Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices Procedure 7 and the regulations under the NGA 8 by the intervention deadline for the project, which is February 16, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP24–37–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP24–37–000. To file via USPS: Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other courier: DebbieAnne Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email at: to David A. Alonzo, Manager, Project Authorizations, Columbia Gulf Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, or at david_alonzo@ tcenergy.com. Any subsequent 7 18 8 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 17:12 Jan 31, 2024 Jkt 262001 submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5 p.m. Eastern Time on February 16, 2024. Dated: January 26, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–02034 Filed 1–31–24; 8:45 am] BILLING CODE 6717–01–P 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). 11 18 CFR 385.214(b)(3) and (d). PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 6515 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–46–000] ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on January 19, 2024, ANR Pipeline Company (ANR), 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA), and ANR’s blanket certificate issued in Docket No. CP82–480–000, for authorization to abandon one natural gas storage injection/withdrawal and the associated pipeline and appurtenances at its Lincoln-Freeman Storage Field. All of the above facilities are located in Clare County, Michigan (2024 Lincoln Well Abandonment Project). The project will allow ANR to abandon well Lincoln 61 that it has determined does not provide significant value through its poor flow performance, and to maintain current integrity standards. The estimated cost for the project is $383,000.00, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. Public access to records formerly available in the Commission’s physical Public Reference Room, which was located at the Commission’s headquarters, 888 First Street NE, Washington, DC 20426, are now available via the Commission’s website. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ferc.gov or call tollfree, (866) 208–3676 or TTY (202) 502– 8659. Any questions concerning this request should be directed to David A. Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, at (832) 320–5477, or david_alonzo@tcenergy.com. E:\FR\FM\01FEN1.SGM 01FEN1 6516 Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5 p.m. Eastern Time on March 26, 2024. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. ddrumheller on DSK120RN23PROD with NOTICES1 Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is March 26, 2024. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 2 Persons VerDate Sep<11>2014 17:12 Jan 31, 2024 Jkt 262001 subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is March 26, 2024. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before March 26, 2024. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP24–46–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the 4 18 5 18 PO 00000 CFR 385.214. CFR 157.10. Frm 00018 Fmt 4703 Sfmt 4703 Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP24–46– 000. To file via USPS: Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: DebbieAnne Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: David A. Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, or david_alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. E:\FR\FM\01FEN1.SGM 01FEN1 Federal Register / Vol. 89, No. 22 / Thursday, February 1, 2024 / Notices time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: January 26, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–02030 Filed 1–31–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1888–043] ddrumheller on DSK120RN23PROD with NOTICES1 York Haven Power Company, LLC; Notice of Intent To Prepare an Environmental Assessment On January 26, 2023, as supplemented on October 5 and 20, 2023, York Haven Power Company, LLC filed an application for a non-capacity amendment for the York Haven Hydroelectric Project No. 1888. The project is located on the Susquehanna River in Lancaster and York counties, Pennsylvania. The project does not occupy Federal lands. The licensee proposes to amend its license to allow for the construction and operation of an inland nature-like fishway versus the in-river nature-like fishway currently required by the license. Amending the license would allow the licensee to incorporate the amended terms of the project’s Settlement Agreement, which now requires an inland nature-like fishway. In addition, the licensee is proposing to amend Article 404 of its license to expand the window for tree clearing activities associated with construction of the fishway (August 16 to May 14, as opposed to November 15 to March 31 as currently stated in Article 404). A Notice of Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests was issued on April 13, 2023. No comments were received; however, one motion to intervene was filed by Constellation Energy Generation, LLC. This notice identifies Commission staff’s intention to prepare an environmental assessment (EA) for the proposed action. The planned schedule for the completion of the EA is May 2024.1 Revisions to the schedule may be made as appropriate. The EA will be 1 42 U.S.C. 4336a(g)(1)(B) requires lead Federal agencies to complete EAs within 1 year of the agency’s decision to prepare an EA. VerDate Sep<11>2014 17:12 Jan 31, 2024 Jkt 262001 issued and made available for review by all interested parties. All comments filed on the EA will be reviewed by staff and considered in the Commission’s final decision on the proceeding. With this notice, the Commission is inviting Federal, State, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues affected by the proposal to cooperate in the preparation of the EA planned to be issued May 2024. Agencies wishing to cooperate, or further discuss the benefits, responsibilities, and obligations of the cooperating agency role, should contact staff listed at the bottom of this notice by February 16, 2024. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of any environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members, and others to access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Any questions regarding this notice may be directed to Joy Kurtz at 202– 502–6760 or joy.kurtz@ferc.gov. Dated: January 26, 2024. Debbie-Anne Reese, Acting Secretary. [FR Doc. 2024–02028 Filed 1–31–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP24–38–000] MountainWest Pipeline, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on January 16, 2024, MountainWest Pipeline, LLC (MWP), 333 South State Street, Salt Lake City, Utah 84111, filed in the above referenced docket, a prior notice request pursuant to sections 157.205, 157.208(b), and 157.211 of the Commission’s regulations under the Natural Gas Act (NGA), and MWP’s PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 6517 blanket certificate issued in Docket No. CP82–491–000,1 for authorization for its Unita Basin Expansion Project in Duchesne and Uintah Counites, Utah. Specifically, MWP proposes to: (1) upgrade the Altamont and Bluebell Meter Stations (MS); (2) modify the Myton MS; (3) modify the Brundage Mountain MS; (4) modify the 40–47 Junction; (5) modify the Fidlar Compressor Station; and (6) pay Western Midstream to install one electric compressor unit within its Chipeta Processing Plant. The Project is fully subscribed and will provide an additional 113,300 dekatherms per day of year-round firm transportation capacity from existing receipt meter allocation points in the Uinta Basin. The estimated cost to construct the project is $11,100,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. Public access to records formerly available in the Commission’s physical Public Reference Room, which was located at the Commission’s headquarters, 888 First Street NE, Washington, DC 20426, are now available via the Commission’s website. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ferc.gov or call tollfree, (886) 208–3676 or TTY (202) 502– 8659. Any questions concerning this request should be directed to Greg Williams, Regulatory Analyst Lead, MountainWest Pipeline, LLC, 333 South State Street, Salt Lake City, Utah 84111, or call (801) 209–6764, or via email to greg.williams@williams.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5 p.m. 1 Mountain Fuel Resources, Inc., 20 FERC ¶ 62,580 (1982). E:\FR\FM\01FEN1.SGM 01FEN1

