Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping, 6138-6139 [2024-01834]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
6138
Federal Register / Vol. 89, No. 21 / Wednesday, January 31, 2024 / Notices
32. Notice of intent to audit PianoTrax
LLC for the period of January 1, 2021,
through December 31, 2023.
33. Notice of intent to audit Power
Music, Inc. for the period of January 1,
2021, through December 31, 2023.
34. Notice of intent to audit
PRIMEPHONIC B.V. for the period of
January 1, 2021, through December 31,
2023.
35. Notice of intent to audit Recisio
SAS for the period of January 1, 2021,
through December 31, 2023.
36. Notice of intent to audit Saavn
Media Limited for the period of January
1, 2021, through December 31, 2023.
37. Notice of intent to audit Securus
Technologies, LLC for the period of
January 1, 2021, through December 31,
2023.
38. Notice of intent to audit Slacker,
Inc. for the period of January 1, 2021,
through December 31, 2023.
39. Notice of intent to audit
Smithsonian Institution for the period of
January 1, 2021, through December 31,
2023.
40. Notice of intent to audit Sonos,
Inc. for the period of January 1, 2021,
through December 31, 2023.
41. Notice of intent to audit
SoundCloud Operations Inc. for the
period of January 1, 2021, through
December 31, 2023.
42. Notice of intent to audit Spotify
USA Inc. for the period of January 1,
2021, through December 31, 2023.
43. Notice of intent to audit TIDAL
Music AS for the period of January 1,
2021, through December 31, 2023.
44. Notice of intent to audit Transsnet
Music Limited for the period of January
1, 2021, through December 31, 2023.
45. Notice of intent to audit TRIBL,
LLC for the period of January 1, 2021,
through December 31, 2023.
46. Notice of intent to audit Ultimate
Guitar USA LLC for the period of
January 1, 2021, through December 31,
2023.
47. Notice of intent to audit Weav
Music, Inc. for the period of January 1,
2021, through December 31, 2023.
48. Notice of intent to audit XANDRIE
USA for the period of January 1, 2021,
through December 31, 2023.
49. Notice of intent to audit Yoto Ltd
for the period of January 1, 2021,
through December 31, 2023.
On January 25, 2024, the Office
received a notice of intent to conduct an
audit of the MLC from Caswell
Weinbren for the period of January 1,
2021, through December 31, 2023.
A copy of each notice will be made
available on the Office’s website at
https://copyright.gov/musicmodernization/audits/.
VerDate Sep<11>2014
17:00 Jan 30, 2024
Jkt 262001
Dated: January 25, 2024.
Suzanne V. Wilson,
General Counsel and Associate Register of
Copyrights.
[FR Doc. 2024–01878 Filed 1–30–24; 8:45 am]
BILLING CODE 1410–30–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–244, 50–454, 50–455, 50–
456, 50–457, 72–067, 72–068, and 72–073;
NRC–2024–0027]
Issuance of Multiple Exemptions
Regarding Security Notifications,
Reports, and Recording Keeping
Nuclear Regulatory
Commission.
ACTION: Exemptions; issuance.
AGENCY:
I. Introduction
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a single
notice to announce the issuance of three
exemptions in response to requests from
one licensee in response to a change to
NRC’s regulations published in the
Federal Register on March 14, 2023.
DATES: During the period from
December 1, 2023, to December 31,
2023, the NRC granted three exemptions
in response to requests submitted by
one licensee from October 13, 2023, to
December 7, 2023.
ADDRESSES: Please refer to Docket ID
NRC–2024–0027 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2024–0027. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the ‘‘For Further Information
Contact’’ section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, at
301–415–4737, or by email to
PDR.Resource@nrc.gov. For the
convenience of the reader, instructions
about obtaining materials referenced in
this document are provided in the
‘‘Availability of Documents’’ section.
SUMMARY:
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
• NRC’s PDR: The PDR, where you
may examine and order copies of
publicly available documents, is open
by appointment. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Ed
Miller, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2481, email:
Ed.Miller@nc.gov.
