dam. Union
Falls releases the minimum bypassed
reach flows through the low-level outlet
gates in the project dam.
Union Falls does not propose to add
any new project facilities or make any
changes to the project boundary.
On August 3, 2023, Union Falls filed
a Settlement Agreement for the project’s
relicense proceeding, on behalf of itself;
the U.S. Fish and Wildlife Service; the
New York State Department of
Environmental Conservation; and Trout
Unlimited. As part of the Settlement
Agreement, Union Falls proposes to: (1)
operate the project in a run-of-river
mode, such that outflow from the
project approximates inflow to the
impoundment at any given time and the
surface elevation of the impoundment is
maintained within 1 inch of the crest of
the spillway or flashboards, if present;
(2) release a year-round minimum flow
of 50 cfs or inflow to the impoundment,
whichever is less, from the project dam
to the bypassed reach; (3) release a
minimum flow of 165 cfs or inflow to
VerDate Sep<11>2014
16:13 Mar 06, 2024
Jkt 262001
the impoundment, whichever is less, to
the Saranac River downstream of the
tailrace, including minimum flow
releases from the project dam; (4)
continue to maintain 1-inch trashracks
to protect fish; (5) develop an operation
compliance monitoring plan; (6) install
directional signage for the canoe portage
trail and tailrace parking area; and (7)
implement the following plans filed
with the Settlement Agreement: Bald
Eagle Management Plan, Invasive
Species Management Plan, and
Impoundment Drawdown Plan.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
You may also register online at
https://ferconline.ferc.gov/FERC
Online.aspx to be notified via email of
new filings and issuances related to this
or other pending projects. For
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
assistance, contact FERC Online
Support.
n. The applicant must file no later
than 60 days following the date of
issuance of this notice: (1) a copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural Schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Filing of Comments, Recommendations, Terms and
Conditions, and Prescriptions.
Filing of Reply Comments ....
Target date
April 2024.
June 2024.
Dated: February 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04809 Filed 3–6–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–60–000]
Northern Natural Gas Company; Notice
of Application and Establishing
Intervention Deadline
Take notice that on February 16, 2024,
Northern Natural Gas Company
(Northern Natural), 1111 South 103rd
Street, Omaha, Nebraska 68124–1000,
filed an application under sections 7(b)
and 7(c) of the Natural Gas Act (NGA),
and part 157 of the Commission’s
regulations requesting authorization for
its Northern Lights 2025 Expansion
Project (Project). The Project consists of
approximately 8.62 miles of natural gas
pipeline of multiple diameters at
different locations, modifications to its
existing La Crescent Compressor
Station, appurtenant facilities, and the
abandonment by removal of
approximately 275 feet of its existing
30-inch-diameter MNB87703 Elk River
3rd branch line. The Project will
provide an additional 46,064
dekatherms per day (Dth/d) of firm
transportation capacity for residential,
commercial, and industrial customer
markets in Northern Natural’s market
area. Northern Natural estimates the
total cost of the Project to be
$60,678,722, all as more fully set forth
E:\FR\FM\07MRN1.SGM
07MRN1
16552
Federal Register / Vol. 89, No. 46 / Thursday, March 7, 2024 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
in the application which is on file with
the Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
Public access to records formerly
available in the Commission’s physical
Public Reference Room, which was
located at the Commission’s
headquarters, 888 First Street NE,
Washington, DC 20426, are now
available via the Commission’s website.
For assistance, contact the Federal
Energy Regulatory Commission at
FercOnlineSupport@ferc.gov or call tollfree, (866) 208–3676 or TTY (202) 502–
8659.
Any questions regarding the proposed
project should be directed to Donna
Martens, Senior Regulatory Analyst,
P.O. Box 3330, Omaha, Nebraska 68103,
by telephone at (402) 398–7138 or by
email at donna.martens@nngco.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
16:13 Mar 06, 2024
Jkt 262001
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
March 21, 2024. How to file protests,
motions to intervene, and comments is
explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before March 21, 2024.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP24–60–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments or
protests electronically by using the
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
to the following address below. Your
written comments must reference the
Project docket number (CP24–60–000).
To file via USPS: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
6 18
7 18
CFR 385.102(d).
CFR 385.214.
E:\FR\FM\07MRN1.SGM
07MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 89, No. 46 / Thursday, March 7, 2024 / Notices
the NGA 8 by the intervention deadline
for the project, which is March 21, 2024.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP24–60–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP24–60–000.
To file via USPS: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne A. Reese, Acting Secretary,
Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville,
Maryland 20852
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Donna Martens,
Senior Regulatory Analyst, P.O. Box
3330, Omaha, Nebraska 68103 or by
email at donna.martens@nngco.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
8 18
CFR 157.10.
