Columbia Gulf Transmission, LLC; Notice of Application and Establishing Intervention Deadline, 6513-6515 [2024-02034]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices
Commission’s (Commission or FERC)
regulations, 18 CFR part 380,
Commission staff reviewed Dominion
Energy South Carolina’s (licensee)
application for a Non-project Use of
Project Lands and Waters of the Saluda
Hydroelectric Project No. 516 and have
prepared an Environmental Assessment
(EA) for a proposed water withdraw.
The licensee proposes to allow the City
of West Columbia, South Carolina
(City), the use of Saluda Hydroelectric
project lands and waters to expand the
use of the City’s existing raw water
withdrawal facility. The City would
replace two pumps within their exiting
raw water intake facility, excavate and
install a larger conveyance pipe, and
increase its maximum withdrawal from
Lake Murry from an approved 48
million gallons per day (mgd) to 72
mgd, an increase of 24 mgd. The Saluda
project is located on the Saluda River in
Richland, Lexington, Saluda, and
Newberry counties, South Carolina. The
proposed action is located at the
existing raw water pump facility in
Lexington County. The project does not
occupy federal lands.
The final EA contains Commission
staff’s analysis of the potential
environmental effects of the proposed
water withdraw, alternatives to the
proposed action, and concludes that the
proposed water withdraw, with
appropriate environmental protective
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
The final EA may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number (P–516–513) in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
VerDate Sep<11>2014
17:12 Jan 31, 2024
Jkt 262001
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
For further information, contact
Robert Ballantine at 202–502–6289 or
robert.ballantine@ferc.gov.
Dated: January 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–02029 Filed 1–31–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24–339–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: 4(d) Rate Filing: Capacity
Release—NR Agmt NRG 290896 to be
effective 1/1/2024.
Filed Date: 1/25/24.
Accession Number: 20240125–5146.
Comment Date: 5 p.m. ET 2/6/24.
Docket Numbers: RP24–341–000.
Applicants: MountainWest Overthrust
Pipeline, LLC.
Description: § 4(d) Rate Filing:
Statement of Negotiated Rates Version
18 to be effective 1/27/2024.
Filed Date: 1/26/24.
Accession Number: 20240126–5031.
Comment Date: 5 p.m. ET 2/7/24.
Docket Numbers: RP24–342–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2024–01–26 Negotiated Rate Agreement
Amendment to be effective 1/26/2024.
Filed Date: 1/26/24.
Accession Number: 20240126–5083.
Comment Date: 5 p.m. ET 2/7/24.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
6513
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: January 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–02031 Filed 1–31–24; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[CP24–37–000]
Columbia Gulf Transmission, LLC;
Notice of Application and Establishing
Intervention Deadline
Take notice that on January 16, 2024,
Columbia Gulf Transmission, LLC
(Columbia Gulf), 700 Louisiana Street,
Suite 1300, Houston, Texas, 77002–
2700, filed an application under section
7(b) of the Natural Gas Act (NGA), and
part 157 of the Commission’s
regulations requesting authorization for
its Amoco South Pecan Lake
Abandonment Project (Project). The
Project consists of the abandonment of
approximately 21 miles of obsolete
pipeline and related appurtenances,
located in Cameron Parish, Louisiana.
Columbia Gulf states that the Project
will eliminate the need for future
operating and maintenance
expenditures on outdated facilities that
are no longer needed to satisfy current
firm service obligations. Columbia Gulf
states that abandonment of these
facilities will not change the certificated
capacity of Columbia Gulf’s system and
will not result in the termination or
reduction of service to existing
customers of Columbia Gulf. Columbia
Gulf estimates the total cost of the
Project to be $16,600,000, all as more
fully set forth in the application which
E:\FR\FM\01FEN1.SGM
01FEN1
6514
Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
is on file with the Commission and open
for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
Public access to records formerly
available in the Commission’s physical
Public Reference Room, which was
located at the Commission’s
headquarters, 888 First Street NE,
Washington, DC 20426, are now
available via the Commission’s website.
For assistance, contact the Federal
Energy Regulatory Commission at
FercOnlineSupport@ferc.gov or call tollfree, (886) 208–3676 or TTY (202) 502–
8659.
Any questions regarding the proposed
project should be directed to David A.
Alonzo, Manager, Project
Authorizations, Columbia Gulf
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, by phone at (832) 320–
5477, or by email at david_alonzo@
tcenergy.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
17:12 Jan 31, 2024
Jkt 262001
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
February 16, 2024. How to file protests,
motions to intervene, and comments is
explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before February 16, 2024.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP24–37–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments or
protests electronically by using the
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
to the following address below. Your
written comments must reference the
Project docket number (CP24–37–000).