SUPPLEMENTARY INFORMATION:
During the period from December 1,
2023, to December 31, 2023, the NRC
granted three exemptions in response to
requests submitted by the licensee,
Constellation Energy Generation, LLC
(Constellation), from October 13, 2023,
to December 7, 2023. Constellation’s
requested exemptions pertaining to its
Byron Station, Units 1 and 2; R.E. Ginna
Nuclear Power Plant; and Braidwood
Station, Units 1 and 2. These
exemptions temporarily allow the
licensee to deviate from certain
requirements of part 73 of title 10 of the
Code of Federal Regulations (10 CFR),
‘‘Physical Protection of Plants and
Materials,’’ subpart T, ‘‘Security
Notifications, Reports, and
Recordkeeping.’’ In support of its
exemption requests, Constellation
agreed to effect site-specific
administrative controls that maintain
the approach to complying with 10 CFR
part 73 in effect prior to the NRC’s
issuance of a final rule, ‘‘Enhanced
Weapons, Firearms Background Checks,
and Security Event Notifications,’’
which was published in the Federal
Register on March 14, 2023, and became
effective on April 13, 2023 (88 FR
15864).
II. Availability of Documents
The tables in this notice provide
transparency regarding the number and
type of exemptions the NRC has issued
and provide the facility name, docket
number, document description,
document date, and ADAMS accession
number for each exemption issued.
Additional details on each exemption
issued, including the exemption request
submitted by the respective licensee and
the NRC’s decision, are provided in
each exemption approval listed in the
following tables. For additional
directions on accessing information in
ADAMS, see the ADDRESSES section of
this document.
E:\FR\FM\31JAN1.SGM
31JAN1
Federal Register / Vol. 89, No. 21 / Wednesday, January 31, 2024 / Notices
6139
BYRON STATION, UNITS 1 AND 2; DOCKET NOS. 50–454, 50–455, AND 72–068
ADAMS
accession No.
Document description
Byron Station, Units 1 and 2, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation.
Byron Station, Units 1 and 2—Supplemental Information Letter for Part 73
Exemption Request—Responses to Request for Confirmatory Information.
[External_Sender] Supplement—Byron Security Rule Exemption Request—
ISFSI Docket No. Reference (EPID L–2023–LLE–0027).
Byron Station, Units 1 and 2—Exemption from Select Requirements of 10
CFR part 73 (EPID L–2023–LLE–0027 [Security Notifications, Reports, and
Recordkeeping and Suspicious Activity Reporting]).
Document date
ML23286A036
October 13, 2023.
ML23317A102
November 10, 2023.
ML23317A201
November 22, 2023.
ML23320A176
December 13, 2023.
R.E. GINNA NUCLEAR POWER PLANT; DOCKET NOS. 50–244 AND 72–067
ADAMS
accession No.
Document description
R.E. Ginna Nuclear Power Plant—Request for Exemption from Enhanced
Weapons, Firearms Background Checks, and Security Event Notifications
Implementation.
R.E. Ginna Nuclear Power Plant—Supplemental Information Letter for part
73 Exemption Request—Responses to Request for Confirmatory Information and Request for Additional Information.
R.E. Ginna Nuclear Power Plant—Supplemental Response to part 73 Exemption Request—Withdrawal of Request for Exemption from 10 CFR 73,
subpart B, Preemption Authority Requirements.
R.E. Ginna Nuclear Power Plant—Exemption from Select Requirements of
10 CFR part 73 (EPID L–2023–LLE–0029 [Security Notifications, Reports,
and Recordkeeping and Suspicious Activity Reporting]).
Document date
ML23289A104
October 16, 2023.
ML23321A139
November 17, 2023.
ML23341A125
December 7, 2023.
ML23348A099
December 15, 2023.
BRAIDWOOD STATION, UNITS 1 AND 2; DOCKET NOS. 50–456, 50–457, AND 72–073
ADAMS
accession No.
Document description
Braidwood Station, Units 1 and 2—Request for Exemption from Enhanced
Weapons, Firearms Background Checks, and Security Event Notifications
Implementation.