VerDate Sep<11>2014
16:13 Mar 06, 2024
Jkt 262001
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on March 21, 2024.
Dated: February 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04802 Filed 3–6–24; 8:45 am]
BILLING CODE 6717–01–P
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
11 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
16553
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR24–53–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: § 284.123(g) Rate Filing:
EOIT Revised Fuel Percentages 2–28–24
to be effective 4/1/2024.
Filed Date: 2/28/24.
Accession Number: 20240228–5224.
Comment Date: 5 p.m. ET 3/20/24.
§ 284.123(g) Protest: 5 p.m. ET 4/29/
24.
Docket Numbers: PR24–54–000.
Applicants: Bay Gas Storage
Company, LLC.
Description: § 284.123 Rate Filing:
Bay Gas Storage Annual Adjustment to
Company Use Percentage Filing to be
effective 3/1/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5050.
Comment Date: 5 p.m. ET 3/21/24.
Docket Numbers: PR24–55–000.
Applicants: Atmos Energy
Corporation.
Description: § 284.123(g) Rate Filing:
Baseline Filing of Statement of
Operating Conditions to be effective 2/
29/2024.
Filed Date: 2/29/24.
Accession Number: 20240229–5066.
Comment Date: 5 p.m. ET 3/21/24.
§ 284.123(g) Protest: 5 p.m. ET 4/29/
24.
Docket Numbers: RP24–432–000.
Applicants: RH energytrans, LLC.
Description: Request for Waiver of
Requirement to File FL&U Percentage
Adjustment of RH energytrans, LLC.
Filed Date: 2/27/24.
Accession Number: 20240227–5231.
Comment Date: 5 p.m. ET 3/11/24.
Docket Numbers: RP24–440–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
3–1–24 to be effective 3/1/2024.
Filed Date: 2/28/24.
Accession Number: 20240228–5237.
Comment Date: 5 p.m. ET 3/11/24.
Docket Numbers: RP24–441–000.
Applicants: Adelphia Gateway, LLC.
Description: Compliance filing:
Adelphia Gateway Refund Report Filing
to be effective N/A.
Filed Date: 2/28/24.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 89, Number 46 (Thursday, March 7, 2024)]
[Notices]
[Pages 16551-16553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-04802]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP24-60-000]
Northern Natural Gas Company; Notice of Application and
Establishing Intervention Deadline
Take notice that on February 16, 2024, Northern Natural Gas Company
(Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124-
1000, filed an application under sections 7(b) and 7(c) of the Natural
Gas Act (NGA), and part 157 of the Commission's regulations requesting
authorization for its Northern Lights 2025 Expansion Project (Project).
The Project consists of approximately 8.62 miles of natural gas
pipeline of multiple diameters at different locations, modifications to
its existing La Crescent Compressor Station, appurtenant facilities,
and the abandonment by removal of approximately 275 feet of its
existing 30-inch-diameter MNB87703 Elk River 3rd branch line. The
Project will provide an additional 46,064 dekatherms per day (Dth/d) of
firm transportation capacity for residential, commercial, and
industrial customer markets in Northern Natural's market area. Northern
Natural estimates the total cost of the Project to be $60,678,722, all
as more fully set forth
[[Page 16552]]
in the application which is on file with the Commission and open for
public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. Public access
to records formerly available in the Commission's physical Public
Reference Room, which was located at the Commission's headquarters, 888
First Street NE, Washington, DC 20426, are now available via the
Commission's website. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(866) 208-3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
Donna Martens, Senior Regulatory Analyst, P.O. Box 3330, Omaha,
Nebraska 68103, by telephone at (402) 398-7138 or by email at
[email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
March 21, 2024. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before March 21, 2024.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP24-60-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number (CP24-60-000).
To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
To file via any other courier: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \7\ and the regulations under
[[Page 16553]]
the NGA \8\ by the intervention deadline for the project, which is
March 21, 2024. As described further in Rule 214, your motion to
intervene must state, to the extent known, your position regarding the
proceeding, as well as your interest in the proceeding. For an
individual, this could include your status as a landowner, ratepayer,
resident of an impacted community, or recreationist. You do not need to
have property directly impacted by the project in order to intervene.
For more information about motions to intervene, refer to the FERC
website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP24-60-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP24-60-
000.
To file via USPS: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
To file via any other courier: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Donna Martens, Senior Regulatory Analyst,
P.O. Box 3330, Omaha, Nebraska 68103 or by email at
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on March 21, 2024.
Dated: February 29, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-04802 Filed 3-6-24; 8:45 am]