Alabama Power Company; Notice of Application for Temporary Variance of Article 407 Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 13066-13067 [2024-03427]
Download as PDF
13066
Federal Register / Vol. 89, No. 35 / Wednesday, February 21, 2024 / Notices
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: February 13, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–03433 Filed 2–20–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2165–112]
khammond on DSKJM1Z7X2PROD with NOTICES
Alabama Power Company; Notice of
Application for Temporary Variance of
Article 407 Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request for
Temporary Variance of Minimum Flow
Requirement Pursuant to Article 407.
b. Project No: 2165–112.
c. Date Filed: January 18, 2024.
d. Applicant: Alabama Power
Company.
e. Name of Project: Warrior River
Project.
f. Location: The project is located in
north central Alabama on the Black
Warrior River, and on the Sipsey Fork
2 in Cullman, Walker, and Winston
counties; and in west central Alabama
VerDate Sep<11>2014
17:43 Feb 20, 2024
Jkt 262001
on the Black Warrior River in
Tuscaloosa County. The project
occupies federal lands administered by
the U.S. Forest Service and by the
Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Candace R.
Meadows, Hydro Licensing Specialist,
crmeadow@southernco.com, (205) 257–
1499.
i. FERC Contact: Jason Krebill, (202)
502–8268, Jason.Krebill@ferc.gov.
j. Cooperating agencies: With this
notice, the Commission is inviting
federal, state, local, and Tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item k
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Deadline for filing comments,
motions to intervene, and protests:
March 14, 2024.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Debbie-Anne A. Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Debbie-Anne A.
Reese, Acting Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
include the docket number P–2165–112.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: The licensee
is seeking a temporary variance from
license Article 407 minimum flow
requirements of the Warrior River
Project for a period of six months,
ranging from June 1 through November
30, 2024. Article 407 requires the
licensee to release a minimum flow of
50 cubic feet per second (cfs) from the
Smith dam. The licensee is requesting a
variance to allow for reconfiguration of
the minimum flow systems on both Unit
1 and Unit 2, to correct degradation of
the existing system. The licensee
anticipates beginning work as early as
June, however, the exact start date will
depend on flow conditions. Only one
unit’s minimum flow system will be
modified, tested, and optimized at a
time. During each unit’s modification,
approximately 25 cfs will be released
from the other unit. However,
approximately 50 cfs would be released
whenever both units are available. The
licensee anticipates meeting state water
quality standards in accordance with its
401 Water Quality Certification.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
E:\FR\FM\21FEN1.SGM
21FEN1
Federal Register / Vol. 89, No. 35 / Wednesday, February 21, 2024 / Notices
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: February 13, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–03427 Filed 2–20–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–53–000]
khammond on DSKJM1Z7X2PROD with NOTICES
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on February 7, 2024,
WBI Energy Transmission, Inc. (WBI
Energy), 1250 West Century Avenue,
Bismarck, North Dakota 58503, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.206 and 157.216(b) of the
Commission’s regulations under the
VerDate Sep<11>2014
17:43 Feb 20, 2024
Jkt 262001
Natural Gas Act (NGA), and WBI
Energy’s blanket certificate issued in
Docket No. CP82–487–000, for
authorization to disconnect and
abandon by sale a 1,478 ratedhorsepower (hp) compressor unit (Unit
7) at its Landeck Compressor Station.
All of the above facilities are located in
Campbell County, Wyoming (Landeck
Unit 7 Abandonment). The project will
allow WBI Energy to minimize the need
for future operating and maintenance
expenditures by abandoning the Unit as
there is no operational need and WBI
states that it is able to meet its firm
contractual commitments without the
use of its Landeck Compressor Station,
all as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
Public access to records formerly
available in the Commission’s physical
Public Reference Room, which was
located at the Commission’s
headquarters, 888 First Street NE,
Washington, DC 20426, are now
available via the Commission’s website.
For assistance, contact the Federal
Energy Regulatory Commission at
FercOnlineSupport@ferc.gov or call tollfree, (866) 208–3676 or TTY (202) 502–
8659.
Any questions concerning this request
should be directed to Lori Myerchin,
Director, Regulatory Affairs and
Transportation Services, 1250 West
Century Avenue, Bismarck, North
Dakota 58503, (701) 530–1563,
lori.myerchin@wbienergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5 p.m.
eastern time on April 15, 2024. How to
file protests, motions to intervene, and
comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
13067
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is April 15,
2024. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is April 15, 2024.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
5 18 CFR 157.10.
2 Persons
E:\FR\FM\21FEN1.SGM
21FEN1
Agencies
[Federal Register Volume 89, Number 35 (Wednesday, February 21, 2024)]
[Notices]
[Pages 13066-13067]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-03427]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2165-112]
Alabama Power Company; Notice of Application for Temporary
Variance of Article 407 Accepted for Filing, Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request for Temporary Variance of Minimum Flow
Requirement Pursuant to Article 407.
b. Project No: 2165-112.
c. Date Filed: January 18, 2024.
d. Applicant: Alabama Power Company.
e. Name of Project: Warrior River Project.
f. Location: The project is located in north central Alabama on the
Black Warrior River, and on the Sipsey Fork 2 in Cullman, Walker, and
Winston counties; and in west central Alabama on the Black Warrior
River in Tuscaloosa County. The project occupies federal lands
administered by the U.S. Forest Service and by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Candace R. Meadows, Hydro Licensing
Specialist, [email protected], (205) 257-1499.
i. FERC Contact: Jason Krebill, (202) 502-8268,
[email protected].
j. Cooperating agencies: With this notice, the Commission is
inviting federal, state, local, and Tribal agencies with jurisdiction
and/or special expertise with respect to environmental issues affected
by the proposal, that wish to cooperate in the preparation of any
environmental document, if applicable, to follow the instructions for
filing such requests described in item k below. Cooperating agencies
should note the Commission's policy that agencies that cooperate in the
preparation of any environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. Deadline for filing comments, motions to intervene, and
protests: March 14, 2024.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include the docket number P-2165-112.
Comments emailed to Commission staff are not considered part of the
Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
l. Description of Request: The licensee is seeking a temporary
variance from license Article 407 minimum flow requirements of the
Warrior River Project for a period of six months, ranging from June 1
through November 30, 2024. Article 407 requires the licensee to release
a minimum flow of 50 cubic feet per second (cfs) from the Smith dam.
The licensee is requesting a variance to allow for reconfiguration of
the minimum flow systems on both Unit 1 and Unit 2, to correct
degradation of the existing system. The licensee anticipates beginning
work as early as June, however, the exact start date will depend on
flow conditions. Only one unit's minimum flow system will be modified,
tested, and optimized at a time. During each unit's modification,
approximately 25 cfs will be released from the other unit. However,
approximately 50 cfs would be released whenever both units are
available. The licensee anticipates meeting state water quality
standards in accordance with its 401 Water Quality Certification.
m. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's
[[Page 13067]]
Rules may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
p. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
q. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: February 13, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-03427 Filed 2-20-24; 8:45 am]
BILLING CODE 6717-01-P