Download as PDF Federal Register / Vol. 89, No. 15 / Tuesday, January 23, 2024 / Notices Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. On June 7, 2023, the Commission issued a notice indicating that staff intended to prepare a draft and final Environmental Assessment (EA). However, upon further review, staff intends to prepare a single EA on the application to relicense the Meyers Falls Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. By this notice, Commission staff is updating the procedural schedule for completing the EA. The revised schedule is shown below. Further revisions to the schedule may be made as appropriate. Milestone Commission issues EA .... Comments on EA ............. Target date May 2024.1 June 2024. Any questions regarding this notice may be directed to Maryam Zavareh at (202) 502–8474 or maryam.zavareh@ ferc.gov. Dated: January 17, 2024. Debbie-Anne A. Reese, Acting Secretary. khammond on DSKJM1Z7X2PROD with NOTICES [FR Doc. 2024–01262 Filed 1–22–24; 8:45 am] BILLING CODE 6717–01–P 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) (2022) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. See National Environmental Policy Act, 42 U.S.C. 4321 et seq., as amended by section 107(g)(1)(B)(iii) of the Fiscal Responsibility Act of 2023, Public Law 118–5, 4336a, 137 Stat. 42. VerDate Sep<11>2014 17:41 Jan 22, 2024 Jkt 262001 license for the project or other disposition under the FPA, whichever comes first. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2391–000] PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation The license for the Warren Hydroelectric Project No. 2391 was issued for a period ending December 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2391 is issued to PE Hydro Generation, LLC for a period effective January 1, 2024, through December 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before December 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that PE Hydro Generation, LLC is authorized to continue operation of the Warren Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 4291 Dated: January 16, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–01142 Filed 1–22–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC24–41–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Application for Authorization Under Section 203 of the Federal Power Act of Tri-State Generation and Transmission Association, Inc. Filed Date: 1/16/24. Accession Number: 20240116–5302. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: EC24–42–000. Applicants: Hunterstown Gen Holdings, LLC, Kestrel Acquisition, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Hunterstown Gen Holdings, LLC, et al. Filed Date: 1/16/24. Accession Number: 20240116–5305. Comment Date: 5 p.m. ET 2/6/24. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–97–001. Applicants: Iris Solar, LLC. Description: Iris Solar, LLC submits Notice of Change in Facts of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 1/11/24. Accession Number: 20240111–5116. Comment Date: 5 p.m. ET 2/1/24. Docket Numbers: EG24–79–000. Applicants: Bristol BESS, LLC. Description: Bristol BESS, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 1/16/24. Accession Number: 20240116–5288. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: EG24–80–000. Applicants: Morgan Energy Center, LLC. Description: Morgan Energy Center, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. E:\FR\FM\23JAN1.SGM 23JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 4292 Federal Register / Vol. 89, No. 15 / Tuesday, January 23, 2024 / Notices Filed Date: 1/17/24. Accession Number: 20240117–5109. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: EG24–81–000. Applicants: Decatur Solar Energy Center, LLC. Description: Decatur Solar Energy Center, LLC submits Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 1/17/24. Accession Number: 20240117–5152. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: EG24–82–000. Applicants: Washington County Solar, LLC. Description: Washington County Solar, LLC submits Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 1/17/24. Accession Number: 20240117–5154. Comment Date: 5 p.m. ET 2/7/24. Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL24–55–000. Applicants: Brainerd Solar, LLC. Description: Petition for Declaratory Order of Brainerd Solar, LLC. Filed Date: 1/16/24. Accession Number: 20240116–5287. Comment Date: 5 p.m. ET 2/15/24. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1918–004. Applicants: Kestrel Acquisition, LLC. Description: Request for Waiver, Expedited Consideration and Informational Filing Regarding Upstream Change in Control of Kestrel Acquisition, LLC. Filed Date: 1/16/24. Accession Number: 20240116–5306. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: ER22–2360–001. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Compliance filing: Compliance Filing for Order No. 881 Managing Transmission Line Ratings to be effective 7/12/2025. Filed Date: 1/17/24. Accession Number: 20240117–5145. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER23–2171–002. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Tariff Amendment: Response to Deficiency Letter, Request for Shortened Comment Period to be effective 1/1/2024. Filed Date: 1/16/24. Accession Number: 20240116–5247. Comment Date: 5 p.m. ET 2/6/24. VerDate Sep<11>2014 17:41 Jan 22, 2024 Jkt 262001 Docket Numbers: ER24–483–001. Applicants: Duke Energy Florida, LLC. Description: Tariff Amendment: DEF– FMPA Amendment SA No. 148 to be effective 1/1/2024. Filed Date: 1/16/24. Accession Number: 20240116–5259. