Drawbridge Operation Regulation; River Rouge, Detroit, MI; Correction, 14744 [2024-04273]
Download as PDF
14744
Federal Register / Vol. 89, No. 41 / Thursday, February 29, 2024 / Rules and Regulations
(MD) 8.4, ‘‘Management of Backfitting,
Forward Fitting, Issue Finality, and
Information Requests,’’ would not affect
the issue finality of any approval issued
under 10 CFR part 52; and would not
constitute forward fitting as that term is
defined and described in MD 8.4. This
RG will not apply to any construction
permits, operating licenses, early site
permits, limited work authorizations
issued under 10 CFR 50.10, or combined
licenses, for which the NRC issued a
final environmental impact statement
(EIS) preceded by a draft EIS under 10
CFR 51.76 or 51.75, any of which were
issued by the NRC prior to issuance of
this final RG. The NRC has already
completed its siting determination for
those construction permits, operating
licenses, early site permits, limited work
authorizations, and combined licenses.
Therefore, no further NRC regulatory
action on siting will occur for those
licenses, permits, and authorizations,
for which the guidance in the RG would
be relevant. The methods described in
this RG will be used in evaluating
applications for construction permits,
early site permits, combined operating
licenses and limited work
authorizations, which includes
information under 10 CFR 51.49(b) or
(f), with respect to compliance with
applicable regulations governing the
siting of new nuclear power plants and
testing facilities, unless the applicant
proposes an acceptable alternative
method for complying with those
regulations. Methods that differ from
those described in this RG may be
deemed acceptable if the applicant
provides sufficient basis and
information for the NRC staff to verify
that the proposed alternative complies
with the applicable NRC regulations.
V. Submitting Suggestions for
Improvement of Regulatory Guides
khammond on DSKJM1Z7X2PROD with RULES
A member of the public may, at any
time, submit suggestions to the NRC for
improvement of existing RGs or for the
development of new RGs. Suggestions
can be submitted on the NRC’s public
website at https://www.nrc.gov/readingrm/doc-collections/reg-guides/
contactus.html. Suggestions will be
considered in future updates and
enhancements to the ‘‘Regulatory
Guide’’ series.
Dated: February 23, 2024.
For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs
Management Branch, Division of Engineering,
Office of Nuclear Regulatory Research.
[FR Doc. 2024–04223 Filed 2–28–24; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
16:00 Feb 28, 2024
Jkt 262001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2023–0183]
RIN 1625–AA09
Drawbridge Operation Regulation;
River Rouge, Detroit, MI; Correction
Coast Guard, Department of
Homeland Security (DHS).
ACTION: Correcting amendment.
AGENCY:
The Coast Guard is correcting
regulations that published in the
Federal Register on December 28, 2023.
The final rule announced changes to the
operations of all movable bridges over
the River Rouge, Detroit, MI, to improve
communications and establish winter
hours. This correction fixes incorrect
language in the regulations. The
language in the final rule inadvertently
stated the draw of the Dix Avenue
Bridge, mile 2.73, is remotely operated,
when it is not equipped or authorized
to operate remotely.
DATES: This correcting amendment is
effective February 29, 2024.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this correcting
amendment, call or email Mr. Lee D.
Soule, Bridge Management Specialist,
Ninth Coast Guard District; telephone
216–902–6085, email Lee.D.Soule@
uscg.mil.
SUMMARY:
In FR Doc.
2023–28645, appearing on page 89574
in the Federal Register of December 28,
2023, the final rule inadvertently
identified in paragraph (h) that the
bridge is remotely operated. The Coast
Guard did not intend to include this text
in § 117.645(h). Therefore, we are
correcting paragraph (h) by removing
the words ‘‘is remotely operated’’.
SUPPLEMENTARY INFORMATION:
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the
preamble, the Coast Guard corrects 33
CFR part 117 by making the following
correcting amendment:
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
■
Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
and DHS Delegation No. 00170.1, Revision
No. 01.3.
2. Amend § 117.645 by revising
paragraph (h) to read as follows:
■
PO 00000
Frm 00002
Fmt 4700
Sfmt 4700
§ 117.645
River Rouge.
