Application for Amended Authorization To Export Electric Energy; NRG Business Marketing LLC, 9136-9137 [2024-02679]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
9136
Federal Register / Vol. 89, No. 28 / Friday, February 9, 2024 / Notices
electricity.’’ App. at 3. However, the
Applicant ‘‘operates as a wholesale
marketer of electric energy and as
electric energy agent to Brookfield
Renewable, which owns companies
regulated as public utilities under the
FPA and companies owning qualifying
facilities.’’ Id. BRTM notes it has
‘‘market-based rate authorization issued
by the Federal Energy Regulatory
Commission (‘FERC’) under Section 205
of the FPA.’’ Id.
The Applicant asserts that it ‘‘does
not have a franchised service area and,
consequently, has no native load
obligations’’ and will purchase the
electric energy that it exports from
electric utilities, qualifying cogeneration
facilities, qualifying small power
production facilities, Independent
System Operators, Regional
Transmission Operators, or from other
exempt wholesale generators. App. at 6.
Therefore, BRTM contends that ‘‘the
electric energy that will be sold to
BRTM is surplus to the needs of the
selling entities’’ and ‘‘will not impair
the sufficiency of the electric energy
supply within the United States.’’ Id.
BRTM also states it will comply with
existing industry procedures for
obtaining transmission capacity and
asserts the proposed transmission
would not impede or tend to impede the
coordination in the public interest of
facilities subject to DOE’s jurisdiction.
Id.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of Federal
Energy Regulatory Commission’s
(FERC’s) Rules of Practice and
Procedure (18 CFR 385.211). Any
person desiring to become a party to this
proceeding should file a motion to
intervene at Electricity.Exports@
hq.doe.gov in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning BRTM’s Application should
be clearly marked with GDO Docket No.
EA–465–A. Additional copies are to be
provided directly to the Senior Director,
Legal, Attn: EMR Legal, Brookfield
Renewable Trading and Marketing LP,
200 Liberty Street, 14th Floor, New
York, New York 10281, EMRLegal@
brookfieldrenewable.com.
VerDate Sep<11>2014
17:20 Feb 08, 2024
Jkt 262001
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
January 30, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on February 6,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–02678 Filed 2–8–24; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–498–A]
Application for Amended Authorization
To Export Electric Energy; NRG
Business Marketing LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
AGENCY:
NRG Business Marketing LLC
(the Applicant or NRGBM), formerly
known as Direct Energy Business
Marketing, LLC (DEBM), has applied for
amended authorization to transmit
electric energy from the United States to
Canada pursuant to the Federal Power
Act.
SUMMARY:
Comments, protests, or motions
to intervene must be submitted on or
before February 26, 2024.
DATES:
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Christina Gomer, (240) 474–2403,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) by Delegation Order No.
S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On March 31, 2023, DEBM applied for
authorization to transmit electric energy
from the United States to Canada as a
power marketer for a term of five years.
On September 13, 2023, DOE issued
EA–498, granting DEBM its requested
permission. See EA–498. On December
29, 2023, NRGBM filed an application
with DOE (Application or App.) to
amend the authorization to reflect
DEBM’s name change to NRGBM. See
App. at 1.
The Application states that on July 31,
2023, DEBM changed its name to
NRGBM. App. at 1. NRGBM notes that
‘‘[t]his action was solely a name
change’’ and there were ‘‘no changes to
the corporate structure, governance, or
ownership of the LLC.’’ Id. at 2. The
Application reflects that the other
information concerning the subject
exports provided in DEBM’s initial
application for authorization, approved
in EA–497, remains unchanged. See Id.
at 1–4.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
ADDRESSES:
E:\FR\FM\09FEN1.SGM
09FEN1
Federal Register / Vol. 89, No. 28 / Friday, February 9, 2024 / Notices
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning NRGBM’s Application
should be clearly marked with GDO
Docket No. EA–498–A. Additional
copies are to be provided directly to
Ryan Harwell, Manager, Regulatory
Licensing & Reporting, NRG Business
Marketing LLC, 910 Louisiana Street,
Suite B200, Houston, Texas 77002,
ryan.harwell@nrg.com, and Ryan C.
Norfolk, Baker Botts LLP, 700 K Street
NW, Washington, DC 20001,
ryan.norfolk@bakerbotts.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
January 30, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on February 6,
2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2024–02679 Filed 2–8–24; 8:45 am]
ddrumheller on DSK120RN23PROD with NOTICES1
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–497–A]
Application for Amended Authorization
To Export Electric Energy; NRG
Business Marketing LLC
Grid Deployment Office,
Department of Energy.
AGENCY:
VerDate Sep<11>2014
17:20 Feb 08, 2024
Jkt 262001
ACTION:
Notice of application.
NRG Business Marketing LLC
(NRGBM or the Applicant), formerly
known as Direct Energy Business
Marketing, LLC (DEBM), has applied for
amended authorization to transmit
electric energy from the United States to
Mexico pursuant to the Federal Power
Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before February 26, 2024.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Christina Gomer, (240) 474–2403,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) by Delegation Order No.
