Aron Energy Prepay 34 LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 14471-14472 [2024-04037]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 89, No. 39 / Tuesday, February 27, 2024 / Notices interconnection with the grid occurs; and (6) other appurtenances. The Newport Development consists of: (1) a 28.8-foot-high, 443-foot-long reinforced concrete dam; (2) a 103-acre impoundment with a storage capacity of 1,090 acre-feet; (3) a 73.5-foot-long, 21.2-foot-wide powerhouse adjacent to the north end of the dam, with three Francis turbine/generating units with a total installed capacity of 1,400 kW; (4) 150-foot-long, 2.4-kilovolt (kV) project generator lines; (5) a substation containing a 3-phase, 2.4/34.5-kV transformer where interconnection with the grid occurs; and (5) other appurtenances. Both developments operate in run-ofriver mode with minimum flows of 47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport Developments, respectively. The project had an average annual generation of 10,928 megawatthours between 2011 and 2016. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov, or call (886) 208–3676 (toll free) or (202) 502– 8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members, and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595, or OPP@ ferc.gov. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the VerDate Sep<11>2014 16:53 Feb 26, 2024 Jkt 262001 Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Request Additional Information— February 2024 Issue Notice of Ready for Environmental Analysis—April 2024 Dated: February 20, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–03932 Filed 2–26–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER24–1275–000] Aron Energy Prepay 34 LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Aron Energy Prepay 34 LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 14471 intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is March 12, 2024. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. E:\FR\FM\27FEN1.SGM 27FEN1 14472 Federal Register / Vol. 89, No. 39 / Tuesday, February 27, 2024 / Notices Dated: February 21, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–04037 Filed 2–26–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP24–409–000. Applicants: Empire Pipeline, Inc. Description: 4(d) Rate Filing: Fuel Tracker (Empire Tracking Supply Motioned in Rates 2024) to be effective 2/1/2024. Filed Date: 2/21/24. Accession Number: 20240221–5042. Comment Date: 5 p.m. ET 3/4/24. Docket Numbers: RP24–410–000. Applicants: Elba Express Company, L.L.C. Description: 4(d) Rate Filing: EEC Fuel Tracker Filing—2024 to be effective 4/1/2024. Filed Date: 2/21/24. Accession Number: 20240221–5062. Comment Date: 5 p.m. ET 3/4/24. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. lotter on DSK11XQN23PROD with NOTICES1 Filings in Existing Proceedings Docket Numbers: PR24–15–001. Applicants: Columbia Gas of Pennsylvania. Description: 284.123 Rate Filing: Revised Statement of Operating Conditions (PR24–15–) to be effective 11/29/2023. Filed Date: 2/21/24. Accession Number: 20240221–5057. Comment Date: 5 p.m. ET 3/13/24. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ VerDate Sep<11>2014 16:53 Feb 26, 2024 Jkt 262001 fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: February 21, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–04035 Filed 2–26–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2391–053] PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 2391–053. c. Date filed: January 3, 2022. d. Applicant: PE Hydro Generation, LLC. e. Name of Project: Warren Hydroelectric Project. f. Location: On the Shenandoah River near the Town of Front Royal in Warren County, Virginia. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, Bethesda, MD 20814; Phone at (804) 382–1764 or email at jody.smet@eaglecreekre.com. i. FERC Contact: Kristine Sillett at (202) 502–6575, or kristine.sillett@ ferc.gov. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 j. Deadline for filing motions to intervene and protest: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Warren Hydroelectric Project (P–2391–053). The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted but is not ready for environmental analysis. l. The Warren Project consists of the following existing facilities: (1) a 15.3foot-high, 527-foot-long, reinforced concrete dam; (2) a 105-acre impoundment with a storage capacity of 900 acre-feet; (3) a 44-foot-wide headgate structure with four 4.5-foot by 8-foot gates; (4) a 350-foot-long headrace canal; (5) an 82-foot-long, 30-foot-wide powerhouse containing 3 generating units with a total installed capacity of 750 kW; (6) 360-foot-long, 2.4-kilovolt (kV) project generator lines; (7) a substation containing a 3-phase, 2.4/ 34.5-kV transformer where interconnection with the grid occurs; and (8) other appurtenances. The project creates an approximately 550-foot-long bypassed reach of the Shenandoah River. The project operates in run-of-river mode with a minimum flow of 56 cubic feet per second provided by a 1-inch veil flow over the dam into the bypassed reach. The project had an average E:\FR\FM\27FEN1.SGM 27FEN1

Agencies

[Federal Register Volume 89, Number 39 (Tuesday, February 27, 2024)]
[Notices]
[Pages 14471-14472]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-04037]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER24-1275-000]


Aron Energy Prepay 34 LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Aron Energy Prepay 34 LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is March 12, 2024.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically may mail similar pleadings to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Hand delivered submissions in docketed 
proceedings should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].


[[Page 14472]]


    Dated: February 21, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-04037 Filed 2-26-24; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.