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: ER24–905–000. Applicants: Hopi Utilities Corporation. Description: Petition for Limited Waiver of Hopi Utilities Corporation. Filed Date: 1/12/24. Accession Number: 20240112–5201. Comment Date: 5 p.m. ET 1/24/24. Docket Numbers: ER24–918–000. Applicants: Bristol BESS, LLC. Description: Baseline eTariff Filing: Application for Market Based Rate Authority to be effective 3/16/2024. Filed Date: 1/16/24. Accession Number: 20240116–5246. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: ER24–919–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Filing of Gunnison Agreement to be effective 1/1/2024. Filed Date: 1/16/24. Accession Number: 20240116–5269. Comment Date: 5 p.m. ET 2/6/24. Docket Numbers: ER24–921–000. Applicants: ITC Midwest LLC. Description: § 205(d) Rate Filing: Filing of DTIA &#40;RS 232&#41;_JUA &#40;RS 233&#41;_Agency Agmt &#40;RS 234&#41 to be effective 3/18/ 2024. Filed Date: 1/17/24. Accession Number: 20240117–5033. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–922–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3158R1 Basin Electric and MidAmerican Energy Att AO Cancel to be effective 12/31/2023. Filed Date: 1/17/24. Accession Number: 20240117–5037. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–923–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3161R1 Basin Electric and MidAmerican Energy Att AO Cancel to be effective 12/31/2023. Filed Date: 1/17/24. Accession Number: 20240117–5043. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–924–000. Applicants: Arizona Public Service Company. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Description: § 205(d) Rate Filing: Service Agreement No. 416, West Camp Wind LGIA to be effective 12/18/2023. Filed Date: 1/17/24. Accession Number: 20240117–5050. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–925–000. Applicants: Wilderness Line Holdings, LLC. Description: Compliance filing: Order No. 881 Compliance Filing to be effective 7/12/2025. Filed Date: 1/17/24. Accession Number: 20240117–5075. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–926–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: FE PA submits one Construction Agreement, SA No. 6649 to be effective 3/18/2024. Filed Date: 1/17/24. Accession Number: 20240117–5098. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–927–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: FE PA submits one Construction Agreement, SA No. 6926 to be effective 3/18/2024. Filed Date: 1/17/24. Accession Number: 20240117–5099. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–928–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to 4 Service Agreements re: FirstEnergy Reorganization to be effective 1/1/2024. Filed Date: 1/17/24. Accession Number: 20240117–5112. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–929–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7155; Queue No. AE1–093 to be effective 12/18/2023. Filed Date: 1/17/24. Accession Number: 20240117–5155. Comment Date: 5 p.m. ET 2/7/24. Docket Numbers: ER24–930–000. Applicants: Algonquin Tinker Gen Co. Description: § 205(d) Rate Filing: Notice of Succession for MBR & Reactive Rate Tariffs to 2569848 Alberta ULC to be effective 12/28/2023. E:\FR\FM\23JAN1.SGM 23JAN1 Federal Register / Vol. 89, No. 15 / Tuesday, January 23, 2024 / Notices Filed Date: 1/17/24. Accession Number: 20240117–5159. Comment Date: 5 p.m. ET 2/7/24. khammond on DSKJM1Z7X2PROD with NOTICES Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF24–194–000; EL24–55–000. Applicants: Brainerd Solar, LLC, Brainerd Solar, LLC. Description: Refund Report of Brainerd Solar, LLC. Filed Date: 1/17/24. Accession Number: 20240117–5157. Comment Date: 5 p.m. ET 2/7/24. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: January 17, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–01267 Filed 1–22–24; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:41 Jan 22, 2024 Jkt 262001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2361–056] ALLETE, Inc.; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a subsequent license to continue to operate and maintain the Prairie River Hydroelectric Project (project). The project is located on the Prairie River in Itasca County, Minnesota. Commission staff has prepared an Environmental Assessment (EA) for the project. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the EA via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://ferconline.ferc.gov/FERCOnline. aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595, or OPP@ ferc.gov. Any comments should be filed within 45 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 4293 using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2361–056. For further information, contact Laura Washington at 202–502–6072 or laura.washington@ferc.gov. Dated: January 16, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–01144 Filed 1–22–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2425–000] PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation The license for the Luray and Newport Hydroelectric Project No. 2425 was issued for a period ending December 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms E:\FR\FM\23JAN1.SGM 23JAN1