*
*
*
*
*
(h) The draw of the Dix Avenue
Bridge, mile 2.73, is required to operate
a radiotelephone, and shall open on
signal except from January 1 through
March 31 when the bridge shall open on
signal if provided a 12-hour advance
notice.
Jonathan Hickey,
Rear Admiral, U.S. Coast Guard, Commander,
Ninth Coast Guard District.
[FR Doc. 2024–04273 Filed 2–28–24; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2023–0189]
RIN 1625–AA09
Drawbridge Operation Regulation;
Ashtabula River, Ashtabula, OH
Coast Guard, Department of
Homeland Security (DHS).
ACTION: Final rule.
AGENCY:
The Coast Guard is modifying
the operating schedule that governs the
Fifth Street Bridge, mile 0.15, and the
Norfolk Southern Railroad Bridge, mile
1.5, both over the Ashtabula River. The
Coast Guard is also changing signaling
and signage requirements for the
Norfolk Southern Railroad Bridge, mile
1.5. The Coast Guard is modifying these
rules in response to complaints received
concerning the operations of one or
more bridges over the waterway and a
desire to improve safety, remove
barriers to interstate commerce, improve
communications, and standardize
winter operations associated with these
bridges.
DATES: This rule is effective April 1,
2024.
SUMMARY:
To view documents
mentioned in this preamble as being
available in the docket, go to https://
www.regulations.gov. Type USCG–
2023–0189 in the ‘‘SEARCH’’ box and
click ‘‘SEARCH.’’ Click on Open Docket
Folder on the line associated with this
rule.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this final rule,
call or email Mr. Lee D. Soule, Bridge
Management Specialist, Ninth Coast
Guard District; telephone 216–902–
6085, email Lee.D.Soule@uscg.mil.
SUPPLEMENTARY INFORMATION:
ADDRESSES:
E:\FR\FM\29FER1.SGM
29FER1
Agencies
[Federal Register Volume 89, Number 41 (Thursday, February 29, 2024)]
[Rules and Regulations]
[Page 14744]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-04273]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2023-0183]
RIN 1625-AA09
Drawbridge Operation Regulation; River Rouge, Detroit, MI;
Correction
AGENCY: Coast Guard, Department of Homeland Security (DHS).
ACTION: Correcting amendment.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard is correcting regulations that published in
the Federal Register on December 28, 2023. The final rule announced
changes to the operations of all movable bridges over the River Rouge,
Detroit, MI, to improve communications and establish winter hours. This
correction fixes incorrect language in the regulations. The language in
the final rule inadvertently stated the draw of the Dix Avenue Bridge,
mile 2.73, is remotely operated, when it is not equipped or authorized
to operate remotely.
DATES: This correcting amendment is effective February 29, 2024.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
correcting amendment, call or email Mr. Lee D. Soule, Bridge Management
Specialist, Ninth Coast Guard District; telephone 216-902-6085, email
[email protected].
SUPPLEMENTARY INFORMATION: In FR Doc. 2023-28645, appearing on page
89574 in the Federal Register of December 28, 2023, the final rule
inadvertently identified in paragraph (h) that the bridge is remotely
operated. The Coast Guard did not intend to include this text in Sec.
117.645(h). Therefore, we are correcting paragraph (h) by removing the
words ``is remotely operated''.
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the preamble, the Coast Guard corrects
33 CFR part 117 by making the following correcting amendment:
PART 117--DRAWBRIDGE OPERATION REGULATIONS
0
1. The authority citation for part 117 continues to read as follows:
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No.
00170.1, Revision No. 01.3.
0
2. Amend Sec. 117.645 by revising paragraph (h) to read as follows:
Sec. 117.645 River Rouge.
* * * * *
(h) The draw of the Dix Avenue Bridge, mile 2.73, is required to
operate a radiotelephone, and shall open on signal except from January
1 through March 31 when the bridge shall open on signal if provided a
12-hour advance notice.
Jonathan Hickey,
Rear Admiral, U.S. Coast Guard, Commander, Ninth Coast Guard District.
[FR Doc. 2024-04273 Filed 2-28-24; 8:45 am]
BILLING CODE 9110-04-P