Federal Register / Vol. 89, No. 43 / Monday, March 4, 2024 / Notices
whether there is any new information
with respect to the environment or the
environmental impacts of the SHINE
facility, including information that is
different from that considered in
NUREG–2183. NRC staff did not
identify any information that presented
a considerably different picture of the
environmental consequences of
constructing, operating, and
decommissioning the SHINE facility.
After weighing the environmental,
economic, technical, and other benefits
against environmental and other costs,
NRC staff’s recommendation, unless
safety issues mandate otherwise, was
that the operating license be issued as
proposed. NRC staff based its
recommendation on the following: the
application, including SHINE’s
supplemental environmental report;
consultation with Federal, State, Tribal,
and local agencies; the staff’s
independent review; and the
consideration of public comments.
khammond on DSKJM1Z7X2PROD with NOTICES
Decision
NNSA intends to issue a modification
to its cooperative agreement with SHINE
Technologies, DE–NA0004010, to revise
the scope of the agreement to include
cost-share funding for facility
construction to support deployment of
this non-HEU Mo–99 production
technology. Issuance of the modification
is subject to satisfactory completion of
pricing and other technical reviews.
This modification reflects a reallocation
of funding previously awarded to DE–
NA0004010 and does not increase the
agreement’s total funding level.
Basis for Decision
The environmental impacts of this
proposed action have been previously
addressed in NUREG–2183,
‘‘Environmental Impact Statement for
the Construction Permit for the SHINE
Medical Radioisotope Production
Facility,’’ and NUREG–2183,
Supplement 1, ‘‘Environmental Impact
Statement Related to the Operating
License for the SHINE Medical Isotope
Production Facility.’’ NNSA was a
cooperating agency for both the EIS and
supplement and after an independent
review and determined that its
comments and suggestions were
satisfied per 40 CFR 1506.3(b)(2).
NNSA’s proposed action is substantially
the same as the proposed action
analyzed in NRC’s EIS and supplement.
Signing Authority
This document of the Department of
Energy was signed on January 31, 2024
by Jill Hruby, Under Secretary for
Nuclear Security and Administrator,
NNSA, pursuant to delegated authority
VerDate Sep<11>2014
18:32 Mar 01, 2024
Jkt 262001
from the Secretary of Energy. That
document with the original signature
and date is maintained by DOE. For
administrative purposes only, and in
compliance with requirements of the
Office of the Federal Register, the
undersigned DOE Federal Register
Liaison Officer has been authorized to
sign and submit the document in
electronic format for publication, as an
official document of the Department of
Energy. This administrative process in
no way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on February 27,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–04397 Filed 3–1–24; 8:45 am]
BILLING CODE 6450–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings in Existing Proceedings
Docket Numbers: RP23–1032–001.
Applicants: Osaka Gas Trading &
Export LLC.
Description: Osaka Gas Trading &
Export LLC submits Annual Report of
Purchased Capacity pursuant to the
October 20, 2023 Order.
Filed Date: 2/26/24.
Accession Number: 20240226–5102.
Comment Date: 5 p.m. ET 3/11/24.
Docket Numbers: RP24–412–001.
Applicants: Guardian Pipeline, L.L.C.
Description: Tariff Amendment:
Amendment to Electric Power Cost
Recovery Surcharge Adjustment to be
effective 4/1/2024.
Filed Date: 2/23/24.
Accession Number: 20240223–5205.
Comment Date: 5 p.m. ET 3/6/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
Frm 00026
Fmt 4703
Sfmt 4703
Dated: February 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04417 Filed 3–1–24; 8:45 am]
DEPARTMENT OF ENERGY
PO 00000
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Federal Energy Regulatory
Commission
[Docket No. CP24–27–000]
Kern River Gas Transmission
Company; Notice of Staff Protest to
Proposed Blanket Certificate Activity
Federal Energy Regulatory
Commission (FERC or Commission) staff
(Protestor) hereby protests the prior
notice request filed under the provisions
of the Commission’s regulations at part
157, subpart F, by Kern River Gas
Transmission Company (Kern River) on
December 15, 2023, in the abovereferenced docket. Pursuant to its Part
157, subpart F, blanket certificate
authority, Kern River proposes to
construct and operate the Lanes
Crossing Meter Station (Project), within
Kern River’s existing Victorville Meter
Station at the High Desert Power Plant,
San Bernardino County, California.
Protestor seeks to have this prior notice
request processed as a case-specific
application filed under section 7(c) of
the Natural Gas Act (NGA) and Part 157,
subpart A, of the Commission’s
regulations.1
Protestor notes that Kern River did
not provide a copy of a finding by the
California State Historic Preservation
1 Section 157.205(f) provides that a protested
prior notice filing shall be treated as though it had
filed a case-specific application under NGA section
7, unless, pursuant to section 157.205(g), the
protestor withdraws its protest within 30 days after
protests were due.
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 89, Number 43 (Monday, March 4, 2024)]
[Notices]
[Page 15566]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-04417]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings in Existing Proceedings
Docket Numbers: RP23-1032-001.
Applicants: Osaka Gas Trading & Export LLC.
Description: Osaka Gas Trading & Export LLC submits Annual Report
of Purchased Capacity pursuant to the October 20, 2023 Order.
Filed Date: 2/26/24.
Accession Number: 20240226-5102.
Comment Date: 5 p.m. ET 3/11/24.
Docket Numbers: RP24-412-001.
Applicants: Guardian Pipeline, L.L.C.
Description: Tariff Amendment: Amendment to Electric Power Cost
Recovery Surcharge Adjustment to be effective 4/1/2024.
Filed Date: 2/23/24.
Accession Number: 20240223-5205.
Comment Date: 5 p.m. ET 3/6/24.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: February 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-04417 Filed 3-1-24; 8:45 am]
BILLING CODE 6717-01-P