S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On March 31, 2023, DEBM applied for
authorization to transmit electric energy
from the United States to Mexico as a
power marketer for a term of five years.
On September 13, 2023, DOE issued
EA–497, granting DEBM its requested
permission. See EA–497. On December
29, 2023, NRGBM filed an application
with DOE (Application or App.) to
amend the authorization to reflect
DEBM’s name change to NRGBM. See
App. at 1.
The Application states that on July 31,
2023, DEBM changed its name to
NRGBM. App. at 1. NRGBM notes that
‘‘[t]his action was solely a name
change’’ and there were ‘‘no changes to
the corporate structure, governance, or
ownership of the LLC.’’ Id. at 2. The
Application reflects that the other
information concerning the subject
exports provided in DEBM’s initial
application for authorization, approved
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
9137
in EA–497, remains unchanged. See Id.
at 1–4.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of Federal
Energy Regulatory Commission’s
(FERC’s) Rules of Practice and
Procedure (18 CFR 385.211). Any
person desiring to become a party to this
proceeding should file a motion to
intervene at Electricity.Exports@
hq.doe.gov in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning NRGBM’s Application
should be clearly marked with GDO
Docket No. EA–497–A. Additional
copies are to be provided directly to
Ryan Harwell, Manager, Regulatory
Licensing & Reporting, NRG Business
Marketing LLC, 910 Louisiana Street,
Suite B200, Houston, Texas 77002,
ryan.harwell@nrg.com, and Ryan C.
Norfolk, Baker Botts LLP, 700 K Street
NW, Washington, DC 20001,
ryan.norfolk@bakerbotts.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
January 30, 2024, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
E:\FR\FM\09FEN1.SGM
09FEN1
Agencies
[Federal Register Volume 89, Number 28 (Friday, February 9, 2024)]
[Notices]
[Pages 9136-9137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-02679]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[GDO Docket No. EA-498-A]
Application for Amended Authorization To Export Electric Energy;
NRG Business Marketing LLC
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: NRG Business Marketing LLC (the Applicant or NRGBM), formerly
known as Direct Energy Business Marketing, LLC (DEBM), has applied for
amended authorization to transmit electric energy from the United
States to Canada pursuant to the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before February 26, 2024.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to
[email protected].
FOR FURTHER INFORMATION CONTACT: Christina Gomer, (240) 474-2403,
[email protected].
SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE)
regulates electricity exports from the United States to foreign
countries in accordance with section 202(e) of the Federal Power Act
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority,
previously exercised by the now-defunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides that an entity which seeks to
export electricity must obtain an order from DOE authorizing that
export (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue
such orders was delegated to the DOE's Grid Deployment Office (GDO) by
Delegation Order No. S1-DEL-S3-2023 and Redelegation Order No. S3-DEL-
GD1-2023.
On March 31, 2023, DEBM applied for authorization to transmit
electric energy from the United States to Canada as a power marketer
for a term of five years. On September 13, 2023, DOE issued EA-498,
granting DEBM its requested permission. See EA-498. On December 29,
2023, NRGBM filed an application with DOE (Application or App.) to
amend the authorization to reflect DEBM's name change to NRGBM. See
App. at 1.
The Application states that on July 31, 2023, DEBM changed its name
to NRGBM. App. at 1. NRGBM notes that ``[t]his action was solely a name
change'' and there were ``no changes to the corporate structure,
governance, or ownership of the LLC.'' Id. at 2. The Application
reflects that the other information concerning the subject exports
provided in DEBM's initial application for authorization, approved in
EA-497, remains unchanged. See Id. at 1-4.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at
[email protected]. Protests should be filed in accordance
with Rule 211 of FERC's Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to become a party to this proceeding
should file a motion to intervene at [email protected] in
[[Page 9137]]
accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning NRGBM's Application should be
clearly marked with GDO Docket No. EA-498-A. Additional copies are to
be provided directly to Ryan Harwell, Manager, Regulatory Licensing &
Reporting, NRG Business Marketing LLC, 910 Louisiana Street, Suite
B200, Houston, Texas 77002, [email protected], and Ryan C. Norfolk,
Baker Botts LLP, 700 K Street NW, Washington, DC 20001,
[email protected].
A final decision will be made on the requested authorization after
the environmental impacts have been evaluated pursuant to DOE's
National Environmental Policy Act Implementing Procedures (10 CFR part
1021) and after DOE evaluates whether the proposed action will have an
adverse impact on the sufficiency of supply or reliability of the
United States electric power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at https://www.energy.gov/gdo/pending-applications-0 or by emailing [email protected].
Signing Authority: This document of the Department of Energy was
signed on January 30, 2024, by Maria Robinson, Director, Grid
Deployment Office, pursuant to delegated authority from the Secretary
of Energy. That document with the original signature and date is
maintained by DOE. For administrative purposes only, and in compliance
with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on February 6, 2024.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2024-02679 Filed 2-8-24; 8:45 am]