PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 14472-14473 [2024-03924]
Download as PDF
14472
Federal Register / Vol. 89, No. 39 / Tuesday, February 27, 2024 / Notices
Dated: February 21, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04037 Filed 2–26–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24–409–000.
Applicants: Empire Pipeline, Inc.
Description: 4(d) Rate Filing: Fuel
Tracker (Empire Tracking Supply
Motioned in Rates 2024) to be effective
2/1/2024.
Filed Date: 2/21/24.
Accession Number: 20240221–5042.
Comment Date: 5 p.m. ET 3/4/24.
Docket Numbers: RP24–410–000.
Applicants: Elba Express Company,
L.L.C.
Description: 4(d) Rate Filing: EEC
Fuel Tracker Filing—2024 to be
effective 4/1/2024.
Filed Date: 2/21/24.
Accession Number: 20240221–5062.
Comment Date: 5 p.m. ET 3/4/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
lotter on DSK11XQN23PROD with NOTICES1
Filings in Existing Proceedings
Docket Numbers: PR24–15–001.
Applicants: Columbia Gas of
Pennsylvania.
Description: 284.123 Rate Filing:
Revised Statement of Operating
Conditions (PR24–15–) to be effective
11/29/2023.
Filed Date: 2/21/24.
Accession Number: 20240221–5057.
Comment Date: 5 p.m. ET 3/13/24.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
VerDate Sep<11>2014
16:53 Feb 26, 2024
Jkt 262001
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: February 21, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–04035 Filed 2–26–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2391–053]
PE Hydro Generation, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2391–053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Warren
Hydroelectric Project.
f. Location: On the Shenandoah River
near the Town of Front Royal in Warren
County, Virginia.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (804) 382–1764 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Kristine Sillett at
(202) 502–6575, or kristine.sillett@
ferc.gov.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
j. Deadline for filing motions to
intervene and protest: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. All
filings must clearly identify the project
name and docket number on the first
page: Warren Hydroelectric Project
(P–2391–053).
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
but is not ready for environmental
analysis.
l. The Warren Project consists of the
following existing facilities: (1) a 15.3foot-high, 527-foot-long, reinforced
concrete dam; (2) a 105-acre
impoundment with a storage capacity of
900 acre-feet; (3) a 44-foot-wide
headgate structure with four 4.5-foot by
8-foot gates; (4) a 350-foot-long headrace
canal; (5) an 82-foot-long, 30-foot-wide
powerhouse containing 3 generating
units with a total installed capacity of
750 kW; (6) 360-foot-long, 2.4-kilovolt
(kV) project generator lines; (7) a
substation containing a 3-phase, 2.4/
34.5-kV transformer where
interconnection with the grid occurs;
and (8) other appurtenances. The project
creates an approximately 550-foot-long
bypassed reach of the Shenandoah
River.
The project operates in run-of-river
mode with a minimum flow of 56 cubic
feet per second provided by a 1-inch
veil flow over the dam into the bypassed
reach. The project had an average
E:\FR\FM\27FEN1.SGM
27FEN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 89, No. 39 / Tuesday, February 27, 2024 / Notices
annual generation of 3,456 megawatthours between 2013 and 2017.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov, or call
(886) 208–3676 (toll free) or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support. The
Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595, or OPP@
ferc.gov.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
VerDate Sep<11>2014
16:53 Feb 26, 2024
Jkt 262001
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Request Additional Information:
February 2024
Issue Notice of Ready for Environmental
Analysis: April 2024
Dated: February 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–03924 Filed 2–26–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–1270–000]
Prescott Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Prescott
Wind Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 11,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
14473
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: February 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–03921 Filed 2–26–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Alton Post Office Solar, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Alton
Post Office Solar, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 89, Number 39 (Tuesday, February 27, 2024)]
[Notices]
[Pages 14472-14473]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-03924]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2391-053]
PE Hydro Generation, LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2391-053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Warren Hydroelectric Project.
f. Location: On the Shenandoah River near the Town of Front Royal
in Warren County, Virginia.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (804) 382-1764 or email at
[email protected].
i. FERC Contact: Kristine Sillett at (202) 502-6575, or
[email protected].
j. Deadline for filing motions to intervene and protest: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Debbie-Anne A. Reese, Acting
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify the project name and docket
number on the first page: Warren Hydroelectric Project (P-2391-053).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted but is not ready for
environmental analysis.
l. The Warren Project consists of the following existing
facilities: (1) a 15.3-foot-high, 527-foot-long, reinforced concrete
dam; (2) a 105-acre impoundment with a storage capacity of 900 acre-
feet; (3) a 44-foot-wide headgate structure with four 4.5-foot by 8-
foot gates; (4) a 350-foot-long headrace canal; (5) an 82-foot-long,
30-foot-wide powerhouse containing 3 generating units with a total
installed capacity of 750 kW; (6) 360-foot-long, 2.4-kilovolt (kV)
project generator lines; (7) a substation containing a 3-phase, 2.4/
34.5-kV transformer where interconnection with the grid occurs; and (8)
other appurtenances. The project creates an approximately 550-foot-long
bypassed reach of the Shenandoah River.
The project operates in run-of-river mode with a minimum flow of 56
cubic feet per second provided by a 1-inch veil flow over the dam into
the bypassed reach. The project had an average
[[Page 14473]]
annual generation of 3,456 megawatt-hours between 2013 and 2017.
m. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number, excluding the last
three digits in the docket number field to access the document. For
assistance, contact FERC at [email protected], or call (886)
208-3676 (toll free) or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support. The Commission's Office of Public Participation (OPP)
supports meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members, and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595, or [email protected].
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
Request Additional Information: February 2024
Issue Notice of Ready for Environmental Analysis: April 2024
Dated: February 20, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-03924 Filed 2-26-24; 8:45 am]
BILLING CODE 6717-01-P