Braidwood Station, Units 1 and 2—Supplemental Information Letter for part
73 Exemption Request—Responses to Request for Confirmatory Information.
Supplement—Braidwood Security Rule Exemption Request—ISFSI Docket
No. Reference (EPID L–2023–LLE–0030).
Braidwood Station, Units 1 and 2—Exemption from Select Requirements of
10 CFR part 73 (EPID L–2023–LLE–0030 [Security Notifications, Reports,
and Recordkeeping and Suspicious Activity Reporting]).
Dated: January 25, 2024.
For the Nuclear Regulatory Commission.
Jeffrey A. Whited,
Chief, Plant Licensing Branch 3, Division of
Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2024–01834 Filed 1–30–24; 8:45 am]
lotter on DSK11XQN23PROD with NOTICES1
ML23289A119
October 16, 2023.
ML23317A101
November 10, 2023.
ML23331A892
November 22, 2023.
ML23348A216
December 15, 2023.
OFFICE OF PERSONNEL
MANAGEMENT
Submission for Review: Questionnaire
for Public Trust Positions (SF 85P) and
Supplemental Questionnaire for
Selected Positions (SF 85P–S)
Office of Personnel
Management.
ACTION: 30-Day notice and request for
comments.
AGENCY:
BILLING CODE 7590–01–P
The Office of Personnel
Management (OPM), Suitability
Executive Agent Programs, is notifying
the general public and other Federal
agencies that OPM proposes to request
the Office of Management and Budget
(OMB) revise and renew the
SUMMARY:
VerDate Sep<11>2014
17:00 Jan 30, 2024
Jkt 262001
PO 00000
Frm 00052
Fmt 4703
Document date
Sfmt 4703
Questionnaire for Public Trust Positions
(SF 85P) and Supplemental
Questionnaire for Selected Positions (SF
85P–S).
DATES: Comments are encouraged and
will be accepted until March 1, 2024.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
FOR FURTHER INFORMATION CONTACT: A
copy of this information collection, with
applicable supporting documentation,
E:\FR\FM\31JAN1.SGM
31JAN1
Agencies
[Federal Register Volume 89, Number 21 (Wednesday, January 31, 2024)]
[Notices]
[Pages 6138-6139]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-01834]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-244, 50-454, 50-455, 50-456, 50-457, 72-067, 72-068,
and 72-073; NRC-2024-0027]
Issuance of Multiple Exemptions Regarding Security Notifications,
Reports, and Recording Keeping
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemptions; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a
single notice to announce the issuance of three exemptions in response
to requests from one licensee in response to a change to NRC's
regulations published in the Federal Register on March 14, 2023.
DATES: During the period from December 1, 2023, to December 31, 2023,
the NRC granted three exemptions in response to requests submitted by
one licensee from October 13, 2023, to December 7, 2023.
ADDRESSES: Please refer to Docket ID NRC-2024-0027 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2024-0027. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the ``For Further
Information Contact'' section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Ed Miller, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-2481, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Introduction
During the period from December 1, 2023, to December 31, 2023, the
NRC granted three exemptions in response to requests submitted by the
licensee, Constellation Energy Generation, LLC (Constellation), from
October 13, 2023, to December 7, 2023. Constellation's requested
exemptions pertaining to its Byron Station, Units 1 and 2; R.E. Ginna
Nuclear Power Plant; and Braidwood Station, Units 1 and 2. These
exemptions temporarily allow the licensee to deviate from certain
requirements of part 73 of title 10 of the Code of Federal Regulations
(10 CFR), ``Physical Protection of Plants and Materials,'' subpart T,
``Security Notifications, Reports, and Recordkeeping.'' In support of
its exemption requests, Constellation agreed to effect site-specific
administrative controls that maintain the approach to complying with 10
CFR part 73 in effect prior to the NRC's issuance of a final rule,
``Enhanced Weapons, Firearms Background Checks, and Security Event
Notifications,'' which was published in the Federal Register on March
14, 2023, and became effective on April 13, 2023 (88 FR 15864).