Agencies

[Federal Register Volume 89, Number 15 (Tuesday, January 23, 2024)]
[Notices]
[Pages 4291-4293]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-01267]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC24-41-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Tri-State Generation and Transmission Association, 
Inc.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5302.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: EC24-42-000.
    Applicants: Hunterstown Gen Holdings, LLC, Kestrel Acquisition, 
LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Hunterstown Gen Holdings, LLC, et al.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5305.
    Comment Date: 5 p.m. ET 2/6/24.

    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG21-97-001.
    Applicants: Iris Solar, LLC.
    Description: Iris Solar, LLC submits Notice of Change in Facts of 
Self-Certification of Exempt Wholesale Generator Status.
    Filed Date: 1/11/24.
    Accession Number: 20240111-5116.
    Comment Date: 5 p.m. ET 2/1/24.

    Docket Numbers: EG24-79-000.
    Applicants: Bristol BESS, LLC.
    Description: Bristol BESS, LLC submits Notice of Self-Certification 
of Exempt Wholesale Generator Status.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5288.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: EG24-80-000.
    Applicants: Morgan Energy Center, LLC.
    Description: Morgan Energy Center, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.

[[Page 4292]]

    Filed Date: 1/17/24.
    Accession Number: 20240117-5109.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: EG24-81-000.
    Applicants: Decatur Solar Energy Center, LLC.
    Description: Decatur Solar Energy Center, LLC submits Notice of 
Self-Certification of Exempt Wholesale Generator Status.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5152.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: EG24-82-000.
    Applicants: Washington County Solar, LLC.
    Description: Washington County Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5154.
    Comment Date: 5 p.m. ET 2/7/24.

    Take notice that the Commission received the following Complaints 
and Compliance filings in EL Dockets:
    Docket Numbers:
    EL24-55-000.
    Applicants: Brainerd Solar, LLC.
    Description: Petition for Declaratory Order of Brainerd Solar, LLC.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5287.
    Comment Date: 5 p.m. ET 2/15/24.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER18-1918-004.
    Applicants: Kestrel Acquisition, LLC.
    Description: Request for Waiver, Expedited Consideration and 
Informational Filing Regarding Upstream Change in Control of Kestrel 
Acquisition, LLC.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5306.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: ER22-2360-001.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Compliance filing: Compliance Filing for Order No. 881 
Managing Transmission Line Ratings to be effective 7/12/2025.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5145.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER23-2171-002.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Tariff Amendment: Response to Deficiency Letter, 
Request for Shortened Comment Period to be effective 1/1/2024.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5247.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: ER24-483-001.
    Applicants: Duke Energy Florida, LLC.
    Description: Tariff Amendment: DEF-FMPA Amendment SA No. 148 to be 
effective 1/1/2024.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5259.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: ER24-905-000.
    Applicants: Hopi Utilities Corporation.
    Description: Petition for Limited Waiver of Hopi Utilities 
Corporation.
    Filed Date: 1/12/24.
    Accession Number: 20240112-5201.
    Comment Date: 5 p.m. ET 1/24/24.

    Docket Numbers: ER24-918-000.
    Applicants: Bristol BESS, LLC.
    Description: Baseline eTariff Filing: Application for Market Based 
Rate Authority to be effective 3/16/2024.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5246.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: ER24-919-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Filing of Gunnison Agreement 
to be effective 1/1/2024.
    Filed Date: 1/16/24.
    Accession Number: 20240116-5269.
    Comment Date: 5 p.m. ET 2/6/24.

    Docket Numbers: ER24-921-000.
    Applicants: ITC Midwest LLC.
    Description: Sec.  205(d) Rate Filing: Filing of DTIA (RS 
232)_JUA (RS 233)_Agency Agmt (RS 234) to be 
effective 3/18/2024.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5033.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-922-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3158R1 Basin Electric and 
MidAmerican Energy Att AO Cancel to be effective 12/31/2023.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5037.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-923-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3161R1 Basin Electric and 
MidAmerican Energy Att AO Cancel to be effective 12/31/2023.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5043.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-924-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 416, 
West Camp Wind LGIA to be effective 12/18/2023.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5050.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-925-000.
    Applicants: Wilderness Line Holdings, LLC.
    Description: Compliance filing: Order No. 881 Compliance Filing to 
be effective 7/12/2025.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5075.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-926-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: FE PA 
submits one Construction Agreement, SA No. 6649 to be effective 3/18/
2024.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5098.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-927-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: FE PA 
submits one Construction Agreement, SA No. 6926 to be effective 3/18/
2024.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5099.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-928-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to 4 Service 
Agreements re: FirstEnergy Reorganization to be effective 1/1/2024.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5112.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-929-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7155; Queue No. AE1-093 to be effective 12/18/2023.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5155.
    Comment Date: 5 p.m. ET 2/7/24.

    Docket Numbers: ER24-930-000.
    Applicants: Algonquin Tinker Gen Co.
    Description: Sec.  205(d) Rate Filing: Notice of Succession for MBR 
& Reactive Rate Tariffs to 2569848 Alberta ULC to be effective 12/28/
2023.

[[Page 4293]]

    Filed Date: 1/17/24.
    Accession Number: 20240117-5159.
    Comment Date: 5 p.m. ET 2/7/24.

    Take notice that the Commission received the following qualifying 
facility filings:
    Docket Numbers: QF24-194-000; EL24-55-000.
    Applicants: Brainerd Solar, LLC, Brainerd Solar, LLC.
    Description: Refund Report of Brainerd Solar, LLC.
    Filed Date: 1/17/24.
    Accession Number: 20240117-5157.
    Comment Date: 5 p.m. ET 2/7/24.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: January 17, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-01267 Filed 1-22-24; 8:45 am]
BILLING CODE 6717-01-P