To file via USPS: Debbie-Anne Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne Reese, Acting Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
6 18
E:\FR\FM\01FEN1.SGM
CFR 385.102(d).
01FEN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is February 16,
2024. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP24–37–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP24–37–000.
To file via USPS: Debbie-Anne Reese,
Acting Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
To file via any other courier: DebbieAnne Reese, Acting Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: to David A. Alonzo,
Manager, Project Authorizations,
Columbia Gulf Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, or at david_alonzo@
tcenergy.com. Any subsequent
7 18
8 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
17:12 Jan 31, 2024
Jkt 262001
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5 p.m. Eastern
Time on February 16, 2024.
Dated: January 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024–02034 Filed 1–31–24; 8:45 am]
BILLING CODE 6717–01–P
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
11 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
6515
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–46–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on January 19, 2024,
ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205 and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA), and
ANR’s blanket certificate issued in
Docket No. CP82–480–000, for
authorization to abandon one natural
gas storage injection/withdrawal and the
associated pipeline and appurtenances
at its Lincoln-Freeman Storage Field.
All of the above facilities are located in
Clare County, Michigan (2024 Lincoln
Well Abandonment Project). The project
will allow ANR to abandon well Lincoln
61 that it has determined does not
provide significant value through its
poor flow performance, and to maintain
current integrity standards. The
estimated cost for the project is
$383,000.00, all as more fully set forth
in the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
Public access to records formerly
available in the Commission’s physical
Public Reference Room, which was
located at the Commission’s
headquarters, 888 First Street NE,
Washington, DC 20426, are now
available via the Commission’s website.
For assistance, contact the Federal
Energy Regulatory Commission at
FercOnlineSupport@ferc.gov or call tollfree, (866) 208–3676 or TTY (202) 502–
8659.
Any questions concerning this request
should be directed to David A. Alonzo,
Manager of Project Authorizations, ANR
Pipeline Company, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at (832) 320–5477, or
david_alonzo@tcenergy.com.
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 89, Number 22 (Thursday, February 1, 2024)]
[Notices]
[Pages 6513-6515]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-02034]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[CP24-37-000]
Columbia Gulf Transmission, LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on January 16, 2024, Columbia Gulf Transmission,
LLC (Columbia Gulf), 700 Louisiana Street, Suite 1300, Houston, Texas,
77002-2700, filed an application under section 7(b) of the Natural Gas
Act (NGA), and part 157 of the Commission's regulations requesting
authorization for its Amoco South Pecan Lake Abandonment Project
(Project). The Project consists of the abandonment of approximately 21
miles of obsolete pipeline and related appurtenances, located in
Cameron Parish, Louisiana. Columbia Gulf states that the Project will
eliminate the need for future operating and maintenance expenditures on
outdated facilities that are no longer needed to satisfy current firm
service obligations. Columbia Gulf states that abandonment of these
facilities will not change the certificated capacity of Columbia Gulf's
system and will not result in the termination or reduction of service
to existing customers of Columbia Gulf. Columbia Gulf estimates the
total cost of the Project to be $16,600,000, all as more fully set
forth in the application which
[[Page 6514]]
is on file with the Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. Public access
to records formerly available in the Commission's physical Public
Reference Room, which was located at the Commission's headquarters, 888
First Street NE, Washington, DC 20426, are now available via the
Commission's website. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
David A. Alonzo, Manager, Project Authorizations, Columbia Gulf
Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas
77002-2700, by phone at (832) 320-5477, or by email at
[email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
February 16, 2024. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before February 16, 2024.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP24-37-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number (CP24-37-000).
To file via USPS: Debbie-Anne Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
To file via any other courier: Debbie-Anne Reese, Acting Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and
[[Page 6515]]
Procedure \7\ and the regulations under the NGA \8\ by the intervention
deadline for the project, which is February 16, 2024. As described
further in Rule 214, your motion to intervene must state, to the extent
known, your position regarding the proceeding, as well as your interest
in the proceeding. For an individual, this could include your status as
a landowner, ratepayer, resident of an impacted community, or
recreationist. You do not need to have property directly impacted by
the project in order to intervene. For more information about motions
to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP24-37-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP24-37-
000.
To file via USPS: Debbie-Anne Reese, Acting Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
To file via any other courier: Debbie-Anne Reese, Acting Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: to David A. Alonzo, Manager, Project
Authorizations, Columbia Gulf Transmission, LLC, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002-2700, or at [email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online. Service can be via email with a link to the
document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5 p.m. Eastern Time on February 16, 2024.
Dated: January 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-02034 Filed 1-31-24; 8:45 am]
BILLING CODE 6717-01-P