II. Availability of Documents
The tables in this notice provide transparency regarding the number
and type of exemptions the NRC has issued and provide the facility
name, docket number, document description, document date, and ADAMS
accession number for each exemption issued. Additional details on each
exemption issued, including the exemption request submitted by the
respective licensee and the NRC's decision, are provided in each
exemption approval listed in the following tables. For additional
directions on accessing information in ADAMS, see the ADDRESSES section
of this document.
[[Page 6139]]
Byron Station, Units 1 and 2; Docket Nos. 50-454, 50-455, and 72-068
------------------------------------------------------------------------
Document description ADAMS accession No. Document date
------------------------------------------------------------------------
Byron Station, Units 1 and 2, ML23286A036 October 13,
Request for Exemption from 2023.
Enhanced Weapons, Firearms
Background Checks, and
Security Event Notifications
Implementation.
Byron Station, Units 1 and 2-- ML23317A102 November 10,
Supplemental Information 2023.
Letter for Part 73 Exemption
Request--Responses to Request
for Confirmatory Information.
[External_Sender] Supplement-- ML23317A201 November 22,
Byron Security Rule Exemption 2023.
Request--ISFSI Docket No.
Reference (EPID L-2023-LLE-
0027).
Byron Station, Units 1 and 2-- ML23320A176 December 13,
Exemption from Select 2023.
Requirements of 10 CFR part
73 (EPID L-2023-LLE-0027
[Security Notifications,
Reports, and Recordkeeping
and Suspicious Activity
Reporting]).
------------------------------------------------------------------------
R.E. Ginna Nuclear Power Plant; Docket Nos. 50-244 and 72-067
------------------------------------------------------------------------
Document description ADAMS accession No. Document date
------------------------------------------------------------------------
R.E. Ginna Nuclear Power ML23289A104 October 16,
Plant--Request for Exemption 2023.
from Enhanced Weapons,
Firearms Background Checks,
and Security Event
Notifications Implementation.
R.E. Ginna Nuclear Power ML23321A139 November 17,
Plant--Supplemental 2023.
Information Letter for part
73 Exemption Request--
Responses to Request for
Confirmatory Information and
Request for Additional
Information.
R.E. Ginna Nuclear Power ML23341A125 December 7,
Plant--Supplemental Response 2023.
to part 73 Exemption Request--
Withdrawal of Request for
Exemption from 10 CFR 73,
subpart B, Preemption
Authority Requirements.
R.E. Ginna Nuclear Power ML23348A099 December 15,
Plant--Exemption from Select 2023.
Requirements of 10 CFR part
73 (EPID L-2023-LLE-0029
[Security Notifications,
Reports, and Recordkeeping
and Suspicious Activity
Reporting]).
------------------------------------------------------------------------
Braidwood Station, Units 1 and 2; Docket Nos. 50-456, 50-457, and 72-073
------------------------------------------------------------------------
Document description ADAMS accession No. Document date
------------------------------------------------------------------------
Braidwood Station, Units 1 and ML23289A119 October 16,
2--Request for Exemption from 2023.
Enhanced Weapons, Firearms
Background Checks, and
Security Event Notifications
Implementation.
Braidwood Station, Units 1 and ML23317A101 November 10,
2--Supplemental Information 2023.
Letter for part 73 Exemption
Request--Responses to Request
for Confirmatory Information.
Supplement--Braidwood Security ML23331A892 November 22,
Rule Exemption Request--ISFSI 2023.
Docket No. Reference (EPID L-
2023-LLE-0030).
Braidwood Station, Units 1 and ML23348A216 December 15,
2--Exemption from Select 2023.
Requirements of 10 CFR part
73 (EPID L-2023-LLE-0030
[Security Notifications,
Reports, and Recordkeeping
and Suspicious Activity
Reporting]).
------------------------------------------------------------------------
Dated: January 25, 2024.
For the Nuclear Regulatory Commission.
Jeffrey A. Whited,
Chief, Plant Licensing Branch 3, Division of Operating Reactor
Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2024-01834 Filed 1-30-24; 8:45 am]
BILLING CODE 7590-01-P