Agencies

[Federal Register Volume 89, Number 22 (Thursday, February 1, 2024)]
[Notices]
[Pages 6515-6517]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-02030]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP24-46-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on January 19, 2024, ANR Pipeline Company (ANR), 
700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, filed in 
the above referenced docket, a prior notice request pursuant to 
sections 157.205 and 157.216 of the Commission's regulations under the 
Natural Gas Act (NGA), and ANR's blanket certificate issued in Docket 
No. CP82-480-000, for authorization to abandon one natural gas storage 
injection/withdrawal and the associated pipeline and appurtenances at 
its Lincoln-Freeman Storage Field. All of the above facilities are 
located in Clare County, Michigan (2024 Lincoln Well Abandonment 
Project). The project will allow ANR to abandon well Lincoln 61 that it 
has determined does not provide significant value through its poor flow 
performance, and to maintain current integrity standards. The estimated 
cost for the project is $383,000.00, all as more fully set forth in the 
request which is on file with the Commission and open to public 
inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. Public access 
to records formerly available in the Commission's physical Public 
Reference Room, which was located at the Commission's headquarters, 888 
First Street NE, Washington, DC 20426, are now available via the 
Commission's website. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(866) 208-3676 or TTY (202) 502-8659.
    Any questions concerning this request should be directed to David 
A. Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700 
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at (832) 320-
5477, or [email protected].

[[Page 6516]]

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5 p.m. Eastern Time on March 26, 2024. How 
to file protests, motions to intervene, and comments is explained 
below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is March 26, 2024. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is March 26, 2024. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before March 26, 2024. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP24-46-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP24-46-000.
    To file via USPS: Debbie-Anne Reese, Acting Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    To file via any other method: Debbie-Anne Reese, Acting Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852.
    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: David A. 
Alonzo, Manager of Project Authorizations, ANR Pipeline Company, 700 
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, or 
[email protected]. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of

[[Page 6517]]

time you spend researching proceedings by automatically providing you 
with notification of these filings, document summaries, and direct 
links to the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: January 26, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-02030 Filed 1-31-24; 8:45 am]